  • 8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD

    1/27

    System Process DocumentViewing the Resource Workbench and Job

    Workbench for Scheduling

    Department

    Responsibility/Role

    File Name 27599115.doc

    Revision

    Document Generation Date 14/01/2010 14:04:00

    Date Modified 1/14/2010 02:04:00 PM

    Last Changed by

    Status

    Viewing the Resource Workbench and Job Workbench forScheduling

    Trigger:

    Concept

    The Job Workbench and Resource Workbench pages provide a visual display of work on the

    shop floor and enable you to schedule resources for your requirements. The Job Workbench

    provides a job oriented view, while the Resource Workbench displays a resource oriented view.

    These tools enable you to:

    Filter job and resource information View scheduling information on the Gantt chart

    Drag and drop to reschedule

    View tool tip and property windows

    In this topic, you will view the Job Workbench page and Resource Workbench page for

    resource scheduling information.

    Required Field(s) Comments

    Output - Result(s) Comments

    Additional Information

    Last changed on: 1/14/2010 02:04:00 PM Page 1

  • 8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD

    2/27

  • 8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD

    3/27

    System Process DocumentViewing the Resource Workbench and Job

    Workbench for Scheduling

    Step Action

    2. Click the Resource Workbench link.

    Last changed on: 1/14/2010 02:04:00 PM Page 3

  • 8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD

    4/27

    System Process DocumentViewing the Resource Workbench and JobWorkbench for Scheduling

    Step Action

    3. The Resource Workbench Startup page appears as it connects to the server.

    Step Action

    4. The Resource Workbench provides a visual display of work on the shop floor by

    each performing resource. This enables you to monitor resources, assign alternateresources, or change scheduling.

    Page 4 Last changed on: 1/14/2010 02:04:00 PM

  • 8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD

    5/27

    System Process DocumentViewing the Resource Workbench and Job

    Workbench for Scheduling

    Step Action

    5. Point to the Resource Bar tooltip.

    Last changed on: 1/14/2010 02:04:00 PM Page 5

  • 8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD

    6/27

    System Process DocumentViewing the Resource Workbench and JobWorkbench for Scheduling

    Step Action

    6. The Resource Tooltip page displays job related information for a resource. The

    page is displayed by rolling your cursor over a resource bar on the Gantt chart.

    Step Action

    7. Right-click the Resource Bar option.

    Page 6 Last changed on: 1/14/2010 02:04:00 PM

  • 8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD

    7/27

    System Process DocumentViewing the Resource Workbench and Job

    Workbench for Scheduling

    Step Action

    8. The drop down menu for the resource bar displays available functions andinformation pages to access.

    Click the Properties list item.

    Last changed on: 1/14/2010 02:04:00 PM Page 7

  • 8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD

    8/27

    System Process DocumentViewing the Resource Workbench and JobWorkbench for Scheduling

    Step Action

    9. The Resource Properties for Job Operation page has four tabbed regionsGeneral, Operation Quantities, Components, and Sales Order Lines. It displays job

    operation information associated with the resource.

    Page 8 Last changed on: 1/14/2010 02:04:00 PM

  • 8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD

    9/27

    System Process DocumentViewing the Resource Workbench and Job

    Workbench for Scheduling

    Step Action

    10. Click the Operation tab.

    Step Action11. You can view specific job information for this resource on each tab. The Operation

    tab displays quantities in each step.

    Click the Close option.

    Last changed on: 1/14/2010 02:04:00 PM Page 9

  • 8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD

    10/27

    System Process DocumentViewing the Resource Workbench and JobWorkbench for Scheduling

    Step Action

    12. Click the Preference button.

    Page 10 Last changed on: 1/14/2010 02:04:00 PM

  • 8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD

    11/27

    System Process DocumentViewing the Resource Workbench and Job

    Workbench for Scheduling

    Step Action

    13. Data display on the Resource Workbench page is controlled by preferences

    selected in the Preferencepage. You can select options for the tree display, bardisplay, and scheduling defaults.

    Step Action

    14. Click the Cancel button.

    Last changed on: 1/14/2010 02:04:00 PM Page 11

  • 8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD

    12/27

    System Process DocumentViewing the Resource Workbench and JobWorkbench for Scheduling

    Step Action

    15. Navigate to the Job Workbench page.

    Click the Job Workbench link.

    Page 12 Last changed on: 1/14/2010 02:04:00 PM

  • 8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD

    13/27

    System Process DocumentViewing the Resource Workbench and Job

    Workbench for Scheduling

    Step Action

    16. The Job Workbench Startup page appears as it connects to the server.

    Step Action

    17. The Job Workbench enables you to view and reschedule jobs and operations,providing a visual job oriented display of work on the shop floor. You can

    interactively reschedule jobs, operations, and resources. You can manually control

    the rescheduling or let the system automatically schedule.

    Last changed on: 1/14/2010 02:04:00 PM Page 13

  • 8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD

    14/27

    System Process DocumentViewing the Resource Workbench and JobWorkbench for Scheduling

    Step Action

    18. Click the Filter button.

    Page 14 Last changed on: 1/14/2010 02:04:00 PM

  • 8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD

    15/27

    System Process DocumentViewing the Resource Workbench and Job

    Workbench for Scheduling

    Step Action

    19. The Session Filter page enables you to display specific jobs in the tree hierarchy

    and Gantt Chart to meet your criteria.

    Step Action

    20. Click in the Department field.

    Last changed on: 1/14/2010 02:04:00 PM Page 15

  • 8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD

    16/27

    System Process DocumentViewing the Resource Workbench and JobWorkbench for Scheduling

    Step Action

    21. Enter the desired information into the Department field. Enter "ASSEMBLY".

    Page 16 Last changed on: 1/14/2010 02:04:00 PM

  • 8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD

    17/27

    System Process DocumentViewing the Resource Workbench and Job

    Workbench for Scheduling

    Step Action

    22. Click the Immediate Dispatch option.

    Step Action

    23. Click the OKbutton.

    Last changed on: 1/14/2010 02:04:00 PM Page 17

  • 8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD

    18/27

    System Process DocumentViewing the Resource Workbench and JobWorkbench for Scheduling

    Step Action

    24. Click the Preference button.

    Page 18 Last changed on: 1/14/2010 02:04:00 PM

  • 8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD

    19/27

    System Process DocumentViewing the Resource Workbench and Job

    Workbench for Scheduling

    Step Action

    25. Data display on the Job Workbench is controlled by preferences selected in the

    Preference page. You can select options for the tree display, bar display, andscheduling

    behavior.

    Step Action

    26. Click the Assembly list item.

    Last changed on: 1/14/2010 02:04:00 PM Page 19

  • 8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD

    20/27

    System Process DocumentViewing the Resource Workbench and JobWorkbench for Scheduling

    Step Action

    27. Click the Move button.

    Page 20 Last changed on: 1/14/2010 02:04:00 PM

  • 8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD

    21/27

    System Process DocumentViewing the Resource Workbench and Job

    Workbench for Scheduling

    Step Action

    28. Click the Scheduled Quantity list item.

    Step Action

    29. Click the Move button.

    Last changed on: 1/14/2010 02:04:00 PM Page 21

  • 8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD

    22/27

    System Process DocumentViewing the Resource Workbench and JobWorkbench for Scheduling

    Step Action

    30. Click the OKbutton.

    Page 22 Last changed on: 1/14/2010 02:04:00 PM

  • 8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD

    23/27

    System Process DocumentViewing the Resource Workbench and Job

    Workbench for Scheduling

    Step Action

    31. After saving your preference select scheduled quantity values appear in the tree.

    Step Action

    32. The Show/Hide Resource Load option is used to display or hide the Select

    Resources, and Resource Load Versus Capacity panes on the workbench.

    Click the Show/Hide Resource Load button.

    Last changed on: 1/14/2010 02:04:00 PM Page 23

  • 8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD

    24/27

    System Process DocumentViewing the Resource Workbench and JobWorkbench for Scheduling

    Step Action

    33. Click the Select Resources button.

    Page 24 Last changed on: 1/14/2010 02:04:00 PM

  • 8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD

    25/27

    System Process DocumentViewing the Resource Workbench and Job

    Workbench for Scheduling

    Step Action

    34. The Select Resources page is used to define the display on the Resource Load

    Versus Capacity pane. The first level nodes contain departments, with asecondary level of any resources that are owned or borrowed by that department.

    Step Action

    35. Click the Move All button.

    Last changed on: 1/14/2010 02:04:00 PM Page 25

  • 8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD

    26/27

    System Process DocumentViewing the Resource Workbench and JobWorkbench for Scheduling

    Step Action

    36. Click the OKbutton.

    Page 26 Last changed on: 1/14/2010 02:04:00 PM

  • 8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD

    27/27

    System Process DocumentViewing the Resource Workbench and Job

    Workbench for Scheduling

    Step Action

    37. The Resource Load Versus Capacity pane shows the load for each resource

    selected by your choice of a bar or table view graph.Resource load includes all shop floor demand, not just demand displayed on the

    workbench.

    Step Action

    38. You have completed the Viewing the Resource Workbench and Job Workbench

    for Scheduling procedure.

    End of Procedure.