LEGENDSTAGE 1: DOWNSTREAM STORMWATER
STAGE 2: FJ TAXIWAY STROMWATER
STAGE 3: COMPLETE STORMWATER IN GRASS
STAGE 4: STAND 31 CONCRETE
STAGE 5: STAND 31 / TAXIWAY EXTENSION CONCRETE
STAGE 6: STAND 32 CONCRETE
STAGE 7: STAND 32 / TAXIWAY EXTENSION CONCRETE
TAXIWAY CLEARANCE LINES
NOTES:1. DO NOT SCALE FROM THIS DRAWING.2. ALL DEMOLITION WORKS TO BE IN ACCORDANCE WITH THE
PROJECT METHOD OF WORKS PLAN AND TECHNICALSPECIFICATIONS.
ISSUE FOR CONSTRUCTION
N
FJ APRON
ATS
FJTAXIWAY
TAXIWAY ALPHA
STAND 32
STAND 31
JUHI
GATE 4
ATS
TAXIWAY ALPHA
FUEL PIPELINESTAGE B
FUEL PIPELINESTAGE A