FIBREFLOWTM MICRODUCT INSTALLATION GOTTHARD BASE TUNNEL, SWITZERLAND
Emtelle provided thousands of kilometres of its FibreFlow™ Microduct solution to one of the most impressive projects of this century: the transalpine Swiss Railway Gotthard Base Tunnel.
With the length of 57 km, the Gotthard Base Tunnel is the world’s longest tunnel and it is expected to
bring sweeping changes to European transport. Located in the heart of Europe, it will allow trains to
travel at speeds of up to 250 km per hour, shortening transalpine transportation and travelling time
between northern and southern parts of Europe tremendously.
The Gotthard Base Tunnel - with its two single-track tubes - is a tunnel of superlatives which is proven
by the benchmark data below:
• Construction time: over 20 years (1996 – 2017; general contractor: AlpTransit
Gotthard AG).
• Amount of excavated rock: 26,500,000 tons
• Tunnel Drill head diameter: 10 m
• Number of workers: over 2,500
• Total cost: 7.5 billion €
• High speed trains: 160 km per hour for freight trains, 250 km per hour for passenger
trains.
Emtelle provides numerous special products and solutions for this major project
It is more than obvious that an absolute reliable, stable and future-proof communication system is a
necessary precondition and a decisive factor for safety and security in the tunnel. This system has
been found in Emtelle’s FibreFlow™ solution, which is able to master the greatest challenges, and
offers decisive advantages over traditional cabling methods:
Planning reliability
Beyond the long construction time of 20 years including expected and
unexpected changes of fibre technologies and location points during
installation time. Easy add of additional requirements.
Development of unique customer-specific solutions
We developed a wide range of special products including low fire hazard
tube & distribution closures.
Long distance blown fibre
In order to reduce the splicing costs, we installed blown fibres over a
distance of more than 4km in one installation via a central blowing
technique.
Besides Emtelle’s unmatched commitment to drive product innovation according to the customer’s
needs, the General Contractor’s Alpiq Burkhalter Technik AG decision to install Emtelle FibreFlowTM
in the Gotthard Base Tunnel was based on our system’s advantages over competing solutions as
detailed below.
Time and Space Saving
• The final distribution is being quickly realised by fail-safe and fire-protected end-to-end fibre
connections.
• No time and labour-intensive splicing required for branching off the fibre optic cables.
• Space saving is phenomenal as with FibreFlowTM only 3 of the available total 12 infrastructure
tubes are needed for telecommunication; and in tunnels space is the most valuable asset.
Time saving
Our solution is simple and time saving, perfect for a complex data cabling
requirement – over 4000 individual data access points within the tunnel
fibre system.
Meeting exceptional demands
We needed to meet exception and unique demands – for instance the
installation of FibreFlowTM blown fibre in the 800 metre vertical shaft. Our
solution ensures no further access is needed to the shaft for future
modifications.
Optimised logistics
In such an ambitious project, special attention needed to be paid to the
logistics. Our FibreFlowTM solution allow the installation of the tracks
followed by the blowing of the FibreFlowTM blown fibre.
• Logistics is easy because the installation can be realised with few components in several
stages.
Flexible and Futureproof
• The solution allows for easy and flexible adaptation of changes in technology even beyond the
lifetime of the project.
• With FibreFlowTM the network can easily be upgraded and maintained at low costs and without
interruption of rail traffic.
Five years after the start of construction in 2010, the installation of communication cabling is now
successfully completed. Mr Reto Meyer, responsible product/project developer and project manager
on the part of the general contractor Alpiq Burkhalter Technik AG, Switzerland, expresses his
complete satisfaction with the Emtelle solution as follows:
In total Emtelle has contributed the following amounts of material to equip the two 57km long tunnel
tubes and 178 cross passages with passive network infrastructure:
• >7,000km tubes and tube bundles
• >120,000km optical fibre in the whole project
• >4,000 accessory items and data points
Please contact us any time for details regarding the Gotthard Base Tunnel project and general
questions about the Emtelle FibreFlowTM solution.
Emtelle Contact: Robert Deffa-Wilk, International Business Development, [email protected]
“Emtelle FibreFlow is a great solution allowing for an easy installation process in
this long-term project. It reduces a great amount of handling cost during this
time, makes many fibre splicing points redundant, and enables a simple and
smart end to end fibre solution. It is a joy to develop and design the best
products for this world wide unique project together with Emtelle.“
Reto Meyer, Product / Project Developer & Senior Manager ABAG
Emtelle UK Limited, Haughhead, Hawick TD9 8LF, Scotland
t 01450 364000 f 01450 364001 w www.emtelle.com e [email protected]