+ All Categories

Folio

Date post: 12-Mar-2016
Category:
Upload: gillian-hatch
View: 212 times
Download: 0 times
Share this document with a friend
Description:
I am an architecture graduate seeking employment having completed the Masters of Architecture in July, 2013.
Popular Tags:
21
Gillian Hatch Graduate of Architecture
Transcript
  • Gillian HatchGraduate of Architecture

  • DetailsArchitecture graduate seeking employment having completed the Masters of Architecture at RMIT.

    ObjectiveTo work in a large school architecture office whos design philosophies I feel passionate about.

    SkillsAutoCAD, ArchiCAD, Rhino, Adobe Suite, Microsoft Office, Model making, Hand drawing

    Education

    2013Masters of Architecture RMIT, Honours

    2011-2012Study Abroad, University of Innsbruck, Austria

    2010Bachelor of Architecture RMITWork Integrated Learning Program, RMIT Ho Chi Minh City

    Experience2010-PresentStudent Architect/Graduate Architect at MAKE architecture-Assisting in preparation of drawing sets from schematic design through to contract documentation, presentation layouts, administrative work, website, marketing

    CommunityRobin Boyd FoundationArchitects For PeaceOpen MelbourneRMIT

    Awards/Competitons/WorkshopsAudio Architecture Workshop 2012SAC Sustainability Competition 2011- WinnerLatrobe Valley Future Cities Competition 2012

  • A LITTLE BIT LEFT OVER

    Major Project 2013

    In the 1960s Geelong was the most industrialized city in Australia, today industries are closing and moving away from the city, leaving only the places that they inhabited as reminders. This project is about re-inhabiting, re-using and re-engaging with these industrial typologies- not dissimilar to OMAs masterplan for the Zeche Zollverein; this project is concerned with finding new meaning and purpose for infrastructure that has lost its relevance through disuse.

    The disused and partially demolished cement factory is located on Geelongs fringe and like similar abandoned industrial sites demolition and more housing was planned. Instead the large scale and single purpose industrial infrastructure is reinterpreted into a series of education, cultural and recreation facilities to support the urban landscape that borders the site. As the cement works are located between suburbias outer edge and the beginning of industrial land, the proposal is also about engaging with that peripheral threshold condition of a city and the odd adjacencies that come with this.

    Cedric Price argued for the making better rather than the overturning of existing social conditions. The conditions in this case would be the rapid growth of the city that has eaten into land once reserved for an industrial ring- creating a situation where the houses sit adjacent to the industrial site. This proximity and the unusual adjacencies that it creates are important and this proposal furthers this- facilitating closeness between residents and the processes that support a city.

    So, like Prices Fun Palace- the site becomes a collage of the machine, ruin, monument and play in the process of redefining the citys industrial heritage, making it relevant through an architecture that engages with issues of the ruin and the redundant.

    Above all, this proposal is about making the most of and valuing what is left over from a citys industrial past.

    a

    a

    b

    b

    c

    d

    e

    f

    g

    h

    i

    j

    Axonometric1:1000

  • Section d-d

    Section e-e

    Section c-c

    Section f-f

    Section g-g

    Section h-h

    Section i-i

    Section j-j

    Llamas Shearing shed

    Wool collection Wool processing/manufacture

    Vegetable crop Vegetable harvesting

    Transport Processing/sorting

    Market sales

    Sale in other places

    Artists/students Art Education Artist Studios

    Art Gallery

    Changerooms General public Swimming facilities

    Silos for scuba diving practice

    Making Sale

    Football oval Clubrooms Cricket Oval Cricket nets

    A series of the buildings are designed for education and research purposes, a collection of classrooms for art as well as research facilities. These spaces open and spill out into a communal space. The spaces are multi-functional- community based events can occur here.

  • Workshop spaces to expose visitors to the site to the processes of making.

    The workshop spaces look out onto the football field and form a grandstand.

    Market space

  • PRESHIL SCHOOL LIBRARY

    A masterplanning stratergy informed the location of the new library at the front of the existing Preshil Senior School.

    The choice of materials borrows from the brick dominated materiality of the surrounding buildings and the colour palette is taken from the trees on the site

  • SOCIAL and DESIGN ideas are achieved through careful consideration of site. This project began with a careful study of the positions, sizes and species of trees on the site. I looked at KEVIN BORLANDS school buildings on the junior school site that allow trees to grow around and through them. I was also lead by the Preshil philosophy of learning through play and this lead to a study of play- ALDO VAN EYKES series of play objects.

    A series of tree platforms encourage the students to DIRECTLY ENGAGE with the trees through play.

    Section

  • CASTLEMAINE HOUSING

    A small housing development in Castlemaine designed to respect and contribute to the existing community while making reference to the brick materiality of the historical civic buildings that surround it.

    Designed to be a model for medium density housing, it is tucked behind a brick screen that shifts and changes along the streetscape providing the residents with moments of interaction with and moments of protection from the street.

  • ROOF SPACEOFFICE COURTYARD

    FIRST FLOOROFFICE SPACE 2

    GROUND FLOOROFFICE SPACE 1

    SECOND FLOORUNIT 2

    FIRST FLOORUNIT 2

    GROUND FLOORGRANNY FLAT

    Apartment axonometric

  • OFF

    ICE

    SPAC

    E

    OFF

    ICE

    SPAC

    EO

    FFIC

    E SP

    ACE

    OFF

    ICE

    SPAC

    EO

    FFIC

    E SP

    ACE

    SOCI

    AL

    HO

    USI

    NG

    SOCI

    AL

    HO

    USI

    NG

    GRA

    NN

    Y FL

    ATG

    RAN

    NY

    FLAT

    APA

    RTM

    ENT

    APA

    RTM

    ENT

    OFF

    ICE

    SPAC

    E

    SOCI

    AL

    HO

    USI

    NG

    OFF

    ICE

    SPAC

    E

    APA

    RTM

    ENT

    APA

    RTM

    ENT

    APA

    RTM

    ENT

    APA

    RTM

    ENT

    Siteplan

  • 1_153 km to Aschau

    2_123 km to Aschau

    3_93 km to Aschau

    4_63 km to Aschau5_33 km to Aschau

    6_Aschau

    KEY

    Water

    Fields/Grass

    Forest/Trees

    Other

    1

    2

    3

    4

    5

    6

    100m

    MAPPING

    While studying in Austria I completed a series of maps exploring the relationship between the small Austrian ski town of Aschau and Munich.

    MU

    NIC

    HSt

    adze

    ntru

    m

    ASC

    HAU

    Zille

    rtal

    Val

    ley

    13.4

    kms/

    18m

    inut

    es

    20.4

    kms/

    23m

    inut

    es

    24.5

    kms/

    25m

    inut

    es

    25.8

    kms/

    26m

    inut

    es

    32.8

    kms/

    29m

    inut

    es33

    .2km

    s/29

    min

    utes

    36.1

    kms/

    31m

    inut

    es

    37km

    s/31

    min

    utes

    39.5

    kms/

    32m

    inut

    es

    42.9

    kms/

    34m

    inut

    es

    50.6

    kms/

    38m

    inut

    es

    53.3

    kms/

    39m

    inut

    es 62.

    3km

    s/44

    min

    utes

    70.7

    kms/

    48m

    inut

    es

    72.5

    kms/

    49m

    inut

    es

    86.7

    kms/

    56m

    inut

    es87

    .7km

    s/57

    min

    utes

    94.1

    kms/

    1hou

    r 0m

    inut

    es

    99.3

    kms/

    1hou

    r 3m

    inut

    es

    102k

    ms/

    1hou

    r 5m

    inut

    es

    110k

    ms/

    1hou

    r 9m

    inut

    es

    112k

    ms/

    1hou

    r 10m

    inut

    es11

    6km

    s/1h

    our 1

    2min

    utes

    119k

    ms/

    1hou

    r 13m

    inut

    es

    123k

    ms/

    1hou

    r 15m

    inut

    es

    128k

    ms/

    1hou

    r 18m

    inut

    es

    153k

    ms/

    1hou

    r 40m

    inut

    es

    0km

    s/0m

    inut

    es

    18.1

    kms/

    22m

    inut

    es

    20.5

    kms/

    23m

    inut

    es

    24.7

    kms/

    26m

    inut

    es

    35.9

    kms/

    31m

    inut

    es

    25.8

    kms/

    28m

    inut

    es

    38.0

    kms/

    32m

    inut

    es39

    .5km

    s/32

    min

    utes

    41.8

    kms/

    34m

    inut

    es44

    .1km

    s/35

    min

    utes

    48.8

    kms/

    37m

    inut

    es50

    .3km

    s/38

    min

    utes

    67.2

    kms/

    46m

    inut

    es

    70.1

    kms/

    48m

    inut

    es

    72.5

    kms/

    49m

    inut

    es73

    .4km

    s/50

    min

    utes

    74.7

    kms/

    51m

    inut

    es

    78.2

    kms/

    52m

    inut

    es78

    .5km

    s/52

    min

    utes

    82.2

    kms/

    54m

    inut

    es82

    .7km

    s/54

    min

    utes

    84.4

    kms/

    55m

    inut

    es

    86.9

    kms/

    57m

    inut

    es87

    .4km

    s/57

    min

    utes

    92.4

    kms/

    59m

    inut

    es

    95.0

    kms/

    1hou

    r 1m

    inut

    e

    97.1

    kms/

    1hou

    r 2m

    inut

    es

    106k

    ms/

    1hou

    r 7m

    inut

    es

    117k

    ms/

    1hou

    r 12m

    inut

    es11

    8km

    s/1h

    our 1

    3min

    utes

    119k

    ms/

    1hou

    r 13m

    inut

    es

    123k

    ms/

    1hou

    r 15m

    inut

    es

    124k

    ms/

    1hou

    r 16m

    inut

    es

    134k

    ms/

    1hou

    r 22m

    inut

    es13

    5km

    s/1h

    our 2

    2min

    utes

    140k

    ms/

    1hou

    r 27m

    inut

    es

    136k

    ms/

    1hou

    r 24m

    inut

    es

    138k

    ms/

    1hou

    r 25m

    inut

    es

    139k

    ms/

    1hou

    r 26m

    inut

    es

    141k

    ms/

    1hou

    r 28m

    inut

    es

    146k

    ms/

    1hou

    r 32m

    inut

    es

    KEYCitiesFarming/Agriculture AreasForestMountainsVillages

  • 1_153 km to Aschau

    2_123 km to Aschau

    3_93 km to Aschau

    4_63 km to Aschau5_33 km to Aschau

    6_Aschau

    KEY

    Water

    Fields/Grass

    Forest/Trees

    Other

    1

    2

    3

    4

    5

    6

    100m

  • TREN

    ERRY

    CRE

    SCEN

    T

    TURN

    ER S

    T

    LANE

    WAY

    0 10m1:200GROUND FLOOR PLAN

    TREN

    ERRY

    CRE

    SCEN

    T

    TURN

    ER S

    T

    LANE

    WAY

    0 10m1:200GROUND FLOOR PLAN

    MAKE ARCHITECTURE

    As a student architect and now as a graduate I have been involved in a variety of projects at MAKE architecture.

    I was involved in the Design, Town Planning and Contract Documentation of the House Reduction project (pictured) and was also responsible for the preparation of the presentation drawings.

    The project received the HOUSES Sustainability Award and the BPN Sustainability Award in 2012.

    Photographs: Peter Bennetts

  • 0 2m1:50SECTION

    TREN

    ERRY

    CRE

    SCEN

    T

    TURN

    ER S

    T

    LANE

    WAY

    0 10m1:200GROUND FLOOR PLAN


Recommended