+ All Categories
Home > Documents > Form 7 Final

Form 7 Final

Date post: 14-Apr-2018
Category:
Upload: michelle-kay-mangubat-bendana
View: 222 times
Download: 0 times
Share this document with a friend

of 5

Transcript
  • 7/30/2019 Form 7 Final

    1/5

    BE Form 07

    BRIGADA ESKWELASCHOOL ACCOMPLISHMENT REPORT

    (To be accomplished by the School Head)

    DIVISION: Batangas REGION: IV-A CALABARZON

    SCHOOL: San Luis Central School SCHOOL I.D. 107653

    School Address: Poblacion, San Luis, Batangas

    (Please check appropriate box)

    Level:

    ( / ) Elementary

    ( ) High School

    Type of School:

    ( / ) Central School

    ( ) Non- Central School (complete)

    ( ) Multigrade

    ( ) Primary School/ Incomplete

    ( ) Integrated

    SCHOOL HEAD: Mrs. ROMANA M. HERNANDEZ CONTACT NUMBER:

    PTA PRESIDENT: Jeceilyn D. Mercado CONTACT NUMBER:

    A. SCOPE OF REPAIR AND MAINTENACE WORK COMPLETED ( Please check appropriate column)What was done?

    Repaired Repainted Replaced Others (Brief Description)

    Roofs/gutters / /

    Ceilings / / /

    Walls / /

    Blackboards / /

    Chairs, desk, tables / /

    Water facilities /

    Signages Set-up

    School Garden Cleaned/trimmed

    Lightning Set-up

    Windows / /

    Doors /

    Comfort Rooms /School Grounds Cleaned

    School Canteen/ clinic /

    School Fence /

    B. DONATIONS/ MATERIAL RESOURCES GENERATED (Use separate sheets, if needed)Type of Donations Source Estimated Cost

    Water Tank Donations 10,000.00

    Computer Table Donations 2,150.00Bookshelves Donations 1,300.00

    Printers Donations/ Solicitations 15,000.00

    Bookshelves Donations 1,300.00

    Electric Fan Mrs. Mary Joan M. De Castro 900.00

    Electric Fan Ms. Kristine RJ M. De Claro 900.00

    Electric Fan Ms. Shiela Marie Marco 900.00

    Electric Fan Mr. Jeffrey Almoros 900.00

  • 7/30/2019 Form 7 Final

    2/5

    Thermos Donations 1,200.00

    Samsung Es80 Donations 3,800.00

    School Supplies LSB/PSB 45,000.00Curtain for E-Learning room Retired Teachers of SLCS 10,000.00

    SBM Cabinet Donations 6,000.00

    TV Rack Donations 1,000.00

    Trash can Donations 780.00

    PVC for toilet repair Donations 200.00

    Florescent bulb Donations 90.00

    Wall fan Donations 1700.00

    Stand fan Donations 1,000.00

    TV Set Donations 4,000.00

    TV Set Donations 4,000.00

    E-learning Package DepEd Central 169,000.00Computer units PSB 174,974.99

    Projector and laptop PSB 60,000.00

    School Supplies LSB/PSB 45,000.00

    Construction of E-Learning Tables Retired Teachers of SLCS 10,000.00

    Landscaping in front of Recto Building Donations 50,000.00

    Extension of Dist. Office PTA Donations/Solicitations 145,000.00

    Construction of Ballusters at the District Office Donations/Solicitations 10,000.00

    Construction of Kiosk Donations/Solicitations 25,000.00

    Security Grills LSB 45,000.00

    Replacement of EMIS Door Donations 2000.00

    Repair of BLSB with 6 classrooms DepEd Central Office 1,000,000.00

    Repainting of kinder room Donations 10,000.00

    Repair of Centennial Room LSB 135,000.00

    Curtain for Library and Guidance Room Retired Teachers of SLCS 8,000.00

    Paint- QDE Ms. Nina Irene Reyes 540.00

    Paint-nalcrete Ms. Janice Anoyo 500.00

    Paint-nalcrete Ms. Shane Belino 500.00

    Paint Brush Mr. Romeo Bendana 75.00

    Roller Brush Mr. Romeo Bendana 150.00

    Paint Thinner Mr. Romeo Bendana 120.00

    Pain- QDE Mr. Romeo Bendana 1620.00

    White nalcrete-gloss Gloss White CCF 6,642.00

    White QDE-Gloss CCF 6,963.00Raw sienna-acrylic CCF 645.00

    Thalo green- tintin Color CCF 1,350.00

    Hanza yellow- tinting color CCF 1,350.00

    Thinner CCF 420.00

    Roof Guard paint PSB 5500.00

    Paint Materials for tables and chairs Donations 14,000.00

    Roof guard-paint LSB 21,000.00

    Materials for Construction PSB 48,360.00

    Paint-Baguio Green Grade Five Parents 2260.00

    Paint Brush Grade Five Parents 400.00

    Paint-QDE Grade Six Parents 8320.00

    Vulcaseal Grade Six Parents 370.00Floorwax Grade Six Parents 310.00

    Paint-Wall Grade One Parents 1500.00

    Paint-QDE Grade One Parents 1140.00

    Paint-Baguio Gree Parents of Grade 2 2,300.00

    Raw Sienna Grade 2 Parents 500.00

    Gutter Grade 3 Parents 2400.00

  • 7/30/2019 Form 7 Final

    3/5

    Nipple Grade 3 Parents 1250.00

    Gutter Grade 4 parents 2520.00

    Broom Sir Dan MAligaya 100.00Broom De Claros Construction 100.00

    Broomsticks Demors Store 500.00

    Broomsticks Hon. Amando Onda 500.00

    Brush for cleaning ballusters Concern Citizen (B.Tubig) 500.00

    Dustpan Grade 1 parents 500.00

    Broom Grade 1 parents 500.00

    Trash Cans Grade 1 parents 500.00

    Floorwax Grade Six Parents 310.00

    Floorwax Grade One Parents 610.00

    Fita Biscuits Leo and Gie Sari-Sari Store 200.00

    Bread Pharmatech c/o Ludimeer Masangkay 500.00

    Tetra Pack Juices Pulido Aparels 554.00

    Tetra Pack Juices Abaksa 554.00

    Rice MoyMoy Store 1,000.00

    Pork Golden Harvest 1050.00

    Coke Carlo Store 240.00

    Drinking Glass OK Ka Bakery 200

    Drinking Glass Mrs. Edeliza Atienza 200

    Tang Tetra Pack Grade One Parents 270.00

    Bread Kinder parents 2600.00

    Rice Kinder Parents 1,800.00

    Bread Masangkay Bakery 200.00

    Nestea Tetra Pack Waylie Nina De Claro 100.00Pansit Magnaye Store 500.00

    Spaghetti Balite Eatery 500.00

    Total 2,148,687.99

    E. SIGNIFICANT EVENTS / EXPERIENCES

    What happened? Who were involved? When

    What is/are important contribution to the

    operation of the school or to the existing

    needs of the school?

    D. ESTIMATED COST OF VOLUNTEER SERVICES RENDERED

    Type of S41.4ervice Total Number of

    Volunteers

    Total Number of

    Hours Rendered

    Total Estimated Cost

    Carpentry 57 317.5 15,875.00

    Plumbing 1 8 350.00

    Landscaping/Gardening/ Trimming 20 155 4843.75

    Painting 35 151 7550.00

    Cleaning/ Sweeping 1139 5049.5 157,796.88

    TOTAL AMOUNT OF VOLUNTEER

    SERVICES 1252 4942.5

    186,415.63

  • 7/30/2019 Form 7 Final

    4/5

    Six classrooms has been

    repaired.

    Schoolhead, Division

    Office Personnel,Teachers

    January 2012

    Firewalls were changed into stone,

    classrooms were repainted. Colored roofing

    was placed and ceilings were replaced and

    repainted.

    Donations in kind were

    received by the school for the

    Brigada. These include snacks

    and food for lunch. Paint

    materials, cleaning materials

    and materials for repair were

    also given.

    School head, CCF,

    LGU, Teachers,

    Parents, Pupils,

    Private Inividuals,

    Alumn, NGOs, Brgy.

    Officials and Private

    Companies

    May 21, 2012

    Problem on what to offer the volunteers in

    term of snacks and lunch was resolved.

    Painting was done as well as cleaning and

    repair because of the donated materials.

    Repainting of roofs Private Individuals May 21-26, 2012Lifespan of roofs are extended and make it

    free from rusts.

    Cleaning and repainting

    of walls, concrete balusters and

    flower boxes.

    SK Officials, PTA,

    Parents, 4Ps, CCF

    and GK

    May 21-26, 2012

    Pupils become more attracted to their school

    making them more eager to go to school.It

    makes the school more beautiful

    Repainting of desks,tables and

    armchairs.

    Private Individuals May 21-26, 2012This makes classroom more conducive to

    learning.

    Cleaning and repaintingof

    classrooms and other ancillary

    rooms

    ALS, PTA, Parents,

    BHW, PupilsMay 21-26, 2012

    Classrooms are more conducive to learning.

    Ancillary rooms are made more functional.

    Repair/Replacement/painting

    of some parts of ceiling.

    Tricycle Drivers

    Association, Parents.

    PTA

    May 21-26, 2012 Classroom becomes more beautiful.

    Cutting trees and trimming of

    hedges and grasses

    ParentsMay 21, 2012

    It lessens the leaves falling and prevents

    accidents to happen due to falling twigs and

    branches.

    Replacement of water tank Parent May 25, 2012

    It conserves water and energy. Less

    consumption on electric bill since the school

    owns its own water system.

    Repair of leaking faucets Parent May 25, 2012

    It conserves water and energy. Less

    consumption on electric bill since the school

    owns its own water system.

  • 7/30/2019 Form 7 Final

    5/5

    Cleaning/repair of comfort

    room

    Parents, teachers,

    Pupils May 21-23, 2012 It makes comfort rooms more presentable

    Repair of school canteen Parents May 21-26, 2012 Canteen becomes more functional.

    Masonry work/putting up

    balusters at thedistrictofficeParents/PTA May 21-26, 2012 It makes the District Office more presentable.

    Repainting of school fence Barangay Police May 23-24, 2012It makes the school more livelier and

    beautiful.

    Rehabilitation of vegetableand

    Math garden

    Parents, Alumni and

    PTAMay 21, 2012

    Vegetable Garden is more productive.

    Academic Gardens become more functional

    and remind the pupils on lessons taught

    inside the room.

    E. ISSUES AND CONCERNS (Describe briefly problems encountered and how resolved)

    It was a successful Brigada Eskwela as there were a lot of volunteers that have shown their cooperation and support

    with the schools aim of having a prepared school for the opening of classes. However, there was a problem on food distribution

    for the volunteers for the first day since unexpected number of volunteers came however it was resolved on the second day

    when the teacher assigned on each group of people coming to help was recorded and reported to the Food and Refreshment

    Committee.

    F LESSONS LEARNED / BEST PRACTICES

    Unity is a key for an entity to succeed in any endeavour that they are into. With the help of the stakeholders and the

    community as well the school was able to bring up their goal of having the school repainted.

    G. EVIDENCES / ATTACHMENTS

    a. Photos (before, during, after)b. Photocopy of all completed BE Forms (check if attach)

    ___/___ Form 01 ____/___ Form 05

    ___/___ Form 02 ____/___ Form 06

    ___/___ Form 03

    ___/___ Form 04

    Prepared by:

    ROMANA M. HERNANDEZ

    Principal II

    Name and Designation

    Date:

    May 30,2012


Recommended