US 95, Northern Idaho
FY2021 to FY2027 Draft for Public Comment - July 2020
Idaho Transportation Department Investment Program
TABLE OF CONTENTS
Background Information and How to Submit Comments The Idaho Transportation Investment Program (ITIP) . . . . . . . . . . . . . . . . . . . . . . . . . . 1
How to Submit Comments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
ITIP Development Calendar . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
ITIP Development Participants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Project Selection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Program Priorities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
STIP Format. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Air Quality and Conformity ................................................ 4
Federal Funding, FAST Act ................................................ 4
Funding Assumptions/Forecasts ........................................... 4
References to MPO Transportation Improvement Programs . . . . . . . . . . . . . . . . . . . . 5
Draft Program and Project List Idaho Transportation Investment Program, FY21 to FY27 . . . . . . . . . . . . . . . . . . . . . . . 7
Grouped Project FHWA Control Totals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Program Name Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Fund Source Abbreviations ............................................... 10
District 1 Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
District 2 Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
District 3 Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
District 4 Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54
District 5 Projects ....................................................... 71
District 6 Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82
Statewide Projects ..... . . . .. . . . . ..................................... 96
Indian Reservation Roads Program ....................................... 108
The Idaho Transportation Investment ProgramThe Idaho Transportation Investment Program (ITIP)is a multi-modal program that includes highways, bridges, public transportation, railroads, aviation, and non-motorized transportation. Idaho’s state and local transportation systems are a network of cross-jurisdictional routes that require cooperation, coordination, and continuous planning to operate, maintain, and improve.
The Idaho Transportation Department is providing this draft of the FY21 to FY27 ITIP to allow transportation agencies and the public to review and provide comments on the program.
The ITIP’s federal document format meets the requirements of the Fixing America’s Surface Transportation Act (FAST), the law that provides federal funding for transportation projects to move people and freight. In compliance with the FAST Act,this draft ITIP is fiscally constrained and includes at least four years of projects in compliance with 23CFR 450.218.
How to Submit CommentsTo submit comments on the ITIP, please use one of the following methods:
• On Line: Click on the map on the right side of thedraft program web page. The following page willhave a "Submit Comments" button at its upper left.itd.idaho.gov/funding/?target=draft-itip
• Mail: Idaho Transportation Department ITIP CommentsAttention Aubrie SpenceOffice of CommunicationsP.O. Box 7129 Boise, ID 83707-1129
If you have questions regarding this document, please contact Aubrie Spence via email at [email protected] or call (208) 334-8119.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 1
ITIP Development Participants The Idaho Transportation Department (ITD) refines federal and state funding estimates in January, based on the annual revenue forecast published in August. In January, ITD also provides the funding estimates to metropolitan planning organizations, the Local Highway Technical Assistance Council (LHTAC), and ITD’s six district offices.
In June, ITD submits a draft ITIP, including all state and local projects, to the Idaho Transportation Board for review.
In July, ITD provides the draft ITIP to state and local agencies, transportation stakeholders, and the public for comment. The department takes these comments into consideration as it finalizes the ITIP in August. The Idaho Transportation Board approves the final ITIP in September.
In November, ITD submits the ITIP Federal Approval Document to the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) for approval as Idaho’s FY2021-FY2027 Statewide Transportation Improvement Program or STIP.
The STIP includes references to the Transportation Improvement Programs for Idaho’s five metropolitan planning areas rather than duplicating those projects in the STIP.
Construction on new ITIP projects can begin following FHWA approval. The Environmental Protection Agency has a 30-day review and comment period that typically is concurrent with the FHWA and FTA review.
Project SelectionITD uses road and bridge management systems to select projects that:
• Optimize current and projected funding levels
• Support federally funded local transportationagency plans and programs
• Address system priorities
• Achieve system-performance goals
Teams of experienced engineers and planners assist in the project-selection process by:
• Analyzing road and bridge data provided bymanagement systems
• Determining specific program objectives
• Establishing engineering requirements forprojects that achieve objectives
• Making recommendations to management onfunding levels required to meet objectives
• Balancing program budgets with available revenue
Program PrioritiesThe ITIP’s priorities support the safety, mobility, and economic opportunity goals identified in the department’s strategic plan. The department:
• Is committed to providing facilities that enablethe safe movement of people and goods. Safetyis considered in all transportation activities,investments, and decision-making processes.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 2
• Promotes accessible, affordable, and convenienttransportation choices for the movement ofpeople and goods.
• Strives to keep the transportation infrastructurein good repair and ensure uninterrupted service.
• Applies resources to maintain, improve, andexpand routes and services that contribute to thestate’s economic vitality.
• Uses integrated management systems to ensuretransportation investments align with Idaho'stransportation vision.
ITD strategically targets investments that improve safety, enhance mobility, and provide economic opportunity. Idaho’s Safety & Capacity Program contains these projects. They are funded with federal Highway Safety Improvement Program funds. They are funded by the federal Highway Safety Improvement Program, National Highway Performance Program, the Transportation Expansion and Congestion Mitigation Program, and state funds.
In March 2017, the Idaho Transportation Board reviewed scenarios for pavement and bridge condition with various funding levels based on their impact on the percent of pavement and bridges that are in good or fair condition.
After reviewing the trade-offs between these funding levels and their effect on performance measures, the board approved for FY22 forward a funding increase for safety and capacity (safety, mobility, and economic opportunity) to $80 million annually, reduced pavement funding to $103 million, and reduced bridge funding to $80 million annually.
STIP FormatThe department, the FHWA, and Idaho's metropolitan planning organizations have agreed on the following improvements to make the STIP approval process more efficient. These improvements are authorized by 23 CFR450.218, Planning Assistance Standards.
• Routine highway projects are grouped by the yearof expenditure and by important types orgeographic areas to highlight investment priorities.The grouped investment totals also serve as thebasis for federal approval of the STIP, allowingthe federal funding of future projects eligible forthe investment groups.
• For a complete list of projects including groupedand MPO projects (includes projects sorted invarious ways for customer use), see the draft ITIPweb page at the location below:itd.idaho.gov/funding/?target=draft-itip
• Highway projects are listed individually only ifthey meet one or more of the following criteria:
- The project requires special reporting due tothe funding source.
- The project requires an environmentalclearance more in-depth than the minimalcategorical exclusion, such as projects withright-of-way needs.
- The project may impact air quality and requiresadditional analysis within certain metropolitanplanning areas.
- The department or an MPO believes the projectwarrants individual attention by local officialsand stakeholders.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 3
• Because investment groups have not yet beenestablished for public transportation andaeronautics projects, they are listed individually.
Air Quality and ConformityThe Clean Air Act of 1990 (42 U.S.C. 7506(c))requires that all federally funded plans, programs, and projects in non-attainment or maintenance areas conform to the Plan for the Control of Air Pollution in the State of Idaho, commonly known as the State Implementation Plan (SIP) for air quality.
Before receiving Idaho Transportation Board approval, the department works with metropolitan planning organizations (MPOs) to demonstrate air quality conformity in the areas of the state that may have air quality concerns. The MPOs in those areas have
regional long-range transportation plans that take into consideration air quality conformity issues by creating plans focusing on various transportation corridors, pathways, public transportation systems, and transportation system management elements.
Federal Funding, FAST ActThe Fixing America’s Surface Transportation Act (FAST), Public Law No. 114-94, the current federal transportation authorization act,became law on December 4, 2015 and establishes funding over federal fiscal years 2016 through 2020. The MAP-21 transportation program structure continues under the FAST Act with one substantial change; the inclusion of a new Freight Program.
Idaho’s Transportation Alternatives Program is populated through FY21 with projects for bike and pedestrian facilities, Safe Routes to School projects, Americans with Disabilities Act projects, and projects for the historic preservation or rehabilitation of transportation facilities. Additionally, funding is reserved for FY24 through FY27 in this program.
Though no specific projects are listed in this document, Idaho Parks and Recreation administers the Recreational Trails Program for years 2021 through 2027 using federal funds distributed to them by ITD.
Funding Assumptions/Forecasts
Federal-Aid Funding AssumptionsFederal Highways program funding level estimates are $316.6 million in FY21 through FY27. Funds are shown in year of expenditure dollars.
Obligation authority is assumed to be equal to 100% of estimated apportionments. Funding forecasts do not include year-end redistribution of obligation authority not used by other states. Approximately $25 million in highway-related federal indirect cost recovery is redirected annually to the State Highway System.
State Highway Funding Assumptions Estimates of state funds available for capital construction take into account projected revenues, the reservation of state matching funds for federal-aid, and other operational needs not shown in the ITIP.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 4
The amount of state highway funding can be impacted by legislation passed in any given year. There were two bills passed during the 2020 session that had an effect on transportation funding.
House Bill 334 increases funding for the local bridge inspection account by $75,000 annually to $175,000. While this legislation does not impact revenue, it does reduce the amount available for distribution from the Highway Distribution Account.
Senate Bill 1379 provides for using existing law enforcement and ITD resources to inspect commercial vehicles for dyed fuel. This should increase revenue from special fuel taxes because it will act as a deterrent to those drivers who illegally use dyed diesel on highways.
As a reminder, Senate Bill 1201 which was passed during the 2019 Legislative Session removes the Idaho State Police from the Highway Distribution Account distribution formula over a period of five years beginning with the FY22 appropriation. This action will result in an additional $1.9 million per year for a total of approximately $11 million to the State Highway Account when the transition is complete in FY26.
The estimated state funding for FY21 through FY27 available for highway capital construction ranges from $106.2 million to $142.5 million annually.
GARVEE Bonds Debt ServiceGARVEE bonds are revenue bonds that do not pledge the full faith and credit of the state. Idaho Code allows no more than 30% of ITD’s federal apportionment to be used for debt service. The department uses federal highway revenue to repay the bonds.
Prior to FY17, the Idaho Legislature authorized the department to secure financing of $857 million of
infrastructure improvements in the GARVEE Program. Projects funded by the pre-FY17 authorizations were closed out during FY16.
In March 2017, the Idaho Legislature authorized the issuance of up to $300 million in new GARVEE bonds to fund additional projects to be selected by the Idaho Transportation Board.
Estimated debt service is approximately $69.5 million annually, including the original $857 million and the new $300 million legislative authorization. Approximately $64 million of the debt service is federal funds and approximately $5,5 million is state matching funds.
Aeronautics Funding AssumptionsThe majority of funding for airport improvements is provided directly to local airport owners by the Federal Aviation Administration. Local airport owners provide most of the required local matching funds.
The Division of Aeronautics provides the remaining funds. The Division of Aeronautics receives Federal Aviation Administration funding for statewide planning and pavement evaluations. Airports that are not eligible for FAA funding receive matching grants from the Division of Aeronautics for airport improvements and planning. State funding to the Idaho Airport Aid Program is a minimum of $1,000,000 per year for FY21 through FY27.
Public Transportation Funding Assumptions The Department is the direct recipient of Federal Transit Administration (FTA) funding for rural and small urban programs. These funds support fixed route and paratransit services, transportation services for the elderly and persons with disabilities, buses and bus facilities. Under the FAST Act which ends in FY20, estimated
federal funding for these rural and small urban programs is $15.1 million in FY20. Estimated funding for non-ITD recipients (transit service providers in the urbanized areas) is $12.2 million in FY20. Dedicated state funds of $312, 000 annually are available for vehicle replacement needs under the Vehicle Investment Program (VIP) and are awarded through a competitive application process.
References to Metropolitan Planning Organizations - Transportation Improvement ProgramsAs specified in 23 CFR 450.218(b), Transportation Improvement Programs (TIPs) developed by the Metropolitan Planning Organizations can be included by reference. Each of Idaho’s five MPO websites is listed below:
• Kootenai Metropolitan Planning Organization(KMPO) Phone: (208) 930-4164Website: www.kmpo.net
• Lewis-Clark Valley Metropolitan PlanningOrganization (LCVMPO)Phone: (208) 298-1345Website: www.lewisclarkmpo.org
• Community Planning Organization ofSouthwest Idaho (COMPASS)Phone: (208) 855-2558Website: www.compassidaho.org
• Bannock Transportation Planning Organization(BTPO) Phone: (208) 233-9322Website: www.bannockplanning.org
• Bonneville Metropolitan Planning Organization(BMPO)Phone: (208) 612-8530Website: www.bmpo.org
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 5
Row Program Name Available Program Available Program Available Program Available Program Available Program Available Program Available Program Available Program1 Pavement Preservation (Commerce) 27,546 23,495 31,389 31,576 14,200 15,852 24,740 25,815 38,477 37,422 28,609 28,298 61,683 44,391 226,644 206,848 2 Pavement Preservation (Non-Commerce) 9,684 8,196 9,534 12,681 10,833 11,029 6,894 6,720 8,473 8,074 6,202 6,533 18,000 14,218 69,620 67,450 3 Pavement Restoration 71,739 80,808 81,104 62,269 64,686 64,776 92,621 77,017 94,195 73,512 140,914 117,917 58,538 70,426 603,797 546,725 4 SHS Pavements 108,969 112,499 122,027 106,526 89,719 91,657 124,255 109,552 141,145 119,008 175,725 152,747 138,221 129,035 900,061 821,024 5 Bridge Preservation 23,522 26,565 13,611 14,506 25,640 29,097 18,722 17,413 13,139 13,121 15,372 16,389 15,000 15,721 125,006 132,813 6 Bridge Restoration 43,479 29,264 62,779 68,684 97,080 92,875 82,406 88,877 55,370 97,783 50,396 71,947 65,000 58,648 456,510 508,079 7 SHS Bridges 67,001 55,829 76,390 83,190 122,720 121,972 101,128 106,291 68,509 110,904 65,768 88,336 80,000 74,370 581,516 640,892 8 Supporting Infrastructure Assets 7,000 7,658 7,000 7,487 7,000 7,579 7,000 7,000 7,000 7,000 7,000 7,000 7,000 7,000 49,000 50,724 9 Safety - Rest Areas - 1,260 - - - - - - - - - - - - - 1,260
10 Safety 8,594 47,283 58,540 48,124 44,895 20,970 37,324 - 265,730 11 Capacity 75,152 71,856 50,738 49,035 47,505 46,035 50,513 - 390,834 12 Safety & Capacity 87,378 83,746 99,840 119,139 93,579 109,278 73,168 97,159 89,522 92,400 57,991 67,004 80,000 87,837 581,478 656,564 13 (Row 4+7+8+9+12) SHS Core 270,348 260,992 305,257 316,342 313,018 330,487 305,551 320,001 306,176 329,312 306,484 315,088 305,221 298,242 2,112,055 2,170,463 14 Significant Projects & Corridors - - - - - - - - - - - - - - - - 15 Formula Debt Service + Fees & Interest1 67,476 67,476 69,510 69,510 69,536 69,536 69,550 69,550 69,612 69,612 69,621 69,621 71,051 71,051 486,356 486,356 16 SHS Strategic 67,476 67,476 69,510 69,510 69,536 69,536 69,550 69,550 69,612 69,612 69,621 69,621 71,051 71,051 486,356 486,356 17 System Support 6,500 11,956 6,500 7,847 6,500 7,596 6,500 7,596 6,500 7,626 6,500 6,500 6,500 6,500 45,500 55,621 18 State Board Unallocated 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 35,000 35,000 19 SHS Other 11,500 16,956 11,500 12,847 11,500 12,596 11,500 12,596 11,500 12,626 11,500 11,500 11,500 11,500 80,500 90,621 20 Planning & Scoping 2,100 2,430 1,600 1,835 1,600 1,625 1,600 1,350 250 1,350 - - - - 7,150 8,590 21 Metropolitan Planning 1,885 1,895 1,885 1,895 1,885 1,895 1,885 1,895 1,885 1,895 - - - - 9,423 9,475 22 State Planning and Research 7,030 7,090 7,030 7,090 7,030 7,090 7,031 7,090 7,031 7,066 - - - - 35,153 35,426 23 Hwy Planning 11,015 11,415 10,515 10,820 10,515 10,610 10,515 10,335 9,166 10,311 - - - - 51,726 53,491 24 Recreational Trails 1,711 1,711 1,711 1,711 1,711 1,711 1,711 1,711 1,711 1,711 - - - - 8,553 8,555 25 Transportation Alternatives (TAP) 3,822 3,322 3,822 3,518 3,822 5,180 3,822 3,822 3,822 3,822 - - - - 19,109 19,664 26 Freight 10,393 13,330 10,393 7,421 10,393 9,162 10,394 - 10,394 4,336 10,394 2,988 10,394 13,767 72,755 51,003 27 Congestion Mitigation/Air Quality (CMAQ) - - - - - - - - - - - - - - - - 28 Hwy Statewide Competitive 15,925 18,363 15,925 12,650 15,926 16,053 15,926 5,533 15,926 9,869 10,394 2,988 10,394 13,767 100,417 79,222 29 STBG - Local Urban 8,831 8,892 8,831 9,002 8,831 8,699 8,831 8,855 8,831 9,329 30,000 32,598 - - 74,155 77,374 30 STBG - Transportation Mgt Area 10,887 10,908 10,887 10,886 10,887 10,887 10,887 10,887 10,887 10,108 21,774 10,901 - - 76,208 64,576 31 TAP - Transportation Mgt. Area 480 400 480 479 480 480 480 480 480 480 960 733 - - 3,358 3,051 32 STBG - Local Rural 14,683 11,258 14,646 18,010 14,538 11,304 14,430 12,329 14,322 12,504 43,431 43,431 - - 116,049 108,837 33 Bridge, Local 5,447 5,293 5,447 3,555 5,447 7,514 5,447 4,143 5,447 5,320 23,335 23,335 - - 50,570 49,159 34 Bridge, Off System 4,085 7,014 4,085 2,612 4,085 5,251 4,085 7,489 4,085 6,029 8,654 8,654 - - 29,078 37,049 35 Safety - Local 8,904 8,904 8,904 8,904 8,904 8,904 8,904 8,905 8,905 8,904 8,905 17,634 8,905 8,905 62,330 71,059 36 Safety - Railroad Crossings 2,191 3,080 2,191 1,915 2,191 1,755 2,191 1,515 2,191 2,090 2,191 2,191 2,191 2,191 15,338 14,737 37 Hwy Local 55,507 55,749 55,470 55,363 55,362 54,793 55,255 54,602 55,147 54,764 139,249 139,477 11,096 11,096 427,086 425,843 38 LHTAC Programs 33,119 32,469 33,081 33,081 32,974 32,972 32,866 32,866 32,758 32,758 84,325 93,054 8,905 8,905 258,027 266,104 39 Hwy Federal Formula & State Funds 431,772 430,951 468,177 477,531 475,857 494,074 468,297 472,617 467,527 486,494 537,248 538,674 409,261 405,655 3,258,139 3,305,997 40 High Priority (SAFETEA-LU) - - - - - - - - - - - - - - - - 41 High Priority (TEA-21) 18,426 18,426 - - - - - - - - - - - - 18,426 18,426 42 Discretionary Earmarks 5,182 5,182 - - - - - - - - - - - - 5,182 5,182 43 Emergency Relief - - - - - - - - - - - - - - - - 44 Federal Lands Access 13,898 11,027 13,898 17,110 13,898 18,482 13,898 17,699 13,898 1,686 - - - - 69,490 66,004 45 Indian Reservation Roads 1,000 1,000 1,007 1,007 457 457 887 887 - - - - - - 3,352 3,352 46 Other Federal Non-Formula 5,262 5,262 2,262 2,262 2,062 2,062 2,262 2,262 462 462 - - - - 12,310 12,310 47 Hwy Other Federal Programs 43,768 40,897 17,167 20,379 16,417 21,001 17,047 20,848 14,360 2,148 - - - - 108,760 105,274 48 Federal Non-Participating - - - - - - - - - - - - - - - - 49 Local/Private Partnership 8,170 8,170 448 448 1,964 1,964 380 380 1,835 1,835 - - 780 780 13,577 13,577 50 Hwy Other Programs 8,170 8,170 448 448 1,964 1,964 380 380 1,835 1,835 - - 780 780 13,577 13,577 51 GARVEE 2017 Legislative Authorization 1 78,697 78,697 - - - - - - - - - - - - 78,697 78,697 52 Highways Total 562,407 558,715 485,792 498,359 494,239 517,040 485,724 493,845 483,722 490,477 537,248 538,674 410,041 406,435 3,459,172 3,503,544 53 Capital 16,925 16,925 16,730 16,730 16,163 16,163 16,420 16,420 15,823 15,823 8,393 8,393 - - 90,454 90,454 54 Operations 55,020 55,020 27,792 27,792 27,862 27,862 27,900 27,900 27,918 27,918 2,624 2,624 - - 169,116 169,116 55 Public Transit Total 71,945 71,945 44,522 44,522 44,025 44,025 44,320 44,320 43,741 43,741 11,017 11,017 - - 259,570 259,570 56 New Airport Facility 5,444 5,444 13,559 13,559 5,308 5,308 9,212 9,212 7,711 7,711 5,399 5,399 150 150 46,783 46,783 57 Airport Facility Maintenance 32,275 32,275 21,277 21,277 29,751 29,751 26,373 26,373 14,042 14,042 5,399 5,399 150 150 129,267 129,267 58 Airport Planning 266 266 1,867 1,867 884 884 558 558 493 493 5,279 5,279 5,000 5,000 14,347 14,347 59 Aviation System Planning 583 583 289 289 - - 311 311 - - 407 407 - - 1,590 1,590 60 Aeronautics Total 38,568 38,568 36,992 36,992 35,943 35,943 36,454 36,454 22,246 22,246 16,484 16,484 5,300 5,300 191,987 191,987 61 Grand Total 672,920 669,228 567,306 579,873 574,207 597,008 566,498 574,619 549,709 556,464 564,749 566,175 415,341 411,735 3,910,729 3,955,101
* Available estimates are to be used for planning purposes only. FFY20 is last year of FAST transportation act. FY21 and later are flat-lined at FY20 levels.Funds expressed in Year-Of-Expenditure Dollars assuming 2% annual inflation.Funding levels assume 100% Obligation AuthorityIncludes set-asides for short/under-programmed programs1 Grant Anticipation Revenue Vehicle (GARVEE) bonds provide no net additional transportation funding as they are repaid with future federal funds via debt service. FAST means "Fixing America's Surface Transportation"STBG means "Surface Transportation Block Grant"
(PREL for Locals)FY 2022*
Statewide Transportation Improvement Program (STIP)FY2023* FY 2024* Sum FY21-27
AVAILABLE FUNDING WITH MATCH vs. PROGRAMMED PROJECTS (AvP)
This Report should be used only during Public Involvement (data as of 06/24/2020)FY 2021 - 2027 DRAFT IDAHO TRANSPORTATION INVESTMENT PROGRAM
Estimates of Apportionments/Allocations in $000s with Match in Year-Of-Expenditure Dollars
FY 2025* FY 2026* FY 2027*
Idaho Transportation Investment Program (ITIP)
FY 2021*
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 7
Group Name FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY21-27Pavement Preservation (Commerce) 18,449 23,119 12,280 25,815 32,585 28,297 36,540 177,085 Pavement Preservation (Non-Commerce) 8,196 12,681 10,966 5,618 7,618 6,533 12,304 63,916 Pavement Restoration 66,554 54,574 18,455 48,902 38,446 99,259 53,920 380,110
SHS Pavements 93,199 90,374 41,701 80,335 78,649 134,089 102,764 621,111 Bridge Preservation 21,666 12,802 27,120 17,414 13,121 16,389 15,721 124,233 Bridge Restoration 17,464 41,168 10,667 26,753 65,309 64,515 58,648 284,524
SHS Bridges 39,130 53,970 37,787 44,167 78,430 80,904 74,369 408,757 SHS Core 132,329 144,344 79,488 124,502 157,079 214,993 177,133 1,029,868
System Support 7,346 7,246 7,596 7,596 7,626 500 500 38,410 Safety - Rail-Highway Crossings 1,015 380 380 30 30 30 30 1,895
Other 8,361 7,626 7,976 7,626 7,656 530 530 40,305 Planning & Scoping 1,830 1,600 1,600 1,350 1,350 - - 7,730 State Planning and Research 7,090 7,090 7,090 7,090 7,066 7,066 7,066 49,558
Hwy Planning 8,920 8,690 8,690 8,440 8,416 7,066 7,066 57,288 Recreational Trails 1,711 1,711 1,711 1,711 1,711 - - 8,555
Hwy Statewide Competitive 1,711 1,711 1,711 1,711 1,711 - - 8,555 Hwy Projects Outside of Metropolitan Planning Areas 151,321 162,371 97,865 142,279 174,862 222,589 184,729 1,136,016
Notes:Highways groupings include projects that have or are expected to receive environmental categorical exclusions per 23 CFR 450.218(j). Regionally significant projects are detailed in the STIP.All public transit projects are currently detailed within the STIP.All aeronautics projects are currently detailed within the STIP.Please see the Idaho Transportation Investment Program (ITIP) web site for project candidates within these groupings (costs in current dollars).
FY 2021 - 2027 DRAFT STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (06/25/2020)Grouped Project FHWA Control Totals
Cost in Thousands of Year-of-Expenditure Dollars
Statewide Transportation Improvement Program
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 8
Program Name Abbreviations Used in Program Sheets Abbreviation Program Name Abbreviation Program NameAPPR Appropriation Earmarks MET Metro Planning APT‐MTNC Airport Facility Maintenance NP Non‐Participating APT‐NEW New Airport Facility NP (L) Non‐Participating (Local) APT‐PLAN Airport Planning OPS System Support AVI‐SYS Aviation System Planning OTH‐FA Other Federal Aid BR‐DSCR Bridge Discretionary OTH‐FA (L) Other Federal Aid (Local) BR‐LOCAL Bridge ‐ Local PAVE Pavement Preservation BR‐OFF Bridge ‐ Off System PLAN Planning & Scoping BR‐PRESERVE Bridge Preservation PLHD Public Lands BR‐RESTORE Bridge Restoration PLHD (L) Public Lands (Local) CC4I Transportation Alternatives RDSIDE Roadside Items CMAQ Congestion Mitigation/Air Quality RESTORE Restoration CMAQ (L) Congestion Mitigation/Air Quality (Local) SAFETY Safety CPCTY Capacity SAFETY (L) Safety (Local) DEMO Demonstration SPR State Planning & Research DEMO (L) Demonstration (Local) ST RRX State Rail EARLY Early Development STP‐RURAL (L) STP ‐ Local Rural ER‐NOW ER ‐ Emergency Repair STP‐TMA STP ‐ Transportation Mgt Area ER‐NOW (L) ER ‐ Emergency Repair (Local) STP‐URBAN (L) STP ‐ Local Urban ER‐PERM ER ‐ Permanent Repair STRATEGY Strategic Initiatives ER‐PERM (L) ER ‐ Permanent Repair (Local) OTHER ASSETS Supporting Infrastructure Assets EXTRNL External to ITD Financials TAP‐TMA Transportation Alternatives ‐ TMA FED RRX STP ‐ Rail (Protection) TCSP TCSP FED RRX (L) STP. ‐ Rail (Protection) (Local) TIGER TIGER FLAP Federal Lands Access Program TRAFFIC Traffic Operations FLAP (L) Federal Lands Access Program (Local) TRAILS Recreational Trails FREIGHT Formula Freight Program TRNS‐CAP Capital HIPRI High Priority SAFETEA‐LU TRNS‐OPS Operations UNALLOC State Unallocated LP‐ST Local Participation MAJOR Significant Projects Program
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 9
Abbreviation Fund Source Name Abbreviation Fund Source Name112 Section 112 (FY06 Appr Bill) FREIGHT Formula Freight115 Section 115 (FY04 Appr Bill) GA‐APT General Aviation Airport117 Section 117 (FY05 Appr Bill) HFL Highways for Life129 Section 129 (FY08 Appr Bill) HIPRI High Priority SAFETEA‐LU330 Section 330 Discretionary HIPRI High Priority TEA‐21378 Section 378 Funding (Utah Border) HSIP Safety5303 5303 ‐ Metropolitan Planning HSIP (L) Safety (Local)5304 5304 ‐ Statewide Planning IM Interstate Maintenance5309 5309 ‐ Bus and Bus Facility Grants IM‐DISCR Interstate Maintenance Discretionary*5311 5311 ‐ Rural Area Formula Program IRR Indian Reservation Roads5312 5312 ‐ National Research Program LPT Local Participating5320 5320 ‐ Alt. Trans. in Parks and Public Lands LTAP LTAP ‐ T2 Center5505 5505 ‐ University Transportation Centers MET Metro Planning5307 LUrb 5307 ‐ Large Urbanized Area Formula Grants NH National Highway System5307 SUrb 5307 ‐ Small Urbanized Area Formula Grants NP Non‐Participating5309(d) 5309(d) ‐ Capital Investment Grants "New Starts" OTH‐FED Other Federal Non‐Formula5310 LUrb 5310 ‐ Pop>200K Transport for Elderly&Disabled PLHD Public Lands Highways Discretionary*5310 RUrb 5310 ‐ Pop<50K Transport for Elderly&Disabled PR‐APT Primary Service Airport5310 SUrb 5310 ‐ Pop<200K Transport for Elderly&Disabled PRIV Private Funds5311(b)(2) 5311(b)(3) ‐ Rural Transit Assistance PU‐APT Public Use Airports5311(c) 5311(c) ‐ Public Trans. On Indian Reservations SB Scenic Byways Discretionary*5311(f) 5311(f) ‐ Intercity Bus SF Other State Categories5313(a)(2) 5313(a)(2) ‐ Transit Cooperative Research Program SPR State Planning & Research5339 LUrb 5339 ‐ Large Urban State of Good Repair for Bus SR2S Safe Routes to School5339 Rural 5339 ‐ Rural State of Good Repair for Bus ST State5339 SUrb 5339 ‐ Small Urban State of Good Repair for Bus ST2 State (HB312)BR‐DISCR Bridge Discretionary* STB State UnallocatedBR‐LOC Bridge ‐ Local STP STP ‐ State HighwayBR‐OFF Bridge ‐ Off System STP‐RURAL STP ‐ Local RuralBR‐STATE Bridge ‐ State STP‐TMA STP ‐ Transportation Management AreaCA‐APT Community Access Airport STP‐U STP ‐ Local UrbanCBI Corridor Border Infrastructure Discretionary* STSI State Strategic InitiativesCIG TAX Cigarette Tax STX State Rail‐Highway SafetyCMAQ Congestion Mitigation / Air Quality TAP‐RURAL Transportation Alternatives ‐ RuralDEMO Demonstration Projects ISTEA TAP‐TMA Transportation Alternatives ‐ TMATIGER TIGER TAP‐URBAN Transportation Alternatives ‐ UrbanFED RRX Federal Rail Highway Crossings TCSP TCSP Discretionary*FLAP Federal Lands Access Program TECM Transportation Expansion & Congestion Mitigation
TRAILS Recreational Trails
Fund Source Abbreviations Used in Program Sheets
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 10
District 1 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
138731
STP-RURAL (L) STP-RURALST MARIES
STC-1801, RAILROAD AVE, ST MARIESMP 101.301 - 101.784 RESRF/RESTO&REHAB, Base/Sub-bas
102
2,766
95
2,563
7
203660 612 48
CN
RWPE
-----2,766------
----102
--
--- - -
The purpose of this project is to reconstruct Railroad Avenue between the Potlatch Mill and Hwy‐3 in St. Maries. This includes a two lane section with turn lanes at 10th and Hwy‐3, and a retaining wall with storm water improvements. The project is located on STC‐1801 between mile points 101.301 and 101.784.
188131
BR-OFF BR-OFFBENEWAH COUNTY
OFFSYS, SLAUGHTER HOUSE BR, BENEWAH COMP 101.885 - 101.885 BR/APPRS, Bridge Replacement
-
2,577
-
2,388
-
189580 537 43
CN
RWPE
---2,577--------
-----
--
--- - -
The Slaughter House Bridge on St. Joe City Road is a one lane bridge in very poor condition. The bridge has been on the watch list for Benewah County for many years. The guardrails are substandard and because of the narrow width, the rails are damaged from many logging truck impacts. This project is located at mile point 101.885.
190461
BR-OFF BR-OFFBOUNDARY COUNTY
OFFSYS, RUBY CR #2 BR, BOUNDARY COMP 100.691 - 100.691 BR/APPRS, Bridge Replacement
-
944
-
875
-
69532 493 39
CN
RWPE
-----944------
-----
--
--- - -
This project will replace the Ruby Creek Bridge #2 . The importance of Bridge #2 is that traffic to a private school (formerly Rocky Mountain Academy) all must cross this 15 foot wide structure, most of this traffic in the same time frame in the morning and evening. Once replaced, there will be two way access up this first one half mile of winding road all the way to Administration Lane, where the majority of traffic leaves Ruby Creek Road. The project is located at mile point 100.691.
B2
192481
BR-RESTORE NHSTATE OF IDAHO (ITD)
US 95, SANDPOINT LONG BR OVER PEND O'REILLEMP 471.743 - 472.862 BR/APPRS, Bridge Rehabilitation
-
16,389
-
15,186
-
1,2031,100 1,019 81
CN
RWPE
----6,4169,973------
-----
--
--- - -
This project will provide bridge preservation and preventive maintenance to the existing Sandpoint Longbridge to improve user operating conditions, increase safety, and reduce future maintenance costs through steel pile wrapping, adjusting or replacing bearing pads, and repairing concrete. The project is located on US‐95 between mile points 471.743 and 472.862.
192921
BR-LOCAL BR-LOCPINEHURST
STC-5764, MAIN ST/SILVER VALLEY RD BRIDGE, PINEHURSTMP 1.390 - 1.790 BR/APPRS, Bridge Replacement
51
3,946
47
3,656
4
290455 422 33
CN
RWPE
3,946----------455
---51-
--
--- - -
This project will replace the Main St. Bridge located over Pine Creek between Silver Street and Seventh Street. The bridges substructure is in critical condition as the concrete girders and abutments have numerous cracks and both of the bridges pier walls have been undermined. The steel piles supporting the bridge have completely lost their protective coating and are heavily corroded and pitted. The bridge and approach guardrails are all substandard, highlighting serious safety concerns. This project is located on STC‐5764 between mile points 1.39 and 1.79.
195131
STP-RURAL (L) STP-RURALPRIEST RIVER
STC-5770, WISCONSIN ST; HIGH ST TO US-2, PRIEST RIVERMP 6.015 - 6.119 RECONST/REALIGN, Plant Mix Paveme
300
1,113
278
1,032
22
81221 205 16
CN
RWPE
---1,113--------
-----
--
--- - -
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 11
District 1 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
This project will provide street improvements on Wisconsin St. from High St. to Hwy‐2 in Priest River. This project includes a new sidewalk on the east side of Wisconsin St. and pedestrian improvements at the intersection of Hwy‐2 and High St. The offset intersection creates confusion for all vehicles creating a safety concern. This project is located on STC‐5770 between mile points 6.015 and 6.119.
197181
BR-LOCAL BR-LOCSHOSHONE COUNTY
STC-5750, PINE CR RD BRIDGE, SHOSHONE COMP 5.150 - 5.550 BR/APPRS, Bridge Replacement
20
3,673
19
3,404
1
269405 375 30
CN
RWPE
3,673----------405
---20-
--
--- - -
This project will replace the Pine Creek Rd. Bridge located over Pine Creek in Shoshone County. The bridges substructure is in critical condition with its steel piles rusted, abutments cracking and its concrete on the southwest wing wall spalled exposing rebar. Significant scour has occurred and the bridge railing has also been damaged. This project is located on STC‐5750 between mile points 5.15 and 5.55.
MP19916
1
RESTORE STSTATE OF IDAHO (ITD)
US 95, LABROSSE HILL ST TO ALDERSON LN, BONNERS FERMP 505.000 - 506.250 RESRF/RESTO&REHAB, Pavement Re
1,800
15,128
-
29
1,800
15,0991,135 - 1,135
CN
RWPE
--6,4576,895--------
-----
--
--- - -
MP
1
RDSIDE STSTATE OF IDAHO (ITD)
US 95, LABROSSE HILL ST TO ALDERSON LN, BONNERS FERMP 505.000 - 506.250 RESRF/RESTO&REHAB, Pavement Re
1,800
15,128
-
29
1,800
15,0991,135 - 1,135
CN
RWPE
--881864--------
-----
--
--- - -
MP
1
ETS STSTATE OF IDAHO (ITD)
US 95, LABROSSE HILL ST TO ALDERSON LN, BONNERS FERMP 505.000 - 506.250 RESRF/RESTO&REHAB, Pavement Re
1,800
15,128
-
29
1,800
15,0991,135 - 1,135
CN
RWPE
---31--------
-----
--
--- - -
This project will improve safety and mobility on Hwy‐95 in Bonners Ferry from (milepost 505) up through Hwy‐2 (milepost 506.25). The safety and mobility improvements will be accomplished by expanding the two lane roadway in the business area, into three lanes and adding bicycle lanes. Also sidewalks will be updated to allow people with disabilities more access.
199951
RAIL FED RRXBONNER COUNTY
STC-5782, SELLE RD UPRR RRX, BONNER COMP 106.270 - 106.270 SAFTY/TRAF OPER, Railroad Gates
-
420
-
378
-
4225 22 3
CN
RWPE
---41010-----10-
-----
--
--- - -
This project will install gates, warning signs and insulated concrete planking at MP 106.27 to enhance safety for travelers on Selle Rd, (STC‐5782).
200391
BR-LOCAL STP-RURALSHOSHONE COUNTY
STC-5750, W FK PINE CR RD BR, SHOSHONE COMP 103.151 - 103.189 BR/APPRS, Bridge Replacement
-
1,570
-
1,455
-
115207 192 15
CN
RWPE
1,570----------207
-----
--
--- - -
The West Fork Pine Creek Road Bridge over Pine Creek project is located near the City of Pinehurst in Shoshone County and includes replacement of the existing single‐span concrete bridge. The project is located on STC‐5750 at mile point 103.151.
MP20121
1
RESTORE STSTATE OF IDAHO (ITD)
US 2, BNSF RR UNDERPASS, SANDPOINTMP 475.100 - 475.800 RECONST/REALIGN, Bridge Vertical Cl
120
4,472
-
-
120
4,472553 - 553
CN
RWPE
------------
----120
--
4,427-- - -
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 12
District 1 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
MP20121
1
RDSIDE STSTATE OF IDAHO (ITD)
US 2, BNSF RR UNDERPASS, SANDPOINTMP 475.100 - 475.800 RECONST/REALIGN, Bridge Vertical Cl
120
4,472
-
-
120
4,472553 - 553
CN
RWPE
------------
-----
--
44-- - -
The project US‐2 BNSF RR UNDERPASS CLEARANCE INPROVEMENT reconstructs 0.7 miles of US‐2 to correct the vertical overhead height restriction clearance of 14.5 feet to current standards. The project is located on US‐2 between mile points 475.1 and 475.8.
202071
BR-OFF BR-OFFBONNER COUNTY
OFFSYS, RAPID LIGHTNING CR BR #5, BONNER COMP 105.852 - 105.865 BR/APPRS, Bridge Replacement
-
3,182
-
2,948
-
234634 587 47
CN
RWPE
3,182-----------
-----
--
--- - -
The Rapid Lightning Creek Bridge #5 Replacement project is located near the City of Sandpoint in Bonner County and includes replacement of the deficient bridge with replacement of the approach guardrail along with new bridge railing. The project is located between mile points 105.852 and 105.865.
202151
STP-RURAL (L) STP-RURALBOUNDARY COUNTY
STC-5804, DEEP CR LOOP; JCT US-95 TO LIONS DEN, BOUNDMP 0.000 - 3.056 RESRF/RESTO&REHAB, Resurfacing
-
1,695
-
1,571
-
124336 311 25
CN
RWPE
----1,695-------
-----
--
--- - -
This project is located near the City of Naples and the City of Bonners Ferry in Boundary County and consists of a thick overlay along this roadway as the existing road has become rough and uneven from the weather and heavy truck traffic during the hot summer months. This application will address areas of rutting as well as edge cracking and physical damage. The project is located on STC‐5804 between mile points 0.0 and 3.056.
MRP20350
1
CPCTY STECMSTATE OF IDAHO (ITD)
US 95, GRANITE NORTH & FRONTAGE RDS, BONNER COMP 450.880 - 454.510 MAJRWIDN, Grading & Drainage
2,458
34,725
1,415
10,597
1,043
24,1282,875 - 2,875
CN
RWPE
---4,682--------
-----
--
--- - -
MRP
1
FREIGHT FREIGHTSTATE OF IDAHO (ITD)
US 95, GRANITE NORTH & FRONTAGE RDS, BONNER COMP 450.880 - 454.510 MAJRWIDN, Grading & Drainage
2,458
34,725
1,415
10,597
1,043
24,1282,875 - 2,875
CN
RWPE
---9,161--------
-----
--
--- - -
The project will construct 4 lane divided highway on US‐95 and frontage road from MP 452.5 to 454.1. The southern tie in would be the terminus of the recently constructed “Granite South Project” and the north terminus would be at Trails End Road. Project is funded, in part, with Grant Anticipation Revenue Vehicle bonds until repaid via debt service using federal funds.
203591
RAIL FED RRXBONNER COUNTY
OFFSYS, S GRANITE LAKE BNSF RRX, BONNER COMP 100.758 - 100.758 SAFTY/TRAF OPER, Railroad Signals
-
310
-
279
-
3110 9 1
CN
RWPE
--310-----10---
-----
--
--- - -
Install type 1 signal including constant warning detection, planking, and cabinet. The project is located at mile point 100.758.
203831
BR-LOCAL BR-LOCWALLACE
STC-5758, 6TH ST; S FK CDA RV BR, WALLACEMP 0.120 - 0.230 BR/APPRS, Bridge Replacement
20
2,590
19
2,400
1
190940 871 69
CN
RWPE
2,590-----------
----20
--
--- - -
Replacement of 101 yr. old bridge in Wallace on 6th Street over South Fork of the Coeur d'Alene River. This bridge is adjacent to the historic downtown Wallace and under the I‐90 viaduct. The project is located on STC‐5758 at mile point 0.12 to 0.23.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 13
District 1 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
M20453
1
SAFETY HSIPSTATE OF IDAHO (ITD)
SH 200, MCGHEE TO KOOTENAI ST, BONNER COMP 31.750 - 32.450 MAJRWIDN, Safety
100
2,963
93
2,745
7
218270 250 20
CN
RWPE
--2,937--------30
----100
--
--- - -
M
1
ETS HSIPSTATE OF IDAHO (ITD)
SH 200, MCGHEE TO KOOTENAI ST, BONNER COMP 31.750 - 32.450 MAJRWIDN, Safety
100
2,963
93
2,745
7
218270 250 20
CN
RWPE
--25---------
-----
--
--- - -
This project will reduce serious and fatal crashes by widening the roadway cross section from 2 to 3 lanes and widen shoulders to be used as right turn movements. The project is located on SH‐200 between mile points 31.75 and 32.2.
205041
RAIL FED RRXBOUNDARY COUNTY
STC-5908, SCHOOL HOUSE RD UPRR RRX, BOUNDARY COMP 100.108 - 100.108 SAFTY/TRAF OPER, Railroad Signals
-
310
-
279
-
3110 9 1
CN
RWPE
-310------10---
-----
--
--- - -
Install type 1 signal including constant warning protection, planking, and cabinet. This project is located on STC‐5908 at mile point 100.108.
206211
RAIL FED RRXBONNER COUNTY
OFFSYS, ELMIRA RD UPRR RRX, BONNER COMP 100.411 - 100.411 SAFTY/TRAF OPER, Railroad Signals
-
300
-
270
-
3010 9 1
CN
RWPE
-----300------
-----
--
--- - -
Install type 1 signal including constant warning protection, planking, and cabinet. This project is located at mile point 100.411.
206561
RAIL FED RRXSANDPOINT
OFFSYS, WOODLAND DR BNSF RRX, SANDPOINTMP 0.000 - 0.000 SAFTY/TRAF OPER, Railroad Signals
-
310
-
279
-
3148 43 5
CN
RWPE
--310-----10---
-----
--
--- - -
Install type 1 signal including constant warning protection, planking, and cabinet.
RP206581
SAFETY HSIPSTATE OF IDAHO (ITD)
US 2, MOYIE SPRINGS TURN BAYS, BOUNDARY COMP 66.600 - 69.900 MAJRWIDN, Turn Bay
-
2,601
-
2,410
-
191277 256 21
CN
RWPE
---2,601--------
-----
--
--- - -
This project US 2, Moyie Springs Turn Bays, Boundary Co. will widen the existing roadway between MP 66.6 and 69.9, install turn bays and acceleration lanes with illumination at Roosevelt Ave. and Blume Hill Rd. The project will reduce serious and fatal type crashes as well as improve mobility.
M20662
1
SAFETY HSIPSTATE OF IDAHO (ITD)
US 95, MCARTHUR LAKE, BOUNDARY COMP 492.600 - 493.300 SAFTY/TRAF OPER, Safety
1,550
10,866
1,436
10,068
114
7981,325 1,228 97
CN
RWPE
---10,789--------
----1,550
--
--- - -
M
1
ETS HSIPSTATE OF IDAHO (ITD)
US 95, MCARTHUR LAKE, BOUNDARY COMP 492.600 - 493.300 SAFTY/TRAF OPER, Safety
1,550
10,866
1,436
10,068
114
7981,325 1,228 97
CN
RWPE
---77--------
-----
--
--- - -
This project will reduce serious and fatal crashes by reconstructing the existing two lane section and adding wider shoulders, and replaces a width restricted bridge over McArthur Lake outlet, provides for animal passage under US‐95, improves the alignments of Kapu Rd and MacArthur Lake and US‐95. The project is located on US‐95 between mile points 492.6 and 493.3.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 14
District 1 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
207761
FLAP (L) FLAPBONNER COUNTY
OFFSYS, TRESTLE CREEK RD, BONNER COMP 100.000 - 103.000 RECONST/REALIGN, Grading & Draina
-
4,443
-
4,117
-
326280 259 21
CN
RWPE
---4,113330------280
-----
--
--- - -
Reconstruct Trestle Creek Rd. to a single lane with turnouts. Work includes associated intersection improvements, horizontal and vertical alignment upgrades, drainage improvements, stream bank restoration, and roadside safety improvements. This project is located between mile points 100 and 103.
219821
STP-RURAL (L) STP-RURALBOUNDARY COUNTY
STC-5908, SCHOOL HOUSE RD IMPV, BOUNDARY COMP 100.000 - 100.220 RESRF/RESTO&REHAB, Pavement Re
79
1,062
73
984
6
78305 283 22
CN
RWPE
1,062----------305
---79-
--
--- - -
Improve and resurface School House Road between US 95 and Deep Creek Loop Road. The project is located on STC‐5908 between mile points 100 and 100.22.
219901
SAFETY (L) HSIP (L)BONNER COUNTY
OFFSYS, RRX NR SANDPOINT, BONNER COMP 0.000 - 0.000 SAFTY/TRAF OPER, Railroad Signals
-
882
-
817
-
65142 132 10
CN
RWPE
-----882------
-----
--
--- - -
The Bonner County Railroad Crossing Improvement project, located near the City of Sandpoint in Bonner County, will add pavement to 100ft on either side of the tracks, install thermoplastic crossbucks and will install LED Flashing RR Crossing warning signs to increase visibility and driver awareness to reduce/eliminate fatal and serious injury crashes, for all roadway users, at these crossing locations.
219941
SAFETY (L) HSIP (L)BOUNDARY COUNTY
OFFSYS, GUARDRAIL UPGRADE, NR BONNERS FERRYMP 0.000 - 0.000 SAFTY/TRAF OPER, Metal Guard Rail
-
264
-
264
-
-50 50 -
CN
RWPE
-----264------
-----
--
--- - -
The Boundary County Guardrail Improvements project, located near the City of Bonners Ferry in Boundary County, will install guardrail along outside curves at multiple locations along Deep Creek Loop, Highland Flats Road and Moyie River Road to improve safety for roadway users as they negotiate curves to reduce/eliminate fatal and serious injury crashes for all roadway users.
220391
TAP TAP-URBANSANDPOINT
LOCAL, FY21 SANDPOINT SRTS COORDINATOR & ACTIVITIESMP 0.000 - 0.000 ENV PRESV, Bicycle/Pedestrian/Equestr
-
65
-
60
-
5- - -
CN
RWPE
-----65------
-----
--
--- - -
This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.
220731
TAP TAP-URBANSANDPOINT
SMA-7775, PINE ST SIDEWALK, SANDPOINTMP 100.500 - 101.770 ENV PRESV, Sidewalk
-
375
-
347
-
2855 51 4
CN
RWPE
-----375------
-----
--
--- - -
This project will include infilling sidewalk and ADA corners on both sides of Pine St. from US HWY 2 west to Division Ave. The project length is approximately 3,000 linear feet with sidewalk to be installed approximately 3,500 linear feet, including 32 ADA ramps. The project will install five transit‐stop concrete pads to establish safe and defined bus route pedestrian waiting areas. The project is located on SMA‐7775 between mile points 100.5 and 101.77.
222601
OTHER ASSETS STSTATE OF IDAHO (ITD)
US 2, MP 10.5 ROCKFALL MITIGATION, BONNER COMP 10.500 - 11.900 SAFTY/TRAF OPER, Safety
-
550
-
-
-
550110 - 110
CN
RWPE
-----550------
-----
--
--- - -
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 15
District 1 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
The Rock Fall Mitigation project is to perform select rock fall mitigation along US‐2 from approximate milepost 10.5 to 11.9.
222701
OTHER ASSETS STSTATE OF IDAHO (ITD)
SH 1, MISSION CREEK CULVERT REPAIR, BOUNDARY COMP 0.740 - 0.760 PM, Drainage Improvements
-
830
-
-
-
83045 - 45
CN
RWPE
-----830------
-----
--
--- - -
MP .76 to .76 culvert repair project will repair the existing culvert beneath the roadway fill.
222731
OTHER ASSETS STSTATE OF IDAHO (ITD)
US 95, D1 CULVERT REPLACEMENT, BONNER COMP 459.200 - 460.600 PM, Drainage Improvements
-
170
-
-
-
17040 - 40
CN
RWPE
-----170------
-----
--
--- - -
The Culvert Replacement is needed to maintain critical drainage. The project is located on US‐95 between mileposts 459.2 and 460.6 in Bonner County.
W22275
1
OTHER ASSETS STSTATE OF IDAHO (ITD)
I 90, FY21 FENCE REPAIR, KOOTENAI COMP 21.000 - 25.000 PM, Incidental Repairs
-
148
-
-
-
1485 - 5
CN
RWPE
-----148-----(11)
-----
--
--- - -
The 2021 Interstate 90 Fence Repair project will repair and replace interstate controlled access fence between mile post 21 and 25. Access control fence is to help prevent pedestrian and wildlife crossing onto the high speed facility.
W22286
1
OTHER ASSETS STSTATE OF IDAHO (ITD)
I 90, FY22 FENCE REPAIR, SHOSHONE COMP 45.000 - 49.000 PM, Incidental Repairs
-
129
-
-
-
12916 - 16
CN
RWPE
----129------16
-----
--
--- - -
The 2022 Interstate 90 Fence Repair project will repair and replace interstate controlled access fence between mile post 45 and 49. Access control fence is to help prevent pedestrian and wildlife crossing onto the high speed facility.
223961
SAFETY (L) HSIP (L)KELLOGG
LOCAL, INTERSECTION SAFETY IMPROVEMENTS, KELLOGGMP 0.000 - 0.000 SAFTY/TRAF OPER, Intersection Improv
-
25
-
25
-
-3 3 -
CN
RWPE
-----25-----3
-----
--
--- - -
Install Flashing LED Stop Signs and New Stop Bars on each approach at three intersections in the City of Kellogg.
223981
SAFETY (L) HSIP (L)PONDERAY
LOCAL, MCGHEE RD PED IMPROVEMENTS, PONDERAYMP 100.370 - 100.510 SAFTY/TRAF OPER, Sidewalk
-
386
-
357
-
2957 53 4
CN
RWPE
----386------57
-----
--
--- - -
Construct a separated sidewalk on the west side of McGhee Rd., north of the railroad tracks from milepost 100.37 to 100.51.
223991
SAFETY (L) HSIP (L)SHOSHONE COUNTY
LOCAL, SILVER VALLEY RD SAFETY IMPROVEMENTS, SHOSHMP 0.000 - 0.000 SAFTY/TRAF OPER, Intersection Improv
-
564
-
523
-
4183 77 6
CN
RWPE
----564------83
-----
--
--- - -
Improve approaches along the roadway with the installation of additional delineation, lighting, guardrail, curb/gutter and pavement markings.
224011
SAFETY (L) HSIP (L)BENEWAH COUNTY
STC-5705, BENEWAH CR RD SAFETY IMPROV, BENEWAH COMP 0.000 - 0.000 SAFTY/TRAF OPER, Signing Improvem
-
163
-
163
-
-25 25 -
CN
RWPE
----163------25
-----
--
--- - -
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 16
District 1 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
For the work of installing additional warning signs, improving the gravel surface, and the installation of guardrail and end terminals at two spot locations to improve the safety for all roadway users.
226011
FLAP (L) FLAPBOUNDARY COUNTY
STC-5806, RIVERSIDE RD IMPROVEMENT/ENHANCEMENT, BMP 0.000 - 1.565 RECONST/REALIGN, Bicycle/Pedestria
-
2,226
-
2,063
-
163206 191 15
CN
RWPE
--2,226------18620-
-----
--
--- - -
Rebuild and widen the paved surface and include a widened shoulder on the river side of the road for bicycle and pedestrian use.
228881
MAJOR STSTATE OF IDAHO (ITD)
SH 3, GOOSEHAVEN RD TO ROUND LAKE RD, BENAWAH COMP 89.900 - 92.500 RESRF/RESTO&REHAB, Minor Widenin
-
15,000
-
-
-
15,0002,000 - 2,000
CN
RWPE
Unfunded-----Unfunded-----
-----
--
--- - Unfunded
Levee Repair, the pavement width is narrow and commercial vehicle crashes are increasing. The proposed solution is to use light weight Geofoam blocks to widen the existing roadway without impacting the wetlands.
WORN22735
1
OTHER ASSETS IMSTATE OF IDAHO (ITD)
I 90, FY23 D1 BROOMINGMP 0.000 - 35.000 SAFTY/TRAF OPER, Miscellaneous Imp
-
345
-
345
-
-18 18 -
CN
RWPE
---345-------18
-----
--
--- - -
The FY23 I90 Brooming project will broom and flush the travel lanes and shoulders and will clean and flush drains, bridge joints, raised medians and slope paving within the project limits. from Washington state line to mile post 35.
ORN227661
OTHER ASSETS NHSTATE OF IDAHO (ITD)
US 95, D1 BYWAY BRIDGE APPROACHESMP 473.900 - 474.260 SAFTY/TRAF OPER, Miscellaneous Imp
-
284
-
263
-
2120 19 1
CN
RWPE
---284-------20
-----
--
--- - -
The Byway Bridge Approaches project located in Sandpoint milepost near 474 will use foam injection to lift the approach slabs on two bridges to make smooth transition on and off the bridges. Pavement work will also be performed to match the approach slabs.
ORN227961
PLAN NHSTATE OF IDAHO (ITD)
US 95, GARWOOD TO SAGLE EIS WILDLIFE CROSSING REEVMP 436.900 - 471.700 PLAN/STUDY, Environmental
-
-
-
-
-
-210 195 15
CN
RWPE
----------210-
-----
--
--- - -
The Garwood to Sagle Wildlife Crossing Reevaluation is to update the EIS developed in the corridor to identify animal movement and mitigation.
ORN227981
HES NHSTATE OF IDAHO (ITD)
US2, W ELMIRA, PARADISE VALLEY, MOUNT MEAD RD INT IMMP - SAFTY/TRAF OPER, Intersection Improv
32
2,924
29
2,709
3
215347 321 26
CN
RWPE
--64-------347-
-32---
2,860-
--- - -
This is a safety and capacity driven project and will address serious and fatal crashes as well as focus on the through movement of traffic by installing turn bays and illumination at three high impact intersections on US 95 in Bonner and Boundary County.
ORN228711
SAFETY (L) HSIP (L)OSBURN
LOCAL, FLASHING LED SIGN IMPROVEMENTS, OSBURNMP - SAFTY/TRAF OPER, Intersection Improv
-
50
-
46
-
46 6 -
CN
RWPE
----50-----6-
-----
--
--- - -
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 17
District 1 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
Install solar powered, radar activated Flashing LED Stop Signs at six locations in the City of Osburn to reduce fatal and serious injury accidents to improve safety for all roadway users.
ORN228731
SAFETY (L) HSIP (L)KELLOGG
LOCAL, DIVISION ST INTERSECTION IMP, KELLOGGMP - SAFTY/TRAF OPER, Intersection Improv
-
44
-
41
-
36 6 -
CN
RWPE
----44-----6-
-----
--
--- - -
Install solar powered Flashing LED Stop Signs at five locations in the City of Kellogg to reduce fatal and serious injury accidents to improve safety for all roadway users.
ORN228761
SAFETY (L) HSIP (L)BONNER COUNTY
LOCAL, CLEAR ZONE SAFETY IMPV, BONNER COMP - SAFTY/TRAF OPER, Alignment/Grade S
-
575
-
533
-
4291 84 7
CN
RWPE
---575------91-
-----
--
--- - -
This project would have a contractor clear most trees and brush within the public right of ways in accordance with the County’s Roadside Brushing Policy on three roadways. This would create an approximately 15‐20ft wide swaths of clearing on each side of the road.
ORN228931
BR-OFF BR-OFFBONNER COUNTY
OFFSYS, N FORK EAST RV BR, BONNER COMP - BR/APPRS, Bridge Replacement
-
2,281
-
2,114
-
167307 284 23
CN
RWPE
2,281---------307-
-----
--
--- - -
This project will replace the existing structurally deficient single lane bridge with a 2‐lane, un‐restricted weight bridge. This bridge lacks modern guardrail and poses a safety concern.
ORN229081
TAP TAP-URBANSANDPOINT
LOCAL, FY22 SANDPOINT SRTS COORDINATOR & ACTIVITIESMP - ENV PRESV, Bicycle/Pedestrian/Equestr
-
64
-
60
-
4- - -
CN
RWPE
----64-------
-----
--
--- - -
This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.
ORN229091
TAP TAP-RURALSANDPOINT
LOCAL, FY23 SANDPOINT SRTS COORDINATOR & ACTIVITIESMP - ENV PRESV, Bicycle/Pedestrian/Equestr
-
64
-
60
-
4- - -
CN
RWPE
---64--------
-----
--
--- - -
This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.
ORN229581
TAP TAP-RURALDOVER
LOCAL, PATHWAY CONNECTION, DOVERMP - ENV PRESV, Bicycle/Pedestrian/Equestr
-
434
-
402
-
3274 69 5
CN
RWPE
----434------74
-----
--
--- - -
The project is proposed to connect the existing trail and pedestrian facility network within the city with the existing National Bike Route 10.
ORN229601
OPS STOSBURN
LOCAL, FY22 OSBURN 15 ADA RAMPS PH 1MP - ENV PRESV, Curb & Gutter
-
58
-
-
-
58- - -
CN
RWPE
----58-------
-----
--
--- - -
Construct 15 Americans with Disabilities curb ramps in Osburn, Shoshone Co., Idaho.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 18
District 1 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
ORN229611
OPS STOSBURN
LOCAL, FY22 OSBURN 13 ADA RAMPS PH 2MP - ENV PRESV, Curb & Gutter
-
54
-
-
-
54- - -
CN
RWPE
----54-------
-----
--
--- - -
Construct 13 Americans with Disabilities curb ramps in Osburn, Shoshone Co., Idaho.
ORN230181
FED RRX (L) FED RRXBOUNDARY COUNTY
OFFSYS, DEEP CR LOOP BNSF RRX, S OF BONNERS FERRYMP 100.000 - 100.000 SAFTY/TRAF OPER, Railroad Gates
-
600
-
540
-
6020 18 2
CN
RWPE
-600------20---
-----
--
--- - -
Upgrade gates and signals.
ORN230331
STP-URBAN (L) STP-USANDPOINT
LOCAL, TRANSPORTATION PLAN, SANDPOINT AREAMP - PLAN/STUDY, Planning/Transportation
-
170
-
158
-
12- - -
CN
RWPE
-----170------
-----
--
--- - -
This project will, In accordance with industry standards, update the transportation plan for the City of Sandpoint, City of Dover, City of Ponderay, City of Kootenai, and the IHD to re‐engage and strategically begin addressing multi‐jurisdictional transportation challenges. A revised plan will take into account the significant changes resulting from the increased growth and aging infrastructure.
Construction
Right-of-WayDevelopment
4,47291013,21144,58210,39617,462--501869971,967--32-1501,892
Total 4,47291013,29344,76811,54321,321G: Project is grouped in STIP
1: Project is also shown in a Transportation Improvement Program
W: Work zone safety priority
CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition
Notes:
Phases:
2: Project is being advance constructed with non-federal funds
P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM
B: Project addresses Federal Bridge Condition PM
A: Project utilizes an alternative contracting method.
M: Project included in multiple programs
33,3052,860----
33,3052,860
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 19
District 1 Public Transit Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Transit Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
M19430
1
TRNS-CAP 5339 RuralMISCELLANEOUS
TRANSIT, D1 5339 BUS AND BUS FACILITYMP 0.000 - 0.000 Bus Purchase / Construction
-
4,285
-
3,428
-
857- - -
CN
RWPE
-613613613613613------
-----
--
--- - -
M
1
TRNS-CAP 5339 SUrbMISCELLANEOUS
TRANSIT, D1 5339 BUS AND BUS FACILITYMP 0.000 - 0.000 Bus Purchase / Construction
-
4,285
-
3,428
-
857- - -
CN
RWPE
-244244244244244------
-----
--
--- - -
Program provides capital funding to replace, rehabilitate and purchase buses and related equipment or to construct bus‐related facilities in rural and small urban areas directly affecting Benewah, Bonner, Boundary, Kootenai, Shoshone counties.
196191
TRNS-OPS 5311 RuralSTATE OF IDAHO (ITD)
TRANSIT, D1 5311 STATEWIDE RURAL AREA FORMULA PROGMP 0.000 - 0.000 Transit Admin/Operations/PM
-
8,240
-
5,182
-
3,058- - -
CN
RWPE
-1,6481,6481,6481,6481,648------
-----
--
--- - -
Program provides capital, planning, and operating assistance to support public transportation operators who provide demand response and fixed route services in rural areas with populations less than 50,000. Serving Benewah, Bonner, Boundary, Kootenai, Shoshone counties.
M20013
1
TRNS-OPS 5310 RuralMISCELLANEOUS
TRANSIT, D1 ELDERLY & DISABLEDMP 0.000 - 0.000 Demand Response Operations
-
2,310
-
1,640
-
670- - -
CN
RWPE
-139139139139139------
-----
--
--- - -
M
1
TRNS-OPS 5310 SUrbMISCELLANEOUS
TRANSIT, D1 ELDERLY & DISABLEDMP 0.000 - 0.000 Demand Response Operations
-
2,310
-
1,640
-
670- - -
CN
RWPE
-323323323323323------
-----
--
--- - -
Program serves the special needs of transit‐dependent senior citizens and persons with disabilities by providing funds for projects which go beyond traditional transit services (demand response) including those required under the Americans with Disabilities Act (ADA).
ORN230541
TRNS-OPS 5311 RuralSTATE OF IDAHO (ITD)
TRANSIT, D1 5311 CARES ACTMP - Security
-
2,867
-
2,867
-
-- - -
CN
RWPE
-----2,867------
-----
--
--- - -
Provides operating and capital funding for Coronavirus Aid, Relief, and Economic Security in rural areas.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 20
District 1 Public Transit Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Transit Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027Construction
Right-of-WayDevelopment
-2,9672,9672,9672,9675,834------------
Total -2,9672,9672,9672,9675,834G: Project is grouped in STIP
1: Project is also shown in a Transportation Improvement Program
W: Work zone safety priority
CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition
Notes:
Phases:
2: Project is being advance constructed with non-federal funds
P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM
B: Project addresses Federal Bridge Condition PM
A: Project utilizes an alternative contracting method.
M: Project included in multiple programs
--------
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 21
District 1 Aeronautics Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Aeronautics Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
192511
APT-NEW GA-APTSHOSHONE COUNTY
S83, KELLOGG, EXPAND APRON, DESIGNMP 0.000 - 0.000 APT DEV, New Facility
-
-
-
-
-
-200 200 -
CN
RWPE
-----------200
-----
--
--- - -
Design ‐ Expand aircraft parking apron.
194931
APT-NEW GA-APTBOUNDARY COUNTY
65S, BONNERS FERRY, EXTEND RUNWAY PH II CONSTRUCTMP 0.000 - 0.000 APT DEV, New Facility
-
634
-
571
-
63- - -
CN
RWPE
---634--------
-----
--
--- - -
Construct Rwy Extension
198821
APT-MTNC GA-APTBOUNDARY COUNTY
65S, BONNERS FERRY, REHABILITATE APRON PH II CONSTRMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
67
-
60
-
7- - -
CN
RWPE
---67--------
-----
--
--- - -
Construct Apn rehab
199751
APT-NEW GA-APTBOUNDARY COUNTY
65S, BONNERS FERRY, EXTEND TAXIWAY LIGHTINGMP 0.000 - 0.000 APT DEV, New Facility
-
30
-
27
-
3- - -
CN
RWPE
---30--------
-----
--
--- - -
Extend Twy lighting
199821
APT-NEW GA-APTBONNER COUNTY
SZT, SANDPOINT, INSTALL SEGMENTED CIRCLE, DESIGNMP 0.000 - 0.000 APT DEV, New Facility
-
20
-
18
-
2- - -
CN
RWPE
-20----------
-----
--
--- - -
Design ‐ Install Segmented Circle
199851
APT-NEW GA-APTBOUNDARY COUNTY
65S, BONNERS FERRY, EXTEND RUNWAY LIGHTINGMP 0.000 - 0.000 APT DEV, New Facility
-
80
-
72
-
8- - -
CN
RWPE
---80--------
-----
--
--- - -
Extend Rwy lighting
200211
APT-MTNC GA-APTSHOSHONE COUNTY
S83, KELLOGG, REHABILITATE TAXIWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
100
-
90
-
10- - -
CN
RWPE
--100---------
-----
--
--- - -
Fog seal, crack seal, and remarking of Runway, Taxiway and Apron
201301
APT-PLAN GA-APTBONNER COUNTY
SZT, SANDPOINT, MASTER PLAN UPDATEMP 0.000 - 0.000 APT PLN, Airport Planning
-
-
-
-
-
-400 360 40
CN
RWPE
---------400--
-----
--
--- - -
Master Plan Update
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 22
District 1 Aeronautics Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Aeronautics Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
201761
APT-NEW GA-APTBOUNDARY COUNTY
65S, BONNERS FERRY, EXTEND TAXIWAY PH II CONSTRUCTMP 0.000 - 0.000 APT DEV, New Facility
-
342
-
308
-
34- - -
CN
RWPE
---342--------
-----
--
--- - -
Construct Twy Extension
201791
APT-MTNC GA-APTBOUNDARY COUNTY
65S, BONNERS FERRY, REHABILITATE RUNWAY PH II CONSTMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
1,463
-
1,316
-
147- - -
CN
RWPE
---1,463--------
-----
--
--- - -
Construct Rwy rehab
201971
APT-MTNC GA-APTBOUNDARY COUNTY
65S, BONNERS FERRY, REHABILITATE TAXIWAY PH II CONSTMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
845
-
760
-
85- - -
CN
RWPE
---845--------
-----
--
--- - -
Construct Twy rehab
203751
APT-NEW GA-APTBONNER COUNTY
1S6, PRIEST RIVERACQUIRE SREMP 0.000 - 0.000 APT DEV, New Facility
-
300
-
270
-
30- - -
CN
RWPE
-300----------
-----
--
--- - -
Acquire Snow Removal Equipment
204431
APT-MTNC GA-APTBONNER COUNTY
SZT, SANDPOINT, RECONSTRUCT RUNWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
378
-
378
-
-- - -
CN
RWPE
-----378------
-----
--
--- - -
DESIGN ‐ Reconstruct runway due to poor pavement condition rating.
204941
APT-MTNC GA-APTSHOSHONE COUNTY
S83, KELLOGG, REHABILITATE APRONMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
100
-
90
-
10- - -
CN
RWPE
--100---------
-----
--
--- - -
Fog seal, crack seal, and remarking of Runway, Taxiway and Apron
205241
APT-MTNC GA-APTBONNER COUNTY
1S6, PRIEST RIVER, INSTALL RUNWAY LIGHTING, CONSTRUCMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
2,200
-
1,980
-
220- - -
CN
RWPE
---2,200--------
-----
--
--- - -
CONSTRUCT ‐ widen runway 2/20 includes MIRL and PAPI
205581
APT-NEW GA-APTSHOSHONE COUNTY
S83, KELLOGG, EXPAND APRON, CONSTRUCTMP 0.000 - 0.000 APT DEV, New Facility
-
1,795
-
1,616
-
179- - -
CN
RWPE
----1,795-------
-----
--
--- - -
Expand aircraft parking apron.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 23
District 1 Aeronautics Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Aeronautics Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
206701
APT-MTNC GA-APTSHOSHONE COUNTY
S83, KELLOGG, REHABILITATE TAXIWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
200
-
180
-
20- - -
CN
RWPE
--200---------
-----
--
--- - -
Fog seal, crack seal, and remarking of Runway, Taxiway and Apron
206901
APT-MTNC GA-APTBONNER COUNTY
SZT, SANDPOINT, TAXIWAY LIGHTING & SIGNS, DESIGNMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
665
-
599
-
66- - -
CN
RWPE
--665---------
-----
--
--- - -
Design ‐Taxiway construction costs include new edge lighting and lighted signs
207181
APT-NEW GA-APTBONNER COUNTY
1S6, PRIEST RIVER, SRE BUILDINGMP 0.000 - 0.000 APT DEV, New Facility
-
1,667
-
1,500
-
167- - -
CN
RWPE
-1,667----------
-----
--
--- - -
Construct Snow Removal Equipment Bldg.
224171
APT-MTNC GA-APTBOUNDARY COUNTY
65S, BOUNDARY COUNTY, AIRPORT TAXIWAY WIDENINGMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
597
-
538
-
59- - -
CN
RWPE
---597--------
-----
--
--- - -
Widen taxiway to meet FAA standards
225341
APT-NEW GA-APTST MARIES
S72, ST MARIES, AIRPORT TAXIWAY DESIGNMP 0.000 - 0.000 APT PLN, Airport Planning
-
-
-
-
-
-140 126 14
CN
RWPE
--------140---
-----
--
--- - -
St Maries Municipal Airport taxilane design
225351
APT-NEW GA-APTBENEWAH COUNTY
S72, ST MARIES, AIRPORT TAXILANE CONSTRUCTMP 0.000 - 0.000 APT DEV, Facility
-
700
-
630
-
70- - -
CN
RWPE
-700----------
-----
--
--- - -
St Maries Municipal Airport taxilane construction
225651
APT-MTNC GA-APTBONNER COUNTY
SZT, SANDPOINT, RELOCATE BOYER ROADMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
144
-
130
-
14- - -
CN
RWPE
----144-------
-----
--
--- - -
Relocate Boyer Road and fence beyond Object Free Area
225661
APT-NEW GA-APTBONNER COUNTY
SZT, SANDPOINT, AIRPORT LAND PURCHASEMP 0.000 - 0.000 APT DEV, New Facility
1,166
-
1,166
-
-
-- - -
CN
RWPE
------------
----1,166
--
--- - -
Land purchase to meet FAA standards for RPZ control
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 24
District 1 Aeronautics Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Aeronautics Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
225671
APT-NEW GA-APTBONNER COUNTY
SZT, SANDPOINT, AIRPORT LAND PURCHASEMP 0.000 - 0.000 APT DEV, New Facility
1,102
-
992
-
110
-- - -
CN
RWPE
------------
---1,102-
--
--- - -
Purchase land for taxiways
225681
APT-NEW GA-APTBONNER COUNTY
SZT, SANDPOINT, AIRPORT TAXIWAY CONSTRUCTIONMP 0.000 - 0.000 APT DEV, New Facility
-
380
-
342
-
38- - -
CN
RWPE
---380--------
-----
--
--- - -
Construct taxiways.
225691
APT-NEW GA-APTBONNER COUNTY
SZT, SANDPOINT, AIRPORT TAXIWAY CONSTRUCTIONMP 0.000 - 0.000 APT DEV, New Facility
-
2,488
-
2,239
-
249- - -
CN
RWPE
-2,488----------
-----
--
--- - -
Airport taxiway construction to include lighting and guidance signs
225701
APT-MTNC GA-APTSHOSHONE COUNTY
S83, KELLOG, AIRPORT FENCEMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
20
-
18
-
2- - -
CN
RWPE
-20----------
-----
--
--- - -
Install perimeter fence
225711
APT-MTNC GA-APTSHOSHONE COUNTY
S83, KELLOG, AIRPORT OBSTUCTION REMOVALMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
200
-
200
-
-- - -
CN
RWPE
-----200------
-----
--
--- - -
Remove obstructions
225751
APT-MTNC GA-APTBONNER COUNTY
1S6, PRIEST RIVER, AIRPORT OBST REMOVALMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
144
-
144
-
-- - -
CN
RWPE
-----144------
-----
--
--- - -
Removed obstructions in airport approaches
225761
APT-MTNC GA-APTBONNER COUNTY
1S6, PRIEST RIVER, AIRPORT OBST REMOVALMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
200
-
200
-
-- - -
CN
RWPE
-----200------
-----
--
--- - -
Remove trees obstructing airport airspace
225771
APT-PLAN GA-APTBONNER COUNTY
1S6, PRIEST RIVER, AIRPORT EAMP 0.000 - 0.000 APT PLN, Airport Planning
-
-
-
-
-
-167 150 17
CN
RWPE
----------167-
-----
--
--- - -
Priest River Airport Environmental Assessment
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 25
District 1 Aeronautics Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Aeronautics Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
225781
APT-NEW GA-APTBONNER COUNTY
1S6, PRIEST RIVER, AIRPORT LAND PURCHASEMP 0.000 - 0.000 APT DEV, Land Purchase
1,500
-
1,350
-
150
-- - -
CN
RWPE
------------
-1,500---
--
--- - -
Land purchase to approach safety
225831
APT-MTNC GA-APTBENEWAH COUNTY
S72, ST MARIES, AIRPORT LAND PURCHASEMP 0.000 - 0.000 APT DEV, New Facility
250
-
225
-
25
-- - -
CN
RWPE
------------
-----
--
--
250 - -
225841
APT-MTNC GA-APTSHOSHONE COUNTY
S83, SHOSHONE COUNTY, AIRPORT PERIMETER FENCEMP 0.000 - 0.000 APT DEV, New Facility
-
500
-
450
-
50- - -
CN
RWPE
------------
-----
--
500-- - -
229341
APT-MTNC GA-APTBOUNDARY COUNTY
65S, BOUNDARY COUNTY AIRPORT, AIRFIELD IMPROVEMENMP - APT DEV, Facility Maintenance
-
-
-
-
-
-206 185 21
CN
RWPE
----------206-
-----
--
--- - -
Construction
Right-of-WayDevelopment
5005,1941,0656,6381,940922--140400373200
250-1,500-1,1021,166Total 7505,1942,7057,0383,4152,288
G: Project is grouped in STIP
1: Project is also shown in a Transportation Improvement Program
W: Work zone safety priority
CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition
Notes:
Phases:
2: Project is being advance constructed with non-federal funds
P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM
B: Project addresses Federal Bridge Condition PM
A: Project utilizes an alternative contracting method.
M: Project included in multiple programs
--------
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 26
District 2 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside LCVMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
MRP9294
2
DEMO HIPRISTATE OF IDAHO (ITD)
US 95, THORN CR RD TO MOSCOW, PH 1MP 337.200 - 343.982 RECONST/REALIGN, Plant Mix Paveme
5,500
70,847
5,096
63,350
404
7,4976,157 5,525 632
CN
RWPE
-----18,426------
-----
--
--- - -
MRP
2
APPR 129STATE OF IDAHO (ITD)
US 95, THORN CR RD TO MOSCOW, PH 1MP 337.200 - 343.982 RECONST/REALIGN, Plant Mix Paveme
5,500
70,847
5,096
63,350
404
7,4976,157 5,525 632
CN
RWPE
-----490------
-----
--
--- - -
MRP
2
CPCTY NHSTATE OF IDAHO (ITD)
US 95, THORN CR RD TO MOSCOW, PH 1MP 337.200 - 343.982 RECONST/REALIGN, Plant Mix Paveme
5,500
70,847
5,096
63,350
404
7,4976,157 5,525 632
CN
RWPE
--24,284-20,2457,252------
-----
--
--- - -
This project will replace approximately 6.5 miles of the existing two‐lane roadway with a new four‐lane divided highway on Hwy‐95 from mileposts 337.2 to 343.9. The project is expected to improve safety and highway capacity by widening shoulders, adding rumble strips, and replacing guardrail.
129952
SAFETY HSIPSTATE OF IDAHO (ITD)
US 12, GREER RD TO KAMIAH, ROCKFALL MITIGATIONMP 51.569 - 56.085 SAFTY/TRAF OPER, Safety Improveme
255
4,962
236
4,597
19
365710 658 52
CN
RWPE
--4,962--------100
---255-
--
--- - -
This project will mitigate potential rock fall along the westbound lane of US‐12 between MP 51.569 to 56.085. Work activities include excavating and blasting rock outcrops, rock fall removal, guardrail update, culvert replacements, and a plant mix overlay.
RP130022
CPCTY STSTATE OF IDAHO (ITD)
US 95, MISSION CR TO GOLDEN EAGLE RD, NEZ PERCE COMP 293.720 - 296.320 RESRF/RESTO&REHAB, Minor Widenin
-
3,641
-
-
-
3,641645 37 608
CN
RWPE
---3,641--------
-----
--
--- - -
This project will widen US‐95 from milepost 293.7‐296.32 to include constructing a 1.5 mile northbound passing lane from Mission Creek Bridge, a right turn lane and southbound acceleration lane at Webb Road. This project will increase mobility and safety by adding additional passing opportunities on US‐95.
RP130042
CPCTY NHSTATE OF IDAHO (ITD)
US 95, POTLATCH NB PASSING LN, LATAH COMP 361.700 - 363.000 MAJRWIDN, Passing Lane
-
2,717
-
2,517
-
200265 246 19
CN
RWPE
-2,717----------
-----
--
--- - -
This project will construct a northbound passing lane on US 95 from milepost 361.7 to milepost 363 in Latah County.
130082
CPCTY STPSTATE OF IDAHO (ITD)
SH 8, MP 5 EB PASSING LN, LATAH COMP 5.000 - 6.400 MAJRWIDN, Passing Lane
-
2,642
-
2,448
-
194220 204 16
CN
RWPE
--2,642---------
-----
--
--- - -
This project consists of constructing an Eastbound passing lane on Hwy‐ 8 from Milepost 5.0 to Milepost 6.4. This passing lane will provide more mobility and allow travelers to pass slower moving vehicles safely.
130142
STP-URBAN (L) STP-UMOSCOW
SMA-7674, MOUNTAIN VIEW RD, MOSCOWMP 0.288 - 0.474 RECONST/REALIGN, Grading & Draina
100
3,458
93
3,204
7
254513 475 38
CN
RWPE
--1,9571,501--------
-----
--
--- - -
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 27
District 2 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside LCVMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
This project will widen Mountain View Rd. in Moscow from a 24 foot wide paved two‐lane rural road section to a 36 foot wide two‐lane urban road section. This new section will have bicycle lanes, turn lanes where warranted, storm drainage improvements, illumination upgrades, curbs, gutter, sidewalks, tree lawns, and a roundabout at the intersection of Mountain View Road and 6th Street. This project is located on SMA‐7674 between mile points 0.288 and 0.474.
134452
BR-LOCAL STP-RURALIDAHO COUNTY
STC-4715, CLEAR CR BR, IDAHO COMP 101.920 - 102.080 BR/APPRS, Bridge Replacement
-
1,747
-
1,619
-
128658 609 49
CN
RWPE
-----1,747------
-----
--
--- - -
This project will replace the 50 year old Clear Creek bridge in Idaho County. The bridge is outdated and will be replaced with a new structure that meets current standards. It is a vital transportation asset for Idaho county as it serves as an access point to hundreds of residents, several businesses, and the primary access point to the Nez Perce Tribes Clear Creek Fish Hatchery. This project is located on STC‐4715 between mile points 101.92 and 102.08.
187702
STP-RURAL (L) STP-RURALGENESEE
STC-4792, BEECH/CHESTNUT ST RECONSTRUCTION, GENESMP 0.728 - 1.371 RESRF/RESTO&REHAB, Minor Widenin
40
3,244
37
3,006
3
238655 607 48
CN
RWPE
----3,244-------
----40
--
--- - -
This project will rehabilitate the roadway on Chestnut Street from Jackson St to Cedar St. This roadway is a major rural route that needs a major rehabilitation including: widening, storm water system repairs, sidewalks, bike lanes, turn lanes, resurfacing, lighting and landscape enhancements. This project is located on STC‐4792 between mile points 0.728 and 1.371.
RBP2
192612
CPCTY STECMSTATE OF IDAHO (ITD)
US 95, CULDESAC CANYON PASSING LN PH 2; LAPWAI CR BRMP 279.700 - 282.200 MAJRWIDN, Passing Lane
-
32,784
-
23,231
-
9,553805 679 126
CN
RWPE
-----2,500------
-----
--
--- - -
This project will construct the Culdesac Canyon passing lane on Hwy‐95 from Milepost 279.7 to Milepost 282.2. This passing lane will provide more mobility and allow travelers to pass slower moving vehicles safely. And replace nine very large culverts with precast bridges over Lapwai Creek.
P193772
SAFETY HSIPSTATE OF IDAHO (ITD)
US 12, LOCHSA RANGER STATION TO HOLLY CR TURNOUT, IMP 121.300 - 131.500 RESRF/RESTO&REHAB, Minor Widenin
-
9,547
-
8,846
-
701845 783 62
CN
RWPE
---9,547--------
-----
--
--- - -
This project will construct a shoulder notch on both sides of Hwy‐12 from Lochsa Ranger Station (milepost 121.3) to Holly Cr Turnout (milepost 131.5).
RP195262
SAFETY HSIPSTATE OF IDAHO (ITD)
US 95, JCT SH 6 TURNBAY, LATAH COMP 360.285 - 361.000 MAJRWIDN, Turn Bay
-
3,264
-
3,024
-
240433 401 32
CN
RWPE
----3,264-------
-----
--
--- - -
This project consists of constructing right and left turn bays off US 95 and the Jct. of US 95 & Meckel Road at milepost 360.
RP198222
CPCTY NHSTATE OF IDAHO (ITD)
US 95, FERDINAND NB PASSING LN, IDAHO COMP 261.000 - 263.825 MAJRWIDN, Passing Lane
-
1,905
-
1,765
-
14060 56 4
CN
RWPE
------------
-----
--
1,905-- - -
This project consists of constructing a north bound passing just south of the city of Ferdinand on US‐95 between mileposts 261 and 264.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 28
District 2 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside LCVMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
198612
SAFETY HSIPSTATE OF IDAHO (ITD)
SH 13, CURVE IMPROVEMENT, NR KOOSKIAMP 23.400 - 23.800 RECONST/REALIGN, Base/Sub-base W
-
1,177
-
1,091
-
86370 343 27
CN
RWPE
----1,177-------
-----
--
--- - -
This project consists of constructing a curve improvement at Milepost 23.5 on SH‐13 just south of the city of Kooskia.
RP199412
SAFETY HSIPSTATE OF IDAHO (ITD)
US 95, RIVERSIDE NB PASSING LN, LATAH COMP 358.820 - 359.820 MAJRWIDN, Passing Lane
60
1,418
56
1,314
4
104365 338 27
CN
RWPE
-----1,418------
-----
--
--- - -
This project consists of constructing a north bound passing lane on the south side of Riverside Hill just south of the US‐95 and SH‐6 intersection. The project is located at milepost 359 on US‐95.
RP200292
CPCTY NHSTATE OF IDAHO (ITD)
US 95, FREEZE RD TO BEPLATE RD PASSING LNS, LATAH COMP 364.130 - 365.960 MAJRWIDN, Passing Lane
-
2,160
-
2,001
-
159160 148 12
CN
RWPE
------------
-----
--
2,160-- - -
This project consists of constructing a north and south bound passing lane between Freeze Rd. and Beplate Rd. just north of Potlatch on US‐95 between mileposts 364 and 366.
MRP20032
2
BR-RESTORE NHSTATE OF IDAHO (ITD)
US 95, CULDESAC CANYON PASSING LN, PH 3, NEZ PERCE CMP 283.830 - 286.130 MAJRWIDN, Passing Lane
75
10,346
69
1,681
6
8,6651,206 640 566
CN
RWPE
---1,815--------
-----
--
--- - -
MRP
2
CPCTY STECMSTATE OF IDAHO (ITD)
US 95, CULDESAC CANYON PASSING LN, PH 3, NEZ PERCE CMP 283.830 - 286.130 MAJRWIDN, Passing Lane
75
10,346
69
1,681
6
8,6651,206 640 566
CN
RWPE
---8,531--------
-----
--
--- - -
This project will construct a south bound passing lane on US‐95 in Culdesac Canyon from milepost 283.83 to 286.13. The passing lane will increase mobility and allow travelers to pass slower vehicles safely.
RP200902
SAFETY HSIPSTATE OF IDAHO (ITD)
US 95, GRANGEVILLE TRUCK ROUTE BYPASS RD TURNBAYMP 240.320 - 240.560 MAJRWIDN, Turn Bay
-
790
-
732
-
58163 151 12
CN
RWPE
---790--------
-----
--
--- - -
This project consist of constructing a south bound left turn bay and a north bound right turn bay at the intersection of US‐95 and the Grangeville Truck Route Bypass Road just north of the city of Grangeville. The project is located at milepost 240 on US‐95.
201092
SAFETY (L) HSIP (L)MOSCOW
STC-7664, 6TH ST PED IMPRV, MOSCOWMP 0.000 - 0.000 SAFTY/TRAF OPER, Intersection Improv
-
123
-
114
-
951 45 6
CN
RWPE
-----113------
-----
--
--- - -
This project will make improvements to this corridor with the installation of ADA compliant curb extensions to reduce the pedestrian crossing length and improve pedestrian visibility. Additionally the project will include the improvement of pedestrian ramps and crosswalks to eliminate gaps in the ADA compliant corridor connecting the University of Idaho to the central business district and high‐density residential.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 29
District 2 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside LCVMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
RP203952
CPCTY STECMSTATE OF IDAHO (ITD)
US 95, CULDESAC CANYON PASSING LN PH 4, LEWIS COMP 286.130 - 289.220 MAJRWIDN, Passing Lane
75
7,959
69
-
6
7,9591,439 685 754
CN
RWPE
--7,959---------
-----
--
--- - -
This project is a continuation of the Culdesac Canyon Passing Lane Phase 2 and Phase 3 projects and will construct a south bound US‐95 passing lane in Culdesac Canyon from milepost 286.13 to 289.22. The passing lane will increase mobility and allow safer travel.
RP204262
CPCTY STSTATE OF IDAHO (ITD)
US 95, S WINCHESTER TO CHAINUP TURNOUT, LEWIS COMP 278.030 - 278.880 MAJRWIDN, Minor Widening & Resurfac
-
1,043
-
-
-
1,043495 - 495
CN
RWPE
------------
-----
--
1,043-- - -
This project consists of constructing a Northbound Passing Lane to help reduce congestion on US‐95.
RP204442
CPCTY STECMSTATE OF IDAHO (ITD)
US 95, CULDESAC CANYON PASSING LN PH 5, NEZ PERCE CMP 283.120 - 289.210 MAJRWIDN, Passing Lane
-
7,331
-
-
-
7,3311,550 315 1,235
CN
RWPE
----------510500
-----
--
7,331-- - -
This project consists of constructing a South Bound passing lane in Culdesac Canyon, Phase 5. The project is located on US‐95 between mileposts 283 and 289.
204832
SAFETY (L) HSIP (L)MOSCOW
SH 8, 3RD ST SAFETY IMPRV PH 1, MOSCOWMP 1.612 - 1.797 SAFTY/TRAF OPER, Sidewalk
-
358
-
332
-
2666 61 5
CN
RWPE
-----358------
-----
--
--- - -
The Third Street (SH‐8) Safety Improvements Phase 1 project is located in the City of Moscow in Latah County will improve pedestrian/bike safety with the replacement of curb, pedestrian ramps and sidewalk along with the installation of additional roadway lighting to reduce/eliminate serious injury crashes and fatalities. The project is located on the roadside of SH‐8 between mile points 1.612 and 1.797.
207772
FLAP (L) FLAPCLEARWATER COUNTY
STC-4783, DENT BRIDGE RD, CLEARWATER COMP 20.000 - 36.000 RESRF/RESTO&REHAB, CRABS
-
3,556
-
3,295
-
261444 411 33
CN
RWPE
-2962,966-294-----200244
-----
--
--- - -
Utilize available funding to rehabilitate northern section of road, including guardrail, cement recycled asphalt base (CRAB) and asphalt concrete pavement, minor realignment, retaining walls, drainage, and erosion control. This project is located on STC‐4783 between mile points 20 and 36.
219652
OTH-FA OTH-FEDSTATE OF IDAHO (ITD)
US 12, BIG SMITH CR FISH PASSAGE, IDAHO COMP 88.350 - 88.450 BR/APPRS, Bridge Replacement
-
2,000
-
-
-
2,000300 - 300
CN
RWPE
-----2,000------
-----
--
--- - -
This project is being funded by USDA funds. This project will replace an existing structure with a fish friendly structure. The project is located on US‐12 at milepost 88.
219862
BR-OFF BR-OFFNORTH LATAH HD
OFFSYS, SAND RD BR NR MOSCOW, N LATAH HDMP 1.800 - 1.900 BR/APPRS, Bridge Replacement
36
1,919
33
1,778
3
141505 468 37
CN
RWPE
1,919----------505
---36-
--
--- - -
Replace Sand Road bridge over the South Fork of the Palouse River west of Moscow. The project is located at mile point 1.85.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 30
District 2 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside LCVMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
219962
SAFETY (L) HSIP (L)CLEARWATER COUNTY
OFFSYS, OLD AHSAHKA GRADE, CLEARWATER COMP 108.540 - 111.620 SAFTY/TRAF OPER, Metal Guard Rail
-
317
-
317
-
-57 57 -
CN
RWPE
-----317------
-----
--
--- - -
The Old Ahsahka Grade Guardrail project, located near the City of Ahsahka in Clearwater County, will install roughly 7,000 feet of steel post guardrail adjacent to the steepest embankments to eliminate run off the road possibilities along this 2.5 Mile section of roadway to reduce/eliminate fatal and serious injury crashes for all roadway users. The project is located between mile points 108.54 and 111.62.
219972
SAFETY (L) HSIP (L)MOSCOW
SH 8, 3RD ST SAFETY IMPRV PH2, MOSCOWMP 1.540 - 1.615 SAFTY/TRAF OPER, Illumination
-
264
-
245
-
1944 41 3
CN
RWPE
-----264------
-----
--
--- - -
The Third Street Corridor Safety Improvement, Phase 2, project, located in the City of Moscow in Latah County, will remove and replace concrete sidewalk, upgrade ADA pedestrian ramps, install curb and gutter, install LED Luminaires and install four high visibility thermoplastic crosswalks to reduce/eliminate fatal and serious injury accidents for all roadway users. The project is located on the roadside of SH‐8 between mile points 1.54 and 1.615.
RP222122
CPCTY STSTATE OF IDAHO (ITD)
US 95, MISSION CR TO GOLDEN EAGLE RD EARLY R/W, NEZ MP 293.720 - 296.320 ENV PRESV, Minor Widening & Resurfa
150
-
-
-
150
-- - -
CN
RWPE
------------
----150
--
--- - -
This project will allow the District to purchase the Right‐of‐Way early. The project is on US‐95 between mileposts 293 and 296.
222952
BR-RESTORE STPSTATE OF IDAHO (ITD)
SH 13B, MIDDLE FK CLEARWATER RV BR, KOOSKIAMP 0.703 - 0.703 BR/APPRS, Bridge Replacement
-
7,433
-
6,887
-
546732 678 54
CN
RWPE
---------26306400
-----
--
7,433-- - -
This project will replace the Clearwater River bridge at MP 0.703 on SH‐13B in Kooskia. The bridge is currently posted and was originally built in 1935
224022
SAFETY (L) HSIP (L)MOSCOW
OFFSYS, PUBLIC AVE; POLK ST TO ORCHARD AVE, MOSCOWMP 10.000 - 10.440 SAFTY/TRAF OPER, Intersection Improv
-
851
-
788
-
63122 113 9
CN
RWPE
----851------122
-----
--
--- - -
For the work of constructing a concrete splitter island at the intersection of Polk Avenue and Public Avenue, upgrade the road section, install approximately 2,200 linear feet of curb, gutter, and 5‐foot sidewalk, and widen the roadway to eliminate roadside ditches. This project is located on Public Ave. between mileposts 10.0 and 10.44.
224042
SAFETY (L) HSIP (L)GRANGEVILLE HD
LOCAL, LAKE RD SAFETY IMPROVEMENTS, GRANGEVILLE HMP 101.190 - 103.450 SAFTY/TRAF OPER, Minor Widening
20
1,023
19
948
1
75147 136 11
CN
RWPE
----1,023-------
---20-
--
--- - -
For the work of improving the rural roadway by redesigning the horizontal and vertical curves. The project is located between mileposts 101.19 and 103.45.
226032
FLAP (L) FLAPCLEARWATER COUNTY
STC-4783, DENT BRIDGE RD SAFETY IMPROV, CLEARWATER MP 20.000 - 36.000 RESRF/RESTO&REHAB, Metal Guard
-
3,262
-
3,023
-
239444 411 33
CN
RWPE
-2962,966-----20022420-
-----
--
--- - -
Guard rail demolition and installation, Cement Recycled Asphalt Base (CRABS) and an asphalt concrete pavement, some minor realignment, some retaining wall construction, drainage improvements, as well as environment compliance and erosion control.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 31
District 2 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside LCVMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
226082
FLAP (L) FLAPSHOSHONE COUNTY
STC-5752, PRICHARD TO MURRAY SAFETY IMPROV, SHOSHOMP 23.043 - 29.175 SAFTY/TRAF OPER, Safety Improveme
-
1,651
-
1,530
-
121225 208 17
CN
RWPE
-1501,501-----10010025-
-----
--
--- - -
Safety improvements of approximately 6.43 miles of Forest Hwy 9 to current FHWA standards is proposed.
ORN227082
SAFETY HSIPSTATE OF IDAHO (ITD)
US 12, SPALDING TO ARROW N&S PASSING LANES, NEZ PERMP 10.900 - 14.900 MAJRWIDN, Safety
-
9,325
-
8,640
-
685255 236 19
CN
RWPE
--------1065297-
-----
9,325-
--- - -
This project consists of constructing a passing lane in the east and westbound lanes on US‐12 from MP 10.900 to 14.900.
ORN227362
SAFETY HSIPSTATE OF IDAHO (ITD)
US 95, SPALDING BR TO THORN CR RD CABLE BARRIERMP 304.618 - 337.368 SAFTY/TRAF OPER, Metal Guard Rail
-
4,524
-
4,192
-
33250 46 4
CN
RWPE
-----------50
-----
4,524-
--- - -
This project consists of constructing a cable median barrier on US‐95 between MP 304.618 and 337.368.
PORN227502
SAFETY NHSTATE OF IDAHO (ITD)
US 95, FOOTHILLS RD & ESTES RD TURNBAYS, LATAH COMP 347.201 - 348.706 MAJRWIDN, Turn Bay
-
1,591
-
1,475
-
116139 129 10
CN
RWPE
---------4297-
-----
1,591-
--- - -
This project consists of constructing turn bays at the intersections of Foothills Rd and Estes Rd on US‐95 between MP 347.201 and 348.706.
ORN227762
OTHER ASSETS STSTATE OF IDAHO (ITD)
SH 64, NEZPERCE TO DRAKE RD, LEWIS COMP 15.413 - 23.706 PM, Pavement Rehabilitation & Resurfac
-
243
-
-
-
2437 - 7
CN
RWPE
-----243-----7
-----
--
--- - -
This project consists of repairing soft spots within the existing roadway on SH‐64 between MP 15.413 and 23.706.
ORN227802
OTHER ASSETS STSTATE OF IDAHO (ITD)
US 12, FY21 D2 HIGH PRI CULVERT REPLACEMENT, IDAHO CMP 77.960 - 85.180 RESRF/RESTO&REHAB, Drainage Impr
-
218
-
-
-
2188 - 8
CN
RWPE
-----218-----8
-----
--
--- - -
This project consists of replacing high priority culverts under US‐12 between MP 77.960 and 85.180.
ORN227822
OTHER ASSETS STSTATE OF IDAHO (ITD)
STATE, FY22 D2 SOFT SPOT REPAIRSMP - PM, Pavement Rehabilitation & Resurfac
-
250
-
-
-
2507 - 7
CN
RWPE
----250-----7-
-----
--
--- - -
This project consists of repairing soft spots within the roadway in Latah County.
ORN227832
OTHER ASSETS STSTATE OF IDAHO (ITD)
STATE, FY23 D2 SOFT SPOT REPAIRSMP - PM, Pavement Rehabilitation & Resurfac
-
253
-
-
-
2537 - 7
CN
RWPE
---253-------7
-----
--
--- - -
This project consists of soft spot repairs to the existing roadway at various to‐be‐determined locations throughout the District to maintain the pavement in good condition.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 32
District 2 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside LCVMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
ORN227852
OTHER ASSETS STSTATE OF IDAHO (ITD)
STATE, FY22 D2 HIGH PRIORITY CULVERT REPLACEMENTSMP - RESRF/RESTO&REHAB, Drainage Impr
-
242
-
-
-
24211 - 11
CN
RWPE
----242------11
-----
--
--- - -
This project consists of replacing or lining high priority culverts at various to‐be‐determined locations throughout the District to maintain the drainage system in good condition.
ORN227872
OTHER ASSETS STSTATE OF IDAHO (ITD)
STATE, FY22 D2 HIGHWAY LUMINAIRES LED UPDATEMP - SAFTY/TRAF OPER, Safety Improveme
-
107
-
-
-
1075 - 5
CN
RWPE
----107------5
-----
--
--- - -
This project consists of updating all of ITD's highway and street lighting luminaires to LED at various locations throughout the District.
ORN227882
OTHER ASSETS STSTATE OF IDAHO (ITD)
US 95B, WINCHESTER BUSINESS LOOPMP 0.000 - 4.021 PM, Preventive Maintenance
-
378
-
-
-
37810 - 10
CN
RWPE
---378-------10
-----
--
--- - -
This project consists of repairing soft spots and approaches on US‐95B between MP 0.000 and 4.021. This will be achieved by constructing mill and inlays, soft spot repairs, pothole/fog line patches, and approach aprons.
ORN228772
SAFETY (L) HSIP (L)CLEARWATER COUNTY
LOCAL, SIGNING & GUARDRAIL, CLEARWATER COMP - SAFTY/TRAF OPER, Signing Improvem
-
387
-
359
-
2859 55 4
CN
RWPE
---387------59-
-----
--
--- - -
This project will install LED flashing Ice signs, curve ahead signs, as well as intersection ahead signs at poor visibility locations. Additionally this project will help prevent slide offs by installing guardrail along those roads that are steep, narrow and winding.
ORN228912
BR-OFF BR-OFFNEZ PERCE COUNTY
OFFSYS, LENORE BR FEASIBILITY STUDY, NEZ PERCE COMP - PLAN/STUDY, Planning/Transportation
-
-
-
-
-
-158 146 12
CN
RWPE
----------158-
-----
--
--- - -
This project will perform a feasibility study for the Lenore Bridge. The feasibility study for this bridge replacement will allow the County to identify potential areas of concern, identify and select preferred replacement for the bridge, plan the construction process and traffic control, and create a general game plan to ensure that the bridge replacement will go smoothly in the future. This study is crucial due to the importance of the declining condition of the existing bridge and the importance of this bridge to the community.
ORN228972
TAP TAP-RURALCLEARWATER COUNTY
LOCAL, FY21 CLEARWATER SRTS, CLEARWATER COMP - ENV PRESV, Bicycle/Pedestrian/Equestr
-
56
-
52
-
4- - -
CN
RWPE
-----56------
-----
--
--- - -
This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.
ORN228982
TAP TAP-RURALCLEARWATER COUNTY
LOCAL, FY22 CLEARWATER SRTS COORDINATOR & ACTIVITIMP - ENV PRESV, Bicycle/Pedestrian/Equestr
-
56
-
52
-
4- - -
CN
RWPE
----56-------
-----
--
--- - -
This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 33
District 2 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside LCVMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
ORN228992
TAP TAP-RURALCLEARWATER COUNTY
LOCAL, FY23 CLEARWATER SRTS COORDINATOR & ACTIVITIMP - ENV PRESV, Bicycle/Pedestrian/Equestr
-
56
-
52
-
4- - -
CN
RWPE
---56--------
-----
--
--- - -
This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.
ORN229172
TAP TAP-URBANUNIVERSITY OF IDAHO
LOCAL, FY21 UNIV OF IDAHO SRTS COORDINATOR & ACTIVITMP - ENV PRESV, Bicycle/Pedestrian/Equestr
-
65
-
60
-
5- - -
CN
RWPE
-----65------
-----
--
--- - -
This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.
ORN229182
TAP TAP-URBANUNIVERSITY OF IDAHO
LOCAL, FY22 UNIV OF IDAHO SRTS COORDINATOR & ACTIVITMP - ENV PRESV, Bicycle/Pedestrian/Equestr
-
65
-
60
-
5- - -
CN
RWPE
----65-------
-----
--
--- - -
This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.
ORN229432
TAP TAP-URBANMOSCOW
LOCAL, PEDESTRIAN UNDERPASS, MOSCOWMP - ENV PRESV, Bicycle/Pedestrian/Equestr
-
859
-
427
-
432147 73 74
CN
RWPE
---859------147-
-----
--
--- - -
Underpass to connect downtown, U of I campus and surrounding neighborhoods near US95, SH8, and Sweet Avenue on the Paradise Pathway.
ORN229492
TAP TAP-RURALLAPWAI
LOCAL, MAIN ST SIDEWALK & ADA, LAPWAIMP - ENV PRESV, Sidewalk
-
443
-
411
-
323 3 -
CN
RWPE
----443------3
-----
--
--- - -
The Lapwai Main Street Sidewalk & ADA Curb Ramp Project Phase IV will remove and replace 920 feet of 8’wide hazardous sidewalks, curbs, gutters, and install six (6) new ADA curb ramps on the east side of Main Street between Willow and Birch Avenues.
Construction
Right-of-WayDevelopment
19,8723,45949,23727,75831,26035,467--4064441,6261,971----311190
Total 19,8723,45949,64328,20233,19737,628G: Project is grouped in STIP
1: Project is also shown in a Transportation Improvement Program
W: Work zone safety priority
CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition
Notes:
Phases:
2: Project is being advance constructed with non-federal funds
P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM
B: Project addresses Federal Bridge Condition PM
A: Project utilizes an alternative contracting method.
M: Project included in multiple programs
1,91915,440----
1,91915,440
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 34
District 2 Public Transit Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Transit Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside LCVMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
M19671
2
TRNS-CAP 5339 RuralMISCELLANEOUS
TRANSIT, D2 5339 BUS AND BUS FACILITYMP 0.000 - 0.000 Bus Purchase / Construction
-
2,578
-
2,062
-
516- - -
CN
RWPE
-438438438438438------
-----
--
--- - -
M
2
TRNS-CAP 5339 SUrbMISCELLANEOUS
TRANSIT, D2 5339 BUS AND BUS FACILITYMP 0.000 - 0.000 Bus Purchase / Construction
-
2,578
-
2,062
-
516- - -
CN
RWPE
-7878787878------
-----
--
--- - -
Program provides capital funding to replace, rehabilitate and purchase buses and related equipment or to construct bus‐related facilities in rural and small urban areas directly affecting Clearwater, Idaho, Latah, Lewis, Nez Perce counties.
196982
TRNS-OPS 5311 RuralMISCELLANEOUS
TRANSIT, D2 5311 STATEWIDE RURAL AREA FORMULA PROGMP 0.000 - 0.000 Transit Admin/Capital/Operations/PM
-
5,885
-
3,878
-
2,007- - -
CN
RWPE
-1,1771,1771,1771,1771,177------
-----
--
--- - -
Program provides capital, planning, and operating assistance to support public transportation operators who provide demand response and fixed route services in rural areas with populations less than 50,000. Serving Clearwater, Idaho, Latah, Lewis, Nez Perce counties.
M20226
2
TRNS-OPS 5310 RuralMISCELLANEOUS
TRANSIT, D2 ELDERLY & DISABLEDMP 0.000 - 0.000 Demand Response Operations
-
960
-
768
-
192- - -
CN
RWPE
-9090909090------
-----
--
--- - -
M
2
TRNS-OPS 5310 SUrbMISCELLANEOUS
TRANSIT, D2 ELDERLY & DISABLEDMP 0.000 - 0.000 Demand Response Operations
-
960
-
768
-
192- - -
CN
RWPE
-102102102102102------
-----
--
--- - -
Program serves the special needs of transit‐dependent senior citizens and persons with disabilities by providing funds for projects which go beyond traditional transit services (demand response) including those required under the Americans with Disabilities Act (ADA).
ORN230552
TRNS-OPS 5311 RuralSTATE OF IDAHO (ITD)
TRANSIT, D2 5311 CARES ACTMP - Security
-
2,048
-
2,048
-
-- - -
CN
RWPE
-----2,048------
-----
--
--- - -
Provides operating and capital funding for Coronavirus Aid, Relief, and Economic Security in rural areas.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 35
District 2 Public Transit Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Transit Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside LCVMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027Construction
Right-of-WayDevelopment
-1,8841,8841,8841,8843,932------------
Total -1,8841,8841,8841,8843,932G: Project is grouped in STIP
1: Project is also shown in a Transportation Improvement Program
W: Work zone safety priority
CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition
Notes:
Phases:
2: Project is being advance constructed with non-federal funds
P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM
B: Project addresses Federal Bridge Condition PM
A: Project utilizes an alternative contracting method.
M: Project included in multiple programs
--------
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 36
District 2 Aeronautics Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Aeronautics Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside LCVMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
198442
APT-MTNC GA-APTIDAHO COUNTY
GIC, GRANGEVILLE, REHABILITATE TAXIWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
460
-
460
-
-- - -
CN
RWPE
-----460------
-----
--
--- - -
Fog Seal, Crack Fill, and Painting of Parallel Taxiway and Connectors, Pavement Maintenance to Seal Taxiway to Extend Pavement Life Cycle and Protect Investment of New Construction completed in 2016.
199562
APT-MTNC PR-APTMOSCOW/PULLMAN
PUW, MOSCOW-PULLMAN, ACQUIRE TRAINING SYSTEMMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
392
-
392
-
-- - -
CN
RWPE
-----392------
-----
--
--- - -
Part 139 training requirements a significantly more stringent and a CBT based system will enhance meeting airport certification obligations.
203622
APT-MTNC GA-APTOROFINO
S68, OROFINO, REHABILITATE TAXIWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
80
-
72
-
8- - -
CN
RWPE
-80----------
-----
--
--- - -
Crack fill and slurry or fog seal
203982
APT-MTNC PR-APTMOSCOW/PULLMAN
PUW, MOSCOW-PULLMAN, TERMINAL EXPANSION, CONSTRUMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
2,338
-
2,192
-
146- - -
CN
RWPE
----2,338-------
-----
--
--- - -
CONSTRUCT ‐ Terminal Expansion ‐ Building construction including construction engineering services
204292
APT-MTNC PR-APTMOSCOW/PULLMAN
PUW, MOSCOW-PULLMAN, TERMINAL EXPANSION, DESIGNMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
274
-
274
-
-- - -
CN
RWPE
-----274------
-----
--
--- - -
Terminal Expansion ‐ Design / Expansion to address inadequate space and facilities within existing terminal building
204412
APT-MTNC GA-APTOROFINO
S68, OROFINO, REHABILITATE APRONMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
50
-
45
-
5- - -
CN
RWPE
-50----------
-----
--
--- - -
Crack fill and slurry or fog seal
205512
APT-MTNC GA-APTOROFINO
S68, OROFINO, REHABILITATE RUNWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
140
-
126
-
14- - -
CN
RWPE
-140----------
-----
--
--- - -
Crack fill and slurry or fog seal
205542
APT-NEW PR-APTMOSCOW/PULLMAN
PUW, MOSCOW-PULLMAN, ACQUIRE SNOW REMOVAL EQUIPMP 0.000 - 0.000 APT DEV, New Facility
-
507
-
475
-
32- - -
CN
RWPE
----507-------
-----
--
--- - -
Replace Aging SRE Equipment
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 37
District 2 Aeronautics Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Aeronautics Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside LCVMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
206312
APT-NEW GA-APTIDAHO COUNTY
GIC, GRANGEVILLE, INSTALL FENCING DESIGNMP 0.000 - 0.000 APT DEV, New Facility
-
-
-
-
-
-21 19 2
CN
RWPE
----------21-
-----
--
--- - -
Fencing to improve security and keep wildlife off of airfield. Security Fencing Installation Phase 1 (Southern, Western, and Partial Eastern Sides)
207502
APT-NEW GA-APTOROFINO
S68, OROFINO, INSTALL REILMP 0.000 - 0.000 APT DEV, New Facility
-
75
-
68
-
7- - -
CN
RWPE
---75--------
-----
--
--- - -
Install Runway End Identifier Lights as a navigational aid, identified in the current ALP, to increase pilot safety.
207542
APT-NEW GA-APTOROFINO
S68, OROFINO, INSTALL AWOSMP 0.000 - 0.000 APT DEV, New Facility
-
100
-
90
-
10- - -
CN
RWPE
---100--------
-----
--
--- - -
Install an Automatic Weather Observation System (AWOS A) to inform inbound/outbound pilots of current weather conditions whereby increasing safety.
225602
APT-MTNC GA-APTOROFINO
75c, OROFINO, AIRPORT RSA IMPROVEMENTMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
50
-
50
-
-- - -
CN
RWPE
-----50------
-----
--
--- - -
Runway Safety Area improvements.
225612
APT-MTNC GA-APTOROFINO
75C, OROFINO, AIRPORT TREE REMOVALMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
250
-
250
-
-- - -
CN
RWPE
-----250------
-----
--
--- - -
Remove trees.
228022
APT-MTNC GA-APTIDAHO COUNTY
GIC, IDAHO COUNTY AIRPORT, APRON RECON PHIIMP - RECONST/REALIGN, Facility Maintenan
-
560
-
504
-
56- - -
CN
RWPE
---560--------
-----
--
--- - -
228032
APT-MTNC GA-APTIDAHO COUNTY
GIC, IDAHO COUNTY AIRPORT, WILDLIFE FENCEMP - APT DEV, Safety Improvement
-
201
-
181
-
20- - -
CN
RWPE
--201---------
-----
--
--- - -
228042
APT-MTNC GA-APTIDAHO COUNTY
GIC, IDAHO COUNTY AIRPORT, FUEL APRON RECONMP - RECONST/REALIGN, Facility Maintenan
-
-
-
-
-
-70 63 7
CN
RWPE
-------70----
-----
--
--- - -
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 38
District 2 Aeronautics Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Aeronautics Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside LCVMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027Construction
Right-of-WayDevelopment
-2702017352,8451,426-70--21-------
Total -3402017352,8661,426G: Project is grouped in STIP
1: Project is also shown in a Transportation Improvement Program
W: Work zone safety priority
CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition
Notes:
Phases:
2: Project is being advance constructed with non-federal funds
P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM
B: Project addresses Federal Bridge Condition PM
A: Project utilizes an alternative contracting method.
M: Project included in multiple programs
--------
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 39
District 3 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside COMPASS Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
RP2
10043
CPCTY NHSTATE OF IDAHO (ITD)
SH 55, SMITH'S FERRY TO ROUND VALLEYMP 98.251 - 99.295 SAFTY/TRAF OPER, Minor Widening
100
30,974
-
27,610
100
3,3645,244 4,195 1,049
CN
RWPE
----7,14012,338------
-----
--
--- - -
Safety improvements from MP 98.3 to 99.3 on SH‐55. The safety improvements will widen the existing road and add guardrail along the river side of the road. Widening will be completed by the addition of MSE walls and removing rock outcrops.
134933
STP-URBAN (L) STP-UEMMETT
STC-7169, S JOHNS AVE; E 12TH TO E 4TH ST, EMMETTMP 101.680 - 102.310 RESRF/RESTO&REHAB, Pavement Re
180
2,870
167
2,659
13
211511 473 38
CN
RWPE
-----2,870------
-----
--
--- - -
This project will reconstruct S. John’s Avenue in Emmett between 4th Street and 12th Street. This will be accomplished by reconstructing the roadway asphalt and base materials in addition to providing updated sidewalk, curb & gutter, and storm water improvements. This project is located on STC‐7169 between mile points 101.68 and 102.31.
191293
BR-LOCAL STP-RURALWASHINGTON COUNTY
STC-8217, COVE RD BRIDGE, WASHINGTON COMP 0.923 - 0.973 BR/APPRS, Short Span Replacement
350
5,261
324
4,875
26
386702 650 52
CN
RWPE
-5,221--41-------
----350
--
--- - -
This project will replace the Cove Rd. Bridge in Weiser, which is currently outdated and only holds one‐lane with severe weight restrictions. This bridge is fracture critical, structurally deficient, and functionally obsolete and will be replaced with a new structure that meets current standards. The project is located on STC‐8217 at mile point 0.925.
199773
CPCTY STSTATE OF IDAHO (ITD)
STATE, FY21 D3 INTERSECTION IMPROVEMENTSMP 0.000 - 0.000 SAFTY/TRAF OPER, Turn Bay
-
510
-
-
-
5105 - 5
CN
RWPE
-----510-----5
-----
--
--- - -
This project will increase safety and alleviate congestion by one or more of the following: widening the highway, adding additional turn or through lanes, improving the drainage, new signs, adding traffic signals, signal timing and coordination, better lighting and improved accessibility for people with disabilities.
200193
STP-RURAL (L) STP-RURALPAYETTE COUNTY
STC-3857, SAND HOLLOW; OASIS TO BLACK CANYON RD, PAMP 7.859 - 12.525 RESRF/RESTO&REHAB, Pavement Re
-
3,730
-
3,456
-
274368 341 27
CN
RWPE
3,730-----------
-----
--
--- - -
This project is located north of the City of Caldwell in Payette County and includes rehabilitating asphalt pavement (pavement repair and overlay) and upgrading guardrail at an existing structure to improve safety. The project is located on STC‐3857 between mile points 7.859 and 12.525.
201003
STP-RURAL (L) STP-RURALGEM COUNTY
STC-3840, OLA HWY; POWERLINE RD TO 2ND FORK RD, GEM MP 19.350 - 24.447 RESRF/RESTO&REHAB, Pavement Re
-
2,512
-
2,327
-
185395 366 29
CN
RWPE
2,512-----------
-----
--
--- - -
This project is located near the unincorporated Community of Ola in Gem County and is anticipated to overlay two miles of existing pavement and pave three miles of existing gravel road to keep paved roads good and also to pave a road which exceeds the ADT for a gravel type surface. This project is located on STC‐3840 between mile points 19.35 and 24.447.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 40
District 3 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside COMPASS Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
201463
STP-RURAL (L) STP-RURALMCCALL
OFFSYS, MISSION ST; SCL TO DEINHARD LN, MCCALLMP 103.020 - 103.590 RESRF/RESTO&REHAB, Base/Sub-bas
25
2,544
23
2,357
2
187503 466 37
CN
RWPE
2,544-----------
----25
--
--- - -
This project is located in the City of McCall in Valley County and is anticipated to include the removal of the existing asphalt surface, widening of the road section, verifying the structural integrity of the base and sub‐base, new asphalt pavement, striping, utility relocations and the installation of storm water conveyance and treatment systems to improve the condition of the roadway. The project is located between mile points 103.02 and 103.59.
201823
STP-RURAL (L) STP-RURALMOUNTAIN HOME HD
STC-3816, OLD HWY 30; OLD OREGON TRAIL RD TO E 54TH S MP 105.410 - 107.530 RESRF/RESTO&REHAB, Resurfacing
-
1,464
-
1,357
-
107224 208 16
CN
RWPE
--1,464---------
-----
--
--- - -
This project is located near City of Mountain Home, Hammett and Glenns Ferry in Elmore County and consists mostly of a three inch overlay over the existing 26 feet wide pavement in order to improve the safety and longevity of the pavement section along this portion of the roadway. The project is located on STC‐3816 between mile points 105.41 and 107.53.
202303
BR-OFF BR-OFFVALLEY COUNTY
OFFSYS, EASTSIDE DR BR, VALLEY COMP 106.223 - 106.253 BR/APPRS, Bridge Replacement
-
3,789
-
3,510
-
279669 620 49
CN
RWPE
-3,789----------
-----
--
--- - -
The Eastside Drive Bridge project is located north of Payette Lake in Valley County and includes replacement of the deficient and single lane bridge with a single span structure. The project is located at mile point 106.223.
202423
STP-RURAL (L) STP-RURALVALLEY COUNTY
STC-3945, E LAKE FK RD; E LAKE FK CR BR TO SH55, VALLEYMP 0.000 - 0.550 RESRF/RESTO&REHAB, Base/Sub-bas
-
873
-
809
-
64285 264 21
CN
RWPE
873----------285
-----
--
--- - -
This project is located north of the City of Donnelly in Valley County and includes widening the 0.55 mile section of roadway, lessen the vertical grade near the SH55 intersection, replace deteriorated culverts and irrigation canal crossing, acquire ROW and mitigate wetland impacts adjacent to the roadway.
203643
RAIL FED RRXEMMETT
OFFSYS, N WARDELL AVE INPR RRX, EMMETTMP 100.349 - 100.349 SAFTY/TRAF OPER, Safety Improveme
-
250
-
225
-
25- - -
CN
RWPE
----250-------
-----
--
--- - -
Install insulated concrete planking. The project is located at mile point 100.349.
205783
RAIL FED RRXEMMETT
OFFSYS, N JOHNS AVE INPR RRX, EMMETTMP 102.736 - 102.751 SAFTY/TRAF OPER, Safety Improveme
-
150
-
135
-
15- - -
CN
RWPE
----150-------
-----
--
--- - -
Install insulated concrete planking. The project is located at mile point 102.736.
207233
RAIL FED RRXWASHINGTON COUNTY
STC-3877, RIVER DOCK RD UPRR RRX, WASHINGTON COMP 2.179 - 2.179 SAFTY/TRAF OPER, Railroad Gates
-
290
-
261
-
2910 9 1
CN
RWPE
-290------10---
-----
--
--- - -
Install signals, gates, and cabinet. The project is located on STC‐3877 at mile point 2.179.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 41
District 3 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside COMPASS Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
207733
FLAP FLAPSTATE OF IDAHO (ITD)
SH 21, WILDLIFE OVERPASS AT CERVIDAE PEAK, BOISE COMP 19.300 - 19.300 ENV PRESV, Wildlife/Game Crossings
-
2,869
-
2,658
-
211258 242 16
CN
RWPE
----2,712157-----119
-----
--
--- - -
Construct a 150‐ft. wildlife overpass at MP 19.32 and approximately 12,500 linear ft. of 8‐ft. high big game exclusion fence paralleling SH‐21 with jump‐outs.
218633
CPCTY STSTATE OF IDAHO (ITD)
STATE, FY23 D3 INTERSECTION IMROVEMENTSMP 0.000 - 0.000 SAFTY/TRAF OPER, Intersection Improv
-
531
-
-
-
531- - -
CN
RWPE
---531--------
-----
--
--- - -
This project will increase safety and alleviate congestion by one or more of the following: widening the highway, adding additional turn or through lanes, improving the drainage, new signs, adding traffic signals, signal timing and coordination, better lighting and improved accessibility for people with disabilities.
218713
CPCTY STECMSTATE OF IDAHO (ITD)
STATE, FREEZEOUT HILL S PASSING LN, EMMETTMP 6.323 - 10.132 MAJRWIDN, Pavement Markings
474
3,720
-
-
474
3,720375 - 375
CN
RWPE
-3,720----------
----474
--
--- - -
The SH‐16; FREEZEOUT HILL SOUTH PASSING LANE, expansion project located in Gem County, will construct a southbound passing lane in order to improve mobility and reduce crashes along the corridor.
M21981
3
STP-RURAL (L) STP-RURALMOUNTAIN HOME HD
STC-3805, SIMCO RD REHABILITATION, ELMORE COMP 104.500 - 115.100 RESRF/RESTO&REHAB, Pavement Re
-
5,114
-
4,738
-
376569 527 42
CN
RWPE
2,126-----------
-----
--
--- - -
M
3
FREIGHT FREIGHTMOUNTAIN HOME HD
STC-3805, SIMCO RD REHABILITATION, ELMORE COMP 104.500 - 115.100 RESRF/RESTO&REHAB, Pavement Re
-
5,114
-
4,738
-
376569 527 42
CN
RWPE
------------
-----
--
2,987-- - -
Rehabilitate a 10.5 mile stretch of Simco Road from milepost 104.5 to 115.1. This is a rural asphalt surface major collector in Elmore Co.
220873
OPS STCASCADE
STATE, FY20 CASCADE 7 ADA RAMPSMP 0.000 - 0.000 SAFTY/TRAF OPER, Curb & Gutter
-
35
-
-
-
35- - -
CN
RWPE
-----35------
-----
--
--- - -
Construct 7 Americans with Disabilities ramps in Cascade.
222433
OTHER ASSETS STSTATE OF IDAHO (ITD)
SH 71, SNAKE RV BR TO JCT US-95 GUARDRAIL, WASHINGTOMP 0.060 - 28.790 ENV PRESV, Capital Maintenance
-
799
-
-
-
79970 - 70
CN
RWPE
-----799------
-----
--
--- - -
This project will update guardrail on SH‐71 between the Snake River Bridge (milepost 0.06) and the junction with US‐95 (milepost 28.79).
222573
CPCTY STSTATE OF IDAHO (ITD)
STATE, FY25 D3 INTERSECTION IMPROVEMENTSMP 0.000 - 0.000 SAFTY/TRAF OPER, Intersection Improv
-
325
-
-
-
325- - -
CN
RWPE
-325----------
-----
--
--- - -
This project will increase safety and alleviate congestion by one or more of the following: widening the highway, adding additional turn or through lanes, improving the drainage, new signs, adding traffic signals, signal timing and coordination, better lighting and improved accessibility for people with disabilities.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 42
District 3 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside COMPASS Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
224053
SAFETY (L) HSIP (L)MOUNTAIN HOME HD
LOCAL, DITTO CR & RESERVOIR RD, MT HOME HDMP 100.000 - 100.760 SAFTY/TRAF OPER, Minor Widening
50
1,095
46
1,015
4
80157 145 12
CN
RWPE
----1,095-------
----50
--
--- - -
For the work of improving sections of rural roadways by redesigning the alignments horizontal and vertical curves to current geometric standards and will add a paved surface to the roadway improving skid resistance and reduce risk to the traveling public.
224063
SAFETY (L) HSIP (L)VALLEY COUNTY
LOCAL, RECREATIONAL RDS SIGNING, VALLEY COMP 0.000 - 0.000 SAFTY/TRAF OPER, Signing Improvem
-
70
-
70
-
-10 10 -
CN
RWPE
-----70-----10
-----
--
--- - -
For the work of providing for extra signage to help drivers safely navigate and increase driver awareness of corners at various locations along recreational roads within Valley County. The corners will receive advance warning signs and delineators, and a bridge will receive advance warning LED signs and guardrail reflectors.
224603
FED RRX (L) FED RRXSTATE OF IDAHO (ITD)
SH 19, BVRR RRX, GREENLEAFMP 14.240 - 14.240 SAFTY/TRAF OPER, Railroad Gates
-
100
-
90
-
1010 9 1
CN
RWPE
-----100-----10
-----
--
--- - -
This project will install cantilever gates and lights at the crossing in Greenleaf at milepost 14.24 on SH‐19. The crossing# is 819698A
W22470
3
OTHER ASSETS STSTATE OF IDAHO (ITD)
I 84, FY22 D3 FENCE REPAIR, ELMORE COMP 111.000 - 115.000 SAFTY/TRAF OPER, Incidental Repairs
-
500
-
-
-
50010 - 10
CN
RWPE
----500------10
-----
--
--- - -
This project will repair fences along I‐84 between mileposts 111 to 115.
W22562
3
RA ST2STATE OF IDAHO (ITD)
I 84, SNAKE RIVER REST AREA REPAIRMP 0.780 - 0.780 SUP FACIL, Rest Area Improvement
-
1,000
-
-
-
1,000260 - 260
CN
RWPE
-----1,000-----260
-----
--
--- - -
Construct new drainage field for in‐ground infiltration system for the sewage disposal.
M22594
3
BR-DSCR BR-DISCRLOCAL HIGHWAY TECHNICA
OFFSYS, NORTH FORK BOULDER CREEK BR, OWYHEE COMP 119.812 - 119.812 BR/APPRS, Bridge Replacement
-
588
-
534
-
54438 406 32
CN
RWPE
-----389------
-----
--
--- - -
M
3
BR-OFF BR-OFFLOCAL HIGHWAY TECHNICA
OFFSYS, NORTH FORK BOULDER CREEK BR, OWYHEE COMP 119.812 - 119.812 BR/APPRS, Bridge Replacement
-
588
-
534
-
54438 406 32
CN
RWPE
-----187-----165
-----
--
--- - -
M
3
LP-ST LPTLOCAL HIGHWAY TECHNICA
OFFSYS, NORTH FORK BOULDER CREEK BR, OWYHEE COMP 119.812 - 119.812 BR/APPRS, Bridge Replacement
-
588
-
534
-
54438 406 32
CN
RWPE
-----12------
-----
--
--- - -
Replace N FORK BOULDER CREEK BR, OWYHEE CO
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 43
District 3 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside COMPASS Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
226053
FLAP FLAPSTATE OF IDAHO (ITD)
SH 55, BANKS-LOWMAN INTERSECTION STUDY, BOISE COMP 78.820 - 78.820 PLAN/STUDY, Planning/Transportation
-
-
-
-
-
-675 625 50
CN
RWPE
-----------675
-----
--
--- - -
Planning study for the intersection improvement of State Highway 55 with Banks Lowman Rd. and Banks Grade Rd. will include a topographic investigation and environmental scan to be used in alternative analysis.
226063
FLAP (L) FED RRXMOUNTAIN HOME HD
STC-3811, PINE-FEATHERVILLE RD REHAB, MT HOME HDMP 17.378 - 27.851 RESRF/RESTO&REHAB, Bridge Replac
-
4,167
-
3,861
-
306456 423 33
CN
RWPE
---3,706-461----235221
-----
--
--- - -
Rehabilitate the roadway surface with the use of CRABS (Cement Recycled Asphalt Base Stabilization) process. The project will also include the replacement of one set of culverts at Dog Creek with a clear span bridge.
ORN227113
CPCTY STSTATE OF IDAHO (ITD)
STATE, FY27 D3 INTERSECTION IMPROVEMENTSMP - SAFTY/TRAF OPER, Intersection Improv
-
563
-
-
-
563- - -
CN
RWPE
------------
-----
563-
--- - -
The FY27 D3 INTERSECTION IMPROVEMENTS project will increase safety and alleviate congestion by one or more of the following: widening the highway, adding additional turn or through lanes, improving the drainage, new signs, adding traffic signals, signal timing and coordination, better lighting and improved accessibility for people with disabilities.
ORN227423
OTHER ASSETS STSTATE OF IDAHO (ITD)
STATE, FY22 D3 FENCINGMP - ENV PRESV, Capital Maintenance
-
500
-
-
-
50010 - 10
CN
RWPE
----500-----10-
-----
--
--- - -
The FY21 D3 FENCING project will update right‐of‐way fence throughout District 3 to maintain existing infrastructure.
ORN227443
OTHER ASSETS STSTATE OF IDAHO (ITD)
STATE, FY22 D3 SIGNINGMP - ENV PRESV, Capital Maintenance
-
240
-
-
-
24010 - 10
CN
RWPE
----240------10
-----
--
--- - -
The FY22 D3 SIGNING project will update signing throughout District 3 to maintain existing infrastructure.
ORN227453
OTHER ASSETS STSTATE OF IDAHO (ITD)
STATE, FY22 D3 CULVERT CLEANINGMP - ENV PRESV, Capital Maintenance
-
240
-
-
-
24010 - 10
CN
RWPE
----240------10
-----
--
--- - -
The FY22 D3 CULVERT CLEANING project will clean out culverts throughout District 3 to maintain existing infrastructure.
ORN227473
OTHER ASSETS STSTATE OF IDAHO (ITD)
STATE, FY23 D3 FENCINGMP - ENV PRESV, Capital Maintenance
-
510
-
-
-
51010 - 10
CN
RWPE
---510------10-
-----
--
--- - -
The FY21 D3 FENCING project will update right‐of‐way fence throughout District 3 to maintain existing infrastructure.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 44
District 3 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside COMPASS Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
ORN227483
OTHER ASSETS STSTATE OF IDAHO (ITD)
STATE, FY23 D3 SIGNINGMP - SAFTY/TRAF OPER, Capital Maintenan
-
94
-
-
-
9410 - 10
CN
RWPE
---94------10-
-----
--
--- - -
The FY23 D3 SIGNING project will update signing throughout District 3 to maintain existing infrastructure.
ORN227493
OTHER ASSETS STSTATE OF IDAHO (ITD)
STATE, FY23 D3 CULVERT CLEANINGMP - ENV PRESV, Capital Maintenance
-
94
-
-
-
9410 - 10
CN
RWPE
---94------10-
-----
--
--- - -
The FY23 D3 CULVERT CLEANING project will clean out culverts throughout District 3 to maintain existing infrastructure.
ORN228793
SAFETY (L) HSIP (L)MOUNTAIN HOME HD
STC-3805, SIMCO RD SAFETY IMPV, MT HOME HDMP 102.300 - 104.500 SAFTY/TRAF OPER, Signing Improvem
-
2,122
-
1,967
-
155- - -
CN
RWPE
--2,122---------
-----
--
--- - -
This project will improve safety for all roadway users by redesigning the alignment’s horizontal and vertical curves, adding flashing LED curve warning signs, and rehabilitation of the asphalt surface.
ORN228893
STP-RURAL (L) STP-RURALMOUNTAIN HOME HD
STC-3811, PINE-FEATHERVILLE RD REHAB, MT HOME HDMP 22.000 - 25.000 RESRF/RESTO&REHAB, Resurfacing
-
1,931
-
1,789
-
142260 241 19
CN
RWPE
1,931---------260-
-----
--
--- - -
This project will rehabilitate Pine‐Featherville Road by using a RABS (Recycled Asphalt Base Stabilization) or CRABS (Cement Recycled Asphalt Base) process in conjunction with a new layer of plant mix asphalt.
ORN229483
TAP TAP-URBANEMMETT
LOCAL, SOUTH JOHNS AVE, EMMETTMP - ENV PRESV, Sidewalk
-
540
-
500
-
40- - -
CN
RWPE
-----540------
-----
--
--- - -
Construct the pedestrian/bicycle mobility components as part of the larger companion project for S. Johns Ave Reconstruction project ‐ 4th to 12th Street.
ORN229503
TAP TAP-RURALMCCALL
LOCAL, 1ST ST PEDESTRIAN SAFETY, MCCALLMP - ENV PRESV, Bicycle/Pedestrian/Equestr
-
541
-
491
-
5010 9 1
CN
RWPE
---541------10-
-----
--
--- - -
The 1st Street Pedestrian Safety Project will construct 10 ft. wide sidewalk, curb and gutter along the east and west sides of 1st Street within the City of McCall's downtown core between E. Lake Street, SH55 south to Park Street.
ORN229533
TAP TAP-RURALCASCADE
LOCAL, MAIN ST SIDEWALK & BEACON, CASCADEMP - ENV PRESV, Sidewalk
-
458
-
424
-
3480 74 6
CN
RWPE
---458------80-
-----
--
--- - -
Construct 10’ sidewalk connecting downtown on SH55, Pine street to Lake Cascade Parkway.
ORN229643
OPS STMCCALL
LOCAL, FY21 MCCALL 3 ADA RAMPSMP - ENV PRESV, Curb & Gutter
-
60
-
-
-
60- - -
CN
RWPE
-----60------
-----
--
--- - -
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 45
District 3 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside COMPASS Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
Construct 3 Americans with Disabilities ramps in McCall.
ORN230203
FED RRX (L) FED RRXFRUITLAND
STC-3858, WEST 1ST ST INPR RRX, FRUITLANDMP 100.410 - 100.410 SAFTY/TRAF OPER, Railroad Gates
-
430
-
387
-
4320 18 2
CN
RWPE
--430------20--
-----
--
--- - -
Install: surface, signals and gates. Sidewalk, bike pathConstruction
Right-of-WayDevelopment
2,98713,3444,0175,93212,86719,528--10206261,780-----899
Total 2,98713,3444,0275,95213,49322,207G: Project is grouped in STIP
1: Project is also shown in a Transportation Improvement Program
W: Work zone safety priority
CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition
Notes:
Phases:
2: Project is being advance constructed with non-federal funds
P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM
B: Project addresses Federal Bridge Condition PM
A: Project utilizes an alternative contracting method.
M: Project included in multiple programs
13,716563----
13,716563
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 46
District 3 Public Transit Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Transit Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside COMPASS Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
193803
TRNS-OPS 5311 RuralMISCELLANEOUS
TRANSIT, D3 5311 STATEWIDE RURAL AREA FORMULA PROGMP 0.000 - 0.000 Transit Admin/Capital/Operations/PM
-
12,945
-
9,056
-
3,889- - -
CN
RWPE
-2,5892,5892,5892,5892,589------
-----
--
--- - -
Program provides capital, planning, and operating assistance to support public transportation operators who provide demand response and fixed route services in rural areas with populations less than 50,000. Serving Ada, Adams, Boise, Canyon, Elmore, Gem, Owyhee, Payette, Valley, Washington counties.
M19464
3
TRNS-CAP 5310 RuralMISCELLANEOUS
TRANSIT, D3 ELDERLY AND DISABLEDMP 0.000 - 0.000 Transit Operations / Capital
-
3,550
-
2,958
-
592- - -
CN
RWPE
-193193193193193------
-----
--
--- - -
M
3
TRNS-CAP 5310 SUrbMISCELLANEOUS
TRANSIT, D3 ELDERLY AND DISABLEDMP 0.000 - 0.000 Transit Operations / Capital
-
3,550
-
2,958
-
592- - -
CN
RWPE
-517517517517517------
-----
--
--- - -
Program serves the special needs of transit‐dependent senior citizens and persons with disabilities by providing funds for projects which go beyond traditional transit services (demand response) including those required under the Americans with Disabilities Act (ADA). In Ada, Adam, Boise, Canyon, Elmore, Gem, Owyhee, Payette, Valley, Washington counties.
M19981
3
TRNS-OPS 5310 RuralMISCELLANEOUS
TRANSIT, D3 ELDERLY & DISABLEDMP 0.000 - 0.000 Demand Response Operations
-
3,550
-
2,840
-
710- - -
CN
RWPE
-193193193193193------
-----
--
--- - -
M
3
TRNS-OPS 5310 SUrbMISCELLANEOUS
TRANSIT, D3 ELDERLY & DISABLEDMP 0.000 - 0.000 Demand Response Operations
-
3,550
-
2,840
-
710- - -
CN
RWPE
-517517517517517------
-----
--
--- - -
Program serves the special needs of transit‐dependent senior citizens and persons with disabilities by providing funds for projects which go beyond traditional transit services (demand response) including those required under the Americans with Disabilities Act (ADA).
199833
TRNS-OPS 5311 RuralMISCELLANEOUS
TRANSIT, RURAL AREAS FIXED LINE SERVICEMP 0.000 - 0.000 Demand Response Operations
-
9,370
-
6,418
-
2,952- - -
CN
RWPE
-1,8741,8741,8741,8741,874------
-----
--
--- - -
Fixed line service in rural areas of Southwest Idaho, including Ada and Canyon Counties for all groups, including but not limited to, older adults, persons with disabilities, youth, low income, non‐drivers, minority groups, veterans, and refugee populations. The project includes required demand response service, as well as administration, operation, preventive maintenance, and capital purchases. Various aspects of the project have different local match rates.
M20136
3
TRNS-CAP 5339 RuralMISCELLANEOUS
TRANSIT, D3 BUS & BUS FACILITIESMP 0.000 - 0.000 Bus Purchase / Upgrade Facility Equipm
-
6,750
-
5,400
-
1,350- - -
CN
RWPE
-963963963963963------
-----
--
--- - -
M
3
TRNS-CAP 5339 SUrbMISCELLANEOUS
TRANSIT, D3 BUS & BUS FACILITIESMP 0.000 - 0.000 Bus Purchase / Upgrade Facility Equipm
-
6,750
-
5,400
-
1,350- - -
CN
RWPE
-387387387387387------
-----
--
--- - -
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 47
District 3 Public Transit Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Transit Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside COMPASS Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
Program provides capital funding to replace, rehabilitate, and purchase buses and related equipment or to construct bus‐related facilities in rural and small urban areas directly affecting Adams, Valley, Washington, Payette, Boise, Canyon, Gem, and Ada counties.
ORN230573
TRNS-OPS 5311 RuralSTATE OF IDAHO (ITD)
TRANSIT, D3 5311 CARES ACTMP - Security
-
4,506
-
4,506
-
-- - -
CN
RWPE
-----4,506------
-----
--
--- - -
Provides operating and capital funding for Coronavirus Aid, Relief, and Economic Security in rural areas.Construction
Right-of-WayDevelopment
-7,2337,2337,2337,23311,739------------
Total -7,2337,2337,2337,23311,739G: Project is grouped in STIP
1: Project is also shown in a Transportation Improvement Program
W: Work zone safety priority
CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition
Notes:
Phases:
2: Project is being advance constructed with non-federal funds
P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM
B: Project addresses Federal Bridge Condition PM
A: Project utilizes an alternative contracting method.
M: Project included in multiple programs
--------
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 48
District 3 Aeronautics Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Aeronautics Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside COMPASS Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
192243
APT-MTNC GA-APTMCCALL
MYL, MCCALL, CONSTRUCT APRONMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
1,500
-
1,350
-
150- - -
CN
RWPE
---1,500--------
-----
--
--- - -
Replaces apron lost due to twy relocation & full depth reconstruction
192953
APT-PLAN GA-APTCASCADE
U70, CASCADE, CONDUCT AERONAUTICAL SURVEYMP 0.000 - 0.000 APT PLN, Airport Planning
-
-
-
-
-
-250 225 25
CN
RWPE
-------250----
-----
--
--- - -
Conduct aeronautical survey for Runway 30 approach
193533
APT-MTNC GA-APTMCCALL
MYL, MCCALL, ACQUIRE SNOW REMOVAL EQUIPMENTMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
500
-
450
-
50- - -
CN
RWPE
-500----------
-----
--
--- - -
195083
APT-MTNC GA-APTMOUNTAIN HOME
U76, MOUNTAIN HOME, REHABILITATE TAXIWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
88
-
88
-
-- - -
CN
RWPE
-----88------
-----
--
--- - -
Seal Coat and Crack Fill
196073
APT-MTNC GA-APTMOUNTAIN HOME
U76, MOUNTAIN HOME, REHABILITATE APRONMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
88
-
88
-
-- - -
CN
RWPE
-----88------
-----
--
--- - -
Seal Coat and Crack Fill
197333
APT-MTNC GA-APTMOUNTAIN HOME
U76, MOUNTAIN HOME, REHABILITATE RUNWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
175
-
175
-
-- - -
CN
RWPE
-----175------
-----
--
--- - -
Seal Coat and Crack Fill
199323
APT-MTNC GA-APTMCCALL
MYL, MCCALL, REHABILITATE APRON, PH 3MP 0.000 - 0.000 APT DEV, Facility Maintenance
-
2,000
-
1,800
-
200- - -
CN
RWPE
-2,000----------
-----
--
--- - -
Rehabilitate remaining apron surfaces
199353
APT-MTNC GA-APTCASCADE
U70, CASCADE, REHABILITATE RUNWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
200
-
200
-
-- - -
CN
RWPE
-----200------
-----
--
--- - -
Crack Seal, Seal Coat & Remark
200613
APT-MTNC GA-APTMCCALL
MYL, MCCALL, REHABILITATE TAXIWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
1,200
-
1,080
-
120- - -
CN
RWPE
-1,200----------
-----
--
--- - -
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 49
District 3 Aeronautics Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Aeronautics Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside COMPASS Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
TLANE MC‐01, MC‐02, and MC‐03 on pavement report; indicates poor condition by 2017.
201073
APT-NEW GA-APTCASCADE
U70, CASCADE, SRE BUILDINGMP 0.000 - 0.000 APT DEV, New Facility
-
200
-
180
-
20- - -
CN
RWPE
----200-------
-----
--
--- - -
SRE Building
201383
APT-NEW GA-APTMCCALL
MYL, MCCALL, EXPAND APRON PH 1MP 0.000 - 0.000 APT DEV, New Facility
-
2,000
-
1,800
-
200- - -
CN
RWPE
--2,000---------
-----
--
--- - -
PH 1 ‐ Expand Apron to meet Master Plan/ALP (Cost included in Apron Rehab line)
203743
APT-MTNC GA-APTWEISER
S87, WEISER, OBSTRUCTION REMOVALMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
150
-
135
-
15- - -
CN
RWPE
---150--------
-----
--
--- - -
Obstruction Removal
204003
APT-NEW GA-APTWEISER
S87, WEISER, GUIDANCE SIGNSMP 0.000 - 0.000 APT DEV, New Facility
-
81
-
81
-
-- - -
CN
RWPE
-----81------
-----
--
--- - -
Install unlighted guidance signs ‐ cost included in Rwy lighting line
204853
APT-MTNC GA-APTWEISER
S87, WEISER, RUNWAY LIGHTINGMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
527
-
527
-
-- - -
CN
RWPE
-----527------
-----
--
--- - -
Rehab Rwy lighting
205293
APT-MTNC GA-APTWEISER
S87, WEISER, ENVIRONMENTAL ASSESSMENTMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
-
-
-
-
-75 68 7
CN
RWPE
----------75-
-----
--
--- - -
EA for Obstruction Removal
205533
APT-MTNC GA-APTHOMEDALE
S66, HOMEDALE, REHABILITATE APRON, CONSTRUCTMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
1,300
-
1,170
-
130- - -
CN
RWPE
---1,300--------
-----
--
--- - -
Rehabilitate portions of apron that is failing. Rehabilitate portions of apron that is failing to improve safety and operations at the airport.
205863
APT-MTNC GA-APTWEISER
S87, WEISER, TAXIWAY REFLECTORSMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
114
-
114
-
-- - -
CN
RWPE
-----114------
-----
--
--- - -
Rehab taxiway lighting
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 50
District 3 Aeronautics Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Aeronautics Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside COMPASS Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
208013
APT-MTNC GA-APTMOUNTAIN HOME
U76, MOUNTAIN HOME AIRPORT TERMINAL DESIGNMP 0.000 - 0.000 APT PLN, Facility Maintenance
-
-
-
-
-
-125 112 13
CN
RWPE
---------125--
-----
--
--- - -
Mountain Home Airport Terminal Design
208053
APT-PLAN GA-APTCOUNCIL
U82, COUNCIL AIRPORT APRON DESIGNMP 0.000 - 0.000 APT PLN, Airport Planning
-
-
-
-
-
-15 14 1
CN
RWPE
---------15--
-----
--
--- - -
Council Airport Apron rehab design
208073
APT-MTNC GA-APTHOMEDALE
S66, HOMEDALE REHABILITATE RUNWAY DESIGNMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
200
-
180
-
20- - -
CN
RWPE
-200----------
-----
--
--- - -
Design widening & reconstruction
208223
APT-MTNC GA-APTMOUNTAIN HOME
U76, MOUNTAIN HOME AIRPORT TERMINAL BUILDMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
611
-
550
-
61- - -
CN
RWPE
-611----------
-----
--
--- - -
Mountain Home Airport Terminal Construction
208263
APT-MTNC GA-APTCOUNCIL
U82, COUNCIL APRON REHABILITATION MP 0.000 - 0.000 APT DEV, Facility Maintenance
-
75
-
68
-
7- - -
CN
RWPE
-75----------
-----
--
--- - -
Council Airport Apron Rehab
208273
APT-MTNC GA-APTCOUNCIL
U82, COUNCIL AIRPORT REHABILITATE RUNWAY DESIGNMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
75
-
68
-
7- - -
CN
RWPE
-75----------
-----
--
--- - -
Council Airport Runway Rehabilitation Design
208283
APT-MTNC GA-APTCOUNCIL
U82, COUNCIL AIRPORT REHABILITATE TAXIWAY DESIGNMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
-
-
-
-
-15 14 1
CN
RWPE
---------15--
-----
--
--- - -
Council Airport Taxiway Rehabilitation Design
208293
APT-MTNC GA-APTCOUNCIL
U82, COUNCIL AIRPORT REHABILITATE TAXIWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
135
-
122
-
13- - -
CN
RWPE
-135----------
-----
--
--- - -
Council Airport Taxiway Rehab
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 51
District 3 Aeronautics Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Aeronautics Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside COMPASS Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
221843
APT-PLAN GA-APTBOUNDARY COUNTY
65S, BONNERS FERRY AIRPORT REHABILITATIONMP 0.000 - 0.000 APT PLN, Facility Maintenance
-
-
-
-
-
-222 200 22
CN
RWPE
----------222-
-----
--
--- - -
Bonners Ferry Airport rehabilitation design
225263
APT-MTNC GA-APTCOUNCIL
U82, COUNCIL, AIRPORT RUNWAY REHAB DESIGNMP 0.000 - 0.000 APT PLN, Airport Planning
-
15
-
14
-
1- - -
CN
RWPE
---15--------
-----
--
--- - -
225543
APT-PLAN GA-APTCASCADE
U70, CASCADE, AIRPORT ENVIRONMENTAL ASSESSMENTMP 0.000 - 0.000 APT PLN, Airport Planning
-
-
-
-
-
-225 202 23
CN
RWPE
---------225--
-----
--
--- - -
Conduct environmental assessment.
225553
APT-NEW GA-APTCASCADE
U70, CASCADE, AIRPORT NAVIGATION AIDSMP 0.000 - 0.000 APT DEV, New Facility
-
692
-
623
-
69- - -
CN
RWPE
--692---------
-----
--
--- - -
Install PAPI, REIL on runway 30 end for safe landing operations.
225803
APT-PLAN GA-APTMCCALL
MYL, MCCALL, AIRPORT MASTER PLAN UPDATEMP 0.000 - 0.000 APT PLN, Airport Planning
-
-
-
-
-
-266 266 -
CN
RWPE
-----------266
-----
--
--- - -
Update airport master plan
225813
APT-MTNC GA-APTMCCALL
MYL, MCCALL, AIRPORT PAVEMENT REHABMP 0.000 - 0.000 RESRF/RESTO&REHAB, Facility Mainte
-
250
-
225
-
25- - -
CN
RWPE
----250-------
-----
--
--- - -
Runway pavement crack fill, seal coat, and remark
225823
APT-MTNC GA-APTMCCALL
MYL, MCCALL, AIRPORT RECON TWYMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
1,400
-
1,260
-
140- - -
CN
RWPE
-1,400----------
-----
--
--- - -
Reconstruct and reconfigure general aviation taxiway
225883
APT-PLAN GA-APTMCCALL
MYL, MCCALL, AIRPORT EAMP 0.000 - 0.000 APT PLN, Airport Planning
-
-
-
-
-
-240 216 24
CN
RWPE
------------
-----
--
-240
- - -
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 52
District 3 Aeronautics Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Aeronautics Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside COMPASS Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027Construction
Right-of-WayDevelopment
-6,1962,6922,9654501,272240250-380297266
------Total 2406,4462,6923,3457471,538
G: Project is grouped in STIP
1: Project is also shown in a Transportation Improvement Program
W: Work zone safety priority
CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition
Notes:
Phases:
2: Project is being advance constructed with non-federal funds
P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM
B: Project addresses Federal Bridge Condition PM
A: Project utilizes an alternative contracting method.
M: Project included in multiple programs
--------
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 53
District 4 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
WB2
130904
BR-RESTORE ST2STATE OF IDAHO (ITD)
I 86, RAFT RV BR, EB & WB LANES, CASSIA COMP 14.320 - 14.330 BR/APPRS, Bridge Rehabilitation
-
13,561
-
-
-
13,561536 495 41
CN
RWPE
-----1,000------
-----
--
--- - -
This project will replace the Raft River Bridges on I‐86 at milepost (14.3). These bridges will remove mobility restrictions associated with commercial traffic and allow for a higher capacity.
139984
STP-RURAL (L) STP-RURALBLAINE COUNTY
STC-2822, W GLENDALE RD & CNL BR, BLAINE COMP 1.000 - 1.850 RECONST/REALIGN, Bituminous Surfac
-
2,436
-
2,257
-
179505 468 37
CN
RWPE
-----2,380------
-----
--
--- - -
This project will upgrade the roadway .7 miles west of Hwy‐75 to Glendale Canal in Blaine County. Project includes replacing structurally deficient Glendale Canal Bridge. This is a main route to a multiple use area, including an industrial and business community, Blaine County Road and Bridge Facilities and to Bellevue's Waste Water Treatment Plant.
188074
STP-URBAN (L) STP-UHAILEY
STC-8030, RIVER ST; WALNUT TO GALENA, HAILEYMP 100.378 - 100.684 RESRF/RESTO&REHAB, Minor Widenin
-
2,301
-
2,132
-
169525 486 39
CN
RWPE
2,301-----------
-----
--
--- - -
The project will provide safety and circulation improvements to River Street, between Walnut Street and Galena Street in Hailey.
189734
BR-LOCAL BR-LOCGOODING HD Number 1
LOCAL, 1700 S RD BRIDGE, GOODING HD #1MP 101.010 - 101.390 BR/APPRS, Bridge Replacement
-
2,314
-
2,144
-
170528 489 39
CN
RWPE
----2,28034------
-----
--
--- - -
This project will replace the 1700 South Road Bridge within the Gooding Highway District due to its rapid deterioration. The bridge has a 90 degree skew that makes it very dangerous for motorist and trucks trying to travel over the bridge.
190284
STP-RURAL (L) STP-RURALOAKLEY HD
STC-2742, GOLDEN VALLEY RD; 1500 W TO 900 W, OAKLEY HMP 5.900 - 12.100 RESRF/RESTO&REHAB, Minor Widenin
-
5,084
-
4,711
-
373279 259 20
CN
RWPE
----5,084-------
-----
--
--- - -
This joint project will rehabilitate Golden Valley Road south of Burley from milepost 5.9 to milepost 12.1. This consists of approximately 6 miles of roadway rehabilitation starting at the intersection of 1500W Road and Golden Valley Road, and continuing east to the intersection 900W and Golden Valley Road. The project consists of approximately 2 miles of overlay, 2 miles of Recycles Asphalt Base Stabilization, and chip sealing the entire 6 miles of roadway.
191144
STP-RURAL (L) STP-RURALJEROME HD
SMA-8072, NORTH RD PHASE 3, JEROME HDMP 11.080 - 12.230 RESRF/RESTO&REHAB, Minor Widenin
-
2,098
-
1,944
-
154379 351 28
CN
RWPE
-----2,098------
-----
--
--- - -
This project will reconstruct 1.15 miles of North Rd in Jerome Hwy District. This project will upgrade the base, widen pavement, install a traffic control signal and left hand turn lanes.
RP2
191344
SAFETY HSIPSTATE OF IDAHO (ITD)
US 93, 100 SOUTH RD, JEROME COMP 57.231 - 59.531 RECONST/REALIGN, Grading & Draina
-
10,741
-
9,952
-
7891,050 973 77
CN
RWPE
---4,1626,579-------
-----
--
--- - -
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 54
District 4 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
This project is part of an overall strategy to improve the safety and mobility on the US‐93 corridor. The strategy focuses upon safety‐driven improvement projects and, with project locations focus at intersections. The alignment adjustment will improve roadway geometrics and provide space for turning lanes.
191714
FLAP FLAPSTATE OF IDAHO (ITD)
SH 75, GALENA SUMMIT SLIDE, BLAINE COUNTYMP 156.600 - 159.400 SAFTY/TRAF OPER, Safety Improveme
-
3,288
-
3,050
-
238685 635 50
CN
RWPE
-----325------
-----
--
--- - -
Stabilize the historic slide area on SH 75 by adding more buttressing material at the foot of the slide area and over the surface of the slide and provide a revegetated surface.
WB2
193384
BR-RESTORE BR-STATESTATE OF IDAHO (ITD)
I 84, SOUTH JEROME IC, JEROME COMP 167.400 - 168.400 BR/APPRS, Bridge Replacement
204
20,078
188
18,526
16
1,5522,525 2,330 195
CN
RWPE
--10,8249,254--------
---204-
--
--- - -
This project on I‐84 will replace a bridge at milepost 168.0 in Jerome. The new structure will include 5 lanes, 3 foot shoulders and a 10 foot bike path/raised sidewalk.
196374
STP-RURAL (L) STP-RURALBURLEY HD
STC-2837, YALE RD STG 4; MP 12.1 TO 13.7, CASSIA COMP 12.100 - 13.700 RECONST/REALIGN, Plant Mix Paveme
225
4,055
208
3,757
17
298495 459 36
CN
RWPE
-4,055----------
----225
--
--- - -
This project will rehabilitate pavement on Yale Rd. from milepost 12.1 to 13.7. The 2 miles of pavement rehabilitation and realignment include: Roadway ballast to support the increased heavy truck traffic associated with the farm to market operations, Improved horizontal and vertical alignment by removing substandard curves, widened road and shoulders to meet AASHTO standards and allow for safe passage of vehicles, and improved shoulder slopes, ditches, and drainage structures to improve the drainage system. This will result in a safer, efficient, and more durable road for the traveling public.
196724
STP-RURAL (L) STP-RURALFILER HD
STC-2721, 4100 N; 2100 E TO 2400 E, FILER HWY DISTRICTMP 3.600 - 6.104 RESRF/RESTO&REHAB, CRABS
-
3,821
-
3,541
-
280402 372 30
CN
RWPE
-3,821----------
-----
--
--- - -
This project will rehabilitate the existing 4100 North Road from 2100 E to 2400 E. The highway district is being proactive before the roadway further deteriorates and causes an emergency. The rehabilitation project plans to use a Cement Recycled Asphalt Base stabilization process to rehabilitate this road and prepare it for the expected traffic volumes.
RP199434
SAFETY HSIPSTATE OF IDAHO (ITD)
US 93, 300 SOUTH RD, JEROME COMP 55.162 - 56.227 RECONST/REALIGN, Intersection Impro
-
5,837
-
5,408
-
4291,000 927 73
CN
RWPE
--5,837---------
-----
--
--- - -
This project is part of an overall strategy to improve the safety and mobility on the US‐93 corridor. The strategy focuses upon safety‐driven improvement projects and, with project locations focus at intersections, approximately ½ mile each side of intersection center line. The alignment adjustment will improve roadway geometrics and provide space for turn lanes.
WP19973
4
FREIGHT FREIGHTSTATE OF IDAHO (ITD)
I 84, DECLO POE EB, CASSIA COMP 217.450 - 219.520 RECONST/REALIGN, Port of Entry
85
13,768
79
12,703
6
1,0651,035 955 80
CN
RWPE
------------
-----
13,768-
--- - -
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 55
District 4 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
The project is to build a new Port of Entry (POE) facility 3 miles east of I‐84 IC 216 serving both the eastbound and westbound lanes to replace the existing Cotterel POE. The Cotterel POE and Cotterel Rest Area (RA) were constructed in 1966 and currently share the same site. Dual usage of the property has been problematic as traffic volumes increased over the years. Concerns of vehicular traffic and heavy commercial trucking co‐mingling in a restricted area have created safety issues that need to be addressed.
200334
CPCTY STECMSTATE OF IDAHO (ITD)
SH 75, ELKHORN RD TO RIVER ST, KETCHUMMP 126.480 - 128.200 RECONST/REALIGN, Pavement Rehabi
-
20,425
-
-
-
20,4253,485 2,303 1,182
CN
RWPE
-11,041----------
-----
--
9,385-- - -
This project will replace the bridge at Trail Creek and complete roadway as defined in the environmental impact statement.
201804
SAFETY ST2STATE OF IDAHO (ITD)
SH 74, JCT US-93, TWIN FALLS COMP 0.000 - 0.700 RECONST/REALIGN, Intersection Impro
-
246
-
-
-
24688 82 6
CN
RWPE
-----246------
-----
--
--- - -
This project will realign, reconstruct and widen the pavement to eliminate a skewed intersection. The existing right‐of‐way will be increased to 33 feet either side of the centerline to match the highway corridor width and minimize the impact to the existing residence.
WP20191
4
FREIGHT FREIGHTSTATE OF IDAHO (ITD)
I 84, DECLO POE WB, CASSIA COMP 217.450 - 219.520 RECONST/REALIGN, Port of Entry
128
13,330
118
12,300
10
1,030862 795 67
CN
RWPE
-----13,330------
-----
--
--- - -
The project is to build a new Port of Entry (POE) facility 3 miles east of I‐84 IC 216 serving both the eastbound and westbound lanes to replace the existing Cotterel POE. The Cotterel POE and Cotterel Rest Area (RA) were constructed in 1966 and currently share the same site. Dual usage of the property has been problematic as traffic volumes increased over the years. Concerns of vehicular traffic and heavy commercial trucking co‐mingling in a restricted area have created safety issues that need to be addressed.
205184
STP-RURAL (L) STP-RURALBUHL HD
STC-2715, E 4100 N REHABILITATION PH 2, BUHL HDMP 0.100 - 3.600 RESRF/RESTO&REHAB, Minor Widenin
60
2,619
56
2,427
4
192403 373 30
CN
RWPE
2,619-----------
----60
--
--- - -
Rehabilitate and widen E 4100 N Road (Pole Line Rd) for 3.5 miles from N1730E to N2100E. This project is a joint project between Buhl HD and Filer HD.
205834
CPCTY STECMSTATE OF IDAHO (ITD)
US 93, HOLLISTER NCL TO 3250 N, TWIN FALLS COMP 27.980 - 34.990 SAFTY/TRAF OPER, Rumble Strips
100
8,335
-
-
100
8,335500 463 37
CN
RWPE
-8,335----------
----100
--
--- - -
This project will provide wider shoulders with rumble strips on the shoulder and centerline. The project will also provide new pavement.
206334
STP-RURAL (L) STP-RURALBUHL
STC-2706, BURLEY AVE; US-30 TO FRUITLAND AVE, BUHLMP 1.250 - 2.035 RECONST/REALIGN, Plant Mix Paveme
-
3,382
-
3,134
-
248446 413 33
CN
RWPE
3,382-----------
-----
--
--- - -
Reconstruct existing Burley Ave. for one mile between Fruitland Rd and US30/SH46. Include curb, gutter, and sidewalk. This project is a joint project between City of Buhl and Buhl HD.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 56
District 4 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
206384
RAIL FED RRXDIETRICH
OFFSYS, WASHINGTON ST UPRR RRX, DIETRICH HDMP 100.618 - 100.618 SAFTY/TRAF OPER, Railroad Gates
-
325
-
292
-
33- - -
CN
RWPE
---325--------
-----
--
--- - -
Upgrade lights and install gates and planking.
206664
STP-RURAL (L) STP-RURALGOODING HD Number 1
STC-2777, SHOE STRING RD REHABILITATION, GOODING HDMP 4.500 - 10.900 RESRF/RESTO&REHAB, Minor Widenin
-
2,187
-
2,027
-
160348 322 26
CN
RWPE
2,187-----------
-----
--
--- - -
Rehabilitate and widen shoulders of Shoe String Rd between S1300 and SH46. This is a collector between I‐84 and SH46 in Gooding HD. Improve asphalt rutting and widen to 26 feet.
206994
STP-RURAL (L) STP-RURALHILLSDALE HD
STC-2793, CRESTVIEW RD REHABILITATION PH 1, HILLSDALEMP 100.000 - 104.000 RECONST/REALIGN, Minor Widening &
-
2,187
-
2,027
-
160318 295 23
CN
RWPE
2,187-----------
-----
--
--- - -
Rehabilitate Crestview Rd for 4 miles from I‐84 to 600 Rd S. Resurface and minor widening to 26 foot width.
207284
RAIL FED RRXJEROME, CITY OF
OFFSYS, E 200 S EIRR RRX, JEROMEMP 100.685 - 100.685 SAFTY/TRAF OPER, Railroad Gates
-
400
-
360
-
4010 9 1
CN
RWPE
-----400------
-----
--
--- - -
Install gates, signals, and widen planking.
218234
TRAFFIC STSTATE OF IDAHO (ITD)
SH 75, STANLEY RWISMP 138.700 - 138.700 SAFTY/TRAF OPER, Intelligent Transpo
-
265
-
-
-
26530 - 30
CN
RWPE
----265-------
-----
--
--- - -
The Stanley RWIS project is located on SH75 between Ketchum and Stanley. This project will consist of the installation of a new Road Weather Information System. This system will provide additional information to better aid road maintenance during inclement weather.
W21840
4
TRAFFIC STSTATE OF IDAHO (ITD)
I 84, FY21 D4 INTERSTATE STRIPINGMP 121.135 - 275.650 SAFTY/TRAF OPER, Pavement Marking
-
393
-
-
-
39310 10 -
CN
RWPE
-----393------
-----
--
--- - -
The FY21 Interstate Striping project will stripe various parts of I84 in order to maintain proper striping.
W21841
4
TRAFFIC IMSTATE OF IDAHO (ITD)
I 84, FY22 D4 INTERSTATE STRIPINGMP 121.135 - 275.650 SAFTY/TRAF OPER, Pavement Marking
-
401
-
401
-
-10 10 -
CN
RWPE
----401-------
-----
--
--- - -
The FY22 Interstate Striping project will stripe various parts of I84 in order to maintain proper striping.
W21842
4
TRAFFIC IMSTATE OF IDAHO (ITD)
I 84, FY23 D4 INTERSTATE STRIPINGMP 121.135 - 275.650 SAFTY/TRAF OPER, Pavement Marking
-
409
-
409
-
-10 10 -
CN
RWPE
---409--------
-----
--
--- - -
The FY23 Interstate Striping project will stripe various parts of I84 in order to maintain proper striping.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 57
District 4 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
W21843
4
TRAFFIC IMSTATE OF IDAHO (ITD)
I 84, FY24 D4 INTERSTATE STRIPINGMP 121.135 - 275.650 SAFTY/TRAF OPER, Pavement Marking
-
425
-
425
-
-10 10 -
CN
RWPE
--425---------
-----
--
--- - -
The FY24 Interstate Striping project will stripe various parts of I84 in order to maintain proper striping.
W21844
4
TRAFFIC IMSTATE OF IDAHO (ITD)
I 84, FY25 D4 INTERSTATE STRIPINGMP 121.135 - 275.650 SAFTY/TRAF OPER, Pavement Marking
-
434
-
434
-
-10 10 -
CN
RWPE
-434----------
-----
--
--- - -
The FY25 Interstate Striping project will stripe various parts of I84 in order to maintain proper striping.
W21845
4
FREIGHT FREIGHTSTATE OF IDAHO (ITD)
I 84, FY25 BLISS RA PARKING EXPANSIONMP 133.000 - 133.000 ENV PRESV, Rest Area Improvement
-
4,336
-
4,017
-
319750 695 55
CN
RWPE
-4,336----------
-----
--
--- - -
The objective of the FY25 Bliss Rest Area Parking Expansion project is to expand the parking area at the Bliss RA. This project will meet the department's goal to increase safety, mobility and economic opportunity by enabling more of the traveling public to use the RA. This is important due to the upcoming closure of the Jerome RA.
219144
SAFETY HSIPSTATE OF IDAHO (ITD)
SH 75, JCT US 20 RURAL CONFLICT WARNING SYSTEMMP 101.980 - 102.240 SAFTY/TRAF OPER, Intersection Improv
-
173
-
160
-
1320 19 1
CN
RWPE
-173----------
-----
--
--- - -
The SH 75, US 20 INTERSECTION RICWS project is located at the intersection of SH75 and US 20. This project will consist of the installation of a conflict warning system to help improve safety at the intersection.
P219514
SAFETY HSIPSTATE OF IDAHO (ITD)
US 93, 3250 N TO 3800 N, TWIN FALLS COMP 34.990 - 40.000 SAFTY/TRAF OPER, Minor Widening
102
6,468
95
5,993
7
475425 394 31
CN
RWPE
-6,468----------
---102-
--
--- - -
This project will widen roadway shoulders, add active signage, and rumble strips.
220014
SAFETY (L) HSIP (L)BUHL HD
OFFSYS, RIVER RD SAFETY IMPRV, BUHL HDMP 101.670 - 106.960 SAFTY/TRAF OPER, Metal Guard Rail
-
26
-
26
-
-5 5 -
CN
RWPE
-----26------
-----
--
--- - -
The River Road Curves Safety Improvement project, located near the City of Buhl in Twin Falls County, will improve the safety of six curves with similar conditions with the installation of Chevrons and Curve Advance Warning Signs to reduce/eliminate fatal and serious injury crashes for all roadway users.
220034
SAFETY (L) HSIP (L)GOODING HD Number 1
STC-2777, SHOE STRING RD SAFETY, GOODING HDMP 3.950 - 8.900 SAFTY/TRAF OPER, Minor Widening
-
723
-
670
-
53107 99 8
CN
RWPE
--723---------
-----
--
--- - -
The Shoe String Road Shoulder Widening project, located in the City of Tuttle in Gooding County, will construct widened shoulders and install edge line striping to improve safety for all roadway users with the reduction/elimination of fatal and serious injury crashes.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 58
District 4 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
221974
CPCTY STSTATE OF IDAHO (ITD)
STATE, FY22 D4 INTERSECTION IMPROVEMENTSMP 0.000 - 0.000 SAFTY/TRAF OPER, Drainage Improve
-
255
-
-
-
2555 - 5
CN
RWPE
----255------3
-----
--
--- - -
This project will increase safety by one or more of the following: roadway widening, adding additional turn or through lanes and/or drainage improvements throughout District 4.
W22218
4
OTHER ASSETS IMSTATE OF IDAHO (ITD)
I 84, FY26 D4 INTERSTATE STRIPINGMP 121.135 - 275.850 SAFTY/TRAF OPER, Pavement Marking
-
486
-
486
-
-10 10 -
CN
RWPE
------------
-----
--
486-- - -
The FY26 Interstate Striping project will stripe various parts of I‐84 between mileposts 121.1 and 275.9 to maintain proper striping.
224074
SAFETY (L) HSIP (L)JEROME HD
LOCAL, INTERSECTION IMPROVEMENTS, JEROME HDMP 0.000 - 0.000 SAFTY/TRAF OPER, Intersection Improv
-
62
-
62
-
-10 10 -
CN
RWPE
-----62-----10
-----
--
--- - -
For the work of improving busy intersections with the installation of stop sign‐mounted flashing beacons at multiple intersections within the district. The intersections are located along North Road, 500 North, 300 North, 200 North, West Road, 100 South, and GolfCourse Road.
224084
SAFETY (L) HSIP (L)TWIN FALLS HD
STC-2730, 3000 E & FOOTHILL RD CURVE, TWIN FALLS HDMP 8.090 - 8.290 SAFTY/TRAF OPER, Minor Widening
31
985
28
913
3
72142 132 10
CN
RWPE
---985-------142
---31-
--
--- - -
For the work to flatten and super‐elevate the curve to improve safety, improve the intersection of Foothills Road by squaring it up with 3000 North Road. Right of way will be required for the project. The project is located between mileposts 8.09 and 8.29.
224094
SAFETY (L) HSIP (L)TWIN FALLS, CITY OF
STC-7082, FILER AVE SAFETY AUDIT, TWIN FALLSMP 0.990 - 3.000 SAFTY/TRAF OPER, Preliminary Engine
-
-
-
-
-
-50 46 4
CN
RWPE
-----------50
-----
--
--- - -
The Filer Avenue Road Safety Audit project will perform a multi‐disciplinary Road Safety Audit along this roadway to identify potential safety improvements and prioritize short term and long‐term improvements to reduce/eliminate fatal and serious injury crashes for all roadway users.
224104
SAFETY (L) HSIP (L)RAFT RIVER HD
STC-2847, OLD HWY 81 SAFETY IMPROV, RAFT RIVER HDMP 12.580 - 12.980 SAFTY/TRAF OPER, Signing Improvem
-
67
-
67
-
-5 5 -
CN
RWPE
-----67-----5
-----
--
--- - -
For the work of installing new/additional roadway signing and delineators between mileposts 12.58 and 12.98.
224324
BR-OFF BR-OFFBLAINE COUNTY
OFFSYS, KILPATRICK BR, BLAINE COMP 105.410 - 105.410 BR/APPRS, Bridge Rehabilitation
-
1,272
-
1,179
-
93410 380 30
CN
RWPE
1,272----------410
-----
--
--- - -
For the work to replace the local deficient bridge over Silver Creek. The bridge provides access to local residential area and recreational uses along the creek. The bridge is located at milepost 105.41.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 59
District 4 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
224344
STP-RURAL (L) STP-RURALRAFT RIVER HD
STC-2847, OLD HWY 81 S, RAFT RIVER HDMP 8.500 - 10.500 RESRF/RESTO&REHAB, Pavement Re
-
2,045
-
1,895
-
150264 245 19
CN
RWPE
2,045----------264
-----
--
--- - -
For the work to widen existing roadway and rehabilitate existing pavement with RABS and overlay.
224474
OPS STJEROME, CITY OF
STATE, FY21 JEROME 10 ADA RAMPSMP 0.000 - 0.000 SAFTY/TRAF OPER, Sidewalk
-
60
-
-
-
60- - -
CN
RWPE
-----60------
-----
--
--- - -
Install ten Americans with Disabilities (ADA) ramps at various locations in the City of Jerome
224484
OPS STSHOSHONE, CITY OF
STATE, FY21 SHOSHONE 11 ADA RAMPSMP 0.000 - 0.000 SAFTY/TRAF OPER, Sidewalk
-
55
-
-
-
55- - -
CN
RWPE
-----55------
-----
--
--- - -
Install 11 Americans with Disabilities (ADA) ramps in various locations throughout the City of Shoshone.
224494
OPS STTWIN FALLS, CITY OF
STATE, FY21 TWIN FALLS 12 ADA RAMPSMP 0.000 - 0.000 SAFTY/TRAF OPER, Sidewalk
-
60
-
-
-
60- - -
CN
RWPE
-----60------
-----
--
--- - -
Install twelve Americans with Disabilities (ADA) ramps in various locations throughout the City of Twin Falls.
P224554
SAFETY HSIPSTATE OF IDAHO (ITD)
US 93, 3800 N TO IC 93/30, TWIN FALLS COMP 40.000 - 41.800 SAFTY/TRAF OPER, Minor Widening
-
3,312
-
3,069
-
243373 346 27
CN
RWPE
------------
-----
--
3,312-- - -
This project on US‐93, from milepost 40.0 to 41.8, will restore the pavement driving surface and improve safety by installing rumble strips and widening the shoulders.
224564
SAFETY HSIPSTATE OF IDAHO (ITD)
SH 46, INT E 2000 S, GOODING COMP 109.700 - 110.250 SAFTY/TRAF OPER, Turn Bay
-
459
-
426
-
3390 83 7
CN
RWPE
------------
-----
--
459-- - -
This project, at the intersection of SH‐46 & 2000 South, will improve safety by constructing designated left turn lanes for north and south bound traffic by reducing angle, rear end, and road departure accidents. The project is located between mileposts 109.7 and 110.25.
224714
OTHER ASSETS STSTATE OF IDAHO (ITD)
SH 77, ALBION SNOW FENCE, CASSIA COMP 17.800 - 18.800 SAFTY/TRAF OPER, Incidental Repairs
-
126
-
-
-
12616 - 16
CN
RWPE
-----126------
-----
--
--- - -
This project will install a snow fence on SH‐77 between mileposts 17.8 and 18.8 near the City of Albion in Cassia Co.
224724
OTHER ASSETS STSTATE OF IDAHO (ITD)
US 93, US-30 IC DYNAMIC MESSAGE SIGN, TWIN FALLS COMP 37.920 - 37.920 SAFTY/TRAF OPER, Intelligent Transpo
-
357
-
-
-
35730 - 30
CN
RWPE
----357------30
-----
--
--- - -
Install a dynamic message sign on US‐93 at the interchange with US‐30 at milepost 37.92 in Twin Falls County.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 60
District 4 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
M22595
4
BR-DSCR BR-DISCRLOCAL HIGHWAY TECHNICA
OFFSYS, LITTLE WOOD RIVER BR, SHOSHONE HDMP 102.465 - 102.465 BR/APPRS, Bridge Replacement
-
836
-
763
-
73408 378 30
CN
RWPE
-----557------
-----
--
--- - -
M
4
BR-OFF BR-OFFLOCAL HIGHWAY TECHNICA
OFFSYS, LITTLE WOOD RIVER BR, SHOSHONE HDMP 102.465 - 102.465 BR/APPRS, Bridge Replacement
-
836
-
763
-
73408 378 30
CN
RWPE
-----266-----149
-----
--
--- - -
M
4
LP-ST LPTLOCAL HIGHWAY TECHNICA
OFFSYS, LITTLE WOOD RIVER BR, SHOSHONE HDMP 102.465 - 102.465 BR/APPRS, Bridge Replacement
-
836
-
763
-
73408 378 30
CN
RWPE
-----12------
-----
--
--- - -
Replace LITTLE WOOD RIVER BR, SHOSHONE HD
M22596
4
BR-DSCR BR-DISCRLOCAL HIGHWAY TECHNICA
OFFSYS, 4200 N RD, DEEP CREEK BR, BUHL HDMP 101.491 - 101.491 BR/APPRS, Bridge Replacement
-
749
-
683
-
66410 380 30
CN
RWPE
-----499------
-----
--
--- - -
M
4
BR-OFF BR-OFFLOCAL HIGHWAY TECHNICA
OFFSYS, 4200 N RD, DEEP CREEK BR, BUHL HDMP 101.491 - 101.491 BR/APPRS, Bridge Replacement
-
749
-
683
-
66410 380 30
CN
RWPE
-----238-----151
-----
--
--- - -
M
4
LP-ST LPTLOCAL HIGHWAY TECHNICA
OFFSYS, 4200 N RD, DEEP CREEK BR, BUHL HDMP 101.491 - 101.491 BR/APPRS, Bridge Replacement
-
749
-
683
-
66410 380 30
CN
RWPE
-----12------
-----
--
--- - -
Replace 4200 N RD, DEEP CREEK BR, BUHL HD
WORN22696
4
OTHER ASSETS IMSTATE OF IDAHO (ITD)
I 84, FY27 D4 INTERSTATE STRIPINGMP 121.100 - 275.650 SAFTY/TRAF OPER, Pavement Marking
-
563
-
522
-
4113 12 1
CN
RWPE
---------3-10
-----
563-
--- - -
This is an Interstate striping project to stripe various segments of I84 to maintain pavement markings.
ORN227044
SAFETY HSIPSTATE OF IDAHO (ITD)
SH 24, MINIDOKA CO LN TO KIMAMA, LINCOLN COMP 32.000 - 34.500 SAFTY/TRAF OPER, Safety Improveme
-
4,905
-
4,545
-
360293 272 21
CN
RWPE
----------173120
-----
4,905-
--- - -
This project consists of a pavement rehabilitation with shoulder widening and the installation of edge line rumble strips that will improve safety and pavement conditions.
ORN227094
OTHER ASSETS NHSTATE OF IDAHO (ITD)
STATE, D4 LUMINAIRE REPAIR MP - SAFTY/TRAF OPER, Safety
-
520
-
482
-
3840 37 3
CN
RWPE
---520-------40
-----
--
--- - -
This project will repair luminaires at selected interchanges that are currently nonfunctioning, throughout the District, to increase safety for the traveling public.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 61
District 4 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
ORN227234
OTHER ASSETS STPSTATE OF IDAHO (ITD)
SH 25, WEST RD TO W FRONTAGE RD N, JEROME COMP 0.000 - 0.300 RESRF/RESTO&REHAB, Pavement Re
-
390
-
362
-
2830 28 2
CN
RWPE
---390-------30
-----
--
--- - -
This project is a mill and plant mix inlay to repair distressed pavement and provide for an improved pavement surface.
ORN228804
SAFETY (L) HSIP (L)TWIN FALLS HD
LOCAL, FLASHING LED SIGNS, TWIN FALLS HDMP - SAFTY/TRAF OPER, Intersection Improv
-
82
-
76
-
66 6 -
CN
RWPE
----82-----6-
-----
--
--- - -
This project will Install solar powered, radar activated Flashing LED Stop Signs and Flashing LED Stop Ahead signs at three two‐way stop control intersection.
ORN228814
SAFETY (L) HSIP (L)TWIN FALLS, CITY OF
LOCAL, RETROREFLECTIVE SIGNAL BACKPLATES, TWIN FALMP - SAFTY/TRAF OPER, Intersection Improv
-
49
-
45
-
46 6 -
CN
RWPE
----49-----6-
-----
--
--- - -
This project will install Retroreflective Back plates on signal heads at various locations.
ORN228824
SAFETY (L) HSIP (L)FILER HD
OFFSYS, INT 3800 N & US-93, FILER HDMP 3.750 - 4.320 SAFTY/TRAF OPER, Intersection Improv
-
1,097
-
1,016
-
81167 155 12
CN
RWPE
---1,097------167-
-----
--
--- - -
This project will overlay the existing cold mix asphalt mat with a new hot mix overlay 1500 feet both directions of the intersection, will install transverse rumble strips, and will add thermoplastic "stop ahead" onto the road surface.
ORN228904
STP-RURAL (L) STP-RURALWENDELL HD
STC-2765, BOB BARTON RD; 2200 E TO 2400 E, WENDELL HDMP 7.137 - 9.099 RECONST/REALIGN, Plant Mix Paveme
498
2,208
461
2,046
37
162367 340 27
CN
RWPE
2,208---------367-
498----
--
--- - -
This project will consist of constructing 32‐foot‐wide roadway and right of way along the Bob Barton Road similar in character to the other four phases and is necessary to repair the deteriorating roadway surface and improve the safety of the corridor.
ORN229104
TAP TAP-RURALMOUNTAIN RIDES TRANSPO
LOCAL, FY21 MRTA SRTS COORDINATOR & ACTIVITIESMP - ENV PRESV, Bicycle/Pedestrian/Equestr
-
64
-
60
-
4- - -
CN
RWPE
-----64------
-----
--
--- - -
This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.
ORN229114
TAP TAP-RURALMOUNTAIN RIDES TRANSPO
LOCAL, FY22 MRTA SRTS COORDINATOR & ACTIVITIESMP - ENV PRESV, Bicycle/Pedestrian/Equestr
-
64
-
60
-
4- - -
CN
RWPE
----64-------
-----
--
--- - -
This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.
ORN229134
TAP TAP-RURALMOUNTAIN RIDES TRANSPO
LOCAL, FY23 MRTA SRTS COORDINATOR & ACTIVITIESMP - ENV PRESV, Bicycle/Pedestrian/Equestr
-
64
-
60
-
4- - -
CN
RWPE
---64--------
-----
--
--- - -
This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 62
District 4 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
ORN229474
TAP TAP-RURALHAILEY
LOCAL, CROY TO QUIGLEY PATH, HAILEYMP - ENV PRESV, Bicycle/Pedestrian/Equestr
-
474
-
431
-
4356 51 5
CN
RWPE
----474-----354
-----
--
--- - -
Construct shared use path for East Croy St. from the Wood River Trail bike path east to Eastridge Dr., then Eastridge Dr. south to Quigley Road.
ORN229554
TAP TAP-URBANJEROME, CITY OF
LOCAL, EAST MAIN ST SIDEWALK, JEROMEMP - ENV PRESV, Sidewalk
-
449
-
416
-
3390 83 7
CN
RWPE
----449------90
-----
--
--- - -
The E Main St Sidewalk project will fill in the pedestrian and bicycle gap between the urban core and Jerome High School. Currently students walk on the pavement of State Highway 25, a heavily used trucking and passenger vehicle route.
ORN229564
TAP TAP-RURALBUHL
LOCAL, BUHL SCHOOL SIDEWALK, BUHLMP - ENV PRESV, Sidewalk
-
394
-
365
-
2985 78 7
CN
RWPE
----394------85
-----
--
--- - -
This project will connect and provide safe access to the Buhl High, Middle and Popplewell elementary Schools from the surrounding neighborhood.
ORN229664
OPS STJEROME, CITY OF
LOCAL, FY22 JEROME 7 ADA RAMPS PH 1MP - ENV PRESV, Curb & Gutter
-
60
-
-
-
60- - -
CN
RWPE
----60-------
-----
--
--- - -
Construct 7 Americans with Disabilities curb ramps in Jerome.
ORN229684
OPS STJEROME, CITY OF
LOCAL, FY22 JEROME ADA RAMPS PH 2MP - ENV PRESV, Curb & Gutter
-
60
-
-
-
60- - -
CN
RWPE
----60-------
-----
--
--- - -
Construct 7 Americans with Disabilities curb ramps in Jerome.
ORN229704
OPS STKETCHUM
LOCAL, FY22 KETCHUM 4 ADA RAMPSMP - ENV PRESV, Curb & Gutter
-
24
-
-
-
24- - -
CN
RWPE
----24-------
-----
--
--- - -
Construct 4 Americans with Disabilities curb ramps in Ketchum.
ORN229714
OPS STTWIN FALLS, CITY OF
LOCAL, FY22 TWIN FALLS 10 ADA RAMPSMP - ENV PRESV, Curb & Gutter
-
60
-
-
-
60- - -
CN
RWPE
----60-------
-----
--
--- - -
Construct 10 Americans with Disabilities curb ramps in Twin Falls.
ORN230164
FED RRX (L) FED RRXMINIDOKA HD
OFFSYS, N 800 E UPRR RRX, MINIDOKA HDMP 100.750 - 100.750 SAFTY/TRAF OPER, Railroad Gates
-
590
-
531
-
5920 18 2
CN
RWPE
-590------20---
-----
--
--- - -
Update gates and signals.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 63
District 4 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027Construction
Right-of-WayDevelopment
13,64239,25117,80917,20616,93622,311--2037231,642-498--337385
Total 13,64239,74917,82917,20917,99624,338G: Project is grouped in STIP
1: Project is also shown in a Transportation Improvement Program
W: Work zone safety priority
CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition
Notes:
Phases:
2: Project is being advance constructed with non-federal funds
P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM
B: Project addresses Federal Bridge Condition PM
A: Project utilizes an alternative contracting method.
M: Project included in multiple programs
18,20119,236----
18,20119,236
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 64
District 4 Public Transit Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Transit Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
193284
TRNS-OPS 5311 RuralMISCELLANEOUS
TRANSIT, D4 5311 STATEWIDE RURAL AREA FORMULA PROGMP 0.000 - 0.000 Transit Admin/Operations/PM
-
15,300
-
10,878
-
4,422- - -
CN
RWPE
-3,0603,0603,0603,0603,060------
-----
--
--- - -
Program provides capital, planning, and operating assistance to support public transportation operators who provide demand response and fixed route services in rural areas with populations less than 50,000. Serving Blaine, Cassia, Gooding, Jerome, Lincoln, Minidoka, Twin Falls counties.
193674
TRNS-CAP 5310 RuralMISCELLANEOUS
TRANSIT, D4 5310 ELDERLY AND DISABLED MP 0.000 - 0.000 Transit Capital
-
1,080
-
864
-
216- - -
CN
RWPE
-216216216216216------
-----
--
--- - -
Program serves the special needs of transit‐dependent senior citizens and persons with disabilities by providing funds for projects which go beyond traditional transit services (demand response) including those required under the Americans with Disabilities Act (ADA). In Blaine, Cassia, Gooding, Jerome, Lincoln, Minidoka, Twin Falls counties.
197354
TRNS-CAP 5339 RuralMISCELLANEOUS
TRANSIT, D4 5339 BUS AND BUS FACILITYMP 0.000 - 0.000 Bus Purchase / Construction
-
5,688
-
4,550
-
1,138- - -
CN
RWPE
-1,1381,1381,1381,1381,138------
-----
--
--- - -
Program provides capital funding to replace, rehabilitate and purchase buses and related equipment or to construct bus‐related facilities in rural and small urban areas directly affecting Blaine, Cassia, Gooding, Jerome, Lincoln, Minidoka, Twin Falls counties.
199764
TRNS-OPS 5310 RuralMISCELLANEOUS
TRANSIT, D4 ELDERLY & DISABLEDMP 0.000 - 0.000 Demand Response Operations
-
1,080
-
540
-
540- - -
CN
RWPE
-216216216216216------
-----
--
--- - -
Program serves the special needs of transit‐dependent senior citizens and persons with disabilities by providing funds for projects which go beyond traditional transit services (demand response) including those required under the Americans with Disabilities Act (ADA).
ORN230594
TRNS-OPS 5311 RuralSTATE OF IDAHO (ITD)
TRANSIT, D4 5311 CARES ACTMP - Security
-
5,325
-
5,325
-
-- - -
CN
RWPE
-----5,325------
-----
--
--- - -
Provides operating and capital funding for Coronavirus Aid, Relief, and Economic Security in rural areas.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 65
District 4 Public Transit Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Transit Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027Construction
Right-of-WayDevelopment
-4,6304,6304,6304,6309,954------------
Total -4,6304,6304,6304,6309,954G: Project is grouped in STIP
1: Project is also shown in a Transportation Improvement Program
W: Work zone safety priority
CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition
Notes:
Phases:
2: Project is being advance constructed with non-federal funds
P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM
B: Project addresses Federal Bridge Condition PM
A: Project utilizes an alternative contracting method.
M: Project included in multiple programs
--------
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 66
District 4 Aeronautics Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Aeronautics Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
192284
APT-NEW CA-APTJEROME COUNTY
U94, HAZELTON, CONSTRUCT TAXIWAYMP 0.000 - 0.000 APT DEV, New Facility
-
60
-
-
-
60- - -
CN
RWPE
----60-------
-----
--
--- - -
Construction of a partial parallel taxiway at Hazelton Municipal Airport. This parallel taxiway will eliminate back‐taxiing on Runway 6‐24 and enhance airport safety.
192824
APT-NEW CA-APTOAKLEY
1U6, OAKLEY, CONSTRUCT RUNWAYMP 0.000 - 0.000 APT DEV, New Facility
-
100
-
-
-
100- - -
CN
RWPE
----100-------
-----
--
--- - -
Pave existing runway area 3800' x 40'. Oakley is the furthest south landing area in the area. a paved runway would be a great asset to fire fighting efforts in south central Idaho.
197434
APT-NEW GA-APTJEROME COUNTY
JER, JEROME, CONSTRUCT TAXIWAY EXTENSIONMP 0.000 - 0.000 APT DEV, New Facility
-
150
-
135
-
15- - -
CN
RWPE
------------
-----
150-
--- - -
Design parallel taxiway extension to new runway end.
198904
APT-MTNC GA-APTBUHL
U03, BUHL, REHABILITATE APRONMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
222
-
200
-
22- - -
CN
RWPE
--222---------
-----
--
--- - -
Rehabilitate taxiway
200364
APT-MTNC PR-APTTWIN FALLS/TWIN FALLS CO
TWF, FY21 TWIN FALLS, REHABILITATE RUNWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
683
-
683
-
-- - -
CN
RWPE
-----683------
-----
--
--- - -
Pavement Maintenance ‐ Slurry Seal / Crack Fill
200754
APT-MTNC PR-APTTWIN FALLS/TWIN FALLS CO
TWF, TWIN FALLS, UPGRADE LIGHTING SYSTEMMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
341
-
341
-
-- - -
CN
RWPE
-----341------
-----
--
--- - -
Lighting system upgrade (R/W & T/W)
201024
APT-MTNC GA-APTBUHL
U03, BUHL, REHABILITATE TAXIWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
222
-
200
-
22- - -
CN
RWPE
--222---------
-----
--
--- - -
Rehabilitate taxiway
201164
APT-MTNC PR-APTTWIN FALLS/TWIN FALLS CO
TWF, TWIN FALLS, INSTALL PAPI & REILMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
171
-
171
-
-- - -
CN
RWPE
-----171------
-----
--
--- - -
PAPI / RIEL Upgrade
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 67
District 4 Aeronautics Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Aeronautics Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
203884
APT-MTNC PR-APTTWIN FALLS/TWIN FALLS CO
TWF, TWIN FALLS, REHABILITATE RUNWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
4,583
-
4,297
-
286- - -
CN
RWPE
--4,583---------
-----
--
--- - -
Rehabilitate Runway 8/26 ‐ 7/26
205014
APT-NEW GA-APTJEROME COUNTY
JER, JEROME, ENVIRONMENTAL ASSESSMENTMP 0.000 - 0.000 APT DEV, New Facility
-
-
-
-
-
-344 310 34
CN
RWPE
----------344-
-----
--
--- - -
Prepare environmental assessment for runway/taxiway extension. Airport Master Plan (currently underway) is developing justification for the extension.
205464
APT-MTNC GA-APTGOODING
GNG, GOODING MUNICIPAL, REHABILITATE RUNWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
167
-
167
-
-- - -
CN
RWPE
---167--------
-----
--
--- - -
Crack Seal, Seal coat & Remark
205614
APT-PLAN PR-APTTWIN FALLS/TWIN FALLS CO
TWF, TWIN FALLS, ENVIRONMENTAL ASSESSMENTMP 0.000 - 0.000 APT PLN, Airport Planning
-
-
-
-
-
-284 266 18
CN
RWPE
----------284-
-----
--
--- - -
Environmental EA for Cross wind Runway
205674
APT-MTNC GA-APTBUHL
U03, BUHL, REHABILITATE RUNWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
333
-
300
-
33- - -
CN
RWPE
--333---------
-----
--
--- - -
Crack Seal/Fog Coat Airport runway
206734
APT-MTNC GA-APTJEROME COUNTY
JER, JEROME, REHABILITATE RUNWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
2,389
-
2,389
-
-- - -
CN
RWPE
---2,389--------
-----
--
--- - -
Rehab Runway
208004
APT-NEW GA-APTBURLEY
BYI, NEW BURLEY AIRPORT RUNWAY CONSTRUCTION PHASMP 0.000 - 0.000 APT DEV, New Airport
-
5,049
-
4,544
-
505- - -
CN
RWPE
------------
-----
--
5,049-- - -
Construct Airfield electrical, runway and taxiway markings, terminal building, and install fuel system.
208064
APT-MTNC GA-APTBURLEY
BYI, NEW BURLEY AIRPORT CONSTRUCTION PHASE IVMP 0.000 - 0.000 APT DEV, New Facility
-
4,372
-
3,935
-
437- - -
CN
RWPE
-4,372----------
-----
--
--- - -
Access road pavement and airfield pavement placement
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 68
District 4 Aeronautics Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Aeronautics Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
208184
APT-NEW GA-APTBURLEY
BYI, NEW BURLEY AIRPORT CONSTRUCT RUNWAY PHASE IIIMP 0.000 - 0.000 APT DEV, New Airport
-
4,379
-
3,941
-
438- - -
CN
RWPE
--4,379---------
-----
--
--- - -
New Burley Airport Construct Runway
225194
APT-MTNC GA-APTWEISER
S87, WEISER, AIRPORT PAVEMENT REHABMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
282
-
254
-
28- - -
CN
RWPE
--282---------
-----
--
--- - -
Weiser Airport runway, taxiway, and apron rehabilitation
225204
APT-PLAN GA-APTWEISER
S87, WEISER, AIRPORT TAXILANE DESIGNMP 0.000 - 0.000 APT PLN, Airport Planning
-
-
-
-
-
-100 90 10
CN
RWPE
-------100----
-----
--
--- - -
Weiser airport hangar taxilane design
225214
APT-NEW GA-APTWEISER
S87, WEISER, AIRPORT CONSTRUCT TAXILANESMP 0.000 - 0.000 APT DEV, New Facility
-
350
-
315
-
35- - -
CN
RWPE
------------
-----
--
350-- - -
Weiser airport hangar taxilane construction
225224
APT-PLAN GA-APTJEROME COUNTY
JER, JEROME, AIRPORT AGIS SURVEYMP 0.000 - 0.000 APT PLN, Airport Planning
-
-
-
-
-
-244 220 24
CN
RWPE
---------244--
-----
--
--- - -
Airport AGIS Survey
225234
APT-PLAN GA-APTJEROME COUNTY
JER, JEROME, RUNWAY EXTENSION DESIGNMP 0.000 - 0.000 APT PLN, Airport Planning
-
-
-
-
-
-225 202 23
CN
RWPE
--------225---
-----
--
--- - -
Airport runway and taxiway extension design.
225244
APT-MTNC GA-APTJEROME COUNTY
JER, JEROME, AIRPORT RUNWAY EXTENSIONMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
1,556
-
1,400
-
156- - -
CN
RWPE
------------
-----
--
1,556-- - -
Runway extension for capacity
229334
APT-MTNC PU-APTJEROME COUNTY
U94, HAZELTON, RUNWAY REHABMP - RESRF/RESTO&REHAB, Facility Mainte
-
250
-
-
-
250- - -
CN
RWPE
----250-------
-----
--
--- - -
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 69
District 4 Aeronautics Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Aeronautics Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027Construction
Right-of-WayDevelopment
6,9554,37210,0222,5564101,195-100225244628-------
Total 6,9554,47210,2472,8001,0381,195G: Project is grouped in STIP
1: Project is also shown in a Transportation Improvement Program
W: Work zone safety priority
CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition
Notes:
Phases:
2: Project is being advance constructed with non-federal funds
P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM
B: Project addresses Federal Bridge Condition PM
A: Project utilizes an alternative contracting method.
M: Project included in multiple programs
-150-----150
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 70
District 5 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside BTPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
192475
STP-URBAN (L) STP-UBLACKFOOT
SMA-7607, S FISHER AVE; E WALKER ST TO ALICE ST, BLACKMP 100.150 - 100.850 RECONST/REALIGN, Base/Sub-base W
-
2,570
-
2,382
-
188290 269 21
CN
RWPE
2,570-----------
-----
--
--- - -
This project will provide a pavement rehabilitation to Fisher Street from Walker St. to Alice St. in Blackfoot. This project will reconstruct the curb, gutters, pavement and draining systems on Fisher Street. Fisher St. will receive a full depth reconstruction from Alice Street to Walker Street. The project will lay a new sub base, road base, asphalt, and chip seal on the road. To eliminate storm water flooding, a new draining system will be put along the entire length of the project.
193765
CPCTY STPSTATE OF IDAHO (ITD)
US 91, SHELLEY NCL TO YORK RD, PH2MP 118.700 - 122.880 MAJRWIDN, Base/Sub-base Work & Re
-
10,910
-
10,109
-
801210 195 15
CN
RWPE
----5,6105,300------
-----
--
--- - -
This project will improve roadway capacity, improve transportation safety, and update substandard roadway features on Hwy‐91 between Shelley, Idaho (milepost 118.7) to York Rd. (Milepost 122.8). The improvements for the existing roadway will consist of: reconstructing intersections, increasing shoulder widths, adding additional lanes, adding a median for left turning movements, and replacing the Snake River Valley Canal Bridge.
196055
CPCTY STPSTATE OF IDAHO (ITD)
I 86B, INT POCATELLO AVE, POWER COMP 4.080 - 4.080 SAFTY/TRAF OPER, Intersection Improv
350
2,524
93
2,339
257
185507 470 37
CN
RWPE
----2,524-------
-----
--
--- - -
This project will improve safety at the intersection of the I‐86 Business Loop and Pocatello Ave in American Falls. This will enhance safety by improving the traffic flow and increasing the mobility of the roadway.
196225
STP-RURAL (L) STP-RURALMALAD CITY
STC-1705, BANNOCK ST, MALAD CITYMP 0.000 - 0.710 RECONST/REALIGN, Undetermined Sur
-
2,385
-
2,210
-
175553 512 41
CN
RWPE
-2,385----------
-----
--
--- - -
This project will reconstruct approximately 0.7 miles of Bannock Street, which runs through the center of Malad city. Routine maintenance has kept the roadway drivable, but the heavy truck traffic along the route has deteriorated the pavement section. A major water system upgrade in the recent past has left this route with many utilities patches. The roadway needs a complete reconstruction to re‐establish a proper pavement section.
198385
STP-RURAL (L) STP-RURALBEAR LAKE COUNTY
STC-1809, DINGLE E SHORE; BEACH TO CEMETERY, BEAR LAMP 9.780 - 12.280 RESRF/RESTO&REHAB, Base/Sub-bas
-
3,617
-
3,351
-
266408 378 30
CN
RWPE
3,617-----------
-----
--
--- - -
This project is located in Bear Lake County and includes Roadway reconstruction/rehabilitation with safety improvements by upgrading existing facilities with new pavement construction and other improvements.
WB2
198495
BR-RESTORE IMSTATE OF IDAHO (ITD)
I 15, ARIMO RD IC# 40, BANNOCK COMP 40.425 - 40.426 BR/APPRS, Bridge Replacement
-
9,828
-
9,069
-
759550 507 43
CN
RWPE
--4,4165,412--------
-----
--
--- - -
This project will replace the Arimo Road Interchange (#40) Bridge on I‐15 in Bannock County.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 71
District 5 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside BTPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
199305
RAIL FED RRXINKOM
OFFSYS, PARK ST UPRR RRX, INKOMMP 0.000 - 0.000 SAFTY/TRAF OPER, Railroad Gates
-
200
-
180
-
20- - -
CN
RWPE
----200-------
-----
--
--- - -
Add crossing gates.
WB2
200835
BR-RESTORE IMSTATE OF IDAHO (ITD)
I 15, FORT HALL IC# 80, BANNOCK COMP 79.821 - 80.123 BR/APPRS, Bridge Replacement
-
18,873
-
17,414
-
1,459640 591 49
CN
RWPE
---7,42811,444-------
-----
--
--- - -
This project includes bridge replacements for I‐15 Exit #80 (mile point 79.9) Overhead Bridge including new ramps, Town Lateral Canal Bridge under I‐15 (mile point 80.14), and Ross Fork Creek Bridges under the Exit #80 ramps and I‐15 (mile point 79.8) It will also include redesigning the roads that are directly adjacent to the bridges to fit the new geometric design of the ramps and bridges as necessary.
M20115
5
RDSIDE STSTATE OF IDAHO (ITD)
STATE, FY21 D5 REVEGETATIONMP 0.000 - 0.000 ENV PRESV, Environmental
-
117
-
-
-
1172 - 2
CN
RWPE
-----105-----(48)
-----
--
--- - -
M
5
OTHER ASSETS STSTATE OF IDAHO (ITD)
STATE, FY21 D5 REVEGETATIONMP 0.000 - 0.000 ENV PRESV, Environmental
-
117
-
-
-
1172 - 2
CN
RWPE
-----12------
-----
--
--- - -
This project will help vegetate areas disturbed by construction following the completion of work.
201285
RAIL FED RRXBLACKFOOT
SMA-7601, RICH LN UPRR RRX, BLACKFOOTMP 0.028 - 0.028 SAFTY/TRAF OPER, Railroad Gates
-
200
-
180
-
2010 9 1
CN
RWPE
---200------10-
-----
--
--- - -
Add crossing gates.
204195
RDSIDE STPSTATE OF IDAHO (ITD)
STATE, FY21 D5 MONUMENT PRESERVATIONMP 0.000 - 0.000 ENV PRESV, Environmental
-
-
-
-
-
-160 148 12
CN
RWPE
-----------160
-----
--
--- - -
This project will hire a Professional Land Surveyor to preserve section corner and property corner markers during active construction projects.
RP204245
SAFETY HSIPSTATE OF IDAHO (ITD)
SH 39, THOMAS TO COLLINS SIDING RD, BLACKFOOTMP 51.451 - 52.698 MAJRWIDN, Turn Bay
-
2,429
-
2,251
-
178598 554 44
CN
RWPE
---------198--
-----
--
2,429-- - -
This project will involve the addition of a two way left turn lane, with a possible roundabout at the intersection of SH‐39 and Collins Siding Road.
204375
OTHER ASSETS NHSTATE OF IDAHO (ITD)
US 30, D5 WILDLIFE FENCEMP 371.770 - 375.958 ENV PRESV, Wildlife/Game Crossings
-
1,276
-
1,177
-
9960 55 5
CN
RWPE
---1,276--------
-----
--
--- - -
This project will allow for the installation of wildlife fencing along US‐30.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 72
District 5 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside BTPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
RP204815
SAFETY HSIPSTATE OF IDAHO (ITD)
US 26, MORELAND RD TO MP 303.5, BLACKFOOTMP 301.538 - 303.500 MAJRWIDN, Turn Bay
-
7,782
-
7,211
-
571200 185 15
CN
RWPE
---7,782--------
-----
--
--- - -
The scope of this project will be to construct three additional lanes on US‐26 to create a four‐lane highway with a two‐way left turn lane.
205155
RDSIDE STPSTATE OF IDAHO (ITD)
STATE, FY22 D5 MONUMENT PRESERVATIONMP 0.000 - 0.000 ENV PRESV, Environmental
-
-
-
-
-
-163 151 12
CN
RWPE
----------163-
-----
--
--- - -
This project will hire a Professional Land Surveyor to preserve section corner and property corner markers during active construction projects.
205955
TRAFFIC STPSTATE OF IDAHO (ITD)
STATE, FY23 BLACKFOOT SIGNAL UPGRADEMP 0.000 - 0.000 SAFTY/TRAF OPER, Traffic Signals
-
2,381
-
2,207
-
174250 232 18
CN
RWPE
----2,381-------
-----
--
--- - -
This project will include the installation of a new signal cabinet, mast arms, and will upgrade the signals to modern equipment on the ITD system throughout Blackfoot.
207335
RDSIDE STPSTATE OF IDAHO (ITD)
STATE, FY23 D5 MONUMENT PRESERVATIONMP 0.000 - 0.000 ENV PRESV, Environmental
-
-
-
-
-
-166 154 12
CN
RWPE
---------166--
-----
--
--- - -
This project will hire a Professional Land Surveyor to preserve section corner and property corner markers during active construction projects.
218335
OTHER ASSETS STPSTATE OF IDAHO (ITD)
STATE, FY25 D5 REVEGETATIONMP 0.000 - 0.000 ENV PRESV, Environmental
-
121
-
113
-
810 10 -
CN
RWPE
-121-------10--
-----
--
--- - -
This project will help vegetate areas disturbed by construction following the completion of work.
218345
RDSIDE STPSTATE OF IDAHO (ITD)
STATE, FY25 D5 MONUMENT PRESERVATIONMP 0.000 - 0.000 ENV PRESV, Environmental
-
-
-
-
-
-173 160 13
CN
RWPE
-------173----
-----
--
--- - -
The goal of this project is to preserve right of way monuments damaged by roadway and associated construction.
218545
OTHER ASSETS STPSTATE OF IDAHO (ITD)
STATE, FY24 D5 REVEGETATIONMP 0.000 - 0.000 ENV PRESV, Environmental
-
119
-
110
-
910 9 1
CN
RWPE
--119-------10-
-----
--
--- - -
This project will help vegetate areas disturbed by construction following the completion of work.
218555
RDSIDE STPSTATE OF IDAHO (ITD)
STATE, FY24 MONUMENT PRESERVATIONMP 0.000 - 0.000 ENV PRESV, Environmental
-
-
-
-
-
-170 157 13
CN
RWPE
--------170---
-----
--
--- - -
The goal of this project is to preserve right of way monuments damaged by roadway and associated construction.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 73
District 5 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside BTPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
219425
OTHER ASSETS STPSTATE OF IDAHO (ITD)
STATE, FY22 D5 REVEGETATIONMP 0.000 - 0.000 ENV PRESV, Environmental
-
109
-
101
-
810 9 1
CN
RWPE
----109-------
-----
--
--- - -
This project will help vegetate areas disturbed by construction following the completion of work.
219435
OTHER ASSETS STPSTATE OF IDAHO (ITD)
STATE, FY23 D5 REVEGETATIONMP 0.000 - 0.000 ENV PRESV, Environmental
-
111
-
103
-
810 9 1
CN
RWPE
---111-------10
-----
--
--- - -
This project will help vegetate areas disturbed by construction following the completion of work.
M22162
5
LP-ST LPTSTATE OF IDAHO (ITD)
US 30, ROCKY POINT WILDLIFE XING, BEAR LAKE COMP 442.000 - 448.000 ENV PRESV, Wildlife/Game Crossings
-
8,049
-
-
-
8,049260 - 260
CN
RWPE
-1,500----------
-----
--
--- - -
M
5
SAFETY STSTATE OF IDAHO (ITD)
US 30, ROCKY POINT WILDLIFE XING, BEAR LAKE COMP 442.000 - 448.000 ENV PRESV, Wildlife/Game Crossings
-
8,049
-
-
-
8,049260 - 260
CN
RWPE
-6,549----------
-----
--
--- - -
Add fencing and deer under crossings to mitigate deer/vehicle collisions at this location. The deer migration has resulted in approximately 100 deer/vehicle collisions annually.
222875
OTHER ASSETS STPSTATE OF IDAHO (ITD)
STATE, FY26 D5 REVEGETATIONMP 0.000 - 0.000 ENV PRESV, Environmental
-
121
-
113
-
810 10 -
CN
RWPE
---------10--
-----
--
121-- - -
This project will help vegetate areas disturbed by construction following the completion of work.
224865
OTHER ASSETS STPSTATE OF IDAHO (ITD)
SH 34, FY23 D5 GUARDRAIL REPLACEMENT, FRANKLIN COMP 23.500 - 26.300 SAFTY/TRAF OPER, Metal Guard Rail
-
229
-
212
-
1720 19 1
CN
RWPE
---229--------
-----
--
--- - -
This project will replace guardrail from milepost 23.5 to 26.3 on SH‐34 in Franklin Co.
W22487
5
OTHER ASSETS IMSTATE OF IDAHO (ITD)
I 86, FY21 D5 FENCE IMPROVEMENT, CASSIA/POWER COMP 14.820 - 19.000 SAFTY/TRAF OPER, Incidental Repairs
-
242
-
223
-
1922 20 2
CN
RWPE
-----242------
-----
--
--- - -
This project will improve the fencing along I‐86 between mileposts 14.82 and 19 in Cassia and Power counties.
W22488
5
OTHER ASSETS IMSTATE OF IDAHO (ITD)
I 86, FY22 D5 FENCE IMPROVEMENTS, POWER COMP 19.000 - 29.000 SAFTY/TRAF OPER, Incidental Repairs
-
449
-
414
-
3540 37 3
CN
RWPE
----449-------
-----
--
--- - -
This project will improve the fences along I‐86 between mileposts 19 and 29 in Power county.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 74
District 5 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside BTPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
W22489
5
OTHER ASSETS IMSTATE OF IDAHO (ITD)
I 15, FY23 D5 FENCE IMPROVEMENTS, BANNOCK COMP 27.000 - 37.000 SAFTY/TRAF OPER, Incidental Repairs
-
458
-
422
-
3640 37 3
CN
RWPE
---458--------
-----
--
--- - -
This project will improve fencing along I‐15 between mileposts 27 and 37 in Bannock County.
M22598
5
BR-DSCR BR-DISCRLOCAL HIGHWAY TECHNICA
OFFSYS, ST CHARLES CREEK BR, BEAR LAKE COMP 100.053 - 100.053 BR/APPRS, Bridge Replacement
-
543
-
491
-
52415 384 31
CN
RWPE
-----358------
-----
--
--- - -
M
5
BR-OFF BR-OFFLOCAL HIGHWAY TECHNICA
OFFSYS, ST CHARLES CREEK BR, BEAR LAKE COMP 100.053 - 100.053 BR/APPRS, Bridge Replacement
-
543
-
491
-
52415 384 31
CN
RWPE
-----172-----156
-----
--
--- - -
M
5
LP-ST LPTLOCAL HIGHWAY TECHNICA
OFFSYS, ST CHARLES CREEK BR, BEAR LAKE COMP 100.053 - 100.053 BR/APPRS, Bridge Replacement
-
543
-
491
-
52415 384 31
CN
RWPE
-----12------
-----
--
--- - -
Replace ST CHARLES CREEK BR, BEAR LAKE CO
ORN226495
OTHER ASSETS STPSTATE OF IDAHO (ITD)
STATE, FY27 D5 REVEGETATIONMP - ENV PRESV, Environmental
-
124
-
115
-
911 10 1
CN
RWPE
--------11---
-----
124-
--- - -
This project will help vegetate areas disturbed by construction following the completion of work.
ORN226545
PLAN STPSTATE OF IDAHO (ITD)
STATE, D5 MATERIALS RECONNAISSANCEMP - SYS PLN, System Planning
-
-
-
-
-
-150 139 11
CN
RWPE
---------2525100
-----
--
--- - -
This project will provide funds for the materials lab to run tests for potential and upcoming projects.
ORN227595
SAFETY STSTATE OF IDAHO (ITD)
STATE, FY21 D5 INTERSECTION IMPROVEMENTSMP - SAFTY/TRAF OPER, Intersection Improv
-
-
-
-
-
-55 - 55
CN
RWPE
-----------55
-----
--
--- - -
This project will allow for improvements to intersections throughout southeastern Idaho.
ORN229575
TAP TAP-URBANINKOM
I 15B, INKOM ELEMENTARY SCHOOL SIDEWALK, INKOMMP - ENV PRESV, Sidewalk
-
485
-
450
-
3550 46 4
CN
RWPE
---485------50-
-----
--
--- - -
Install 8’ sidewalks on three segments: I‐15B at Main St, to Holstein St; to the Elementary School Driveway.
ORN229755
OPS STROCKLAND
LOCAL, FY22 ROCKLAND 11 ADA RAMPSMP - ENV PRESV, Curb & Gutter
-
44
-
-
-
44- - -
CN
RWPE
----44-------
-----
--
--- - -
Construct 11 Americans with Disabilities curb ramps in Rockland, Power Co., Idaho.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 75
District 5 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside BTPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027Construction
Right-of-WayDevelopment
2,55010,5554,53523,38222,7626,202-173180410258433------
Total 2,55010,7284,71523,79223,0206,635G: Project is grouped in STIP
1: Project is also shown in a Transportation Improvement Program
W: Work zone safety priority
CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition
Notes:
Phases:
2: Project is being advance constructed with non-federal funds
P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM
B: Project addresses Federal Bridge Condition PM
A: Project utilizes an alternative contracting method.
M: Project included in multiple programs
6,187124----
6,187124
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 76
District 5 Public Transit Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Transit Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside BTPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
194225
TRNS-OPS 5311 RuralMISCELLANEOUS
TRANSIT, D5 5311 STATEWIDE RURAL AREA FORMULA PROGMP 0.000 - 0.000 Transit Admin/Operations/PM
-
7,060
-
4,828
-
2,232- - -
CN
RWPE
-1,4121,4121,4121,4121,412------
-----
--
--- - -
Program provides capital, planning, and operating assistance to support public transportation operators who provide demand response and fixed route services in rural areas with populations less than 50,000. Serving Bannock, Bear Lake, Bingham, Caribou, Franklin, Oneida, Power counties.
M19686
5
TRNS-CAP 5339 RuralMISCELLANEOUS
TRANSIT, D5 5339 BUS AND BUS FACILITYMP 0.000 - 0.000 Bus Purchase / Construction
-
3,510
-
2,808
-
702- - -
CN
RWPE
-525525525525525------
-----
--
--- - -
M
5
TRNS-CAP 5339 SUrbMISCELLANEOUS
TRANSIT, D5 5339 BUS AND BUS FACILITYMP 0.000 - 0.000 Bus Purchase / Construction
-
3,510
-
2,808
-
702- - -
CN
RWPE
-177177177177177------
-----
--
--- - -
Program provides capital funding to replace, rehabilitate and purchase buses and related equipment or to construct bus‐related facilities in rural and small urban areas directly affecting Bannock, \ Bear Lake, Bingham, Caribou, Franklin, Oneida, Power counties.
M20262
5
TRNS-OPS 5310 SUrbMISCELLANEOUS
TRANSIT, D5 ELDERLY & DISABLEDMP 0.000 - 0.000 Demand Response Operations
-
1,505
-
1,204
-
301- - -
CN
RWPE
-241241241241241------
-----
--
--- - -
M
5
TRNS-OPS 5310 RuralMISCELLANEOUS
TRANSIT, D5 ELDERLY & DISABLEDMP 0.000 - 0.000 Demand Response Operations
-
1,505
-
1,204
-
301- - -
CN
RWPE
-6060606060------
-----
--
--- - -
Program serves the special needs of transit‐dependent senior citizens and persons with disabilities by providing funds for projects which go beyond traditional transit services (demand response) including those required under the Americans with Disabilities Act (ADA).
ORN230605
TRNS-OPS 5311 RuralSTATE OF IDAHO (ITD)
TRANSIT, D5 5311 CARES ACTMP - Security
-
2,458
-
2,458
-
-- - -
CN
RWPE
-----2,458------
-----
--
--- - -
Provides operating and capital funding for Coronavirus Aid, Relief, and Economic Security in rural areas.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 77
District 5 Public Transit Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Transit Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside BTPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027Construction
Right-of-WayDevelopment
-2,4152,4152,4152,4154,873------------
Total -2,4152,4152,4152,4154,873G: Project is grouped in STIP
1: Project is also shown in a Transportation Improvement Program
W: Work zone safety priority
CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition
Notes:
Phases:
2: Project is being advance constructed with non-federal funds
P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM
B: Project addresses Federal Bridge Condition PM
A: Project utilizes an alternative contracting method.
M: Project included in multiple programs
--------
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 78
District 5 Aeronautics Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Aeronautics Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside BTPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
193575
APT-NEW GA-APTBEAR LAKE COUNTY
1U7, BEAR LAKE, SNOW REMOVAL EQUIPMENTMP 0.000 - 0.000 APT DEV, New Facility
-
333
-
300
-
33- - -
CN
RWPE
---333--------
-----
--
--- - -
Multidirectional Tractor w/ plow, broom, blower & bucket.
199725
APT-NEW GA-APTBEAR LAKE COUNTY
1U7, BEAR LAKE, SNOW REMOVAL EQUIPMENT BUILDINGMP 0.000 - 0.000 APT DEV, New Facility
-
333
-
300
-
33- - -
CN
RWPE
----333-------
-----
--
--- - -
Storage Bldg. for SRE.
201615
APT-MTNC GA-APTBEAR LAKE COUNTY
1U7, BEAR LAKE, RUNWAY DECOUPLING, DESIGNMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
-
-
-
-
-333 300 33
CN
RWPE
--------333---
-----
--
--- - -
Design ‐ Decouple Runway Ends/Construct Taxiway
201905
APT-MTNC GA-APTBEAR LAKE COUNTY
1U7, BEAR LAKE, RUNWAY DECOUPLING, CONSTRUCTMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
1,833
-
1,650
-
183- - -
CN
RWPE
-1,833----------
-----
--
--- - -
Construct ‐ Decouple Runway Ends/Construct Taxiway
203775
APT-MTNC GA-APTBLACKFOOT
U02, BLACKFOOT, INSTALL AWOSMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
406
-
365
-
41- - -
CN
RWPE
-406----------
-----
--
--- - -
Install AWOS ‐ Currently pilots have to get weather reporting from either Idaho Falls Regional Airport or Pocatello Regional Airport.
203825
APT-NEW GA-APTABERDEEN
U36, ABERDEEN, CONSTRUCT RUNWAYMP 0.000 - 0.000 APT DEV, New Facility
-
1,125
-
1,012
-
113- - -
CN
RWPE
-1,125----------
-----
--
--- - -
Runway relocation.
203875
APT-MTNC CA-APTSODA SPRINGS
U78, SODA SPRINGS, RECONSTRUCT APRONMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
86
-
-
-
86- - -
CN
RWPE
-----86------
-----
--
--- - -
207415
APT-NEW GA-APTABERDEEN
U36, ABERDEEN, CONSTRUCT RUNWAY, DESIGNMP 0.000 - 0.000 APT DEV, New Facility
-
-
-
-
-
-444 400 44
CN
RWPE
----------444-
-----
--
--- - -
Ph. 1 ‐ Design
221815
APT-MTNC GA-APTBLACKFOOT
U02, PLANNING-CONDUCT ENVIRONMENTAL ASSESSEMENTMP 0.000 - 0.000 APT PLN, Airport Planning
-
-
-
-
-
-333 333 -
CN
RWPE
-----------333
-----
--
--- - -
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 79
District 5 Aeronautics Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Aeronautics Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside BTPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
225295
APT-PLAN GA-APTBLACKFOOT
U02, BLACKFOOT, MCCARLEY FIELD ENVIRONMENTAL ASSEMP 0.000 - 0.000 APT PLN, Airport Planning
-
-
-
-
-
-456 410 46
CN
RWPE
----------456-
-----
--
--- - -
McCarley Airfield Environmental Assessment
225305
APT-MTNC GA-APTBLACKFOOT
U02, BLACKFOOT, MCCARLEY FIELD RUNWAY REHABMP 0.000 - 0.000 RESRF/RESTO&REHAB, Facility Mainte
-
2,111
-
1,900
-
211- - -
CN
RWPE
--2,111---------
-----
--
--- - -
McCarley Field runway rehabilitation
225315
APT-MTNC GA-APTBLACKFOOT
U02, BLACKFOOT, MCCARLEY FIELD TAXIWAY REHABMP 0.000 - 0.000 RESRF/RESTO&REHAB, Facility Mainte
-
167
-
150
-
17- - -
CN
RWPE
---167--------
-----
--
--- - -
McCarly Field crack seal, fog seal, stripe taxiway
225325
APT-PLAN GA-APTBLACKFOOT
U02, BLACKFOOT, MCCARLEY FIELD APRON DESIGNMP 0.000 - 0.000 APT PLN, Airport Planning
-
-
-
-
-
-167 150 17
CN
RWPE
------------
-----
--
-167
- - -
McCarley Field apron rehab design
225335
APT-MTNC GA-APTBLACKFOOT
U02, BLACKFOOT, MCCARLEY FIELD APRON REHABMP 0.000 - 0.000 RESRF/RESTO&REHAB, Facility Mainte
-
1,167
-
1,050
-
117- - -
CN
RWPE
------------
-----
--
1,167-- - -
McCarley Field apron rehabilitation
225375
APT-MTNC GA-APTABERDEEN
U36, ABERDEEN, AIRPORT RUNWAY CONSTRUCTION PH IIMP 0.000 - 0.000 RECONST/REALIGN, Facility Maintenan
-
337
-
303
-
34- - -
CN
RWPE
--337---------
-----
--
--- - -
PH II Aberdeen Airport Runway Construction
225385
APT-MTNC GA-APTABERDEEN
U36, ABERDEEN, AIRPORT PAVEMENT REHABMP 0.000 - 0.000 RESRF/RESTO&REHAB, Facility Mainte
-
145
-
131
-
14- - -
CN
RWPE
------------
-----
--
145-- - -
225395
APT-NEW GA-APTABERDEEN
U36, ABERDEEN, AIRPORT LAND ACQUISITIONMP 0.000 - 0.000 APT DEV, Facility Maintenance
525
-
525
-
-
-- - -
CN
RWPE
------------
----525
--
--- - -
Aberdeen Airport land acquisition for runway relocation
225405
APT-MTNC GA-APTABERDEEN
U36, ABERDEEN, AIRPORT FENCEMP 0.000 - 0.000 APT DEV, Safety
-
175
-
158
-
17- - -
CN
RWPE
-175----------
-----
--
--- - -
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 80
District 5 Aeronautics Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Aeronautics Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside BTPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
Aberdeen Airport construct perimeter fence
225635
APT-MTNC GA-APTFRANKLIN COUNTY
U10, PRESTON, AIRPORT RUNWAY REHABMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
7,142
-
6,428
-
714- - -
CN
RWPE
----7,142-------
-----
--
--- - -
Design and construct runway rehab.
225645
APT-MTNC GA-APTFRANKLIN COUNTY
U10, PRESTON, AIRPORT PAVEMENT REHABMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
67
-
60
-
7- - -
CN
RWPE
---67--------
-----
--
--- - -
Airport taxiway and apron rehabilitation.
225875
APT-MTNC GA-APTFRANKLIN COUNTY
U10, PRESTON, AIRPORT RUNWAY REHABMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
115
-
104
-
11- - -
CN
RWPE
------------
-----
--
115-- - -
229355
APT-MTNC GA-APTABERDEEN
U36, ABERDEEN, AIRPORT RUNWAY RELOCATIONMP - APT DEV, Facility Maintenance
-
250
-
225
-
25- - -
CN
RWPE
---250--------
-----
--
--- - -
229365
APT-MTNC GA-APTBEAR LAKE COUNTY
1U7, BEAR LAKE, AIRPORT REHABMP - RESRF/RESTO&REHAB, Facility Mainte
-
6,400
-
6,400
-
-- - -
CN
RWPE
-----6,400------
-----
--
--- - -
Construction
Right-of-WayDevelopment
1,4273,5392,4488177,4756,486167-333-900333
-----525Total 1,5943,5392,7818178,3757,344
G: Project is grouped in STIP
1: Project is also shown in a Transportation Improvement Program
W: Work zone safety priority
CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition
Notes:
Phases:
2: Project is being advance constructed with non-federal funds
P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM
B: Project addresses Federal Bridge Condition PM
A: Project utilizes an alternative contracting method.
M: Project included in multiple programs
--------
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 81
District 6 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside BMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
P140546
RESTORE NHSTATE OF IDAHO (ITD)
US 20, JCT SH 87 TO MT ST LN (TARGHEE PASS) PH 1 & PH 2MP 401.500 - 406.300 RECONST/REALIGN, Minor Widening
-
22,311
-
20,674
-
1,6372,340 2,168 172
CN
RWPE
-13,470----------
-----
--
8,841-- - -
Reconstruction of four miles of U.S. 20, with potential for truck climbing lane.
140586
STP-RURAL (L) STP-RURALCLARK COUNTY
STC-6805, A2 HIGHWAY, CLARK COMP 2.000 - 9.000 RESRF/RESTO&REHAB, Base/Sub-bas
-
5,232
-
4,848
-
384429 398 31
CN
RWPE
---5,232--------
-----
--
--- - -
This project will improve the A2 Hwy in Clark County by widening the roadway, fixing soft spots, adding additional base and paving the roadway. This will include the replacement of culverts, and other minor drainage improvements. The project will widen the road from 22 ‐ 26 foot section to a 30 foot section which will require modifications to cattle guards and box culverts.
140596
STP-RURAL (L) STP-RURALFREMONT COUNTY
STC-6770, N SALEM RD, FREMONT COMP 3.928 - 4.928 RESRF/RESTO&REHAB, Base/Sub-bas
-
3,462
-
3,208
-
254300 278 22
CN
RWPE
----3,462-------
-----
--
--- - -
This project will widen and improve the existing sub‐base to match the middle section of Salem Road in Fremont County. It is anticipated that a Cement Recycle and Base Stabilization(CRAB) project will be performed also.
189336
STP-RURAL (L) STP-RURALCUSTER COUNTY
STC-6867, GARDEN CR RD TO CHALLIS CLMP 142.356 - 144.347 RESRF/RESTO&REHAB, Pavement Re
152
2,938
141
2,722
11
216783 726 57
CN
RWPE
---2,938-------100
----152
--
--- - -
The purpose of this project is to rebuild Garden Creek Road from the crossing at Garden Creek up to the Challis city limits. The work will include a full reconstruction of the road structure, correcting horizontal and vertical alignment deficiencies, and improving drainage.
193056
STP-RURAL (L) STP-RURALJEFFERSON COUNTY
STC-6748, ANNIS HWY; RIGBY TO MENAN-LORENZO HWYMP 0.900 - 3.910 RESRF/RESTO&REHAB, Minor Widenin
-
2,327
-
2,156
-
171307 284 23
CN
RWPE
--2,327---------
-----
--
--- - -
This project will improve the Annis Hwy from the northern Rigby City Limit to the Menan‐Lorenzo Highway. This project will include an asphalt overlay, shoulder widening, geometric improvements of an un‐safe horizontal curve and site clearing along the right‐of‐way to improve the geometric configuration of an accident prone intersection.
M19358
6
SAFETY HSIPSTATE OF IDAHO (ITD)
US 20, INT SH 47 IMPROVEMENTS, ASHTONMP 360.572 - 360.572 SAFTY/TRAF OPER, Intersection Improv
-
5,420
-
5,023
-
397550 510 40
CN
RWPE
---1,644--------
-----
--
--- - -
M
6
RESTORE NHSTATE OF IDAHO (ITD)
US 20, INT SH 47 IMPROVEMENTS, ASHTONMP 360.572 - 360.572 SAFTY/TRAF OPER, Intersection Improv
-
5,420
-
5,023
-
397550 510 40
CN
RWPE
---3,777--------
-----
--
--- - -
This project will improve safety and upgrade the intersection of Hwy‐47 and Hwy‐20 within Ashton.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 82
District 6 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside BMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
195666
BR-OFF BR-OFFFREMONT COUNTY
OFFSYS, FUN FARM BRIDGE, FREMONT COMP 0.000 - 0.000 BR/APPRS, Bridge Replacement
-
4,762
-
4,412
-
350739 685 54
CN
RWPE
--4,762---------
-----
--
--- - -
This project will replace the Fun Farm Bridge in Fremont County. The bridge is located at 2663 South River Road in Fremont County; this is approximately 3.00 miles east of the City of St. Anthony and the bridge crosses the Henrys Fork of the Snake River. This Fun Farm Bridge is Structurally Deficient and is in need of replacement.
197966
FLAP FLAPLEMHI COUNTY
US 93, 2L HWY 93 TRAIL, LEMHI COMP 263.840 - 265.000 ENV PRESV, Bicycle/Pedestrian/Equestr
-
2,357
-
2,184
-
173212 141 71
CN
RWPE
-----2,357------
-----
--
--- - -
Construct paved trail in the US‐93 right‐of‐way from Salmon to Shoup Bridge BLM site and improve the BLM site.
197976
FLAP FLAPCLARK COUNTY
STC-6805, YALE KILGORE RD IMPROVEMENT, CLARK COMP 9.000 - 16.863 RESRF/RESTO&REHAB, Pavement Re
-
6,676
-
6,186
-
490406 356 50
CN
RWPE
---6006,076------75
-----
--
--- - -
Widen the roadway to a consistent 30 feet and improve the roadway base through excavation and adding additional base aggregate and improving the roadway surface from gravel to hot mix asphalt pavement.
197986
FLAP FLAPFREMONT COUNTY
STC-6805, YALE KILGORE RD IMPROVEMENT, FREMONT COMP 16.865 - 27.908 RESRF/RESTO&REHAB, Pavement Re
-
7,358
-
6,818
-
540484 482 2
CN
RWPE
---6636,097598-----33
-----
--
--- - -
New gravel trail running parallel to the road on the south side. Ideally this trail would be paved but due to the size of the project, this phase will include only gravel.
M20053
6
SAFETY HSIPSTATE OF IDAHO (ITD)
US 20, CHESTER TO ASHTON , FREMONT COMP 352.200 - 363.380 RECONST/REALIGN, Plant Mix Paveme
8,490
47,899
7,867
44,383
623
3,5162,050 1,900 150
CN
RWPE
--14,645---------
-----
--
--- - -
M
6
RESTORE NHSTATE OF IDAHO (ITD)
US 20, CHESTER TO ASHTON , FREMONT COMP 352.200 - 363.380 RECONST/REALIGN, Plant Mix Paveme
8,490
47,899
7,867
44,383
623
3,5162,050 1,900 150
CN
RWPE
-14,79518,460---------
--8,490--
--
--- - -
This project will begin at milepost 352.20 and end at milepost 360.25. The project consists of constructing a 4 lane divided highway with the addition of 2 new interchanges. This will eliminate all at grade crossings within the project limits and add frontage roads for access to US 20.
RP203796
SAFETY HSIPSTATE OF IDAHO (ITD)
US 26, CLARK HILL REST AREA TURN LNS, BONNEVILLE COMP 357.100 - 357.600 MAJRWIDN, Turn Bay
-
2,846
-
2,637
-
209185 171 14
CN
RWPE
----2,846-------
-----
--
--- - -
This project is located on US26 from milepost 357.1 to milepost 357.6.The project will construct a center turn lane and a right turn lane into the Clark Hill Rest Area. This will create a safe lane for traffic that is turning into the rest area. Signing and striping will also be constructed to designate the turn lane areas.
RP204116
SAFETY HSIPSTATE OF IDAHO (ITD)
US 26, ANTELOPE FLATS PASSING LANE, BONNEVILLE COMP 360.300 - 363.000 MAJRWIDN, Passing Lane
-
4,478
-
4,149
-
329185 171 14
CN
RWPE
----4,478-------
-----
--
--- - -
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 83
District 6 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside BMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
This project is located on US26 from milepost 360.3 to milepost 363.00. The project will construct alternating passing lanes. This will increase the mobility and safety of US 26 during peak traffic seasons. Signing will also be installed designating the passing lanes.
A20581
6
RESTORE NHSTATE OF IDAHO (ITD)
US 20, SHEEP FALLS TO PINEHAVEN OVERLAY, FREMONT CMP 369.000 - 377.500 RESRF/RESTO&REHAB, Pavement Ma
-
6,936
-
6,427
-
5092,200 2,039 161
CN
RWPE
----6,936-------
-----
--
--- - -
The scope of this project is to mill 0.1 of pavement to eliminate existing rutting and cracks. Then an overlay will be applied to provide stability of the roadway and extend the life of the pavement surface.
205996
STP-RURAL (L) STP-RURALMADISON COUNTY
STC-6760, W SIDE FRONTAGE RD, MADISON COMP 98.470 - 100.000 NEW RTE, Grading & Drainage
96
3,989
89
3,696
7
293469 435 34
CN
RWPE
3,989-----------
----96
--
--- - -
Construct new 2‐lane frontage road west side of US‐20 between the Thornton IC and 3000 S. New IC restricted access to US‐20 and this frontage road will restore access and improve traffic flow.
206116
RAIL FED RRXJEFFERSON COUNTY
OFFSYS, 500 N EIRR RRX, NR RIGBYMP 100.019 - 100.019 SAFTY/TRAF OPER, Safety Improveme
-
100
-
90
-
10- - -
CN
RWPE
----100-------
-----
--
--- - -
Install insulated concrete planking.
206186
RAIL FED RRXJEFFERSON COUNTY
OFFSYS, 550 N EIRR RRX, NR RIGBYMP 100.019 - 100.019 SAFTY/TRAF OPER, Safety Improveme
-
100
-
90
-
10- - -
CN
RWPE
----100-------
-----
--
--- - -
Install insulated concrete planking.
RP206636
CPCTY NHSTATE OF IDAHO (ITD)
US 93, TOMCAT HILL CURVES, BLAINE COMP 221.000 - 223.000 SAFTY/TRAF OPER, Slope Flattening
-
5,358
-
4,965
-
393750 695 55
CN
RWPE
-5,358----------
-----
--
--- - -
This project will increase the radius of the curves which are now substandard and difficult to navigate with the heavy commercial traffic. The super elevation of the curves will also be design to meet AASHTO standards. The location of this project is on US 93 at milepost 221 to milepost 223.
207106
CPCTY STECMSTATE OF IDAHO (ITD)
SH 33, TETON CO INTERSECTION IMPROVEMENTSMP 138.700 - 149.400 SAFTY/TRAF OPER, Intersection Improv
-
4,654
-
-
-
4,654450 139 311
CN
RWPE
-4,654----------
-----
--
--- - -
This project will improve intersections and add turn lanes on SH33 from milepost 138.70 to milepost 149.40.
207746
FLAP (L) FLAPSALMON NATL FOREST
STC-6867, YANKEE FORK RD, CUSTER COMP 100.000 - 142.000 PM, Bridge Deck Repair
-
3,350
-
3,104
-
246- - -
CN
RWPE
-----3,350------
-----
--
--- - -
Surface stabilization, dust control, bridge work, bridge guardrail and curb upgrades, culvert replacement, vehicular turnouts within the one‐lane roadway section, restore shoulders and ditches, fill stabilization, and signage upgrades.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 84
District 6 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside BMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
M21798
6
PAVE NHSTATE OF IDAHO (ITD)
SH 33, JCT US 20 (IC 333), REXBURGMP 77.800 - 78.600 SAFTY/TRAF OPER, Intersection Improv
431
4,807
399
4,454
32
353704 652 52
CN
RWPE
-----------150
----390
--
--- - -
M
6
CPCTY NHSTATE OF IDAHO (ITD)
SH 33, JCT US 20 (IC 333), REXBURGMP 77.800 - 78.600 SAFTY/TRAF OPER, Intersection Improv
431
4,807
399
4,454
32
353704 652 52
CN
RWPE
---4,807------204-
---41-
--
--- - -
This project will reconstruct the intersections at the ramp locations on SH33. A diverging diamond layout is in the conceptual stage.
MR21799
6
PAVE NHSTATE OF IDAHO (ITD)
NHS-7726, JCT UNIVERSITY BLVD (IC 332), REXBURGMP 10.000 - 10.500 SAFTY/TRAF OPER, Intersection Improv
441
4,764
409
4,414
32
350744 689 55
CN
RWPE
-----------150
----390
--
--- - -
MR
6
CPCTY NHSTATE OF IDAHO (ITD)
NHS-7726, JCT UNIVERSITY BLVD (IC 332), REXBURGMP 10.000 - 10.500 SAFTY/TRAF OPER, Intersection Improv
441
4,764
409
4,414
32
350744 689 55
CN
RWPE
---4,69271-----204-
---51-
--
--- - -
This project will reconstruct the intersections at the ramp locations on University Blvd. A diverging diamond layout is in the conceptual stage.
219836
STP-RURAL (L) STP-RURALTETON COUNTY
STC-6809, N 500 W RECONSTRUCTION, TETON COMP 102.000 - 103.600 RESRF/RESTO&REHAB, Minor Widenin
-
1,564
-
1,450
-
114227 210 17
CN
RWPE
1,564----------227
-----
--
--- - -
Resurface and widen existing N500W north of ID33 to serve residents and campers.
219846
BR-LOCAL BR-LOCMADISON COUNTY
STC-6774, MOODY RD BR, MADISON COMP 1.760 - 2.160 BR/APPRS, Bridge Replacement
92
3,588
85
3,325
7
263- - -
CN
RWPE
3,588-----------
---92-
--
--- - -
Replace existing Moody Road Bridge over the South Fork of the Teton River. Bridge is in poor condition, river floods and undermines the bridge approach.
220716
TAP TAP-URBANREXBURG
OFFSYS, BARNEY DAIRY RD TO NORTH HILL RD PATH, REXBMP 0.000 - 0.000 ENV PRESV, Bicycle/Pedestrian/Equestr
-
159
-
148
-
1117 15 2
CN
RWPE
-----159------
-----
--
--- - -
The shared use pathway is located between the city streets of Barney Dairy Road and North Hill Road. The pathway will run along the east side of the School District’s baseball field, football field, parking lot, and Junior High School building. The pathway begins at the end of the existing greenbelt path and existing crosswalk across Barney Dairy Road and ends at the end of the existing sidewalk in North Hill Road.
222226
MAJOR IMSTATE OF IDAHO (ITD)
US 20, JCT I-15 CONNECTOR, IDAHO FALLSMP 0.000 - 0.000 NEW RTE, Grading & Drainage
-
20,460
-
18,878
-
1,58212,500 11,534 966
CN
RWPE
Unfunded-----Unfunded-----
-----
--
--- - Unfunded
This project will take the alternatives developed during a Planning and Environmental Linkage study and carry them into NEPA for final evaluation of alternatives, selection, design, and construction of improvements near Idaho Falls in Bonneville Co. No mileposts have been determined as of yet we are still in the alternative screening process.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 85
District 6 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside BMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
224126
SAFETY (L) HSIP (L)REXBURG
LOCAL, TRAFFIC SIGNAL HEADS, REXBURGMP 0.000 - 0.000 SAFTY/TRAF OPER, Traffic Signals
-
80
-
80
-
-10 10 -
CN
RWPE
-----80-----10
-----
--
--- - -
For the work of increasing safety at all signaled intersections in the City by utilizing safety countermeasures with the installation of Yellow Retro‐reflective Back‐plates at every signal. This will increase visibility of the traffic signal lights.
224136
SAFETY (L) HSIP (L)MADISON COUNTY
STC-6760, W 5200 S SAFETY IMPROVEMENTS, MADISON COMP 101.250 - 102.460 SAFTY/TRAF OPER, Minor Widening
-
500
-
463
-
3772 67 5
CN
RWPE
----500------72
-----
--
--- - -
For the work of increasing safety of the roadway with shoulder widening and paving along with the installation of roadway striping with fog line delineation. The project is located on W 5200 S between mileposts 101.25 and 102.46.
224146
SAFETY (L) HSIP (L)ASHTON
LOCAL, SIGNING SAFETY UPGRADES, ASHTONMP 0.000 - 0.000 SAFTY/TRAF OPER, Signing Improvem
-
206
-
191
-
1531 29 2
CN
RWPE
----206------31
-----
--
--- - -
For the work of increasing safety to all roadway users by making signs more predominant. The new signs will be installed per the Manual of uniform traffic Control Devices (MUTCD) height and offset guidelines on U‐channel steel posts that conform to the MUTCD. All signs will be retroreflective per the MUTCD guidelines and of the correct size.
224246
OTHER ASSETS STSTATE OF IDAHO (ITD)
SH 32, FY21 D6 ROAD CLOSURE GATESMP 0.030 - 0.030 SAFTY/TRAF OPER, Safety Improveme
-
320
-
-
-
32020 - 20
CN
RWPE
-----320------
-----
--
--- - -
This project will install road closure gates at designated locations where highways are often closed due to winter storms. The locations include SH‐32 at mileposts 0.03 and 28.36 and US‐20 at mileposts 299.7, 301.4, 276.2, and 264.
P224256
PAVE NHSTATE OF IDAHO (ITD)
US 20, ASHTON HILL SEAL COAT, FREMONT COMP 363.691 - 369.000 PM, Seal Coat
-
1,018
-
943
-
7520 19 1
CN
RWPE
----1,018------20
-----
--
--- - -
This project will construct a seal coat on US‐20 between mileposts 363.691 and 369.0 to preserve and protect the new pavement.
224266
OTHER ASSETS STSTATE OF IDAHO (ITD)
US 20, RIGBY LIGHTINGMP 320.485 - 321.891 SAFTY/TRAF OPER, Illumination
-
1,205
-
-
-
1,20565 - 65
CN
RWPE
-----1,205------
-----
--
--- - -
This project will install lighting on US‐20 between the South Rigby Interchange (milepost 320.485) and the North Rigby Interchange (milepost 321.891).
224276
OTHER ASSETS STPSTATE OF IDAHO (ITD)
STATE, FY22 D6 SIGNAL UPGRADEMP 0.000 - 0.000 SAFTY/TRAF OPER, Traffic Signals
-
337
-
312
-
2520 19 1
CN
RWPE
----337------20
-----
--
--- - -
This project will upgrade and improve traffic signals throughout the District.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 86
District 6 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside BMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
224286
OTHER ASSETS STSTATE OF IDAHO (ITD)
US 93, FY21 D6 ROCKFALL MITIGATIONMP 272.100 - 350.000 SAFTY/TRAF OPER, Safety Improveme
-
120
-
-
-
12040 - 40
CN
RWPE
-----120------
-----
--
--- - -
This project will address areas of rock fall which need to have mitigation measures engineered and installed.
224296
OTHER ASSETS STPSTATE OF IDAHO (ITD)
SH 75, FY22 D6 ROCKFALL MITIGATIONMP 217.000 - 240.000 SAFTY/TRAF OPER, Safety Improveme
-
122
-
113
-
940 37 3
CN
RWPE
----122------40
-----
--
--- - -
This project will address areas of rock fall requiring engineered and installed mitigation measures.
224426
OTHER ASSETS STSTATE OF IDAHO (ITD)
STATE, FY22 D6 PEDESTRIAN IMPROVEMENTSMP 0.000 - 0.000 SAFTY/TRAF OPER, Intersection Improv
-
337
-
-
-
33715 - 15
CN
RWPE
----337------15
-----
--
--- - -
This project will convert Rectangular Rapid Flashing Beacon (RRFB) crosswalks at various locations throughout D6 to High Intensity Activated Crosswalks (HAWK).
224446
PLAN NHSTATE OF IDAHO (ITD)
US 93, SALMON RV CROSSING STUDY, LEMHI COMP 305.242 - 305.242 PLAN/STUDY, Planning
-
-
-
-
-
-500 463 37
CN
RWPE
-----------500
-----
--
--- - -
This study will investigate replacing the bridge over the Salmon River at milepost 305.242 on US‐93 in Lemhi Co.
224516
OPS STREXBURG
STATE, FY21 REXBURG 9 ADA RAMPSMP 0.000 - 0.000 SAFTY/TRAF OPER, Sidewalk
-
57
-
-
-
57- - -
CN
RWPE
-----57------
-----
--
--- - -
Install nine Americans with Disabilities (ADA) ramps in various locations throughout Rexburg.
224526
OPS STST ANTHONY
STATE, FY21 ST ANTHONY 7 ADA RAMPSMP 0.000 - 0.000 SAFTY/TRAF OPER, Sidewalk
-
33
-
-
-
33- - -
CN
RWPE
-----33------
-----
--
--- - -
Install seven Americans with Disabilities (ADA) ramps at various locations throughout Saint Anthony.
226046
FLAP (L) FLAPCUSTER COUNTY
OFFSYS, BAYHORSE CREEK BRIDGE, CUSTER COMP 100.029 - 100.029 BR/APPRS, Bridge Replacement
-
3,723
-
3,450
-
273719 666 53
CN
RWPE
--4793,244-----30039920
-----
--
--- - -
Improve access to federal lands by replacing the structurally deficient Bayhorse Bridge over the Salmon River.
230536
OPS STMADISON COUNTY
US 20, SHS ADJUSTMENT PAYMENT, MADISON COMP 337.478 - 339.759 PLAN/STUDY, Planning
-
3,950
-
-
-
3,950- - -
CN
RWPE
-----3,950------
-----
--
--- - -
ITD and Madison County staff signed a road closure and maintenance agreement to transfer a portion of SH 33 from milepost 337.478 ‐ 339.759 and Sugar City Half IC Connector Rd from MP 100.00 ‐ 100.12 and 100.367 ‐ 100.587 to Madison Co.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 87
District 6 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside BMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
PORN226456
RESTORE NHSTATE OF IDAHO (ITD)
US20, CHESTER TO ASHTON PH A, FREMONT COMP 354.250 - 356.500 RECONST/REALIGN, Base/Sub-base W
-
11,236
-
10,412
-
824- - -
CN
RWPE
---11,236--------
-----
--
--- - -
The scope of work for this project is to construct a section of US 20 from a two way two lane highway to a four lane divided highway.
ORN226616
OTHER ASSETS STSTATE OF IDAHO (ITD)
STATE, FY23 D6 MILL AND OVERLAYMP - RESRF/RESTO&REHAB, Pavement Ma
-
531
-
492
-
3910 9 1
CN
RWPE
---531-------10
-----
--
--- - -
The scope of this project is to mill and/or overlay spot locations throughout the district.
ORN226626
OTHER ASSETS STSTATE OF IDAHO (ITD)
STATE, FY23 D6 ROCKFALL MITIGATIONMP - SAFTY/TRAF OPER, Preventive Mainte
-
166
-
154
-
1210 9 1
CN
RWPE
---166-------10
-----
--
--- - -
This project will stabilize rock fall areas in the district. Location to be determined by the district geologist.
ORN226636
OTHER ASSETS STPSTATE OF IDAHO (ITD)
STATE, FY23 D6 DELINEATORSMP - SAFTY/TRAF OPER, Preventive Mainte
-
224
-
207
-
1710 9 1
CN
RWPE
---224-------10
-----
--
--- - -
This project consist of installing flexible delineators along state highways.
ORN226646
OTHER ASSETS STP-ENHSTATE OF IDAHO (ITD)
STATE, FY23 D6 MOWINGMP - ENV PRESV, Preventive Maintenance
-
224
-
207
-
175 5 -
CN
RWPE
---224-------5
-----
--
--- - -
This project will consist of mowing the roadside vegetation in order to prevent drifting in the winter and improve sight distance.
ORN228846
SAFETY (L) HSIP (L)REXBURG
NHS-7816, INT 2ND W & 6TH S, REXBURGMP 11.110 - 11.220 SAFTY/TRAF OPER, Intersection Improv
-
28
-
26
-
26 6 -
CN
RWPE
----28-----6-
-----
--
--- - -
This project will install a Rapid Rectangular Flashing Beacon at one T‐intersection in Rexburg at 2nd West 6th South to increase safety for our pedestrians at this intersection.
ORN228856
SAFETY (L) HSIP (L)JEFFERSON COUNTY
STC-6731, COUNTY LN RD SIGNING, JEFFERSON COMP 0.000 - 15.030 SAFTY/TRAF OPER, Intersection Improv
-
87
-
80
-
76 6 -
CN
RWPE
----87-----6-
-----
--
--- - -
This project will add twelve Flashing LED Stop Signs and fourteen Flashing LED Stop Ahead signs with radar sensors and will be solar powered.
ORN229456
TAP TAP-RURALDRIGGS
LOCAL, SH-33 & LEGRAND PIERRE PATHWAY EXTENSION, DMP - ENV PRESV, Bicycle/Pedestrian/Equestr
-
427
-
396
-
3161 57 4
CN
RWPE
---427-------61
-----
--
--- - -
Install 10’ wide asphalt pathway at two locations; along SH33, LeGrand Pierre to the Driggs Elementary School.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 88
District 6 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside BMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
ORN229526
TAP TAP-RURALVICTOR
LOCAL, VICTOR ELEMENTARY BIKE/PED, VICTORMP - ENV PRESV, Sidewalk
-
452
-
418
-
3444 41 3
CN
RWPE
---452-------44
-----
--
--- - -
Construct 10’ asphalt pathway on Baseline Road from Old Jackson Highway Elm Street to Aspen Street, Aspen Street to Mountain Shadows Way.
ORN229766
OPS STREXBURG
LOCAL, FY22 REXBURG 10 ADA RAMPSMP - ENV PRESV, Curb & Gutter
-
57
-
-
-
57- - -
CN
RWPE
----57-------
-----
--
--- - -
Construct 11 Americans with Disabilities curb ramps in Rexburg.
ORN229786
OPS STROBERTS
LOCAL, FY22 ROBERTS 8 ADA RAMPSMP - ENV PRESV, Curb & Gutter
-
48
-
-
-
48- - -
CN
RWPE
----48-------
-----
--
--- - -
Construct 8 Americans with Disabilities curb ramps in Roberts, Jefferson Co., Idaho
ORN230326
STP-URBAN (L) STP-UREXBURG
LOCAL, TRANSPORTATION PLAN, MADISON COMP - PLAN/STUDY, Planning/Transportation
-
80
-
74
-
6- - -
CN
RWPE
-----80------
-----
--
--- - -
This project will update the Madison County Transportation Master Plan. The transportation plan was last updated in 2015 and the plan covers the transportation networks of Madison County, the City of Rexburg and the City of Sugar City. The original Madison County Transportation Master Plan (TMP) was drafted in 2004. The City would like to update that plan in order to stay on top of the growth that the entire County is experiencing.
ORN230346
STP-URBAN (L) STP-URUPERT
LOCAL, TRANSPORTATION PLAN, RUPERTMP - PLAN/STUDY, Planning/Transportation
-
102
-
95
-
7- - -
CN
RWPE
----102-------
-----
--
--- - -
This project will update the City of Rupert's Transportation Plan to create a more in‐depth assessment of current road inventory, road conditions, bridges, sign management, and Capital Improvement Plan. An updated transportation plan will support the City giving an assessment of current conditions and creating a plan for future work.
ORN230356
STP-URBAN (L) STP-URIGBY
LOCAL, TRANSPORTATION PLAN, RIGBYMP - PLAN/STUDY, Planning/Transportation
-
82
-
76
-
6- - -
CN
RWPE
----82-------
-----
--
--- - -
This project will update the City of Rigby's transportation plan, including their pavement management plan, sign inventory, and Capital Improvement Plan, so they can prioritize use of their limited resources and do projects that will best serve the residents of their city, now and in the future.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 89
District 6 Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside BMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027Construction
Right-of-WayDevelopment
8,84138,27740,67240,85633,08812,309---3008191,604---8,4901841,028
Total 8,84138,27740,67249,64634,09114,941G: Project is grouped in STIP
1: Project is also shown in a Transportation Improvement Program
W: Work zone safety priority
CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition
Notes:
Phases:
2: Project is being advance constructed with non-federal funds
P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM
B: Project addresses Federal Bridge Condition PM
A: Project utilizes an alternative contracting method.
M: Project included in multiple programs
29,602-12,500-
--42,102-
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 90
District 6 Public Transit Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Transit Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside BMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
193146
TRNS-OPS 5311 RuralMISCELLANEOUS
TRANSIT, D6 5311 STATEWIDE RURAL AREA FORMULA PROGMP 0.000 - 0.000 Transit Admin/Operations/PM
-
9,415
-
6,120
-
3,295- - -
CN
RWPE
-1,8831,8831,8831,8831,883------
-----
--
--- - -
Program provides capital, planning, and operating assistance to support public transportation operators who provide demand response and fixed route services in rural areas with populations less than 50,000. Serving Bonneville, Butte, Clair, Custer, Fremont, Jefferson, Lemhi, Madison, Teton counties.
M19330
6
TRNS-CAP 5339 RuralMISCELLANEOUS
TRANSIT, D6 5339 BUS AND BUS FACILITYMP 0.000 - 0.000 Bus Purchase / Construction
-
4,605
-
3,684
-
921- - -
CN
RWPE
-700700700700700------
-----
--
--- - -
M
6
TRNS-CAP 5339 SUrbMISCELLANEOUS
TRANSIT, D6 5339 BUS AND BUS FACILITYMP 0.000 - 0.000 Bus Purchase / Construction
-
4,605
-
3,684
-
921- - -
CN
RWPE
-221221221221221------
-----
--
--- - -
Program provides capital funding to replace, rehabilitate and purchase buses and related equipment or to construct bus‐related facilities in rural and small urban areas directly affecting Bonneville, Butte, Clark, Custer, Fremont, Jefferson, Lemhi, Madison, Teton counties.
M19835
6
TRNS-OPS 5310 SUrbMISCELLANEOUS
TRANSIT, D6 ELDERLY & DISABLEDMP 0.000 - 0.000 Demand Response Operations
-
1,825
-
1,460
-
365- - -
CN
RWPE
-293293293293293------
-----
--
--- - -
M
6
TRNS-OPS 5310 RuralMISCELLANEOUS
TRANSIT, D6 ELDERLY & DISABLEDMP 0.000 - 0.000 Demand Response Operations
-
1,825
-
1,460
-
365- - -
CN
RWPE
-7272727272------
-----
--
--- - -
Program serves the special needs of transit‐dependent senior citizens and persons with disabilities by providing funds for projects which go beyond traditional transit services (demand response) including those required under the Americans with Disabilities Act (ADA).
ORN230616
TRNS-OPS 5311 RuralSTATE OF IDAHO (ITD)
TRANSIT, D6 5311 CARES ACTMP - Security
-
3,277
-
3,277
-
-- - -
CN
RWPE
-----3,277------
-----
--
--- - -
Provides operating and capital funding for Coronavirus Aid, Relief, and Economic security in rural areas.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 91
District 6 Public Transit Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Transit Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside BMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027Construction
Right-of-WayDevelopment
-3,1693,1693,1693,1696,446------------
Total -3,1693,1693,1693,1696,446G: Project is grouped in STIP
1: Project is also shown in a Transportation Improvement Program
W: Work zone safety priority
CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition
Notes:
Phases:
2: Project is being advance constructed with non-federal funds
P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM
B: Project addresses Federal Bridge Condition PM
A: Project utilizes an alternative contracting method.
M: Project included in multiple programs
--------
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 92
District 6 Aeronautics Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Aeronautics Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside BMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
195826
APT-NEW GA-APTDRIGGS
DIJ, DRIGGS, CONSTRUCT RUNWAY, DESIGNMP 0.000 - 0.000 APT DEV, New Facility
-
-
-
-
-
-778 700 78
CN
RWPE
-------778----
-----
--
--- - -
Design ‐ Rwy shift & Flying T Apron
199056
APT-NEW GA-APTDRIGGS
DIJ, DRIGGS, ACQUIRE LANDMP 0.000 - 0.000 APT DEV, New Facility
2,563
-
2,307
-
256
-- - -
CN
RWPE
------------
---2,563-
--
--- - -
OFA land acquisition
199586
APT-MTNC GA-APTARCO/BUTTE CO
AOC, ARCO, REHABILITATE RUNWAY DESIGNMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
-
-
-
-
-400 360 40
CN
RWPE
----------400-
-----
--
--- - -
Portions of the runway will require a major rehabilitation
200476
APT-MTNC GA-APTLEMHI COUNTY
SMN, SALMON, REHABILITATE TAXIWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
333
-
300
-
33- - -
CN
RWPE
-333----------
-----
--
--- - -
Cost estimate includes Twy & Rwy Crack Seal, Slurry Seal & Remark
201496
APT-PLAN GA-APTDRIGGS
DIJ, DRIGGS, ENVIRONMENTAL STUDYMP 0.000 - 0.000 APT PLN, Airport Planning
-
-
-
-
-
-333 300 33
CN
RWPE
--------333---
-----
--
--- - -
Environmental for Rwy shift & Flying T Apron
201666
APT-NEW GA-APTLEMHI COUNTY
SMN, SALMON, SNOW REMOVAL EQUIPMENTMP 0.000 - 0.000 APT DEV, New Facility
-
333
-
300
-
33- - -
CN
RWPE
---333--------
-----
--
--- - -
SRE
207396
APT-MTNC GA-APTREXBURG/MADISON CO
RXE, REXBURG, REHABILITATE RUNWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
401
-
401
-
-- - -
CN
RWPE
-----401------
-----
--
--- - -
Crack Seal & paint only
208256
APT-MTNC GA-APTDRIGGS
DIJ, DRIGGS AIRPORT SNOW REMOVAL EQUIPMENT BUILDINMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
167
-
150
-
17- - -
CN
RWPE
---167--------
-----
--
--- - -
Driggs Airport Snow Removal Equipment Building
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 93
District 6 Aeronautics Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Aeronautics Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside BMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
225176
APT-MTNC GA-APTDRIGGS
DIJ, DRIGGS, AIRPORT PH III RUNWAY CONSTRUCTIONMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
5,000
-
4,500
-
500- - -
CN
RWPE
------------
-----
5,000-
--- - -
Phase III Runway Construction
225186
APT-MTNC GA-APTLEMHI COUNTY
SMN, SALMON-LEMHI COUNTY, AIRPORT APRON REHABMP 0.000 - 0.000 APT DEV, Facility Maintenance
-
3,000
-
3,000
-
-- - -
CN
RWPE
-----3,000------
-----
--
--- - -
Apron Rehabilitation
225366
APT-MTNC GA-APTDRIGGS
DIJ, DRIGGS, REED MEMORIAL AIRPORT PAVEMENT REHABMP 0.000 - 0.000 RESRF/RESTO&REHAB, Facility Mainte
-
500
-
500
-
-- - -
CN
RWPE
-----500------
-----
--
--- - -
Reed Memorial Airport runway, taxiway, and apron crack seal/fog seal pavement rehabilitation.
225416
APT-MTNC GA-APTARCO
AOC, ACRO-BUTTE COUNTY, AIRPORTMP 0.000 - 0.000 APT PLN, Airport Planning
-
-
-
-
-
-167 150 17
CN
RWPE
-------167----
-----
--
--- - -
225726
APT-PLAN GA-APTCHALLIS
LLJ, CHALLIS, AIRPORT PLANNINGMP 0.000 - 0.000 APT PLN, Airport Planning
-
-
-
-
-
-83 77 6
CN
RWPE
----------83-
-----
--
--- - -
Airport Wildlife Hazard Assessment
225736
APT-PLAN GA-APTCHALLIS
LLJ, CHALLIS, AIRPORT PLANNINGMP 0.000 - 0.000 APT PLN, Airport Planning
-
-
-
-
-
-83 77 6
CN
RWPE
----------83-
-----
--
--- - -
Airport aeronautical survey for instrument approach
225746
APT-MTNC GA-APTCHALLIS
LLJ, CHALLIS, AIRPORT PAVEMENT REHABMP 0.000 - 0.000 RESRF/RESTO&REHAB, Facility Mainte
-
389
-
350
-
39- - -
CN
RWPE
---389--------
-----
--
--- - -
Airport pavement rehabilitation
225896
APT-MTNC GA-APTLEMHI COUNTY
SMN, LEMHI COUNTY, AIRPORT SREMP 0.000 - 0.000 APT DEV, Equipment
-
167
-
150
-
17- - -
CN
RWPE
------------
-----
--
167-- - -
229816
APT-MTNC GA-APTARCO
AOC, ARCO, AIRPORT TAXIWAY REHABMP - RESRF/RESTO&REHAB, Facility Mainte
-
167
-
167
-
-- - -
CN
RWPE
-----167------
-----
--
--- - -
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 94
District 6 Aeronautics Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Aeronautics Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIPOutside BMPO Planning Area
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
229916
APT-MTNC GA-APTREXBURG
RXE, REXBURG, AIRPORT RUNWAY REHABMP - RESRF/RESTO&REHAB, Facility Mainte
-
333
-
300
-
33- - -
CN
RWPE
----333-------
-----
--
--- - -
Construction
Right-of-WayDevelopment
167333-8893334,068-944333-567-----2,563-
Total 1671,2773338893,4634,068G: Project is grouped in STIP
1: Project is also shown in a Transportation Improvement Program
W: Work zone safety priority
CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition
Notes:
Phases:
2: Project is being advance constructed with non-federal funds
P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM
B: Project addresses Federal Bridge Condition PM
A: Project utilizes an alternative contracting method.
M: Project included in multiple programs
-5,000-----5,000
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 95
Statewide Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
M15001
9
STP-RURAL (L) STP-RURALMISCELLANEOUS
LOCAL, LOCAL COST INCREASE SET-ASIDEMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation
-
6,050
-
5,606
-
444- - -
CN
RWPE
--538527-1,694------
-----
--
--- - -
M
9
BR-LOCAL BR-LOCMISCELLANEOUS
LOCAL, LOCAL COST INCREASE SET-ASIDEMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation
-
6,050
-
5,606
-
444- - -
CN
RWPE
-100240235210226------
-----
--
--- - -
M
9
BR-OFF BR-OFFMISCELLANEOUS
LOCAL, LOCAL COST INCREASE SET-ASIDEMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation
-
6,050
-
5,606
-
444- - -
CN
RWPE
-184180177173170------
-----
--
--- - -
M
9
STP-TMA STP-TMAMISCELLANEOUS
LOCAL, LOCAL COST INCREASE SET-ASIDEMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation
-
6,050
-
5,606
-
444- - -
CN
RWPE
----47-------
-----
--
--- - -
M
9
SAFETY (L) HSIP (L)MISCELLANEOUS
LOCAL, LOCAL COST INCREASE SET-ASIDEMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation
-
6,050
-
5,606
-
444- - -
CN
RWPE
--424416102400------
-----
--
--- - -
M
9
TAP-TMA TAP-TMAMISCELLANEOUS
LOCAL, LOCAL COST INCREASE SET-ASIDEMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation
-
6,050
-
5,606
-
444- - -
CN
RWPE
--5---------
-----
--
--- - -
Set‐aside for STP‐TMA cost increases.
M19286
9
STP-URBAN (L) STP-USTATE OF IDAHO (ITD)
LOCAL, PENSTOCK BR PAYBACKMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation
-
-
-
-
-
-- - -
CN
RWPE
-----(335)------
-----
--
--- - -
M
9
BR-LOCAL BR-LOCSTATE OF IDAHO (ITD)
LOCAL, PENSTOCK BR PAYBACKMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation
-
-
-
-
-
-- - -
CN
RWPE
-----335------
-----
--
--- - -
198429
OTH-FA OTH-FEDSTATE OF IDAHO (ITD)
STATE, FY21 NAT'L SUMMER TRANS INSTITUTEMP 0.000 - 0.000 PLAN/STUDY, Training
-
72
-
72
-
-- - -
CN
RWPE
-----72------
-----
--
--- - -
200939
BR-OFF BR-OFFSTATE OF IDAHO (ITD)
OFFSYS, FY21 LOCAL/OFFSYS BRIDGE INSPECTIONMP 0.000 - 0.000 BR/APPRS, Bridge Inspection
-
2,100
-
1,946
-
154- - -
CN
RWPE
-----2,100------
-----
--
--- - -
This project provides funds for bridge inspections.
201449
OTH-FA (L) OTH-FEDSTATE OF IDAHO (ITD)
STATE, FY21 ON-THE-JOB-TRAINING/SUPPORTIVE SERVICESMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation
-
90
-
90
-
-- - -
CN
RWPE
-----90------
-----
--
--- - -
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 96
Statewide Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
This project provides funding for the On the Job Training/Supportive Services Program. This is an apprenticeship and training program targeted to move women, minorities, and disadvantaged individuals into journey‐level positions to ensure that a competent workforce is available to meet highway construction hiring needs, and to address the historical under‐representation of these groups in highway construction skilled crafts.
M20147
9
STP-RURAL (L) STP-RURALLOCAL HIGHWAY TECHNICA
LOCAL, FY21 LHTAC PLANNING & SCOPINGMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation
-
200
-
185
-
15- - -
CN
RWPE
-----150------
-----
--
--- - -
M
9
SAFETY (L) HSIP (L)LOCAL HIGHWAY TECHNICA
LOCAL, FY21 LHTAC PLANNING & SCOPINGMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation
-
200
-
185
-
15- - -
CN
RWPE
-----50------
-----
--
--- - -
This project provides funds to create project charters to better define project scope, schedule and budget before the project is recommended for inclusion in the Idaho Transportation Improvement Program.
R201699
OTH-FA OTH-FEDSTATE OF IDAHO (ITD)
STATE, FY21 BONNERS FERRY FMCSA HIGH PRIORITY WIMMP 0.000 - 0.000 SUP FACIL, Port of Entry Improvement
-
1,600
-
1,360
-
240- - -
CN
RWPE
-----1,600------
-----
--
--- - -
This project will add weigh‐in‐motion and automatic vehicle identification technology through a Federal Motor Carrier Safety Administration High Priority grant to the Bonners Ferry Port of Entry.
203619
BR-OFF BR-OFFSTATE OF IDAHO (ITD)
OFFSYS, FY22 LOCAL/OFFSYS BRIDGE INSPECTIONMP 0.000 - 0.000 BR/APPRS, Bridge Inspection
-
1,938
-
1,796
-
142- - -
CN
RWPE
----1,938-------
-----
--
--- - -
This project provides funds for bridge inspections.
203739
OTH-FA OTH-FEDSTATE OF IDAHO (ITD)
STATE, FY22 NAT'L SUMMER TRANS INSTITUTEMP 0.000 - 0.000 PLAN/STUDY, Training
-
72
-
72
-
-- - -
CN
RWPE
----72-------
-----
--
--- - -
204659
OTH-FA (L) OTH-FEDSTATE OF IDAHO (ITD)
STATE, FY22 ON-THE-JOB-TRAINING/SUPPORTIVE SERVICESMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation
-
90
-
90
-
-- - -
CN
RWPE
----90-------
-----
--
--- - -
This project provides funding for the On the Job Training/Supportive Services Program. This is an apprenticeship and training program targeted to move women, minorities, and disadvantaged individuals into journey‐level positions to ensure that a competent workforce is available to meet highway construction hiring needs, and to address the historical under‐representation of these groups in highway construction skilled crafts.
205129
OTH-FA OTH-FEDSTATE OF IDAHO (ITD)
LOCAL, FY21/22 DISADVANTAGED BUSINESS ENTERPRISESMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation
-
200
-
200
-
-- - -
CN
RWPE
----200-------
-----
--
--- - -
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 97
Statewide Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
This project provides funding for the Disadvantaged Business Enterprises Supportive Services. This is a training and assistance program designed to increase the proficiency of minority, women, and socially and economically disadvantaged businesses in competing and performing, on an equal basis, for federal‐aid highway contracts and subcontracts.
M20598
9
STP-RURAL (L) STP-RURALLOCAL HIGHWAY TECHNICA
LOCAL, FY22 LHTAC PLANNING & SCOPINGMP 0.000 - 0.000 PLAN/STUDY, Planning
-
204
-
189
-
15- - -
CN
RWPE
----153-------
-----
--
--- - -
M
9
SAFETY (L) HSIP (L)LOCAL HIGHWAY TECHNICA
LOCAL, FY22 LHTAC PLANNING & SCOPINGMP 0.000 - 0.000 PLAN/STUDY, Planning
-
204
-
189
-
15- - -
CN
RWPE
----51-------
-----
--
--- - -
This project provides funds to create project charters to better define project scope, schedule and budget before the project is recommended for inclusion in the Idaho Transportation Improvement Program.
R206529
OTH-FA OTH-FEDSTATE OF IDAHO (ITD)
STATE, FY24 MARSING FMCSA HIGH PRIORITY WEIGH-IN-MOMP 0.000 - 0.000 SUP FACIL, Port of Entry Improvement
-
1,600
-
1,360
-
240- - -
CN
RWPE
1,600-----------
-----
--
--- - -
This project will add weigh‐in‐motion and automatic vehicle identification technology through a Federal Motor Carrier Safety Administration High Priority grant to the Marsing Port of Entry.
206539
RAIL FED RRXSTATE OF IDAHO (ITD)
STATE, ANNUAL STWD RRX DIAGNOSTIC REVIEWSMP 0.000 - 0.000 PLAN/STUDY, Statewide Planning
-
240
-
216
-
2445 40 5
CN
RWPE
603030303030------
-----
--
30-- - -
Perform annual railroad‐highway crossing reviews with railroad companies.
207279
OTH-FA OTH-FEDSTATE OF IDAHO (ITD)
STATE, FY22 BONNERS FERRY FMCSA HIGH PRIORITY WIMMP 0.000 - 0.000 SUP FACIL, Port of Entry Improvement
-
1,600
-
1,360
-
240- - -
CN
RWPE
----1,600-------
-----
--
--- - -
This project will add weigh‐in‐motion and automatic vehicle identification technology through a Federal Motor Carrier Safety Administration High Priority grant to the Bonners Ferry Port of Entry.
R207569
OTH-FA OTH-FEDSTATE OF IDAHO (ITD)
STATE, FY23 HOLLISTER FMCSA HIGH PRIORITY WEIGH-IN-MMP 0.000 - 0.000 SUP FACIL, Port of Entry Improvement
-
1,600
-
1,360
-
240- - -
CN
RWPE
---1,600--------
-----
--
--- - -
This project will add weigh‐in‐motion and automatic vehicle identification technology through a Federal Motor Carrier Safety Administration High Priority grant to the Hollister Port of Entry.
220239
STP-URBAN (L) STP-ULOCAL HIGHWAY TECHNICA
LOCAL, PD LHTAC PLANNING STUDIESMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation
-
276
-
256
-
20- - -
CN
RWPE
276-----------
-----
--
--- - -
This project will provide funds to augment the Local Highway Technical Assistance Council constituents' planning efforts.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 98
Statewide Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
220249
STP-URBAN (L) STP-ULOCAL HIGHWAY TECHNICA
LOCAL, FY23 URBAN TRANSPORTATION PLANSMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation
-
260
-
241
-
19- - -
CN
RWPE
---260--------
-----
--
--- - -
This project will provide funds to augment the Local Highway Technical Assistance Council constituents' planning efforts.
220259
STP-URBAN (L) STP-ULOCAL HIGHWAY TECHNICA
LOCAL, FY22 URBAN TRANSPORTATION PLANSMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation
-
71
-
66
-
5- - -
CN
RWPE
----71-------
-----
--
--- - -
This project will provide funds to augment the Local Highway Technical Assistance Council constituents' planning efforts.
220379
TAP TAP-RURALMISCELLANEOUS
LOCAL, FY21 STWD SRTS COORDINATOR & ACTIVITIESMP 0.000 - 0.000 ENV PRESV, Bicycle/Pedestrian/Equestr
-
65
-
60
-
5- - -
CN
RWPE
-----65------
-----
--
--- - -
This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.
M22079
9
STP-RURAL (L) STP-RURALLOCAL HIGHWAY TECHNICA
LOCAL, LHTAC PLANNING & SCOPINGMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation
-
208
-
193
-
15- - -
CN
RWPE
---156--------
-----
--
--- - -
M
9
SAFETY (L) HSIP (L)LOCAL HIGHWAY TECHNICA
LOCAL, LHTAC PLANNING & SCOPINGMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation
-
208
-
193
-
15- - -
CN
RWPE
---52--------
-----
--
--- - -
This project provides funds to create project charters to better define project scope, schedule and budget before the project is recommended for inclusion in the Idaho Transportation Improvement Program.
220809
BR-OFF BR-OFFSTATE OF IDAHO (ITD)
OFFSYS, FY23 LOCAL/OFFSYS BRIDGE INSPECTIONMP 0.000 - 0.000 BR/APPRS, Bridge Inspection
-
1,977
-
1,832
-
145- - -
CN
RWPE
---1,977--------
-----
--
--- - -
This project provides funds for bridge inspections.
221209
OTH-FA OTH-FEDSTATE OF IDAHO (ITD)
STATE, FY23 NAT'L SUMMER TRANS INSTITUTEMP 0.000 - 0.000 PLAN/STUDY, Training
-
72
-
72
-
-- - -
CN
RWPE
---72--------
-----
--
--- - -
221219
OTH-FA (L) OTH-FEDSTATE OF IDAHO (ITD)
STATE, FY23 ON-THE-JOB-TRAINING/SUPPORTIVE SERVICESMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation
-
90
-
90
-
-- - -
CN
RWPE
---90--------
-----
--
--- - -
This project provides funding for the On the Job Training/Supportive Services Program. This is an apprenticeship and training program targeted to move women, minorities, and disadvantaged individuals into journey‐level positions to ensure that a competent workforce is available to meet highway construction hiring needs, and to address the historical under‐representation of these groups in highway construction skilled crafts.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 99
Statewide Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
221229
OTH-FA OTH-FEDSTATE OF IDAHO (ITD)
LOCAL, FY23/24 DISADVANTAGED BUSINESS ENTERPRISESMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation
-
200
-
200
-
-- - -
CN
RWPE
--200---------
-----
--
--- - -
This project provides funding for the Disadvantaged Business Enterprises Supportive Services. This is a training and assistance program designed to increase the proficiency of minority, women, and socially and economically disadvantaged businesses in competing and performing, on an equal basis, for federal‐aid highway contracts and subcontracts.
R223369
OTH-FA OTH-FEDSTATE OF IDAHO (ITD)
STATE, FY24 MARSING FMCSA HIGH PRIORITY WEIGH-IN-MOMP 0.000 - 0.000 SUP FACIL, Port of Entry Improvement
-
1,600
-
1,360
-
240- - -
CN
RWPE
--1,600---------
-----
--
--- - -
This project will add weigh‐in‐motion and automatic vehicle identification technology through a Federal Motor Carrier Safety Administration High Priority grant to the Hollister Port of Entry.
223379
OTH-FA OTH-FEDSTATE OF IDAHO (ITD)
STATE, FY24 NAT'L SUMMER TRANS INSTITUTEMP 0.000 - 0.000 PLAN/STUDY, Training
-
72
-
72
-
-- - -
CN
RWPE
--72---------
-----
--
--- - -
223389
OTH-FA (L) OTH-FEDSTATE OF IDAHO (ITD)
STATE, FY24 ON-THE-JOB-TRAINING/SUPPORTIVE SERVICESMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation
-
90
-
90
-
-- - -
CN
RWPE
--90---------
-----
--
--- - -
This project provides funding for the On the Job Training/Supportive Services Program. This is an apprenticeship and training program targeted to move women, minorities, and disadvantaged individuals into journey‐level positions to ensure that a competent workforce is available to meet highway construction hiring needs, and to address the historical under‐representation of these groups in highway construction skilled crafts.
224309
BR-OFF BR-OFFSTATE OF IDAHO (ITD)
LOCAL, FY24 LOCAL/OFF-SYSTEM BRIDGE INSPECTIONMP 0.000 - 0.000 BR/APPRS, Bridge Inspection
-
2,016
-
1,868
-
148- - -
CN
RWPE
--2,016---------
-----
--
--- - -
Statewide inspection of all local bridges.
M22433
9
STP-RURAL (L) STP-RURALLOCAL HIGHWAY TECHNICA
LOCAL, FY24 LHTAC PLANNING & SCOPINGMP 0.000 - 0.000 PLAN/STUDY, Preliminary Engineering
-
212
-
197
-
15- - -
CN
RWPE
--159---------
-----
--
--- - -
M
9
SAFETY (L) HSIP (L)LOCAL HIGHWAY TECHNICA
LOCAL, FY24 LHTAC PLANNING & SCOPINGMP 0.000 - 0.000 PLAN/STUDY, Preliminary Engineering
-
212
-
197
-
15- - -
CN
RWPE
--53---------
-----
--
--- - -
224419
STP-URBAN (L) STP-ULOCAL HIGHWAY TECHNICA
LOCAL, FY24 URBAN TRANSPORTATION PLANSMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation
-
265
-
246
-
19- - -
CN
RWPE
--265---------
-----
--
--- - -
This project will provide funds to augment the Local Highway Technical Assistance Council constituents' planning efforts.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 100
Statewide Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
ORN227289
BR-OFF BR-OFFSTATE OF IDAHO (ITD)
LOCAL, FY25 LOCAL/OFF-SYSTEM BRIDGE INSPECTIONMP 0.000 - 0.000 BR/APPRS, Bridge Inspection
-
2,057
-
1,906
-
151- - -
CN
RWPE
-2,057----------
-----
--
--- - -
Statewide inspection of all local bridges.
ORN228259
OTH-FA OTH-FEDSTATE OF IDAHO (ITD)
STATE, FY25 NAT'L SUMMER TRANS INSTITUTEMP 0.000 - 0.000 PLAN/STUDY, Training
-
72
-
72
-
-- - -
CN
RWPE
-72----------
-----
--
--- - -
ORN228269
OTH-FA (L) OTH-FEDSTATE OF IDAHO (ITD)
STATE, FY25 ON-THE-JOB-TRAINING/SUPPORTIVE SERVICESMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation
-
90
-
90
-
-- - -
CN
RWPE
-90----------
-----
--
--- - -
This project provides funding for the On the Job Training/Supportive Services Program. This is an apprenticeship and training program targeted to move women, minorities, and disadvantaged individuals into journey‐level positions to ensure that a competent workforce is available to meet highway construction hiring needs, and to address the historical under‐representation of these groups in highway construction skilled crafts.
ORN229009
TAP TAP-RURALMISCELLANEOUS
STATE, FY22 STWD SRTS COORDINATOR & ACTIVITIESMP - ENV PRESV, Bicycle/Pedestrian/Equestr
-
64
-
60
-
4- - -
CN
RWPE
----64-------
-----
--
--- - -
This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.
ORN229019
TAP TAP-RURALMISCELLANEOUS
STATE, FY23 STWD SRTS COORDINATOR & ACTIVITIESMP - ENV PRESV, Bicycle/Pedestrian/Equestr
-
64
-
60
-
4- - -
CN
RWPE
---64--------
-----
--
--- - -
This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.
ORN229039
TAP TAP-RURALMISCELLANEOUS
STATE, FY21 STWD SRTS COORDINATOR STIPENDMP - ENV PRESV, Bicycle/Pedestrian/Equestr
-
5
-
4
-
1- - -
CN
RWPE
-----5------
-----
--
--- - -
This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.
ORN229049
TAP TAP-RURALMISCELLANEOUS
STATE, FY22 STWD SRTS COORDINATOR STIPENDMP - ENV PRESV, Bicycle/Pedestrian/Equestr
-
5
-
4
-
1- - -
CN
RWPE
----5-------
-----
--
--- - -
This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.
ORN229069
TAP TAP-RURALMISCELLANEOUS
STATE, FY23 STWD SRTS COORDINATOR STIPENDMP - ENV PRESV, Bicycle/Pedestrian/Equestr
-
5
-
4
-
1- - -
CN
RWPE
---5--------
-----
--
--- - -
This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 101
Statewide Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
MORN22932
9
STP-RURAL (L) STP-RURALLOCAL HIGHWAY TECHNICA
LOCAL, FY25 LHTAC PLANNING & SCOPINGMP 0.000 - 0.000 PLAN/STUDY, Preliminary Engineering
-
216
-
201
-
15- - -
CN
RWPE
-162----------
-----
--
--- - -
M
9
SAFETY (L) HSIP (L)LOCAL HIGHWAY TECHNICA
LOCAL, FY25 LHTAC PLANNING & SCOPINGMP 0.000 - 0.000 PLAN/STUDY, Preliminary Engineering
-
216
-
201
-
15- - -
CN
RWPE
-54----------
-----
--
--- - -
ORN230079
OTH-FA (L) LTAPLOCAL HIGHWAY TECHNICA
LOCAL, FY21 TECHNOLOGY TRANSFERMP - PLAN/STUDY, Planning/Transportation
-
300
-
150
-
150- - -
CN
RWPE
-----300------
-----
--
--- - -
Funds for operating the T2 Center.
ORN230089
OTH-FA (L) LTAPLOCAL HIGHWAY TECHNICA
LOCAL, FY22 TECHNOLOGY TRANSFERMP - PLAN/STUDY, Planning/Transportation
-
300
-
150
-
150- - -
CN
RWPE
----300-------
-----
--
--- - -
Funds for operating the T2 Center.
ORN230109
OTH-FA (L) LTAPLOCAL HIGHWAY TECHNICA
LOCAL, FY23 TECHNOLOGY TRANSFERMP - PLAN/STUDY, Planning/Transportation
-
300
-
150
-
150- - -
CN
RWPE
---300--------
-----
--
--- - -
Funds for operating the T2 Center.
ORN230129
OTH-FA (L) LTAPLOCAL HIGHWAY TECHNICA
LOCAL, FY24 TECHNOLOGY TRANSFERMP - PLAN/STUDY, Planning/Transportation
-
300
-
150
-
150- - -
CN
RWPE
--300---------
-----
--
--- - -
Funds to operate the T2 Center.
ORN230149
OTH-FA (L) LTAPLOCAL HIGHWAY TECHNICA
LOCAL, FY25 TECHNOLOGY TRANSFERMP - PLAN/STUDY, Planning/Transportation
-
300
-
150
-
150- - -
CN
RWPE
-300----------
-----
--
--- - -
Funds to operate the T2 Center.
ORN230399
URB STP-ULOCAL HIGHWAY TECHNICA
LOCAL, FY25 URBAN TRANSPORTATION PLANSMP - PLAN/STUDY, Planning/Transportation
-
271
-
251
-
20- - -
CN
RWPE
-271----------
-----
--
--- - -
Funds for local agencies to develop transportation plans.
ORN230649
OPS STPSTATE OF IDAHO (ITD)
STATE, RECESSED PAVEMENT MARKING PILOTMP - PLAN/STUDY, Pavement Markings
-
300
-
278
-
22- - -
CN
RWPE
-----300------
-----
--
--- - -
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 102
Statewide Highways Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Highway Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
This project will utilize a new product and an innovative approach to pavement marking application to improve pavement marking visibility during wet and dark conditions and increase the life of those markings.
Construction
Right-of-WayDevelopment
303,3196,1745,9625,1077,252------------
Total 303,3196,1745,9625,1077,252G: Project is grouped in STIP
1: Project is also shown in a Transportation Improvement Program
W: Work zone safety priority
CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition
Notes:
Phases:
2: Project is being advance constructed with non-federal funds
P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM
B: Project addresses Federal Bridge Condition PM
A: Project utilizes an alternative contracting method.
M: Project included in multiple programs
1,936-----
1,936-
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 103
Statewide Public Transit Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Transit Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
193359
TRNS-OPS 5311(b)(2)STATE OF IDAHO (ITD)
TRANSIT, 5311 RURAL TECHNICAL ASSISTANCE (RTAP)MP 0.000 - 0.000 Rural Technical Assistance
-
710
-
710
-
-- - -
CN
RWPE
-142142142142142------
-----
--
--- - -
Program provides scholarships for training and technical assistance for rural transit providers statewide.
193639
TRNS-OPS 5304STATE OF IDAHO (ITD)
TRANSIT, 5304 STATEWIDE PLANNINGMP 0.000 - 0.000 Transit Planning
-
615
-
615
-
-- - -
CN
RWPE
-123123123123123------
-----
--
--- - -
Program provides funding to support comprehensive planning for making transportation investment decisions in metropolitan areas and statewide.
195509
TRNS-OPS 5311(f)MISCELLANEOUS
TRANSIT, 5311 INTERCITY S/W RURAL AREA FORMULA PROGMP 0.000 - 0.000 Transit Admin/Operations/PM
-
11,770
-
5,885
-
5,885- - -
CN
RWPE
-2,3542,3542,3542,3542,354------
-----
--
--- - -
Program supports connections between rural areas and the larger regional systems of intercity bus services statewide.
196799
TRNS-OPS 5311 RuralSTATE OF IDAHO (ITD)
TRANSIT, 5311 - STATEWIDE RURAL AREA FORMULA PROGRMP 0.000 - 0.000 Transit State Administration
-
4,540
-
4,540
-
-- - -
CN
RWPE
-908908908908908------
-----
--
--- - -
Program provides funding for the State to manage and administer grants for public transportation projects in rural areas with populations less than 50,000 statewide.
M20206
9
TRNS-OPS 5310 RuralSTATE OF IDAHO (ITD)
TRANSIT, STATEWIDE ELDERLY & DISABLED ADMINMP 0.000 - 0.000 Transit State Administration
-
645
-
645
-
-- - -
CN
RWPE
-4747474747------
-----
--
--- - -
M
9
TRNS-OPS 5310 SUrbSTATE OF IDAHO (ITD)
TRANSIT, STATEWIDE ELDERLY & DISABLED ADMINMP 0.000 - 0.000 Transit State Administration
-
645
-
645
-
-- - -
CN
RWPE
-8282828282------
-----
--
--- - -
Program serves the special needs of transit‐dependent senior citizens and persons with disabilities by providing funds for projects which go beyond traditional transit services (demand response) including those required under the Americans with Disabilities Act (ADA).
ORN230629
TRNS-OPS 5311(f)STATE OF IDAHO (ITD)
TRANSIT, STWD 5311 CARES ACT INTERCITY MP - Security
-
4,096
-
4,096
-
-- - -
CN
RWPE
-----4,096------
-----
--
--- - -
Provides funding for intercity services that provide connections between rural areas and the larger regional systems statewide.
ORN230639
TRNS-OPS 5311 RuralSTATE OF IDAHO (ITD)
TRANSIT, STWD 5311 CARES ACT ADMINISTRATIONMP - Transit State Administration
-
2,731
-
2,731
-
-- - -
CN
RWPE
-----2,731------
-----
--
--- - -
Provides funding for the state to manage and administer grants for public transit projects.
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 104
Statewide Public Transit Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Transit Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027Construction
Right-of-WayDevelopment
-3,6563,6563,6563,65610,483------------
Total -3,6563,6563,6563,65610,483G: Project is grouped in STIP
1: Project is also shown in a Transportation Improvement Program
W: Work zone safety priority
CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition
Notes:
Phases:
2: Project is being advance constructed with non-federal funds
P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM
B: Project addresses Federal Bridge Condition PM
A: Project utilizes an alternative contracting method.
M: Project included in multiple programs
--------
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 105
Statewide Aeronautics Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Aeronautics Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
W19227
9
AVI-SYS PU-APTSTATE OF IDAHO (ITD)
IDS, SYSTEM PLAN, UPDATE STATEWIDE, PCI YR 3 NPIASMP 0.000 - 0.000 SYS PLN, System Planning
-
-
-
-
-
-148 148 -
CN
RWPE
-----------148
-----
--
--- - -
PCI yr. 1 Update (M228010)
W19989
9
AVI-SYS PU-APTSTATE OF IDAHO (ITD)
IDS, SYSTEM PLAN, UPDATE STATEWIDE, ISCIP PROGRAMMP 0.000 - 0.000 SYS PLN, System Planning
-
-
-
-
-
-94 94 -
CN
RWPE
-----------94
-----
--
--- - -
Five‐Year State‐FAA SCIP Coordination. (M228010)
W20018
9
AVI-SYS PU-APTSTATE OF IDAHO (ITD)
IDS, SYSTEM PLAN, UPDATE STATEWIDE, PCI YR 2 NPIASMP 0.000 - 0.000 SYS PLN, System Planning
-
-
-
-
-
-155 155 -
CN
RWPE
----------155-
-----
--
--- - -
PCI yr. 2 Update (M238010)
W20523
9
AVI-SYS PU-APTSTATE OF IDAHO (ITD)
IDS, FY21 SYSTEM PLAN, UPDATE STWD, PCI YR 1 NON-NPIAMP 0.000 - 0.000 SYS PLN, System Planning
-
-
-
-
-
-41 41 -
CN
RWPE
-----------41
-----
--
--- - -
PCI yr. 1 Update Non‐NPIAS
W20569
9
AVI-SYS PU-APTSTATE OF IDAHO (ITD)
IDS, SYSTEM PLAN, UPDATE STATEWIDE, FULL REPORTMP 0.000 - 0.000 SYS PLN, System Planning
-
-
-
-
-
-300 300 -
CN
RWPE
-----------300
-----
--
--- - -
Continuous System Planning Update Econ Impact Study (M228010)
W20593
9
AVI-SYS PU-APTSTATE OF IDAHO (ITD)
IDS, FY22 SYSTEM PLAN, UPDATE STWD, PCI YR 2 NON-NPIAMP 0.000 - 0.000 SYS PLN, System Planning
-
-
-
-
-
-38 38 -
CN
RWPE
----------38-
-----
--
--- - -
PCI yr. 2 Update Non‐NPIAS
W20737
9
AVI-SYS PU-APTSTATE OF IDAHO (ITD)
IDS, SYSTEM PLAN, UPDATE STATEWIDE, ISCIP PROGRAMMP 0.000 - 0.000 SYS PLN, System Planning
-
-
-
-
-
-96 96 -
CN
RWPE
----------96-
-----
--
--- - -
Five‐Year State‐FAA SCIP Coordination. (M238010)
208139
AVI-SYS PU-APTSTATE OF IDAHO (ITD)
AERO, UPDATE STATEWIDE SYSTEM PLAN, ISCIPMP 0.000 - 0.000 SYS PLN, System Planning
-
-
-
-
-
-97 87 10
CN
RWPE
--------97---
-----
--
--- - -
Five year State‐FAA SCIP Coordination
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 106
Statewide Aeronautics Project List
Notes
Lifetime Direct Costs All Programs
MatchFederalTotal
Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail
Fund PhProgramSponsorMileposts
Route, LocationKey No.
2021 2022 2023 2024 2025 PREL
SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES
IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN
Group: Aeronautics Projects (System)Sort: STIP
FY 2021 - FY 2027 Draft STIP
Individually Listed Projects per 23 CFR 450.218(j)
Year-Of-Expenditure Dollars (Not Current Prices)
2026 2027
208149
APT-PLAN PU-APTSTATE OF IDAHO (ITD)
AERO, UPDATE STATEWIDE SYSTEM PLAN, PCI YR 1 NPIASMP 0.000 - 0.000 SYS PLN, System Planning
-
-
-
-
-
-143 129 14
CN
RWPE
-------143----
-----
--
--- - -
PCI year 1 update (M258010)
208159
AVI-SYS PU-APTSTATE OF IDAHO (ITD)
AERO, UPDATE STATEWIDE SYSTEM PLAN, PCI YR 3 NPIASMP 0.000 - 0.000 SYS PLN, System Planning
-
-
-
-
-
-214 193 21
CN
RWPE
--------214---
-----
--
--- - -
PCI 3 YR Update M248010Construction
Right-of-WayDevelopment
-------143311-289583------
Total -143311-289583G: Project is grouped in STIP
1: Project is also shown in a Transportation Improvement Program
W: Work zone safety priority
CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition
Notes:
Phases:
2: Project is being advance constructed with non-federal funds
P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM
B: Project addresses Federal Bridge Condition PM
A: Project utilizes an alternative contracting method.
M: Project included in multiple programs
--------
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 107
Indian Reservation Roads ProgramsFederal Lands Highway
10-OCT-2018 10:02 AM
REPORT FILTERS:
Location = P-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 2 of 29
P0500200
P0518108
P0518113
P0518114
P0518115
P0518116
35,000
0
155,000
135,000
0
41,330
25,000
60,000
0
0
25,060
0
25,000
150,000
0
0
200,000
0
25,000
0
0
0
0
0
135,000
210,000
155,080
135,040
225,170
216,340
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
0 0 0
35,000
0 0 0 0
0 135,000
0 20,000
0 125,000
5,000 5,000
0 0 0 0
35,000 6,310
10 10
0 0 0
25,000
0 60,000
0 0
0 0 0 0
0 0 0 0
25,000 40 10 10
0 0 0 0
0 0 0
25,000
0 130,000 10,000 10,000
0 0 0 0
0 0 0 0
0 180,000 10,000 10,000
0 0 0 0
0 0 0
25,000
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0
135,000
0 190,000 10,000 10,000
0 135,060
10 20,010
0 125,020
5,010 5,010
25,040 180,090 10,020 10,020
35,010 131,310 25,010 25,010
Coeur d'Alene Admin Cap Bldg-Transpor
Mowry Road Chip Seal
Davenport Way
Lovell Valley Road Overlay
DeSmet Sidewalk/Trail
Worley Minor Street Repair
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
PLANING
SEALING
RECONS
OVRLAY
WALKWY
RECONS
O
O
R
O
O
O
P10
S4
7
S4
F1
7
16 - IdahoState P05181 - Coeur D'Alene
009 - Benewah
009 - Benewah
009 - Benewah
009 - Benewah
009 - Benewah
055 - Kootenai
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2018
Funding Amount 426,530
FIRST PAGE FOR CSTIPP05181 - COEUR D'ALENE TRIBEEntity Name
0 0 0
25,000
0 0 0 0
0 60 10 10
0 20 10 10
40 50 10 10
10 125,000 25,000 25,000
25,000
0
80
40
110
175,010
Total
Total
Total
Total
Total
Total
FY 2018 ($)
FY 2018 ($)
FY 2018 ($)
FY 2018 ($)
FY 2018 ($)
FY 2018 ($)
FY 2019 ($)
FY 2019 ($)
FY 2019 ($)
FY 2019 ($)
FY 2019 ($)
FY 2019 ($)
FY 2020 ($)
FY 2020 ($)
FY 2020 ($)
FY 2020 ($)
FY 2020 ($)
FY 2020 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
18-MAY-18FHWA Approved Date
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 108
Indian Reservation Roads ProgramsFederal Lands Highway
10-OCT-2018 10:02 AM
REPORT FILTERS:
Location = P-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 3 of 29
426,530 445,400 410,080 445,060 811,010 2,538,080 2,538,080
426,530 445,400 410,080 445,060 811,010 2,538,080
P0518117
P0518118
P0518119
P0518120
P0518121
P05RM181
40,000
80
80
0
0
20,040
0
0
175,020
105,000
0
20,000
0
0
0
0
50,060
20,000
0
0
0
0
766,010
20,000
40,010
200,080
200,160
105,090
816,070
100,040
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
0 40,000
0 0
10 50 10 10
20 40 10 10
0 0 0 0
0 0 0 0
0 0 0
20,040
0 0 0 0
0 0 0 0
20 145,000 15,000 15,000
50,000 40,000 10,000
5,000
0 0 0 0
0 0 0
20,000
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
50,000 40 10 10
0 0 0
20,000
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
10,010 656,000 50,000 50,000
0 0 0
20,000
0 40,010
0 0
10,010 165,050 10,010 15,010
25,040 145,080 15,020 15,020
50,030 40,040 10,010
5,010
60,010 656,040 50,010 50,010
0 0 0
100,040
8th Street Reconstr.-Plummer
Veterans Memorial Park Trail
Reeves Road Recon
Lovell Valley Rd Rehab
Agency Rd Rehab
Road Maintenance 23USC 204(C)
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
426,530 445,400 410,080 445,060
RECONS
WALKWY
RECONS
RECONS
RECONS
PLANING
O
O
R
R
R
O
7
F1
7
7
7
S1
16 - IdahoState P05181 - Coeur D'Alene
009 - Benewah
009 - Benewah
009 - Benewah
009 - Benewah
009 - Benewah
009 - Benewah
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
Location Subtotal
State SubtotalCSTIP Subtotal
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2018
Funding Amount 426,530
P05181 - COEUR D'ALENE TRIBEEntity Name
811,010
0 10 0 0
10,000 165,000 10,000 15,000
25,000 40 10 10
30 40 10 10
0 0 0 0
0 0 0
20,000
10
200,000
25,060
90
0
20,000
Total
Total
Total
Total
Total
Total
FY 2018 ($)
FY 2018 ($)
FY 2018 ($)
FY 2018 ($)
FY 2018 ($)
FY 2018 ($)
FY 2019 ($)
FY 2019 ($)
FY 2019 ($)
FY 2019 ($)
FY 2019 ($)
FY 2019 ($)
FY 2020 ($)
FY 2020 ($)
FY 2020 ($)
FY 2020 ($)
FY 2020 ($)
FY 2020 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
18-MAY-18
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 109
Indian Reservation Roads ProgramsFederal Lands Highway
10-OCT-2018 10:02 AM
REPORT FILTERS:
Location = P-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 4 of 29
P0518201
P0518202
P0518203
P0518205
P0518207
P0518210
164,839
10,000
73,000
20,000
33,000
70,000
180,000
30,000
90,000
10,000
75,000
0
180,000
30,000
30,000
0
70,000
0
180,000
35,000
30,000
0
145,000
0
884,839
135,000
328,000
50,000
386,000
70,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
50,000 0 0
114,839
0 0 0
10,000
73,000 0 0 0
0 20,000
0 0
33,000 0 0 0
0 0
70,000 0
50,000 0 0
130,000
0 0 0
30,000
90,000 0 0 0
0 10,000
0 0
15,000 40,000 20,000
0
0 0 0 0
50,000 0 0
130,000
0 0 0
30,000
30,000 0 0 0
0 0 0 0
0 50,000 20,000
0
0 0 0 0
50,000 0 0
130,000
0 0 0
35,000
0 30,000
0 0
0 0 0 0
0 125,000 20,000
0
0 0 0 0
250,000 0 0
634,839
0 0 0
135,000
283,000 45,000
0 0
0 50,000
0 0
111,000 215,000 60,000
0
0 0
70,000 0
Nez Perce TTP Mgmt & Planning
Nez Perce Road Maintenance
Aht' Wy Egress
Cherrylane Bridge
Tribal Road
Nez Perce Transit Support
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
PLANING
PLANING
RECONS
REPLACE
RECONS
TRANSIT
O
O
R
B
R
O
P10
S1
I1
B16
I1
T1
16 - IdahoState P05182 - Nez Perce Tribe
035 - Clearwater
069 - Nez Perce
069 - Nez Perce
069 - Nez Perce
069 - Nez Perce
069 - Nez Perce
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2018
Funding Amount 504,839
FIRST PAGE FOR CSTIPP05182 - Nez Perce TribeEntity Name
50,000 0 0
130,000
0 0 0
30,000
90,000 15,000
0 0
0 20,000
0 0
63,000 0 0 0
0 0 0 0
180,000
30,000
105,000
20,000
63,000
0
Total
Total
Total
Total
Total
Total
FY 2018 ($)
FY 2018 ($)
FY 2018 ($)
FY 2018 ($)
FY 2018 ($)
FY 2018 ($)
FY 2019 ($)
FY 2019 ($)
FY 2019 ($)
FY 2019 ($)
FY 2019 ($)
FY 2019 ($)
FY 2020 ($)
FY 2020 ($)
FY 2020 ($)
FY 2020 ($)
FY 2020 ($)
FY 2020 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
21-AUG-18FHWA Approved Date
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 110
Indian Reservation Roads ProgramsFederal Lands Highway
10-OCT-2018 10:02 AM
REPORT FILTERS:
Location = P-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 5 of 29
504,839 501,500 545,000 475,000 660,000 2,686,339 2,686,339
504,839 501,500 545,000 475,000 660,000 2,686,339
P0518211
P0518212
P0518213
P0518215
58,000
46,000
15,000
15,000
0
0
110,000
50,000
0
0
115,000
50,000
0
0
220,000
50,000
83,000
46,000
505,500
198,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
0 0 0
58,000
18,000 28,000
0 0
15,000 0 0 0
15,000 0 0 0
0 0 0 0
0 0 0 0
0 90,000 20,000
0
0 40,000 10,000
0
0 0 0 0
0 0 0 0
0 95,000 20,000
0
0 40,000 10,000
0
0 0 0 0
0 0 0 0
0 200,000 20,000
0
0 40,000 10,000
0
0 0 0
83,000
18,000 28,000
0 0
60,500 385,000 60,000
0
48,000 120,000 30,000
0
Nez Perce Road Maintenance Facility
Parade Avenue Guardrail Replacement S
Agency Street Reconstruction
Whitebird Resonstruction
Total
Total
Total
Total
Phase
Phase
Phase
Phase
504,839 501,500 545,000 475,000
RDMAINT
SAFETY
RECONS
RECONS
O
R
R
R
T1
G
6
6
16 - IdahoState P05182 - Nez Perce Tribe
069 - Nez Perce
069 - Nez Perce
069 - Nez Perce
069 - Nez Perce
Name
Name
Name
Name
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
Location Subtotal
State SubtotalCSTIP Subtotal
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2018
Funding Amount 504,839
P05182 - Nez Perce TribeEntity Name
660,000
0 0 0
25,000
0 0 0 0
45,500 0 0 0
33,000 0 0 0
25,000
0
45,500
33,000
Total
Total
Total
Total
FY 2018 ($)
FY 2018 ($)
FY 2018 ($)
FY 2018 ($)
FY 2019 ($)
FY 2019 ($)
FY 2019 ($)
FY 2019 ($)
FY 2020 ($)
FY 2020 ($)
FY 2020 ($)
FY 2020 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
21-AUG-18
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 111
Indian Reservation Roads ProgramsFederal Lands Highway
10-OCT-2018 10:02 AM
REPORT FILTERS:
Location = P-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 6 of 29
102,533 112,786 112,786 112,786 112,786 553,677 553,677
102,533 112,786 112,786 112,786 112,786 553,677
P0518301
P0518302
P0518303
P0518304
P0550000
P05RM183
10,500
1,000
54,800
27,850
1,383
7,000
20,000
42,786
0
0
10,000
40,000
20,000
42,786
0
0
10,000
40,000
20,000
42,786
0
0
10,000
40,000
90,500
172,144
54,800
27,850
41,383
167,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
10,500 0 0 0
0 0 0
1,000
8,900 35,700
6,200 4,000
3,300 21,300
2,000 1,250
1,383 0 0 0
0 0 0
7,000
20,000 0 0 0
0 0 0
42,786
0 0 0 0
0 0 0 0
10,000 0 0 0
0 0 0
40,000
20,000 0 0 0
0 0 0
42,786
0 0 0 0
0 0 0 0
10,000 0 0 0
0 0 0
40,000
20,000 0 0 0
0 0 0
42,786
0 0 0 0
0 0 0 0
10,000 0 0 0
0 0 0
40,000
90,500 0 0 0
0 0 0
172,144
8,900 35,700
6,200 4,000
3,300 21,300
2,000 1,250
41,383 0 0 0
0 0 0
167,000
Kootenai Transportation Planning
Kootenai TTP Mgmt & Administration
Frontier Village
Little Bear
Kootenai Safety Program
Kootenai Road Maintenance
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
102,533 112,786 112,786 112,786
PLANING
PLANING
RECONS
RECONS
SAFETY
PLANING
O
O
R
R
O
O
P10
P10
IR2
IR2
P6
3
16 - IdahoState P05183 - Kootenai Tribe
021 - Boundary
021 - Boundary
021 - Boundary
021 - Boundary
021 - Boundary
021 - Boundary
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
Location Subtotal
State SubtotalCSTIP Subtotal
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2018
Funding Amount 102,533
FIRST PAGE FOR CSTIPP05183 - Kootenai TribeEntity Name
112,786
20,000 0 0 0
0 0 0
42,786
0 0 0 0
0 0 0 0
10,000 0 0 0
0 0 0
40,000
20,000
42,786
0
0
10,000
40,000
Total
Total
Total
Total
Total
Total
FY 2018 ($)
FY 2018 ($)
FY 2018 ($)
FY 2018 ($)
FY 2018 ($)
FY 2018 ($)
FY 2019 ($)
FY 2019 ($)
FY 2019 ($)
FY 2019 ($)
FY 2019 ($)
FY 2019 ($)
FY 2020 ($)
FY 2020 ($)
FY 2020 ($)
FY 2020 ($)
FY 2020 ($)
FY 2020 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
16-APR-18FHWA Approved Date
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 112
TOTAL $85,000 $105,000 $250,000 $0 $0 $440,000
Maintenance $0 $0 $0 $0 $0 $0Transit $0 $0 $0 $0 $0 $0
Construction Engineering $0 $0 $0 $0 $0 $0Construction $0 $0 $250,000 $0 $0 $250,000
Preliminary Engineering $85,000 $105,000 $0 $0 $0 $190,000Planning $0 $0 $0 $0 $0 $0
Administration $0 $0 $0 $0 $0Activity TOTAL
Comments: Eagle Road Reconstruction to widen a path/sidewalk. Eagle road project is one of the next projects on ourTIP and will still move toward project readiness.TTP Annual Allocation FY18-20 - $440,000.Additional Funding Sources - $0.00.Total expected project costs - $440,000.
State: ID Construction Year: 2020Length: 0.5 Miles County: Bingham
Type of Work: ReconstructionLocation: Fort Hall District
Project Number: SBTDOT-055Route Number: Rte 55, Sec 30
Project Name: Eagle Road Project
PROJECT INFORMATIONFunding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2018
Tribe: Shoshone-Bannock Tribes of Fort Hall Date:Consortium:
Tribal Transportation Program Transportation Improvement Program
$0.00
Tribe Code: P04180
2018 2019 2020 2021 2022
STIP Amount: $440,000
P041800005
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 113
TOTAL $0 $25,000 $25,000 $550,000 $0 $600,000
Maintenance $0 $0 $0 $0 $0 $0Transit $0 $0 $0 $0 $0 $0
Construction Engineering $0 $0 $0 $0 $0 $0Construction $0 $0 $0 $550,000 $0 $550,000
Preliminary Engineering $0 $25,000 $25,000 $0 $0 $50,000Planning $0 $0 $0 $0 $0 $0
Administration $0 $0 $0 $0 $0Activity TOTAL
Comments: Reconstruct/repave the roads in the Agency/Campus area of Fort Hall.TTP annual allocation FY18-21 - $625,000.Additional Funding Sources - $0.00.Total expected project costs - $625,000.
State: ID Construction Year: 2021Length: 1.3 Miles County: Bingham
Type of Work: ReconstructionLocation: Fort Hall District
Project Number: SBTDOT-057Route Number: Rte 57, Sec 10-100
Project Name: Agency Streets/Campus
PROJECT INFORMATIONFunding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2018
Tribe: Shoshone-Bannock Tribes of Fort Hall Date:Consortium:
Tribal Transportation Program Transportation Improvement Program
$0.00
Tribe Code: P04180
2018 2019 2020 2021 2022
STIP Amount: $600,000
P041800011
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 114
TOTAL $85,000 $85,000 $250,000 $0 $0 $420,000
Maintenance $0 $0 $0 $0 $0 $0Transit $0 $0 $0 $0 $0 $0
Construction Engineering $0 $0 $0 $0 $0 $0Construction $0 $0 $250,000 $0 $0 $250,000
Preliminary Engineering $85,000 $85,000 $0 $0 $0 $170,000Planning $0 $0 $0 $0 $0 $0
Administration $0 $0 $0 $0 $0Activity TOTAL
Comments: Reconstruction of Path/Sidewalk-Between exit 80 and Hiline Road.TTP Annual Allocation FY18-20 - $420,000.Additional Funding Sources - $0.00.Total expected project costs - $420,000.
State: ID Construction Year: 2020Length: 0.5 Miles County: Bingham
Type of Work: ReconstructionLocation: Fort Hall District
Project Number: SBTDOT-024Route Number: Rte 24, Sec 10-20
Project Name: Ross Fork/Lone Pine
PROJECT INFORMATIONFunding Source: TTP; (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2018
Tribe: Shoshone-Bannock Tribes of Fort Hall Date:Consortium:
Tribal Transportation Program Transportation Improvement Program
$0.00
Tribe Code: P04180
2018 2019 2020 2021 2022
STIP Amount: $420,000
P041800014
FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 115
TOTAL $1,782,465 $0 $0 $0 $0 $1,782,465
Maintenance $0 $0 $0 $0 $0 $0Transit $0 $0 $0 $0 $0 $0
Construction Engineering $0 $0 $0 $0 $0 $0Construction $1,782,465 $0 $0 $0 $0 $1,782,465
Preliminary Engineering $0 $0 $0 $0 $0 $0Planning $0 $0 $0 $0 $0 $0
Administration $0 $0 $0 $0 $0Activity TOTAL
Comments: This BIA owned bridge has a 32.6 sufficiency rating and is being submitted to the TTP Bridge replacement program for funding. Bridge is listed in the NTTFI and the NBI.TTP Annual Allocation FY18 - $0.00.Additional Funding Sources - TTP Bridge - $1,782,465.Total expected project costs - 1,782,465.
State: ID Construction Year: 2018Length: 0.1 Miles County: Bingham
Type of Work: ReconstructionLocation: Lincoln Creek District
Project Number:Route Number: Rte 15, Sec 40 - P416
Project Name: Just Bridge
PROJECT INFORMATIONFunding Source: TTP Bridge; (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2018
Tribe: Shoshone-Bannock Tribes of Fort Hall Date:Consortium:
Tribal Transportation Program Transportation Improvement Program
$0.00
Tribe Code: P04180
2018 2019 2020 2021 2022
STIP Amount: 1,782,465
P041800016