US 95, Northern Idaho FY2021 to FY2027 Draft for Public Comment - July 2020 Idaho Transportation Department Investment Program
Transcript
Page 1: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

US 95, Northern Idaho

FY2021 to FY2027 Draft for Public Comment - July 2020

Idaho Transportation Department Investment Program

Page 2: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

TABLE OF CONTENTS

Background Information and How to Submit Comments The Idaho Transportation Investment Program (ITIP) . . . . . . . . . . . . . . . . . . . . . . . . . . 1

How to Submit Comments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

ITIP Development Calendar . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

ITIP Development Participants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

Project Selection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

Program Priorities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

STIP Format. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

Air Quality and Conformity ................................................ 4

Federal Funding, FAST Act ................................................ 4

Funding Assumptions/Forecasts ........................................... 4

References to MPO Transportation Improvement Programs . . . . . . . . . . . . . . . . . . . . 5

Draft Program and Project List Idaho Transportation Investment Program, FY21 to FY27 . . . . . . . . . . . . . . . . . . . . . . . 7

Grouped Project FHWA Control Totals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

Program Name Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

Fund Source Abbreviations ............................................... 10

District 1 Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

District 2 Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27

District 3 Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40

District 4 Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54

District 5 Projects ....................................................... 71

District 6 Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82

Statewide Projects ..... . . . .. . . . . ..................................... 96

Indian Reservation Roads Program ....................................... 108

Page 3: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

The Idaho Transportation Investment ProgramThe Idaho Transportation Investment Program (ITIP)is a multi-modal program that includes highways, bridges, public transportation, railroads, aviation, and non-motorized transportation. Idaho’s state and local transportation systems are a network of cross-jurisdictional routes that require cooperation, coordination, and continuous planning to operate, maintain, and improve.

The Idaho Transportation Department is providing this draft of the FY21 to FY27 ITIP to allow transportation agencies and the public to review and provide comments on the program.

The ITIP’s federal document format meets the requirements of the Fixing America’s Surface Transportation Act (FAST), the law that provides federal funding for transportation projects to move people and freight. In compliance with the FAST Act,this draft ITIP is fiscally constrained and includes at least four years of projects in compliance with 23CFR 450.218.

How to Submit CommentsTo submit comments on the ITIP, please use one of the following methods:

• On Line: Click on the map on the right side of thedraft program web page. The following page willhave a "Submit Comments" button at its upper left.itd.idaho.gov/funding/?target=draft-itip

• Mail: Idaho Transportation Department ITIP CommentsAttention Aubrie SpenceOffice of CommunicationsP.O. Box 7129 Boise, ID 83707-1129

If you have questions regarding this document, please contact Aubrie Spence via email at [email protected] or call (208) 334-8119.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 1

Page 4: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

ITIP Development Participants The Idaho Transportation Department (ITD) refines federal and state funding estimates in January, based on the annual revenue forecast published in August. In January, ITD also provides the funding estimates to metropolitan planning organizations, the Local Highway Technical Assistance Council (LHTAC), and ITD’s six district offices.

In June, ITD submits a draft ITIP, including all state and local projects, to the Idaho Transportation Board for review.

In July, ITD provides the draft ITIP to state and local agencies, transportation stakeholders, and the public for comment. The department takes these comments into consideration as it finalizes the ITIP in August. The Idaho Transportation Board approves the final ITIP in September.

In November, ITD submits the ITIP Federal Approval Document to the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) for approval as Idaho’s FY2021-FY2027 Statewide Transportation Improvement Program or STIP.

The STIP includes references to the Transportation Improvement Programs for Idaho’s five metropolitan planning areas rather than duplicating those projects in the STIP.

Construction on new ITIP projects can begin following FHWA approval. The Environmental Protection Agency has a 30-day review and comment period that typically is concurrent with the FHWA and FTA review.

Project SelectionITD uses road and bridge management systems to select projects that:

• Optimize current and projected funding levels

• Support federally funded local transportationagency plans and programs

• Address system priorities

• Achieve system-performance goals

Teams of experienced engineers and planners assist in the project-selection process by:

• Analyzing road and bridge data provided bymanagement systems

• Determining specific program objectives

• Establishing engineering requirements forprojects that achieve objectives

• Making recommendations to management onfunding levels required to meet objectives

• Balancing program budgets with available revenue

Program PrioritiesThe ITIP’s priorities support the safety, mobility, and economic opportunity goals identified in the department’s strategic plan. The department:

• Is committed to providing facilities that enablethe safe movement of people and goods. Safetyis considered in all transportation activities,investments, and decision-making processes.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 2

Page 5: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

• Promotes accessible, affordable, and convenienttransportation choices for the movement ofpeople and goods.

• Strives to keep the transportation infrastructurein good repair and ensure uninterrupted service.

• Applies resources to maintain, improve, andexpand routes and services that contribute to thestate’s economic vitality.

• Uses integrated management systems to ensuretransportation investments align with Idaho'stransportation vision.

ITD strategically targets investments that improve safety, enhance mobility, and provide economic opportunity. Idaho’s Safety & Capacity Program contains these projects. They are funded with federal Highway Safety Improvement Program funds. They are funded by the federal Highway Safety Improvement Program, National Highway Performance Program, the Transportation Expansion and Congestion Mitigation Program, and state funds.

In March 2017, the Idaho Transportation Board reviewed scenarios for pavement and bridge condition with various funding levels based on their impact on the percent of pavement and bridges that are in good or fair condition.

After reviewing the trade-offs between these funding levels and their effect on performance measures, the board approved for FY22 forward a funding increase for safety and capacity (safety, mobility, and economic opportunity) to $80 million annually, reduced pavement funding to $103 million, and reduced bridge funding to $80 million annually.

STIP FormatThe department, the FHWA, and Idaho's metropolitan planning organizations have agreed on the following improvements to make the STIP approval process more efficient. These improvements are authorized by 23 CFR450.218, Planning Assistance Standards.

• Routine highway projects are grouped by the yearof expenditure and by important types orgeographic areas to highlight investment priorities.The grouped investment totals also serve as thebasis for federal approval of the STIP, allowingthe federal funding of future projects eligible forthe investment groups.

• For a complete list of projects including groupedand MPO projects (includes projects sorted invarious ways for customer use), see the draft ITIPweb page at the location below:itd.idaho.gov/funding/?target=draft-itip

• Highway projects are listed individually only ifthey meet one or more of the following criteria:

- The project requires special reporting due tothe funding source.

- The project requires an environmentalclearance more in-depth than the minimalcategorical exclusion, such as projects withright-of-way needs.

- The project may impact air quality and requiresadditional analysis within certain metropolitanplanning areas.

- The department or an MPO believes the projectwarrants individual attention by local officialsand stakeholders.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 3

Page 6: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

• Because investment groups have not yet beenestablished for public transportation andaeronautics projects, they are listed individually.

Air Quality and ConformityThe Clean Air Act of 1990 (42 U.S.C. 7506(c))requires that all federally funded plans, programs, and projects in non-attainment or maintenance areas conform to the Plan for the Control of Air Pollution in the State of Idaho, commonly known as the State Implementation Plan (SIP) for air quality.

Before receiving Idaho Transportation Board approval, the department works with metropolitan planning organizations (MPOs) to demonstrate air quality conformity in the areas of the state that may have air quality concerns. The MPOs in those areas have

regional long-range transportation plans that take into consideration air quality conformity issues by creating plans focusing on various transportation corridors, pathways, public transportation systems, and transportation system management elements.

Federal Funding, FAST ActThe Fixing America’s Surface Transportation Act (FAST), Public Law No. 114-94, the current federal transportation authorization act,became law on December 4, 2015 and establishes funding over federal fiscal years 2016 through 2020. The MAP-21 transportation program structure continues under the FAST Act with one substantial change; the inclusion of a new Freight Program.

Idaho’s Transportation Alternatives Program is populated through FY21 with projects for bike and pedestrian facilities, Safe Routes to School projects, Americans with Disabilities Act projects, and projects for the historic preservation or rehabilitation of transportation facilities. Additionally, funding is reserved for FY24 through FY27 in this program.

Though no specific projects are listed in this document, Idaho Parks and Recreation administers the Recreational Trails Program for years 2021 through 2027 using federal funds distributed to them by ITD.

Funding Assumptions/Forecasts

Federal-Aid Funding AssumptionsFederal Highways program funding level estimates are $316.6 million in FY21 through FY27. Funds are shown in year of expenditure dollars.

Obligation authority is assumed to be equal to 100% of estimated apportionments. Funding forecasts do not include year-end redistribution of obligation authority not used by other states. Approximately $25 million in highway-related federal indirect cost recovery is redirected annually to the State Highway System.

State Highway Funding Assumptions Estimates of state funds available for capital construction take into account projected revenues, the reservation of state matching funds for federal-aid, and other operational needs not shown in the ITIP.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 4

Page 7: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

The amount of state highway funding can be impacted by legislation passed in any given year. There were two bills passed during the 2020 session that had an effect on transportation funding.

House Bill 334 increases funding for the local bridge inspection account by $75,000 annually to $175,000. While this legislation does not impact revenue, it does reduce the amount available for distribution from the Highway Distribution Account.

Senate Bill 1379 provides for using existing law enforcement and ITD resources to inspect commercial vehicles for dyed fuel. This should increase revenue from special fuel taxes because it will act as a deterrent to those drivers who illegally use dyed diesel on highways.

As a reminder, Senate Bill 1201 which was passed during the 2019 Legislative Session removes the Idaho State Police from the Highway Distribution Account distribution formula over a period of five years beginning with the FY22 appropriation. This action will result in an additional $1.9 million per year for a total of approximately $11 million to the State Highway Account when the transition is complete in FY26.

The estimated state funding for FY21 through FY27 available for highway capital construction ranges from $106.2 million to $142.5 million annually.

GARVEE Bonds Debt ServiceGARVEE bonds are revenue bonds that do not pledge the full faith and credit of the state. Idaho Code allows no more than 30% of ITD’s federal apportionment to be used for debt service. The department uses federal highway revenue to repay the bonds.

Prior to FY17, the Idaho Legislature authorized the department to secure financing of $857 million of

infrastructure improvements in the GARVEE Program. Projects funded by the pre-FY17 authorizations were closed out during FY16.

In March 2017, the Idaho Legislature authorized the issuance of up to $300 million in new GARVEE bonds to fund additional projects to be selected by the Idaho Transportation Board.

Estimated debt service is approximately $69.5 million annually, including the original $857 million and the new $300 million legislative authorization. Approximately $64 million of the debt service is federal funds and approximately $5,5 million is state matching funds.

Aeronautics Funding AssumptionsThe majority of funding for airport improvements is provided directly to local airport owners by the Federal Aviation Administration. Local airport owners provide most of the required local matching funds.

The Division of Aeronautics provides the remaining funds. The Division of Aeronautics receives Federal Aviation Administration funding for statewide planning and pavement evaluations. Airports that are not eligible for FAA funding receive matching grants from the Division of Aeronautics for airport improvements and planning. State funding to the Idaho Airport Aid Program is a minimum of $1,000,000 per year for FY21 through FY27.

Public Transportation Funding Assumptions The Department is the direct recipient of Federal Transit Administration (FTA) funding for rural and small urban programs. These funds support fixed route and paratransit services, transportation services for the elderly and persons with disabilities, buses and bus facilities. Under the FAST Act which ends in FY20, estimated

federal funding for these rural and small urban programs is $15.1 million in FY20. Estimated funding for non-ITD recipients (transit service providers in the urbanized areas) is $12.2 million in FY20. Dedicated state funds of $312, 000 annually are available for vehicle replacement needs under the Vehicle Investment Program (VIP) and are awarded through a competitive application process.

References to Metropolitan Planning Organizations - Transportation Improvement ProgramsAs specified in 23 CFR 450.218(b), Transportation Improvement Programs (TIPs) developed by the Metropolitan Planning Organizations can be included by reference. Each of Idaho’s five MPO websites is listed below:

• Kootenai Metropolitan Planning Organization(KMPO) Phone: (208) 930-4164Website: www.kmpo.net

• Lewis-Clark Valley Metropolitan PlanningOrganization (LCVMPO)Phone: (208) 298-1345Website: www.lewisclarkmpo.org

• Community Planning Organization ofSouthwest Idaho (COMPASS)Phone: (208) 855-2558Website: www.compassidaho.org

• Bannock Transportation Planning Organization(BTPO) Phone: (208) 233-9322Website: www.bannockplanning.org

• Bonneville Metropolitan Planning Organization(BMPO)Phone: (208) 612-8530Website: www.bmpo.org

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 5

Page 8: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and
Page 9: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

Row Program Name Available Program Available Program Available Program Available Program Available Program Available Program Available Program Available Program1 Pavement Preservation (Commerce) 27,546 23,495 31,389 31,576 14,200 15,852 24,740 25,815 38,477 37,422 28,609 28,298 61,683 44,391 226,644 206,848 2 Pavement Preservation (Non-Commerce) 9,684 8,196 9,534 12,681 10,833 11,029 6,894 6,720 8,473 8,074 6,202 6,533 18,000 14,218 69,620 67,450 3 Pavement Restoration 71,739 80,808 81,104 62,269 64,686 64,776 92,621 77,017 94,195 73,512 140,914 117,917 58,538 70,426 603,797 546,725 4 SHS Pavements 108,969 112,499 122,027 106,526 89,719 91,657 124,255 109,552 141,145 119,008 175,725 152,747 138,221 129,035 900,061 821,024 5 Bridge Preservation 23,522 26,565 13,611 14,506 25,640 29,097 18,722 17,413 13,139 13,121 15,372 16,389 15,000 15,721 125,006 132,813 6 Bridge Restoration 43,479 29,264 62,779 68,684 97,080 92,875 82,406 88,877 55,370 97,783 50,396 71,947 65,000 58,648 456,510 508,079 7 SHS Bridges 67,001 55,829 76,390 83,190 122,720 121,972 101,128 106,291 68,509 110,904 65,768 88,336 80,000 74,370 581,516 640,892 8 Supporting Infrastructure Assets 7,000 7,658 7,000 7,487 7,000 7,579 7,000 7,000 7,000 7,000 7,000 7,000 7,000 7,000 49,000 50,724 9 Safety - Rest Areas - 1,260 - - - - - - - - - - - - - 1,260

10 Safety 8,594 47,283 58,540 48,124 44,895 20,970 37,324 - 265,730 11 Capacity 75,152 71,856 50,738 49,035 47,505 46,035 50,513 - 390,834 12 Safety & Capacity 87,378 83,746 99,840 119,139 93,579 109,278 73,168 97,159 89,522 92,400 57,991 67,004 80,000 87,837 581,478 656,564 13 (Row 4+7+8+9+12) SHS Core 270,348 260,992 305,257 316,342 313,018 330,487 305,551 320,001 306,176 329,312 306,484 315,088 305,221 298,242 2,112,055 2,170,463 14 Significant Projects & Corridors - - - - - - - - - - - - - - - - 15 Formula Debt Service + Fees & Interest1 67,476 67,476 69,510 69,510 69,536 69,536 69,550 69,550 69,612 69,612 69,621 69,621 71,051 71,051 486,356 486,356 16 SHS Strategic 67,476 67,476 69,510 69,510 69,536 69,536 69,550 69,550 69,612 69,612 69,621 69,621 71,051 71,051 486,356 486,356 17 System Support 6,500 11,956 6,500 7,847 6,500 7,596 6,500 7,596 6,500 7,626 6,500 6,500 6,500 6,500 45,500 55,621 18 State Board Unallocated 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 35,000 35,000 19 SHS Other 11,500 16,956 11,500 12,847 11,500 12,596 11,500 12,596 11,500 12,626 11,500 11,500 11,500 11,500 80,500 90,621 20 Planning & Scoping 2,100 2,430 1,600 1,835 1,600 1,625 1,600 1,350 250 1,350 - - - - 7,150 8,590 21 Metropolitan Planning 1,885 1,895 1,885 1,895 1,885 1,895 1,885 1,895 1,885 1,895 - - - - 9,423 9,475 22 State Planning and Research 7,030 7,090 7,030 7,090 7,030 7,090 7,031 7,090 7,031 7,066 - - - - 35,153 35,426 23 Hwy Planning 11,015 11,415 10,515 10,820 10,515 10,610 10,515 10,335 9,166 10,311 - - - - 51,726 53,491 24 Recreational Trails 1,711 1,711 1,711 1,711 1,711 1,711 1,711 1,711 1,711 1,711 - - - - 8,553 8,555 25 Transportation Alternatives (TAP) 3,822 3,322 3,822 3,518 3,822 5,180 3,822 3,822 3,822 3,822 - - - - 19,109 19,664 26 Freight 10,393 13,330 10,393 7,421 10,393 9,162 10,394 - 10,394 4,336 10,394 2,988 10,394 13,767 72,755 51,003 27 Congestion Mitigation/Air Quality (CMAQ) - - - - - - - - - - - - - - - - 28 Hwy Statewide Competitive 15,925 18,363 15,925 12,650 15,926 16,053 15,926 5,533 15,926 9,869 10,394 2,988 10,394 13,767 100,417 79,222 29 STBG - Local Urban 8,831 8,892 8,831 9,002 8,831 8,699 8,831 8,855 8,831 9,329 30,000 32,598 - - 74,155 77,374 30 STBG - Transportation Mgt Area 10,887 10,908 10,887 10,886 10,887 10,887 10,887 10,887 10,887 10,108 21,774 10,901 - - 76,208 64,576 31 TAP - Transportation Mgt. Area 480 400 480 479 480 480 480 480 480 480 960 733 - - 3,358 3,051 32 STBG - Local Rural 14,683 11,258 14,646 18,010 14,538 11,304 14,430 12,329 14,322 12,504 43,431 43,431 - - 116,049 108,837 33 Bridge, Local 5,447 5,293 5,447 3,555 5,447 7,514 5,447 4,143 5,447 5,320 23,335 23,335 - - 50,570 49,159 34 Bridge, Off System 4,085 7,014 4,085 2,612 4,085 5,251 4,085 7,489 4,085 6,029 8,654 8,654 - - 29,078 37,049 35 Safety - Local 8,904 8,904 8,904 8,904 8,904 8,904 8,904 8,905 8,905 8,904 8,905 17,634 8,905 8,905 62,330 71,059 36 Safety - Railroad Crossings 2,191 3,080 2,191 1,915 2,191 1,755 2,191 1,515 2,191 2,090 2,191 2,191 2,191 2,191 15,338 14,737 37 Hwy Local 55,507 55,749 55,470 55,363 55,362 54,793 55,255 54,602 55,147 54,764 139,249 139,477 11,096 11,096 427,086 425,843 38 LHTAC Programs 33,119 32,469 33,081 33,081 32,974 32,972 32,866 32,866 32,758 32,758 84,325 93,054 8,905 8,905 258,027 266,104 39 Hwy Federal Formula & State Funds 431,772 430,951 468,177 477,531 475,857 494,074 468,297 472,617 467,527 486,494 537,248 538,674 409,261 405,655 3,258,139 3,305,997 40 High Priority (SAFETEA-LU) - - - - - - - - - - - - - - - - 41 High Priority (TEA-21) 18,426 18,426 - - - - - - - - - - - - 18,426 18,426 42 Discretionary Earmarks 5,182 5,182 - - - - - - - - - - - - 5,182 5,182 43 Emergency Relief - - - - - - - - - - - - - - - - 44 Federal Lands Access 13,898 11,027 13,898 17,110 13,898 18,482 13,898 17,699 13,898 1,686 - - - - 69,490 66,004 45 Indian Reservation Roads 1,000 1,000 1,007 1,007 457 457 887 887 - - - - - - 3,352 3,352 46 Other Federal Non-Formula 5,262 5,262 2,262 2,262 2,062 2,062 2,262 2,262 462 462 - - - - 12,310 12,310 47 Hwy Other Federal Programs 43,768 40,897 17,167 20,379 16,417 21,001 17,047 20,848 14,360 2,148 - - - - 108,760 105,274 48 Federal Non-Participating - - - - - - - - - - - - - - - - 49 Local/Private Partnership 8,170 8,170 448 448 1,964 1,964 380 380 1,835 1,835 - - 780 780 13,577 13,577 50 Hwy Other Programs 8,170 8,170 448 448 1,964 1,964 380 380 1,835 1,835 - - 780 780 13,577 13,577 51 GARVEE 2017 Legislative Authorization 1 78,697 78,697 - - - - - - - - - - - - 78,697 78,697 52 Highways Total 562,407 558,715 485,792 498,359 494,239 517,040 485,724 493,845 483,722 490,477 537,248 538,674 410,041 406,435 3,459,172 3,503,544 53 Capital 16,925 16,925 16,730 16,730 16,163 16,163 16,420 16,420 15,823 15,823 8,393 8,393 - - 90,454 90,454 54 Operations 55,020 55,020 27,792 27,792 27,862 27,862 27,900 27,900 27,918 27,918 2,624 2,624 - - 169,116 169,116 55 Public Transit Total 71,945 71,945 44,522 44,522 44,025 44,025 44,320 44,320 43,741 43,741 11,017 11,017 - - 259,570 259,570 56 New Airport Facility 5,444 5,444 13,559 13,559 5,308 5,308 9,212 9,212 7,711 7,711 5,399 5,399 150 150 46,783 46,783 57 Airport Facility Maintenance 32,275 32,275 21,277 21,277 29,751 29,751 26,373 26,373 14,042 14,042 5,399 5,399 150 150 129,267 129,267 58 Airport Planning 266 266 1,867 1,867 884 884 558 558 493 493 5,279 5,279 5,000 5,000 14,347 14,347 59 Aviation System Planning 583 583 289 289 - - 311 311 - - 407 407 - - 1,590 1,590 60 Aeronautics Total 38,568 38,568 36,992 36,992 35,943 35,943 36,454 36,454 22,246 22,246 16,484 16,484 5,300 5,300 191,987 191,987 61 Grand Total 672,920 669,228 567,306 579,873 574,207 597,008 566,498 574,619 549,709 556,464 564,749 566,175 415,341 411,735 3,910,729 3,955,101

* Available estimates are to be used for planning purposes only. FFY20 is last year of FAST transportation act. FY21 and later are flat-lined at FY20 levels.Funds expressed in Year-Of-Expenditure Dollars assuming 2% annual inflation.Funding levels assume 100% Obligation AuthorityIncludes set-asides for short/under-programmed programs1 Grant Anticipation Revenue Vehicle (GARVEE) bonds provide no net additional transportation funding as they are repaid with future federal funds via debt service. FAST means "Fixing America's Surface Transportation"STBG means "Surface Transportation Block Grant"

(PREL for Locals)FY 2022*

Statewide Transportation Improvement Program (STIP)FY2023* FY 2024* Sum FY21-27

AVAILABLE FUNDING WITH MATCH vs. PROGRAMMED PROJECTS (AvP)

This Report should be used only during Public Involvement (data as of 06/24/2020)FY 2021 - 2027 DRAFT IDAHO TRANSPORTATION INVESTMENT PROGRAM

Estimates of Apportionments/Allocations in $000s with Match in Year-Of-Expenditure Dollars

FY 2025* FY 2026* FY 2027*

Idaho Transportation Investment Program (ITIP)

FY 2021*

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 7

Page 10: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

Group Name FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY21-27Pavement Preservation (Commerce) 18,449 23,119 12,280 25,815 32,585 28,297 36,540 177,085 Pavement Preservation (Non-Commerce) 8,196 12,681 10,966 5,618 7,618 6,533 12,304 63,916 Pavement Restoration 66,554 54,574 18,455 48,902 38,446 99,259 53,920 380,110

SHS Pavements 93,199 90,374 41,701 80,335 78,649 134,089 102,764 621,111 Bridge Preservation 21,666 12,802 27,120 17,414 13,121 16,389 15,721 124,233 Bridge Restoration 17,464 41,168 10,667 26,753 65,309 64,515 58,648 284,524

SHS Bridges 39,130 53,970 37,787 44,167 78,430 80,904 74,369 408,757 SHS Core 132,329 144,344 79,488 124,502 157,079 214,993 177,133 1,029,868

System Support 7,346 7,246 7,596 7,596 7,626 500 500 38,410 Safety - Rail-Highway Crossings 1,015 380 380 30 30 30 30 1,895

Other 8,361 7,626 7,976 7,626 7,656 530 530 40,305 Planning & Scoping 1,830 1,600 1,600 1,350 1,350 - - 7,730 State Planning and Research 7,090 7,090 7,090 7,090 7,066 7,066 7,066 49,558

Hwy Planning 8,920 8,690 8,690 8,440 8,416 7,066 7,066 57,288 Recreational Trails 1,711 1,711 1,711 1,711 1,711 - - 8,555

Hwy Statewide Competitive 1,711 1,711 1,711 1,711 1,711 - - 8,555 Hwy Projects Outside of Metropolitan Planning Areas 151,321 162,371 97,865 142,279 174,862 222,589 184,729 1,136,016

Notes:Highways groupings include projects that have or are expected to receive environmental categorical exclusions per 23 CFR 450.218(j). Regionally significant projects are detailed in the STIP.All public transit projects are currently detailed within the STIP.All aeronautics projects are currently detailed within the STIP.Please see the Idaho Transportation Investment Program (ITIP) web site for project candidates within these groupings (costs in current dollars).

FY 2021 - 2027 DRAFT STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (06/25/2020)Grouped Project FHWA Control Totals

Cost in Thousands of Year-of-Expenditure Dollars

Statewide Transportation Improvement Program

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 8

Page 11: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

Program Name Abbreviations Used in Program Sheets  Abbreviation  Program Name Abbreviation  Program NameAPPR  Appropriation Earmarks  MET  Metro Planning APT‐MTNC  Airport Facility Maintenance  NP  Non‐Participating APT‐NEW  New Airport Facility  NP (L)  Non‐Participating (Local) APT‐PLAN  Airport Planning  OPS  System Support AVI‐SYS  Aviation System Planning  OTH‐FA  Other Federal Aid BR‐DSCR  Bridge Discretionary  OTH‐FA (L)  Other Federal Aid (Local) BR‐LOCAL  Bridge ‐ Local  PAVE  Pavement Preservation BR‐OFF  Bridge ‐ Off System  PLAN  Planning & Scoping BR‐PRESERVE  Bridge Preservation  PLHD  Public Lands BR‐RESTORE  Bridge Restoration  PLHD (L)  Public Lands (Local) CC4I  Transportation Alternatives  RDSIDE  Roadside Items CMAQ  Congestion Mitigation/Air Quality  RESTORE  Restoration CMAQ (L)  Congestion Mitigation/Air Quality (Local)  SAFETY  Safety CPCTY  Capacity  SAFETY (L)  Safety (Local) DEMO  Demonstration  SPR  State Planning & Research DEMO (L)  Demonstration (Local)  ST RRX  State Rail EARLY  Early Development  STP‐RURAL (L)  STP ‐ Local Rural ER‐NOW  ER ‐ Emergency Repair  STP‐TMA  STP ‐ Transportation Mgt Area ER‐NOW (L)  ER ‐ Emergency Repair (Local)  STP‐URBAN (L)  STP ‐ Local Urban ER‐PERM  ER ‐ Permanent Repair  STRATEGY  Strategic Initiatives ER‐PERM (L)  ER ‐ Permanent Repair (Local)  OTHER ASSETS  Supporting Infrastructure Assets EXTRNL  External to ITD Financials  TAP‐TMA  Transportation Alternatives ‐ TMA FED RRX  STP ‐ Rail (Protection)  TCSP  TCSP FED RRX (L)  STP. ‐ Rail (Protection) (Local)  TIGER  TIGER FLAP  Federal Lands Access Program  TRAFFIC  Traffic Operations FLAP (L)  Federal Lands Access Program (Local)  TRAILS  Recreational Trails FREIGHT  Formula Freight Program  TRNS‐CAP  Capital HIPRI  High Priority SAFETEA‐LU  TRNS‐OPS  Operations  UNALLOC  State Unallocated  LP‐ST  Local Participation MAJOR  Significant Projects Program 

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 9

Page 12: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

Abbreviation Fund Source Name Abbreviation Fund Source Name112 Section 112 (FY06 Appr Bill) FREIGHT Formula Freight115 Section 115 (FY04 Appr Bill) GA‐APT General Aviation Airport117 Section 117 (FY05 Appr Bill) HFL Highways for Life129 Section 129 (FY08 Appr Bill) HIPRI High Priority SAFETEA‐LU330 Section 330 Discretionary HIPRI High Priority TEA‐21378 Section 378 Funding (Utah Border) HSIP Safety5303 5303 ‐ Metropolitan Planning HSIP (L) Safety (Local)5304 5304 ‐ Statewide Planning IM Interstate Maintenance5309 5309 ‐ Bus and Bus Facility Grants IM‐DISCR Interstate Maintenance Discretionary*5311 5311 ‐ Rural Area Formula Program IRR Indian Reservation Roads5312 5312 ‐ National Research Program LPT Local Participating5320 5320 ‐ Alt. Trans. in Parks and Public Lands LTAP LTAP ‐ T2 Center5505 5505 ‐ University Transportation Centers MET Metro Planning5307 LUrb 5307 ‐ Large Urbanized Area Formula Grants NH National Highway System5307 SUrb 5307 ‐ Small Urbanized Area Formula Grants NP Non‐Participating5309(d) 5309(d) ‐ Capital Investment Grants "New Starts" OTH‐FED Other Federal Non‐Formula5310 LUrb 5310 ‐ Pop>200K Transport for Elderly&Disabled PLHD Public Lands Highways Discretionary*5310 RUrb 5310 ‐ Pop<50K Transport for Elderly&Disabled PR‐APT Primary Service Airport5310 SUrb 5310 ‐ Pop<200K Transport for Elderly&Disabled PRIV Private Funds5311(b)(2) 5311(b)(3) ‐ Rural Transit Assistance PU‐APT Public Use Airports5311(c) 5311(c) ‐ Public Trans. On Indian Reservations SB Scenic Byways Discretionary*5311(f) 5311(f) ‐ Intercity Bus SF Other State Categories5313(a)(2) 5313(a)(2) ‐ Transit Cooperative Research Program SPR State Planning & Research5339 LUrb 5339 ‐ Large Urban State of Good Repair for Bus SR2S Safe Routes to School5339 Rural 5339 ‐ Rural State of Good Repair for Bus ST State5339 SUrb 5339 ‐ Small Urban State of Good Repair for Bus ST2 State (HB312)BR‐DISCR Bridge Discretionary* STB State UnallocatedBR‐LOC Bridge ‐ Local STP STP ‐ State HighwayBR‐OFF Bridge ‐ Off System STP‐RURAL STP ‐ Local RuralBR‐STATE Bridge ‐ State STP‐TMA STP ‐ Transportation Management AreaCA‐APT Community Access Airport STP‐U STP ‐ Local UrbanCBI Corridor Border Infrastructure Discretionary* STSI State Strategic InitiativesCIG TAX Cigarette Tax STX State Rail‐Highway SafetyCMAQ Congestion Mitigation / Air Quality TAP‐RURAL Transportation Alternatives ‐ RuralDEMO Demonstration Projects ISTEA TAP‐TMA Transportation Alternatives ‐ TMATIGER TIGER TAP‐URBAN Transportation Alternatives ‐ UrbanFED RRX Federal Rail Highway Crossings TCSP TCSP Discretionary*FLAP Federal Lands Access Program TECM Transportation Expansion & Congestion Mitigation

TRAILS Recreational Trails

Fund Source Abbreviations Used in Program Sheets

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 10

Page 13: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 1 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

138731

STP-RURAL (L) STP-RURALST MARIES

STC-1801, RAILROAD AVE, ST MARIESMP 101.301 - 101.784 RESRF/RESTO&REHAB, Base/Sub-bas

102

2,766

95

2,563

7

203660 612 48

CN

RWPE

-----2,766------

----102

--

--- - -

The purpose of this project is to reconstruct Railroad Avenue between the Potlatch Mill and Hwy‐3 in St. Maries. This includes a two lane section with turn lanes at 10th and Hwy‐3, and a retaining wall with storm water improvements.  The project is located on STC‐1801 between mile points 101.301 and 101.784.

188131

BR-OFF BR-OFFBENEWAH COUNTY

OFFSYS, SLAUGHTER HOUSE BR, BENEWAH COMP 101.885 - 101.885 BR/APPRS, Bridge Replacement

-

2,577

-

2,388

-

189580 537 43

CN

RWPE

---2,577--------

-----

--

--- - -

The Slaughter House Bridge on St. Joe City Road is a one lane bridge in very poor condition. The bridge has been on the watch list for Benewah County for many years. The guardrails are substandard and because of the narrow width, the rails are damaged from many logging truck impacts.  This project is located at mile point 101.885.

190461

BR-OFF BR-OFFBOUNDARY COUNTY

OFFSYS, RUBY CR #2 BR, BOUNDARY COMP 100.691 - 100.691 BR/APPRS, Bridge Replacement

-

944

-

875

-

69532 493 39

CN

RWPE

-----944------

-----

--

--- - -

This project will replace the Ruby Creek Bridge #2 . The importance of Bridge #2 is that traffic to a private school (formerly Rocky Mountain Academy) all must cross this 15 foot wide structure, most of this traffic in the same time frame in the morning and evening.  Once replaced, there will be two way access up this first one half mile of winding road all the way to Administration Lane, where the majority of traffic leaves Ruby Creek Road.  The project is located at mile point 100.691. 

B2

192481

BR-RESTORE NHSTATE OF IDAHO (ITD)

US 95, SANDPOINT LONG BR OVER PEND O'REILLEMP 471.743 - 472.862 BR/APPRS, Bridge Rehabilitation

-

16,389

-

15,186

-

1,2031,100 1,019 81

CN

RWPE

----6,4169,973------

-----

--

--- - -

This project will provide bridge preservation and preventive maintenance to the existing Sandpoint Longbridge to improve user operating conditions, increase safety, and reduce future maintenance costs through steel pile wrapping, adjusting or replacing bearing pads, and repairing concrete.  The project is located on US‐95 between mile points 471.743 and 472.862.

192921

BR-LOCAL BR-LOCPINEHURST

STC-5764, MAIN ST/SILVER VALLEY RD BRIDGE, PINEHURSTMP 1.390 - 1.790 BR/APPRS, Bridge Replacement

51

3,946

47

3,656

4

290455 422 33

CN

RWPE

3,946----------455

---51-

--

--- - -

This project will replace the Main St. Bridge located over Pine Creek between Silver Street and Seventh Street.  The bridges substructure is in critical condition as the concrete girders and abutments have numerous cracks and both of the bridges pier walls have been undermined.  The steel piles supporting the bridge have completely lost their protective coating and are heavily corroded and pitted. The bridge and approach guardrails are all substandard, highlighting serious safety concerns.  This project is located on STC‐5764 between mile points 1.39 and 1.79.

195131

STP-RURAL (L) STP-RURALPRIEST RIVER

STC-5770, WISCONSIN ST; HIGH ST TO US-2, PRIEST RIVERMP 6.015 - 6.119 RECONST/REALIGN, Plant Mix Paveme

300

1,113

278

1,032

22

81221 205 16

CN

RWPE

---1,113--------

-----

--

--- - -

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 11

Page 14: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 1 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

This project will provide street improvements on Wisconsin St. from High St. to Hwy‐2 in Priest River. This project includes a new sidewalk on the east side of Wisconsin St. and pedestrian improvements at the intersection of Hwy‐2 and High St. The offset intersection creates confusion for all vehicles creating a safety concern.  This project is located on STC‐5770 between mile points 6.015 and 6.119.

197181

BR-LOCAL BR-LOCSHOSHONE COUNTY

STC-5750, PINE CR RD BRIDGE, SHOSHONE COMP 5.150 - 5.550 BR/APPRS, Bridge Replacement

20

3,673

19

3,404

1

269405 375 30

CN

RWPE

3,673----------405

---20-

--

--- - -

This project will replace the Pine Creek Rd. Bridge located over Pine Creek in Shoshone County.  The bridges substructure is in critical condition with its steel piles rusted, abutments cracking and its concrete on the southwest wing wall spalled exposing rebar. Significant scour has occurred and the bridge railing has also been damaged.  This project is located on STC‐5750 between mile points 5.15 and 5.55.

MP19916

1

RESTORE STSTATE OF IDAHO (ITD)

US 95, LABROSSE HILL ST TO ALDERSON LN, BONNERS FERMP 505.000 - 506.250 RESRF/RESTO&REHAB, Pavement Re

1,800

15,128

-

29

1,800

15,0991,135 - 1,135

CN

RWPE

--6,4576,895--------

-----

--

--- - -

MP

1

RDSIDE STSTATE OF IDAHO (ITD)

US 95, LABROSSE HILL ST TO ALDERSON LN, BONNERS FERMP 505.000 - 506.250 RESRF/RESTO&REHAB, Pavement Re

1,800

15,128

-

29

1,800

15,0991,135 - 1,135

CN

RWPE

--881864--------

-----

--

--- - -

MP

1

ETS STSTATE OF IDAHO (ITD)

US 95, LABROSSE HILL ST TO ALDERSON LN, BONNERS FERMP 505.000 - 506.250 RESRF/RESTO&REHAB, Pavement Re

1,800

15,128

-

29

1,800

15,0991,135 - 1,135

CN

RWPE

---31--------

-----

--

--- - -

This project will improve safety and mobility on Hwy‐95 in Bonners Ferry from (milepost 505) up through Hwy‐2 (milepost 506.25). The safety and mobility improvements will be accomplished by expanding the two lane roadway in the business area, into three lanes and adding bicycle lanes. Also sidewalks will be updated to allow people with disabilities more access.

199951

RAIL FED RRXBONNER COUNTY

STC-5782, SELLE RD UPRR RRX, BONNER COMP 106.270 - 106.270 SAFTY/TRAF OPER, Railroad Gates

-

420

-

378

-

4225 22 3

CN

RWPE

---41010-----10-

-----

--

--- - -

This project will install gates, warning signs and insulated concrete planking at MP 106.27 to enhance safety for travelers on Selle Rd, (STC‐5782).

200391

BR-LOCAL STP-RURALSHOSHONE COUNTY

STC-5750, W FK PINE CR RD BR, SHOSHONE COMP 103.151 - 103.189 BR/APPRS, Bridge Replacement

-

1,570

-

1,455

-

115207 192 15

CN

RWPE

1,570----------207

-----

--

--- - -

The West Fork Pine Creek Road Bridge over Pine Creek project is located near the City of Pinehurst in Shoshone County and includes replacement of the existing single‐span concrete bridge.  The project is located on STC‐5750 at mile point 103.151.

MP20121

1

RESTORE STSTATE OF IDAHO (ITD)

US 2, BNSF RR UNDERPASS, SANDPOINTMP 475.100 - 475.800 RECONST/REALIGN, Bridge Vertical Cl

120

4,472

-

-

120

4,472553 - 553

CN

RWPE

------------

----120

--

4,427-- - -

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 12

Page 15: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 1 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

MP20121

1

RDSIDE STSTATE OF IDAHO (ITD)

US 2, BNSF RR UNDERPASS, SANDPOINTMP 475.100 - 475.800 RECONST/REALIGN, Bridge Vertical Cl

120

4,472

-

-

120

4,472553 - 553

CN

RWPE

------------

-----

--

44-- - -

The project US‐2 BNSF RR UNDERPASS CLEARANCE INPROVEMENT reconstructs 0.7 miles of US‐2 to correct the vertical overhead height restriction clearance of 14.5 feet to current standards.  The project is located on US‐2 between mile points 475.1 and 475.8.

202071

BR-OFF BR-OFFBONNER COUNTY

OFFSYS, RAPID LIGHTNING CR BR #5, BONNER COMP 105.852 - 105.865 BR/APPRS, Bridge Replacement

-

3,182

-

2,948

-

234634 587 47

CN

RWPE

3,182-----------

-----

--

--- - -

The Rapid Lightning Creek Bridge #5 Replacement project is located near the City of Sandpoint in Bonner County and includes replacement of the deficient bridge with replacement of the approach guardrail along with new bridge railing.  The project is located between mile points 105.852 and 105.865.

202151

STP-RURAL (L) STP-RURALBOUNDARY COUNTY

STC-5804, DEEP CR LOOP; JCT US-95 TO LIONS DEN, BOUNDMP 0.000 - 3.056 RESRF/RESTO&REHAB, Resurfacing

-

1,695

-

1,571

-

124336 311 25

CN

RWPE

----1,695-------

-----

--

--- - -

This project is located near the City of Naples and the City of Bonners Ferry in Boundary County and consists of a thick overlay along this roadway as the existing road has become rough and uneven from the weather and heavy truck traffic during the hot summer months.  This application will address areas of rutting as well as edge cracking and physical damage.  The project is located on STC‐5804 between mile points 0.0 and 3.056.

MRP20350

1

CPCTY STECMSTATE OF IDAHO (ITD)

US 95, GRANITE NORTH & FRONTAGE RDS, BONNER COMP 450.880 - 454.510 MAJRWIDN, Grading & Drainage

2,458

34,725

1,415

10,597

1,043

24,1282,875 - 2,875

CN

RWPE

---4,682--------

-----

--

--- - -

MRP

1

FREIGHT FREIGHTSTATE OF IDAHO (ITD)

US 95, GRANITE NORTH & FRONTAGE RDS, BONNER COMP 450.880 - 454.510 MAJRWIDN, Grading & Drainage

2,458

34,725

1,415

10,597

1,043

24,1282,875 - 2,875

CN

RWPE

---9,161--------

-----

--

--- - -

The project will construct 4 lane divided highway on US‐95 and frontage road from MP 452.5 to 454.1. The southern tie in would be the terminus of the recently constructed “Granite South Project” and the north terminus would be at Trails End Road.  Project is funded, in part, with Grant Anticipation Revenue Vehicle bonds until repaid via debt service using federal funds.

203591

RAIL FED RRXBONNER COUNTY

OFFSYS, S GRANITE LAKE BNSF RRX, BONNER COMP 100.758 - 100.758 SAFTY/TRAF OPER, Railroad Signals

-

310

-

279

-

3110 9 1

CN

RWPE

--310-----10---

-----

--

--- - -

Install type 1 signal including constant warning detection, planking, and cabinet.  The project is located at mile point 100.758.

203831

BR-LOCAL BR-LOCWALLACE

STC-5758, 6TH ST; S FK CDA RV BR, WALLACEMP 0.120 - 0.230 BR/APPRS, Bridge Replacement

20

2,590

19

2,400

1

190940 871 69

CN

RWPE

2,590-----------

----20

--

--- - -

Replacement of 101 yr. old bridge in Wallace on 6th Street over South Fork of the Coeur d'Alene River. This bridge is adjacent to the historic downtown Wallace and under the I‐90 viaduct.  The project is located on STC‐5758 at mile point 0.12 to 0.23.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 13

Page 16: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 1 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

M20453

1

SAFETY HSIPSTATE OF IDAHO (ITD)

SH 200, MCGHEE TO KOOTENAI ST, BONNER COMP 31.750 - 32.450 MAJRWIDN, Safety

100

2,963

93

2,745

7

218270 250 20

CN

RWPE

--2,937--------30

----100

--

--- - -

M

1

ETS HSIPSTATE OF IDAHO (ITD)

SH 200, MCGHEE TO KOOTENAI ST, BONNER COMP 31.750 - 32.450 MAJRWIDN, Safety

100

2,963

93

2,745

7

218270 250 20

CN

RWPE

--25---------

-----

--

--- - -

This project will reduce serious and fatal crashes by widening the roadway cross section from 2 to 3 lanes and widen shoulders to be used as right turn movements.  The project is located on SH‐200 between mile points 31.75 and 32.2.

205041

RAIL FED RRXBOUNDARY COUNTY

STC-5908, SCHOOL HOUSE RD UPRR RRX, BOUNDARY COMP 100.108 - 100.108 SAFTY/TRAF OPER, Railroad Signals

-

310

-

279

-

3110 9 1

CN

RWPE

-310------10---

-----

--

--- - -

Install type 1 signal including constant warning protection, planking, and cabinet.  This project is located on STC‐5908 at mile point 100.108.

206211

RAIL FED RRXBONNER COUNTY

OFFSYS, ELMIRA RD UPRR RRX, BONNER COMP 100.411 - 100.411 SAFTY/TRAF OPER, Railroad Signals

-

300

-

270

-

3010 9 1

CN

RWPE

-----300------

-----

--

--- - -

Install type 1 signal including constant warning protection, planking, and cabinet.  This project is located at mile point 100.411.

206561

RAIL FED RRXSANDPOINT

OFFSYS, WOODLAND DR BNSF RRX, SANDPOINTMP 0.000 - 0.000 SAFTY/TRAF OPER, Railroad Signals

-

310

-

279

-

3148 43 5

CN

RWPE

--310-----10---

-----

--

--- - -

Install type 1 signal including constant warning protection, planking, and cabinet.

RP206581

SAFETY HSIPSTATE OF IDAHO (ITD)

US 2, MOYIE SPRINGS TURN BAYS, BOUNDARY COMP 66.600 - 69.900 MAJRWIDN, Turn Bay

-

2,601

-

2,410

-

191277 256 21

CN

RWPE

---2,601--------

-----

--

--- - -

This project US 2, Moyie Springs Turn Bays, Boundary Co. will widen the existing roadway between MP 66.6 and 69.9, install turn bays and acceleration lanes with illumination at Roosevelt Ave. and Blume Hill Rd. The project will reduce serious and fatal type crashes as well as improve mobility.

M20662

1

SAFETY HSIPSTATE OF IDAHO (ITD)

US 95, MCARTHUR LAKE, BOUNDARY COMP 492.600 - 493.300 SAFTY/TRAF OPER, Safety

1,550

10,866

1,436

10,068

114

7981,325 1,228 97

CN

RWPE

---10,789--------

----1,550

--

--- - -

M

1

ETS HSIPSTATE OF IDAHO (ITD)

US 95, MCARTHUR LAKE, BOUNDARY COMP 492.600 - 493.300 SAFTY/TRAF OPER, Safety

1,550

10,866

1,436

10,068

114

7981,325 1,228 97

CN

RWPE

---77--------

-----

--

--- - -

This project will reduce serious and fatal crashes by reconstructing the existing two lane section and adding wider shoulders, and replaces a width restricted bridge over McArthur Lake outlet, provides for animal passage under US‐95, improves the alignments of Kapu Rd and MacArthur Lake and US‐95.  The project is located on US‐95 between mile points 492.6 and 493.3.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 14

Page 17: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 1 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

207761

FLAP (L) FLAPBONNER COUNTY

OFFSYS, TRESTLE CREEK RD, BONNER COMP 100.000 - 103.000 RECONST/REALIGN, Grading & Draina

-

4,443

-

4,117

-

326280 259 21

CN

RWPE

---4,113330------280

-----

--

--- - -

Reconstruct Trestle Creek Rd. to a single lane with turnouts.  Work includes associated intersection improvements, horizontal and vertical alignment upgrades, drainage improvements, stream bank restoration, and roadside safety improvements.  This project is located between mile points 100 and 103.

219821

STP-RURAL (L) STP-RURALBOUNDARY COUNTY

STC-5908, SCHOOL HOUSE RD IMPV, BOUNDARY COMP 100.000 - 100.220 RESRF/RESTO&REHAB, Pavement Re

79

1,062

73

984

6

78305 283 22

CN

RWPE

1,062----------305

---79-

--

--- - -

Improve and resurface School House Road between US 95 and Deep Creek Loop Road.  The project is located on STC‐5908 between mile points 100 and 100.22.

219901

SAFETY (L) HSIP (L)BONNER COUNTY

OFFSYS, RRX NR SANDPOINT, BONNER COMP 0.000 - 0.000 SAFTY/TRAF OPER, Railroad Signals

-

882

-

817

-

65142 132 10

CN

RWPE

-----882------

-----

--

--- - -

The Bonner County Railroad Crossing Improvement project, located near the City of Sandpoint in Bonner County, will add pavement to 100ft on either side of the tracks, install thermoplastic crossbucks and will install LED Flashing RR Crossing warning signs to increase visibility and driver awareness to reduce/eliminate fatal and serious injury crashes, for all roadway users, at these crossing locations.

219941

SAFETY (L) HSIP (L)BOUNDARY COUNTY

OFFSYS, GUARDRAIL UPGRADE, NR BONNERS FERRYMP 0.000 - 0.000 SAFTY/TRAF OPER, Metal Guard Rail

-

264

-

264

-

-50 50 -

CN

RWPE

-----264------

-----

--

--- - -

The Boundary County Guardrail Improvements project, located near the City of Bonners Ferry in Boundary County, will install guardrail along outside curves at multiple locations along Deep Creek Loop, Highland Flats Road and Moyie River Road to improve safety for roadway users as they negotiate curves to reduce/eliminate fatal and serious injury crashes for all roadway users.

220391

TAP TAP-URBANSANDPOINT

LOCAL, FY21 SANDPOINT SRTS COORDINATOR & ACTIVITIESMP 0.000 - 0.000 ENV PRESV, Bicycle/Pedestrian/Equestr

-

65

-

60

-

5- - -

CN

RWPE

-----65------

-----

--

--- - -

This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.

220731

TAP TAP-URBANSANDPOINT

SMA-7775, PINE ST SIDEWALK, SANDPOINTMP 100.500 - 101.770 ENV PRESV, Sidewalk

-

375

-

347

-

2855 51 4

CN

RWPE

-----375------

-----

--

--- - -

This project will include infilling sidewalk and ADA corners on both sides of Pine St. from US HWY 2 west to Division Ave. The project length is approximately 3,000 linear feet with sidewalk to be installed approximately 3,500 linear feet, including 32 ADA ramps. The project will install five transit‐stop concrete pads to establish safe and defined bus route pedestrian waiting areas.  The project is located on SMA‐7775 between mile points 100.5 and 101.77.

222601

OTHER ASSETS STSTATE OF IDAHO (ITD)

US 2, MP 10.5 ROCKFALL MITIGATION, BONNER COMP 10.500 - 11.900 SAFTY/TRAF OPER, Safety

-

550

-

-

-

550110 - 110

CN

RWPE

-----550------

-----

--

--- - -

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 15

Page 18: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 1 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

The Rock Fall Mitigation project is to perform select rock fall mitigation along US‐2 from approximate milepost 10.5 to 11.9.

222701

OTHER ASSETS STSTATE OF IDAHO (ITD)

SH 1, MISSION CREEK CULVERT REPAIR, BOUNDARY COMP 0.740 - 0.760 PM, Drainage Improvements

-

830

-

-

-

83045 - 45

CN

RWPE

-----830------

-----

--

--- - -

MP .76 to .76 culvert repair project will repair the existing culvert beneath the roadway fill.

222731

OTHER ASSETS STSTATE OF IDAHO (ITD)

US 95, D1 CULVERT REPLACEMENT, BONNER COMP 459.200 - 460.600 PM, Drainage Improvements

-

170

-

-

-

17040 - 40

CN

RWPE

-----170------

-----

--

--- - -

The Culvert Replacement is needed to maintain critical drainage.  The project is located on US‐95 between mileposts 459.2 and 460.6 in Bonner County.

W22275

1

OTHER ASSETS STSTATE OF IDAHO (ITD)

I 90, FY21 FENCE REPAIR, KOOTENAI COMP 21.000 - 25.000 PM, Incidental Repairs

-

148

-

-

-

1485 - 5

CN

RWPE

-----148-----(11)

-----

--

--- - -

The 2021 Interstate 90 Fence Repair project will repair and replace interstate controlled access fence between mile post 21 and 25.  Access control fence is to help prevent pedestrian and wildlife crossing onto the high speed facility.

W22286

1

OTHER ASSETS STSTATE OF IDAHO (ITD)

I 90, FY22 FENCE REPAIR, SHOSHONE COMP 45.000 - 49.000 PM, Incidental Repairs

-

129

-

-

-

12916 - 16

CN

RWPE

----129------16

-----

--

--- - -

The 2022 Interstate 90 Fence Repair project will repair and replace interstate controlled access fence between mile post 45 and 49.  Access control fence is to help prevent pedestrian and wildlife crossing onto the high speed facility.

223961

SAFETY (L) HSIP (L)KELLOGG

LOCAL, INTERSECTION SAFETY IMPROVEMENTS, KELLOGGMP 0.000 - 0.000 SAFTY/TRAF OPER, Intersection Improv

-

25

-

25

-

-3 3 -

CN

RWPE

-----25-----3

-----

--

--- - -

Install Flashing LED Stop Signs and New Stop Bars on each approach at three intersections in the City of Kellogg.

223981

SAFETY (L) HSIP (L)PONDERAY

LOCAL, MCGHEE RD PED IMPROVEMENTS, PONDERAYMP 100.370 - 100.510 SAFTY/TRAF OPER, Sidewalk

-

386

-

357

-

2957 53 4

CN

RWPE

----386------57

-----

--

--- - -

Construct a separated sidewalk on the west side of McGhee Rd., north of the railroad tracks from milepost 100.37 to 100.51.

223991

SAFETY (L) HSIP (L)SHOSHONE COUNTY

LOCAL, SILVER VALLEY RD SAFETY IMPROVEMENTS, SHOSHMP 0.000 - 0.000 SAFTY/TRAF OPER, Intersection Improv

-

564

-

523

-

4183 77 6

CN

RWPE

----564------83

-----

--

--- - -

Improve approaches along the roadway with the installation of additional delineation, lighting, guardrail, curb/gutter and pavement markings.

224011

SAFETY (L) HSIP (L)BENEWAH COUNTY

STC-5705, BENEWAH CR RD SAFETY IMPROV, BENEWAH COMP 0.000 - 0.000 SAFTY/TRAF OPER, Signing Improvem

-

163

-

163

-

-25 25 -

CN

RWPE

----163------25

-----

--

--- - -

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 16

Page 19: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 1 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

For the work of installing additional warning signs, improving the gravel surface, and the installation of guardrail and end terminals at two spot locations to improve the safety for all roadway users.

226011

FLAP (L) FLAPBOUNDARY COUNTY

STC-5806, RIVERSIDE RD IMPROVEMENT/ENHANCEMENT, BMP 0.000 - 1.565 RECONST/REALIGN, Bicycle/Pedestria

-

2,226

-

2,063

-

163206 191 15

CN

RWPE

--2,226------18620-

-----

--

--- - -

Rebuild and widen the paved surface and include a widened shoulder on the river side of the road for bicycle and pedestrian use.

228881

MAJOR STSTATE OF IDAHO (ITD)

SH 3, GOOSEHAVEN RD TO ROUND LAKE RD, BENAWAH COMP 89.900 - 92.500 RESRF/RESTO&REHAB, Minor Widenin

-

15,000

-

-

-

15,0002,000 - 2,000

CN

RWPE

Unfunded-----Unfunded-----

-----

--

--- - Unfunded

Levee Repair, the pavement width is narrow and commercial vehicle crashes are increasing.  The proposed solution is to use light weight Geofoam blocks to widen the existing roadway without impacting the wetlands.

WORN22735

1

OTHER ASSETS IMSTATE OF IDAHO (ITD)

I 90, FY23 D1 BROOMINGMP 0.000 - 35.000 SAFTY/TRAF OPER, Miscellaneous Imp

-

345

-

345

-

-18 18 -

CN

RWPE

---345-------18

-----

--

--- - -

The FY23 I90 Brooming project will broom and flush the travel lanes and shoulders and will clean and flush drains, bridge joints, raised medians and slope paving within the project limits. from Washington state line to mile post 35.

ORN227661

OTHER ASSETS NHSTATE OF IDAHO (ITD)

US 95, D1 BYWAY BRIDGE APPROACHESMP 473.900 - 474.260 SAFTY/TRAF OPER, Miscellaneous Imp

-

284

-

263

-

2120 19 1

CN

RWPE

---284-------20

-----

--

--- - -

The Byway Bridge Approaches project located in Sandpoint milepost near 474 will use foam injection to lift the approach slabs on two bridges to make smooth transition on and off the bridges.  Pavement work will also be performed to match the approach slabs.

ORN227961

PLAN NHSTATE OF IDAHO (ITD)

US 95, GARWOOD TO SAGLE EIS WILDLIFE CROSSING REEVMP 436.900 - 471.700 PLAN/STUDY, Environmental

-

-

-

-

-

-210 195 15

CN

RWPE

----------210-

-----

--

--- - -

The Garwood to Sagle Wildlife Crossing Reevaluation is to update the EIS developed in the corridor to identify animal movement and mitigation.

ORN227981

HES NHSTATE OF IDAHO (ITD)

US2, W ELMIRA, PARADISE VALLEY, MOUNT MEAD RD INT IMMP - SAFTY/TRAF OPER, Intersection Improv

32

2,924

29

2,709

3

215347 321 26

CN

RWPE

--64-------347-

-32---

2,860-

--- - -

This is a safety and capacity driven project and will address serious and fatal crashes as well as focus on the through movement of traffic by installing turn bays and illumination at three high impact intersections on US 95 in Bonner and Boundary County.

ORN228711

SAFETY (L) HSIP (L)OSBURN

LOCAL, FLASHING LED SIGN IMPROVEMENTS, OSBURNMP - SAFTY/TRAF OPER, Intersection Improv

-

50

-

46

-

46 6 -

CN

RWPE

----50-----6-

-----

--

--- - -

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 17

Page 20: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 1 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

Install solar powered, radar activated Flashing LED Stop Signs at six locations in the City of Osburn to reduce fatal and serious injury accidents to improve safety for all roadway users.

ORN228731

SAFETY (L) HSIP (L)KELLOGG

LOCAL, DIVISION ST INTERSECTION IMP, KELLOGGMP - SAFTY/TRAF OPER, Intersection Improv

-

44

-

41

-

36 6 -

CN

RWPE

----44-----6-

-----

--

--- - -

Install solar powered Flashing LED Stop Signs at five locations in the City of Kellogg to reduce fatal and serious injury accidents to improve safety for all roadway users.

ORN228761

SAFETY (L) HSIP (L)BONNER COUNTY

LOCAL, CLEAR ZONE SAFETY IMPV, BONNER COMP - SAFTY/TRAF OPER, Alignment/Grade S

-

575

-

533

-

4291 84 7

CN

RWPE

---575------91-

-----

--

--- - -

This project would have a contractor clear most trees and brush within the public right of ways in accordance with the County’s Roadside Brushing Policy on three roadways.  This would create an approximately 15‐20ft wide swaths of clearing on each side of the road.

ORN228931

BR-OFF BR-OFFBONNER COUNTY

OFFSYS, N FORK EAST RV BR, BONNER COMP - BR/APPRS, Bridge Replacement

-

2,281

-

2,114

-

167307 284 23

CN

RWPE

2,281---------307-

-----

--

--- - -

This project will replace the existing structurally deficient single lane bridge with a 2‐lane, un‐restricted weight bridge.  This bridge lacks modern guardrail and poses a safety concern.

ORN229081

TAP TAP-URBANSANDPOINT

LOCAL, FY22 SANDPOINT SRTS COORDINATOR & ACTIVITIESMP - ENV PRESV, Bicycle/Pedestrian/Equestr

-

64

-

60

-

4- - -

CN

RWPE

----64-------

-----

--

--- - -

This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.

ORN229091

TAP TAP-RURALSANDPOINT

LOCAL, FY23 SANDPOINT SRTS COORDINATOR & ACTIVITIESMP - ENV PRESV, Bicycle/Pedestrian/Equestr

-

64

-

60

-

4- - -

CN

RWPE

---64--------

-----

--

--- - -

This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.

ORN229581

TAP TAP-RURALDOVER

LOCAL, PATHWAY CONNECTION, DOVERMP - ENV PRESV, Bicycle/Pedestrian/Equestr

-

434

-

402

-

3274 69 5

CN

RWPE

----434------74

-----

--

--- - -

The project is proposed to connect the existing trail and pedestrian facility network within the city with the existing National Bike Route 10.

ORN229601

OPS STOSBURN

LOCAL, FY22 OSBURN 15 ADA RAMPS PH 1MP - ENV PRESV, Curb & Gutter

-

58

-

-

-

58- - -

CN

RWPE

----58-------

-----

--

--- - -

Construct 15 Americans with Disabilities curb ramps in Osburn, Shoshone Co., Idaho.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 18

Page 21: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 1 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

ORN229611

OPS STOSBURN

LOCAL, FY22 OSBURN 13 ADA RAMPS PH 2MP - ENV PRESV, Curb & Gutter

-

54

-

-

-

54- - -

CN

RWPE

----54-------

-----

--

--- - -

Construct 13 Americans with Disabilities curb ramps in Osburn, Shoshone Co., Idaho.

ORN230181

FED RRX (L) FED RRXBOUNDARY COUNTY

OFFSYS, DEEP CR LOOP BNSF RRX, S OF BONNERS FERRYMP 100.000 - 100.000 SAFTY/TRAF OPER, Railroad Gates

-

600

-

540

-

6020 18 2

CN

RWPE

-600------20---

-----

--

--- - -

Upgrade gates and signals.

ORN230331

STP-URBAN (L) STP-USANDPOINT

LOCAL, TRANSPORTATION PLAN, SANDPOINT AREAMP - PLAN/STUDY, Planning/Transportation

-

170

-

158

-

12- - -

CN

RWPE

-----170------

-----

--

--- - -

This project will, In accordance with industry standards, update the transportation plan for the City of Sandpoint, City of Dover, City of Ponderay, City of Kootenai, and the IHD  to re‐engage and strategically begin addressing multi‐jurisdictional transportation challenges.  A revised plan will take into account the significant changes resulting from the increased growth and aging infrastructure.

Construction

Right-of-WayDevelopment

4,47291013,21144,58210,39617,462--501869971,967--32-1501,892

Total 4,47291013,29344,76811,54321,321G: Project is grouped in STIP

1: Project is also shown in a Transportation Improvement Program

W: Work zone safety priority

CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition

Notes:

Phases:

2: Project is being advance constructed with non-federal funds

P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM

B: Project addresses Federal Bridge Condition PM

A: Project utilizes an alternative contracting method.

M: Project included in multiple programs

33,3052,860----

33,3052,860

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 19

Page 22: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 1 Public Transit Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Transit Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

M19430

1

TRNS-CAP 5339 RuralMISCELLANEOUS

TRANSIT, D1 5339 BUS AND BUS FACILITYMP 0.000 - 0.000 Bus Purchase / Construction

-

4,285

-

3,428

-

857- - -

CN

RWPE

-613613613613613------

-----

--

--- - -

M

1

TRNS-CAP 5339 SUrbMISCELLANEOUS

TRANSIT, D1 5339 BUS AND BUS FACILITYMP 0.000 - 0.000 Bus Purchase / Construction

-

4,285

-

3,428

-

857- - -

CN

RWPE

-244244244244244------

-----

--

--- - -

Program provides capital funding to replace, rehabilitate and purchase buses and related equipment or to construct bus‐related facilities in rural and small urban areas directly affecting Benewah, Bonner, Boundary, Kootenai, Shoshone counties. 

196191

TRNS-OPS 5311 RuralSTATE OF IDAHO (ITD)

TRANSIT, D1 5311 STATEWIDE RURAL AREA FORMULA PROGMP 0.000 - 0.000 Transit Admin/Operations/PM

-

8,240

-

5,182

-

3,058- - -

CN

RWPE

-1,6481,6481,6481,6481,648------

-----

--

--- - -

Program provides capital, planning, and operating assistance to support public transportation operators who provide demand response and fixed route services  in rural areas with populations less than 50,000. Serving Benewah, Bonner, Boundary, Kootenai, Shoshone counties.

M20013

1

TRNS-OPS 5310 RuralMISCELLANEOUS

TRANSIT, D1 ELDERLY & DISABLEDMP 0.000 - 0.000 Demand Response Operations

-

2,310

-

1,640

-

670- - -

CN

RWPE

-139139139139139------

-----

--

--- - -

M

1

TRNS-OPS 5310 SUrbMISCELLANEOUS

TRANSIT, D1 ELDERLY & DISABLEDMP 0.000 - 0.000 Demand Response Operations

-

2,310

-

1,640

-

670- - -

CN

RWPE

-323323323323323------

-----

--

--- - -

Program serves the special needs of transit‐dependent senior citizens and persons with disabilities by providing funds for projects which go beyond traditional transit services (demand response) including those required under the Americans with Disabilities Act (ADA).

ORN230541

TRNS-OPS 5311 RuralSTATE OF IDAHO (ITD)

TRANSIT, D1 5311 CARES ACTMP - Security

-

2,867

-

2,867

-

-- - -

CN

RWPE

-----2,867------

-----

--

--- - -

Provides operating and capital funding for Coronavirus Aid, Relief, and Economic Security in rural areas.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 20

Page 23: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 1 Public Transit Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Transit Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027Construction

Right-of-WayDevelopment

-2,9672,9672,9672,9675,834------------

Total -2,9672,9672,9672,9675,834G: Project is grouped in STIP

1: Project is also shown in a Transportation Improvement Program

W: Work zone safety priority

CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition

Notes:

Phases:

2: Project is being advance constructed with non-federal funds

P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM

B: Project addresses Federal Bridge Condition PM

A: Project utilizes an alternative contracting method.

M: Project included in multiple programs

--------

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 21

Page 24: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 1 Aeronautics Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Aeronautics Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

192511

APT-NEW GA-APTSHOSHONE COUNTY

S83, KELLOGG, EXPAND APRON, DESIGNMP 0.000 - 0.000 APT DEV, New Facility

-

-

-

-

-

-200 200 -

CN

RWPE

-----------200

-----

--

--- - -

Design ‐ Expand aircraft parking apron.

194931

APT-NEW GA-APTBOUNDARY COUNTY

65S, BONNERS FERRY, EXTEND RUNWAY PH II CONSTRUCTMP 0.000 - 0.000 APT DEV, New Facility

-

634

-

571

-

63- - -

CN

RWPE

---634--------

-----

--

--- - -

Construct Rwy Extension

198821

APT-MTNC GA-APTBOUNDARY COUNTY

65S, BONNERS FERRY, REHABILITATE APRON PH II CONSTRMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

67

-

60

-

7- - -

CN

RWPE

---67--------

-----

--

--- - -

Construct Apn rehab

199751

APT-NEW GA-APTBOUNDARY COUNTY

65S, BONNERS FERRY, EXTEND TAXIWAY LIGHTINGMP 0.000 - 0.000 APT DEV, New Facility

-

30

-

27

-

3- - -

CN

RWPE

---30--------

-----

--

--- - -

Extend Twy lighting

199821

APT-NEW GA-APTBONNER COUNTY

SZT, SANDPOINT, INSTALL SEGMENTED CIRCLE, DESIGNMP 0.000 - 0.000 APT DEV, New Facility

-

20

-

18

-

2- - -

CN

RWPE

-20----------

-----

--

--- - -

Design ‐ Install Segmented Circle

199851

APT-NEW GA-APTBOUNDARY COUNTY

65S, BONNERS FERRY, EXTEND RUNWAY LIGHTINGMP 0.000 - 0.000 APT DEV, New Facility

-

80

-

72

-

8- - -

CN

RWPE

---80--------

-----

--

--- - -

Extend Rwy lighting

200211

APT-MTNC GA-APTSHOSHONE COUNTY

S83, KELLOGG, REHABILITATE TAXIWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

100

-

90

-

10- - -

CN

RWPE

--100---------

-----

--

--- - -

Fog seal, crack seal, and remarking of Runway, Taxiway and Apron

201301

APT-PLAN GA-APTBONNER COUNTY

SZT, SANDPOINT, MASTER PLAN UPDATEMP 0.000 - 0.000 APT PLN, Airport Planning

-

-

-

-

-

-400 360 40

CN

RWPE

---------400--

-----

--

--- - -

Master Plan Update

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 22

Page 25: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 1 Aeronautics Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Aeronautics Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

201761

APT-NEW GA-APTBOUNDARY COUNTY

65S, BONNERS FERRY, EXTEND TAXIWAY PH II CONSTRUCTMP 0.000 - 0.000 APT DEV, New Facility

-

342

-

308

-

34- - -

CN

RWPE

---342--------

-----

--

--- - -

Construct Twy Extension

201791

APT-MTNC GA-APTBOUNDARY COUNTY

65S, BONNERS FERRY, REHABILITATE RUNWAY PH II CONSTMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

1,463

-

1,316

-

147- - -

CN

RWPE

---1,463--------

-----

--

--- - -

Construct Rwy rehab

201971

APT-MTNC GA-APTBOUNDARY COUNTY

65S, BONNERS FERRY, REHABILITATE TAXIWAY PH II CONSTMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

845

-

760

-

85- - -

CN

RWPE

---845--------

-----

--

--- - -

Construct Twy rehab

203751

APT-NEW GA-APTBONNER COUNTY

1S6, PRIEST RIVERACQUIRE SREMP 0.000 - 0.000 APT DEV, New Facility

-

300

-

270

-

30- - -

CN

RWPE

-300----------

-----

--

--- - -

Acquire Snow Removal Equipment

204431

APT-MTNC GA-APTBONNER COUNTY

SZT, SANDPOINT, RECONSTRUCT RUNWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

378

-

378

-

-- - -

CN

RWPE

-----378------

-----

--

--- - -

DESIGN ‐ Reconstruct runway due to poor pavement condition rating.

204941

APT-MTNC GA-APTSHOSHONE COUNTY

S83, KELLOGG, REHABILITATE APRONMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

100

-

90

-

10- - -

CN

RWPE

--100---------

-----

--

--- - -

Fog seal, crack seal, and remarking of Runway, Taxiway and Apron

205241

APT-MTNC GA-APTBONNER COUNTY

1S6, PRIEST RIVER, INSTALL RUNWAY LIGHTING, CONSTRUCMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

2,200

-

1,980

-

220- - -

CN

RWPE

---2,200--------

-----

--

--- - -

CONSTRUCT ‐ widen runway 2/20 includes MIRL and PAPI

205581

APT-NEW GA-APTSHOSHONE COUNTY

S83, KELLOGG, EXPAND APRON, CONSTRUCTMP 0.000 - 0.000 APT DEV, New Facility

-

1,795

-

1,616

-

179- - -

CN

RWPE

----1,795-------

-----

--

--- - -

Expand aircraft parking apron.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 23

Page 26: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 1 Aeronautics Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Aeronautics Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

206701

APT-MTNC GA-APTSHOSHONE COUNTY

S83, KELLOGG, REHABILITATE TAXIWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

200

-

180

-

20- - -

CN

RWPE

--200---------

-----

--

--- - -

Fog seal, crack seal, and remarking of Runway, Taxiway and Apron

206901

APT-MTNC GA-APTBONNER COUNTY

SZT, SANDPOINT, TAXIWAY LIGHTING & SIGNS, DESIGNMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

665

-

599

-

66- - -

CN

RWPE

--665---------

-----

--

--- - -

Design ‐Taxiway construction costs include new edge lighting and lighted signs

207181

APT-NEW GA-APTBONNER COUNTY

1S6, PRIEST RIVER, SRE BUILDINGMP 0.000 - 0.000 APT DEV, New Facility

-

1,667

-

1,500

-

167- - -

CN

RWPE

-1,667----------

-----

--

--- - -

Construct Snow Removal Equipment Bldg.

224171

APT-MTNC GA-APTBOUNDARY COUNTY

65S, BOUNDARY COUNTY, AIRPORT TAXIWAY WIDENINGMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

597

-

538

-

59- - -

CN

RWPE

---597--------

-----

--

--- - -

Widen taxiway to meet FAA standards

225341

APT-NEW GA-APTST MARIES

S72, ST MARIES, AIRPORT TAXIWAY DESIGNMP 0.000 - 0.000 APT PLN, Airport Planning

-

-

-

-

-

-140 126 14

CN

RWPE

--------140---

-----

--

--- - -

St Maries Municipal Airport taxilane design

225351

APT-NEW GA-APTBENEWAH COUNTY

S72, ST MARIES, AIRPORT TAXILANE CONSTRUCTMP 0.000 - 0.000 APT DEV, Facility

-

700

-

630

-

70- - -

CN

RWPE

-700----------

-----

--

--- - -

St Maries Municipal Airport taxilane construction

225651

APT-MTNC GA-APTBONNER COUNTY

SZT, SANDPOINT, RELOCATE BOYER ROADMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

144

-

130

-

14- - -

CN

RWPE

----144-------

-----

--

--- - -

Relocate Boyer Road and fence beyond Object Free Area

225661

APT-NEW GA-APTBONNER COUNTY

SZT, SANDPOINT, AIRPORT LAND PURCHASEMP 0.000 - 0.000 APT DEV, New Facility

1,166

-

1,166

-

-

-- - -

CN

RWPE

------------

----1,166

--

--- - -

Land purchase to meet FAA standards for RPZ control

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 24

Page 27: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 1 Aeronautics Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Aeronautics Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

225671

APT-NEW GA-APTBONNER COUNTY

SZT, SANDPOINT, AIRPORT LAND PURCHASEMP 0.000 - 0.000 APT DEV, New Facility

1,102

-

992

-

110

-- - -

CN

RWPE

------------

---1,102-

--

--- - -

Purchase land for taxiways

225681

APT-NEW GA-APTBONNER COUNTY

SZT, SANDPOINT, AIRPORT TAXIWAY CONSTRUCTIONMP 0.000 - 0.000 APT DEV, New Facility

-

380

-

342

-

38- - -

CN

RWPE

---380--------

-----

--

--- - -

Construct taxiways.

225691

APT-NEW GA-APTBONNER COUNTY

SZT, SANDPOINT, AIRPORT TAXIWAY CONSTRUCTIONMP 0.000 - 0.000 APT DEV, New Facility

-

2,488

-

2,239

-

249- - -

CN

RWPE

-2,488----------

-----

--

--- - -

Airport taxiway construction to include lighting and guidance signs

225701

APT-MTNC GA-APTSHOSHONE COUNTY

S83, KELLOG, AIRPORT FENCEMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

20

-

18

-

2- - -

CN

RWPE

-20----------

-----

--

--- - -

Install perimeter fence

225711

APT-MTNC GA-APTSHOSHONE COUNTY

S83, KELLOG, AIRPORT OBSTUCTION REMOVALMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

200

-

200

-

-- - -

CN

RWPE

-----200------

-----

--

--- - -

Remove obstructions

225751

APT-MTNC GA-APTBONNER COUNTY

1S6, PRIEST RIVER, AIRPORT OBST REMOVALMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

144

-

144

-

-- - -

CN

RWPE

-----144------

-----

--

--- - -

Removed obstructions in airport approaches

225761

APT-MTNC GA-APTBONNER COUNTY

1S6, PRIEST RIVER, AIRPORT OBST REMOVALMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

200

-

200

-

-- - -

CN

RWPE

-----200------

-----

--

--- - -

Remove trees obstructing airport airspace

225771

APT-PLAN GA-APTBONNER COUNTY

1S6, PRIEST RIVER, AIRPORT EAMP 0.000 - 0.000 APT PLN, Airport Planning

-

-

-

-

-

-167 150 17

CN

RWPE

----------167-

-----

--

--- - -

Priest River Airport Environmental Assessment

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 25

Page 28: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 1 Aeronautics Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Aeronautics Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside KMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

225781

APT-NEW GA-APTBONNER COUNTY

1S6, PRIEST RIVER, AIRPORT LAND PURCHASEMP 0.000 - 0.000 APT DEV, Land Purchase

1,500

-

1,350

-

150

-- - -

CN

RWPE

------------

-1,500---

--

--- - -

Land purchase to approach safety

225831

APT-MTNC GA-APTBENEWAH COUNTY

S72, ST MARIES, AIRPORT LAND PURCHASEMP 0.000 - 0.000 APT DEV, New Facility

250

-

225

-

25

-- - -

CN

RWPE

------------

-----

--

--

250 - -

225841

APT-MTNC GA-APTSHOSHONE COUNTY

S83, SHOSHONE COUNTY, AIRPORT PERIMETER FENCEMP 0.000 - 0.000 APT DEV, New Facility

-

500

-

450

-

50- - -

CN

RWPE

------------

-----

--

500-- - -

229341

APT-MTNC GA-APTBOUNDARY COUNTY

65S, BOUNDARY COUNTY AIRPORT, AIRFIELD IMPROVEMENMP - APT DEV, Facility Maintenance

-

-

-

-

-

-206 185 21

CN

RWPE

----------206-

-----

--

--- - -

Construction

Right-of-WayDevelopment

5005,1941,0656,6381,940922--140400373200

250-1,500-1,1021,166Total 7505,1942,7057,0383,4152,288

G: Project is grouped in STIP

1: Project is also shown in a Transportation Improvement Program

W: Work zone safety priority

CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition

Notes:

Phases:

2: Project is being advance constructed with non-federal funds

P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM

B: Project addresses Federal Bridge Condition PM

A: Project utilizes an alternative contracting method.

M: Project included in multiple programs

--------

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 26

Page 29: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 2 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside LCVMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

MRP9294

2

DEMO HIPRISTATE OF IDAHO (ITD)

US 95, THORN CR RD TO MOSCOW, PH 1MP 337.200 - 343.982 RECONST/REALIGN, Plant Mix Paveme

5,500

70,847

5,096

63,350

404

7,4976,157 5,525 632

CN

RWPE

-----18,426------

-----

--

--- - -

MRP

2

APPR 129STATE OF IDAHO (ITD)

US 95, THORN CR RD TO MOSCOW, PH 1MP 337.200 - 343.982 RECONST/REALIGN, Plant Mix Paveme

5,500

70,847

5,096

63,350

404

7,4976,157 5,525 632

CN

RWPE

-----490------

-----

--

--- - -

MRP

2

CPCTY NHSTATE OF IDAHO (ITD)

US 95, THORN CR RD TO MOSCOW, PH 1MP 337.200 - 343.982 RECONST/REALIGN, Plant Mix Paveme

5,500

70,847

5,096

63,350

404

7,4976,157 5,525 632

CN

RWPE

--24,284-20,2457,252------

-----

--

--- - -

This project will replace approximately 6.5 miles of the existing two‐lane roadway with a new four‐lane divided highway on Hwy‐95 from mileposts 337.2 to 343.9. The project is expected to improve safety and highway capacity by widening shoulders, adding rumble strips, and replacing guardrail.

129952

SAFETY HSIPSTATE OF IDAHO (ITD)

US 12, GREER RD TO KAMIAH, ROCKFALL MITIGATIONMP 51.569 - 56.085 SAFTY/TRAF OPER, Safety Improveme

255

4,962

236

4,597

19

365710 658 52

CN

RWPE

--4,962--------100

---255-

--

--- - -

This project will mitigate potential rock fall along the westbound lane of US‐12 between MP 51.569 to 56.085. Work activities include excavating and blasting rock outcrops, rock fall removal, guardrail update, culvert replacements, and a plant mix overlay.

RP130022

CPCTY STSTATE OF IDAHO (ITD)

US 95, MISSION CR TO GOLDEN EAGLE RD, NEZ PERCE COMP 293.720 - 296.320 RESRF/RESTO&REHAB, Minor Widenin

-

3,641

-

-

-

3,641645 37 608

CN

RWPE

---3,641--------

-----

--

--- - -

This project will widen US‐95 from milepost 293.7‐296.32 to include constructing a 1.5 mile northbound passing lane from Mission Creek Bridge, a right turn lane and southbound acceleration lane at Webb Road. This project will increase mobility and safety by adding additional passing opportunities on US‐95.

RP130042

CPCTY NHSTATE OF IDAHO (ITD)

US 95, POTLATCH NB PASSING LN, LATAH COMP 361.700 - 363.000 MAJRWIDN, Passing Lane

-

2,717

-

2,517

-

200265 246 19

CN

RWPE

-2,717----------

-----

--

--- - -

This project will construct a northbound passing lane on US 95 from milepost 361.7 to milepost 363 in Latah County.

130082

CPCTY STPSTATE OF IDAHO (ITD)

SH 8, MP 5 EB PASSING LN, LATAH COMP 5.000 - 6.400 MAJRWIDN, Passing Lane

-

2,642

-

2,448

-

194220 204 16

CN

RWPE

--2,642---------

-----

--

--- - -

This project consists of constructing an Eastbound passing lane on Hwy‐ 8 from Milepost 5.0 to Milepost 6.4. This passing lane will provide more mobility and allow travelers to pass slower moving vehicles safely. 

130142

STP-URBAN (L) STP-UMOSCOW

SMA-7674, MOUNTAIN VIEW RD, MOSCOWMP 0.288 - 0.474 RECONST/REALIGN, Grading & Draina

100

3,458

93

3,204

7

254513 475 38

CN

RWPE

--1,9571,501--------

-----

--

--- - -

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 27

Page 30: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 2 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside LCVMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

This project will widen Mountain View Rd. in Moscow from a 24 foot wide paved two‐lane rural road section to a 36 foot wide two‐lane urban road section. This new section will have bicycle lanes, turn lanes where warranted, storm drainage improvements, illumination upgrades, curbs, gutter, sidewalks, tree lawns, and a roundabout at the intersection of Mountain View Road and 6th Street.  This project is located on SMA‐7674 between mile points 0.288 and 0.474.

134452

BR-LOCAL STP-RURALIDAHO COUNTY

STC-4715, CLEAR CR BR, IDAHO COMP 101.920 - 102.080 BR/APPRS, Bridge Replacement

-

1,747

-

1,619

-

128658 609 49

CN

RWPE

-----1,747------

-----

--

--- - -

This project will replace the 50 year old Clear Creek bridge in Idaho County. The bridge is outdated and will be replaced with a new structure that meets current standards. It is a vital transportation asset for Idaho county as it serves as an access point to hundreds of residents, several businesses, and the primary access point to the Nez Perce Tribes Clear Creek Fish Hatchery.  This project is located on STC‐4715 between mile points 101.92 and 102.08.

187702

STP-RURAL (L) STP-RURALGENESEE

STC-4792, BEECH/CHESTNUT ST RECONSTRUCTION, GENESMP 0.728 - 1.371 RESRF/RESTO&REHAB, Minor Widenin

40

3,244

37

3,006

3

238655 607 48

CN

RWPE

----3,244-------

----40

--

--- - -

This project will rehabilitate the roadway on Chestnut Street from Jackson St to Cedar St. This roadway is a major rural route that needs a major rehabilitation including: widening, storm water system repairs, sidewalks, bike lanes, turn lanes, resurfacing, lighting and landscape enhancements.  This project is located on STC‐4792 between mile points 0.728 and 1.371.

RBP2

192612

CPCTY STECMSTATE OF IDAHO (ITD)

US 95, CULDESAC CANYON PASSING LN PH 2; LAPWAI CR BRMP 279.700 - 282.200 MAJRWIDN, Passing Lane

-

32,784

-

23,231

-

9,553805 679 126

CN

RWPE

-----2,500------

-----

--

--- - -

This project will construct the Culdesac Canyon passing lane on Hwy‐95 from Milepost 279.7 to Milepost 282.2. This passing lane will provide more mobility and allow travelers to pass slower moving vehicles safely.  And replace nine very large culverts with precast bridges over Lapwai Creek.

P193772

SAFETY HSIPSTATE OF IDAHO (ITD)

US 12, LOCHSA RANGER STATION TO HOLLY CR TURNOUT, IMP 121.300 - 131.500 RESRF/RESTO&REHAB, Minor Widenin

-

9,547

-

8,846

-

701845 783 62

CN

RWPE

---9,547--------

-----

--

--- - -

This project will construct a shoulder notch on both sides of Hwy‐12 from Lochsa Ranger Station (milepost 121.3) to Holly Cr Turnout (milepost 131.5).

RP195262

SAFETY HSIPSTATE OF IDAHO (ITD)

US 95, JCT SH 6 TURNBAY, LATAH COMP 360.285 - 361.000 MAJRWIDN, Turn Bay

-

3,264

-

3,024

-

240433 401 32

CN

RWPE

----3,264-------

-----

--

--- - -

This project consists of constructing right and left turn bays off US 95 and the Jct. of US 95 & Meckel Road at milepost 360.

RP198222

CPCTY NHSTATE OF IDAHO (ITD)

US 95, FERDINAND NB PASSING LN, IDAHO COMP 261.000 - 263.825 MAJRWIDN, Passing Lane

-

1,905

-

1,765

-

14060 56 4

CN

RWPE

------------

-----

--

1,905-- - -

This project consists of constructing a north bound passing  just south of the city of Ferdinand on US‐95 between mileposts 261 and 264.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 28

Page 31: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 2 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside LCVMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

198612

SAFETY HSIPSTATE OF IDAHO (ITD)

SH 13, CURVE IMPROVEMENT, NR KOOSKIAMP 23.400 - 23.800 RECONST/REALIGN, Base/Sub-base W

-

1,177

-

1,091

-

86370 343 27

CN

RWPE

----1,177-------

-----

--

--- - -

This project consists of constructing a curve improvement at Milepost 23.5 on SH‐13 just south of the city of Kooskia.

RP199412

SAFETY HSIPSTATE OF IDAHO (ITD)

US 95, RIVERSIDE NB PASSING LN, LATAH COMP 358.820 - 359.820 MAJRWIDN, Passing Lane

60

1,418

56

1,314

4

104365 338 27

CN

RWPE

-----1,418------

-----

--

--- - -

This project consists of constructing a north bound passing lane on the south side of Riverside Hill just south of the US‐95 and SH‐6 intersection.  The project is located at milepost 359 on US‐95.

RP200292

CPCTY NHSTATE OF IDAHO (ITD)

US 95, FREEZE RD TO BEPLATE RD PASSING LNS, LATAH COMP 364.130 - 365.960 MAJRWIDN, Passing Lane

-

2,160

-

2,001

-

159160 148 12

CN

RWPE

------------

-----

--

2,160-- - -

This project consists of constructing a north and south bound passing lane between Freeze Rd. and Beplate Rd. just north of Potlatch on US‐95 between mileposts 364 and 366.

MRP20032

2

BR-RESTORE NHSTATE OF IDAHO (ITD)

US 95, CULDESAC CANYON PASSING LN, PH 3, NEZ PERCE CMP 283.830 - 286.130 MAJRWIDN, Passing Lane

75

10,346

69

1,681

6

8,6651,206 640 566

CN

RWPE

---1,815--------

-----

--

--- - -

MRP

2

CPCTY STECMSTATE OF IDAHO (ITD)

US 95, CULDESAC CANYON PASSING LN, PH 3, NEZ PERCE CMP 283.830 - 286.130 MAJRWIDN, Passing Lane

75

10,346

69

1,681

6

8,6651,206 640 566

CN

RWPE

---8,531--------

-----

--

--- - -

This project will construct a south bound passing lane on US‐95 in Culdesac Canyon from milepost 283.83 to 286.13.  The passing lane will increase mobility and allow travelers to pass slower vehicles safely.

RP200902

SAFETY HSIPSTATE OF IDAHO (ITD)

US 95, GRANGEVILLE TRUCK ROUTE BYPASS RD TURNBAYMP 240.320 - 240.560 MAJRWIDN, Turn Bay

-

790

-

732

-

58163 151 12

CN

RWPE

---790--------

-----

--

--- - -

This project consist of constructing a south bound left turn bay and a north bound right turn bay at the intersection of US‐95 and the Grangeville Truck Route Bypass Road just north of the city of Grangeville.  The project is located at milepost 240 on US‐95.

201092

SAFETY (L) HSIP (L)MOSCOW

STC-7664, 6TH ST PED IMPRV, MOSCOWMP 0.000 - 0.000 SAFTY/TRAF OPER, Intersection Improv

-

123

-

114

-

951 45 6

CN

RWPE

-----113------

-----

--

--- - -

This project will make improvements to this corridor with the installation of ADA compliant curb extensions to reduce the pedestrian crossing length and improve pedestrian visibility.  Additionally the project will include the improvement of pedestrian ramps and crosswalks to eliminate gaps in the ADA compliant corridor connecting the University of Idaho to the central business district and high‐density residential.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 29

Page 32: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 2 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside LCVMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

RP203952

CPCTY STECMSTATE OF IDAHO (ITD)

US 95, CULDESAC CANYON PASSING LN PH 4, LEWIS COMP 286.130 - 289.220 MAJRWIDN, Passing Lane

75

7,959

69

-

6

7,9591,439 685 754

CN

RWPE

--7,959---------

-----

--

--- - -

This project is a continuation of the Culdesac Canyon Passing Lane Phase 2 and Phase 3 projects and will construct a south bound US‐95 passing lane in Culdesac Canyon from milepost 286.13 to 289.22.  The passing lane will increase mobility and allow safer travel.

RP204262

CPCTY STSTATE OF IDAHO (ITD)

US 95, S WINCHESTER TO CHAINUP TURNOUT, LEWIS COMP 278.030 - 278.880 MAJRWIDN, Minor Widening & Resurfac

-

1,043

-

-

-

1,043495 - 495

CN

RWPE

------------

-----

--

1,043-- - -

This project consists of constructing a Northbound Passing Lane to help reduce congestion on US‐95.

RP204442

CPCTY STECMSTATE OF IDAHO (ITD)

US 95, CULDESAC CANYON PASSING LN PH 5, NEZ PERCE CMP 283.120 - 289.210 MAJRWIDN, Passing Lane

-

7,331

-

-

-

7,3311,550 315 1,235

CN

RWPE

----------510500

-----

--

7,331-- - -

This project consists of constructing a South Bound passing lane in Culdesac Canyon, Phase 5.  The project is located on US‐95 between mileposts 283 and 289.

204832

SAFETY (L) HSIP (L)MOSCOW

SH 8, 3RD ST SAFETY IMPRV PH 1, MOSCOWMP 1.612 - 1.797 SAFTY/TRAF OPER, Sidewalk

-

358

-

332

-

2666 61 5

CN

RWPE

-----358------

-----

--

--- - -

The Third Street (SH‐8) Safety Improvements Phase 1 project is located in the City of Moscow in Latah County will improve pedestrian/bike safety with the replacement of curb, pedestrian ramps and sidewalk along with the installation of additional roadway lighting to reduce/eliminate serious injury crashes and fatalities.  The project is located on the roadside of SH‐8 between mile points 1.612 and 1.797.

207772

FLAP (L) FLAPCLEARWATER COUNTY

STC-4783, DENT BRIDGE RD, CLEARWATER COMP 20.000 - 36.000 RESRF/RESTO&REHAB, CRABS

-

3,556

-

3,295

-

261444 411 33

CN

RWPE

-2962,966-294-----200244

-----

--

--- - -

Utilize available funding to rehabilitate northern section of road, including guardrail, cement recycled asphalt base (CRAB) and asphalt concrete pavement, minor realignment, retaining walls, drainage, and erosion control.  This project is located on STC‐4783 between mile points 20 and 36.

219652

OTH-FA OTH-FEDSTATE OF IDAHO (ITD)

US 12, BIG SMITH CR FISH PASSAGE, IDAHO COMP 88.350 - 88.450 BR/APPRS, Bridge Replacement

-

2,000

-

-

-

2,000300 - 300

CN

RWPE

-----2,000------

-----

--

--- - -

This project is being funded by USDA funds. This project will replace an existing structure with a fish friendly structure.  The project is located on US‐12 at milepost 88.

219862

BR-OFF BR-OFFNORTH LATAH HD

OFFSYS, SAND RD BR NR MOSCOW, N LATAH HDMP 1.800 - 1.900 BR/APPRS, Bridge Replacement

36

1,919

33

1,778

3

141505 468 37

CN

RWPE

1,919----------505

---36-

--

--- - -

Replace Sand Road bridge over the South Fork of the Palouse River west of Moscow.  The project is located at mile point 1.85.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 30

Page 33: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 2 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside LCVMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

219962

SAFETY (L) HSIP (L)CLEARWATER COUNTY

OFFSYS, OLD AHSAHKA GRADE, CLEARWATER COMP 108.540 - 111.620 SAFTY/TRAF OPER, Metal Guard Rail

-

317

-

317

-

-57 57 -

CN

RWPE

-----317------

-----

--

--- - -

The Old Ahsahka Grade Guardrail project, located near the City of Ahsahka in Clearwater County, will install roughly 7,000 feet of steel post guardrail adjacent to the steepest embankments to eliminate run off the road possibilities along this 2.5 Mile section of roadway to reduce/eliminate fatal and serious injury crashes for all roadway users.  The project is located between mile points 108.54 and 111.62.

219972

SAFETY (L) HSIP (L)MOSCOW

SH 8, 3RD ST SAFETY IMPRV PH2, MOSCOWMP 1.540 - 1.615 SAFTY/TRAF OPER, Illumination

-

264

-

245

-

1944 41 3

CN

RWPE

-----264------

-----

--

--- - -

The Third Street Corridor Safety Improvement, Phase 2, project, located in the City of Moscow in Latah County, will remove and replace concrete sidewalk, upgrade ADA pedestrian ramps, install curb and gutter, install LED Luminaires and install four high visibility thermoplastic crosswalks to reduce/eliminate fatal and serious injury accidents for all roadway users.  The project is located on the roadside of SH‐8 between mile points 1.54 and 1.615.

RP222122

CPCTY STSTATE OF IDAHO (ITD)

US 95, MISSION CR TO GOLDEN EAGLE RD EARLY R/W, NEZ MP 293.720 - 296.320 ENV PRESV, Minor Widening & Resurfa

150

-

-

-

150

-- - -

CN

RWPE

------------

----150

--

--- - -

This project will allow the District to purchase the Right‐of‐Way early.  The project is on US‐95 between mileposts 293 and 296.

222952

BR-RESTORE STPSTATE OF IDAHO (ITD)

SH 13B, MIDDLE FK CLEARWATER RV BR, KOOSKIAMP 0.703 - 0.703 BR/APPRS, Bridge Replacement

-

7,433

-

6,887

-

546732 678 54

CN

RWPE

---------26306400

-----

--

7,433-- - -

This project will replace the Clearwater River bridge at MP 0.703 on SH‐13B in Kooskia.  The bridge is currently posted and was originally built in 1935

224022

SAFETY (L) HSIP (L)MOSCOW

OFFSYS, PUBLIC AVE; POLK ST TO ORCHARD AVE, MOSCOWMP 10.000 - 10.440 SAFTY/TRAF OPER, Intersection Improv

-

851

-

788

-

63122 113 9

CN

RWPE

----851------122

-----

--

--- - -

For the work of constructing a concrete splitter island at the intersection of Polk Avenue and Public Avenue, upgrade the road section, install approximately 2,200 linear feet of curb, gutter, and 5‐foot sidewalk, and widen the roadway to eliminate roadside ditches.  This project is located on Public Ave. between mileposts 10.0 and 10.44.

224042

SAFETY (L) HSIP (L)GRANGEVILLE HD

LOCAL, LAKE RD SAFETY IMPROVEMENTS, GRANGEVILLE HMP 101.190 - 103.450 SAFTY/TRAF OPER, Minor Widening

20

1,023

19

948

1

75147 136 11

CN

RWPE

----1,023-------

---20-

--

--- - -

For the work of improving the rural roadway by redesigning the horizontal and vertical curves.  The project is located between mileposts 101.19 and 103.45.

226032

FLAP (L) FLAPCLEARWATER COUNTY

STC-4783, DENT BRIDGE RD SAFETY IMPROV, CLEARWATER MP 20.000 - 36.000 RESRF/RESTO&REHAB, Metal Guard

-

3,262

-

3,023

-

239444 411 33

CN

RWPE

-2962,966-----20022420-

-----

--

--- - -

Guard rail demolition and installation, Cement Recycled Asphalt Base (CRABS) and an asphalt concrete pavement, some minor realignment, some retaining wall construction, drainage improvements, as well as environment compliance and erosion control.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 31

Page 34: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 2 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside LCVMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

226082

FLAP (L) FLAPSHOSHONE COUNTY

STC-5752, PRICHARD TO MURRAY SAFETY IMPROV, SHOSHOMP 23.043 - 29.175 SAFTY/TRAF OPER, Safety Improveme

-

1,651

-

1,530

-

121225 208 17

CN

RWPE

-1501,501-----10010025-

-----

--

--- - -

Safety improvements of approximately 6.43 miles of Forest Hwy 9 to current FHWA standards is proposed.

ORN227082

SAFETY HSIPSTATE OF IDAHO (ITD)

US 12, SPALDING TO ARROW N&S PASSING LANES, NEZ PERMP 10.900 - 14.900 MAJRWIDN, Safety

-

9,325

-

8,640

-

685255 236 19

CN

RWPE

--------1065297-

-----

9,325-

--- - -

This project consists of constructing a passing lane in the east and westbound lanes on US‐12 from MP 10.900 to 14.900.

ORN227362

SAFETY HSIPSTATE OF IDAHO (ITD)

US 95, SPALDING BR TO THORN CR RD CABLE BARRIERMP 304.618 - 337.368 SAFTY/TRAF OPER, Metal Guard Rail

-

4,524

-

4,192

-

33250 46 4

CN

RWPE

-----------50

-----

4,524-

--- - -

This project consists of constructing a cable median barrier on US‐95 between MP 304.618 and 337.368.

PORN227502

SAFETY NHSTATE OF IDAHO (ITD)

US 95, FOOTHILLS RD & ESTES RD TURNBAYS, LATAH COMP 347.201 - 348.706 MAJRWIDN, Turn Bay

-

1,591

-

1,475

-

116139 129 10

CN

RWPE

---------4297-

-----

1,591-

--- - -

This project consists of constructing turn bays at the intersections of Foothills Rd and Estes Rd on US‐95 between MP 347.201 and 348.706.

ORN227762

OTHER ASSETS STSTATE OF IDAHO (ITD)

SH 64, NEZPERCE TO DRAKE RD, LEWIS COMP 15.413 - 23.706 PM, Pavement Rehabilitation & Resurfac

-

243

-

-

-

2437 - 7

CN

RWPE

-----243-----7

-----

--

--- - -

This project consists of repairing soft spots within the existing roadway on SH‐64 between MP 15.413 and 23.706. 

ORN227802

OTHER ASSETS STSTATE OF IDAHO (ITD)

US 12, FY21 D2 HIGH PRI CULVERT REPLACEMENT, IDAHO CMP 77.960 - 85.180 RESRF/RESTO&REHAB, Drainage Impr

-

218

-

-

-

2188 - 8

CN

RWPE

-----218-----8

-----

--

--- - -

This project consists of replacing high priority culverts under US‐12 between MP 77.960 and 85.180.

ORN227822

OTHER ASSETS STSTATE OF IDAHO (ITD)

STATE, FY22 D2 SOFT SPOT REPAIRSMP - PM, Pavement Rehabilitation & Resurfac

-

250

-

-

-

2507 - 7

CN

RWPE

----250-----7-

-----

--

--- - -

This project consists of repairing soft spots within the roadway in Latah County.

ORN227832

OTHER ASSETS STSTATE OF IDAHO (ITD)

STATE, FY23 D2 SOFT SPOT REPAIRSMP - PM, Pavement Rehabilitation & Resurfac

-

253

-

-

-

2537 - 7

CN

RWPE

---253-------7

-----

--

--- - -

This project consists of soft spot repairs to the existing roadway at various to‐be‐determined locations throughout the District to maintain the pavement in good condition.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 32

Page 35: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 2 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside LCVMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

ORN227852

OTHER ASSETS STSTATE OF IDAHO (ITD)

STATE, FY22 D2 HIGH PRIORITY CULVERT REPLACEMENTSMP - RESRF/RESTO&REHAB, Drainage Impr

-

242

-

-

-

24211 - 11

CN

RWPE

----242------11

-----

--

--- - -

This project consists of replacing or lining high priority culverts at various to‐be‐determined locations throughout the District to maintain the drainage system in good condition.

ORN227872

OTHER ASSETS STSTATE OF IDAHO (ITD)

STATE, FY22 D2 HIGHWAY LUMINAIRES LED UPDATEMP - SAFTY/TRAF OPER, Safety Improveme

-

107

-

-

-

1075 - 5

CN

RWPE

----107------5

-----

--

--- - -

This project consists of updating all of ITD's highway and street lighting luminaires to LED at various locations throughout the District.

ORN227882

OTHER ASSETS STSTATE OF IDAHO (ITD)

US 95B, WINCHESTER BUSINESS LOOPMP 0.000 - 4.021 PM, Preventive Maintenance

-

378

-

-

-

37810 - 10

CN

RWPE

---378-------10

-----

--

--- - -

This project consists of repairing soft spots and approaches on US‐95B between MP 0.000 and 4.021. This will be achieved by constructing mill and inlays, soft spot repairs, pothole/fog line patches, and approach aprons.

ORN228772

SAFETY (L) HSIP (L)CLEARWATER COUNTY

LOCAL, SIGNING & GUARDRAIL, CLEARWATER COMP - SAFTY/TRAF OPER, Signing Improvem

-

387

-

359

-

2859 55 4

CN

RWPE

---387------59-

-----

--

--- - -

This project will install LED flashing Ice signs, curve ahead signs, as well as intersection ahead signs at poor visibility locations.  Additionally this project will help prevent slide offs by installing guardrail along those roads that are steep, narrow and winding.

ORN228912

BR-OFF BR-OFFNEZ PERCE COUNTY

OFFSYS, LENORE BR FEASIBILITY STUDY, NEZ PERCE COMP - PLAN/STUDY, Planning/Transportation

-

-

-

-

-

-158 146 12

CN

RWPE

----------158-

-----

--

--- - -

This project will perform a feasibility study for the Lenore Bridge. The feasibility study for this bridge replacement will allow the County to identify potential areas of concern, identify and select preferred replacement for the bridge, plan the construction process and traffic control, and create a general game plan to ensure that the bridge replacement will go smoothly in the future. This study is crucial due to the importance of the declining condition of the existing bridge and the importance of this bridge to the community.

ORN228972

TAP TAP-RURALCLEARWATER COUNTY

LOCAL, FY21 CLEARWATER SRTS, CLEARWATER COMP - ENV PRESV, Bicycle/Pedestrian/Equestr

-

56

-

52

-

4- - -

CN

RWPE

-----56------

-----

--

--- - -

This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.

ORN228982

TAP TAP-RURALCLEARWATER COUNTY

LOCAL, FY22 CLEARWATER SRTS COORDINATOR & ACTIVITIMP - ENV PRESV, Bicycle/Pedestrian/Equestr

-

56

-

52

-

4- - -

CN

RWPE

----56-------

-----

--

--- - -

This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 33

Page 36: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 2 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside LCVMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

ORN228992

TAP TAP-RURALCLEARWATER COUNTY

LOCAL, FY23 CLEARWATER SRTS COORDINATOR & ACTIVITIMP - ENV PRESV, Bicycle/Pedestrian/Equestr

-

56

-

52

-

4- - -

CN

RWPE

---56--------

-----

--

--- - -

This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.

ORN229172

TAP TAP-URBANUNIVERSITY OF IDAHO

LOCAL, FY21 UNIV OF IDAHO SRTS COORDINATOR & ACTIVITMP - ENV PRESV, Bicycle/Pedestrian/Equestr

-

65

-

60

-

5- - -

CN

RWPE

-----65------

-----

--

--- - -

This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.

ORN229182

TAP TAP-URBANUNIVERSITY OF IDAHO

LOCAL, FY22 UNIV OF IDAHO SRTS COORDINATOR & ACTIVITMP - ENV PRESV, Bicycle/Pedestrian/Equestr

-

65

-

60

-

5- - -

CN

RWPE

----65-------

-----

--

--- - -

This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.

ORN229432

TAP TAP-URBANMOSCOW

LOCAL, PEDESTRIAN UNDERPASS, MOSCOWMP - ENV PRESV, Bicycle/Pedestrian/Equestr

-

859

-

427

-

432147 73 74

CN

RWPE

---859------147-

-----

--

--- - -

Underpass to connect downtown, U of I campus and surrounding neighborhoods near US95, SH8, and Sweet Avenue on the Paradise Pathway.

ORN229492

TAP TAP-RURALLAPWAI

LOCAL, MAIN ST SIDEWALK & ADA, LAPWAIMP - ENV PRESV, Sidewalk

-

443

-

411

-

323 3 -

CN

RWPE

----443------3

-----

--

--- - -

The Lapwai Main Street Sidewalk & ADA Curb Ramp Project Phase IV will remove and replace 920 feet of 8’wide hazardous sidewalks, curbs, gutters, and install six (6) new ADA curb ramps on the east side of Main Street between Willow and Birch Avenues.

Construction

Right-of-WayDevelopment

19,8723,45949,23727,75831,26035,467--4064441,6261,971----311190

Total 19,8723,45949,64328,20233,19737,628G: Project is grouped in STIP

1: Project is also shown in a Transportation Improvement Program

W: Work zone safety priority

CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition

Notes:

Phases:

2: Project is being advance constructed with non-federal funds

P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM

B: Project addresses Federal Bridge Condition PM

A: Project utilizes an alternative contracting method.

M: Project included in multiple programs

1,91915,440----

1,91915,440

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 34

Page 37: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 2 Public Transit Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Transit Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside LCVMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

M19671

2

TRNS-CAP 5339 RuralMISCELLANEOUS

TRANSIT, D2 5339 BUS AND BUS FACILITYMP 0.000 - 0.000 Bus Purchase / Construction

-

2,578

-

2,062

-

516- - -

CN

RWPE

-438438438438438------

-----

--

--- - -

M

2

TRNS-CAP 5339 SUrbMISCELLANEOUS

TRANSIT, D2 5339 BUS AND BUS FACILITYMP 0.000 - 0.000 Bus Purchase / Construction

-

2,578

-

2,062

-

516- - -

CN

RWPE

-7878787878------

-----

--

--- - -

Program provides capital funding to replace, rehabilitate and purchase buses and related equipment or to construct bus‐related facilities in rural and small urban areas directly affecting Clearwater, Idaho, Latah, Lewis, Nez Perce counties. 

196982

TRNS-OPS 5311 RuralMISCELLANEOUS

TRANSIT, D2 5311 STATEWIDE RURAL AREA FORMULA PROGMP 0.000 - 0.000 Transit Admin/Capital/Operations/PM

-

5,885

-

3,878

-

2,007- - -

CN

RWPE

-1,1771,1771,1771,1771,177------

-----

--

--- - -

Program provides capital, planning, and operating assistance to support public transportation operators who provide demand response and fixed route services  in rural areas with populations less than 50,000. Serving Clearwater, Idaho, Latah, Lewis, Nez Perce counties.

M20226

2

TRNS-OPS 5310 RuralMISCELLANEOUS

TRANSIT, D2 ELDERLY & DISABLEDMP 0.000 - 0.000 Demand Response Operations

-

960

-

768

-

192- - -

CN

RWPE

-9090909090------

-----

--

--- - -

M

2

TRNS-OPS 5310 SUrbMISCELLANEOUS

TRANSIT, D2 ELDERLY & DISABLEDMP 0.000 - 0.000 Demand Response Operations

-

960

-

768

-

192- - -

CN

RWPE

-102102102102102------

-----

--

--- - -

Program serves the special needs of transit‐dependent senior citizens and persons with disabilities by providing funds for projects which go beyond traditional transit services (demand response) including those required under the Americans with Disabilities Act (ADA).

ORN230552

TRNS-OPS 5311 RuralSTATE OF IDAHO (ITD)

TRANSIT, D2 5311 CARES ACTMP - Security

-

2,048

-

2,048

-

-- - -

CN

RWPE

-----2,048------

-----

--

--- - -

Provides operating and capital funding for Coronavirus Aid, Relief, and Economic Security in rural areas.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 35

Page 38: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 2 Public Transit Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Transit Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside LCVMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027Construction

Right-of-WayDevelopment

-1,8841,8841,8841,8843,932------------

Total -1,8841,8841,8841,8843,932G: Project is grouped in STIP

1: Project is also shown in a Transportation Improvement Program

W: Work zone safety priority

CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition

Notes:

Phases:

2: Project is being advance constructed with non-federal funds

P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM

B: Project addresses Federal Bridge Condition PM

A: Project utilizes an alternative contracting method.

M: Project included in multiple programs

--------

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 36

Page 39: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 2 Aeronautics Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Aeronautics Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside LCVMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

198442

APT-MTNC GA-APTIDAHO COUNTY

GIC, GRANGEVILLE, REHABILITATE TAXIWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

460

-

460

-

-- - -

CN

RWPE

-----460------

-----

--

--- - -

Fog Seal, Crack Fill, and Painting of Parallel Taxiway and Connectors, Pavement Maintenance to Seal Taxiway to Extend Pavement Life Cycle and Protect Investment of New Construction completed in 2016.

199562

APT-MTNC PR-APTMOSCOW/PULLMAN

PUW, MOSCOW-PULLMAN, ACQUIRE TRAINING SYSTEMMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

392

-

392

-

-- - -

CN

RWPE

-----392------

-----

--

--- - -

Part 139 training requirements a significantly more stringent and a CBT based system will enhance meeting airport certification obligations.

203622

APT-MTNC GA-APTOROFINO

S68, OROFINO, REHABILITATE TAXIWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

80

-

72

-

8- - -

CN

RWPE

-80----------

-----

--

--- - -

Crack fill and slurry or fog seal

203982

APT-MTNC PR-APTMOSCOW/PULLMAN

PUW, MOSCOW-PULLMAN, TERMINAL EXPANSION, CONSTRUMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

2,338

-

2,192

-

146- - -

CN

RWPE

----2,338-------

-----

--

--- - -

CONSTRUCT ‐ Terminal Expansion ‐ Building construction including construction engineering services

204292

APT-MTNC PR-APTMOSCOW/PULLMAN

PUW, MOSCOW-PULLMAN, TERMINAL EXPANSION, DESIGNMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

274

-

274

-

-- - -

CN

RWPE

-----274------

-----

--

--- - -

Terminal Expansion ‐ Design / Expansion to address inadequate space and facilities within existing terminal building

204412

APT-MTNC GA-APTOROFINO

S68, OROFINO, REHABILITATE APRONMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

50

-

45

-

5- - -

CN

RWPE

-50----------

-----

--

--- - -

Crack fill and slurry or fog seal

205512

APT-MTNC GA-APTOROFINO

S68, OROFINO, REHABILITATE RUNWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

140

-

126

-

14- - -

CN

RWPE

-140----------

-----

--

--- - -

Crack fill and slurry or fog seal

205542

APT-NEW PR-APTMOSCOW/PULLMAN

PUW, MOSCOW-PULLMAN, ACQUIRE SNOW REMOVAL EQUIPMP 0.000 - 0.000 APT DEV, New Facility

-

507

-

475

-

32- - -

CN

RWPE

----507-------

-----

--

--- - -

Replace Aging SRE Equipment

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 37

Page 40: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 2 Aeronautics Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Aeronautics Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside LCVMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

206312

APT-NEW GA-APTIDAHO COUNTY

GIC, GRANGEVILLE, INSTALL FENCING DESIGNMP 0.000 - 0.000 APT DEV, New Facility

-

-

-

-

-

-21 19 2

CN

RWPE

----------21-

-----

--

--- - -

Fencing to improve security and keep wildlife off of airfield. Security Fencing Installation Phase 1 (Southern, Western, and Partial Eastern Sides)

207502

APT-NEW GA-APTOROFINO

S68, OROFINO, INSTALL REILMP 0.000 - 0.000 APT DEV, New Facility

-

75

-

68

-

7- - -

CN

RWPE

---75--------

-----

--

--- - -

Install Runway End Identifier Lights as a navigational aid, identified in the current ALP, to increase pilot safety.

207542

APT-NEW GA-APTOROFINO

S68, OROFINO, INSTALL AWOSMP 0.000 - 0.000 APT DEV, New Facility

-

100

-

90

-

10- - -

CN

RWPE

---100--------

-----

--

--- - -

Install an Automatic Weather Observation System (AWOS A) to inform inbound/outbound pilots of current weather conditions whereby increasing safety.

225602

APT-MTNC GA-APTOROFINO

75c, OROFINO, AIRPORT RSA IMPROVEMENTMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

50

-

50

-

-- - -

CN

RWPE

-----50------

-----

--

--- - -

Runway Safety Area improvements.

225612

APT-MTNC GA-APTOROFINO

75C, OROFINO, AIRPORT TREE REMOVALMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

250

-

250

-

-- - -

CN

RWPE

-----250------

-----

--

--- - -

Remove trees.

228022

APT-MTNC GA-APTIDAHO COUNTY

GIC, IDAHO COUNTY AIRPORT, APRON RECON PHIIMP - RECONST/REALIGN, Facility Maintenan

-

560

-

504

-

56- - -

CN

RWPE

---560--------

-----

--

--- - -

228032

APT-MTNC GA-APTIDAHO COUNTY

GIC, IDAHO COUNTY AIRPORT, WILDLIFE FENCEMP - APT DEV, Safety Improvement

-

201

-

181

-

20- - -

CN

RWPE

--201---------

-----

--

--- - -

228042

APT-MTNC GA-APTIDAHO COUNTY

GIC, IDAHO COUNTY AIRPORT, FUEL APRON RECONMP - RECONST/REALIGN, Facility Maintenan

-

-

-

-

-

-70 63 7

CN

RWPE

-------70----

-----

--

--- - -

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 38

Page 41: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 2 Aeronautics Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Aeronautics Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside LCVMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027Construction

Right-of-WayDevelopment

-2702017352,8451,426-70--21-------

Total -3402017352,8661,426G: Project is grouped in STIP

1: Project is also shown in a Transportation Improvement Program

W: Work zone safety priority

CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition

Notes:

Phases:

2: Project is being advance constructed with non-federal funds

P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM

B: Project addresses Federal Bridge Condition PM

A: Project utilizes an alternative contracting method.

M: Project included in multiple programs

--------

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 39

Page 42: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 3 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside COMPASS Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

RP2

10043

CPCTY NHSTATE OF IDAHO (ITD)

SH 55, SMITH'S FERRY TO ROUND VALLEYMP 98.251 - 99.295 SAFTY/TRAF OPER, Minor Widening

100

30,974

-

27,610

100

3,3645,244 4,195 1,049

CN

RWPE

----7,14012,338------

-----

--

--- - -

Safety improvements from MP 98.3 to 99.3 on SH‐55. The safety improvements will widen the existing road and add guardrail along the river side of the road. Widening will be completed by the addition of MSE walls and removing rock outcrops.

134933

STP-URBAN (L) STP-UEMMETT

STC-7169, S JOHNS AVE; E 12TH TO E 4TH ST, EMMETTMP 101.680 - 102.310 RESRF/RESTO&REHAB, Pavement Re

180

2,870

167

2,659

13

211511 473 38

CN

RWPE

-----2,870------

-----

--

--- - -

This project will reconstruct  S. John’s Avenue in Emmett  between 4th Street and 12th Street. This will be accomplished by reconstructing the roadway asphalt and base materials in addition to providing updated sidewalk, curb & gutter, and storm water improvements.  This project is located on STC‐7169 between mile points 101.68 and 102.31.

191293

BR-LOCAL STP-RURALWASHINGTON COUNTY

STC-8217, COVE RD BRIDGE, WASHINGTON COMP 0.923 - 0.973 BR/APPRS, Short Span Replacement

350

5,261

324

4,875

26

386702 650 52

CN

RWPE

-5,221--41-------

----350

--

--- - -

This project will replace the Cove Rd. Bridge in Weiser, which is currently outdated and only holds one‐lane with severe weight restrictions. This bridge is fracture critical, structurally deficient, and functionally obsolete and will be replaced with a new structure that meets current standards.  The project is located on STC‐8217 at mile point 0.925.

199773

CPCTY STSTATE OF IDAHO (ITD)

STATE, FY21 D3 INTERSECTION IMPROVEMENTSMP 0.000 - 0.000 SAFTY/TRAF OPER, Turn Bay

-

510

-

-

-

5105 - 5

CN

RWPE

-----510-----5

-----

--

--- - -

This project will increase safety and alleviate congestion by one or more of the following:  widening the highway, adding additional turn or through lanes, improving the drainage, new signs, adding traffic signals, signal timing and coordination, better lighting and improved accessibility for people with disabilities.

200193

STP-RURAL (L) STP-RURALPAYETTE COUNTY

STC-3857, SAND HOLLOW; OASIS TO BLACK CANYON RD, PAMP 7.859 - 12.525 RESRF/RESTO&REHAB, Pavement Re

-

3,730

-

3,456

-

274368 341 27

CN

RWPE

3,730-----------

-----

--

--- - -

This project is located north of the City of Caldwell in Payette County and includes rehabilitating asphalt pavement (pavement repair and overlay) and upgrading guardrail at an existing structure to improve safety.  The project is located on STC‐3857 between mile points 7.859 and 12.525.

201003

STP-RURAL (L) STP-RURALGEM COUNTY

STC-3840, OLA HWY; POWERLINE RD TO 2ND FORK RD, GEM MP 19.350 - 24.447 RESRF/RESTO&REHAB, Pavement Re

-

2,512

-

2,327

-

185395 366 29

CN

RWPE

2,512-----------

-----

--

--- - -

This project is located near the unincorporated Community of Ola in Gem County and is anticipated to overlay two miles of existing pavement and pave three miles of existing gravel road to keep paved roads good and also to pave a road which exceeds the ADT for a gravel type surface.  This project is located on STC‐3840 between mile points 19.35 and 24.447.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 40

Page 43: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 3 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside COMPASS Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

201463

STP-RURAL (L) STP-RURALMCCALL

OFFSYS, MISSION ST; SCL TO DEINHARD LN, MCCALLMP 103.020 - 103.590 RESRF/RESTO&REHAB, Base/Sub-bas

25

2,544

23

2,357

2

187503 466 37

CN

RWPE

2,544-----------

----25

--

--- - -

This project is located in the City of McCall in Valley County and is anticipated to include the removal of the existing asphalt surface, widening of the road section, verifying the structural integrity of the base and sub‐base, new asphalt pavement, striping, utility relocations and the installation of storm water conveyance and treatment systems to improve the condition of the roadway.  The project is located between mile points 103.02 and 103.59.

201823

STP-RURAL (L) STP-RURALMOUNTAIN HOME HD

STC-3816, OLD HWY 30; OLD OREGON TRAIL RD TO E 54TH S MP 105.410 - 107.530 RESRF/RESTO&REHAB, Resurfacing

-

1,464

-

1,357

-

107224 208 16

CN

RWPE

--1,464---------

-----

--

--- - -

This project is located near City of Mountain Home, Hammett and Glenns Ferry in Elmore County and consists mostly of a three inch overlay over the existing 26 feet wide pavement in order to improve the safety and longevity of the pavement section along this portion of the roadway.  The project is located on STC‐3816 between mile points 105.41 and 107.53.

202303

BR-OFF BR-OFFVALLEY COUNTY

OFFSYS, EASTSIDE DR BR, VALLEY COMP 106.223 - 106.253 BR/APPRS, Bridge Replacement

-

3,789

-

3,510

-

279669 620 49

CN

RWPE

-3,789----------

-----

--

--- - -

The Eastside Drive Bridge project is located north of Payette Lake in Valley County and includes replacement of the deficient and single lane bridge with a single span structure.  The project is located at mile point 106.223.

202423

STP-RURAL (L) STP-RURALVALLEY COUNTY

STC-3945, E LAKE FK RD; E LAKE FK CR BR TO SH55, VALLEYMP 0.000 - 0.550 RESRF/RESTO&REHAB, Base/Sub-bas

-

873

-

809

-

64285 264 21

CN

RWPE

873----------285

-----

--

--- - -

This project is located north of the City of Donnelly in Valley County and includes widening the 0.55 mile section of roadway, lessen the vertical grade near the SH55 intersection, replace deteriorated culverts and irrigation canal crossing, acquire ROW and mitigate wetland impacts adjacent to the roadway.

203643

RAIL FED RRXEMMETT

OFFSYS, N WARDELL AVE INPR RRX, EMMETTMP 100.349 - 100.349 SAFTY/TRAF OPER, Safety Improveme

-

250

-

225

-

25- - -

CN

RWPE

----250-------

-----

--

--- - -

Install insulated concrete planking.  The project is located at mile point 100.349.

205783

RAIL FED RRXEMMETT

OFFSYS, N JOHNS AVE INPR RRX, EMMETTMP 102.736 - 102.751 SAFTY/TRAF OPER, Safety Improveme

-

150

-

135

-

15- - -

CN

RWPE

----150-------

-----

--

--- - -

Install insulated concrete planking.  The project is located at mile point 102.736.

207233

RAIL FED RRXWASHINGTON COUNTY

STC-3877, RIVER DOCK RD UPRR RRX, WASHINGTON COMP 2.179 - 2.179 SAFTY/TRAF OPER, Railroad Gates

-

290

-

261

-

2910 9 1

CN

RWPE

-290------10---

-----

--

--- - -

Install signals, gates, and cabinet.  The project is located on STC‐3877 at mile point 2.179.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 41

Page 44: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 3 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside COMPASS Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

207733

FLAP FLAPSTATE OF IDAHO (ITD)

SH 21, WILDLIFE OVERPASS AT CERVIDAE PEAK, BOISE COMP 19.300 - 19.300 ENV PRESV, Wildlife/Game Crossings

-

2,869

-

2,658

-

211258 242 16

CN

RWPE

----2,712157-----119

-----

--

--- - -

Construct a 150‐ft. wildlife overpass at MP 19.32 and approximately 12,500 linear ft. of 8‐ft. high big game exclusion fence paralleling SH‐21 with jump‐outs.

218633

CPCTY STSTATE OF IDAHO (ITD)

STATE, FY23 D3 INTERSECTION IMROVEMENTSMP 0.000 - 0.000 SAFTY/TRAF OPER, Intersection Improv

-

531

-

-

-

531- - -

CN

RWPE

---531--------

-----

--

--- - -

This project will increase safety and alleviate congestion by one or more of the following:  widening the highway, adding additional turn or through lanes, improving the drainage, new signs, adding traffic signals, signal timing and coordination, better lighting and improved accessibility for people with disabilities.

218713

CPCTY STECMSTATE OF IDAHO (ITD)

STATE, FREEZEOUT HILL S PASSING LN, EMMETTMP 6.323 - 10.132 MAJRWIDN, Pavement Markings

474

3,720

-

-

474

3,720375 - 375

CN

RWPE

-3,720----------

----474

--

--- - -

The SH‐16; FREEZEOUT HILL SOUTH PASSING LANE, expansion project located in Gem County, will construct a southbound passing lane in order to improve mobility and reduce crashes along the corridor.

M21981

3

STP-RURAL (L) STP-RURALMOUNTAIN HOME HD

STC-3805, SIMCO RD REHABILITATION, ELMORE COMP 104.500 - 115.100 RESRF/RESTO&REHAB, Pavement Re

-

5,114

-

4,738

-

376569 527 42

CN

RWPE

2,126-----------

-----

--

--- - -

M

3

FREIGHT FREIGHTMOUNTAIN HOME HD

STC-3805, SIMCO RD REHABILITATION, ELMORE COMP 104.500 - 115.100 RESRF/RESTO&REHAB, Pavement Re

-

5,114

-

4,738

-

376569 527 42

CN

RWPE

------------

-----

--

2,987-- - -

Rehabilitate a 10.5 mile stretch of Simco Road from milepost 104.5 to 115.1. This is a rural asphalt surface major collector in Elmore Co.

220873

OPS STCASCADE

STATE, FY20 CASCADE 7 ADA RAMPSMP 0.000 - 0.000 SAFTY/TRAF OPER, Curb & Gutter

-

35

-

-

-

35- - -

CN

RWPE

-----35------

-----

--

--- - -

Construct 7 Americans with Disabilities ramps in Cascade.

222433

OTHER ASSETS STSTATE OF IDAHO (ITD)

SH 71, SNAKE RV BR TO JCT US-95 GUARDRAIL, WASHINGTOMP 0.060 - 28.790 ENV PRESV, Capital Maintenance

-

799

-

-

-

79970 - 70

CN

RWPE

-----799------

-----

--

--- - -

This project will update guardrail on SH‐71 between the Snake River Bridge (milepost 0.06) and the junction with US‐95 (milepost 28.79).

222573

CPCTY STSTATE OF IDAHO (ITD)

STATE, FY25 D3 INTERSECTION IMPROVEMENTSMP 0.000 - 0.000 SAFTY/TRAF OPER, Intersection Improv

-

325

-

-

-

325- - -

CN

RWPE

-325----------

-----

--

--- - -

This project will increase safety and alleviate congestion by one or more of the following: widening the highway, adding additional turn or through lanes, improving the drainage, new signs, adding traffic signals, signal timing and coordination, better lighting and improved accessibility for people with disabilities.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 42

Page 45: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 3 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside COMPASS Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

224053

SAFETY (L) HSIP (L)MOUNTAIN HOME HD

LOCAL, DITTO CR & RESERVOIR RD, MT HOME HDMP 100.000 - 100.760 SAFTY/TRAF OPER, Minor Widening

50

1,095

46

1,015

4

80157 145 12

CN

RWPE

----1,095-------

----50

--

--- - -

For the work of improving sections of rural roadways by redesigning the alignments horizontal and vertical curves to current geometric standards and will add a paved surface to the roadway improving skid resistance and reduce risk to the traveling public.

224063

SAFETY (L) HSIP (L)VALLEY COUNTY

LOCAL, RECREATIONAL RDS SIGNING, VALLEY COMP 0.000 - 0.000 SAFTY/TRAF OPER, Signing Improvem

-

70

-

70

-

-10 10 -

CN

RWPE

-----70-----10

-----

--

--- - -

For the work of providing for extra signage to help drivers safely navigate and increase driver awareness of corners at various locations along recreational roads within Valley County. The corners will receive advance warning signs and delineators, and a bridge will receive advance warning LED signs and guardrail reflectors.

224603

FED RRX (L) FED RRXSTATE OF IDAHO (ITD)

SH 19, BVRR RRX, GREENLEAFMP 14.240 - 14.240 SAFTY/TRAF OPER, Railroad Gates

-

100

-

90

-

1010 9 1

CN

RWPE

-----100-----10

-----

--

--- - -

This project will install cantilever gates and lights at the crossing in Greenleaf at milepost 14.24 on SH‐19.  The crossing# is 819698A

W22470

3

OTHER ASSETS STSTATE OF IDAHO (ITD)

I 84, FY22 D3 FENCE REPAIR, ELMORE COMP 111.000 - 115.000 SAFTY/TRAF OPER, Incidental Repairs

-

500

-

-

-

50010 - 10

CN

RWPE

----500------10

-----

--

--- - -

This project will repair fences along I‐84 between mileposts 111 to 115.

W22562

3

RA ST2STATE OF IDAHO (ITD)

I 84, SNAKE RIVER REST AREA REPAIRMP 0.780 - 0.780 SUP FACIL, Rest Area Improvement

-

1,000

-

-

-

1,000260 - 260

CN

RWPE

-----1,000-----260

-----

--

--- - -

Construct new drainage field for in‐ground infiltration system for the sewage disposal. 

M22594

3

BR-DSCR BR-DISCRLOCAL HIGHWAY TECHNICA

OFFSYS, NORTH FORK BOULDER CREEK BR, OWYHEE COMP 119.812 - 119.812 BR/APPRS, Bridge Replacement

-

588

-

534

-

54438 406 32

CN

RWPE

-----389------

-----

--

--- - -

M

3

BR-OFF BR-OFFLOCAL HIGHWAY TECHNICA

OFFSYS, NORTH FORK BOULDER CREEK BR, OWYHEE COMP 119.812 - 119.812 BR/APPRS, Bridge Replacement

-

588

-

534

-

54438 406 32

CN

RWPE

-----187-----165

-----

--

--- - -

M

3

LP-ST LPTLOCAL HIGHWAY TECHNICA

OFFSYS, NORTH FORK BOULDER CREEK BR, OWYHEE COMP 119.812 - 119.812 BR/APPRS, Bridge Replacement

-

588

-

534

-

54438 406 32

CN

RWPE

-----12------

-----

--

--- - -

Replace N FORK BOULDER CREEK BR, OWYHEE CO

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 43

Page 46: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 3 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside COMPASS Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

226053

FLAP FLAPSTATE OF IDAHO (ITD)

SH 55, BANKS-LOWMAN INTERSECTION STUDY, BOISE COMP 78.820 - 78.820 PLAN/STUDY, Planning/Transportation

-

-

-

-

-

-675 625 50

CN

RWPE

-----------675

-----

--

--- - -

Planning study for the intersection improvement of State Highway 55 with Banks Lowman Rd. and Banks Grade Rd. will include a topographic investigation and environmental scan to be used in alternative analysis.

226063

FLAP (L) FED RRXMOUNTAIN HOME HD

STC-3811, PINE-FEATHERVILLE RD REHAB, MT HOME HDMP 17.378 - 27.851 RESRF/RESTO&REHAB, Bridge Replac

-

4,167

-

3,861

-

306456 423 33

CN

RWPE

---3,706-461----235221

-----

--

--- - -

Rehabilitate the roadway surface with the use of CRABS (Cement Recycled Asphalt Base Stabilization) process.  The project will also include the replacement of one set of culverts at Dog Creek with a clear span bridge.

ORN227113

CPCTY STSTATE OF IDAHO (ITD)

STATE, FY27 D3 INTERSECTION IMPROVEMENTSMP - SAFTY/TRAF OPER, Intersection Improv

-

563

-

-

-

563- - -

CN

RWPE

------------

-----

563-

--- - -

The FY27 D3 INTERSECTION IMPROVEMENTS project will increase safety and alleviate congestion by one or more of the following: widening the highway, adding additional turn or through lanes, improving the drainage, new signs, adding traffic signals, signal timing and coordination, better lighting and improved accessibility for people with disabilities.

ORN227423

OTHER ASSETS STSTATE OF IDAHO (ITD)

STATE, FY22 D3 FENCINGMP - ENV PRESV, Capital Maintenance

-

500

-

-

-

50010 - 10

CN

RWPE

----500-----10-

-----

--

--- - -

The FY21 D3 FENCING project will update right‐of‐way fence throughout District 3 to maintain existing infrastructure.

ORN227443

OTHER ASSETS STSTATE OF IDAHO (ITD)

STATE, FY22 D3 SIGNINGMP - ENV PRESV, Capital Maintenance

-

240

-

-

-

24010 - 10

CN

RWPE

----240------10

-----

--

--- - -

The FY22 D3 SIGNING project will update signing throughout District 3 to maintain existing infrastructure.

ORN227453

OTHER ASSETS STSTATE OF IDAHO (ITD)

STATE, FY22 D3 CULVERT CLEANINGMP - ENV PRESV, Capital Maintenance

-

240

-

-

-

24010 - 10

CN

RWPE

----240------10

-----

--

--- - -

The FY22 D3 CULVERT CLEANING project will clean out culverts throughout District 3 to maintain existing infrastructure.

ORN227473

OTHER ASSETS STSTATE OF IDAHO (ITD)

STATE, FY23 D3 FENCINGMP - ENV PRESV, Capital Maintenance

-

510

-

-

-

51010 - 10

CN

RWPE

---510------10-

-----

--

--- - -

The FY21 D3 FENCING project will update right‐of‐way fence throughout District 3 to maintain existing infrastructure.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 44

Page 47: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 3 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside COMPASS Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

ORN227483

OTHER ASSETS STSTATE OF IDAHO (ITD)

STATE, FY23 D3 SIGNINGMP - SAFTY/TRAF OPER, Capital Maintenan

-

94

-

-

-

9410 - 10

CN

RWPE

---94------10-

-----

--

--- - -

The FY23 D3 SIGNING project will update signing throughout District 3 to maintain existing infrastructure.

ORN227493

OTHER ASSETS STSTATE OF IDAHO (ITD)

STATE, FY23 D3 CULVERT CLEANINGMP - ENV PRESV, Capital Maintenance

-

94

-

-

-

9410 - 10

CN

RWPE

---94------10-

-----

--

--- - -

The FY23 D3 CULVERT CLEANING project will clean out culverts throughout District 3 to maintain existing infrastructure.

ORN228793

SAFETY (L) HSIP (L)MOUNTAIN HOME HD

STC-3805, SIMCO RD SAFETY IMPV, MT HOME HDMP 102.300 - 104.500 SAFTY/TRAF OPER, Signing Improvem

-

2,122

-

1,967

-

155- - -

CN

RWPE

--2,122---------

-----

--

--- - -

This project will improve safety for all roadway users by redesigning the alignment’s horizontal and vertical curves, adding flashing LED curve warning signs, and rehabilitation of the asphalt surface.

ORN228893

STP-RURAL (L) STP-RURALMOUNTAIN HOME HD

STC-3811, PINE-FEATHERVILLE RD REHAB, MT HOME HDMP 22.000 - 25.000 RESRF/RESTO&REHAB, Resurfacing

-

1,931

-

1,789

-

142260 241 19

CN

RWPE

1,931---------260-

-----

--

--- - -

This project will rehabilitate Pine‐Featherville Road by using a RABS (Recycled Asphalt Base Stabilization) or CRABS (Cement Recycled Asphalt Base) process in conjunction with a new layer of plant mix asphalt.

ORN229483

TAP TAP-URBANEMMETT

LOCAL, SOUTH JOHNS AVE, EMMETTMP - ENV PRESV, Sidewalk

-

540

-

500

-

40- - -

CN

RWPE

-----540------

-----

--

--- - -

Construct the pedestrian/bicycle mobility components as part of the larger companion project for S. Johns Ave Reconstruction  project ‐ 4th to 12th Street.

ORN229503

TAP TAP-RURALMCCALL

LOCAL, 1ST ST PEDESTRIAN SAFETY, MCCALLMP - ENV PRESV, Bicycle/Pedestrian/Equestr

-

541

-

491

-

5010 9 1

CN

RWPE

---541------10-

-----

--

--- - -

The 1st Street Pedestrian Safety Project will construct 10 ft. wide sidewalk, curb and gutter along the east and west sides of 1st Street within the City of McCall's downtown core between E. Lake Street, SH55 south to Park Street.

ORN229533

TAP TAP-RURALCASCADE

LOCAL, MAIN ST SIDEWALK & BEACON, CASCADEMP - ENV PRESV, Sidewalk

-

458

-

424

-

3480 74 6

CN

RWPE

---458------80-

-----

--

--- - -

Construct 10’ sidewalk connecting downtown on SH55, Pine street to Lake Cascade Parkway.

ORN229643

OPS STMCCALL

LOCAL, FY21 MCCALL 3 ADA RAMPSMP - ENV PRESV, Curb & Gutter

-

60

-

-

-

60- - -

CN

RWPE

-----60------

-----

--

--- - -

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 45

Page 48: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 3 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside COMPASS Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

Construct 3 Americans with Disabilities ramps in McCall.

ORN230203

FED RRX (L) FED RRXFRUITLAND

STC-3858, WEST 1ST ST INPR RRX, FRUITLANDMP 100.410 - 100.410 SAFTY/TRAF OPER, Railroad Gates

-

430

-

387

-

4320 18 2

CN

RWPE

--430------20--

-----

--

--- - -

Install: surface, signals and gates. Sidewalk, bike pathConstruction

Right-of-WayDevelopment

2,98713,3444,0175,93212,86719,528--10206261,780-----899

Total 2,98713,3444,0275,95213,49322,207G: Project is grouped in STIP

1: Project is also shown in a Transportation Improvement Program

W: Work zone safety priority

CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition

Notes:

Phases:

2: Project is being advance constructed with non-federal funds

P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM

B: Project addresses Federal Bridge Condition PM

A: Project utilizes an alternative contracting method.

M: Project included in multiple programs

13,716563----

13,716563

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 46

Page 49: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 3 Public Transit Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Transit Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside COMPASS Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

193803

TRNS-OPS 5311 RuralMISCELLANEOUS

TRANSIT, D3 5311 STATEWIDE RURAL AREA FORMULA PROGMP 0.000 - 0.000 Transit Admin/Capital/Operations/PM

-

12,945

-

9,056

-

3,889- - -

CN

RWPE

-2,5892,5892,5892,5892,589------

-----

--

--- - -

Program provides capital, planning, and operating assistance to support public transportation operators who provide demand response and fixed route services  in rural areas with populations less than 50,000. Serving Ada, Adams, Boise, Canyon, Elmore, Gem, Owyhee, Payette, Valley, Washington counties.

M19464

3

TRNS-CAP 5310 RuralMISCELLANEOUS

TRANSIT, D3 ELDERLY AND DISABLEDMP 0.000 - 0.000 Transit Operations / Capital

-

3,550

-

2,958

-

592- - -

CN

RWPE

-193193193193193------

-----

--

--- - -

M

3

TRNS-CAP 5310 SUrbMISCELLANEOUS

TRANSIT, D3 ELDERLY AND DISABLEDMP 0.000 - 0.000 Transit Operations / Capital

-

3,550

-

2,958

-

592- - -

CN

RWPE

-517517517517517------

-----

--

--- - -

Program serves the special needs of transit‐dependent senior citizens and persons with disabilities by providing funds for projects which go beyond traditional transit services (demand response) including those required under the Americans with Disabilities Act (ADA). In Ada, Adam, Boise, Canyon, Elmore, Gem, Owyhee, Payette, Valley, Washington counties.

M19981

3

TRNS-OPS 5310 RuralMISCELLANEOUS

TRANSIT, D3 ELDERLY & DISABLEDMP 0.000 - 0.000 Demand Response Operations

-

3,550

-

2,840

-

710- - -

CN

RWPE

-193193193193193------

-----

--

--- - -

M

3

TRNS-OPS 5310 SUrbMISCELLANEOUS

TRANSIT, D3 ELDERLY & DISABLEDMP 0.000 - 0.000 Demand Response Operations

-

3,550

-

2,840

-

710- - -

CN

RWPE

-517517517517517------

-----

--

--- - -

Program serves the special needs of transit‐dependent senior citizens and persons with disabilities by providing funds for projects which go beyond traditional transit services (demand response) including those required under the Americans with Disabilities Act (ADA).

199833

TRNS-OPS 5311 RuralMISCELLANEOUS

TRANSIT, RURAL AREAS FIXED LINE SERVICEMP 0.000 - 0.000 Demand Response Operations

-

9,370

-

6,418

-

2,952- - -

CN

RWPE

-1,8741,8741,8741,8741,874------

-----

--

--- - -

Fixed line service in rural areas of Southwest Idaho, including Ada and Canyon Counties for all groups, including but not limited to, older adults, persons with disabilities, youth, low income, non‐drivers, minority groups, veterans, and refugee populations.  The project includes required demand response service, as well as administration, operation, preventive maintenance, and capital purchases.  Various aspects of the project have different local match rates.

M20136

3

TRNS-CAP 5339 RuralMISCELLANEOUS

TRANSIT, D3 BUS & BUS FACILITIESMP 0.000 - 0.000 Bus Purchase / Upgrade Facility Equipm

-

6,750

-

5,400

-

1,350- - -

CN

RWPE

-963963963963963------

-----

--

--- - -

M

3

TRNS-CAP 5339 SUrbMISCELLANEOUS

TRANSIT, D3 BUS & BUS FACILITIESMP 0.000 - 0.000 Bus Purchase / Upgrade Facility Equipm

-

6,750

-

5,400

-

1,350- - -

CN

RWPE

-387387387387387------

-----

--

--- - -

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 47

Page 50: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 3 Public Transit Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Transit Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside COMPASS Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

Program provides capital funding to replace, rehabilitate, and purchase buses and related equipment or to construct bus‐related facilities in rural and small urban areas directly affecting Adams, Valley, Washington, Payette, Boise, Canyon, Gem, and Ada counties.

ORN230573

TRNS-OPS 5311 RuralSTATE OF IDAHO (ITD)

TRANSIT, D3 5311 CARES ACTMP - Security

-

4,506

-

4,506

-

-- - -

CN

RWPE

-----4,506------

-----

--

--- - -

Provides operating and capital funding for Coronavirus Aid, Relief, and Economic Security in rural areas.Construction

Right-of-WayDevelopment

-7,2337,2337,2337,23311,739------------

Total -7,2337,2337,2337,23311,739G: Project is grouped in STIP

1: Project is also shown in a Transportation Improvement Program

W: Work zone safety priority

CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition

Notes:

Phases:

2: Project is being advance constructed with non-federal funds

P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM

B: Project addresses Federal Bridge Condition PM

A: Project utilizes an alternative contracting method.

M: Project included in multiple programs

--------

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 48

Page 51: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 3 Aeronautics Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Aeronautics Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside COMPASS Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

192243

APT-MTNC GA-APTMCCALL

MYL, MCCALL, CONSTRUCT APRONMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

1,500

-

1,350

-

150- - -

CN

RWPE

---1,500--------

-----

--

--- - -

Replaces apron lost due to twy relocation & full depth reconstruction

192953

APT-PLAN GA-APTCASCADE

U70, CASCADE, CONDUCT AERONAUTICAL SURVEYMP 0.000 - 0.000 APT PLN, Airport Planning

-

-

-

-

-

-250 225 25

CN

RWPE

-------250----

-----

--

--- - -

Conduct aeronautical survey for Runway 30 approach

193533

APT-MTNC GA-APTMCCALL

MYL, MCCALL, ACQUIRE SNOW REMOVAL EQUIPMENTMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

500

-

450

-

50- - -

CN

RWPE

-500----------

-----

--

--- - -

195083

APT-MTNC GA-APTMOUNTAIN HOME

U76, MOUNTAIN HOME, REHABILITATE TAXIWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

88

-

88

-

-- - -

CN

RWPE

-----88------

-----

--

--- - -

Seal Coat and Crack Fill 

196073

APT-MTNC GA-APTMOUNTAIN HOME

U76, MOUNTAIN HOME, REHABILITATE APRONMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

88

-

88

-

-- - -

CN

RWPE

-----88------

-----

--

--- - -

Seal Coat and Crack Fill 

197333

APT-MTNC GA-APTMOUNTAIN HOME

U76, MOUNTAIN HOME, REHABILITATE RUNWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

175

-

175

-

-- - -

CN

RWPE

-----175------

-----

--

--- - -

Seal Coat and Crack Fill 

199323

APT-MTNC GA-APTMCCALL

MYL, MCCALL, REHABILITATE APRON, PH 3MP 0.000 - 0.000 APT DEV, Facility Maintenance

-

2,000

-

1,800

-

200- - -

CN

RWPE

-2,000----------

-----

--

--- - -

Rehabilitate remaining apron surfaces 

199353

APT-MTNC GA-APTCASCADE

U70, CASCADE, REHABILITATE RUNWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

200

-

200

-

-- - -

CN

RWPE

-----200------

-----

--

--- - -

Crack Seal, Seal Coat & Remark 

200613

APT-MTNC GA-APTMCCALL

MYL, MCCALL, REHABILITATE TAXIWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

1,200

-

1,080

-

120- - -

CN

RWPE

-1,200----------

-----

--

--- - -

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 49

Page 52: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 3 Aeronautics Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Aeronautics Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside COMPASS Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

TLANE MC‐01, MC‐02, and MC‐03 on pavement report; indicates poor condition by 2017.

201073

APT-NEW GA-APTCASCADE

U70, CASCADE, SRE BUILDINGMP 0.000 - 0.000 APT DEV, New Facility

-

200

-

180

-

20- - -

CN

RWPE

----200-------

-----

--

--- - -

SRE Building 

201383

APT-NEW GA-APTMCCALL

MYL, MCCALL, EXPAND APRON PH 1MP 0.000 - 0.000 APT DEV, New Facility

-

2,000

-

1,800

-

200- - -

CN

RWPE

--2,000---------

-----

--

--- - -

PH 1 ‐ Expand Apron to meet Master Plan/ALP (Cost included in Apron Rehab line)

203743

APT-MTNC GA-APTWEISER

S87, WEISER, OBSTRUCTION REMOVALMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

150

-

135

-

15- - -

CN

RWPE

---150--------

-----

--

--- - -

Obstruction Removal

204003

APT-NEW GA-APTWEISER

S87, WEISER, GUIDANCE SIGNSMP 0.000 - 0.000 APT DEV, New Facility

-

81

-

81

-

-- - -

CN

RWPE

-----81------

-----

--

--- - -

Install unlighted guidance signs ‐ cost included in Rwy lighting line

204853

APT-MTNC GA-APTWEISER

S87, WEISER, RUNWAY LIGHTINGMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

527

-

527

-

-- - -

CN

RWPE

-----527------

-----

--

--- - -

Rehab Rwy lighting

205293

APT-MTNC GA-APTWEISER

S87, WEISER, ENVIRONMENTAL ASSESSMENTMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

-

-

-

-

-75 68 7

CN

RWPE

----------75-

-----

--

--- - -

EA for Obstruction Removal

205533

APT-MTNC GA-APTHOMEDALE

S66, HOMEDALE, REHABILITATE APRON, CONSTRUCTMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

1,300

-

1,170

-

130- - -

CN

RWPE

---1,300--------

-----

--

--- - -

Rehabilitate portions of apron that is failing. Rehabilitate portions of apron that is failing to improve safety and operations at the airport.

205863

APT-MTNC GA-APTWEISER

S87, WEISER, TAXIWAY REFLECTORSMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

114

-

114

-

-- - -

CN

RWPE

-----114------

-----

--

--- - -

Rehab taxiway lighting

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 50

Page 53: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 3 Aeronautics Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Aeronautics Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside COMPASS Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

208013

APT-MTNC GA-APTMOUNTAIN HOME

U76, MOUNTAIN HOME AIRPORT TERMINAL DESIGNMP 0.000 - 0.000 APT PLN, Facility Maintenance

-

-

-

-

-

-125 112 13

CN

RWPE

---------125--

-----

--

--- - -

Mountain Home Airport Terminal Design

208053

APT-PLAN GA-APTCOUNCIL

U82, COUNCIL AIRPORT APRON DESIGNMP 0.000 - 0.000 APT PLN, Airport Planning

-

-

-

-

-

-15 14 1

CN

RWPE

---------15--

-----

--

--- - -

Council Airport Apron rehab design

208073

APT-MTNC GA-APTHOMEDALE

S66, HOMEDALE REHABILITATE RUNWAY DESIGNMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

200

-

180

-

20- - -

CN

RWPE

-200----------

-----

--

--- - -

Design widening & reconstruction

208223

APT-MTNC GA-APTMOUNTAIN HOME

U76, MOUNTAIN HOME AIRPORT TERMINAL BUILDMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

611

-

550

-

61- - -

CN

RWPE

-611----------

-----

--

--- - -

Mountain Home Airport Terminal Construction

208263

APT-MTNC GA-APTCOUNCIL

U82, COUNCIL APRON REHABILITATION MP 0.000 - 0.000 APT DEV, Facility Maintenance

-

75

-

68

-

7- - -

CN

RWPE

-75----------

-----

--

--- - -

Council Airport Apron Rehab

208273

APT-MTNC GA-APTCOUNCIL

U82, COUNCIL AIRPORT REHABILITATE RUNWAY DESIGNMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

75

-

68

-

7- - -

CN

RWPE

-75----------

-----

--

--- - -

Council Airport Runway Rehabilitation Design

208283

APT-MTNC GA-APTCOUNCIL

U82, COUNCIL AIRPORT REHABILITATE TAXIWAY DESIGNMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

-

-

-

-

-15 14 1

CN

RWPE

---------15--

-----

--

--- - -

Council Airport Taxiway Rehabilitation Design

208293

APT-MTNC GA-APTCOUNCIL

U82, COUNCIL AIRPORT REHABILITATE TAXIWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

135

-

122

-

13- - -

CN

RWPE

-135----------

-----

--

--- - -

Council Airport Taxiway Rehab

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 51

Page 54: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 3 Aeronautics Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Aeronautics Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside COMPASS Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

221843

APT-PLAN GA-APTBOUNDARY COUNTY

65S, BONNERS FERRY AIRPORT REHABILITATIONMP 0.000 - 0.000 APT PLN, Facility Maintenance

-

-

-

-

-

-222 200 22

CN

RWPE

----------222-

-----

--

--- - -

Bonners Ferry Airport rehabilitation design

225263

APT-MTNC GA-APTCOUNCIL

U82, COUNCIL, AIRPORT RUNWAY REHAB DESIGNMP 0.000 - 0.000 APT PLN, Airport Planning

-

15

-

14

-

1- - -

CN

RWPE

---15--------

-----

--

--- - -

225543

APT-PLAN GA-APTCASCADE

U70, CASCADE, AIRPORT ENVIRONMENTAL ASSESSMENTMP 0.000 - 0.000 APT PLN, Airport Planning

-

-

-

-

-

-225 202 23

CN

RWPE

---------225--

-----

--

--- - -

Conduct environmental assessment.

225553

APT-NEW GA-APTCASCADE

U70, CASCADE, AIRPORT NAVIGATION AIDSMP 0.000 - 0.000 APT DEV, New Facility

-

692

-

623

-

69- - -

CN

RWPE

--692---------

-----

--

--- - -

Install PAPI, REIL on runway 30 end for safe landing operations.

225803

APT-PLAN GA-APTMCCALL

MYL, MCCALL, AIRPORT MASTER PLAN UPDATEMP 0.000 - 0.000 APT PLN, Airport Planning

-

-

-

-

-

-266 266 -

CN

RWPE

-----------266

-----

--

--- - -

Update airport master plan

225813

APT-MTNC GA-APTMCCALL

MYL, MCCALL, AIRPORT PAVEMENT REHABMP 0.000 - 0.000 RESRF/RESTO&REHAB, Facility Mainte

-

250

-

225

-

25- - -

CN

RWPE

----250-------

-----

--

--- - -

Runway pavement crack fill, seal coat, and remark

225823

APT-MTNC GA-APTMCCALL

MYL, MCCALL, AIRPORT RECON TWYMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

1,400

-

1,260

-

140- - -

CN

RWPE

-1,400----------

-----

--

--- - -

Reconstruct and reconfigure general aviation taxiway

225883

APT-PLAN GA-APTMCCALL

MYL, MCCALL, AIRPORT EAMP 0.000 - 0.000 APT PLN, Airport Planning

-

-

-

-

-

-240 216 24

CN

RWPE

------------

-----

--

-240

- - -

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 52

Page 55: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 3 Aeronautics Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Aeronautics Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside COMPASS Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027Construction

Right-of-WayDevelopment

-6,1962,6922,9654501,272240250-380297266

------Total 2406,4462,6923,3457471,538

G: Project is grouped in STIP

1: Project is also shown in a Transportation Improvement Program

W: Work zone safety priority

CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition

Notes:

Phases:

2: Project is being advance constructed with non-federal funds

P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM

B: Project addresses Federal Bridge Condition PM

A: Project utilizes an alternative contracting method.

M: Project included in multiple programs

--------

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 53

Page 56: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 4 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

WB2

130904

BR-RESTORE ST2STATE OF IDAHO (ITD)

I 86, RAFT RV BR, EB & WB LANES, CASSIA COMP 14.320 - 14.330 BR/APPRS, Bridge Rehabilitation

-

13,561

-

-

-

13,561536 495 41

CN

RWPE

-----1,000------

-----

--

--- - -

 This project will replace the Raft River Bridges on I‐86 at milepost (14.3). These bridges will remove mobility restrictions associated with commercial traffic and allow for a higher capacity.

139984

STP-RURAL (L) STP-RURALBLAINE COUNTY

STC-2822, W GLENDALE RD & CNL BR, BLAINE COMP 1.000 - 1.850 RECONST/REALIGN, Bituminous Surfac

-

2,436

-

2,257

-

179505 468 37

CN

RWPE

-----2,380------

-----

--

--- - -

This project will upgrade the roadway .7 miles west of Hwy‐75 to Glendale Canal in Blaine County.  Project includes replacing structurally deficient Glendale Canal Bridge.  This is a main route to a multiple use area, including an industrial and business community, Blaine County Road and Bridge Facilities and to Bellevue's Waste Water Treatment Plant.

188074

STP-URBAN (L) STP-UHAILEY

STC-8030, RIVER ST; WALNUT TO GALENA, HAILEYMP 100.378 - 100.684 RESRF/RESTO&REHAB, Minor Widenin

-

2,301

-

2,132

-

169525 486 39

CN

RWPE

2,301-----------

-----

--

--- - -

The project will provide safety and circulation improvements to River Street, between Walnut Street and Galena Street in Hailey.

189734

BR-LOCAL BR-LOCGOODING HD Number 1

LOCAL, 1700 S RD BRIDGE, GOODING HD #1MP 101.010 - 101.390 BR/APPRS, Bridge Replacement

-

2,314

-

2,144

-

170528 489 39

CN

RWPE

----2,28034------

-----

--

--- - -

This project will replace the 1700 South Road Bridge within the Gooding Highway District due to its rapid deterioration. The bridge has a 90 degree skew that makes it very dangerous for motorist and trucks trying to travel over the bridge.  

190284

STP-RURAL (L) STP-RURALOAKLEY HD

STC-2742, GOLDEN VALLEY RD; 1500 W TO 900 W, OAKLEY HMP 5.900 - 12.100 RESRF/RESTO&REHAB, Minor Widenin

-

5,084

-

4,711

-

373279 259 20

CN

RWPE

----5,084-------

-----

--

--- - -

This joint project will rehabilitate Golden Valley Road south of Burley from milepost 5.9 to milepost 12.1. This consists of approximately 6 miles of roadway rehabilitation starting at the intersection of 1500W Road and Golden Valley Road, and continuing east to the intersection 900W and Golden Valley Road.  The project consists of approximately 2 miles of overlay, 2 miles of Recycles Asphalt Base Stabilization, and chip sealing the entire 6 miles of roadway.

191144

STP-RURAL (L) STP-RURALJEROME HD

SMA-8072, NORTH RD PHASE 3, JEROME HDMP 11.080 - 12.230 RESRF/RESTO&REHAB, Minor Widenin

-

2,098

-

1,944

-

154379 351 28

CN

RWPE

-----2,098------

-----

--

--- - -

This project will reconstruct 1.15 miles of  North Rd in Jerome Hwy District.  This project will upgrade the base, widen pavement, install a traffic control signal and left hand turn lanes.

RP2

191344

SAFETY HSIPSTATE OF IDAHO (ITD)

US 93, 100 SOUTH RD, JEROME COMP 57.231 - 59.531 RECONST/REALIGN, Grading & Draina

-

10,741

-

9,952

-

7891,050 973 77

CN

RWPE

---4,1626,579-------

-----

--

--- - -

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 54

Page 57: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 4 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

This project is part of an overall strategy to improve the safety and mobility on the US‐93 corridor.  The strategy focuses upon safety‐driven improvement projects and, with project locations focus at intersections.  The alignment adjustment will improve roadway geometrics and provide space for turning lanes.

191714

FLAP FLAPSTATE OF IDAHO (ITD)

SH 75, GALENA SUMMIT SLIDE, BLAINE COUNTYMP 156.600 - 159.400 SAFTY/TRAF OPER, Safety Improveme

-

3,288

-

3,050

-

238685 635 50

CN

RWPE

-----325------

-----

--

--- - -

Stabilize the historic slide area on SH 75 by adding more buttressing material at the foot of the slide area and over the surface of the slide and provide a revegetated surface.

WB2

193384

BR-RESTORE BR-STATESTATE OF IDAHO (ITD)

I 84, SOUTH JEROME IC, JEROME COMP 167.400 - 168.400 BR/APPRS, Bridge Replacement

204

20,078

188

18,526

16

1,5522,525 2,330 195

CN

RWPE

--10,8249,254--------

---204-

--

--- - -

This project on I‐84 will replace a bridge at milepost 168.0 in Jerome. The new structure will include 5 lanes, 3 foot shoulders and a 10 foot bike path/raised sidewalk.

196374

STP-RURAL (L) STP-RURALBURLEY HD

STC-2837, YALE RD STG 4; MP 12.1 TO 13.7, CASSIA COMP 12.100 - 13.700 RECONST/REALIGN, Plant Mix Paveme

225

4,055

208

3,757

17

298495 459 36

CN

RWPE

-4,055----------

----225

--

--- - -

This project will rehabilitate pavement on Yale Rd. from milepost 12.1 to 13.7. The 2 miles of pavement rehabilitation and realignment include: Roadway ballast to support the increased heavy truck traffic associated with the farm to market operations,  Improved horizontal and vertical alignment by removing substandard curves, widened road and shoulders to meet AASHTO standards and allow for safe passage of vehicles, and improved shoulder slopes, ditches, and drainage structures to improve the drainage system. This will result in a safer, efficient, and more durable road for the traveling public.

196724

STP-RURAL (L) STP-RURALFILER HD

STC-2721, 4100 N; 2100 E TO 2400 E, FILER HWY DISTRICTMP 3.600 - 6.104 RESRF/RESTO&REHAB, CRABS

-

3,821

-

3,541

-

280402 372 30

CN

RWPE

-3,821----------

-----

--

--- - -

This project will rehabilitate the existing 4100 North Road from 2100 E to 2400 E.  The highway district is being proactive before the roadway further deteriorates and causes an emergency.  The rehabilitation project plans to use a Cement Recycled Asphalt Base stabilization process to rehabilitate this road and prepare it for the expected traffic volumes.

RP199434

SAFETY HSIPSTATE OF IDAHO (ITD)

US 93, 300 SOUTH RD, JEROME COMP 55.162 - 56.227 RECONST/REALIGN, Intersection Impro

-

5,837

-

5,408

-

4291,000 927 73

CN

RWPE

--5,837---------

-----

--

--- - -

This project is part of an overall strategy to improve the safety and mobility on the US‐93 corridor. The strategy focuses upon safety‐driven improvement projects and, with project locations focus at intersections, approximately ½ mile each side of intersection center line. The alignment adjustment will improve roadway geometrics and provide space for turn lanes.

WP19973

4

FREIGHT FREIGHTSTATE OF IDAHO (ITD)

I 84, DECLO POE EB, CASSIA COMP 217.450 - 219.520 RECONST/REALIGN, Port of Entry

85

13,768

79

12,703

6

1,0651,035 955 80

CN

RWPE

------------

-----

13,768-

--- - -

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 55

Page 58: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 4 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

The project is to build a new Port of Entry (POE) facility 3 miles east of I‐84 IC 216 serving both the eastbound and westbound lanes to replace the existing Cotterel POE. The Cotterel POE and Cotterel Rest Area (RA) were constructed in 1966 and currently share the same site.  Dual usage of the property has been problematic as traffic volumes increased over the years.  Concerns of vehicular traffic and heavy commercial trucking co‐mingling in a restricted area have created safety issues that need to be addressed. 

200334

CPCTY STECMSTATE OF IDAHO (ITD)

SH 75, ELKHORN RD TO RIVER ST, KETCHUMMP 126.480 - 128.200 RECONST/REALIGN, Pavement Rehabi

-

20,425

-

-

-

20,4253,485 2,303 1,182

CN

RWPE

-11,041----------

-----

--

9,385-- - -

This project will replace the bridge at Trail Creek and complete roadway as defined in the environmental impact statement.

201804

SAFETY ST2STATE OF IDAHO (ITD)

SH 74, JCT US-93, TWIN FALLS COMP 0.000 - 0.700 RECONST/REALIGN, Intersection Impro

-

246

-

-

-

24688 82 6

CN

RWPE

-----246------

-----

--

--- - -

This project will realign, reconstruct and widen the pavement to eliminate a skewed intersection.  The existing right‐of‐way will be increased to 33 feet either side of the centerline to match the highway corridor width and minimize the impact to the existing residence.

WP20191

4

FREIGHT FREIGHTSTATE OF IDAHO (ITD)

I 84, DECLO POE WB, CASSIA COMP 217.450 - 219.520 RECONST/REALIGN, Port of Entry

128

13,330

118

12,300

10

1,030862 795 67

CN

RWPE

-----13,330------

-----

--

--- - -

The project is to build a new Port of Entry (POE) facility 3 miles east of I‐84 IC 216 serving both the eastbound and westbound lanes to replace the existing Cotterel POE. The Cotterel POE and Cotterel Rest Area (RA) were constructed in 1966 and currently share the same site.  Dual usage of the property has been problematic as traffic volumes increased over the years.  Concerns of vehicular traffic and heavy commercial trucking co‐mingling in a restricted area have created safety issues that need to be addressed. 

205184

STP-RURAL (L) STP-RURALBUHL HD

STC-2715, E 4100 N REHABILITATION PH 2, BUHL HDMP 0.100 - 3.600 RESRF/RESTO&REHAB, Minor Widenin

60

2,619

56

2,427

4

192403 373 30

CN

RWPE

2,619-----------

----60

--

--- - -

Rehabilitate and widen E 4100 N Road (Pole Line Rd) for 3.5 miles from N1730E to N2100E. This project is a joint project between Buhl HD and Filer HD.

205834

CPCTY STECMSTATE OF IDAHO (ITD)

US 93, HOLLISTER NCL TO 3250 N, TWIN FALLS COMP 27.980 - 34.990 SAFTY/TRAF OPER, Rumble Strips

100

8,335

-

-

100

8,335500 463 37

CN

RWPE

-8,335----------

----100

--

--- - -

This project will provide wider shoulders with rumble strips on the shoulder and centerline.  The project will also provide new pavement.

206334

STP-RURAL (L) STP-RURALBUHL

STC-2706, BURLEY AVE; US-30 TO FRUITLAND AVE, BUHLMP 1.250 - 2.035 RECONST/REALIGN, Plant Mix Paveme

-

3,382

-

3,134

-

248446 413 33

CN

RWPE

3,382-----------

-----

--

--- - -

Reconstruct existing Burley Ave. for one mile between Fruitland Rd and US30/SH46. Include curb, gutter, and sidewalk. This project is a joint project between City of Buhl and Buhl HD.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 56

Page 59: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 4 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

206384

RAIL FED RRXDIETRICH

OFFSYS, WASHINGTON ST UPRR RRX, DIETRICH HDMP 100.618 - 100.618 SAFTY/TRAF OPER, Railroad Gates

-

325

-

292

-

33- - -

CN

RWPE

---325--------

-----

--

--- - -

Upgrade lights and install gates and planking.

206664

STP-RURAL (L) STP-RURALGOODING HD Number 1

STC-2777, SHOE STRING RD REHABILITATION, GOODING HDMP 4.500 - 10.900 RESRF/RESTO&REHAB, Minor Widenin

-

2,187

-

2,027

-

160348 322 26

CN

RWPE

2,187-----------

-----

--

--- - -

Rehabilitate and widen shoulders of Shoe String Rd between S1300 and SH46. This is a collector between I‐84 and SH46 in Gooding HD. Improve asphalt rutting and widen to 26 feet.

206994

STP-RURAL (L) STP-RURALHILLSDALE HD

STC-2793, CRESTVIEW RD REHABILITATION PH 1, HILLSDALEMP 100.000 - 104.000 RECONST/REALIGN, Minor Widening &

-

2,187

-

2,027

-

160318 295 23

CN

RWPE

2,187-----------

-----

--

--- - -

Rehabilitate Crestview Rd for 4 miles from I‐84 to 600 Rd S. Resurface and minor widening to 26 foot width.

207284

RAIL FED RRXJEROME, CITY OF

OFFSYS, E 200 S EIRR RRX, JEROMEMP 100.685 - 100.685 SAFTY/TRAF OPER, Railroad Gates

-

400

-

360

-

4010 9 1

CN

RWPE

-----400------

-----

--

--- - -

Install gates, signals, and widen planking.

218234

TRAFFIC STSTATE OF IDAHO (ITD)

SH 75, STANLEY RWISMP 138.700 - 138.700 SAFTY/TRAF OPER, Intelligent Transpo

-

265

-

-

-

26530 - 30

CN

RWPE

----265-------

-----

--

--- - -

The Stanley RWIS project is located on SH75 between Ketchum and Stanley. This project will consist of the installation of a new Road Weather Information System.  This system will provide additional information to better aid road maintenance during inclement weather.

W21840

4

TRAFFIC STSTATE OF IDAHO (ITD)

I 84, FY21 D4 INTERSTATE STRIPINGMP 121.135 - 275.650 SAFTY/TRAF OPER, Pavement Marking

-

393

-

-

-

39310 10 -

CN

RWPE

-----393------

-----

--

--- - -

The FY21 Interstate Striping project will stripe various parts of I84 in order to maintain proper striping.

W21841

4

TRAFFIC IMSTATE OF IDAHO (ITD)

I 84, FY22 D4 INTERSTATE STRIPINGMP 121.135 - 275.650 SAFTY/TRAF OPER, Pavement Marking

-

401

-

401

-

-10 10 -

CN

RWPE

----401-------

-----

--

--- - -

The FY22 Interstate Striping project will stripe various parts of I84 in order to maintain proper striping.

W21842

4

TRAFFIC IMSTATE OF IDAHO (ITD)

I 84, FY23 D4 INTERSTATE STRIPINGMP 121.135 - 275.650 SAFTY/TRAF OPER, Pavement Marking

-

409

-

409

-

-10 10 -

CN

RWPE

---409--------

-----

--

--- - -

The FY23 Interstate Striping project will stripe various parts of I84 in order to maintain proper striping.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 57

Page 60: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 4 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

W21843

4

TRAFFIC IMSTATE OF IDAHO (ITD)

I 84, FY24 D4 INTERSTATE STRIPINGMP 121.135 - 275.650 SAFTY/TRAF OPER, Pavement Marking

-

425

-

425

-

-10 10 -

CN

RWPE

--425---------

-----

--

--- - -

The FY24 Interstate Striping project will stripe various parts of I84 in order to maintain proper striping.

W21844

4

TRAFFIC IMSTATE OF IDAHO (ITD)

I 84, FY25 D4 INTERSTATE STRIPINGMP 121.135 - 275.650 SAFTY/TRAF OPER, Pavement Marking

-

434

-

434

-

-10 10 -

CN

RWPE

-434----------

-----

--

--- - -

The FY25 Interstate Striping project will stripe various parts of I84 in order to maintain proper striping.

W21845

4

FREIGHT FREIGHTSTATE OF IDAHO (ITD)

I 84, FY25 BLISS RA PARKING EXPANSIONMP 133.000 - 133.000 ENV PRESV, Rest Area Improvement

-

4,336

-

4,017

-

319750 695 55

CN

RWPE

-4,336----------

-----

--

--- - -

The objective of the FY25 Bliss Rest Area Parking Expansion project is to expand the parking area at the Bliss RA.  This project will meet the department's goal to increase safety, mobility and economic opportunity by enabling more of the traveling public to use the RA.  This is important due to the upcoming closure of the Jerome RA.

219144

SAFETY HSIPSTATE OF IDAHO (ITD)

SH 75, JCT US 20 RURAL CONFLICT WARNING SYSTEMMP 101.980 - 102.240 SAFTY/TRAF OPER, Intersection Improv

-

173

-

160

-

1320 19 1

CN

RWPE

-173----------

-----

--

--- - -

The SH 75, US 20 INTERSECTION RICWS project is located at the intersection of SH75 and US 20.  This project will consist of the installation of a conflict warning system to help improve safety at the intersection.

P219514

SAFETY HSIPSTATE OF IDAHO (ITD)

US 93, 3250 N TO 3800 N, TWIN FALLS COMP 34.990 - 40.000 SAFTY/TRAF OPER, Minor Widening

102

6,468

95

5,993

7

475425 394 31

CN

RWPE

-6,468----------

---102-

--

--- - -

This project will widen roadway shoulders, add active signage, and rumble strips.

220014

SAFETY (L) HSIP (L)BUHL HD

OFFSYS, RIVER RD SAFETY IMPRV, BUHL HDMP 101.670 - 106.960 SAFTY/TRAF OPER, Metal Guard Rail

-

26

-

26

-

-5 5 -

CN

RWPE

-----26------

-----

--

--- - -

The River Road Curves Safety Improvement project, located near the City of Buhl in Twin Falls County, will improve the safety of six curves with similar conditions with the installation of Chevrons and Curve Advance Warning Signs to reduce/eliminate fatal and serious injury crashes for all roadway users.

220034

SAFETY (L) HSIP (L)GOODING HD Number 1

STC-2777, SHOE STRING RD SAFETY, GOODING HDMP 3.950 - 8.900 SAFTY/TRAF OPER, Minor Widening

-

723

-

670

-

53107 99 8

CN

RWPE

--723---------

-----

--

--- - -

The Shoe String Road Shoulder Widening project, located in the City of Tuttle in Gooding County, will construct widened shoulders and install edge line striping to improve safety for all roadway users with the reduction/elimination of fatal and serious injury crashes.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 58

Page 61: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 4 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

221974

CPCTY STSTATE OF IDAHO (ITD)

STATE, FY22 D4 INTERSECTION IMPROVEMENTSMP 0.000 - 0.000 SAFTY/TRAF OPER, Drainage Improve

-

255

-

-

-

2555 - 5

CN

RWPE

----255------3

-----

--

--- - -

This project will increase safety by one or more of the following: roadway widening, adding additional turn or through lanes and/or drainage improvements throughout District 4. 

W22218

4

OTHER ASSETS IMSTATE OF IDAHO (ITD)

I 84, FY26 D4 INTERSTATE STRIPINGMP 121.135 - 275.850 SAFTY/TRAF OPER, Pavement Marking

-

486

-

486

-

-10 10 -

CN

RWPE

------------

-----

--

486-- - -

The FY26 Interstate Striping project will stripe various parts of I‐84 between mileposts 121.1 and 275.9 to maintain proper striping. 

224074

SAFETY (L) HSIP (L)JEROME HD

LOCAL, INTERSECTION IMPROVEMENTS, JEROME HDMP 0.000 - 0.000 SAFTY/TRAF OPER, Intersection Improv

-

62

-

62

-

-10 10 -

CN

RWPE

-----62-----10

-----

--

--- - -

For the work of improving busy intersections with the installation of stop sign‐mounted flashing beacons at multiple intersections within the district. The intersections are located along North Road, 500 North, 300 North, 200 North, West Road, 100 South, and GolfCourse Road.

224084

SAFETY (L) HSIP (L)TWIN FALLS HD

STC-2730, 3000 E & FOOTHILL RD CURVE, TWIN FALLS HDMP 8.090 - 8.290 SAFTY/TRAF OPER, Minor Widening

31

985

28

913

3

72142 132 10

CN

RWPE

---985-------142

---31-

--

--- - -

For the work to flatten and super‐elevate the curve to improve safety, improve the intersection of Foothills Road by squaring it up with 3000 North Road. Right of way will be required for the project.  The project is located between mileposts 8.09 and 8.29.

224094

SAFETY (L) HSIP (L)TWIN FALLS, CITY OF

STC-7082, FILER AVE SAFETY AUDIT, TWIN FALLSMP 0.990 - 3.000 SAFTY/TRAF OPER, Preliminary Engine

-

-

-

-

-

-50 46 4

CN

RWPE

-----------50

-----

--

--- - -

The Filer Avenue Road Safety Audit project will perform a multi‐disciplinary Road Safety Audit along this  roadway to identify potential safety improvements and prioritize short term and long‐term improvements to reduce/eliminate fatal and serious injury crashes for all roadway users.

224104

SAFETY (L) HSIP (L)RAFT RIVER HD

STC-2847, OLD HWY 81 SAFETY IMPROV, RAFT RIVER HDMP 12.580 - 12.980 SAFTY/TRAF OPER, Signing Improvem

-

67

-

67

-

-5 5 -

CN

RWPE

-----67-----5

-----

--

--- - -

For the work of installing new/additional roadway signing and delineators between mileposts 12.58 and 12.98.

224324

BR-OFF BR-OFFBLAINE COUNTY

OFFSYS, KILPATRICK BR, BLAINE COMP 105.410 - 105.410 BR/APPRS, Bridge Rehabilitation

-

1,272

-

1,179

-

93410 380 30

CN

RWPE

1,272----------410

-----

--

--- - -

For the work to replace the local deficient bridge over Silver Creek. The bridge provides access to local residential area and recreational uses along the creek.  The bridge is located at milepost 105.41.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 59

Page 62: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 4 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

224344

STP-RURAL (L) STP-RURALRAFT RIVER HD

STC-2847, OLD HWY 81 S, RAFT RIVER HDMP 8.500 - 10.500 RESRF/RESTO&REHAB, Pavement Re

-

2,045

-

1,895

-

150264 245 19

CN

RWPE

2,045----------264

-----

--

--- - -

For the work to widen existing roadway and rehabilitate existing pavement with RABS and overlay.

224474

OPS STJEROME, CITY OF

STATE, FY21 JEROME 10 ADA RAMPSMP 0.000 - 0.000 SAFTY/TRAF OPER, Sidewalk

-

60

-

-

-

60- - -

CN

RWPE

-----60------

-----

--

--- - -

Install ten Americans with Disabilities (ADA) ramps at various locations in the City of Jerome

224484

OPS STSHOSHONE, CITY OF

STATE, FY21 SHOSHONE 11 ADA RAMPSMP 0.000 - 0.000 SAFTY/TRAF OPER, Sidewalk

-

55

-

-

-

55- - -

CN

RWPE

-----55------

-----

--

--- - -

Install 11 Americans with Disabilities (ADA) ramps in various locations throughout the City of Shoshone.

224494

OPS STTWIN FALLS, CITY OF

STATE, FY21 TWIN FALLS 12 ADA RAMPSMP 0.000 - 0.000 SAFTY/TRAF OPER, Sidewalk

-

60

-

-

-

60- - -

CN

RWPE

-----60------

-----

--

--- - -

Install twelve Americans with Disabilities (ADA) ramps in various locations throughout the City of Twin Falls.

P224554

SAFETY HSIPSTATE OF IDAHO (ITD)

US 93, 3800 N TO IC 93/30, TWIN FALLS COMP 40.000 - 41.800 SAFTY/TRAF OPER, Minor Widening

-

3,312

-

3,069

-

243373 346 27

CN

RWPE

------------

-----

--

3,312-- - -

This project on US‐93, from milepost 40.0 to 41.8, will restore the pavement driving surface and improve safety by installing rumble strips and widening the shoulders.

224564

SAFETY HSIPSTATE OF IDAHO (ITD)

SH 46, INT E 2000 S, GOODING COMP 109.700 - 110.250 SAFTY/TRAF OPER, Turn Bay

-

459

-

426

-

3390 83 7

CN

RWPE

------------

-----

--

459-- - -

This project, at the intersection of SH‐46 & 2000 South, will improve safety by constructing designated left turn lanes for north and south bound traffic by reducing angle, rear end, and road departure accidents.  The project is located between mileposts 109.7 and 110.25.

224714

OTHER ASSETS STSTATE OF IDAHO (ITD)

SH 77, ALBION SNOW FENCE, CASSIA COMP 17.800 - 18.800 SAFTY/TRAF OPER, Incidental Repairs

-

126

-

-

-

12616 - 16

CN

RWPE

-----126------

-----

--

--- - -

This project will install a snow fence on SH‐77 between mileposts 17.8 and 18.8 near the City of Albion in Cassia Co.

224724

OTHER ASSETS STSTATE OF IDAHO (ITD)

US 93, US-30 IC DYNAMIC MESSAGE SIGN, TWIN FALLS COMP 37.920 - 37.920 SAFTY/TRAF OPER, Intelligent Transpo

-

357

-

-

-

35730 - 30

CN

RWPE

----357------30

-----

--

--- - -

Install a dynamic message sign on US‐93 at the interchange with US‐30 at milepost 37.92 in Twin Falls County.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 60

Page 63: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 4 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

M22595

4

BR-DSCR BR-DISCRLOCAL HIGHWAY TECHNICA

OFFSYS, LITTLE WOOD RIVER BR, SHOSHONE HDMP 102.465 - 102.465 BR/APPRS, Bridge Replacement

-

836

-

763

-

73408 378 30

CN

RWPE

-----557------

-----

--

--- - -

M

4

BR-OFF BR-OFFLOCAL HIGHWAY TECHNICA

OFFSYS, LITTLE WOOD RIVER BR, SHOSHONE HDMP 102.465 - 102.465 BR/APPRS, Bridge Replacement

-

836

-

763

-

73408 378 30

CN

RWPE

-----266-----149

-----

--

--- - -

M

4

LP-ST LPTLOCAL HIGHWAY TECHNICA

OFFSYS, LITTLE WOOD RIVER BR, SHOSHONE HDMP 102.465 - 102.465 BR/APPRS, Bridge Replacement

-

836

-

763

-

73408 378 30

CN

RWPE

-----12------

-----

--

--- - -

Replace LITTLE WOOD RIVER BR, SHOSHONE HD

M22596

4

BR-DSCR BR-DISCRLOCAL HIGHWAY TECHNICA

OFFSYS, 4200 N RD, DEEP CREEK BR, BUHL HDMP 101.491 - 101.491 BR/APPRS, Bridge Replacement

-

749

-

683

-

66410 380 30

CN

RWPE

-----499------

-----

--

--- - -

M

4

BR-OFF BR-OFFLOCAL HIGHWAY TECHNICA

OFFSYS, 4200 N RD, DEEP CREEK BR, BUHL HDMP 101.491 - 101.491 BR/APPRS, Bridge Replacement

-

749

-

683

-

66410 380 30

CN

RWPE

-----238-----151

-----

--

--- - -

M

4

LP-ST LPTLOCAL HIGHWAY TECHNICA

OFFSYS, 4200 N RD, DEEP CREEK BR, BUHL HDMP 101.491 - 101.491 BR/APPRS, Bridge Replacement

-

749

-

683

-

66410 380 30

CN

RWPE

-----12------

-----

--

--- - -

Replace 4200 N RD, DEEP CREEK BR, BUHL HD 

WORN22696

4

OTHER ASSETS IMSTATE OF IDAHO (ITD)

I 84, FY27 D4 INTERSTATE STRIPINGMP 121.100 - 275.650 SAFTY/TRAF OPER, Pavement Marking

-

563

-

522

-

4113 12 1

CN

RWPE

---------3-10

-----

563-

--- - -

This is an Interstate striping project to stripe various segments of I84 to maintain pavement markings. 

ORN227044

SAFETY HSIPSTATE OF IDAHO (ITD)

SH 24, MINIDOKA CO LN TO KIMAMA, LINCOLN COMP 32.000 - 34.500 SAFTY/TRAF OPER, Safety Improveme

-

4,905

-

4,545

-

360293 272 21

CN

RWPE

----------173120

-----

4,905-

--- - -

This project consists of a pavement rehabilitation with shoulder widening and the installation of edge line rumble strips that will improve safety and pavement conditions. 

ORN227094

OTHER ASSETS NHSTATE OF IDAHO (ITD)

STATE, D4 LUMINAIRE REPAIR MP - SAFTY/TRAF OPER, Safety

-

520

-

482

-

3840 37 3

CN

RWPE

---520-------40

-----

--

--- - -

This project will repair luminaires at selected interchanges that are currently nonfunctioning, throughout the District, to increase safety for the traveling public.  

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 61

Page 64: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 4 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

ORN227234

OTHER ASSETS STPSTATE OF IDAHO (ITD)

SH 25, WEST RD TO W FRONTAGE RD N, JEROME COMP 0.000 - 0.300 RESRF/RESTO&REHAB, Pavement Re

-

390

-

362

-

2830 28 2

CN

RWPE

---390-------30

-----

--

--- - -

This project is a mill and plant mix inlay to repair distressed pavement and provide for an improved pavement surface. 

ORN228804

SAFETY (L) HSIP (L)TWIN FALLS HD

LOCAL, FLASHING LED SIGNS, TWIN FALLS HDMP - SAFTY/TRAF OPER, Intersection Improv

-

82

-

76

-

66 6 -

CN

RWPE

----82-----6-

-----

--

--- - -

This project will Install solar powered, radar activated Flashing LED Stop Signs and Flashing LED Stop Ahead signs at three two‐way stop control intersection.

ORN228814

SAFETY (L) HSIP (L)TWIN FALLS, CITY OF

LOCAL, RETROREFLECTIVE SIGNAL BACKPLATES, TWIN FALMP - SAFTY/TRAF OPER, Intersection Improv

-

49

-

45

-

46 6 -

CN

RWPE

----49-----6-

-----

--

--- - -

This project will install Retroreflective Back plates on signal heads at various locations.

ORN228824

SAFETY (L) HSIP (L)FILER HD

OFFSYS, INT 3800 N & US-93, FILER HDMP 3.750 - 4.320 SAFTY/TRAF OPER, Intersection Improv

-

1,097

-

1,016

-

81167 155 12

CN

RWPE

---1,097------167-

-----

--

--- - -

This project will overlay the existing cold mix asphalt mat with a new hot mix overlay 1500 feet both directions of the intersection, will install transverse rumble strips, and will add thermoplastic "stop ahead" onto the road surface.

ORN228904

STP-RURAL (L) STP-RURALWENDELL HD

STC-2765, BOB BARTON RD; 2200 E TO 2400 E, WENDELL HDMP 7.137 - 9.099 RECONST/REALIGN, Plant Mix Paveme

498

2,208

461

2,046

37

162367 340 27

CN

RWPE

2,208---------367-

498----

--

--- - -

This project will consist of constructing 32‐foot‐wide roadway and right of way along the Bob Barton Road similar in character to the other four phases and is necessary to repair the deteriorating roadway surface and improve the safety of the corridor. 

ORN229104

TAP TAP-RURALMOUNTAIN RIDES TRANSPO

LOCAL, FY21 MRTA SRTS COORDINATOR & ACTIVITIESMP - ENV PRESV, Bicycle/Pedestrian/Equestr

-

64

-

60

-

4- - -

CN

RWPE

-----64------

-----

--

--- - -

This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.

ORN229114

TAP TAP-RURALMOUNTAIN RIDES TRANSPO

LOCAL, FY22 MRTA SRTS COORDINATOR & ACTIVITIESMP - ENV PRESV, Bicycle/Pedestrian/Equestr

-

64

-

60

-

4- - -

CN

RWPE

----64-------

-----

--

--- - -

This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.

ORN229134

TAP TAP-RURALMOUNTAIN RIDES TRANSPO

LOCAL, FY23 MRTA SRTS COORDINATOR & ACTIVITIESMP - ENV PRESV, Bicycle/Pedestrian/Equestr

-

64

-

60

-

4- - -

CN

RWPE

---64--------

-----

--

--- - -

This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 62

Page 65: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 4 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

ORN229474

TAP TAP-RURALHAILEY

LOCAL, CROY TO QUIGLEY PATH, HAILEYMP - ENV PRESV, Bicycle/Pedestrian/Equestr

-

474

-

431

-

4356 51 5

CN

RWPE

----474-----354

-----

--

--- - -

Construct shared use path for East Croy St. from the Wood River Trail bike path east to Eastridge Dr., then Eastridge Dr. south to Quigley Road.

ORN229554

TAP TAP-URBANJEROME, CITY OF

LOCAL, EAST MAIN ST SIDEWALK, JEROMEMP - ENV PRESV, Sidewalk

-

449

-

416

-

3390 83 7

CN

RWPE

----449------90

-----

--

--- - -

The E Main St Sidewalk project will fill in the pedestrian and bicycle gap between the urban core and Jerome High School. Currently students walk on the pavement of State Highway 25, a heavily used trucking and passenger vehicle route.

ORN229564

TAP TAP-RURALBUHL

LOCAL, BUHL SCHOOL SIDEWALK, BUHLMP - ENV PRESV, Sidewalk

-

394

-

365

-

2985 78 7

CN

RWPE

----394------85

-----

--

--- - -

This project will connect and provide safe access to the Buhl High, Middle and Popplewell elementary Schools from the surrounding neighborhood.

ORN229664

OPS STJEROME, CITY OF

LOCAL, FY22 JEROME 7 ADA RAMPS PH 1MP - ENV PRESV, Curb & Gutter

-

60

-

-

-

60- - -

CN

RWPE

----60-------

-----

--

--- - -

Construct 7 Americans with Disabilities curb ramps in Jerome.

ORN229684

OPS STJEROME, CITY OF

LOCAL, FY22 JEROME ADA RAMPS PH 2MP - ENV PRESV, Curb & Gutter

-

60

-

-

-

60- - -

CN

RWPE

----60-------

-----

--

--- - -

Construct 7 Americans with Disabilities curb ramps in Jerome.

ORN229704

OPS STKETCHUM

LOCAL, FY22 KETCHUM 4 ADA RAMPSMP - ENV PRESV, Curb & Gutter

-

24

-

-

-

24- - -

CN

RWPE

----24-------

-----

--

--- - -

Construct 4 Americans with Disabilities curb ramps in Ketchum.

ORN229714

OPS STTWIN FALLS, CITY OF

LOCAL, FY22 TWIN FALLS 10 ADA RAMPSMP - ENV PRESV, Curb & Gutter

-

60

-

-

-

60- - -

CN

RWPE

----60-------

-----

--

--- - -

Construct 10 Americans with Disabilities curb ramps in Twin Falls.

ORN230164

FED RRX (L) FED RRXMINIDOKA HD

OFFSYS, N 800 E UPRR RRX, MINIDOKA HDMP 100.750 - 100.750 SAFTY/TRAF OPER, Railroad Gates

-

590

-

531

-

5920 18 2

CN

RWPE

-590------20---

-----

--

--- - -

Update gates and signals.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 63

Page 66: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 4 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027Construction

Right-of-WayDevelopment

13,64239,25117,80917,20616,93622,311--2037231,642-498--337385

Total 13,64239,74917,82917,20917,99624,338G: Project is grouped in STIP

1: Project is also shown in a Transportation Improvement Program

W: Work zone safety priority

CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition

Notes:

Phases:

2: Project is being advance constructed with non-federal funds

P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM

B: Project addresses Federal Bridge Condition PM

A: Project utilizes an alternative contracting method.

M: Project included in multiple programs

18,20119,236----

18,20119,236

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 64

Page 67: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 4 Public Transit Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Transit Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

193284

TRNS-OPS 5311 RuralMISCELLANEOUS

TRANSIT, D4 5311 STATEWIDE RURAL AREA FORMULA PROGMP 0.000 - 0.000 Transit Admin/Operations/PM

-

15,300

-

10,878

-

4,422- - -

CN

RWPE

-3,0603,0603,0603,0603,060------

-----

--

--- - -

Program provides capital, planning, and operating assistance to support public transportation operators who provide demand response and fixed route services  in rural areas with populations less than 50,000. Serving Blaine, Cassia, Gooding, Jerome, Lincoln, Minidoka, Twin Falls counties.

193674

TRNS-CAP 5310 RuralMISCELLANEOUS

TRANSIT, D4 5310 ELDERLY AND DISABLED MP 0.000 - 0.000 Transit Capital

-

1,080

-

864

-

216- - -

CN

RWPE

-216216216216216------

-----

--

--- - -

Program serves the special needs of transit‐dependent senior citizens and persons with disabilities by providing funds for projects which go beyond traditional transit services (demand response) including those required under the Americans with Disabilities Act (ADA). In Blaine, Cassia, Gooding, Jerome, Lincoln, Minidoka, Twin Falls counties.

197354

TRNS-CAP 5339 RuralMISCELLANEOUS

TRANSIT, D4 5339 BUS AND BUS FACILITYMP 0.000 - 0.000 Bus Purchase / Construction

-

5,688

-

4,550

-

1,138- - -

CN

RWPE

-1,1381,1381,1381,1381,138------

-----

--

--- - -

Program provides capital funding to replace, rehabilitate and purchase buses and related equipment or to construct bus‐related facilities in rural and small urban areas directly affecting Blaine, Cassia, Gooding, Jerome, Lincoln, Minidoka, Twin Falls counties.

199764

TRNS-OPS 5310 RuralMISCELLANEOUS

TRANSIT, D4 ELDERLY & DISABLEDMP 0.000 - 0.000 Demand Response Operations

-

1,080

-

540

-

540- - -

CN

RWPE

-216216216216216------

-----

--

--- - -

Program serves the special needs of transit‐dependent senior citizens and persons with disabilities by providing funds for projects which go beyond traditional transit services (demand response) including those required under the Americans with Disabilities Act (ADA).

ORN230594

TRNS-OPS 5311 RuralSTATE OF IDAHO (ITD)

TRANSIT, D4 5311 CARES ACTMP - Security

-

5,325

-

5,325

-

-- - -

CN

RWPE

-----5,325------

-----

--

--- - -

Provides operating and capital funding for Coronavirus Aid, Relief, and Economic Security in rural areas.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 65

Page 68: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 4 Public Transit Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Transit Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027Construction

Right-of-WayDevelopment

-4,6304,6304,6304,6309,954------------

Total -4,6304,6304,6304,6309,954G: Project is grouped in STIP

1: Project is also shown in a Transportation Improvement Program

W: Work zone safety priority

CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition

Notes:

Phases:

2: Project is being advance constructed with non-federal funds

P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM

B: Project addresses Federal Bridge Condition PM

A: Project utilizes an alternative contracting method.

M: Project included in multiple programs

--------

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 66

Page 69: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 4 Aeronautics Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Aeronautics Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

192284

APT-NEW CA-APTJEROME COUNTY

U94, HAZELTON, CONSTRUCT TAXIWAYMP 0.000 - 0.000 APT DEV, New Facility

-

60

-

-

-

60- - -

CN

RWPE

----60-------

-----

--

--- - -

Construction of a partial parallel taxiway at Hazelton Municipal Airport. This parallel taxiway will eliminate back‐taxiing on Runway 6‐24 and enhance airport safety. 

192824

APT-NEW CA-APTOAKLEY

1U6, OAKLEY, CONSTRUCT RUNWAYMP 0.000 - 0.000 APT DEV, New Facility

-

100

-

-

-

100- - -

CN

RWPE

----100-------

-----

--

--- - -

Pave existing runway area 3800' x 40'. Oakley is the furthest south landing area in the area. a paved runway would be a great asset to fire fighting efforts in south central Idaho.

197434

APT-NEW GA-APTJEROME COUNTY

JER, JEROME, CONSTRUCT TAXIWAY EXTENSIONMP 0.000 - 0.000 APT DEV, New Facility

-

150

-

135

-

15- - -

CN

RWPE

------------

-----

150-

--- - -

Design parallel taxiway extension to new runway end.

198904

APT-MTNC GA-APTBUHL

U03, BUHL, REHABILITATE APRONMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

222

-

200

-

22- - -

CN

RWPE

--222---------

-----

--

--- - -

Rehabilitate taxiway

200364

APT-MTNC PR-APTTWIN FALLS/TWIN FALLS CO

TWF, FY21 TWIN FALLS, REHABILITATE RUNWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

683

-

683

-

-- - -

CN

RWPE

-----683------

-----

--

--- - -

Pavement Maintenance ‐ Slurry Seal / Crack Fill

200754

APT-MTNC PR-APTTWIN FALLS/TWIN FALLS CO

TWF, TWIN FALLS, UPGRADE LIGHTING SYSTEMMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

341

-

341

-

-- - -

CN

RWPE

-----341------

-----

--

--- - -

Lighting system upgrade (R/W & T/W)

201024

APT-MTNC GA-APTBUHL

U03, BUHL, REHABILITATE TAXIWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

222

-

200

-

22- - -

CN

RWPE

--222---------

-----

--

--- - -

Rehabilitate taxiway

201164

APT-MTNC PR-APTTWIN FALLS/TWIN FALLS CO

TWF, TWIN FALLS, INSTALL PAPI & REILMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

171

-

171

-

-- - -

CN

RWPE

-----171------

-----

--

--- - -

PAPI / RIEL Upgrade

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 67

Page 70: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 4 Aeronautics Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Aeronautics Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

203884

APT-MTNC PR-APTTWIN FALLS/TWIN FALLS CO

TWF, TWIN FALLS, REHABILITATE RUNWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

4,583

-

4,297

-

286- - -

CN

RWPE

--4,583---------

-----

--

--- - -

Rehabilitate Runway 8/26 ‐ 7/26

205014

APT-NEW GA-APTJEROME COUNTY

JER, JEROME, ENVIRONMENTAL ASSESSMENTMP 0.000 - 0.000 APT DEV, New Facility

-

-

-

-

-

-344 310 34

CN

RWPE

----------344-

-----

--

--- - -

Prepare environmental assessment for runway/taxiway extension.  Airport Master Plan (currently underway) is developing justification for the extension.

205464

APT-MTNC GA-APTGOODING

GNG, GOODING MUNICIPAL, REHABILITATE RUNWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

167

-

167

-

-- - -

CN

RWPE

---167--------

-----

--

--- - -

Crack Seal, Seal coat & Remark

205614

APT-PLAN PR-APTTWIN FALLS/TWIN FALLS CO

TWF, TWIN FALLS, ENVIRONMENTAL ASSESSMENTMP 0.000 - 0.000 APT PLN, Airport Planning

-

-

-

-

-

-284 266 18

CN

RWPE

----------284-

-----

--

--- - -

Environmental EA for Cross wind Runway

205674

APT-MTNC GA-APTBUHL

U03, BUHL, REHABILITATE RUNWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

333

-

300

-

33- - -

CN

RWPE

--333---------

-----

--

--- - -

Crack Seal/Fog Coat Airport runway

206734

APT-MTNC GA-APTJEROME COUNTY

JER, JEROME, REHABILITATE RUNWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

2,389

-

2,389

-

-- - -

CN

RWPE

---2,389--------

-----

--

--- - -

Rehab Runway

208004

APT-NEW GA-APTBURLEY

BYI, NEW BURLEY AIRPORT RUNWAY CONSTRUCTION PHASMP 0.000 - 0.000 APT DEV, New Airport

-

5,049

-

4,544

-

505- - -

CN

RWPE

------------

-----

--

5,049-- - -

Construct Airfield electrical, runway and taxiway markings, terminal building, and install fuel system.

208064

APT-MTNC GA-APTBURLEY

BYI, NEW BURLEY AIRPORT CONSTRUCTION PHASE IVMP 0.000 - 0.000 APT DEV, New Facility

-

4,372

-

3,935

-

437- - -

CN

RWPE

-4,372----------

-----

--

--- - -

Access road pavement and airfield pavement placement

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 68

Page 71: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 4 Aeronautics Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Aeronautics Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

208184

APT-NEW GA-APTBURLEY

BYI, NEW BURLEY AIRPORT CONSTRUCT RUNWAY PHASE IIIMP 0.000 - 0.000 APT DEV, New Airport

-

4,379

-

3,941

-

438- - -

CN

RWPE

--4,379---------

-----

--

--- - -

New Burley Airport Construct Runway

225194

APT-MTNC GA-APTWEISER

S87, WEISER, AIRPORT PAVEMENT REHABMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

282

-

254

-

28- - -

CN

RWPE

--282---------

-----

--

--- - -

Weiser Airport runway, taxiway, and apron rehabilitation

225204

APT-PLAN GA-APTWEISER

S87, WEISER, AIRPORT TAXILANE DESIGNMP 0.000 - 0.000 APT PLN, Airport Planning

-

-

-

-

-

-100 90 10

CN

RWPE

-------100----

-----

--

--- - -

Weiser airport hangar taxilane design

225214

APT-NEW GA-APTWEISER

S87, WEISER, AIRPORT CONSTRUCT TAXILANESMP 0.000 - 0.000 APT DEV, New Facility

-

350

-

315

-

35- - -

CN

RWPE

------------

-----

--

350-- - -

Weiser airport hangar taxilane construction

225224

APT-PLAN GA-APTJEROME COUNTY

JER, JEROME, AIRPORT AGIS SURVEYMP 0.000 - 0.000 APT PLN, Airport Planning

-

-

-

-

-

-244 220 24

CN

RWPE

---------244--

-----

--

--- - -

Airport AGIS Survey 

225234

APT-PLAN GA-APTJEROME COUNTY

JER, JEROME, RUNWAY EXTENSION DESIGNMP 0.000 - 0.000 APT PLN, Airport Planning

-

-

-

-

-

-225 202 23

CN

RWPE

--------225---

-----

--

--- - -

Airport runway and taxiway extension design.

225244

APT-MTNC GA-APTJEROME COUNTY

JER, JEROME, AIRPORT RUNWAY EXTENSIONMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

1,556

-

1,400

-

156- - -

CN

RWPE

------------

-----

--

1,556-- - -

Runway extension for capacity

229334

APT-MTNC PU-APTJEROME COUNTY

U94, HAZELTON, RUNWAY REHABMP - RESRF/RESTO&REHAB, Facility Mainte

-

250

-

-

-

250- - -

CN

RWPE

----250-------

-----

--

--- - -

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 69

Page 72: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 4 Aeronautics Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Aeronautics Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027Construction

Right-of-WayDevelopment

6,9554,37210,0222,5564101,195-100225244628-------

Total 6,9554,47210,2472,8001,0381,195G: Project is grouped in STIP

1: Project is also shown in a Transportation Improvement Program

W: Work zone safety priority

CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition

Notes:

Phases:

2: Project is being advance constructed with non-federal funds

P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM

B: Project addresses Federal Bridge Condition PM

A: Project utilizes an alternative contracting method.

M: Project included in multiple programs

-150-----150

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 70

Page 73: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 5 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside BTPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

192475

STP-URBAN (L) STP-UBLACKFOOT

SMA-7607, S FISHER AVE; E WALKER ST TO ALICE ST, BLACKMP 100.150 - 100.850 RECONST/REALIGN, Base/Sub-base W

-

2,570

-

2,382

-

188290 269 21

CN

RWPE

2,570-----------

-----

--

--- - -

This project will provide a pavement rehabilitation to Fisher Street from Walker St. to Alice St. in Blackfoot.  This project will reconstruct the curb, gutters, pavement and draining systems on Fisher Street. Fisher St. will receive a full depth reconstruction from Alice Street to Walker Street. The project will lay a new sub base, road base, asphalt, and chip seal on the road. To eliminate storm water flooding, a new draining system will be put along the entire length of the project.

193765

CPCTY STPSTATE OF IDAHO (ITD)

US 91, SHELLEY NCL TO YORK RD, PH2MP 118.700 - 122.880 MAJRWIDN, Base/Sub-base Work & Re

-

10,910

-

10,109

-

801210 195 15

CN

RWPE

----5,6105,300------

-----

--

--- - -

This project will improve roadway capacity, improve transportation safety, and update substandard roadway features on Hwy‐91 between Shelley, Idaho (milepost 118.7) to York Rd. (Milepost 122.8). The improvements for the existing roadway will consist of: reconstructing intersections, increasing shoulder widths, adding additional lanes, adding a median for left turning movements, and replacing the Snake River Valley Canal Bridge. 

196055

CPCTY STPSTATE OF IDAHO (ITD)

I 86B, INT POCATELLO AVE, POWER COMP 4.080 - 4.080 SAFTY/TRAF OPER, Intersection Improv

350

2,524

93

2,339

257

185507 470 37

CN

RWPE

----2,524-------

-----

--

--- - -

This project will improve safety at the intersection of the I‐86 Business Loop and Pocatello Ave in American Falls. This will enhance safety by improving the traffic flow and increasing the mobility of the roadway.

196225

STP-RURAL (L) STP-RURALMALAD CITY

STC-1705, BANNOCK ST, MALAD CITYMP 0.000 - 0.710 RECONST/REALIGN, Undetermined Sur

-

2,385

-

2,210

-

175553 512 41

CN

RWPE

-2,385----------

-----

--

--- - -

This project will reconstruct approximately 0.7 miles of Bannock Street, which runs through the center of Malad city. Routine maintenance has kept the roadway drivable, but the heavy truck traffic along the route has deteriorated the pavement section. A major water system upgrade in the recent past has left this route with many utilities patches.  The roadway needs a complete reconstruction to re‐establish a proper pavement section.

198385

STP-RURAL (L) STP-RURALBEAR LAKE COUNTY

STC-1809, DINGLE E SHORE; BEACH TO CEMETERY, BEAR LAMP 9.780 - 12.280 RESRF/RESTO&REHAB, Base/Sub-bas

-

3,617

-

3,351

-

266408 378 30

CN

RWPE

3,617-----------

-----

--

--- - -

This project is located in Bear Lake County and includes Roadway reconstruction/rehabilitation with safety improvements by upgrading existing facilities with new pavement construction and other improvements.

WB2

198495

BR-RESTORE IMSTATE OF IDAHO (ITD)

I 15, ARIMO RD IC# 40, BANNOCK COMP 40.425 - 40.426 BR/APPRS, Bridge Replacement

-

9,828

-

9,069

-

759550 507 43

CN

RWPE

--4,4165,412--------

-----

--

--- - -

This project will replace the Arimo Road Interchange (#40) Bridge on I‐15 in Bannock County.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 71

Page 74: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 5 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside BTPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

199305

RAIL FED RRXINKOM

OFFSYS, PARK ST UPRR RRX, INKOMMP 0.000 - 0.000 SAFTY/TRAF OPER, Railroad Gates

-

200

-

180

-

20- - -

CN

RWPE

----200-------

-----

--

--- - -

Add crossing gates.

WB2

200835

BR-RESTORE IMSTATE OF IDAHO (ITD)

I 15, FORT HALL IC# 80, BANNOCK COMP 79.821 - 80.123 BR/APPRS, Bridge Replacement

-

18,873

-

17,414

-

1,459640 591 49

CN

RWPE

---7,42811,444-------

-----

--

--- - -

This project includes bridge replacements for I‐15 Exit #80 (mile point 79.9) Overhead Bridge including new ramps, Town Lateral Canal Bridge under I‐15 (mile point 80.14), and Ross Fork Creek Bridges under the Exit #80 ramps and I‐15 (mile point 79.8)  It will also include redesigning the roads that are directly adjacent to the bridges to fit the new geometric design of the ramps and bridges as necessary.

M20115

5

RDSIDE STSTATE OF IDAHO (ITD)

STATE, FY21 D5 REVEGETATIONMP 0.000 - 0.000 ENV PRESV, Environmental

-

117

-

-

-

1172 - 2

CN

RWPE

-----105-----(48)

-----

--

--- - -

M

5

OTHER ASSETS STSTATE OF IDAHO (ITD)

STATE, FY21 D5 REVEGETATIONMP 0.000 - 0.000 ENV PRESV, Environmental

-

117

-

-

-

1172 - 2

CN

RWPE

-----12------

-----

--

--- - -

This project will help vegetate areas disturbed by construction following the completion of work. 

201285

RAIL FED RRXBLACKFOOT

SMA-7601, RICH LN UPRR RRX, BLACKFOOTMP 0.028 - 0.028 SAFTY/TRAF OPER, Railroad Gates

-

200

-

180

-

2010 9 1

CN

RWPE

---200------10-

-----

--

--- - -

Add crossing gates.

204195

RDSIDE STPSTATE OF IDAHO (ITD)

STATE, FY21 D5 MONUMENT PRESERVATIONMP 0.000 - 0.000 ENV PRESV, Environmental

-

-

-

-

-

-160 148 12

CN

RWPE

-----------160

-----

--

--- - -

This project will hire a Professional Land Surveyor to preserve section corner and property corner markers during active construction projects.

RP204245

SAFETY HSIPSTATE OF IDAHO (ITD)

SH 39, THOMAS TO COLLINS SIDING RD, BLACKFOOTMP 51.451 - 52.698 MAJRWIDN, Turn Bay

-

2,429

-

2,251

-

178598 554 44

CN

RWPE

---------198--

-----

--

2,429-- - -

This project will involve the addition of a two way left turn lane, with a possible roundabout at the intersection of SH‐39 and Collins Siding Road. 

204375

OTHER ASSETS NHSTATE OF IDAHO (ITD)

US 30, D5 WILDLIFE FENCEMP 371.770 - 375.958 ENV PRESV, Wildlife/Game Crossings

-

1,276

-

1,177

-

9960 55 5

CN

RWPE

---1,276--------

-----

--

--- - -

This project will allow for the installation of wildlife fencing along US‐30. 

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 72

Page 75: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 5 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside BTPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

RP204815

SAFETY HSIPSTATE OF IDAHO (ITD)

US 26, MORELAND RD TO MP 303.5, BLACKFOOTMP 301.538 - 303.500 MAJRWIDN, Turn Bay

-

7,782

-

7,211

-

571200 185 15

CN

RWPE

---7,782--------

-----

--

--- - -

The scope of this project will be to construct three additional lanes on US‐26 to create a four‐lane highway with a two‐way left turn lane.

205155

RDSIDE STPSTATE OF IDAHO (ITD)

STATE, FY22 D5 MONUMENT PRESERVATIONMP 0.000 - 0.000 ENV PRESV, Environmental

-

-

-

-

-

-163 151 12

CN

RWPE

----------163-

-----

--

--- - -

This project will hire a Professional Land Surveyor to preserve section corner and property corner markers during active construction projects.

205955

TRAFFIC STPSTATE OF IDAHO (ITD)

STATE, FY23 BLACKFOOT SIGNAL UPGRADEMP 0.000 - 0.000 SAFTY/TRAF OPER, Traffic Signals

-

2,381

-

2,207

-

174250 232 18

CN

RWPE

----2,381-------

-----

--

--- - -

This project will include the installation of a new signal cabinet, mast arms, and will upgrade the signals to modern equipment on the ITD system throughout Blackfoot.

207335

RDSIDE STPSTATE OF IDAHO (ITD)

STATE, FY23 D5 MONUMENT PRESERVATIONMP 0.000 - 0.000 ENV PRESV, Environmental

-

-

-

-

-

-166 154 12

CN

RWPE

---------166--

-----

--

--- - -

This project will hire a Professional Land Surveyor to preserve section corner and property corner markers during active construction projects.

218335

OTHER ASSETS STPSTATE OF IDAHO (ITD)

STATE, FY25 D5 REVEGETATIONMP 0.000 - 0.000 ENV PRESV, Environmental

-

121

-

113

-

810 10 -

CN

RWPE

-121-------10--

-----

--

--- - -

This project will help vegetate areas disturbed by construction following the completion of work. 

218345

RDSIDE STPSTATE OF IDAHO (ITD)

STATE, FY25 D5 MONUMENT PRESERVATIONMP 0.000 - 0.000 ENV PRESV, Environmental

-

-

-

-

-

-173 160 13

CN

RWPE

-------173----

-----

--

--- - -

The goal of this project is to preserve right of way monuments damaged by roadway and associated construction. 

218545

OTHER ASSETS STPSTATE OF IDAHO (ITD)

STATE, FY24 D5 REVEGETATIONMP 0.000 - 0.000 ENV PRESV, Environmental

-

119

-

110

-

910 9 1

CN

RWPE

--119-------10-

-----

--

--- - -

This project will help vegetate areas disturbed by construction following the completion of work. 

218555

RDSIDE STPSTATE OF IDAHO (ITD)

STATE, FY24 MONUMENT PRESERVATIONMP 0.000 - 0.000 ENV PRESV, Environmental

-

-

-

-

-

-170 157 13

CN

RWPE

--------170---

-----

--

--- - -

The goal of this project is to preserve right of way monuments damaged by roadway and associated construction. 

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 73

Page 76: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 5 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside BTPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

219425

OTHER ASSETS STPSTATE OF IDAHO (ITD)

STATE, FY22 D5 REVEGETATIONMP 0.000 - 0.000 ENV PRESV, Environmental

-

109

-

101

-

810 9 1

CN

RWPE

----109-------

-----

--

--- - -

This project will help vegetate areas disturbed by construction following the completion of work. 

219435

OTHER ASSETS STPSTATE OF IDAHO (ITD)

STATE, FY23 D5 REVEGETATIONMP 0.000 - 0.000 ENV PRESV, Environmental

-

111

-

103

-

810 9 1

CN

RWPE

---111-------10

-----

--

--- - -

This project will help vegetate areas disturbed by construction following the completion of work. 

M22162

5

LP-ST LPTSTATE OF IDAHO (ITD)

US 30, ROCKY POINT WILDLIFE XING, BEAR LAKE COMP 442.000 - 448.000 ENV PRESV, Wildlife/Game Crossings

-

8,049

-

-

-

8,049260 - 260

CN

RWPE

-1,500----------

-----

--

--- - -

M

5

SAFETY STSTATE OF IDAHO (ITD)

US 30, ROCKY POINT WILDLIFE XING, BEAR LAKE COMP 442.000 - 448.000 ENV PRESV, Wildlife/Game Crossings

-

8,049

-

-

-

8,049260 - 260

CN

RWPE

-6,549----------

-----

--

--- - -

Add fencing and deer under crossings to mitigate deer/vehicle collisions at this location.  The deer migration has resulted in approximately 100 deer/vehicle collisions annually.

222875

OTHER ASSETS STPSTATE OF IDAHO (ITD)

STATE, FY26 D5 REVEGETATIONMP 0.000 - 0.000 ENV PRESV, Environmental

-

121

-

113

-

810 10 -

CN

RWPE

---------10--

-----

--

121-- - -

This project will help vegetate areas disturbed by construction following the completion of work. 

224865

OTHER ASSETS STPSTATE OF IDAHO (ITD)

SH 34, FY23 D5 GUARDRAIL REPLACEMENT, FRANKLIN COMP 23.500 - 26.300 SAFTY/TRAF OPER, Metal Guard Rail

-

229

-

212

-

1720 19 1

CN

RWPE

---229--------

-----

--

--- - -

This project will replace guardrail from milepost 23.5 to 26.3 on SH‐34 in Franklin Co.

W22487

5

OTHER ASSETS IMSTATE OF IDAHO (ITD)

I 86, FY21 D5 FENCE IMPROVEMENT, CASSIA/POWER COMP 14.820 - 19.000 SAFTY/TRAF OPER, Incidental Repairs

-

242

-

223

-

1922 20 2

CN

RWPE

-----242------

-----

--

--- - -

This project will improve the fencing along I‐86 between mileposts 14.82 and 19 in Cassia and Power counties.

W22488

5

OTHER ASSETS IMSTATE OF IDAHO (ITD)

I 86, FY22 D5 FENCE IMPROVEMENTS, POWER COMP 19.000 - 29.000 SAFTY/TRAF OPER, Incidental Repairs

-

449

-

414

-

3540 37 3

CN

RWPE

----449-------

-----

--

--- - -

This project will improve the fences along I‐86 between mileposts 19 and 29 in Power county.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 74

Page 77: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 5 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside BTPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

W22489

5

OTHER ASSETS IMSTATE OF IDAHO (ITD)

I 15, FY23 D5 FENCE IMPROVEMENTS, BANNOCK COMP 27.000 - 37.000 SAFTY/TRAF OPER, Incidental Repairs

-

458

-

422

-

3640 37 3

CN

RWPE

---458--------

-----

--

--- - -

This project will improve fencing along I‐15 between mileposts 27 and 37 in Bannock County.

M22598

5

BR-DSCR BR-DISCRLOCAL HIGHWAY TECHNICA

OFFSYS, ST CHARLES CREEK BR, BEAR LAKE COMP 100.053 - 100.053 BR/APPRS, Bridge Replacement

-

543

-

491

-

52415 384 31

CN

RWPE

-----358------

-----

--

--- - -

M

5

BR-OFF BR-OFFLOCAL HIGHWAY TECHNICA

OFFSYS, ST CHARLES CREEK BR, BEAR LAKE COMP 100.053 - 100.053 BR/APPRS, Bridge Replacement

-

543

-

491

-

52415 384 31

CN

RWPE

-----172-----156

-----

--

--- - -

M

5

LP-ST LPTLOCAL HIGHWAY TECHNICA

OFFSYS, ST CHARLES CREEK BR, BEAR LAKE COMP 100.053 - 100.053 BR/APPRS, Bridge Replacement

-

543

-

491

-

52415 384 31

CN

RWPE

-----12------

-----

--

--- - -

Replace ST CHARLES CREEK BR, BEAR LAKE CO

ORN226495

OTHER ASSETS STPSTATE OF IDAHO (ITD)

STATE, FY27 D5 REVEGETATIONMP - ENV PRESV, Environmental

-

124

-

115

-

911 10 1

CN

RWPE

--------11---

-----

124-

--- - -

This project will help vegetate areas disturbed by construction following the completion of work.

ORN226545

PLAN STPSTATE OF IDAHO (ITD)

STATE, D5 MATERIALS RECONNAISSANCEMP - SYS PLN, System Planning

-

-

-

-

-

-150 139 11

CN

RWPE

---------2525100

-----

--

--- - -

This project will provide funds for the materials lab to run tests for potential and upcoming projects.

ORN227595

SAFETY STSTATE OF IDAHO (ITD)

STATE, FY21 D5 INTERSECTION IMPROVEMENTSMP - SAFTY/TRAF OPER, Intersection Improv

-

-

-

-

-

-55 - 55

CN

RWPE

-----------55

-----

--

--- - -

This project will allow for improvements to intersections throughout southeastern Idaho.

ORN229575

TAP TAP-URBANINKOM

I 15B, INKOM ELEMENTARY SCHOOL SIDEWALK, INKOMMP - ENV PRESV, Sidewalk

-

485

-

450

-

3550 46 4

CN

RWPE

---485------50-

-----

--

--- - -

Install 8’ sidewalks on three segments: I‐15B at Main St, to Holstein St; to the Elementary School Driveway.

ORN229755

OPS STROCKLAND

LOCAL, FY22 ROCKLAND 11 ADA RAMPSMP - ENV PRESV, Curb & Gutter

-

44

-

-

-

44- - -

CN

RWPE

----44-------

-----

--

--- - -

Construct 11 Americans with Disabilities curb ramps in Rockland, Power Co., Idaho.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 75

Page 78: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 5 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside BTPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027Construction

Right-of-WayDevelopment

2,55010,5554,53523,38222,7626,202-173180410258433------

Total 2,55010,7284,71523,79223,0206,635G: Project is grouped in STIP

1: Project is also shown in a Transportation Improvement Program

W: Work zone safety priority

CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition

Notes:

Phases:

2: Project is being advance constructed with non-federal funds

P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM

B: Project addresses Federal Bridge Condition PM

A: Project utilizes an alternative contracting method.

M: Project included in multiple programs

6,187124----

6,187124

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 76

Page 79: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 5 Public Transit Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Transit Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside BTPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

194225

TRNS-OPS 5311 RuralMISCELLANEOUS

TRANSIT, D5 5311 STATEWIDE RURAL AREA FORMULA PROGMP 0.000 - 0.000 Transit Admin/Operations/PM

-

7,060

-

4,828

-

2,232- - -

CN

RWPE

-1,4121,4121,4121,4121,412------

-----

--

--- - -

Program provides capital, planning, and operating assistance to support public transportation operators who provide demand response and fixed route services  in rural areas with populations less than 50,000. Serving Bannock, Bear Lake, Bingham, Caribou, Franklin, Oneida, Power counties.

M19686

5

TRNS-CAP 5339 RuralMISCELLANEOUS

TRANSIT, D5 5339 BUS AND BUS FACILITYMP 0.000 - 0.000 Bus Purchase / Construction

-

3,510

-

2,808

-

702- - -

CN

RWPE

-525525525525525------

-----

--

--- - -

M

5

TRNS-CAP 5339 SUrbMISCELLANEOUS

TRANSIT, D5 5339 BUS AND BUS FACILITYMP 0.000 - 0.000 Bus Purchase / Construction

-

3,510

-

2,808

-

702- - -

CN

RWPE

-177177177177177------

-----

--

--- - -

Program provides capital funding to replace, rehabilitate and purchase buses and related equipment or to construct bus‐related facilities in rural and small urban areas directly affecting Bannock, \ Bear Lake, Bingham, Caribou, Franklin, Oneida, Power counties.

M20262

5

TRNS-OPS 5310 SUrbMISCELLANEOUS

TRANSIT, D5 ELDERLY & DISABLEDMP 0.000 - 0.000 Demand Response Operations

-

1,505

-

1,204

-

301- - -

CN

RWPE

-241241241241241------

-----

--

--- - -

M

5

TRNS-OPS 5310 RuralMISCELLANEOUS

TRANSIT, D5 ELDERLY & DISABLEDMP 0.000 - 0.000 Demand Response Operations

-

1,505

-

1,204

-

301- - -

CN

RWPE

-6060606060------

-----

--

--- - -

Program serves the special needs of transit‐dependent senior citizens and persons with disabilities by providing funds for projects which go beyond traditional transit services (demand response) including those required under the Americans with Disabilities Act (ADA).

ORN230605

TRNS-OPS 5311 RuralSTATE OF IDAHO (ITD)

TRANSIT, D5 5311 CARES ACTMP - Security

-

2,458

-

2,458

-

-- - -

CN

RWPE

-----2,458------

-----

--

--- - -

Provides operating and capital funding for Coronavirus Aid, Relief, and Economic Security in rural areas.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 77

Page 80: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 5 Public Transit Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Transit Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside BTPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027Construction

Right-of-WayDevelopment

-2,4152,4152,4152,4154,873------------

Total -2,4152,4152,4152,4154,873G: Project is grouped in STIP

1: Project is also shown in a Transportation Improvement Program

W: Work zone safety priority

CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition

Notes:

Phases:

2: Project is being advance constructed with non-federal funds

P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM

B: Project addresses Federal Bridge Condition PM

A: Project utilizes an alternative contracting method.

M: Project included in multiple programs

--------

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 78

Page 81: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 5 Aeronautics Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Aeronautics Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside BTPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

193575

APT-NEW GA-APTBEAR LAKE COUNTY

1U7, BEAR LAKE, SNOW REMOVAL EQUIPMENTMP 0.000 - 0.000 APT DEV, New Facility

-

333

-

300

-

33- - -

CN

RWPE

---333--------

-----

--

--- - -

Multidirectional Tractor w/ plow, broom, blower & bucket. 

199725

APT-NEW GA-APTBEAR LAKE COUNTY

1U7, BEAR LAKE, SNOW REMOVAL EQUIPMENT BUILDINGMP 0.000 - 0.000 APT DEV, New Facility

-

333

-

300

-

33- - -

CN

RWPE

----333-------

-----

--

--- - -

Storage Bldg. for SRE. 

201615

APT-MTNC GA-APTBEAR LAKE COUNTY

1U7, BEAR LAKE, RUNWAY DECOUPLING, DESIGNMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

-

-

-

-

-333 300 33

CN

RWPE

--------333---

-----

--

--- - -

Design ‐ Decouple Runway Ends/Construct Taxiway

201905

APT-MTNC GA-APTBEAR LAKE COUNTY

1U7, BEAR LAKE, RUNWAY DECOUPLING, CONSTRUCTMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

1,833

-

1,650

-

183- - -

CN

RWPE

-1,833----------

-----

--

--- - -

Construct ‐ Decouple Runway Ends/Construct Taxiway

203775

APT-MTNC GA-APTBLACKFOOT

U02, BLACKFOOT, INSTALL AWOSMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

406

-

365

-

41- - -

CN

RWPE

-406----------

-----

--

--- - -

Install AWOS ‐ Currently pilots have to get weather reporting from either Idaho Falls Regional Airport or Pocatello Regional Airport. 

203825

APT-NEW GA-APTABERDEEN

U36, ABERDEEN, CONSTRUCT RUNWAYMP 0.000 - 0.000 APT DEV, New Facility

-

1,125

-

1,012

-

113- - -

CN

RWPE

-1,125----------

-----

--

--- - -

Runway relocation.

203875

APT-MTNC CA-APTSODA SPRINGS

U78, SODA SPRINGS, RECONSTRUCT APRONMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

86

-

-

-

86- - -

CN

RWPE

-----86------

-----

--

--- - -

207415

APT-NEW GA-APTABERDEEN

U36, ABERDEEN, CONSTRUCT RUNWAY, DESIGNMP 0.000 - 0.000 APT DEV, New Facility

-

-

-

-

-

-444 400 44

CN

RWPE

----------444-

-----

--

--- - -

Ph. 1 ‐ Design

221815

APT-MTNC GA-APTBLACKFOOT

U02, PLANNING-CONDUCT ENVIRONMENTAL ASSESSEMENTMP 0.000 - 0.000 APT PLN, Airport Planning

-

-

-

-

-

-333 333 -

CN

RWPE

-----------333

-----

--

--- - -

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 79

Page 82: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 5 Aeronautics Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Aeronautics Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside BTPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

225295

APT-PLAN GA-APTBLACKFOOT

U02, BLACKFOOT, MCCARLEY FIELD ENVIRONMENTAL ASSEMP 0.000 - 0.000 APT PLN, Airport Planning

-

-

-

-

-

-456 410 46

CN

RWPE

----------456-

-----

--

--- - -

McCarley Airfield Environmental Assessment

225305

APT-MTNC GA-APTBLACKFOOT

U02, BLACKFOOT, MCCARLEY FIELD RUNWAY REHABMP 0.000 - 0.000 RESRF/RESTO&REHAB, Facility Mainte

-

2,111

-

1,900

-

211- - -

CN

RWPE

--2,111---------

-----

--

--- - -

McCarley Field runway rehabilitation

225315

APT-MTNC GA-APTBLACKFOOT

U02, BLACKFOOT, MCCARLEY FIELD TAXIWAY REHABMP 0.000 - 0.000 RESRF/RESTO&REHAB, Facility Mainte

-

167

-

150

-

17- - -

CN

RWPE

---167--------

-----

--

--- - -

McCarly Field crack seal, fog seal, stripe taxiway

225325

APT-PLAN GA-APTBLACKFOOT

U02, BLACKFOOT, MCCARLEY FIELD APRON DESIGNMP 0.000 - 0.000 APT PLN, Airport Planning

-

-

-

-

-

-167 150 17

CN

RWPE

------------

-----

--

-167

- - -

McCarley Field apron rehab design

225335

APT-MTNC GA-APTBLACKFOOT

U02, BLACKFOOT, MCCARLEY FIELD APRON REHABMP 0.000 - 0.000 RESRF/RESTO&REHAB, Facility Mainte

-

1,167

-

1,050

-

117- - -

CN

RWPE

------------

-----

--

1,167-- - -

McCarley Field apron rehabilitation

225375

APT-MTNC GA-APTABERDEEN

U36, ABERDEEN, AIRPORT RUNWAY CONSTRUCTION PH IIMP 0.000 - 0.000 RECONST/REALIGN, Facility Maintenan

-

337

-

303

-

34- - -

CN

RWPE

--337---------

-----

--

--- - -

PH II Aberdeen Airport Runway Construction

225385

APT-MTNC GA-APTABERDEEN

U36, ABERDEEN, AIRPORT PAVEMENT REHABMP 0.000 - 0.000 RESRF/RESTO&REHAB, Facility Mainte

-

145

-

131

-

14- - -

CN

RWPE

------------

-----

--

145-- - -

225395

APT-NEW GA-APTABERDEEN

U36, ABERDEEN, AIRPORT LAND ACQUISITIONMP 0.000 - 0.000 APT DEV, Facility Maintenance

525

-

525

-

-

-- - -

CN

RWPE

------------

----525

--

--- - -

Aberdeen Airport land acquisition for runway relocation

225405

APT-MTNC GA-APTABERDEEN

U36, ABERDEEN, AIRPORT FENCEMP 0.000 - 0.000 APT DEV, Safety

-

175

-

158

-

17- - -

CN

RWPE

-175----------

-----

--

--- - -

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 80

Page 83: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 5 Aeronautics Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Aeronautics Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside BTPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

Aberdeen Airport construct perimeter fence

225635

APT-MTNC GA-APTFRANKLIN COUNTY

U10, PRESTON, AIRPORT RUNWAY REHABMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

7,142

-

6,428

-

714- - -

CN

RWPE

----7,142-------

-----

--

--- - -

Design and construct runway rehab.

225645

APT-MTNC GA-APTFRANKLIN COUNTY

U10, PRESTON, AIRPORT PAVEMENT REHABMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

67

-

60

-

7- - -

CN

RWPE

---67--------

-----

--

--- - -

Airport taxiway and apron rehabilitation.

225875

APT-MTNC GA-APTFRANKLIN COUNTY

U10, PRESTON, AIRPORT RUNWAY REHABMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

115

-

104

-

11- - -

CN

RWPE

------------

-----

--

115-- - -

229355

APT-MTNC GA-APTABERDEEN

U36, ABERDEEN, AIRPORT RUNWAY RELOCATIONMP - APT DEV, Facility Maintenance

-

250

-

225

-

25- - -

CN

RWPE

---250--------

-----

--

--- - -

229365

APT-MTNC GA-APTBEAR LAKE COUNTY

1U7, BEAR LAKE, AIRPORT REHABMP - RESRF/RESTO&REHAB, Facility Mainte

-

6,400

-

6,400

-

-- - -

CN

RWPE

-----6,400------

-----

--

--- - -

Construction

Right-of-WayDevelopment

1,4273,5392,4488177,4756,486167-333-900333

-----525Total 1,5943,5392,7818178,3757,344

G: Project is grouped in STIP

1: Project is also shown in a Transportation Improvement Program

W: Work zone safety priority

CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition

Notes:

Phases:

2: Project is being advance constructed with non-federal funds

P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM

B: Project addresses Federal Bridge Condition PM

A: Project utilizes an alternative contracting method.

M: Project included in multiple programs

--------

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 81

Page 84: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 6 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside BMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

P140546

RESTORE NHSTATE OF IDAHO (ITD)

US 20, JCT SH 87 TO MT ST LN (TARGHEE PASS) PH 1 & PH 2MP 401.500 - 406.300 RECONST/REALIGN, Minor Widening

-

22,311

-

20,674

-

1,6372,340 2,168 172

CN

RWPE

-13,470----------

-----

--

8,841-- - -

Reconstruction of four miles of U.S. 20, with potential for truck climbing lane.

140586

STP-RURAL (L) STP-RURALCLARK COUNTY

STC-6805, A2 HIGHWAY, CLARK COMP 2.000 - 9.000 RESRF/RESTO&REHAB, Base/Sub-bas

-

5,232

-

4,848

-

384429 398 31

CN

RWPE

---5,232--------

-----

--

--- - -

This project will improve the A2 Hwy in Clark County by widening the roadway, fixing soft spots, adding additional base and paving the roadway.  This will include the replacement of culverts, and other minor drainage improvements.  The project will widen the road from 22 ‐ 26 foot section to a 30 foot section which will require modifications to cattle guards and box culverts.

140596

STP-RURAL (L) STP-RURALFREMONT COUNTY

STC-6770, N SALEM RD, FREMONT COMP 3.928 - 4.928 RESRF/RESTO&REHAB, Base/Sub-bas

-

3,462

-

3,208

-

254300 278 22

CN

RWPE

----3,462-------

-----

--

--- - -

This project will widen and improve the existing sub‐base to match the middle section of Salem Road in Fremont County.  It is anticipated that a Cement Recycle and Base Stabilization(CRAB) project will be performed also.  

189336

STP-RURAL (L) STP-RURALCUSTER COUNTY

STC-6867, GARDEN CR RD TO CHALLIS CLMP 142.356 - 144.347 RESRF/RESTO&REHAB, Pavement Re

152

2,938

141

2,722

11

216783 726 57

CN

RWPE

---2,938-------100

----152

--

--- - -

The purpose of this project is to rebuild Garden Creek Road from the crossing at Garden Creek up to the Challis city limits. The work will include a full reconstruction of the road structure, correcting horizontal and vertical alignment deficiencies, and improving drainage.

193056

STP-RURAL (L) STP-RURALJEFFERSON COUNTY

STC-6748, ANNIS HWY; RIGBY TO MENAN-LORENZO HWYMP 0.900 - 3.910 RESRF/RESTO&REHAB, Minor Widenin

-

2,327

-

2,156

-

171307 284 23

CN

RWPE

--2,327---------

-----

--

--- - -

This project will improve the Annis Hwy from the northern Rigby City Limit to the Menan‐Lorenzo Highway. This project will include an asphalt overlay, shoulder widening, geometric improvements of an un‐safe horizontal curve and site clearing along the right‐of‐way to improve the geometric configuration of an accident prone intersection.

M19358

6

SAFETY HSIPSTATE OF IDAHO (ITD)

US 20, INT SH 47 IMPROVEMENTS, ASHTONMP 360.572 - 360.572 SAFTY/TRAF OPER, Intersection Improv

-

5,420

-

5,023

-

397550 510 40

CN

RWPE

---1,644--------

-----

--

--- - -

M

6

RESTORE NHSTATE OF IDAHO (ITD)

US 20, INT SH 47 IMPROVEMENTS, ASHTONMP 360.572 - 360.572 SAFTY/TRAF OPER, Intersection Improv

-

5,420

-

5,023

-

397550 510 40

CN

RWPE

---3,777--------

-----

--

--- - -

This project will improve safety and upgrade the intersection of Hwy‐47 and Hwy‐20 within Ashton. 

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 82

Page 85: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 6 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside BMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

195666

BR-OFF BR-OFFFREMONT COUNTY

OFFSYS, FUN FARM BRIDGE, FREMONT COMP 0.000 - 0.000 BR/APPRS, Bridge Replacement

-

4,762

-

4,412

-

350739 685 54

CN

RWPE

--4,762---------

-----

--

--- - -

This project will replace the Fun Farm Bridge in Fremont County. The bridge is located at 2663 South River Road in Fremont County; this is approximately 3.00 miles east of the City of St. Anthony and the bridge crosses the Henrys Fork of the Snake River.  This Fun Farm Bridge is Structurally Deficient and is in need of replacement.

197966

FLAP FLAPLEMHI COUNTY

US 93, 2L HWY 93 TRAIL, LEMHI COMP 263.840 - 265.000 ENV PRESV, Bicycle/Pedestrian/Equestr

-

2,357

-

2,184

-

173212 141 71

CN

RWPE

-----2,357------

-----

--

--- - -

Construct paved trail in the US‐93 right‐of‐way from Salmon to Shoup Bridge BLM site and improve the BLM site.

197976

FLAP FLAPCLARK COUNTY

STC-6805, YALE KILGORE RD IMPROVEMENT, CLARK COMP 9.000 - 16.863 RESRF/RESTO&REHAB, Pavement Re

-

6,676

-

6,186

-

490406 356 50

CN

RWPE

---6006,076------75

-----

--

--- - -

Widen the roadway to a consistent 30 feet and improve the roadway base through excavation and adding additional base aggregate and improving the roadway surface from gravel to hot mix asphalt pavement.

197986

FLAP FLAPFREMONT COUNTY

STC-6805, YALE KILGORE RD IMPROVEMENT, FREMONT COMP 16.865 - 27.908 RESRF/RESTO&REHAB, Pavement Re

-

7,358

-

6,818

-

540484 482 2

CN

RWPE

---6636,097598-----33

-----

--

--- - -

New gravel trail running parallel to the road on the south side.  Ideally this trail would be paved but due to the size of the project, this phase will include only gravel.

M20053

6

SAFETY HSIPSTATE OF IDAHO (ITD)

US 20, CHESTER TO ASHTON , FREMONT COMP 352.200 - 363.380 RECONST/REALIGN, Plant Mix Paveme

8,490

47,899

7,867

44,383

623

3,5162,050 1,900 150

CN

RWPE

--14,645---------

-----

--

--- - -

M

6

RESTORE NHSTATE OF IDAHO (ITD)

US 20, CHESTER TO ASHTON , FREMONT COMP 352.200 - 363.380 RECONST/REALIGN, Plant Mix Paveme

8,490

47,899

7,867

44,383

623

3,5162,050 1,900 150

CN

RWPE

-14,79518,460---------

--8,490--

--

--- - -

This project will begin at milepost 352.20 and end at milepost 360.25. The project consists of constructing a 4 lane divided highway with the addition of 2 new interchanges. This will eliminate all at grade crossings within the project limits and add frontage roads for access to US 20.

RP203796

SAFETY HSIPSTATE OF IDAHO (ITD)

US 26, CLARK HILL REST AREA TURN LNS, BONNEVILLE COMP 357.100 - 357.600 MAJRWIDN, Turn Bay

-

2,846

-

2,637

-

209185 171 14

CN

RWPE

----2,846-------

-----

--

--- - -

This project is located on US26 from milepost 357.1 to milepost 357.6.The project will  construct a center turn lane and a right turn lane into the Clark Hill Rest  Area. This will create a safe lane for traffic that is turning into the rest area. Signing and striping will also be constructed to designate the turn lane areas.

RP204116

SAFETY HSIPSTATE OF IDAHO (ITD)

US 26, ANTELOPE FLATS PASSING LANE, BONNEVILLE COMP 360.300 - 363.000 MAJRWIDN, Passing Lane

-

4,478

-

4,149

-

329185 171 14

CN

RWPE

----4,478-------

-----

--

--- - -

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 83

Page 86: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 6 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside BMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

This project is located on US26 from milepost 360.3 to milepost 363.00. The project will construct alternating passing lanes. This will increase the mobility and safety of US 26 during peak traffic seasons. Signing will also be installed designating the passing lanes.

A20581

6

RESTORE NHSTATE OF IDAHO (ITD)

US 20, SHEEP FALLS TO PINEHAVEN OVERLAY, FREMONT CMP 369.000 - 377.500 RESRF/RESTO&REHAB, Pavement Ma

-

6,936

-

6,427

-

5092,200 2,039 161

CN

RWPE

----6,936-------

-----

--

--- - -

The scope of this project is to mill 0.1 of pavement to eliminate existing rutting and cracks. Then an overlay will be applied to provide stability of the roadway and extend the life of the pavement surface.

205996

STP-RURAL (L) STP-RURALMADISON COUNTY

STC-6760, W SIDE FRONTAGE RD, MADISON COMP 98.470 - 100.000 NEW RTE, Grading & Drainage

96

3,989

89

3,696

7

293469 435 34

CN

RWPE

3,989-----------

----96

--

--- - -

Construct new 2‐lane frontage road west side of US‐20 between the Thornton IC and 3000 S. New IC restricted access to US‐20 and this frontage road will restore access and improve traffic flow.

206116

RAIL FED RRXJEFFERSON COUNTY

OFFSYS, 500 N EIRR RRX, NR RIGBYMP 100.019 - 100.019 SAFTY/TRAF OPER, Safety Improveme

-

100

-

90

-

10- - -

CN

RWPE

----100-------

-----

--

--- - -

Install insulated concrete planking.

206186

RAIL FED RRXJEFFERSON COUNTY

OFFSYS, 550 N EIRR RRX, NR RIGBYMP 100.019 - 100.019 SAFTY/TRAF OPER, Safety Improveme

-

100

-

90

-

10- - -

CN

RWPE

----100-------

-----

--

--- - -

Install insulated concrete planking.

RP206636

CPCTY NHSTATE OF IDAHO (ITD)

US 93, TOMCAT HILL CURVES, BLAINE COMP 221.000 - 223.000 SAFTY/TRAF OPER, Slope Flattening

-

5,358

-

4,965

-

393750 695 55

CN

RWPE

-5,358----------

-----

--

--- - -

This project will increase the radius of the curves which are now substandard and difficult to navigate with the heavy commercial traffic. The super elevation of the curves will also be design to meet AASHTO standards. The location of this project is on US 93 at milepost 221 to milepost 223. 

207106

CPCTY STECMSTATE OF IDAHO (ITD)

SH 33, TETON CO INTERSECTION IMPROVEMENTSMP 138.700 - 149.400 SAFTY/TRAF OPER, Intersection Improv

-

4,654

-

-

-

4,654450 139 311

CN

RWPE

-4,654----------

-----

--

--- - -

This project will improve intersections and add turn lanes on SH33 from milepost 138.70 to milepost 149.40.

207746

FLAP (L) FLAPSALMON NATL FOREST

STC-6867, YANKEE FORK RD, CUSTER COMP 100.000 - 142.000 PM, Bridge Deck Repair

-

3,350

-

3,104

-

246- - -

CN

RWPE

-----3,350------

-----

--

--- - -

Surface stabilization, dust control, bridge work, bridge guardrail and curb upgrades, culvert replacement, vehicular turnouts within the one‐lane roadway section, restore shoulders and ditches, fill stabilization, and signage upgrades.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 84

Page 87: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 6 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside BMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

M21798

6

PAVE NHSTATE OF IDAHO (ITD)

SH 33, JCT US 20 (IC 333), REXBURGMP 77.800 - 78.600 SAFTY/TRAF OPER, Intersection Improv

431

4,807

399

4,454

32

353704 652 52

CN

RWPE

-----------150

----390

--

--- - -

M

6

CPCTY NHSTATE OF IDAHO (ITD)

SH 33, JCT US 20 (IC 333), REXBURGMP 77.800 - 78.600 SAFTY/TRAF OPER, Intersection Improv

431

4,807

399

4,454

32

353704 652 52

CN

RWPE

---4,807------204-

---41-

--

--- - -

This project will reconstruct the intersections at the ramp locations on SH33. A diverging diamond layout is in the conceptual stage.

MR21799

6

PAVE NHSTATE OF IDAHO (ITD)

NHS-7726, JCT UNIVERSITY BLVD (IC 332), REXBURGMP 10.000 - 10.500 SAFTY/TRAF OPER, Intersection Improv

441

4,764

409

4,414

32

350744 689 55

CN

RWPE

-----------150

----390

--

--- - -

MR

6

CPCTY NHSTATE OF IDAHO (ITD)

NHS-7726, JCT UNIVERSITY BLVD (IC 332), REXBURGMP 10.000 - 10.500 SAFTY/TRAF OPER, Intersection Improv

441

4,764

409

4,414

32

350744 689 55

CN

RWPE

---4,69271-----204-

---51-

--

--- - -

This project will reconstruct the intersections at the ramp locations on University Blvd. A diverging diamond layout is in the conceptual stage.

219836

STP-RURAL (L) STP-RURALTETON COUNTY

STC-6809, N 500 W RECONSTRUCTION, TETON COMP 102.000 - 103.600 RESRF/RESTO&REHAB, Minor Widenin

-

1,564

-

1,450

-

114227 210 17

CN

RWPE

1,564----------227

-----

--

--- - -

Resurface and widen existing N500W north of ID33 to serve residents and campers.

219846

BR-LOCAL BR-LOCMADISON COUNTY

STC-6774, MOODY RD BR, MADISON COMP 1.760 - 2.160 BR/APPRS, Bridge Replacement

92

3,588

85

3,325

7

263- - -

CN

RWPE

3,588-----------

---92-

--

--- - -

Replace existing Moody Road Bridge over the South Fork of the Teton River. Bridge is in poor condition, river floods and undermines the bridge approach.

220716

TAP TAP-URBANREXBURG

OFFSYS, BARNEY DAIRY RD TO NORTH HILL RD PATH, REXBMP 0.000 - 0.000 ENV PRESV, Bicycle/Pedestrian/Equestr

-

159

-

148

-

1117 15 2

CN

RWPE

-----159------

-----

--

--- - -

The shared use pathway is located between the city streets of Barney Dairy Road and North Hill Road. The pathway will run along the east side of the School District’s baseball field, football field, parking lot, and Junior High School building. The pathway begins at the end of the existing greenbelt path and existing crosswalk across Barney Dairy Road and ends at the end of the existing sidewalk in North Hill Road.

222226

MAJOR IMSTATE OF IDAHO (ITD)

US 20, JCT I-15 CONNECTOR, IDAHO FALLSMP 0.000 - 0.000 NEW RTE, Grading & Drainage

-

20,460

-

18,878

-

1,58212,500 11,534 966

CN

RWPE

Unfunded-----Unfunded-----

-----

--

--- - Unfunded

This project will take the alternatives developed during a Planning and Environmental Linkage study and carry them into NEPA for final evaluation of alternatives, selection, design, and construction of improvements near Idaho Falls in Bonneville Co.  No mileposts have been determined as of yet we are still in the alternative screening process.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 85

Page 88: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 6 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside BMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

224126

SAFETY (L) HSIP (L)REXBURG

LOCAL, TRAFFIC SIGNAL HEADS, REXBURGMP 0.000 - 0.000 SAFTY/TRAF OPER, Traffic Signals

-

80

-

80

-

-10 10 -

CN

RWPE

-----80-----10

-----

--

--- - -

For the work of increasing safety at all signaled intersections in the City by utilizing safety countermeasures with the installation of Yellow Retro‐reflective Back‐plates at every signal. This will increase visibility of the traffic signal lights.

224136

SAFETY (L) HSIP (L)MADISON COUNTY

STC-6760, W 5200 S SAFETY IMPROVEMENTS, MADISON COMP 101.250 - 102.460 SAFTY/TRAF OPER, Minor Widening

-

500

-

463

-

3772 67 5

CN

RWPE

----500------72

-----

--

--- - -

For the work of increasing safety of the roadway with shoulder widening and paving along with the installation of roadway striping with fog line delineation.  The project is located on W 5200 S between mileposts 101.25 and 102.46.

224146

SAFETY (L) HSIP (L)ASHTON

LOCAL, SIGNING SAFETY UPGRADES, ASHTONMP 0.000 - 0.000 SAFTY/TRAF OPER, Signing Improvem

-

206

-

191

-

1531 29 2

CN

RWPE

----206------31

-----

--

--- - -

For the work of increasing safety to all roadway users by making signs more predominant. The new signs will be installed per the Manual of uniform traffic Control Devices (MUTCD) height and offset guidelines on U‐channel steel posts that conform to the MUTCD. All signs will be retroreflective per the MUTCD guidelines and of the correct size.

224246

OTHER ASSETS STSTATE OF IDAHO (ITD)

SH 32, FY21 D6 ROAD CLOSURE GATESMP 0.030 - 0.030 SAFTY/TRAF OPER, Safety Improveme

-

320

-

-

-

32020 - 20

CN

RWPE

-----320------

-----

--

--- - -

This project will install road closure gates at designated locations where highways are often closed due to winter storms.  The locations include SH‐32 at mileposts 0.03 and 28.36 and US‐20 at mileposts 299.7, 301.4, 276.2, and 264.

P224256

PAVE NHSTATE OF IDAHO (ITD)

US 20, ASHTON HILL SEAL COAT, FREMONT COMP 363.691 - 369.000 PM, Seal Coat

-

1,018

-

943

-

7520 19 1

CN

RWPE

----1,018------20

-----

--

--- - -

This project will construct a seal coat on US‐20 between mileposts 363.691 and 369.0 to preserve and protect the new pavement.

224266

OTHER ASSETS STSTATE OF IDAHO (ITD)

US 20, RIGBY LIGHTINGMP 320.485 - 321.891 SAFTY/TRAF OPER, Illumination

-

1,205

-

-

-

1,20565 - 65

CN

RWPE

-----1,205------

-----

--

--- - -

This project will install lighting on US‐20 between the South Rigby Interchange (milepost 320.485) and the North Rigby Interchange (milepost 321.891).

224276

OTHER ASSETS STPSTATE OF IDAHO (ITD)

STATE, FY22 D6 SIGNAL UPGRADEMP 0.000 - 0.000 SAFTY/TRAF OPER, Traffic Signals

-

337

-

312

-

2520 19 1

CN

RWPE

----337------20

-----

--

--- - -

This project will upgrade and improve traffic signals throughout the District.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 86

Page 89: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 6 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside BMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

224286

OTHER ASSETS STSTATE OF IDAHO (ITD)

US 93, FY21 D6 ROCKFALL MITIGATIONMP 272.100 - 350.000 SAFTY/TRAF OPER, Safety Improveme

-

120

-

-

-

12040 - 40

CN

RWPE

-----120------

-----

--

--- - -

This project will address areas of rock fall which need to have mitigation measures engineered and installed.

224296

OTHER ASSETS STPSTATE OF IDAHO (ITD)

SH 75, FY22 D6 ROCKFALL MITIGATIONMP 217.000 - 240.000 SAFTY/TRAF OPER, Safety Improveme

-

122

-

113

-

940 37 3

CN

RWPE

----122------40

-----

--

--- - -

This project will address areas of rock fall requiring engineered and installed mitigation measures.

224426

OTHER ASSETS STSTATE OF IDAHO (ITD)

STATE, FY22 D6 PEDESTRIAN IMPROVEMENTSMP 0.000 - 0.000 SAFTY/TRAF OPER, Intersection Improv

-

337

-

-

-

33715 - 15

CN

RWPE

----337------15

-----

--

--- - -

This project will convert Rectangular Rapid Flashing Beacon (RRFB) crosswalks at various locations throughout D6 to High Intensity Activated Crosswalks (HAWK).

224446

PLAN NHSTATE OF IDAHO (ITD)

US 93, SALMON RV CROSSING STUDY, LEMHI COMP 305.242 - 305.242 PLAN/STUDY, Planning

-

-

-

-

-

-500 463 37

CN

RWPE

-----------500

-----

--

--- - -

This study will investigate replacing the bridge over the Salmon River at milepost 305.242 on US‐93 in Lemhi Co.

224516

OPS STREXBURG

STATE, FY21 REXBURG 9 ADA RAMPSMP 0.000 - 0.000 SAFTY/TRAF OPER, Sidewalk

-

57

-

-

-

57- - -

CN

RWPE

-----57------

-----

--

--- - -

Install nine Americans with Disabilities (ADA) ramps in various locations throughout Rexburg.

224526

OPS STST ANTHONY

STATE, FY21 ST ANTHONY 7 ADA RAMPSMP 0.000 - 0.000 SAFTY/TRAF OPER, Sidewalk

-

33

-

-

-

33- - -

CN

RWPE

-----33------

-----

--

--- - -

Install seven Americans with Disabilities (ADA) ramps at various locations throughout Saint Anthony.

226046

FLAP (L) FLAPCUSTER COUNTY

OFFSYS, BAYHORSE CREEK BRIDGE, CUSTER COMP 100.029 - 100.029 BR/APPRS, Bridge Replacement

-

3,723

-

3,450

-

273719 666 53

CN

RWPE

--4793,244-----30039920

-----

--

--- - -

Improve access to federal lands by replacing the structurally deficient Bayhorse Bridge over the Salmon River.

230536

OPS STMADISON COUNTY

US 20, SHS ADJUSTMENT PAYMENT, MADISON COMP 337.478 - 339.759 PLAN/STUDY, Planning

-

3,950

-

-

-

3,950- - -

CN

RWPE

-----3,950------

-----

--

--- - -

ITD and Madison County staff signed a road closure and maintenance agreement to transfer a portion of SH 33 from milepost 337.478 ‐ 339.759 and Sugar City Half IC Connector Rd from MP 100.00 ‐ 100.12 and 100.367 ‐ 100.587 to Madison Co.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 87

Page 90: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 6 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside BMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

PORN226456

RESTORE NHSTATE OF IDAHO (ITD)

US20, CHESTER TO ASHTON PH A, FREMONT COMP 354.250 - 356.500 RECONST/REALIGN, Base/Sub-base W

-

11,236

-

10,412

-

824- - -

CN

RWPE

---11,236--------

-----

--

--- - -

The scope of work for this project is to construct a section of US 20 from a two way two lane highway to a four lane divided highway.

ORN226616

OTHER ASSETS STSTATE OF IDAHO (ITD)

STATE, FY23 D6 MILL AND OVERLAYMP - RESRF/RESTO&REHAB, Pavement Ma

-

531

-

492

-

3910 9 1

CN

RWPE

---531-------10

-----

--

--- - -

The scope of this project is to mill and/or overlay spot locations throughout the district.

ORN226626

OTHER ASSETS STSTATE OF IDAHO (ITD)

STATE, FY23 D6 ROCKFALL MITIGATIONMP - SAFTY/TRAF OPER, Preventive Mainte

-

166

-

154

-

1210 9 1

CN

RWPE

---166-------10

-----

--

--- - -

This project will stabilize rock fall areas in the district. Location to be determined by the district geologist.

ORN226636

OTHER ASSETS STPSTATE OF IDAHO (ITD)

STATE, FY23 D6 DELINEATORSMP - SAFTY/TRAF OPER, Preventive Mainte

-

224

-

207

-

1710 9 1

CN

RWPE

---224-------10

-----

--

--- - -

This project consist of installing flexible delineators along state highways.

ORN226646

OTHER ASSETS STP-ENHSTATE OF IDAHO (ITD)

STATE, FY23 D6 MOWINGMP - ENV PRESV, Preventive Maintenance

-

224

-

207

-

175 5 -

CN

RWPE

---224-------5

-----

--

--- - -

This project will consist of mowing the roadside vegetation in order to prevent drifting in the winter and improve sight distance.

ORN228846

SAFETY (L) HSIP (L)REXBURG

NHS-7816, INT 2ND W & 6TH S, REXBURGMP 11.110 - 11.220 SAFTY/TRAF OPER, Intersection Improv

-

28

-

26

-

26 6 -

CN

RWPE

----28-----6-

-----

--

--- - -

This project will install a Rapid Rectangular Flashing Beacon at one T‐intersection in Rexburg at 2nd West 6th South to increase safety for our pedestrians at this intersection.

ORN228856

SAFETY (L) HSIP (L)JEFFERSON COUNTY

STC-6731, COUNTY LN RD SIGNING, JEFFERSON COMP 0.000 - 15.030 SAFTY/TRAF OPER, Intersection Improv

-

87

-

80

-

76 6 -

CN

RWPE

----87-----6-

-----

--

--- - -

This project will add twelve Flashing LED Stop Signs and fourteen Flashing LED Stop Ahead signs with radar sensors and will be solar powered.

ORN229456

TAP TAP-RURALDRIGGS

LOCAL, SH-33 & LEGRAND PIERRE PATHWAY EXTENSION, DMP - ENV PRESV, Bicycle/Pedestrian/Equestr

-

427

-

396

-

3161 57 4

CN

RWPE

---427-------61

-----

--

--- - -

Install 10’ wide asphalt pathway at two locations; along SH33, LeGrand Pierre to the Driggs Elementary School.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 88

Page 91: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 6 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside BMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

ORN229526

TAP TAP-RURALVICTOR

LOCAL, VICTOR ELEMENTARY BIKE/PED, VICTORMP - ENV PRESV, Sidewalk

-

452

-

418

-

3444 41 3

CN

RWPE

---452-------44

-----

--

--- - -

Construct 10’ asphalt pathway on Baseline Road from Old Jackson Highway Elm Street to Aspen Street, Aspen Street to Mountain Shadows Way.

ORN229766

OPS STREXBURG

LOCAL, FY22 REXBURG 10 ADA RAMPSMP - ENV PRESV, Curb & Gutter

-

57

-

-

-

57- - -

CN

RWPE

----57-------

-----

--

--- - -

Construct 11 Americans with Disabilities curb ramps in Rexburg.

ORN229786

OPS STROBERTS

LOCAL, FY22 ROBERTS 8 ADA RAMPSMP - ENV PRESV, Curb & Gutter

-

48

-

-

-

48- - -

CN

RWPE

----48-------

-----

--

--- - -

Construct 8 Americans with Disabilities curb ramps in Roberts, Jefferson Co., Idaho

ORN230326

STP-URBAN (L) STP-UREXBURG

LOCAL, TRANSPORTATION PLAN, MADISON COMP - PLAN/STUDY, Planning/Transportation

-

80

-

74

-

6- - -

CN

RWPE

-----80------

-----

--

--- - -

This project will update the Madison County Transportation Master Plan. The transportation plan was last updated in 2015 and the plan covers the transportation networks of Madison County, the City of Rexburg and the City of Sugar City. The original Madison County Transportation Master Plan (TMP) was drafted in 2004. The City would like to update that plan in order to stay on top of the growth that the entire County is experiencing.

ORN230346

STP-URBAN (L) STP-URUPERT

LOCAL, TRANSPORTATION PLAN, RUPERTMP - PLAN/STUDY, Planning/Transportation

-

102

-

95

-

7- - -

CN

RWPE

----102-------

-----

--

--- - -

This project will update the City of Rupert's Transportation Plan to create a more in‐depth assessment of current road inventory, road conditions, bridges, sign management, and Capital Improvement Plan. An updated transportation plan will support the City giving an assessment of current conditions and creating a plan for future work.

ORN230356

STP-URBAN (L) STP-URIGBY

LOCAL, TRANSPORTATION PLAN, RIGBYMP - PLAN/STUDY, Planning/Transportation

-

82

-

76

-

6- - -

CN

RWPE

----82-------

-----

--

--- - -

This project will update the City of Rigby's transportation plan, including their pavement management plan, sign inventory, and Capital Improvement Plan, so they can prioritize use of their limited resources and do projects that will best serve the residents of their city, now and in the future.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 89

Page 92: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 6 Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside BMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027Construction

Right-of-WayDevelopment

8,84138,27740,67240,85633,08812,309---3008191,604---8,4901841,028

Total 8,84138,27740,67249,64634,09114,941G: Project is grouped in STIP

1: Project is also shown in a Transportation Improvement Program

W: Work zone safety priority

CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition

Notes:

Phases:

2: Project is being advance constructed with non-federal funds

P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM

B: Project addresses Federal Bridge Condition PM

A: Project utilizes an alternative contracting method.

M: Project included in multiple programs

29,602-12,500-

--42,102-

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 90

Page 93: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 6 Public Transit Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Transit Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside BMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

193146

TRNS-OPS 5311 RuralMISCELLANEOUS

TRANSIT, D6 5311 STATEWIDE RURAL AREA FORMULA PROGMP 0.000 - 0.000 Transit Admin/Operations/PM

-

9,415

-

6,120

-

3,295- - -

CN

RWPE

-1,8831,8831,8831,8831,883------

-----

--

--- - -

Program provides capital, planning, and operating assistance to support public transportation operators who provide demand response and fixed route services  in rural areas with populations less than 50,000. Serving Bonneville, Butte, Clair, Custer, Fremont, Jefferson, Lemhi, Madison, Teton counties.

M19330

6

TRNS-CAP 5339 RuralMISCELLANEOUS

TRANSIT, D6 5339 BUS AND BUS FACILITYMP 0.000 - 0.000 Bus Purchase / Construction

-

4,605

-

3,684

-

921- - -

CN

RWPE

-700700700700700------

-----

--

--- - -

M

6

TRNS-CAP 5339 SUrbMISCELLANEOUS

TRANSIT, D6 5339 BUS AND BUS FACILITYMP 0.000 - 0.000 Bus Purchase / Construction

-

4,605

-

3,684

-

921- - -

CN

RWPE

-221221221221221------

-----

--

--- - -

Program provides capital funding to replace, rehabilitate and purchase buses and related equipment or to construct bus‐related facilities in rural and small urban areas directly affecting Bonneville, Butte, Clark, Custer, Fremont, Jefferson, Lemhi, Madison, Teton counties.

M19835

6

TRNS-OPS 5310 SUrbMISCELLANEOUS

TRANSIT, D6 ELDERLY & DISABLEDMP 0.000 - 0.000 Demand Response Operations

-

1,825

-

1,460

-

365- - -

CN

RWPE

-293293293293293------

-----

--

--- - -

M

6

TRNS-OPS 5310 RuralMISCELLANEOUS

TRANSIT, D6 ELDERLY & DISABLEDMP 0.000 - 0.000 Demand Response Operations

-

1,825

-

1,460

-

365- - -

CN

RWPE

-7272727272------

-----

--

--- - -

Program serves the special needs of transit‐dependent senior citizens and persons with disabilities by providing funds for projects which go beyond traditional transit services (demand response) including those required under the Americans with Disabilities Act (ADA).

ORN230616

TRNS-OPS 5311 RuralSTATE OF IDAHO (ITD)

TRANSIT, D6 5311 CARES ACTMP - Security

-

3,277

-

3,277

-

-- - -

CN

RWPE

-----3,277------

-----

--

--- - -

Provides operating and capital funding for Coronavirus Aid, Relief, and Economic security in rural areas.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 91

Page 94: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 6 Public Transit Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Transit Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside BMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027Construction

Right-of-WayDevelopment

-3,1693,1693,1693,1696,446------------

Total -3,1693,1693,1693,1696,446G: Project is grouped in STIP

1: Project is also shown in a Transportation Improvement Program

W: Work zone safety priority

CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition

Notes:

Phases:

2: Project is being advance constructed with non-federal funds

P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM

B: Project addresses Federal Bridge Condition PM

A: Project utilizes an alternative contracting method.

M: Project included in multiple programs

--------

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 92

Page 95: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 6 Aeronautics Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Aeronautics Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside BMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

195826

APT-NEW GA-APTDRIGGS

DIJ, DRIGGS, CONSTRUCT RUNWAY, DESIGNMP 0.000 - 0.000 APT DEV, New Facility

-

-

-

-

-

-778 700 78

CN

RWPE

-------778----

-----

--

--- - -

Design ‐ Rwy shift & Flying T Apron

199056

APT-NEW GA-APTDRIGGS

DIJ, DRIGGS, ACQUIRE LANDMP 0.000 - 0.000 APT DEV, New Facility

2,563

-

2,307

-

256

-- - -

CN

RWPE

------------

---2,563-

--

--- - -

OFA land acquisition

199586

APT-MTNC GA-APTARCO/BUTTE CO

AOC, ARCO, REHABILITATE RUNWAY DESIGNMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

-

-

-

-

-400 360 40

CN

RWPE

----------400-

-----

--

--- - -

Portions of the runway will require a major rehabilitation

200476

APT-MTNC GA-APTLEMHI COUNTY

SMN, SALMON, REHABILITATE TAXIWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

333

-

300

-

33- - -

CN

RWPE

-333----------

-----

--

--- - -

Cost estimate includes Twy & Rwy Crack Seal, Slurry Seal & Remark

201496

APT-PLAN GA-APTDRIGGS

DIJ, DRIGGS, ENVIRONMENTAL STUDYMP 0.000 - 0.000 APT PLN, Airport Planning

-

-

-

-

-

-333 300 33

CN

RWPE

--------333---

-----

--

--- - -

Environmental for Rwy shift & Flying T Apron

201666

APT-NEW GA-APTLEMHI COUNTY

SMN, SALMON, SNOW REMOVAL EQUIPMENTMP 0.000 - 0.000 APT DEV, New Facility

-

333

-

300

-

33- - -

CN

RWPE

---333--------

-----

--

--- - -

SRE

207396

APT-MTNC GA-APTREXBURG/MADISON CO

RXE, REXBURG, REHABILITATE RUNWAYMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

401

-

401

-

-- - -

CN

RWPE

-----401------

-----

--

--- - -

Crack Seal & paint only

208256

APT-MTNC GA-APTDRIGGS

DIJ, DRIGGS AIRPORT SNOW REMOVAL EQUIPMENT BUILDINMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

167

-

150

-

17- - -

CN

RWPE

---167--------

-----

--

--- - -

Driggs Airport Snow Removal Equipment Building

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 93

Page 96: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 6 Aeronautics Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Aeronautics Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside BMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

225176

APT-MTNC GA-APTDRIGGS

DIJ, DRIGGS, AIRPORT PH III RUNWAY CONSTRUCTIONMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

5,000

-

4,500

-

500- - -

CN

RWPE

------------

-----

5,000-

--- - -

Phase III Runway Construction

225186

APT-MTNC GA-APTLEMHI COUNTY

SMN, SALMON-LEMHI COUNTY, AIRPORT APRON REHABMP 0.000 - 0.000 APT DEV, Facility Maintenance

-

3,000

-

3,000

-

-- - -

CN

RWPE

-----3,000------

-----

--

--- - -

Apron Rehabilitation

225366

APT-MTNC GA-APTDRIGGS

DIJ, DRIGGS, REED MEMORIAL AIRPORT PAVEMENT REHABMP 0.000 - 0.000 RESRF/RESTO&REHAB, Facility Mainte

-

500

-

500

-

-- - -

CN

RWPE

-----500------

-----

--

--- - -

Reed Memorial Airport runway, taxiway, and apron crack seal/fog seal pavement rehabilitation.

225416

APT-MTNC GA-APTARCO

AOC, ACRO-BUTTE COUNTY, AIRPORTMP 0.000 - 0.000 APT PLN, Airport Planning

-

-

-

-

-

-167 150 17

CN

RWPE

-------167----

-----

--

--- - -

225726

APT-PLAN GA-APTCHALLIS

LLJ, CHALLIS, AIRPORT PLANNINGMP 0.000 - 0.000 APT PLN, Airport Planning

-

-

-

-

-

-83 77 6

CN

RWPE

----------83-

-----

--

--- - -

Airport Wildlife Hazard Assessment

225736

APT-PLAN GA-APTCHALLIS

LLJ, CHALLIS, AIRPORT PLANNINGMP 0.000 - 0.000 APT PLN, Airport Planning

-

-

-

-

-

-83 77 6

CN

RWPE

----------83-

-----

--

--- - -

Airport aeronautical survey for instrument approach

225746

APT-MTNC GA-APTCHALLIS

LLJ, CHALLIS, AIRPORT PAVEMENT REHABMP 0.000 - 0.000 RESRF/RESTO&REHAB, Facility Mainte

-

389

-

350

-

39- - -

CN

RWPE

---389--------

-----

--

--- - -

Airport pavement rehabilitation

225896

APT-MTNC GA-APTLEMHI COUNTY

SMN, LEMHI COUNTY, AIRPORT SREMP 0.000 - 0.000 APT DEV, Equipment

-

167

-

150

-

17- - -

CN

RWPE

------------

-----

--

167-- - -

229816

APT-MTNC GA-APTARCO

AOC, ARCO, AIRPORT TAXIWAY REHABMP - RESRF/RESTO&REHAB, Facility Mainte

-

167

-

167

-

-- - -

CN

RWPE

-----167------

-----

--

--- - -

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 94

Page 97: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

District 6 Aeronautics Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Aeronautics Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIPOutside BMPO Planning Area

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

229916

APT-MTNC GA-APTREXBURG

RXE, REXBURG, AIRPORT RUNWAY REHABMP - RESRF/RESTO&REHAB, Facility Mainte

-

333

-

300

-

33- - -

CN

RWPE

----333-------

-----

--

--- - -

Construction

Right-of-WayDevelopment

167333-8893334,068-944333-567-----2,563-

Total 1671,2773338893,4634,068G: Project is grouped in STIP

1: Project is also shown in a Transportation Improvement Program

W: Work zone safety priority

CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition

Notes:

Phases:

2: Project is being advance constructed with non-federal funds

P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM

B: Project addresses Federal Bridge Condition PM

A: Project utilizes an alternative contracting method.

M: Project included in multiple programs

-5,000-----5,000

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 95

Page 98: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

Statewide Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

M15001

9

STP-RURAL (L) STP-RURALMISCELLANEOUS

LOCAL, LOCAL COST INCREASE SET-ASIDEMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation

-

6,050

-

5,606

-

444- - -

CN

RWPE

--538527-1,694------

-----

--

--- - -

M

9

BR-LOCAL BR-LOCMISCELLANEOUS

LOCAL, LOCAL COST INCREASE SET-ASIDEMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation

-

6,050

-

5,606

-

444- - -

CN

RWPE

-100240235210226------

-----

--

--- - -

M

9

BR-OFF BR-OFFMISCELLANEOUS

LOCAL, LOCAL COST INCREASE SET-ASIDEMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation

-

6,050

-

5,606

-

444- - -

CN

RWPE

-184180177173170------

-----

--

--- - -

M

9

STP-TMA STP-TMAMISCELLANEOUS

LOCAL, LOCAL COST INCREASE SET-ASIDEMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation

-

6,050

-

5,606

-

444- - -

CN

RWPE

----47-------

-----

--

--- - -

M

9

SAFETY (L) HSIP (L)MISCELLANEOUS

LOCAL, LOCAL COST INCREASE SET-ASIDEMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation

-

6,050

-

5,606

-

444- - -

CN

RWPE

--424416102400------

-----

--

--- - -

M

9

TAP-TMA TAP-TMAMISCELLANEOUS

LOCAL, LOCAL COST INCREASE SET-ASIDEMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation

-

6,050

-

5,606

-

444- - -

CN

RWPE

--5---------

-----

--

--- - -

Set‐aside for STP‐TMA cost increases.

M19286

9

STP-URBAN (L) STP-USTATE OF IDAHO (ITD)

LOCAL, PENSTOCK BR PAYBACKMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation

-

-

-

-

-

-- - -

CN

RWPE

-----(335)------

-----

--

--- - -

M

9

BR-LOCAL BR-LOCSTATE OF IDAHO (ITD)

LOCAL, PENSTOCK BR PAYBACKMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation

-

-

-

-

-

-- - -

CN

RWPE

-----335------

-----

--

--- - -

198429

OTH-FA OTH-FEDSTATE OF IDAHO (ITD)

STATE, FY21 NAT'L SUMMER TRANS INSTITUTEMP 0.000 - 0.000 PLAN/STUDY, Training

-

72

-

72

-

-- - -

CN

RWPE

-----72------

-----

--

--- - -

200939

BR-OFF BR-OFFSTATE OF IDAHO (ITD)

OFFSYS, FY21 LOCAL/OFFSYS BRIDGE INSPECTIONMP 0.000 - 0.000 BR/APPRS, Bridge Inspection

-

2,100

-

1,946

-

154- - -

CN

RWPE

-----2,100------

-----

--

--- - -

This project provides funds for bridge inspections.

201449

OTH-FA (L) OTH-FEDSTATE OF IDAHO (ITD)

STATE, FY21 ON-THE-JOB-TRAINING/SUPPORTIVE SERVICESMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation

-

90

-

90

-

-- - -

CN

RWPE

-----90------

-----

--

--- - -

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 96

Page 99: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

Statewide Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

This project provides funding for the On the Job Training/Supportive Services Program. This is an apprenticeship and training program targeted to move women, minorities, and disadvantaged individuals into journey‐level positions to ensure that a competent workforce is available to meet highway construction hiring needs, and to address the historical under‐representation of these groups in highway construction skilled crafts.

M20147

9

STP-RURAL (L) STP-RURALLOCAL HIGHWAY TECHNICA

LOCAL, FY21 LHTAC PLANNING & SCOPINGMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation

-

200

-

185

-

15- - -

CN

RWPE

-----150------

-----

--

--- - -

M

9

SAFETY (L) HSIP (L)LOCAL HIGHWAY TECHNICA

LOCAL, FY21 LHTAC PLANNING & SCOPINGMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation

-

200

-

185

-

15- - -

CN

RWPE

-----50------

-----

--

--- - -

This project provides funds to create project charters  to better define project scope, schedule and budget before the project is recommended for inclusion in the Idaho Transportation Improvement Program.

R201699

OTH-FA OTH-FEDSTATE OF IDAHO (ITD)

STATE, FY21 BONNERS FERRY FMCSA HIGH PRIORITY WIMMP 0.000 - 0.000 SUP FACIL, Port of Entry Improvement

-

1,600

-

1,360

-

240- - -

CN

RWPE

-----1,600------

-----

--

--- - -

This project will add weigh‐in‐motion and automatic vehicle identification technology through a Federal Motor Carrier Safety Administration High Priority grant to the Bonners Ferry Port of Entry.

203619

BR-OFF BR-OFFSTATE OF IDAHO (ITD)

OFFSYS, FY22 LOCAL/OFFSYS BRIDGE INSPECTIONMP 0.000 - 0.000 BR/APPRS, Bridge Inspection

-

1,938

-

1,796

-

142- - -

CN

RWPE

----1,938-------

-----

--

--- - -

This project provides funds for bridge inspections.

203739

OTH-FA OTH-FEDSTATE OF IDAHO (ITD)

STATE, FY22 NAT'L SUMMER TRANS INSTITUTEMP 0.000 - 0.000 PLAN/STUDY, Training

-

72

-

72

-

-- - -

CN

RWPE

----72-------

-----

--

--- - -

204659

OTH-FA (L) OTH-FEDSTATE OF IDAHO (ITD)

STATE, FY22 ON-THE-JOB-TRAINING/SUPPORTIVE SERVICESMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation

-

90

-

90

-

-- - -

CN

RWPE

----90-------

-----

--

--- - -

This project provides funding for the On the Job Training/Supportive Services Program. This is an apprenticeship and training program targeted to move women, minorities, and disadvantaged individuals into journey‐level positions to ensure that a competent workforce is available to meet highway construction hiring needs, and to address the historical under‐representation of these groups in highway construction skilled crafts.

205129

OTH-FA OTH-FEDSTATE OF IDAHO (ITD)

LOCAL, FY21/22 DISADVANTAGED BUSINESS ENTERPRISESMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation

-

200

-

200

-

-- - -

CN

RWPE

----200-------

-----

--

--- - -

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 97

Page 100: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

Statewide Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

This project provides funding for the Disadvantaged Business Enterprises Supportive Services. This is a training and assistance program designed to increase the proficiency of minority, women, and socially and economically disadvantaged businesses in competing and performing, on an equal basis, for federal‐aid highway contracts and subcontracts.

M20598

9

STP-RURAL (L) STP-RURALLOCAL HIGHWAY TECHNICA

LOCAL, FY22 LHTAC PLANNING & SCOPINGMP 0.000 - 0.000 PLAN/STUDY, Planning

-

204

-

189

-

15- - -

CN

RWPE

----153-------

-----

--

--- - -

M

9

SAFETY (L) HSIP (L)LOCAL HIGHWAY TECHNICA

LOCAL, FY22 LHTAC PLANNING & SCOPINGMP 0.000 - 0.000 PLAN/STUDY, Planning

-

204

-

189

-

15- - -

CN

RWPE

----51-------

-----

--

--- - -

This project provides funds to create project charters  to better define project scope, schedule and budget before the project is recommended for inclusion in the Idaho Transportation Improvement Program.

R206529

OTH-FA OTH-FEDSTATE OF IDAHO (ITD)

STATE, FY24 MARSING FMCSA HIGH PRIORITY WEIGH-IN-MOMP 0.000 - 0.000 SUP FACIL, Port of Entry Improvement

-

1,600

-

1,360

-

240- - -

CN

RWPE

1,600-----------

-----

--

--- - -

This project will add weigh‐in‐motion and automatic vehicle identification technology through a Federal Motor Carrier Safety Administration High Priority grant to the Marsing Port of Entry.

206539

RAIL FED RRXSTATE OF IDAHO (ITD)

STATE, ANNUAL STWD RRX DIAGNOSTIC REVIEWSMP 0.000 - 0.000 PLAN/STUDY, Statewide Planning

-

240

-

216

-

2445 40 5

CN

RWPE

603030303030------

-----

--

30-- - -

Perform annual railroad‐highway crossing reviews with railroad companies.

207279

OTH-FA OTH-FEDSTATE OF IDAHO (ITD)

STATE, FY22 BONNERS FERRY FMCSA HIGH PRIORITY WIMMP 0.000 - 0.000 SUP FACIL, Port of Entry Improvement

-

1,600

-

1,360

-

240- - -

CN

RWPE

----1,600-------

-----

--

--- - -

This project will add weigh‐in‐motion and automatic vehicle identification technology through a Federal Motor Carrier Safety Administration High Priority grant to the Bonners Ferry Port of Entry.

R207569

OTH-FA OTH-FEDSTATE OF IDAHO (ITD)

STATE, FY23 HOLLISTER FMCSA HIGH PRIORITY WEIGH-IN-MMP 0.000 - 0.000 SUP FACIL, Port of Entry Improvement

-

1,600

-

1,360

-

240- - -

CN

RWPE

---1,600--------

-----

--

--- - -

This project will add weigh‐in‐motion and automatic vehicle identification technology through a Federal Motor Carrier Safety Administration High Priority grant to the Hollister Port of Entry.

220239

STP-URBAN (L) STP-ULOCAL HIGHWAY TECHNICA

LOCAL, PD LHTAC PLANNING STUDIESMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation

-

276

-

256

-

20- - -

CN

RWPE

276-----------

-----

--

--- - -

This project will provide funds to augment the Local Highway Technical Assistance Council constituents' planning efforts.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 98

Page 101: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

Statewide Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

220249

STP-URBAN (L) STP-ULOCAL HIGHWAY TECHNICA

LOCAL, FY23 URBAN TRANSPORTATION PLANSMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation

-

260

-

241

-

19- - -

CN

RWPE

---260--------

-----

--

--- - -

This project will provide funds to augment the Local Highway Technical Assistance Council constituents' planning efforts.

220259

STP-URBAN (L) STP-ULOCAL HIGHWAY TECHNICA

LOCAL, FY22 URBAN TRANSPORTATION PLANSMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation

-

71

-

66

-

5- - -

CN

RWPE

----71-------

-----

--

--- - -

This project will provide funds to augment the Local Highway Technical Assistance Council constituents' planning efforts.

220379

TAP TAP-RURALMISCELLANEOUS

LOCAL, FY21 STWD SRTS COORDINATOR & ACTIVITIESMP 0.000 - 0.000 ENV PRESV, Bicycle/Pedestrian/Equestr

-

65

-

60

-

5- - -

CN

RWPE

-----65------

-----

--

--- - -

This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.

M22079

9

STP-RURAL (L) STP-RURALLOCAL HIGHWAY TECHNICA

LOCAL, LHTAC PLANNING & SCOPINGMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation

-

208

-

193

-

15- - -

CN

RWPE

---156--------

-----

--

--- - -

M

9

SAFETY (L) HSIP (L)LOCAL HIGHWAY TECHNICA

LOCAL, LHTAC PLANNING & SCOPINGMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation

-

208

-

193

-

15- - -

CN

RWPE

---52--------

-----

--

--- - -

This project provides funds to create project charters  to better define project scope, schedule and budget before the project is recommended for inclusion in the Idaho Transportation Improvement Program.

220809

BR-OFF BR-OFFSTATE OF IDAHO (ITD)

OFFSYS, FY23 LOCAL/OFFSYS BRIDGE INSPECTIONMP 0.000 - 0.000 BR/APPRS, Bridge Inspection

-

1,977

-

1,832

-

145- - -

CN

RWPE

---1,977--------

-----

--

--- - -

This project provides funds for bridge inspections.

221209

OTH-FA OTH-FEDSTATE OF IDAHO (ITD)

STATE, FY23 NAT'L SUMMER TRANS INSTITUTEMP 0.000 - 0.000 PLAN/STUDY, Training

-

72

-

72

-

-- - -

CN

RWPE

---72--------

-----

--

--- - -

221219

OTH-FA (L) OTH-FEDSTATE OF IDAHO (ITD)

STATE, FY23 ON-THE-JOB-TRAINING/SUPPORTIVE SERVICESMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation

-

90

-

90

-

-- - -

CN

RWPE

---90--------

-----

--

--- - -

This project provides funding for the On the Job Training/Supportive Services Program. This is an apprenticeship and training program targeted to move women, minorities, and disadvantaged individuals into journey‐level positions to ensure that a competent workforce is available to meet highway construction hiring needs, and to address the historical under‐representation of these groups in highway construction skilled crafts.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 99

Page 102: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

Statewide Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

221229

OTH-FA OTH-FEDSTATE OF IDAHO (ITD)

LOCAL, FY23/24 DISADVANTAGED BUSINESS ENTERPRISESMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation

-

200

-

200

-

-- - -

CN

RWPE

--200---------

-----

--

--- - -

This project provides funding for the Disadvantaged Business Enterprises Supportive Services. This is a training and assistance program designed to increase the proficiency of minority, women, and socially and economically disadvantaged businesses in competing and performing, on an equal basis, for federal‐aid highway contracts and subcontracts.

R223369

OTH-FA OTH-FEDSTATE OF IDAHO (ITD)

STATE, FY24 MARSING FMCSA HIGH PRIORITY WEIGH-IN-MOMP 0.000 - 0.000 SUP FACIL, Port of Entry Improvement

-

1,600

-

1,360

-

240- - -

CN

RWPE

--1,600---------

-----

--

--- - -

This project will add weigh‐in‐motion and automatic vehicle identification technology through a Federal Motor Carrier Safety Administration High Priority grant to the Hollister Port of Entry.

223379

OTH-FA OTH-FEDSTATE OF IDAHO (ITD)

STATE, FY24 NAT'L SUMMER TRANS INSTITUTEMP 0.000 - 0.000 PLAN/STUDY, Training

-

72

-

72

-

-- - -

CN

RWPE

--72---------

-----

--

--- - -

223389

OTH-FA (L) OTH-FEDSTATE OF IDAHO (ITD)

STATE, FY24 ON-THE-JOB-TRAINING/SUPPORTIVE SERVICESMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation

-

90

-

90

-

-- - -

CN

RWPE

--90---------

-----

--

--- - -

This project provides funding for the On the Job Training/Supportive Services Program. This is an apprenticeship and training program targeted to move women, minorities, and disadvantaged individuals into journey‐level positions to ensure that a competent workforce is available to meet highway construction hiring needs, and to address the historical under‐representation of these groups in highway construction skilled crafts.

224309

BR-OFF BR-OFFSTATE OF IDAHO (ITD)

LOCAL, FY24 LOCAL/OFF-SYSTEM BRIDGE INSPECTIONMP 0.000 - 0.000 BR/APPRS, Bridge Inspection

-

2,016

-

1,868

-

148- - -

CN

RWPE

--2,016---------

-----

--

--- - -

Statewide inspection of all local bridges.

M22433

9

STP-RURAL (L) STP-RURALLOCAL HIGHWAY TECHNICA

LOCAL, FY24 LHTAC PLANNING & SCOPINGMP 0.000 - 0.000 PLAN/STUDY, Preliminary Engineering

-

212

-

197

-

15- - -

CN

RWPE

--159---------

-----

--

--- - -

M

9

SAFETY (L) HSIP (L)LOCAL HIGHWAY TECHNICA

LOCAL, FY24 LHTAC PLANNING & SCOPINGMP 0.000 - 0.000 PLAN/STUDY, Preliminary Engineering

-

212

-

197

-

15- - -

CN

RWPE

--53---------

-----

--

--- - -

224419

STP-URBAN (L) STP-ULOCAL HIGHWAY TECHNICA

LOCAL, FY24 URBAN TRANSPORTATION PLANSMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation

-

265

-

246

-

19- - -

CN

RWPE

--265---------

-----

--

--- - -

This project will provide funds to augment the Local Highway Technical Assistance Council constituents' planning efforts.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 100

Page 103: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

Statewide Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

ORN227289

BR-OFF BR-OFFSTATE OF IDAHO (ITD)

LOCAL, FY25 LOCAL/OFF-SYSTEM BRIDGE INSPECTIONMP 0.000 - 0.000 BR/APPRS, Bridge Inspection

-

2,057

-

1,906

-

151- - -

CN

RWPE

-2,057----------

-----

--

--- - -

Statewide inspection of all local bridges.

ORN228259

OTH-FA OTH-FEDSTATE OF IDAHO (ITD)

STATE, FY25 NAT'L SUMMER TRANS INSTITUTEMP 0.000 - 0.000 PLAN/STUDY, Training

-

72

-

72

-

-- - -

CN

RWPE

-72----------

-----

--

--- - -

ORN228269

OTH-FA (L) OTH-FEDSTATE OF IDAHO (ITD)

STATE, FY25 ON-THE-JOB-TRAINING/SUPPORTIVE SERVICESMP 0.000 - 0.000 PLAN/STUDY, Planning/Transportation

-

90

-

90

-

-- - -

CN

RWPE

-90----------

-----

--

--- - -

This project provides funding for the On the Job Training/Supportive Services Program. This is an apprenticeship and training program targeted to move women, minorities, and disadvantaged individuals into journey‐level positions to ensure that a competent workforce is available to meet highway construction hiring needs, and to address the historical under‐representation of these groups in highway construction skilled crafts.

ORN229009

TAP TAP-RURALMISCELLANEOUS

STATE, FY22 STWD SRTS COORDINATOR & ACTIVITIESMP - ENV PRESV, Bicycle/Pedestrian/Equestr

-

64

-

60

-

4- - -

CN

RWPE

----64-------

-----

--

--- - -

This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.

ORN229019

TAP TAP-RURALMISCELLANEOUS

STATE, FY23 STWD SRTS COORDINATOR & ACTIVITIESMP - ENV PRESV, Bicycle/Pedestrian/Equestr

-

64

-

60

-

4- - -

CN

RWPE

---64--------

-----

--

--- - -

This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.

ORN229039

TAP TAP-RURALMISCELLANEOUS

STATE, FY21 STWD SRTS COORDINATOR STIPENDMP - ENV PRESV, Bicycle/Pedestrian/Equestr

-

5

-

4

-

1- - -

CN

RWPE

-----5------

-----

--

--- - -

This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.

ORN229049

TAP TAP-RURALMISCELLANEOUS

STATE, FY22 STWD SRTS COORDINATOR STIPENDMP - ENV PRESV, Bicycle/Pedestrian/Equestr

-

5

-

4

-

1- - -

CN

RWPE

----5-------

-----

--

--- - -

This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.

ORN229069

TAP TAP-RURALMISCELLANEOUS

STATE, FY23 STWD SRTS COORDINATOR STIPENDMP - ENV PRESV, Bicycle/Pedestrian/Equestr

-

5

-

4

-

1- - -

CN

RWPE

---5--------

-----

--

--- - -

This project provides for Safe Routes To School program personnel, education materials, encouragement incentives, special events and indirect costs.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 101

Page 104: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

Statewide Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

MORN22932

9

STP-RURAL (L) STP-RURALLOCAL HIGHWAY TECHNICA

LOCAL, FY25 LHTAC PLANNING & SCOPINGMP 0.000 - 0.000 PLAN/STUDY, Preliminary Engineering

-

216

-

201

-

15- - -

CN

RWPE

-162----------

-----

--

--- - -

M

9

SAFETY (L) HSIP (L)LOCAL HIGHWAY TECHNICA

LOCAL, FY25 LHTAC PLANNING & SCOPINGMP 0.000 - 0.000 PLAN/STUDY, Preliminary Engineering

-

216

-

201

-

15- - -

CN

RWPE

-54----------

-----

--

--- - -

ORN230079

OTH-FA (L) LTAPLOCAL HIGHWAY TECHNICA

LOCAL, FY21 TECHNOLOGY TRANSFERMP - PLAN/STUDY, Planning/Transportation

-

300

-

150

-

150- - -

CN

RWPE

-----300------

-----

--

--- - -

Funds for operating the T2 Center.

ORN230089

OTH-FA (L) LTAPLOCAL HIGHWAY TECHNICA

LOCAL, FY22 TECHNOLOGY TRANSFERMP - PLAN/STUDY, Planning/Transportation

-

300

-

150

-

150- - -

CN

RWPE

----300-------

-----

--

--- - -

Funds for operating the T2 Center.

ORN230109

OTH-FA (L) LTAPLOCAL HIGHWAY TECHNICA

LOCAL, FY23 TECHNOLOGY TRANSFERMP - PLAN/STUDY, Planning/Transportation

-

300

-

150

-

150- - -

CN

RWPE

---300--------

-----

--

--- - -

Funds for operating the T2 Center.

ORN230129

OTH-FA (L) LTAPLOCAL HIGHWAY TECHNICA

LOCAL, FY24 TECHNOLOGY TRANSFERMP - PLAN/STUDY, Planning/Transportation

-

300

-

150

-

150- - -

CN

RWPE

--300---------

-----

--

--- - -

Funds to operate the T2 Center.

ORN230149

OTH-FA (L) LTAPLOCAL HIGHWAY TECHNICA

LOCAL, FY25 TECHNOLOGY TRANSFERMP - PLAN/STUDY, Planning/Transportation

-

300

-

150

-

150- - -

CN

RWPE

-300----------

-----

--

--- - -

Funds to operate the T2 Center.

ORN230399

URB STP-ULOCAL HIGHWAY TECHNICA

LOCAL, FY25 URBAN TRANSPORTATION PLANSMP - PLAN/STUDY, Planning/Transportation

-

271

-

251

-

20- - -

CN

RWPE

-271----------

-----

--

--- - -

Funds for local agencies to develop transportation plans.

ORN230649

OPS STPSTATE OF IDAHO (ITD)

STATE, RECESSED PAVEMENT MARKING PILOTMP - PLAN/STUDY, Pavement Markings

-

300

-

278

-

22- - -

CN

RWPE

-----300------

-----

--

--- - -

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 102

Page 105: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

Statewide Highways Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Highway Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

This project will utilize a new product and an innovative approach to pavement marking application to improve pavement marking visibility during wet and dark conditions and increase the life of those markings.

Construction

Right-of-WayDevelopment

303,3196,1745,9625,1077,252------------

Total 303,3196,1745,9625,1077,252G: Project is grouped in STIP

1: Project is also shown in a Transportation Improvement Program

W: Work zone safety priority

CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition

Notes:

Phases:

2: Project is being advance constructed with non-federal funds

P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM

B: Project addresses Federal Bridge Condition PM

A: Project utilizes an alternative contracting method.

M: Project included in multiple programs

1,936-----

1,936-

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 103

Page 106: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

Statewide Public Transit Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Transit Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

193359

TRNS-OPS 5311(b)(2)STATE OF IDAHO (ITD)

TRANSIT, 5311 RURAL TECHNICAL ASSISTANCE (RTAP)MP 0.000 - 0.000 Rural Technical Assistance

-

710

-

710

-

-- - -

CN

RWPE

-142142142142142------

-----

--

--- - -

Program provides scholarships for training and technical assistance for rural transit providers statewide. 

193639

TRNS-OPS 5304STATE OF IDAHO (ITD)

TRANSIT, 5304 STATEWIDE PLANNINGMP 0.000 - 0.000 Transit Planning

-

615

-

615

-

-- - -

CN

RWPE

-123123123123123------

-----

--

--- - -

Program provides funding to support comprehensive planning for making transportation investment decisions in metropolitan areas and statewide.

195509

TRNS-OPS 5311(f)MISCELLANEOUS

TRANSIT, 5311 INTERCITY S/W RURAL AREA FORMULA PROGMP 0.000 - 0.000 Transit Admin/Operations/PM

-

11,770

-

5,885

-

5,885- - -

CN

RWPE

-2,3542,3542,3542,3542,354------

-----

--

--- - -

Program supports connections between rural areas and the larger regional systems of intercity bus services statewide. 

196799

TRNS-OPS 5311 RuralSTATE OF IDAHO (ITD)

TRANSIT, 5311 - STATEWIDE RURAL AREA FORMULA PROGRMP 0.000 - 0.000 Transit State Administration

-

4,540

-

4,540

-

-- - -

CN

RWPE

-908908908908908------

-----

--

--- - -

Program provides funding for the State to manage and administer grants for public transportation projects  in rural areas with populations less than 50,000 statewide. 

M20206

9

TRNS-OPS 5310 RuralSTATE OF IDAHO (ITD)

TRANSIT, STATEWIDE ELDERLY & DISABLED ADMINMP 0.000 - 0.000 Transit State Administration

-

645

-

645

-

-- - -

CN

RWPE

-4747474747------

-----

--

--- - -

M

9

TRNS-OPS 5310 SUrbSTATE OF IDAHO (ITD)

TRANSIT, STATEWIDE ELDERLY & DISABLED ADMINMP 0.000 - 0.000 Transit State Administration

-

645

-

645

-

-- - -

CN

RWPE

-8282828282------

-----

--

--- - -

Program serves the special needs of transit‐dependent senior citizens and persons with disabilities by providing funds for projects which go beyond traditional transit services (demand response) including those required under the Americans with Disabilities Act (ADA).

ORN230629

TRNS-OPS 5311(f)STATE OF IDAHO (ITD)

TRANSIT, STWD 5311 CARES ACT INTERCITY MP - Security

-

4,096

-

4,096

-

-- - -

CN

RWPE

-----4,096------

-----

--

--- - -

Provides funding for intercity services that provide connections between rural areas and the larger regional systems statewide.

ORN230639

TRNS-OPS 5311 RuralSTATE OF IDAHO (ITD)

TRANSIT, STWD 5311 CARES ACT ADMINISTRATIONMP - Transit State Administration

-

2,731

-

2,731

-

-- - -

CN

RWPE

-----2,731------

-----

--

--- - -

Provides funding for the state to manage and administer grants for public transit projects.

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 104

Page 107: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

Statewide Public Transit Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Transit Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027Construction

Right-of-WayDevelopment

-3,6563,6563,6563,65610,483------------

Total -3,6563,6563,6563,65610,483G: Project is grouped in STIP

1: Project is also shown in a Transportation Improvement Program

W: Work zone safety priority

CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition

Notes:

Phases:

2: Project is being advance constructed with non-federal funds

P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM

B: Project addresses Federal Bridge Condition PM

A: Project utilizes an alternative contracting method.

M: Project included in multiple programs

--------

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 105

Page 108: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

Statewide Aeronautics Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Aeronautics Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

W19227

9

AVI-SYS PU-APTSTATE OF IDAHO (ITD)

IDS, SYSTEM PLAN, UPDATE STATEWIDE, PCI YR 3 NPIASMP 0.000 - 0.000 SYS PLN, System Planning

-

-

-

-

-

-148 148 -

CN

RWPE

-----------148

-----

--

--- - -

PCI yr. 1 Update (M228010)

W19989

9

AVI-SYS PU-APTSTATE OF IDAHO (ITD)

IDS, SYSTEM PLAN, UPDATE STATEWIDE, ISCIP PROGRAMMP 0.000 - 0.000 SYS PLN, System Planning

-

-

-

-

-

-94 94 -

CN

RWPE

-----------94

-----

--

--- - -

Five‐Year State‐FAA SCIP Coordination. (M228010)

W20018

9

AVI-SYS PU-APTSTATE OF IDAHO (ITD)

IDS, SYSTEM PLAN, UPDATE STATEWIDE, PCI YR 2 NPIASMP 0.000 - 0.000 SYS PLN, System Planning

-

-

-

-

-

-155 155 -

CN

RWPE

----------155-

-----

--

--- - -

PCI yr. 2 Update (M238010)

W20523

9

AVI-SYS PU-APTSTATE OF IDAHO (ITD)

IDS, FY21 SYSTEM PLAN, UPDATE STWD, PCI YR 1 NON-NPIAMP 0.000 - 0.000 SYS PLN, System Planning

-

-

-

-

-

-41 41 -

CN

RWPE

-----------41

-----

--

--- - -

PCI yr. 1 Update Non‐NPIAS  

W20569

9

AVI-SYS PU-APTSTATE OF IDAHO (ITD)

IDS, SYSTEM PLAN, UPDATE STATEWIDE, FULL REPORTMP 0.000 - 0.000 SYS PLN, System Planning

-

-

-

-

-

-300 300 -

CN

RWPE

-----------300

-----

--

--- - -

Continuous System Planning Update Econ  Impact Study (M228010)

W20593

9

AVI-SYS PU-APTSTATE OF IDAHO (ITD)

IDS, FY22 SYSTEM PLAN, UPDATE STWD, PCI YR 2 NON-NPIAMP 0.000 - 0.000 SYS PLN, System Planning

-

-

-

-

-

-38 38 -

CN

RWPE

----------38-

-----

--

--- - -

PCI yr. 2 Update Non‐NPIAS  

W20737

9

AVI-SYS PU-APTSTATE OF IDAHO (ITD)

IDS, SYSTEM PLAN, UPDATE STATEWIDE, ISCIP PROGRAMMP 0.000 - 0.000 SYS PLN, System Planning

-

-

-

-

-

-96 96 -

CN

RWPE

----------96-

-----

--

--- - -

Five‐Year State‐FAA SCIP Coordination. (M238010)

208139

AVI-SYS PU-APTSTATE OF IDAHO (ITD)

AERO, UPDATE STATEWIDE SYSTEM PLAN, ISCIPMP 0.000 - 0.000 SYS PLN, System Planning

-

-

-

-

-

-97 87 10

CN

RWPE

--------97---

-----

--

--- - -

Five year State‐FAA SCIP Coordination

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 106

Page 109: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

Statewide Aeronautics Project List

Notes

Lifetime Direct Costs All Programs

MatchFederalTotal

Scheduled Costs (Dollars in Thousands with Match)DistrictWork, Detail

Fund PhProgramSponsorMileposts

Route, LocationKey No.

2021 2022 2023 2024 2025 PREL

SUBJECT TO REVISION DUE TO REASONS SUCH AS FUNDING, OBLIGATION LIMITATION, PROJECT SCOPE, COST, AND POLICY/REGULATION/RULE CHANGES

IDAHO TRANSPORTATION BOARDBILL MOAD, CHAIRMAN

Group: Aeronautics Projects (System)Sort: STIP

FY 2021 - FY 2027 Draft STIP

Individually Listed Projects per 23 CFR 450.218(j)

Year-Of-Expenditure Dollars (Not Current Prices)

2026 2027

208149

APT-PLAN PU-APTSTATE OF IDAHO (ITD)

AERO, UPDATE STATEWIDE SYSTEM PLAN, PCI YR 1 NPIASMP 0.000 - 0.000 SYS PLN, System Planning

-

-

-

-

-

-143 129 14

CN

RWPE

-------143----

-----

--

--- - -

PCI year 1 update (M258010)

208159

AVI-SYS PU-APTSTATE OF IDAHO (ITD)

AERO, UPDATE STATEWIDE SYSTEM PLAN, PCI YR 3 NPIASMP 0.000 - 0.000 SYS PLN, System Planning

-

-

-

-

-

-214 193 21

CN

RWPE

--------214---

-----

--

--- - -

PCI 3 YR Update M248010Construction

Right-of-WayDevelopment

-------143311-289583------

Total -143311-289583G: Project is grouped in STIP

1: Project is also shown in a Transportation Improvement Program

W: Work zone safety priority

CN - Construction, utilities, construction engineering, purchasesPE - preliminary engineering by state and/or consultant forcesRW - Right-Of-Way acquisition

Notes:

Phases:

2: Project is being advance constructed with non-federal funds

P: Project addresses Federal Pavement Condition PMR; Project addresses Federal Travel Time Reliability PM

B: Project addresses Federal Bridge Condition PM

A: Project utilizes an alternative contracting method.

M: Project included in multiple programs

--------

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 107

Page 110: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

Indian Reservation Roads ProgramsFederal Lands Highway

10-OCT-2018 10:02 AM

REPORT FILTERS:

Location = P-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 2 of 29

P0500200

P0518108

P0518113

P0518114

P0518115

P0518116

35,000

0

155,000

135,000

0

41,330

25,000

60,000

0

0

25,060

0

25,000

150,000

0

0

200,000

0

25,000

0

0

0

0

0

135,000

210,000

155,080

135,040

225,170

216,340

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

0 0 0

35,000

0 0 0 0

0 135,000

0 20,000

0 125,000

5,000 5,000

0 0 0 0

35,000 6,310

10 10

0 0 0

25,000

0 60,000

0 0

0 0 0 0

0 0 0 0

25,000 40 10 10

0 0 0 0

0 0 0

25,000

0 130,000 10,000 10,000

0 0 0 0

0 0 0 0

0 180,000 10,000 10,000

0 0 0 0

0 0 0

25,000

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0

135,000

0 190,000 10,000 10,000

0 135,060

10 20,010

0 125,020

5,010 5,010

25,040 180,090 10,020 10,020

35,010 131,310 25,010 25,010

Coeur d'Alene Admin Cap Bldg-Transpor

Mowry Road Chip Seal

Davenport Way

Lovell Valley Road Overlay

DeSmet Sidewalk/Trail

Worley Minor Street Repair

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

PLANING

SEALING

RECONS

OVRLAY

WALKWY

RECONS

O

O

R

O

O

O

P10

S4

7

S4

F1

7

16 - IdahoState P05181 - Coeur D'Alene

009 - Benewah

009 - Benewah

009 - Benewah

009 - Benewah

009 - Benewah

055 - Kootenai

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2018

Funding Amount 426,530

FIRST PAGE FOR CSTIPP05181 - COEUR D'ALENE TRIBEEntity Name

0 0 0

25,000

0 0 0 0

0 60 10 10

0 20 10 10

40 50 10 10

10 125,000 25,000 25,000

25,000

0

80

40

110

175,010

Total

Total

Total

Total

Total

Total

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

18-MAY-18FHWA Approved Date

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 108

Page 111: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

Indian Reservation Roads ProgramsFederal Lands Highway

10-OCT-2018 10:02 AM

REPORT FILTERS:

Location = P-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 3 of 29

426,530 445,400 410,080 445,060 811,010 2,538,080 2,538,080

426,530 445,400 410,080 445,060 811,010 2,538,080

P0518117

P0518118

P0518119

P0518120

P0518121

P05RM181

40,000

80

80

0

0

20,040

0

0

175,020

105,000

0

20,000

0

0

0

0

50,060

20,000

0

0

0

0

766,010

20,000

40,010

200,080

200,160

105,090

816,070

100,040

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

0 40,000

0 0

10 50 10 10

20 40 10 10

0 0 0 0

0 0 0 0

0 0 0

20,040

0 0 0 0

0 0 0 0

20 145,000 15,000 15,000

50,000 40,000 10,000

5,000

0 0 0 0

0 0 0

20,000

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

50,000 40 10 10

0 0 0

20,000

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

10,010 656,000 50,000 50,000

0 0 0

20,000

0 40,010

0 0

10,010 165,050 10,010 15,010

25,040 145,080 15,020 15,020

50,030 40,040 10,010

5,010

60,010 656,040 50,010 50,010

0 0 0

100,040

8th Street Reconstr.-Plummer

Veterans Memorial Park Trail

Reeves Road Recon

Lovell Valley Rd Rehab

Agency Rd Rehab

Road Maintenance 23USC 204(C)

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

426,530 445,400 410,080 445,060

RECONS

WALKWY

RECONS

RECONS

RECONS

PLANING

O

O

R

R

R

O

7

F1

7

7

7

S1

16 - IdahoState P05181 - Coeur D'Alene

009 - Benewah

009 - Benewah

009 - Benewah

009 - Benewah

009 - Benewah

009 - Benewah

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State SubtotalCSTIP Subtotal

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2018

Funding Amount 426,530

P05181 - COEUR D'ALENE TRIBEEntity Name

811,010

0 10 0 0

10,000 165,000 10,000 15,000

25,000 40 10 10

30 40 10 10

0 0 0 0

0 0 0

20,000

10

200,000

25,060

90

0

20,000

Total

Total

Total

Total

Total

Total

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

18-MAY-18

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 109

Page 112: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

Indian Reservation Roads ProgramsFederal Lands Highway

10-OCT-2018 10:02 AM

REPORT FILTERS:

Location = P-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 4 of 29

P0518201

P0518202

P0518203

P0518205

P0518207

P0518210

164,839

10,000

73,000

20,000

33,000

70,000

180,000

30,000

90,000

10,000

75,000

0

180,000

30,000

30,000

0

70,000

0

180,000

35,000

30,000

0

145,000

0

884,839

135,000

328,000

50,000

386,000

70,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

50,000 0 0

114,839

0 0 0

10,000

73,000 0 0 0

0 20,000

0 0

33,000 0 0 0

0 0

70,000 0

50,000 0 0

130,000

0 0 0

30,000

90,000 0 0 0

0 10,000

0 0

15,000 40,000 20,000

0

0 0 0 0

50,000 0 0

130,000

0 0 0

30,000

30,000 0 0 0

0 0 0 0

0 50,000 20,000

0

0 0 0 0

50,000 0 0

130,000

0 0 0

35,000

0 30,000

0 0

0 0 0 0

0 125,000 20,000

0

0 0 0 0

250,000 0 0

634,839

0 0 0

135,000

283,000 45,000

0 0

0 50,000

0 0

111,000 215,000 60,000

0

0 0

70,000 0

Nez Perce TTP Mgmt & Planning

Nez Perce Road Maintenance

Aht' Wy Egress

Cherrylane Bridge

Tribal Road

Nez Perce Transit Support

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

PLANING

PLANING

RECONS

REPLACE

RECONS

TRANSIT

O

O

R

B

R

O

P10

S1

I1

B16

I1

T1

16 - IdahoState P05182 - Nez Perce Tribe

035 - Clearwater

069 - Nez Perce

069 - Nez Perce

069 - Nez Perce

069 - Nez Perce

069 - Nez Perce

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2018

Funding Amount 504,839

FIRST PAGE FOR CSTIPP05182 - Nez Perce TribeEntity Name

50,000 0 0

130,000

0 0 0

30,000

90,000 15,000

0 0

0 20,000

0 0

63,000 0 0 0

0 0 0 0

180,000

30,000

105,000

20,000

63,000

0

Total

Total

Total

Total

Total

Total

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

21-AUG-18FHWA Approved Date

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 110

Page 113: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

Indian Reservation Roads ProgramsFederal Lands Highway

10-OCT-2018 10:02 AM

REPORT FILTERS:

Location = P-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 5 of 29

504,839 501,500 545,000 475,000 660,000 2,686,339 2,686,339

504,839 501,500 545,000 475,000 660,000 2,686,339

P0518211

P0518212

P0518213

P0518215

58,000

46,000

15,000

15,000

0

0

110,000

50,000

0

0

115,000

50,000

0

0

220,000

50,000

83,000

46,000

505,500

198,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

0 0 0

58,000

18,000 28,000

0 0

15,000 0 0 0

15,000 0 0 0

0 0 0 0

0 0 0 0

0 90,000 20,000

0

0 40,000 10,000

0

0 0 0 0

0 0 0 0

0 95,000 20,000

0

0 40,000 10,000

0

0 0 0 0

0 0 0 0

0 200,000 20,000

0

0 40,000 10,000

0

0 0 0

83,000

18,000 28,000

0 0

60,500 385,000 60,000

0

48,000 120,000 30,000

0

Nez Perce Road Maintenance Facility

Parade Avenue Guardrail Replacement S

Agency Street Reconstruction

Whitebird Resonstruction

Total

Total

Total

Total

Phase

Phase

Phase

Phase

504,839 501,500 545,000 475,000

RDMAINT

SAFETY

RECONS

RECONS

O

R

R

R

T1

G

6

6

16 - IdahoState P05182 - Nez Perce Tribe

069 - Nez Perce

069 - Nez Perce

069 - Nez Perce

069 - Nez Perce

Name

Name

Name

Name

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State SubtotalCSTIP Subtotal

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2018

Funding Amount 504,839

P05182 - Nez Perce TribeEntity Name

660,000

0 0 0

25,000

0 0 0 0

45,500 0 0 0

33,000 0 0 0

25,000

0

45,500

33,000

Total

Total

Total

Total

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

21-AUG-18

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 111

Page 114: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

Indian Reservation Roads ProgramsFederal Lands Highway

10-OCT-2018 10:02 AM

REPORT FILTERS:

Location = P-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 6 of 29

102,533 112,786 112,786 112,786 112,786 553,677 553,677

102,533 112,786 112,786 112,786 112,786 553,677

P0518301

P0518302

P0518303

P0518304

P0550000

P05RM183

10,500

1,000

54,800

27,850

1,383

7,000

20,000

42,786

0

0

10,000

40,000

20,000

42,786

0

0

10,000

40,000

20,000

42,786

0

0

10,000

40,000

90,500

172,144

54,800

27,850

41,383

167,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

10,500 0 0 0

0 0 0

1,000

8,900 35,700

6,200 4,000

3,300 21,300

2,000 1,250

1,383 0 0 0

0 0 0

7,000

20,000 0 0 0

0 0 0

42,786

0 0 0 0

0 0 0 0

10,000 0 0 0

0 0 0

40,000

20,000 0 0 0

0 0 0

42,786

0 0 0 0

0 0 0 0

10,000 0 0 0

0 0 0

40,000

20,000 0 0 0

0 0 0

42,786

0 0 0 0

0 0 0 0

10,000 0 0 0

0 0 0

40,000

90,500 0 0 0

0 0 0

172,144

8,900 35,700

6,200 4,000

3,300 21,300

2,000 1,250

41,383 0 0 0

0 0 0

167,000

Kootenai Transportation Planning

Kootenai TTP Mgmt & Administration

Frontier Village

Little Bear

Kootenai Safety Program

Kootenai Road Maintenance

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

102,533 112,786 112,786 112,786

PLANING

PLANING

RECONS

RECONS

SAFETY

PLANING

O

O

R

R

O

O

P10

P10

IR2

IR2

P6

3

16 - IdahoState P05183 - Kootenai Tribe

021 - Boundary

021 - Boundary

021 - Boundary

021 - Boundary

021 - Boundary

021 - Boundary

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State SubtotalCSTIP Subtotal

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2018

Funding Amount 102,533

FIRST PAGE FOR CSTIPP05183 - Kootenai TribeEntity Name

112,786

20,000 0 0 0

0 0 0

42,786

0 0 0 0

0 0 0 0

10,000 0 0 0

0 0 0

40,000

20,000

42,786

0

0

10,000

40,000

Total

Total

Total

Total

Total

Total

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2018 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2019 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2020 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

16-APR-18FHWA Approved Date

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 112

Page 115: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

TOTAL $85,000 $105,000 $250,000 $0 $0 $440,000

Maintenance $0 $0 $0 $0 $0 $0Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0Construction $0 $0 $250,000 $0 $0 $250,000

Preliminary Engineering $85,000 $105,000 $0 $0 $0 $190,000Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0Activity TOTAL

Comments: Eagle Road Reconstruction to widen a path/sidewalk. Eagle road project is one of the next projects on ourTIP and will still move toward project readiness.TTP Annual Allocation FY18-20 - $440,000.Additional Funding Sources - $0.00.Total expected project costs - $440,000.

State: ID Construction Year: 2020Length: 0.5 Miles County: Bingham

Type of Work: ReconstructionLocation: Fort Hall District

Project Number: SBTDOT-055Route Number: Rte 55, Sec 30

Project Name: Eagle Road Project

PROJECT INFORMATIONFunding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2018

Tribe: Shoshone-Bannock Tribes of Fort Hall Date:Consortium:

Tribal Transportation Program Transportation Improvement Program

$0.00

Tribe Code: P04180

2018 2019 2020 2021 2022

STIP Amount: $440,000

P041800005

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 113

Page 116: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

TOTAL $0 $25,000 $25,000 $550,000 $0 $600,000

Maintenance $0 $0 $0 $0 $0 $0Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0Construction $0 $0 $0 $550,000 $0 $550,000

Preliminary Engineering $0 $25,000 $25,000 $0 $0 $50,000Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0Activity TOTAL

Comments: Reconstruct/repave the roads in the Agency/Campus area of Fort Hall.TTP annual allocation FY18-21 - $625,000.Additional Funding Sources - $0.00.Total expected project costs - $625,000.

State: ID Construction Year: 2021Length: 1.3 Miles County: Bingham

Type of Work: ReconstructionLocation: Fort Hall District

Project Number: SBTDOT-057Route Number: Rte 57, Sec 10-100

Project Name: Agency Streets/Campus

PROJECT INFORMATIONFunding Source: TTP (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2018

Tribe: Shoshone-Bannock Tribes of Fort Hall Date:Consortium:

Tribal Transportation Program Transportation Improvement Program

$0.00

Tribe Code: P04180

2018 2019 2020 2021 2022

STIP Amount: $600,000

P041800011

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 114

Page 117: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

TOTAL $85,000 $85,000 $250,000 $0 $0 $420,000

Maintenance $0 $0 $0 $0 $0 $0Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0Construction $0 $0 $250,000 $0 $0 $250,000

Preliminary Engineering $85,000 $85,000 $0 $0 $0 $170,000Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0Activity TOTAL

Comments: Reconstruction of Path/Sidewalk-Between exit 80 and Hiline Road.TTP Annual Allocation FY18-20 - $420,000.Additional Funding Sources - $0.00.Total expected project costs - $420,000.

State: ID Construction Year: 2020Length: 0.5 Miles County: Bingham

Type of Work: ReconstructionLocation: Fort Hall District

Project Number: SBTDOT-024Route Number: Rte 24, Sec 10-20

Project Name: Ross Fork/Lone Pine

PROJECT INFORMATIONFunding Source: TTP; (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2018

Tribe: Shoshone-Bannock Tribes of Fort Hall Date:Consortium:

Tribal Transportation Program Transportation Improvement Program

$0.00

Tribe Code: P04180

2018 2019 2020 2021 2022

STIP Amount: $420,000

P041800014

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 115

Page 118: FY2021 to FY2027 Draft for Public Comment - apps.itd.idaho.gov · in good repair and ensure uninterrupted service. •Applies resources to maintain, improve, and expand routes and

TOTAL $1,782,465 $0 $0 $0 $0 $1,782,465

Maintenance $0 $0 $0 $0 $0 $0Transit $0 $0 $0 $0 $0 $0

Construction Engineering $0 $0 $0 $0 $0 $0Construction $1,782,465 $0 $0 $0 $0 $1,782,465

Preliminary Engineering $0 $0 $0 $0 $0 $0Planning $0 $0 $0 $0 $0 $0

Administration $0 $0 $0 $0 $0Activity TOTAL

Comments: This BIA owned bridge has a 32.6 sufficiency rating and is being submitted to the TTP Bridge replacement program for funding. Bridge is listed in the NTTFI and the NBI.TTP Annual Allocation FY18 - $0.00.Additional Funding Sources - TTP Bridge - $1,782,465.Total expected project costs - 1,782,465.

State: ID Construction Year: 2018Length: 0.1 Miles County: Bingham

Type of Work: ReconstructionLocation: Lincoln Creek District

Project Number:Route Number: Rte 15, Sec 40 - P416

Project Name: Just Bridge

PROJECT INFORMATIONFunding Source: TTP Bridge; (examples: IRR, IRRBP, 2% Planning, PLH-D) Current FY: 2018

Tribe: Shoshone-Bannock Tribes of Fort Hall Date:Consortium:

Tribal Transportation Program Transportation Improvement Program

$0.00

Tribe Code: P04180

2018 2019 2020 2021 2022

STIP Amount: 1,782,465

P041800016

FY 2021 to 2027 Draft Idaho Transportation Investment Program - July 2020 116


Recommended