1 DESIGN AND APPLICATION OF GAS PIPING SYSTEM IN BUILDING LPG MEDICAL GAS
Transcript
Page 1: Gas Piping

1

DESIGN AND APPLICATION OF

GAS PIPING SYSTEM IN BUILDING

• LPG• MEDICAL GAS

Page 2: Gas Piping

2

LIQUID PETROLEUM GAS

• COMMERCIAL

• LABORATORY

Page 3: Gas Piping

3

MEDICAL GAS• HOSPITAL

– Oxygen– Nitrous oxide– Helium– Nitrogen– Mixed gas

Page 4: Gas Piping

4

STANDARD AND CODE REFERENCE

ON LPG SYSTEM

• E.I.T. Standard 3006-40 (Standard for Liquid Petroleum Gas system)• Liquid Petroleum Gas law (From Ministry of Interior)

Page 5: Gas Piping

5

STANDARD AND CODE REFERENCE

ON MEDICAL GAS

• NFPA Standards 99 (Standard for Health Care Facilities)• NFPA Standard 50 (Bulk Oxygen Systems at Consumer Sites)

Page 6: Gas Piping

6

CRITERIA TO DESIGN

LIQUID PETROLEUM GAS

Planing• Architectural and Structure Plan•Gas Equipment Information•Code and Law•Piping lay-out

Page 7: Gas Piping

7

CRITERIA TO DESIGN

LIQUID PETROLEUM GAS

Sizing of Gas Piping System• Determine the maximum possible gas

demand

Page 8: Gas Piping

8

Page 9: Gas Piping

9

CRITERIA TO DESIGN

LIQUID PETROLEUM GAS

Determine the maximum possible gas demand• Commercial kitchen use 100% Simultaneous use

factor• Dwelling unit use 65,000 Btu/hr/unit

(See simultaneous use factor in Table 2)• Laboratory use 5,000 Btu/hr/burner

(See simultaneous use factor in Table 3)

Page 10: Gas Piping

10

Page 11: Gas Piping

11

Page 12: Gas Piping

12

CRITERIA TO DESIGN

LIQUID PETROLEUM GAS

Determine the pressure drop• Less than 10% of working pressure

Page 13: Gas Piping

13

CRITERIA TO DESIGN

LIQUID PETROLEUM GAS

Determine the distance to the most remote gas outlet• Equivalent length

Page 14: Gas Piping

14

Page 15: Gas Piping

15

Page 16: Gas Piping

16

CRITERIA TO DESIGN

LIQUID PETROLEUM GAS

Determine the specific gravity of the gas• Use the gravity factor

Page 17: Gas Piping

17

CRITERIA TO DESIGN

LIQUID PETROLEUM GAS

Determine the system design pressure• National Fuel Gas Code - 5 Psi maximum for NG. - 20 Psi Maximum for LPG.

Page 18: Gas Piping

18

TABLE 3

Page 19: Gas Piping

19

TABLE 4

Page 20: Gas Piping

20

TABLE 5

Page 21: Gas Piping

21

CRITERIA TO DESIGN

LIQUID PETROLEUM GAS Determine the pipe size Example :

80

SECTION 3

Pout=10 psi

20 25FT

20FT

SECTION 1SECTION 2

1,888,00 BTU/HR

1,145,00 BTU/HR

2,120,00 BTU/HR

2,400,00 BTU/HR

A

C

B

D

3020

60

40

Page 22: Gas Piping

22

CRITERIA TO DESIGN

LIQUID PETROLEUM GAS Determine the pipe size Solution :

- The distance to the most remote gas outlet is 185 FT- Outlet A : = 1450 CFH, FROM TABLE 4 :-REQUIRES DIA 1”- Outlet B : = 1888 CFH, FROM TABLE 4 :-REQUIRES DIA 1 1/4”- Outlet C : = 2120 CFH, FROM TABLE 4 :-REQUIRES DIA 1 1/4”- Outlet D : = 2400 CFH, FROM TABLE 4 :-REQUIRES DIA 1 1/4”

Page 23: Gas Piping

23

CRITERIA TO DESIGN

LIQUID PETROLEUM GAS Determine the pipe size Solution :Section 1 : 3,338 CFH, FROM TABLE 4 :-REQUIRES DIA 1 1/2”Section 2 : 5,458 CFH, FROM TABLE 4 :-REQUIRES DIA 2”Section 3 : 7,858 CFH, FROM TABLE 4 :-REQUIRES DIA 2”

Page 24: Gas Piping

24

CRITERIA TO DESIGN

LIQUID PETROLEUM GAS Determine the pipe size Solution :

SECTION 3

Pout=10 psi

11/4"

A

C

B

2" 11/2"

11/4"

1"

11/4"

2"

D

Page 25: Gas Piping

25

CRITERIA TO DESIGN

LIQUID PETROLEUM GAS

Determine the pipe size• See Figure 1 (Low pressure)• See Figure 2 (High pressure)

Page 26: Gas Piping

26

Page 27: Gas Piping

27

Page 28: Gas Piping

28

CRITERIA TO DESIGN

LIQUID PETROLEUM GAS Piping Materials (NFPA 54)• Steel pipe - ASTM A53 - ASTM A106• Copper pipe - ASTM B42

Page 29: Gas Piping

29

CRITERIA TO DESIGN

LIQUID PETROLEUM GAS Tubing Materials (NFPA 54)• Steel tube - ASTM A539• Copper tube - ASTM B88 (Type K or L)

Page 30: Gas Piping

30

CRITERIA TO DESIGNLIQUID PETROLEUM GAS

Other Standard• Tubing Material Copper Tube - EN 1057- R250 ✐ Table X ✐ Table Y - EN 1057-R220 ✐ Table W ✐ Table Y

Page 31: Gas Piping

31

Page 32: Gas Piping

32

CRITERIA TO DESIGN

LIQUID PETROLEUM GAS Piping Components• Gas Meter• Gas Pressure Regulators - Service pressure regulator - Line pressure regulator• Overpressure Protection• Back Pressure Protection• Shut off valves

Page 33: Gas Piping

33

CRITERIA TO DESIGN

LIQUID PETROLEUM GAS Gas Piping Installation• Underground - More than 0.45m under cover - Coatings and Wrappings

Page 34: Gas Piping

34

CRITERIA TO DESIGN

LIQUID PETROLEUM GAS Gas Piping Installation• Above ground Piping Outside A Building - Protected from physical damage - Corrosion

Page 35: Gas Piping

35

CRITERIA TO DESIGN

LIQUID PETROLEUM GAS Gas Piping Installation• In Building - In Concealed Location ✐ Above-ceiling ✐ Partitions ✐ Floors

Page 36: Gas Piping

36

CRITERIA TO DESIGN

LIQUID PETROLEUM GAS Pressure-Testing Inspection• Test Preparation• Test Pressure - 1.5 times of maximum working pressure• Test Duration - 10 min for pipe volume less than 0.28m3

- 30 min for each 14.0m3 of pipe volume

Page 37: Gas Piping

37

CRITERIA TO DESIGN

LIQUID PETROLEUM GAS System Check• Check entire system• Purging - 1.5 times of maximum working pressure• Test Duration - 10 min for pipe volume less than 0.28m3

- 30 min for each 14.0m3 of pipe volume

Page 38: Gas Piping

38

CRITERIA TO DESIGN

MEDICAL GASPlanning• Architectural and Structure Plan• Gases Information• Codes and Law• Piping lay out

Page 39: Gas Piping

39

CRITERIA TO DESIGN

MEDICAL GASSizing of Gas Piping System• Oxygen Systems - 1 to 100 outlets, manifold - over 100 outlets, bulk - Determine the maximum possible gas demand

Page 40: Gas Piping

40

TABLE 6

Page 41: Gas Piping

41

CRITERIA TO DESIGN

MEDICAL GASOxygen Systems• Pipe sizing - Maximum friction loss of 5 psi - Outlet pressure (> 50 psi) - Pressure loss (see Table)

Page 42: Gas Piping

42

TABLE 7 Pressure loss per 100 ft of pipe, psi

Page 43: Gas Piping

43

CRITERIA TO DESIGN

MEDICAL GASSizing of Gas Piping System• Nitrous Oxide Systems - Determine the maximum possible gas demand

Page 44: Gas Piping

44

TABLE 8

Page 45: Gas Piping

45

CRITERIA TO DESIGN

MEDICAL GASNitrous Oxide Systems• Pipe sizing - Maximum friction loss of 5 psi - Outlet pressure (> 50 psi) - Pressure loss (see Table)

Page 46: Gas Piping

46

TABLE 9 Pressure loss per 100 ft of pipe, psi

Page 47: Gas Piping

47

CRITERIA TO DESIGN

MEDICAL GASPiping Materials (NFPA99)• Copper tube - ASTM B819 Seamless medical gas tube, Type K or L

Page 48: Gas Piping

48

CRITERIA TO DESIGN

MEDICAL GASPressure-Testing Inspection• Initial Pressure Test - 1.5 time of working pressure (not less than 150 psi)• Final Pressure Test - 20% above operating pressure - Duration (24 hrs.)


Recommended