WHO WE ARE Global systems and process company Expertise in oil, gas, water and power Over 60 years of proven operational success WHERE WE ARE Operations in over 30 countries Regionally focused, locally aligned WHAT WE DO Integrated project solutions Design, Build, Own, Operate and Maintain hydrocarbon processing and treating facilities Aftermarket services OUR CAPABILITIES Design and engineering excellence Project management and construction Turnkey facilities and operations GAS PROCESSING COMPLEX Customer Challenges/Requirements: Scalable, modular design to match rapid production growth in key onshore basin Site access difficult due to remote location and challenging topography Long-term, capable partner to ensure continuity of future train deliveries Exterran Solutions: Facility design based on standardized C200 cryogenic plant Provided BOP engineering and all processing equipment Delivered Train 1 in approximately 15 months from concept to commission Plan to deliver additional trains as required by area production growth Results: Exterran has delivered 9 trains with a processing capacity of over 1.8 BCFD as of Q4 2017 Trains 10 and 11 are in the construction phase and will be operational in Q3 and Q4 2018, respectively The complex is expected to be the largest processing facility in North America by year end 2018 (2.2 BCFD, nameplate capacity) Exterran.com Scalable Solutions for Rapidly Growing Hydrocarbon Production Regions For more information, contact Exterran at [email protected] © 2017 Exterran Corporation, All Rights Reserved. Processing Complex APR18 Start 12 months RFQ/FEED Study Contract Award BOP Engineering Processing Plant & Manufacturing BOP Equipment Procurement & Fabrication Construction Commissioning & Start-up 1 month 6 months 10 months 7 months 7 months 2 months 1 month DESIGN AND BUILD SCHEDULE TRAIN 1 – 3Q 2012 1 ST CONTRACT – 3Q 2011 TRAIN 2 – 3Q 2013 TRAIN 3 – 1Q 2014 TRAIN 4 – 2Q 2014 TRAIN 5 – 4Q 2014 TRAIN 6 – 2Q 2015 TRAIN 7 – 1Q 2017 TRAIN 8 – 3Q 2017 TRAIN 9 – 4Q 2017 2012 2013 2014 2011 2015 2016 2017 2018 Operational Timeline 1.8 BCFD IN 5 YEARS
Transcript
Page 1: GAS PROCESSING COMPLEX - exterran.com

WHO WE ARE � Global systems and process company

� Expertise in oil, gas, water and power

� Over 60 years of proven operational success

WHERE WE ARE � Operations in over 30 countries

� Regionally focused, locally aligned

WHAT WE DO � Integrated project solutions

� Design, Build, Own, Operate and Maintain hydrocarbon processing and treating facilities

� Aftermarket services

OUR CAPABILITIES � Design and engineering excellence

� Project management and construction

� Turnkey facilities and operations

GAS PROCESSING COMPLEX

Customer Challenges/Requirements: � Scalable, modular design to match rapid production growth in key onshore basin � Site access difficult due to remote location and challenging topography � Long-term, capable partner to ensure continuity of future train deliveries

Exterran Solutions: � Facility design based on standardized C200 cryogenic plant � Provided BOP engineering and all processing equipment � Delivered Train 1 in approximately 15 months from concept to commission � Plan to deliver additional trains as required by area production growth

Results: � Exterran has delivered 9 trains with a processing capacity of over 1.8 BCFD as of Q4 2017

� Trains 10 and 11 are in the construction phase and will be operational in Q3 and Q4 2018, respectively

� The complex is expected to be the largest processing facility in North America by year end 2018 (2.2 BCFD, nameplate capacity)

Exterran.com

Scalable Solutions for Rapidly Growing Hydrocarbon Production Regions

For more information, contact Exterran at [email protected]

© 2017 Exterran Corporation, All Rights Reserved. Processing Complex APR18

Start 12 months

RFQ/FEED Study

Contract Award

BOP Engineering

Processing Plant & Manufacturing

BOP Equipment Procurement & Fabrication

Construction

Commissioning & Start-up

1 month

6 months

10 months

7 months

7 months

2 months

1 month

SHERWOOD SCHEDULEDESIGN AND BUILD SCHEDULE

�TR

AIN

1 –

3Q

201

2

�1

ST C

ON

TRAC

T –

3Q 2

011

�TR

AIN

2 –

3Q

201

3

�TR

AIN

3 –

1Q

201

4

�TR

AIN

4 –

2Q

201

4

�TR

AIN

5 –

4Q

201

4

�TR

AIN

6 –

2Q

201

5

�TR

AIN

7 –

1Q

201

7

� �

TRA

IN 8

– 3

Q 2

017

TRA

IN 9

– 4

Q 2

017

2012 2013 20142011 2015 2016 2017 2018

Operational Timeline

1.8 BCFD IN 5 YEARS

Recommended