+ All Categories
Home > Engineering > Gibela Trencon Presentation - 02june2016

Gibela Trencon Presentation - 02june2016

Date post: 14-Apr-2017
Category:
Upload: sibongile-nsibande
View: 20 times
Download: 2 times
Share this document with a friend
15
Transcript
Page 1: Gibela Trencon Presentation - 02june2016
Page 2: Gibela Trencon Presentation - 02june2016

Page 3: Gibela Trencon Presentation - 02june2016

Page 4: Gibela Trencon Presentation - 02june2016

Page 5: Gibela Trencon Presentation - 02june2016

Page 6: Gibela Trencon Presentation - 02june2016

Page 7: Gibela Trencon Presentation - 02june2016

Page

The factory

7

Supplier park:• centre of train manufacturing excellence • 78ha site• R1 billion investment• maximum capacity end 2019:• two cars per day

• 1 500 workers employed on site

Training centre: • 4 000m2

• to train 19 500 peopleTesting centre:• static test buildings• 1.2 km test track

Manufacturing buildings• 31 500m2

2 June 2016Moving forward with Trencon and Black Jill JV

Page 8: Gibela Trencon Presentation - 02june2016

••••

••••••

•••••

••

Page 9: Gibela Trencon Presentation - 02june2016

Page

Key construction milestones

9

May Building construction

starts

OctoberTraining Centre

buildings ready to be equipped

MarchFirst manufacturingbuilding completed

SeptemberConstruction ends

Second QuarterTrain production

starts

2016 2017

2 June 2016Moving forward with Trencon and Black Jill JV

Page 10: Gibela Trencon Presentation - 02june2016

Page

Construction milestones

Overall construction programme will last approximately 18 months

2 June 2016Moving forward with Trencon and Black Jill JV 10

Note: Main construction Milestones for P0+1+2: black dot =complete, orange dot = planned.

Work package 2016 2017Dec

2015 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan 2018

Plant rescue, clearance, earthworks, infrastructure

RS site buildings

Rail infrastructure

Electrical reticulation and equipment

Electrical reticulation and equipment (traction)

Mechanical (HVAC, gas, air, water)

Cranes

Transborder and turn table

Non-statutory signage (Gibela visual identity)

Bulk electrical supply

Bulk roads and rails

Bulk potable water, sewerage pipelines

Bulk stormwater

Start of construction

Plant removal complete

Start of building package

CBS Portion 1 Beneficial occupationM07 Beneficial occupation

Permanent power supply

Progress: 67%

Page 11: Gibela Trencon Presentation - 02june2016
Page 12: Gibela Trencon Presentation - 02june2016

••

Page 13: Gibela Trencon Presentation - 02june2016
Page 14: Gibela Trencon Presentation - 02june2016

Page

Special thanks

2 June 2016Moving forward with Trencon and Black Jill JV 14

To the Executive Mayor of Ekurhuleniand the EMM Executive Committee and officials for their ongoing support of the project

“This project means that Ekurhuleni is no longer the historic leader in manufacturing – it affirms us as the future leader and puts us at the cutting edge of technology.”

Page 15: Gibela Trencon Presentation - 02june2016

Recommended