+ All Categories
Home > Documents > Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day...

Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day...

Date post: 14-Aug-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
67
Grandview- Woodland Neighbourhood Transportation & Parking Meeting # 3 May 11, 2017 Stakeholder Advisory Group
Transcript
Page 1: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

Grandview-Woodland

Neighbourhood Transportation

& Parking

Meeting # 3 May 11, 2017

Stakeholder Advisory Group

Page 2: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

2

Introductions

Page 3: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

• Grandview Woodland Area Council

• East Village / Hastings North BIA

• Commercial Drive Business Society

• Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood

House • Vancouver Coastal Health

3

Introductions & Welcome

Triangle West

• REACH Community Health Centre

• TransLink • Streets for Everyone • BEST • HUB • Advisory Committees

– Persons with Disabilities – Seniors’ – Active Transportation – Urban Aboriginal Peoples

• City of Vancouver – Dale Bracewell, Hailey Steiger-

Tang, Carol Kong, Liliana Quintero

Page 4: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

6:30 pm Intros & Welcome

6:40 pm Project Updates

7:10 pm False Creek Flats & East – West Arterial Update

7:20 pm Break

7:30 pm Moving Towards Zero

8:00 pm Closing & Next Steps

4

Agenda

Triangle West

Page 5: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

5

Project Updates

Page 6: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

6

Complete Streets

Why Complete Streets?

• Help achieve Transportation 2040 targets on mode share

and safety

• Renewable City Strategy

o T.1.2 Enhance and accelerate the development of

complete streets and green infrastructure

• Deliver better streets for all users and promote sustainable

transportation

Also Supported by

• Other Citywide policies:

• Greenest City Action Plan

• Healthy City Strategy

• Citywide Integrated Rainwater Management Plan

(IRMP)

• ATPC Motion

Page 7: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

City of Vancouver | Complete Streets Planning | 2017

Transportation

Perspective

• Consider needs of

people of all ages &

abilities

• Integrate planning for

all modes of travel

• Ensure critical mobility

and access functions

are met

• Respond to local

context, and

connectivity and

reliability of the

broader transportation

network

What are Complete Streets?

7

Page 8: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

City of Vancouver | Complete Streets Planning | 2017

Broader Perspective

• Bring a holistic lens to

street design

• Integrate seamlessly

land use, transportation,

urban design, green

infrastructure and

public space

• Promote public life and

deliver context sensitive

public realm

• Help create Complete

Communities

What are Complete Streets?

8

Page 9: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

City of Vancouver | Complete Streets Planning | 2017

Not a one-size-fits all approach

Typologies informed by:

• Transportation function

within a broader network

• Available right-of-way

• Type of street driven by land

use intensity and activity

• Other factors that make a

street unique

9

Street Typology and Network Considerations

Page 10: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

City of Vancouver | Complete Streets Planning | 2017

• First enacted in 1944

• Allows for motor vehicle

infrastructure:

o Mark and modify traffic lanes for

moving vehicles

o Designate and regulate parking

on streets

o Locating and establishing vehicle

traffic controls on streets

• But doesn’t allow for:

o Modification to improve walking,

biking and transit infrastructure

(per T2040)

Opportunity to Improve Delivery

Existing City Engineer Authority:

10

Page 11: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

City of Vancouver | Complete Streets Planning | 2017

Update City Engineer’s

delegated authority to

• Reallocate public right-of-

way for different modes and

uses

• Divert general motor vehicle

traffic from streets

• Reroute transit access onto

different streets

Allows for more efficient

delivery of improvements to

achieve T2040 targets

Opportunity to Improve Delivery

Recommended amendments to modernize the Street and

Traffic By-law

11

Page 12: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

City of Vancouver | Complete Streets Planning | 2017

Recommendations:

• Council receive for information the Citywide Complete Streets policy framework

• Council approve amendments to the Street & Traffic Bylaw to facilitate street modifications to support Transportation 2040 safety and mode share targets, and delivery of more Complete Streets

• Council instruct the Director of Legal services to bring

forward for enactment amendments to the Street and Traffic By-law

Complete Streets

City of Vancouver | Complete Streets Planning | 2017 12

Page 13: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

Road network policies • Optimize network

operations to manage congestion impacts

• Consider impacts to

transit, commercial vehicles, and general traffic flow prior to reallocating road space

• Manage traffic to

improve safety, business activity and neighbourhood livability

Congestion Management Strategy

Page 14: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

• Slower moving vehicles can be helpful to improve neighbourhood livability, business activity and reduces risk of traffic-related injuries or fatalities

• Congestion is harmful as it impacts

travel times of transit and goods movement, and increases emissions

• Sustainable transportation is

prioritized in Vancouver, however vehicle congestion that is not managed can negatively affect urban areas and the economy

Congestion Management Strategy

Page 15: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

Goals

1. Improve monitoring of traffic conditions and trends

2. Improve road safety

3. Ensure a smart and efficient transportation system

4. Coordinate street use

5. Prioritize people & goods movement

Congestion Management Strategy

Page 16: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

Consultation on Key Project parameters targeted for June

• Managing construction impacts – Traffic – Business Access – Walking/Biking – Transit

• Design considerations – Stations – Public Realm – Intermodal connections

16

Transit - Millennium Line Broadway Extension

Page 17: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

17

– Business & Goods Movement Survey results are online – Business engagement

• Ongoing analysis: Parking, loading, volumes, transit data, etc.

• June 2017: Loading and parking newsletter update • Fall 2017: Information session on loading and parking

Summer 2017 • Pop-up events on the Drive regarding walking, public spaces,

placemaking (with VIVA Vancouver)

Commercial Drive Complete Street

Page 18: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

10th Avenue & Union-Adanac Corridors

Union-Adanac Corridor • Spot improvements proposed at Jan

2017 open houses • Design adjustments made based on

feedback e.g. reduced impacts to parking

• Updates to Victoria Drive & Nanaimo Street residents underway. Updates soon on vancouver.ca/adanac

10th Avenue Corridor: Commercial-Victoria • Minor refinements based on Nov 2016

feedback • Construction of interim improvements

anticipated in late 2017 or 2018

Page 19: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

19

• “Listen and learn” session with residents – May 18th, Trout Lake Community Centre 6:30-8:30pm

• Discuss transportation related

concerns and opportunities for improvement, in the context of proposed land use changes

• Study to assess existing vs. future traffic conditions (as per changing land use) and to identify range of potential solutions

Broadway Triangle Transportation Study

Nan

aim

o St

Clar

k

Kam

loop

s

Broadway

Hastings

Grandview Hwy

Page 20: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

20

First Avenue – FortisBC Work (2018)

Fortis BC Pipeline Replacement Project

• Replacing deteriorating 20” pipeline on 2nd Avenue with a 30” pipeline on 1st Avenue

• Improve safety and reliability of City’s gas supply

• East 1st avenue from Boundary to Woodland Drive, including segment on Graveley St.

• January - September 2018

Page 21: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

21

First Avenue – FortisBC Work (2018)

Traffic Management

• Boundary to Nanaimo St

– Closure of eastbound lanes on E 1st Avenue,

– One-lane two-way traffic within the westbound lanes

• Nanaimo to Clark

– Full closure

– 2 month window (July/August)

– Trenchless crossings of Nanaimo and Commercial

Page 22: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

10-Year Vision Update

Grandview-Woodland Transportation Advisory Group May 11, 2017 Andrew Tester, TransLink

22

Page 23: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

The 10-year Vision is our Regional Blueprint for Multimodal Transportation Investments

23

• New buses to expand bus service by 25%.

• New SkyTrain cars. • Station and bus

exchange upgrades.

• New rapid transit in Vancouver, Surrey & Langley.

• New SeaBus, with service every 10 mins.

• 80% more NightBus • $200M for walking &

cycling, w/ 2,700km of new bike lanes

• $330M for upgrades and seismic investments of roads

• Welcome 1 million more people and 500,000 more jobs in the next 30 years

• Maintain gateway competitiveness and Canada’s strongest economy

• Advance environmental policy objectives

Page 24: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

2017 Investment Plan to be Phase One of Implementing the 10-Year Vision

24

Page 25: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

The Phase One Plan will improve transportation across the region

25

Service design, including routing, for new transit services, will be confirmed through collaboration with municipalities and project-level public consultation.

Page 26: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

Bus Service Improvements 26

Bus Service • 25 • 43 • 49 • 84 • 100 • 430 • N8 • N20 • 99 B-Line

HandyDART • 15% increase

across the region

Page 27: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

Other Transit Improvements 27

• 28 new rail cars

• 5 new cars

• 22 new rail cars • Station upgrades

• Increase frequency to 15 minute service all day, 7 days a week.

• New SeaBus, with frequency increased to every 10 minutes during the AM and PM peak.

SeaBus

Page 28: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

Infrastructure Improvements 28

Infrastructure Improvements A. Burrard Station B. Joyce-

Collingwood Station (Phase 2)

C. King Edward Station

Page 29: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

B-Line or Better 29

B-Line or Better – • 41st Avenue • Hastings St

B-Line Study – Metrotown / Richmond-Brighouse

Page 30: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

Entire 10-Year Vision Phase One Approved / Underway

Phase Two Working Assumptions

Phase Three Remaining Investments

Bus Service

SeaBus Service

• 1 new SeaBus • 10 min peak frequency; all-day FTN

service (every 15 mins or better)

• 1 new SeaBus • 10 min peak frequency; all-day FTN

service (every 15 mins or better)

HandyDART Service

SkyTrain & West Coast Express (WCE)

• 114 Expo/Millennium Lines cars • 22 Canada Line cars • 10 WCE cars + locomotive

• 28 Expo/Millennium Lines cars • 22 Canada Line cars • 5 WCE cars + 1 new locomotive • Upgrades to Expo/Millennium &

Canada Line stations

• 86 Expo/Millennium Line cars (including Broadway Extension)

• Upgrades to Expo/Millennium & Canada Line stations

• 5 WCE cars

• Upgrades to Expo/Millennium & Canada Line stations

Major Projects

• Millennium Line Broadway Extension • Surrey-Langley Rapid Transit • Pattullo Bridge Replacement

• Pre-construction on Broadway Extension

• Pre-construction on Surrey-Newton-Guildford LRT

• Design for Pattullo Bridge Replacement

• Construction of Broadway Extension • Construction of Surrey-Newton-

Guildford LRT • Construction of Pattullo Bridge

Replacement • Pre-construction on Surrey-Langley

LRT

• Construction of Surrey-Langley LRT

Major Roads Network (MRN)

• MRN expansion: 1% annual increase + one-time 10% increase

• MRN expansion: 1% annual increase + one-time 10% increase

Walking & Cycling

Transit Exchanges

13 new or expanded transit exchanges

3 updated transit exchanges, in addition to 2 exchanges as part of Surrey pre-construction work

2 upgraded transit exchanges 6 upgraded transit exchanges

Completing the 10-Year Vision for Metro Vancouver Transit & Transportation

Working assumptions as of Feb 2017

25% increase 11 new B-Lines

10% increase 5 new B-Lines

6% increase 2 new B-Lines

30% increase 15% increase 7% increase

MRN upgrades: $200M

MRN seismic: $130M

Regional Cycling

$50M (25% of Vision)

$32.5M (25% of Vision)

$40M (20% of Vision)

$26M (20% of Vision)

$110M (55%)

$71.5M (55%)

$131M

Walking Access to Transit: $35M

$41.3M (32% of Vision)

$12.5M (36% of Vision)

$23.8M (18% of Vision)

$10M (29% of Vision)

$65.9M (50% of Vision)

$12.5M (36% of Vision)

8% increase

9% increase 4 new B-Lines

Phase One investments dependent on enabling legislation for new regional development fee

Subject to refinement after Phase Two development

30

Page 31: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

31

False Creek Flats + E-W Arterial

Page 32: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

32

False Creek Flats – Area Plan

Page 33: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

False Creek Flats – Area Plan

Institutional Anchors Amenity Hubs

and pockets of residential

Page 34: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

34

New Streets and Transit

Big Moves

• Gore/Station Street

• Prior/Venables Replacement Arterial

• Millennium Line Broadway Extension

Page 35: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

35

Walking and Cycling

Big Moves

• Expanding the network

• Adanac Bikeway grade-separation

• Connections across rail

Page 36: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

Rail

• Grade-separating the Burrard-Inlet Rail Line

– Prior/Venables replacement arterial

– Adanac Bikeway

– Local street closures

Page 37: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

37

East-West Arterial - Background

Page 38: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

38

What We Heard

Page 39: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

39

Exploring William Street as a potential option

• Further study & engagement to select 1 of 3 alignment options:

– William Street

– Malkin Avenue

– National Avenue

• Engineering developing concepts for William St

• Park Board assessing impacts and mitigation for Strathcona Park

• Two rounds of open houses led by Park Board (TBC – June & Sept)

• Report to Park Board & City Council in late 2017

Page 40: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

40

Break (15 mins)

1932 – Hastings at Clark Drive

Page 41: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

Moving Towards Zero

Safety Action Plan

Liliana Quintero, P. Eng

Traffic and Data Management

Page 42: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

• Transportation 2040: Zero Traffic Related

Fatality goal

• Pedestrian Safety Study and Action Plan

• Cycling Safety Study and Action plan

• Creation of Traffic Safety Advisory group

Vancouver Safety Progress

Page 43: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

1. Enhanced Data

2. Evaluate and Prioritize Locations

3. Engineering Action Plan

4. Education & Public Outreach

5. Enforcement

6. Next Steps

Moving Towards Zero: Action Plan

Page 44: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

• Transportation Related Fatalities – VPD

o Summary reports as they occur

o Annual review

• Collisions involving – ICBC

o Summary reports each year

o Annual review

o Serious injury data – included since 2014

• Health Injury Data - NEW

o Hospital data - Vancouver Coastal Health

o Ambulance data – BC Ambulance

1. Enhanced Data: Current Data Sources

Page 45: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

25

34

39

21

32

2625

23

30

25 25

19

16

9

13

19

1615

1415

30

100,000

200,000

300,000

400,000

500,000

600,000

700,000

800,000

0

5

10

15

20

25

30

35

40

199

6

199

7

199

8

199

9

200

1

200

2

200

3

200

4

200

5

200

6

200

7

200

8

200

9

201

0

201

1

201

2

201

3

201

4

201

5

201

6

201

7

Po

pu

lati

on

Po

pu

lati

on

Po

pu

lati

on

Po

pu

lati

on

Tra

ffic

Rela

ted

Fata

liti

es

Tra

ffic

Rela

ted

Fata

liti

es

Tra

ffic

Rela

ted

Fata

liti

es

Tra

ffic

Rela

ted

Fata

liti

es

Source: VPD Traffic Fatality Data (1996-2017)

Population

Increasing

Traffic Related

Fatalities Decreasing

1. Enhanced Data:

TransportationTransportationTransportationTransportation----Related FatalitiesRelated FatalitiesRelated FatalitiesRelated Fatalities

Page 46: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

0.61.0

1.31.5

1.92.2

2.4 2.6

3.1 3.23.5 3.6 3.7

4.0

5.2

5.9

0

1

2

3

4

5

6

7

Oslo

Sto

ckh

olm

Co

pe

nh

age

n

Lo

nd

on

Am

ste

rda

m

Va

nco

uve

r

To

ron

to

Ed

mo

nto

n

Ne

w Y

ork

Ottaw

a

Se

attle

Bo

sto

n

Sa

n F

ran

cis

co

Wa

sh

ing

ton

DC

Lo

s A

ng

ele

s

Po

rtla

nd

Fata

liti

es

Fata

liti

es

Fata

liti

es

Fata

liti

es p

er

10

0,0

00

p

er

10

0,0

00

p

er

10

0,0

00

p

er

10

0,0

00

in

hab

itan

tsin

hab

itan

tsin

hab

itan

tsin

hab

itan

tsVancouver Compared to

Other Cities

Page 47: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

OBJECTIVES:

• Quantify

serious injuries

• Understand

injury

demographics

• Insight on non-

motor vehicle

collisions

1. Enhanced Data:

Hospital Injury Data SummaryHospital Injury Data SummaryHospital Injury Data SummaryHospital Injury Data Summary

Page 48: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

Source: VGH Injury Data (2011- 2016)

43%

16%

8%6%

3% 3%

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

Fall Trafficrelated

Other Sports Stab/Cut Assault

Nu

mb

er

of

Pati

en

tsN

um

be

r o

f P

ati

en

tsN

um

be

r o

f P

ati

en

tsN

um

be

r o

f P

ati

en

ts

Serious Injuries by Serious Injuries by Serious Injuries by Serious Injuries by TypeTypeTypeTypeTrafficTrafficTrafficTraffic----

related related related related

injuries are

the 2222ndndndnd

highest highest highest highest

cause cause cause cause of

serious serious serious serious

injuriesinjuriesinjuriesinjuries

arriving at

VGH

1. Enhanced Data:

Hospital Injury Data SummaryHospital Injury Data SummaryHospital Injury Data SummaryHospital Injury Data Summary

Page 49: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

Source: VPD Traffic Fatality Data (2011-16) VGH Hospital Injury Data (2011-16)

PedestrianPedestrianPedestrianPedestrian

60%60%60%60%

CyclistsCyclistsCyclistsCyclists

4%4%4%4%

MotorcyclistsMotorcyclistsMotorcyclistsMotorcyclists

13%13%13%13%

Motor Motor Motor Motor

vehicle vehicle vehicle vehicle

occupantsoccupantsoccupantsoccupants

23%23%23%23%

FatalitiesFatalitiesFatalitiesFatalities

PedestriansPedestriansPedestriansPedestrians

35%35%35%35%

CyclistsCyclistsCyclistsCyclists

23%23%23%23%MotorcylistsMotorcylistsMotorcylistsMotorcylists

10%10%10%10%

Motor Motor Motor Motor

Vehicle Vehicle Vehicle Vehicle

OccupantsOccupantsOccupantsOccupants

32%32%32%32%

Serious InjuriesSerious InjuriesSerious InjuriesSerious Injuries

PedestriansPedestriansPedestriansPedestrians

12%12%12%12%

CyclistsCyclistsCyclistsCyclists

23%23%23%23%

MotorcylistsMotorcylistsMotorcylistsMotorcylists

5%5%5%5%

Motor Motor Motor Motor

Vehicle Vehicle Vehicle Vehicle

OccupantsOccupantsOccupantsOccupants

60%60%60%60%

Minor InjuriesMinor InjuriesMinor InjuriesMinor Injuries

~15 fatalities

per year

~300

serious injuries

per year

~2,000

minor injuries

per year

1. Enhanced Data:

Hospital Injury Data SummaryHospital Injury Data SummaryHospital Injury Data SummaryHospital Injury Data Summary

Page 50: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

Seniors: Higher risk of fatality & serious injuries

Source: VPD Traffic Fatality Data (2011-15), VGH Traffic Injury Data (2011-2015) & Census 2011 Population Data

0%

10%

20%

30%

40%

0-14 15-24 25-34 35-54 55-64 >=65

Fatalities by Age

% Fatalities % Total Population

0%

10%

20%

30%

40%

0-14 15-24 25-34 35-54 55-64 >=65

Serious Injuries by Age

% Serious Injuries % Total Population

1. Enhanced Data:

Hospital Injury Data SummaryHospital Injury Data SummaryHospital Injury Data SummaryHospital Injury Data Summary

Page 51: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

Source: VGH Traffic Injury Data (2011-2015)

41%

38%

21%Involving motorvehicle

Non- motorized

Unknown motorvehicleinvolvement

All Cycling All Cycling All Cycling All Cycling

Serious InjuriesSerious InjuriesSerious InjuriesSerious Injuries

Non Non Non Non ---- MotorizedMotorizedMotorizedMotorized

Cycling Serious Cycling Serious Cycling Serious Cycling Serious

InjuriesInjuriesInjuriesInjuries

50%

36%

8%

6%

Single Cyclist

Cyclist -Unknown

Cyclist -Pedestrian

Cyclist - Cyclist

1. Enhanced Data:

Hospital Injury Data SummaryHospital Injury Data SummaryHospital Injury Data SummaryHospital Injury Data Summary

Page 52: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

1.1.1.1. Enhanced Data:Enhanced Data:Enhanced Data:Enhanced Data:

Falls DataFalls DataFalls DataFalls Data

Source: VGH Injury Data (2011- 2016)

43%

16%

8%6%

3% 3%

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

Fall Trafficrelated

Other Sports Stab/Cut Assault

Nu

mb

er

of

Pati

en

tsN

um

be

r o

f P

ati

en

tsN

um

be

r o

f P

ati

en

tsN

um

be

r o

f P

ati

en

ts

Serious Injuries by Serious Injuries by Serious Injuries by Serious Injuries by TypeTypeTypeType

Page 53: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

BC Ambulance

collects GPS

coordinates with

patient pick-up

and hospital

drop-off

locations

1. Enhanced Data:

Ambulance DataAmbulance DataAmbulance DataAmbulance Data

Page 54: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

Top Corridors & Top Corridors & Top Corridors & Top Corridors &

Intersections for Intersections for Intersections for Intersections for

Deep DiveDeep DiveDeep DiveDeep Dive

*based on collision model using ICBC , Hospital and VPD data

(10)

(10)

(10)

(15)

2.2.2.2. Evaluate & Prioritize LocationsEvaluate & Prioritize LocationsEvaluate & Prioritize LocationsEvaluate & Prioritize Locations

Page 55: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

• Hospital data

o Most children treated at

BCCH

o No location info

• ICBC data

o Collisions adjacent to

schools & during school

days

o ~2% of all City collisions

22220.40.40.40.4%%%%

7272727214.414.414.414.4%%%%

42742742742785.285.285.285.2%%%%

Fatal

Severe

Minor

Source: BCCH Traffic Injury Data 2011-13

2. Evaluate & Prioritize Locations

Page 56: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

• More data focused

• Work with VSB

• Delivery of program in-house

• Accelerate countermeasures to more schools

2. Evaluate & Prioritize Locations: Improved School Safety ProgramsImproved School Safety ProgramsImproved School Safety ProgramsImproved School Safety Programs

2016/2017 schools

Page 57: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

Develop best safety practices toolkit & select the Develop best safety practices toolkit & select the Develop best safety practices toolkit & select the Develop best safety practices toolkit & select the most effective solutions to address priority most effective solutions to address priority most effective solutions to address priority most effective solutions to address priority locationslocationslocationslocations

• Validate toolkit

• New Pilot Programs

• Develop countermeasure based strategy

• Action plan for high priority areas

3. Engineering Action Plan

Page 58: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

Toolkit Validation:

Pedestrian Safety Improvements

UpgradesUpgradesUpgradesUpgrades LocationsLocationsLocationsLocations

CompletedCompletedCompletedCompleted

CollisionCollisionCollisionCollision ReductionReductionReductionReduction

PedestrianPedestrianPedestrianPedestrian All All All All

(Fatal & Injury)(Fatal & Injury)(Fatal & Injury)(Fatal & Injury)

New Pedestrian

Signals

2 -96% -20%

LT Arrows 5 -38% -26%

LED Lighting 18 -27%* -46%*

Countdown Timers 33 -28% -10%

Slower Walking

Speeds

4 -12%

Validated through Vancouver Implementation

*After dark collisions only

Page 59: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

UpgradesUpgradesUpgradesUpgrades LocationsLocationsLocationsLocations

CompletedCompletedCompletedCompleted

Collision ReductionCollision ReductionCollision ReductionCollision Reduction

CyclingCyclingCyclingCycling All All All All

(Fatal & Injury)(Fatal & Injury)(Fatal & Injury)(Fatal & Injury)

Removal of traffic

circles

2 -100% -60%

Median extension

– RT more difficult

1 -42%** -33%**

Adding lighting 1 -25% * 0%*

Green Paint at

Conflict Areas

6 Data not sufficient to assess

*After dark collisions only

** RT collisions only

Validated through Vancouver Implementation

Toolkit Validation:

Cycling Spot Improvements

Page 60: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

Rectangular Rapid

Flashing Beacons

3 locations in pilot3 locations in pilot3 locations in pilot3 locations in pilot

Accessible

Pedestrian Signals

4444 locations in pilotlocations in pilotlocations in pilotlocations in pilot

Leading Pedestrian

Intervals

1111 location in pilotlocation in pilotlocation in pilotlocation in pilot

Engineering Action Plan:

New Pilot Programs

Page 61: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

LPI (6)

Turning Mov. Changes (12)

Geom./Signal Changes (2)

Flashing Beacons (10)

Signals (15)

LED Lighting (50)

Slower Walking Speeds

(60+)

By countermeasureBy countermeasureBy countermeasureBy countermeasure

Treat overrepresented types of collisions:• Left turn• Right turn• Driver failure to yield• Jaywalking• Collisions after dark

2. Engineering Action Plan:

CountermeasuresCountermeasuresCountermeasuresCountermeasures

Page 62: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

• Work with VPD to develop

targeted enforcement

programs to tackle dangerous

behaviors at priority locations

• VPD Commercial Vehicle Team

inspections with other

municipalities and provincial

Commercial Vehicle Safety &

Enforcement (CVSE)

• VPD Established Targeted

enforcement team to target

unsafe and reckless pedestrian

and cycling behaviors in high

incident areas

4. Enforcement

Page 63: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

• Develop a Zero Traffic-Related Fatalities website

• Report to Council annually on progress

• Conduct Pedestrian Safety Campaign

• Continue to work with Traffic Safety Working

Group

• Disability Awareness training for staff

Chinese Community Policing Centre volunteers with VPD Traffic OfficersChinese Community Policing Centre volunteers with VPD Traffic OfficersChinese Community Policing Centre volunteers with VPD Traffic OfficersChinese Community Policing Centre volunteers with VPD Traffic Officers

5. Education and Public Outreach

Page 64: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

• Serious injury data analysisSerious injury data analysisSerious injury data analysisSerious injury data analysiso Hospital Data

o Ambulance Data

• Priority Intersections & CorridorsPriority Intersections & CorridorsPriority Intersections & CorridorsPriority Intersections & Corridorso Undertake detailed assessments at priority intersections,

corridors and focus areas (i.e. seniors)

o Revamp School Program

• Engineering Action PlanEngineering Action PlanEngineering Action PlanEngineering Action Plano Implement quick start action plan

• Education & Public OutreachEducation & Public OutreachEducation & Public OutreachEducation & Public Outreacho Conduct Pedestrian Safety Campaign

o Create Moving Towards Zero website

Report Back to Council Spring 2017Report Back to Council Spring 2017Report Back to Council Spring 2017Report Back to Council Spring 2017

Next Steps

Page 65: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

42

• Grandview-Woodland Plan Implementation – Two family (Duplex) Zones

• May 13 (Saturday) 12-3pm @ Wise Hall

• May 17 (Wednesday) 5-8pm @ Wise Hall

• Britannia Renewal Events

• May 23 ( Tuesday ) Designing Safe Places, 6:30-8:00pm

• June 4 ( Sunday) Physical Wellbeing & Community Wellbeing – 12-2pm

• New St. Pauls \ Health Campus – Draft Policy Open Houses

• May 13 ( Saturday) 3 – 6pm @ Creekside Community Centre

• May 15 (Monday) 5-8pm @ Strathcona Community Centre

Upcoming Events

Page 66: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

43

Next Steps

– Meeting minutes to be circulated next week; materials online mid-May

– Next Meeting: September 2017 (date TBD)

Closing

Questions? Comments?

• Reminder please report back to your respective organizations and share information broadly within networks

• SAG Coordinator: [email protected] 604-873-7742

Page 67: Grandview- Woodland Neighbourhood Transportation & Parking · 11-05-2017  · • Italian Day Festival • ISS of BC • The Kettle Society • Kiwassa Neighbourhood House • Vancouver

44

Thank you


Recommended