HDviaOSN NETWORK team
FINAL PRESENTATIONCommunication System Design, Summer 2009
Date: 19-10-2009
Meraldina Paula Mazivela [email protected]
Muhammad Adnan [email protected]
Muhammad Farooq [email protected]
Yichi Zhang [email protected]
Zeeshan Khan [email protected]
Website: http://www.tslab.ssvl.kth.se/csd/projects/0931139/
Slide # 1
Project Outline
Project goals
Project background
Project ResultsNetwork Deployment
NOC Solution
Summary
Future Work
Slide #2
Project Goals
There are two primary goals of our project:
1.Network Extension
Extend the existing 10 gigabit open source research
network between KTH Kista and Valhallavägen to
Karolinska in Solna and Huddinge
2. Network Operation Centre
Implement a Network Operation Center (NOC) to monitor
the network performance, devices and make it secure
Slide # 3
Project Background Extension of Previous CSD projects working on HD Video
Conferencing including:
CUinHD, CSD Spring 2009
HDValley, CSD Fall 2008
High Definition Video Conferencing System needs a high
performance and fault tolerant underlying network
HDviaOSN Network Group has put its effort to build this
network
Slide # 4
Bifrost Routing Performance
Motherboard CPU Routing Performance
Rx Tx Mpps
ASRock A780GM-LE AMD Quadcore 2.6 GHz 7.3 7.3 1.4-1.5
ASRock A780GM-LE AMD Quadcore 3.2 GHz 7.3 7.4 1.4-1.5
ECS Black Series A785GM-M AMD Quadcore 3.2 GHz 7.3 7.3 1.4-1.5
TYAN S7002 Intel Zeon 8 Core 2.4GHz 8.6 8.3 1.7-1.8
Test Bed for Performance Testing
Bifrost Routing Performance Results
Slide # 11
Fiber Optic link
VV Bifrost
Karolinska Huddinge
Patch Cable
KI Solna
300 meters45
Kilometers
HS1 Operation Theatre
Distance
Attenuation 15-16 dB 5-6 dB
KI Bifrost
KTH Valhallavagen
Fiber Link
Total Attenuation 20-22dB
Problem Area
Slide # 13
Fiber Optic Link
Installation of new fiber needed here
Several Connectors
increasing dB
Slide # 14
VV Bifrost
Karolinska Huddinge
Patch Cable
KI Solna
300 meters
45 Kilometers
HS1 Operation Theatre
Distance
Attenuation 15-16 dB 5-6 dB
KI Bifrost
KTH Valhallavagen
Fiber Link
Total Attenuation 20-22dB
Acceptable attenuation for 10 G XFPs = 21 dBNo Power Margin, No connectivity in 10G Scheme
Alternative Scheme: Install 70km 1G SFPs to get the link up and change the network cards to 10G once
the fiber is replace
Network GraphingMRTG
Tool to monitor the traffic load on network links
Generates HTML pages containing PNG images
Uses SNMP to read the traffic Counters of the devices and Create graphs
Slide # 16
Network GraphingCacticomplete network graphing solution
Provides an easy to use web Interface for configuration
Stores all of the necessary information to create graphs and populate them with data in a MySQL database
We are monitoring CPU load, Memory usage and Bifrost Routerswith the help of Cacti
Slide # 17
Network GraphingWeathermap4RRDTo show a high-level graphical representation of our network
The overall map of the network
Data acquired from MRTG generated html files
Monitoring of all the three routers in our topology
Kista
Vallhalvägen
KarolinskaSlide # 18
Alert System
Notification: Host unreachable.Address: 192.168.1.253Severity: Critical
SMS A
lert
Notification: Host unreachableSeverity: Critical
Slide # 22
Alert System implementation
GAMMU
Any other user-defined method through plugin system
Web interface
Email notification
SMS notification
Monitor hosts and services
Monitor hosts and services
Alert when service or host has problem
Alert when service or host has problem
Slide #23
Summary
Goal Fully Achieved Partially Achieved Not Achieved
Bypassing Solna Yes
Routing Performance Evaluation Yes
Network Deployment Yes(due to problems stated in fiber optics section)
IPv6 Implementation Yes
Network Services including IPv4, IPv6-DNS, DHCP, Syslog Server
Yes
Network Graphing Yes
Request Tracking Yes
Alert System (including SMS) Yes
Intrusion Detection System Yes
Bifrost Firewall Yes
Total 9 1 0
Slide #26
Future Work- Network ExtensionOption 1Upgrading the Network to 10 gigabit once the new fiber cable is installed in Karolinska Huddinge
VV Bifrost
Karolinska Huddinge
Patch Cable
KI Solna
300 meters45
Kilometers
HS1 Operation Theatre
Distance
Attenuation 15-16 dB
Link Repaired!!!Less than
1dB
KI Bifrost
KTH Valhallavagen
Fiber Link
Total Attenuation 20-22dB
Expected Total Attenuation after new fiber is installed: 16 + 0.5 = 16.6 dB
Acceptable Attenuation for 1550nm XFPs = 19 dB
Link Budget Margin = 19- 16.5 = 2.5 dB
2.5 dB is good but
not suitable for long
term solution
Slide # 27
Future Work- Network ExtensionOption 2 Install a bifrost router in Karolinska Solna which will be suitable for long term solution and video conferencing can be performed from Solna as well.
Slide # 28
Future WorkBifrost Routing Performance
It’s a continuous process to be carried on to boost the
performance further with new equipments, Documentation on
our website will be helpful
NOC System
Evaluate and implement a mechanism for monitoring the live
HD video streams for HD video conferencing system
Maputo Network
Deploy similar network and NOC system in Mozambique NREN,
as the MoRENet starts operating
Slide # 29