Helium D istribution in SM18 RF H orizontal Test Bunker M9. T. Koettig, BE-RF-SRF 1 st Aug 2013. Content. Layout of the SM18 RF test area New cryogenic infrastructure => commissioning is ongoing M9 clients and requirements Proposal for the new Interconnection Valve B ox . - PowerPoint PPT Presentation
Popular Tags:
14
Helium Distribution in SM18 RF Horizontal Test Bunker M9 T. Koettig, BE-RF-SRF 1 st Aug 2013
Transcript
Page 1: Helium  D istribution in SM18 RF H orizontal Test Bunker M9

Helium Distribution in SM18 RF

Horizontal Test Bunker M9

T. Koettig, BE-RF-SRF 1st Aug 2013

Page 2: Helium  D istribution in SM18 RF H orizontal Test Bunker M9

• Layout of the SM18 RF test area

• New cryogenic infrastructure => commissioning is ongoing

• M9 clients and requirements

• Proposal for the new Interconnection Valve Box

Content

Page 3: Helium  D istribution in SM18 RF H orizontal Test Bunker M9

3

M7 M9

V3 V4 V5 V6

Cryo Infra Upgrade of SM18 RF TFRF TEST FACILITY AREA

TRANSFER LINE GALLERY

6 kW L in de C r yo pl an t

25 m3 Dewar 1.6 bara sat. LHe

to WPU2

LP/RECUP return

He Guards

The 6 kW Linde cold boxCapacity: 25 g/s (720 l/h) of LHe

Page 4: Helium  D istribution in SM18 RF H orizontal Test Bunker M9

4

Cryo Infra Upgrade: 3D-layout

M92 K - 4.5 K

V32 K

M72 K

V42 K V5

4.5 K V64.5 K

Page 5: Helium  D istribution in SM18 RF H orizontal Test Bunker M9

5

SM18 RF TF : General PID for 2013

M9 - Service module

Warm pumping unit capacity:

• 6 g/s @ 10 mbar• 12 g/s @ 20 mbar• 18 g/s @ 30 mbar

Very low pressure heater:

32 kW (20 g/s)

Page 6: Helium  D istribution in SM18 RF H orizontal Test Bunker M9

- LHC temporary connection with semi rigid bayonets: LHe supply and GHe return, 4.5 K operation, 80 % reused

later.

- Hie-Isolde CMspecial procedures for cool down and warm up, 4.5 K operation + shield cooling at 50 K.Two Venturi flow meters

- CRAB cavity CM operation at T< 2 K, shield maybe at 80 K?Helium guard, Pressure relief devices: SV at 1.8 bara, RD at

2.2 bara

Functional specs for He distribution in M9 can be found in EDMS:https://edms.cern.ch/document/1279849/1

Requirements of customers in M9

Page 7: Helium  D istribution in SM18 RF H orizontal Test Bunker M9

PID M9 helium distribution

Page 8: Helium  D istribution in SM18 RF H orizontal Test Bunker M9

M9 detail: new Interconnection Valve Box

Page 9: Helium  D istribution in SM18 RF H orizontal Test Bunker M9

9

Test schedule in SM18 RF : horizontal bunkers

Projects:

• 1 test @ 4.5K of LHC cryo module . Provisional schedule : 2013

• 2 tests @ 4.5 K of HIE-Isolde cryomodule. Provisional schedule : 2014

• 1 test @ 1.8 K of SPL half cryomodule. Provisional schedule : 2014

• x tests @ 2K of crab cavity CM. Provisional schedule : 2nd half of 2015

Page 10: Helium  D istribution in SM18 RF H orizontal Test Bunker M9

Thank you very much for your attention

Page 11: Helium  D istribution in SM18 RF H orizontal Test Bunker M9
Page 12: Helium  D istribution in SM18 RF H orizontal Test Bunker M9

Venturi Flow meter:

Cavity circuit at 4.5 K vaporShield circuit at 75 K gas

Page 13: Helium  D istribution in SM18 RF H orizontal Test Bunker M9

Venturi Flow meter

Cavity circuit at 4.5 K vapor Shield circuit at 75 K gas

Page 14: Helium  D istribution in SM18 RF H orizontal Test Bunker M9

14

SM18 RF TF : bunkers PID for 2013

QLKRF_M7 @ 1.8 KQLKRF_M9 @ 1.8 K – 4.5 K