Hillsborough County Public Works Project Deliverable Checklist
, Hillsborough County Project Manager , Consultant Project Manager
Resubmittal #
Date: To: From: Hillsborough County CIP # Project Name: Submittal Stage: (Check Box for items submitted) ☐ Executed Scope
☐ Responses to Comments
☐ Permit Documentation☐ Notes to Reviewer☐ Geometry Calculations
☐ PER☐ Drainage Report / Calculations
☐ Roadway Plans☐ Stormwater Model Files
☐ Signing & Marking Plans☐ Structural Calculations
☐ Signalization Plans☐ Traffic Analysis Report
☐ Lighting Plans☐ Signal Warrant Study ☐ Utility Notification Letters
☐ Structure Plans
☐ Lighting Design Analysis Report ☐ Utility Schedule
☐ Geotechnical Design Report☐ Pavement Design
☐ ROW Survey Files
☐ Design Exceptions
☐ Topographic Files☐ Legal Descriptions
☐ Design Criteria
☐ Parcel Sketch
☐ Supplemental Specifications☐ Meeting Minutes
☐ Title Search
☐ DGN or DWG Plan Files
☐ Drainage Plans
☐ QA/QC Mark Up Plans/Reports
☐
The current estimated construction cost is $ The prior estimated construction cost was $ The cost differential is $ , a change of from the prior estimate This difference is explained as follows:
I certify all documents “checked” above are included in the delivery of this phase submittal.
Consultant Project Manager Signature Print Name Date
I certify all documents “checked” above have been delivered to Hillsborough County.
Hillsborough County Project Manager Signature Print Name Date
Version 4 - 02/27/2020
☐ ITS Plans
☐ Opinion of Probable Costs
☐ Bridge Hydraulics Report☐
☐
Water Quality Model ☐ Typical Section Package
☐ Landscaping Plans
☐ Design Documentation Report