+ All Categories
Home > Documents > Hirmi Cement Works Energy Management...Grinding unit Bulk terminals Mangalore Cement Unit BSBT-...

Hirmi Cement Works Energy Management...Grinding unit Bulk terminals Mangalore Cement Unit BSBT-...

Date post: 15-Sep-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
37
1 Hirmi Cement Works Energy Management
Transcript
Page 3: Hirmi Cement Works Energy Management...Grinding unit Bulk terminals Mangalore Cement Unit BSBT- Dodballapur Shankarapally Bulk Terminal Navi Mumbai Cement Unit 3 Hirmi Cement Works

Hirmi Cement Works

Jafrabad Cement

Works

Magdalla Cement

Works

Ratnagiri Cement

Works

Andhra Pradesh Cement

Works

Arrakonam Cement

Works

Awarpur Cement

Works

Jharsuguda Cement

Works

West Bengal Cement

Works

Bathinda Cement

Works

Aditya Cement

Vikram

Cement

Gujarat Cement

Works

Kotputli Cement

Works

Hotgi Cement Works

Rajashree Cement

Works

Ginigera Cement

Works

Panipat Cement

Works Dadri Cement

Works Aligarh Cement Works

RWCW

Reddipalayam Cement

Works

Integrated plant

Grinding unit

Bulk terminals Mangalore Cement

Unit BSBT-

Dodballapur

Shankarapally Bulk

Terminal

Navi Mumbai Cement

Unit

3

Hirmi Cement Works

HCW Clinker contributes 7 %

Of UltraTech

Hirmi Cement Works

ABG - Largest Cement Producer in India.

Page 5: Hirmi Cement Works Energy Management...Grinding unit Bulk terminals Mangalore Cement Unit BSBT- Dodballapur Shankarapally Bulk Terminal Navi Mumbai Cement Unit 3 Hirmi Cement Works

5

Introduction

• Plant Clinkerization capacity is 2.75 Million tons.

• Plant is a single line Kiln, two VRMs for Limestone Grinding, One

VRM for Coal Grinding and two closed circuit Cement mills. All

major equipment's are supplied by FLS.

• High Kiln Volumetric loading – 7.35 TPD / M3 @ 8000 TPD.

• Most of the capacity enhancement through Kaizens, modifications

& optimisation without any major Capex.

• Rated 4 Star by Whitehopleman International benchmark.

• BCE Green Plant and won Chairman WCM Gold award in 2015.

OPC- 43 [IS : 8112-2013]

PPC- (UltraTech PPC) [IS : 1489-Part-I 1991]

Page 10: Hirmi Cement Works Energy Management...Grinding unit Bulk terminals Mangalore Cement Unit BSBT- Dodballapur Shankarapally Bulk Terminal Navi Mumbai Cement Unit 3 Hirmi Cement Works

Energy Policy

10

UltraTech Cement Limited Hirmi Cement Works

Energy Management Policy

We are committed to conduct our operations by utilizing various forms of energy in the most cost effective and efficient manner so as to conserve energy resources and to make cleaner environment for our future generation. Our emphasis is to: Adopt energy conservation measures to enhance energy

efficiency. Monitor & control the consumption of energy through effective

energy information system & through periodic reviews. Create awareness through training amongst all Employees as

part of Mass Energy Conservation Movement Carry out regular energy audits through internal / external

resources / agencies to identify areas of improvement.

Unit Head

Page 18: Hirmi Cement Works Energy Management...Grinding unit Bulk terminals Mangalore Cement Unit BSBT- Dodballapur Shankarapally Bulk Terminal Navi Mumbai Cement Unit 3 Hirmi Cement Works

Energy Mapping

Approach- • Capturing and reviewing drive wise power consumption for each

section. • Real time data made available to all employees & HO through PI

and PG. DEPARTMENT PARTICULARS

ON DATE

PROD.

ON DATE R

Hrs ON DATE TPH ON DATE UNITS

ON DATE

UNITS/Hrs

ONDATE/MT

MAT

TARGET /MT

MAT DEVIATION

MONTH TO

DATE/MT MAT

LS CRUSHER

A.LSCR1 MAIN DRIVE 16,218.00 13.69 1185 6,280 459 0.39 0.32 0.07 0.4

B.LSCR1 AUX 0 0 17,052 0 1.05 1.06 - 0.01 1.15

SUBTOTAL : 16,218.00 13.69 1185 23,332 1,704 1.44 1.38 0.06 1.55

RAW MILL-1

A.RM1 MAIN DRIVE 6,909.00 23.42 295 60,720 2,593 8.79 8.7 0.09 8.88

B.RM1 FEED 4,211 180 0.61 0.57 0.04 0.61

C.RM1 FAN 49,180 2,100 7.12 7.22 - 0.10 7.29

D.RM1 AUX 3,014 129 0.44 0.5 - 0.06 0.49

E.RM1 AIR LIFT/BBE 2,211 94 0.32 0.33 - 0.01 0.33

F.RM1 WATER SUPPLY 322 14 0.05 0.06 - 0.01 0.06

G.RM1 COMPRESSOR 1,612 69 0.23 0.2 0.03 0.23

SUBTOTAL : 6,909.00 23.42 295 1,21,269 5,178 17.55 17.58 - 0.03 17.87

RAW MILL-2

A.RM2 MAIN DRIVE 7,062.00 24 294 63,390 2,641 8.98 8.7 0.28 8.99

B.RM2 FEED 4,305 179 0.61 0.57 0.04 0.61

C.RM2 FAN 55,150 2,298 7.81 7.22 0.59 7.78

D.RM2 AUX 2,501 104 0.35 0.44 - 0.09 0.39

E.RM2 AIR LIFT/BBE 2,259 94 0.32 0.33 - 0.01 0.33

F.RM2 WATER SUPPLY 329 14 0.05 0.06 - 0.01 0.06

G.RM2 COMPRESSOR 1,647 69 0.23 0.2 0.03 0.25

SUBTOTAL : 7,062.00 24 294 1,29,581 5,399 18.35 17.52 0.83 18.42

RAW MILLS TOTAL : 13,971.00 47.42 295 2,50,850 5,290 17.96 17.55 0.41 18.17

COAL MILL

A.MAIN DRIVE 1,129.82 16.34 69 8,820 540 7.81 9.11 - 1.30 8.31

B.FAN 8,640 529 7.65 8.95 - 1.30 8.41

C.AUX 3,208 196 2.84 5.8 - 2.96 4.01

D.COMPRESSOR 4,345 266 3.85 2.75 1.10 3.37

SUBTOTAL : 1,129.82 16.34 69 25,013 1,531 22.14 26.61 - 4.47 24.09

KILN

A.KILN MAIN DRIVE 8,186.00 24 341 12,150 506 1.48 1.5 - 0.02 1.49

B.KILN FAN J1J01 27,260 1,136 3.33 3.05 0.28 3.43

C.CALC FAN J1J03 54,020 2,251 6.6 6.35 0.25 6.38

D.MAIN ESP FAN 22,030 918 2.69 2.7 - 0.01 2.71

E.KILN FEED 10,294 429 1.26 1.51 - 0.25 1.3

F.COAL XPORT 12,120 505 1.48 1.42 0.06 1.53

G.COOLER&CLKR

XPOR 52,369 2,182 6.4 6.65

- 0.25 6.63

H.W1P21 ESP FAN 1,150 48 0.14 0.32 - 0.18 0.33

I.WIP31 ESP FAN 2,285 95 0.28 0.35 - 0.07 0.36

J.WATER SUPPLY 1,301 54 0.16 0.2 - 0.04 0.17

K.COMPRESSOR 3,259 136 0.4 0.29 0.11 0.36

L.DUST TRANSPORT 9,530 397 1.16 1.46 - 0.30 1.27

SUBTOTAL : 8,186.00 24.000 341 2,07,767 8,657 25.38 25.8 - 0.42 25.97

Review- • Review of Power

Consumption done in the daily production meeting, energy meeting and MPR meeting.

Page 27: Hirmi Cement Works Energy Management...Grinding unit Bulk terminals Mangalore Cement Unit BSBT- Dodballapur Shankarapally Bulk Terminal Navi Mumbai Cement Unit 3 Hirmi Cement Works

27

Project 4- Raw mill 1 Energy Efficiency

SN Action Point

1 Raw material size optimised by optimising Grinding path in Crusher.

2 Fan flow optimized with Separator vis a vis required residue.

3 RM 1 & 2 Separator top seal gap modified.

4 Water spray optimised- 12 m3/hr to 8 m3/hr.

5 Dam ring height reduction.