FRIDAY, MARCH 25, 2016 NITIN SHINGANE HUL NASIK ICD Factory Jan 2014 TO July 2015 NETWORKING - PROJECT
Transcript

FRIDAY, MARCH 25, 2016

NITIN SHINGANE HUL NASIK ICD FactoryJan 2014 TO July 2015

NETWORKING - PROJECT

Key statistics

General

81244 Square Meter , 20% Built up area

Rs. 170 Cr GBV

2014 Expected t/o of Rs 500 Cr

Manpower

8 Managers, 27 Executives, 8 Office Asst, 499 Workmen

Manufacturing

3 Production units, 3 Categories Served ( Ice cream, Spread &

Savory ), 550 tons of Weekly Production

9 Processing Lines , 14 Packing Machines

5.8 MVA Connected Load, 2 Boilers (4 TPH), 3 Air Compressors (Total @ 800 CFM)

2 HVAC Systems on R-134 (Total @ 300 TR) 1 VAM for ICD (150 TR)

2 DG Sets (Total @ 2250 KVA), and 1 Water Treatment Plant (60 m3/hr)

800 TR Refrigeration Capacity

1 Effluent Treatment Plants (Total Capacity @ 420TPD)

Logistics

110 SKUs, 300 RM/PM , 2 Outside job-work location

10-20 trucks/day for Inbound Material movements

10-15 trucks/day for F.G. Despatch across depots

Shashank JainFactory Manager

Mfg Manager ICD

Chaitra

Quality Manager

Himadri Maiti

Mfg Manager CPD/Savory

Manoj Yadav

Commercial Manager

Saurabh Mittal

HR Manager Radhika

Manufacturing EngineeringManufacturing Commercial HR Quality

Nasik Management Team

Factory Engineer

Ashish Bajpai

Safety

Safety Manager

Manish Patel

PROJECT- RE-STRUCTURE NETWORKING

NITIN SHINGANENASIK FACTORY

FRIDAY, MARCH 25, 2016

OLD LAN STRACTURE QA SWITCH RACKWESTAGE LAN

CONNECTION

ADMIN LOCATIONSECURITY GATE SWITCH

Before

Networking

condition

SERVER RACK SERVER ROOM SERVER ROOM

Before

networking

condition

Before: QA DEPT SWITCH After: QA DEPT SWITCH

ICD Rollo – Machine Cleaning

Before: OLD CABLE

STRUTURE

After: NEW CABLE

STURTURE

Before: Security Gate Switch After: Security gate Switch

Before: Server Room

CablingAfter: Server Room Cabling

Before: Server Room Switch After: Server Room Switch

AWARDS FOR BEST JOBS 2014 & 2015