Huw Rhys Lewis MRIBA, MRICS, MAPM
Managing Director
West Midlands Forum for Growth September 6th 2017
Hybrid Bill proposal
Hybrid Bill proposals
Our Vision
Illustrative Masterplan
• Airport option• Passive provision for
2036 terminal
2016 Masterplan &
LOD Overlay
Phase 1 (2018-2022)
De
velo
pm
en
t
Infr
astr
uct
ure
Phase 2 (2023-2027)
De
velo
pm
en
t
Infr
astr
uct
ure
Phase 3 (2028-2030)
De
velo
pm
en
t
Infr
astr
uct
ure
Phase 4 (2032- Beyond)
De
velo
pm
en
t
Infr
astr
uct
ure
DeliveryDevolution Agreement
Value Capture Framework tool kit
WMCA SEP
HS2 Growth Strategy
Investment Prospectus
Investments underpinned by
new or improved infrastructure
VALUE CAPTURE needs to be a
core part of this approach
• Framework developed for selecting from 21 tools
• New and existing development / activities
• Commercial, planning, voluntary business contribution and fiscal tools
• Existing or new / amended mechanisms
• UKC Hub: tested value capture using a combination of 12 mechanisms
• Up to £2 billion (2017 prices) in value could potentially be captured over the period to 2045
• UKC Hub: tested value capture using existing (non-specifically designated) mechanism
• Up to £0.97 billion captured (2017 prices) to 2045