Date post: | 13-Feb-2018 |
Category: |
Documents |
Upload: | nguyenkhanh |
View: | 221 times |
Download: | 1 times |
CONFIDENTIAL
2
CONFIDENTIAL
AGENDA
• Company Introduction
• Hybrid System Solution
• Some Reference Cases
CONFIDENTIAL
3
CONFIDENTIAL
RWE / Innogy
RWE New Structure since June 2016
RWE AG
Conventional
Generation
Global Engineering
Consulting
Trading
77%
23%
100%
CONFIDENTIAL
4
CONFIDENTIAL
BELECTRIC: Company profile
One of the world’s largest PV system integrator
In-house R&D and manufacturing
Over 1.5 GWp total installed capacity
Experience in all continents and climates
Germany
USA
Israel Tanzania
Australia
Israel
CONFIDENTIAL
5
CONFIDENTIAL
AGENDA
• Company Introduction
• Hybrid System Solution
• Some Reference Cases
CONFIDENTIAL
7
CONFIDENTIAL
Hybrid system
1
2
3
4
fuel
investment
energy share energy share required quantitatively
System Design: Different Hybrid Options
N/A
CONFIDENTIAL
8
CONFIDENTIAL
System Design: Economic Feasibility
• Financial objectives • Load data • System costs • …
Input Data: • System Cost • Energy resources • Load requirements • System lifetime • Current future energy
costs •O&M costs • Finance terms • Inflation
Economic Model: The most cost-effective solution: PV size, storage?
Financial model analysis
Hybrid system configuration
CONFIDENTIAL
10
CONFIDENTIAL
Hybrid: The Hybrid Controller
The Hybrid Controller manages the different energy sources based
on the load demands and grid requirements, and guarantee high
quality energy generation
Genset
Power Unit Existing
energy
sources
Solar Power
Unit
Energy
Buffer Unit
Managing all power plant units to ensure grid stability
Optimizing operation cost in real time
Voltage
Control Frequency
Control
Ensure max.
power output
CONFIDENTIAL
11
CONFIDENTIAL
AGENDA
• Company Introduction
• Hybrid System Solution
• Some Reference Cases
CONFIDENTIAL
12
CONFIDENTIAL
References: Hybrid Systems
54 Feasibility Studies carried out in all continents
7 Projects implemented
PV-Battery Hybrid, Kenitra, Morocco: 25.4kWp PV, 38 kWh battery & 2kW wind, 2014
Marawah Island, United Arab Emirates: 492kWp PV and Diesel, 2011
PV Hybrid system, Maldives Islands: 70kWp PV, 2009
PV-Battery Hybrid, Salinas, Puerto Rico: 15.5MWp PV & 5.4 MW battery, 2015
CONFIDENTIAL
13
CONFIDENTIAL
References: Hybrid System in Tanzania Hybrid system in remote location in south Tanzania
40% diesel fuel saving
System controller guarantees quality of energy supply
Full EPC done by Belectric, completed in Feb 2014
108kWp PV 542kVA Hydro power plant
1,730kVA Diesel
Belectric‘s Hybrid
Controller
Mini-grid
CONFIDENTIAL
14
CONFIDENTIAL
References: Hybrid System in Somaliland 41% diesel fuel saving
Energy storage & system controller guarantee energy supply quality
Grid forming battery inverters: Diesel offline during the day
Currently under commissioning (March 2017)
492kWp PV 1.05MWh / 560 kVA storage system
300kVA Diesel power
Belectric system control
Customer
CONFIDENTIAL
15
CONFIDENTIAL
References: Hybrid Systems in Eritrea
3 different Sites
Tekera: 2 MWp PV
Gergera: 2 MWp PV
Kerkebet: 4 MWp PV
PV & Diesel powered minigrids
First site (Tekera) under preparation
CONFIDENTIAL
16
CONFIDENTIAL
Mining Feasibility Study: Gold Mine, Tanzania
Solution: PV for cost reduction, inverters for voltage stabilization
Nominal Power: 34.8 MWp + Grid + Diesel
Contract: PPA through partnering IPP
Status: Tender won, project on hold mainly due to diesel supply
price reduction, now possibly first stage smaller