HYDROGEN Capability Statement Nov 2020
Transcript

HYDROGEN

Capability Statement

Nov 2020

Project Experience (1/2):• Process engineering and capital cost estimation for the world’s largest

proposed electrolysis facility utilising an adjacent utility-scale PV Solar array to

create renewable H2. More information: https://arena.gov.au/blog/renewable-

future-beckons-for-queensland-ammonia-plants/

• Electrolyser vendor Request for Quotation (RFQ) documentation, vendor

management and submission assessment for a 74 tonnes per day renewable

hydrogen facility in Trinidad & Tobago. https://fuelcellsworks.com/news/io-

awarded-contract-for-newgen-energys-carbon-neutral-green-hydrogen-

project/

• Western Australian Renewable H2 Fund supporting City of Cockburn Green

Hydrogen Project: Feasibility study for solar H2 production for waste

collection and light vehicle fleets. Study also examines cogeneration

opportunities for electricity and heat production. More information:

http://www.drd.wa.gov.au/projects/EnergyFutures/Pages/Renewable-

Hydrogen-Fund.aspx

• CAPEX, cash flow estimation and concept design for a renewable hydrogen

facility and hydrogen refuelling station (HRS) from wind and PV solar for a

utility scale renewable energy company, Western Australia.

• Gladstone Regional Council – H2 strategy for providing export tonnages of

H2; electrolysis; H2 to support fuel refinery and power station requirements.

• Northern Oil Refinery: engineering review of a renewable

H2 system. https://www.gladstoneobserver.com.au/news/southern-oil-

receives-1m-bio-hydrogen-boost/3192364/

• Technical input for H2 strategy and staged uptake of H2 for one of the

world’s largest mining companies.

• H2 PEM electrolyser and refueler for forklift and truck fleet for a large ready-

meal food manufacturer, Eagle farm, Queensland – Concept Design, CAPEX,

OPEX, cash flow, IRR and payback estimation.

1 MW Alkaline

Electrolyser &

truck re-fueller

Hydrogen Capability Statement

Hydrogen Capability Statement

All Energy Pty Ltd can assist your business with:

• Engineering design.

• Concept and feasibility studies.

• Capital cost estimation.

• Advanced Thermodynamic Process Modelling

• Energy and transport strategies.

• Emissions and energy cost reduction.

• Energy strategy.

• Carbon Zero accreditation.

• Environmental approvals.

• Project management.

The image to the left shows a Process Flow Diagram created to show a mining major the opportunities forintegrating H2 with an existing mine site.

Hydrogen Capability Statement

• WMI Pty Ltd: biogas to power to renewable H2 project in south-east

Queensland.

• H2 from recycled water and co-located embedded power generation

systems (solar PV and biogas) to fuel a truck fleet for a vertically integrated

food manufacturing supply chain - feasibility study.

• Henderson Energy Park: Concept design and feasibility of a H2 Transport

Hub: techno-economic assessment for renewable energy generation & H2

utilisation options including for heavy vehicle fuel, light vehicle fleet, & H2

fuel cell off-grid power

• Advanced Process Modelling:

• CAPE-OPEN steady-state simulation environment: H2 and electrolyser gas

processing and compression, inter-coolers,

sub-cooling, process modelling, optimisation.

• ASPEN V9: gasification / pyrolysis of biomass to generate syngas (H2 / CO);

H2 handling, compression and cooling systems modelling.

• Pure Hydrogen Company (https://purehydrogen.com.au/): hydrogen

solutions for Queensland mining, resource and logistics companies.

• Queensland Government’s carbon neutral by 2050 target (CN50):

opportunities assessment including fugitive methane reforming

to H2 for industry & transport.

• Institute of Chemical Engineers - Energy Workshops including

H2 production and utilisation options.

• Audits on industrial facilities including H2 generation / utilisation.

Project Experience (2/2):

5.0 MW PEM Electrolyser

with Water Buffer Tanks &

tube trailer load-out

All Energy Pty Ltd has expert experience inAdvanced Thermodynamic Process Modelling.

The image to the left shows a “digital twin” model of a plant for producing Liquid H2 via the “Kawasaki” methodology.

Hydrogen Capability Statement

All Energy Pty Ltd has commercial and engineering expertise in industrial scale chemical processing, hydrogen (H2), PV solar, rotating generation, process industries, pressurised

equipment, and transport fuels, which enables All Energy Pty Ltd to be ideally placed to assist Australian

businesses with their H2 projects.

E: [email protected]

W: www.allenergypl.com.au