1
IABSE Conference – Shanghai 2009
1
Lillebælt Bridge, 1935
Storstrøm Bridge, 1937
Møn Bridge, 1943
2
The missing link:
StorebæltGreat Belt
3Great Belt Bridge Project 1936
4
2
Great Belt BridgeProject 1978
5
Railway Tunnel
Final Great Belt Link Design 1989
East Bridge
West Bridge
ZealandFunen
6
7 8
3
9 10
11 12
4
13 14
15 16
5
17 18
19
The GREAT BELT LINKOpened to traffic: 14 June 1998
20
6
Øresund
21
Øresund Bridge Project 193622
Final Øresund Link Design 1993
Copenhagen
Malmö
23 24
7
25 26
27 28
8
29 30
Femern
31
Copenhagen-Hamburgvia Great Belt:
450 km450 km
Copenhagen-Hamburgvia Femern Belt:
~300 km300 km
32
9
33
Femern Lolland
Feasibility study 1999
Bridge for road and rail traffic; length 18.6 km
Femern Lolland
Immersed tunnel for road and rail traffic; length 18.5 km
34
Feasibility study 1999Preferred bridge solution
35
Feasibility study 1999Suspension bridge solution
36
10
Final Design ?
37
State-of-the-art climatic wind-tunnelResearch project at the Technical University of Denmark and Force Technology
Sponsored by Femern Belt Link
38
state-of-the-art climatic wind-tunnel 20m x 8m closed-circuit
25 m/sec mean wind velocity (min) with turbulence grid and flaps at -5 deg C
40 m/sec mean velocity (min) without cooling elements
Water spray capabilities (simulated rain) for rain and ice
2mx2m section minimum to allow for a maximum of 10% blockage on
a 200mm wide cable or bridge section
Consistency of flow characteristics for both smooth and turbulent flow
Full turbulence spectrum (within reason) achieved through turbulence generators
Approx. 1 MW tunnel power consumption
39
Improved durability of reinforced concreteResearch project at the Technical University of DenmarkSponsored by Femern Belt Link
10mm
Future protection:
FRC (fiber reinforced concrete)
FRP reinforcement (~ carbon fiber)
ECC ( i d ti it )
R/C
10mm
ECC (engineered cementious composite)
R/ECC40
11
Consulting Engineers for the Femern Link tender design:
Bridge option:• COWI Denmark
• OBERMEYER Germany
• Leonhardt, Andrä und Partner (subconsultant) Germany
• Dissing+Weitling (architects) Denmark.
Tunnel option:Tunnel option:• Ramboll Denmark
• Arup UK
• TEC (Tunnel Engineering Consultants) Holland
41