    s.no description unit price

    fanlight catches nos 50.00

    " dia pvc elbows/bend/socket no 9.25

    " dia. PVC TEES no 7.00

    " dia TEE no 12.00

    " dia. PVC elbows/bend/socket no 12.25

    1" dia. PVC elbows/bend/socket no 18.25

    1" dia. PVC TEES no 20.00

    1" dia. PVC elbows/bend/socket no 37.00

    1" dia. PVC TEE no 30.00

    1" dia. PVC elbows/bend/socket no 60.00

    1"dia. PVC TEE no 52.00

    2" dia. PVC TEE no 80.00

    2" dia. PVC elbows/bend/socket no 126.00

    2" dia. PVC elbows/bend/socket no 305.00

    2" dia. PVC TEE no 146.00

    3" dia. PVC elbows/bend/socket no 510.00

    3" dia. PVC tees no 335.00

    acid gal 200.00

    anticorrosive ltr 230.00

    asbestos corrugated sheet sq.ft 26.00

    asbestos flat sheet sq.ft 15.00

    beading x l.ft 1.50

    beading 1x halmilla l.ft 10.00

    bidet no b

    binding wire 16 BWG lbs 35.00

    bitumen gal 75.00

    blacksmith days 550.00

    blasting powder lbs 300.00

    blue ozs 10.00

    boiled lime cwts 350.00

    bolt 16mm, 18" long nos 75.00

    brackets no

    Brass bolt 4" nos 45.00

    brass nails 1 kg 100.00

    brass panel pin doz 5.00brass screw 1 doz 35.00

    brass screw 4" nos 12.00

    brass screws nos 1.25

    brass screws doz 1.75

    brass screws 1" no 2.35

    brass screws 1" no 3.75

  • 8/12/2019 Imperial BSR

    2/193

    brick work 4 sq

    bricks nos 2.80

    brush 2" nos 167.00

    brush 3" nos 210.00

    brush 6" nos 403.00

    But hinges 5x2 brass nos 87.50

    C.I.cistern with 1 flush pipe chain nos 1550.00

    C.I.pipe 4" l.ft 155.00

    C.I.pipe 4" l.ft 155.00

    carpenter days 600.00

    Casement fasteners nos 40.00

    Casement stays nos 40.00

    cement cwts 485.00

    cement block 16x8x4 nos 30.00

    cement block 16x8x8 nos 45.00

    cistern no

    clay tile nos 11.00

    clip and nail for " pvc nos 6.75

    clip and nail for " pvc nos 8.00

    clip and nail for 1" pvc nos 10.75

    clip and nail for 1" pvc nos 14.50

    clip and nail for 1" pvc nos 20.50

    clip and nail for 2" pvc nos 29.75

    clip and nail for 3" pvc nos 132.75

    clip nos 25.00

    clout nails " lbs 50.00coir brush 6" nos 40.00

    coloured pigment lb 150.00

    colouring powder lb 150.00

    concrete 1 2 4 cube 14965.33

    concrete 1 3 6 (1) cube 12233.33

    cotton waste lb 12.50

    cove moulding halmilla 2x2 l.ft 35.00

    cover slab no 300.00

    d d t powded lbs 100.00

    Door closer(hydraulic) nos 1650.00dowels M.S. 5/8" nos 15.00

    Draw rings nos 15.00

    earth cube 600.00

    elbow no b

    emulsion lit 312.50

    enamel ltr 380.00

  • 8/12/2019 Imperial BSR

    3/193

    end cap no 38.00

    eves gutter length no 425.00

    EW pipe 4" no 80.00

    excavation cube b

    fibre/plastic plug nos 2.00

    fibre/plastic plug with 4" screw nos 7.00

    firewood lbs 3.00

    flannel cloth yrds 65.00

    floor brush nos 150.00

    fuse l.ft 7.50

    G.I.grating 4" nos 15.00

    G.I.Sheet 8x4( 18BWG) nos 2200.00

    glass pane 1/8" sq.ft 30.00

    glazed tile 6x6 nos 15.00

    glazier sq.ft 30.00

    gutter brackets no 20.00

    gutter joiner no 43.00

    half round tile sq 5.00

    iron screws kg

    iron screws 3" nos 3.00

    joiner no 43.00

    jumper steel lbs 125.00

    Jute Hessian sq.ft 3.50

    L iron brackets nos 55.00

    labour days 400.00

    lead lb 150.00low level suite complete nos 4500.00

    lunumidella ceiling planks sq.ft 27.00

    mason days 600.00

    metal 2" cube 2000.00

    metal cube 3200.00

    metal 1 cube 2900.00

    metal 1 cube 2600.00

    mitre bend no b

    mixture days 1200.00

    Mortice lock with screws nos 600.00mould oil lit 35.00

    nails 2" kg 100.00

    painter days 275.00

    planks 1" sq.ft 110.00

    plumber days 275.00

    plywood sash 6'9"x2'9" nos 1400.00

  • 8/12/2019 Imperial BSR

    4/193

    pressed tile 8x8 nos 15.00

    primer for wall lit 377.00

    props 2x4 l.ft 25.00

    pvc 3" pipe,1000 type l.ft 170.00

    pvc gutter head no 105.00

    pvc pipe l.ft 7.10

    pvc pipe l.ft 12.50

    pvc pipe 1" l.ft 18.75

    pvc pipe 1" l.ft 28.50

    pvc pipe 1" l.ft 42.50

    pvc pipe 2" l.ft 72.00

    pvc pipe 3" l.ft 170.00

    pvc pipe 3 l.ft 80.00

    pvc straps no

    rawl plugs no 2.00

    reeper 2x1 l.ft 10.00

    rendering 1 2 sq

    ridge tile nos 25.00

    ridges 3'8" long pair 250.00

    Rim lock with screws nos 300.00

    roofing screws or bolt nos 3.00

    roofing screws and washers nos 3.50

    rubble 6-9 cube 1650.00

    S.W. gulley 4" nos 450.00

    salt lb 10.00

    sand cube 4000.00sand paper nos 17.50

    shoe no 60.00

    Sink 24x15x7 nos 1750.00

    sk/labour days 550.00

    slaked lime cwts 300.00

    socket 1" nos 12.00

    socket 3" nos 170.00

    soldering lead lb 250.00

    solvent cement gms 1.20

    spreader nospur stone nos 25.00

    squatting pan with trap nos 750.00

    stop cock nos 250.00

    tap nos 250.00

    tapered wooden plug nos 25.00

    tarnap gal 125.00

  • 8/12/2019 Imperial BSR

    5/193

    Tee hinges 6"x12" pair 50.00

    terpentine/thinner lit 100.00

    terrazzo tiles 12x12 nos 75.00

    Timber cu.ft 1100.00

    timber 2x2 l.ft 25.00

    timber 4x3 class I cu.ft 1100.00

    timber base plates sq.ft 45.00

    timber battens 2x1 class 1 l.ft 10.00

    timber bearers 4x2 class 1 l.ft 55.00

    timber bearers 4x2 class 2 l.ft 35.00

    Timber cl 1 cu.ft 1100.00

    timber class 11 2x1 l.ft 3.50

    timber class11 cu.ft 625.00

    timber class11 2x2 l.ft 12.00

    timber joists 4x2 class 2 cu.ft 625.00

    timber ledgers 2x2 l.ft 12.00

    timber planks ", class 1 sq.ft 90.00

    timber planks 1", class 1 sq.ft 110.00

    timber planks 1 class1 sq.ft 140.00

    timber planks 1", class 2 sq.ft 45.00

    timber planks 1", class 2 sq.ft 45.00

    timber plug no 5.00

    timber plug 6x6x2 no 48.00

    timber purlin cu.ft 1100.00

    timber runners 4x2 cu.ft 1100.00

    timber sash 3x1 sq.ft 180.00timber strips2x l.ft 4.00

    timber wedges nos 6.00

    tinker days 325.00

    Tor steel cwts 2500.00

    Tower / skeleton brass bolts nos 100.00

    urinal no 1650.00

    Varnish lit 400.00

    vibrator days 1500.00

    wash basin nos 2800.00

    waste plug and chain nos 150.00water gal 0.30

    wax polish lb 125.00

    white cement kg 35.00

    wire brush nos 65.00

    wire cut bricks nos 8.75

    wire nail kg 100.00

  • 8/12/2019 Imperial BSR

    6/193

    wire nail 1 lb 50.00

    wire nail 2" long lb 50.00

    wire nail 6" long lb 50.00

    wire nails lb 50.00

    wood preservative ltr 115.00

    wood primer ltr 105.00

    wooden plug no 15.00

    yarn lbs 35.00

    yellow ochre lb 10.00

    Mild steel cwts 1600.00

  • 8/12/2019 Imperial BSR

    7/193

    1Removing top soil to a depth not exceeding

    6" & depositi ng as directed withi n site

    sq 400.00

    per sqare

    consider an area of 10.00 sqrs

    ie, 5.00 cubes of excavation

    Labour days 10.00 400.00 4000.00

    rate per sqr 400.00

    2Excavation over si te to reduce level in any

    materi al except rock requir ing blasting

    including depositi ng and levell ing as

    dir ected upto a distance not exceeding 30ft

    cube 650.00

    per cube

    Labour days 1.63 400.00 650.00

    rate per sqr 650.00

    3Excavation in tr enches for wal ls/columnpits in soft/ loose soil f rom 0-5ft deep and

    deposi ting excavated material to a distance

    not exceeding 30ft . (earth work support to

    be paid separately).

    cube 400.00

    per cube

    Labour days 1.00 400.00 400.00

    400.00

    4Excavation in tr enches for wal ls/column

    pits in ordinary soil fr om 0-5ft deep and

    deposi ting excavated material to a distance

    not exceeding 30ft .

    cube 900.00

    per cube

    Labour days 2.25 400.00 900.00

    900.00

    5Excavation in tr enches for wal ls/column

    pits in hard dense soil f rom 0-5ft deep and

    deposi ting excavated material to a distance

    not exceeding 30ft .

    cube 1400.00

    per cube

    Labour days 3.50 400.00 1400.00

    1400.00

    Construction-BSR 7

  • 8/12/2019 Imperial BSR

    8/193

    6Excavation in tr enches for wal ls/column

    pits in mud/wet soil fr om 0-5ft deep and

    deposi ting excavated material to a distance

    not exceeding 30ft . (earthwork and

    dewatering paid for separately)

    cube 2400.00

    per cube

    Labour days 3.00 400.00 1200.00

    1200.00

    7Excavation in tr enches for wal ls/column

    pits in soft distintegrated rock (not requi ri ng

    blasting) up to a depth of 5f t and deposit ing

    excavated materi al to a distance not

    exceeding 30ft .

    cube 1000.00

    per cube

    Labour days 2.50 400.00 1000.00

    1000.00

    8Excavation in tr enches for wal ls/column

    pits in hard rock requir ing blasting up to adepth of 5ft and deposit ing excavated

    materi al to a distance not exceeding 30ft .

    cube 1860.00

    per cube

    mateials

    blasting powder lbs 0.75 300.00 225.00

    fuse l.ft 10.00 7.50 75.00

    jumper steel lbs 1.00 125.00 125.00

    fuel and gorge(20%) 85.00

    Labour

    Labour days 2.00 400.00 800.00

    sk/labour days 1.00 550.00 550.00

    1860.00

    9Benching rock in foundation in 3" -6"

    steps.(Bl asting prohibited)

    sq.ft 123.13

    per 10.00 sq ft

    drilling,chipping and wedging

    sk/labour days 1.50 550.00 825.00

    steel, fuel forge(25%) 206.25

    collecting and deposing

    Labour days 0.50 400.00 200.00

    per 10.00 sq ft 1231.25

    per sq.ft 123.13

    Construction-BSR 8

  • 8/12/2019 Imperial BSR

    9/193

    10Anti -termi te treatment on excavated

    foundation and compacted soil under fl oors

    sq 1806.00

    per sqare

    materials

    d d t powded lbs 16.00 100.00 1600.00

    water gal 20.00 0.30 6.00

    Labour days 0.50 400.00 200.00

    1806.00

    11Earthwork-backfi ll ing & compacting with

    selected earth available at site

    cube 400.00

    Backfilling to trenches with selected earth

    available at site

    per cube

    Labour days 1.00 400.00 400.00

    12Backfi ll ing to trenches with imported

    material

    cube 1090.00

    per cubeearth delivered at site cube 1.00 600.00 600.00

    Allow for compaction 15% 90.00

    filling and compacting

    Labour days 1.00 400.00 400.00

    1090.00

    13F il li ng under fl oors including levell ing

    wateri ng and compacting in 3" layers with

    avail able and selected earth at site

    cube 800.00

    per cube

    Labour days 2.00 400.00 800.00

    14F il li ng under fl oors including levell ing

    wateri ng and compacting in 3" layers with

    imported selected earth at site

    cube 1490.00

    per cube

    earth delivered at site cube 1.00 600.00 600.00

    Allow for compaction 15% 90.00

    Labour days 2.00 400.00 800.00

    1490.00

    Construction-BSR 9

  • 8/12/2019 Imperial BSR

    10/193

    15Cutti ng tur f sods loading to hand cards and

    transporting upto 30 yards laying and

    wateri ng for 30 days .(Royalty for tur f

    pegging and transport beond 30 yards paid

    separately)

    sq 1818.00

    per sqare

    Cutting turf sods loading and transporting

    ti site and unloading

    Labour days 2.50 400.00 1000.00

    laying turf rods at site

    Labour days 0.50 400.00 200.00

    Watering for 30 days

    Labour days 1.50 400.00 600.00

    water gal 60.00 0.30 18.00

    1818.00

    16 Earth work support (open planking ) in

    trenches upto a depth of 5ft

    sq 3114.06

    consider trench 15ft long 3ft wide and 5ftdepth open planking to both faces

    total area-2/15'x5'=150sq.ft

    per 150sq.ft

    materials

    timber class11(4 use) cu.ft 17.50 156.25 2734.38

    Add 5% for wedges 136.72

    carpenter days 1.00 600.00 600.00

    Labour days 3.00 400.00 1200.00

    total per 150 sq.ft 4671.09

    rate per sq 3114.06

    17 Earth work support (close planking ) in

    trenches upto a depth of 5ft

    sq 4747.92

    consider trench 15ft long 3ft wide and 5ft

    height open planking to both faces

    total area of planking-2/15'x5'=150sq.ft

    per 150sq.ft

    materials

    timber class11(4 use) cu.ft 30.00 156.25 4687.50

    Add 5% for wedges 234.38

    carpenter days 1.00 600.00 600.00

    Labour days 4.00 400.00 1600.00

    total per 150 sq.ft 7121.88

    rate per sq 4747.92

    Construction-BSR 10

  • 8/12/2019 Imperial BSR

    11/193

    18 Earth work support (close planking ) in

    deep excavation in trenches upto 15ft

    depth

    sq 5290.28

    consider trench of length of 15'width

    5'6"at top, 3'6" at bottom

    then area supported is 2/15'x15'=450 sq.ft

    timber class11(4 use) cu.ft 100.00 156.25 15625.00

    Add 5% for wedges 781.25

    carpenter days 3.00 600.00 1800.00

    Labour days 14.00 400.00 5600.00

    total per 450 sq.ft 23806.25

    rate per sq 5290.28

    19 Mixing concrete 1 3 6 (1") cube 12233.33

    per cube

    materials

    cement cwts 13.00 485.00 6305.00

    sand cube 0.53 4000.00 2120.00metal 1 cube 0.92 2600.00 2392.00

    mixture days 0.33 1200.00 400.00

    water gal 110.00 0.30 33.00

    sk/labour days 0.33 550.00 183.33

    Labour days 2.00 400.00 800.00

    12233.33

    20 Mixing concrete 1 2 5 (1") cube 13213.33

    per cube

    materials

    cement cwts 14.00 485.00 6790.00

    sand cube 0.60 4000.00 2400.00

    metal 1 cube 0.90 2900.00 2610.00

    mixture days 0.33 1200.00 400.00

    water gal 100.00 0.30 30.00

    sk/labour days 0.33 550.00 183.33

    Labour days 2.00 400.00 800.00

    13213.33

    21M ixing concrete 1 2 4 ( " ) cube 14965.33

    cement cwts 18.00 485.00 8730.00

    sand cube 0.50 4000.00 2000.00

    metal cube 0.88 3200.00 2816.00

    mixture days 0.33 1200.00 400.00

    water gal 120.00 0.30 36.00sk/labour days 0.33 550.00 183.33

    Labour days 2.00 400.00 800.00

    14965.33

    Construction-BSR 11

  • 8/12/2019 Imperial BSR

    12/193

    22M ixing concrete 1 1 3 ( " ) cube 16887.33

    cement cwts 23.00 485.00 11155.00

    sand cube 0.42 4000.00 1680.00

    metal cube 0.82 3200.00 2624.00

    mixture days 0.33 1200.00 400.00

    water gal 150.00 0.30 45.00

    sk/labour days 0.33 550.00 183.33

    Labour days 2.00 400.00 800.00

    16887.33

    23M ixing concrete 1 1 2 ( " ) cube 21310.33

    cement cwts 31.00 485.00 15035.00

    sand cube 0.44 4000.00 1760.00

    metal cube 0.96 3200.00 3072.00

    mixture days 0.33 1200.00 400.00

    water gal 200.00 0.30 60.00

    sk/labour days 0.33 550.00 183.33

    Labour days 2.00 400.00 800.00

    21310.33

    242" thick cement concrete 1 3 6(1) screed

    in foundation at depts not exceeding 5'-0"

    sq 2511.53

    per square

    materials

    concrete 1 3 6 cube 0.17 12233.33 2038.89

    Add 10% for wastage 203.89

    sk/labour days 0.13 550.00 68.75

    Labour days 0.50 400.00 200.00

    2511.53

    253" thick cement concrete 1 3 6(1) screed

    in foundation at depts not exceeding 5'-0"

    sq 3732.92

    per square

    materials

    concrete 1 3 6 cube 0.25 12233.33 3058.33

    Add 10% for wastage 305.83

    sk/labour days 0.13 550.00 68.75

    Labour days 0.75 400.00 300.00

    3732.92

    Construction-BSR 12

  • 8/12/2019 Imperial BSR

    13/193

    266" thi ck cement concrete 1 2 4( ) fl oor

    (mass concr ete)

    sq 8691.80

    per square

    materials

    concrete 1 2 4 cube 0.50 14965.33 7482.67

    Add 5% for wastage 374.13

    sk/labour days 0.50 550.00 275.00

    Labour days 1.25 400.00 500.00

    water gal 200.00 0.30 60.00

    8691.80

    27Cement concrete 1 2 4( ) in 4" x6

    column in ground fl oor

    24895.33

    consider 24 nos columns each 4"x6"x10'

    ie .45 cubes

    per .45 cubes

    materials

    concrete 1 2 4 cube 0.45 14965.33 6734.40

    Add 10% for wastagevibrator days 1.00 1500.00 1500.00

    Labour

    mason days 1.00 600.00 600.00

    carpenter days 0.00 600.00 0.00

    Labour days 3.00 400.00 1200.00

    sk/labour(vibrator) days 1.00 550.00 550.00

    curing

    Jute Hessian sq.ft 105.00 3.50 367.50

    water gal 170.00 0.30 51.00

    Labour days 0.50 400.00 200.00

    total for .45 cubes 11202.90

    per cube 24895.33

    Construction-BSR 13

  • 8/12/2019 Imperial BSR

    14/193

    28Cement concrete in 6" x6" column in

    ground floor 1 2 4( )

    cube 24680.89

    consider 18 no columns 6"x6" each 10'

    high. Ie 0.45cubes

    per .45 cubes

    materials

    concrete 1 2 4 cube 0.45 14965.33 6734.40

    Add 10% for wastage

    vibrator days 1.00 1500.00 1500.00

    Labour

    mason days 1.00 600.00 600.00

    carpenter

    sk/labour(vibrator) days 1.00 550.00 550.00

    Labour days 3.00 400.00 1200.00

    curing

    Jute Hessian sq.ft 80.00 3.50 280.00

    water gal 140.00 0.30 42.00

    Labour days 0.50 400.00 200.00total for .45 cubes 11106.40

    per cube 24680.89

    29Cement concrete in 9x9 column i n ground

    floor 1 2 4( )

    cube 24498.67

    consider 8 no 9"x9" column each 10' high

    .ie .45 cubes

    per .45 cubes

    materials

    concrete 1 2 4 cube 0.45 14965.33 6734.40

    vibrator days 1.00 1500.00 1500.00

    Labour

    mason days 1.00 600.00 600.00

    sk/labour(vibrator) days 1.00 550.00 550.00

    Labour days 3.00 400.00 1200.00

    curing

    Jute Hessian sq.ft 60.00 3.50 210.00

    water gal 100.00 0.30 30.00

    Labour days 0.50 400.00 200.00

    total for .45 cubes 11024.40

    per cube 24498.67

    Construction-BSR 14

  • 8/12/2019 Imperial BSR

    15/193

    30Cement concrete in 12x12 column i n

    ground floor 1 2 4 9( )

    cube 23405.33

    consider 5 no. columns 12"x12" each 10'

    high

    per .50 cubes

    materials

    concrete 1 2 4 cube 0.50 14965.33 7482.67

    Jute Hessian sq.ft 40.00 3.50 140.00

    vibrator days 1.00 1500.00 1500.00

    water gal 100.00 0.30 30.00

    Labour

    mason days 1.00 600.00 600.00

    carpenter days 1.00 0.00 0.00

    sk/labour(vibrator) days 1.00 550.00 550.00

    Labour days 3.00 400.00 1200.00

    curing

    Labour days 0.50 400.00 200.00total for .50 cubes 11702.67

    rate per cube 23405.33

    31Cement concrete in 13x13 column in

    ground floor(1 2 4 ( ))

    cube 20970.24

    consider 4no. Columns 13x13 each 10'

    high . I.e. 0.51 cube

    materials

    concrete 1 2 4 cube 0.51 14965.33 7632.32

    vibrator days 1.00 1500.00 1500.00

    Labour

    mason days 0.50 600.00 300.00

    sk/labour(vibrator) days 0.50 550.00 275.00

    Labour days 1.50 400.00 600.00

    curing

    Jute Hessian sq.ft 45.00 3.50 157.50

    water gal 100.00 0.30 30.00

    Labour days 0.50 400.00 200.00

    total for 0.51 cube 10694.82

    rate per cube 20970.24

    Construction-BSR 15

  • 8/12/2019 Imperial BSR

    16/193

    32Cement concrete 6x6 beam upto 1st floor

    level (1 2 4 ( ))

    cube 25153.11

    consider 180 ft of beam 6"x6" . Ie. 0.45

    cubes

    per 0.45 cube

    materials

    concrete 1 2 4 cube 0.45 14965.33 6734.40

    vibrator days 1.00 1500.00 1500.00

    Labour

    mason days 1.00 600.00 600.00

    sk/labour(vibrator) days 1.00 550.00 550.00

    Labour days 4.00 400.00 1600.00

    curing

    Jute Hessian sq.ft 23.00 3.50 80.50

    water gal 180.00 0.30 54.00

    Labour days 0.50 400.00 200.00rate per 0.45 cube 11318.90

    rate per cube 25153.11

    33Cement concrete 9x6 beam upto 1st floor

    level

    cube 25133.11

    consider 120ft 9x6 beam . Ie. 0.45 cubes

    per 0.45 cube

    materials

    concrete 1 2 4 cube 0.45 14965.33 6734.40

    vibrator days 1.00 1500.00 1500.00

    Labour

    mason days 1.00 600.00 600.00

    sk/labour(vibrator) days 1.00 550.00 550.00

    Labour days 4.00 400.00 1600.00

    curing

    Jute Hessian sq.ft 23.00 3.50 80.50

    water gal 150.00 0.30 45.00

    Labour days 0.50 400.00 200.00

    total for 0.45 cube 11309.90

    rate per cube 25133.11

    Construction-BSR 16

  • 8/12/2019 Imperial BSR

    17/193

    34 Cement concrete 9x9 beam upto 1st floor

    level

    cube 25400.89

    consider 80ft length of 9x9 beam. Ie. 0.45

    cubes

    per 0.45 cube

    materials

    concrete 1 2 4 cube 0.45 14965.33 6734.40

    vibrator days 1.00 1500.00 1500.00

    Labour

    mason days 1.00 600.00 600.00

    sk/labour(vibrator) days 1.00 550.00 550.00

    Labour days 4.00 400.00 1600.00

    curing

    Jute Hessian sq.ft 60.00 3.50 210.00

    water gal 120.00 0.30 36.00

    Labour days 0.50 400.00 200.00total for 0.45 cube 11430.40

    rate per cube 25400.89

    355" thi ck R.C.C. f loor sl ab i n 1st f loor sq 19879.33

    consider 5" thick slab 10'x12'. Volume of

    concrete 50.00 cu.ft

    per 0.50 cube

    materials

    concrete 1 2 4 cube 0.50 14965.33 7482.67

    vibrator days 0.50 1500.00 750.00

    Labour

    mason days 0.50 600.00 300.00

    sk/labour(vibrator) days 0.50 550.00 275.00

    Labour days 2.00 400.00 800.00

    curing

    Jute Hessian sq.ft 30.00 3.50 105.00

    water gal 90.00 0.30 27.00

    Labour days 0.50 400.00 200.00

    total for 0.50 cube 9939.67

    rate per cube 19879.33

    Construction-BSR 17

  • 8/12/2019 Imperial BSR

    18/193

    36 6" thick R.C.C. floor slab in 1st floor sq 19844.33

    consider 10'x10' panel=50cu.ft

    materials

    concrete 1 2 4 cube 0.50 14965.33 7482.67

    vibrator days 0.50 1500.00 750.00

    Labour

    mason days 0.50 600.00 300.00

    sk/labour(vibrator) days 0.50 550.00 275.00

    Labour days 2.00 400.00 800.00

    curing

    Jute Hessian sq.ft 25.00 3.50 87.50

    water gal 90.00 0.30 27.00

    Labour days 0.50 400.00 200.00

    total for 0.50 cube 9922.17

    rate per cube 19844.33

    37Cement concrete in 4" x6 l in tols in groundfloor

    l.ft 48.25

    consider 240 l.ft , ie. 45 cu.ft

    materials

    concrete 1 2 4 cube 0.45 14965.33 6734.40

    vibrator days 1.00 1500.00 1500.00

    Labour

    mason days 1.00 600.00 600.00

    sk/labour(vibrator) days 1.00 550.00 550.00

    Labour days 4.00 400.00 1600.00

    curing

    Jute Hessian sq.ft 105.00 3.50 367.50

    water gal 90.00 0.30 27.00

    Labour days 0.50 400.00 200.00

    total per 240.0 l.ft 11578.90

    rate per l.ft 48.25

    Construction-BSR 18

  • 8/12/2019 Imperial BSR

    19/193

    38Cement concrete in 9x9 li ntols in ground

    floor

    l.ft 142.77

    consider 80 ft of liintol , ie. 45 cu.ft

    concrete

    materials

    concrete 1 2 4 cube 0.45 14965.33 6734.40

    vibrator days 1.00 1500.00 1500.00

    Labour

    mason days 1.00 600.00 600.00

    sk/labour(vibrator) days 1.00 550.00 550.00

    Labour days 4.00 400.00 1600.00

    curing

    Jute Hessian sq.ft 60.00 3.50 210.00

    water gal 90.00 0.30 27.00

    Labour days 0.50 400.00 200.00

    total per 80 ft 11421.40per ft 142.77

    39 Cement concrete in 9x12 lintols in ground

    floor

    l.ft 190.07

    consider 60 ft of liintol , ie. 45 cu.ft

    concrete

    materials

    concrete 1 2 4 cube 0.45 14965.33 6734.40

    vibrator days 1.00 1500.00 1500.00

    Labour

    mason days 1.00 600.00 600.00

    sk/labour(vibrator) days 1.00 550.00 550.00

    Labour days 4.00 400.00 1600.00

    curing

    Jute Hessian sq.ft 55.00 3.50 192.50

    water gal 90.00 0.30 27.00

    Labour days 0.50 400.00 200.00

    total per 60 ft 11403.90

    per ft 190.07

    Construction-BSR 19

  • 8/12/2019 Imperial BSR

    20/193

    40 Cement concrete in12x15 lintols in ground

    floor

    l.ft 315.32

    consider 36 ft of liintol , ie. 45 cu.ft

    concrete

    materials

    concrete cube 0.45 14965.33 6734.40

    vibrator days 1.00 1500.00 1500.00

    Labour 0.00

    mason days 1.00 600.00 600.00

    sk/labour(vibrator) days 1.00 550.00 550.00

    Labour days 4.00 400.00 1600.00

    curing

    Jute Hessian sq.ft 40.00 3.50 140.00

    water gal 90.00 0.30 27.00

    Labour days 0.50 400.00 200.00

    total per 36 ft 11351.40per ft 315.32

    Construction-BSR 20

  • 8/12/2019 Imperial BSR

    21/193

    41Sawn timber formwork to 9x9 cement

    concrete column i n ground floor

    sq. 4588.95

    per sq ft

    consider column length of 5ft, contact area-

    15.0 sq ft

    a) making mould

    1) materials

    1" tk , class2, timber sq.ft 18.15 45.00 816.75

    2x2 class 2 timber in yokes l.ft 17.10 12.00 205.20

    2x1 class2 timber battens l.ft 16.12 3.50 56.42

    wire nails lbs 1.50 50.00 75.00

    2) fabricating

    carpenter days 0.50 0.00 0.00

    Labour days 0.50 400.00 200.00

    total cost for 4 use 1353.37

    per use 338.34

    b) assembling

    materialsbolt 16mm, 18" long ( 20 use) nos 12.00 75.00 45.00

    mould oil lit 0.50 35.00 17.50

    props 2x4 ( 10 use) l.ft 35.00 25.00 87.50

    Labour

    carpenter days 0.25 0.00 0.00

    Labour days 0.25 400.00 100.00

    cost of assembling per use 250.00

    c) dismantling cleaning and repairing (per

    use)

    carpenter days 0.25 0.00 0.00

    Labour days 0.25 400.00 100.00

    cost of assembling per use 100.00total cost for per use(15.0 sq.ft) ie. (a+b+c) 688.34

    rate per sq 4588.95

    Construction-BSR 21

  • 8/12/2019 Imperial BSR

    22/193

    42Sawn timber f ormwork for concrete beam in

    ground floor

    sq 7202.76

    consider 9x12 beam of 20ft long . Contact

    area 55sq.ft

    a) making mould

    timber planks 1" class 2 sq.ft 60.00 45.00 2700.00

    timber battens 2x1 class 2 l.ft 24.00 3.50 84.00

    timber ledgers 2x2 class 2 l.ft 45.00 12.00 540.00

    timber bearers 4x2, class 2 l.ft 30.00 35.00 1050.00

    wire nails lbs 2.00 50.00 100.00

    Labour

    carpenter days 1.50 0.00 0.00

    Labour days 2.00 400.00 800.00

    total cost of mould 5274.00

    assuming 4 use, cost per use 1318.50

    Add 10% for repairs 131.85

    cost per use 1450.35

    b) assemblingmaterials

    4x2 verical props class 2 l.ft 110.00 35.00 3850.00

    bracing 2x2, class 2 l.ft 80.00 12.00 960.00

    base plate 1" timber, class 2 sq.ft 6.00 45.00 270.00

    wedges nos 22.00 6.00 132.00

    5212.00

    cost of materials for assembling . Assuming

    an average of 6 uses . Cost of materials per

    use

    868.67

    c) labour and sundries

    Labourcarpenter days 1.00 0.00 0.00

    Labour days 2.00 400.00 800.00

    mould oil gal 0.50 35.00 17.50

    wirenail lbs 0.50 50.00 25.00

    cost per use 842.50

    d) dismantling and cleaning

    Labour

    carpenter days 0.50 0.00 0.00

    Labour days 2.00 400.00 800.00

    cost of labour for dismantling per use 800.00

    total cost for making the mould assembling

    aligning dismantling and cleaning for 55 sq ft

    per use(a+b+c+d)

    3961.52

    rate per sq 7202.76

    Construction-BSR 22

  • 8/12/2019 Imperial BSR

    23/193

    43 Sawn timber formwork for underside of

    first floor slab

    sq 5861.00

    consider a slab of dimensions 20ftx10ft.

    Contact area = 2.0 sq

    a) making panels

    materials

    timber planks 1", class 2 sq.ft 220.00 45.00 9900.00

    timber runners 4x2, class 2 cu.ft 121.00 35.00 4235.00

    wire nails lbs 4.00 50.00 200.00

    Labour

    carpenter days 3.00 0.00 0.00

    Labour days 3.00 400.00 1200.00

    total cost of making panels 15535.00

    assuming 4 uses cost per use 3883.75

    add 20% for repairs 776.75

    total cost of panels per use 4660.50

    b) assembling

    materials4x2 vertical timber props l.ft 690.00 35.00 24150.00

    timber 2x2 l.ft 66.00 12.00 792.00

    timber wedges nos 122.00 6.00 732.00

    timber base plates sq.ft 33.00 45.00 1485.00

    cost of materials for assembling 27159.00

    assuming 6 uses , cost of materials for

    assembling per use

    4526.50

    c) labour and sundries for assembling

    carpenter days 1.00 0.00 0.00

    Labour days 4.00 400.00 1600.00

    mould oil gal 1.00 35.00 35.00

    wire nails lbs 2.00 50.00 100.00total cost per use for assembling 1735.00

    d) dismantling and cleaning

    Labour

    carpenter days 0.50 0.00 0.00

    Labour days 2.00 400.00 800.00

    total cost for dismantling per use 800.00

    total cost for assembling per use for 2.0 sq

    .(a+b+c+d)

    11722.00

    rate per sq 5861.00

    Construction-BSR 23

  • 8/12/2019 Imperial BSR

    24/193

    44 Tor steel reinforcement to lintols slab

    beams or columns bent to shape laid in

    position and tied with G I wire as directed

    cwts 3920.63

    materials

    Tor steel including transport to site cwts 1.00 2500.00 2500.00

    wastage 15% 375.00

    binding wire 16 BWG lbs 1.50 35.00 52.50

    add 1.5% of steel cost for spacers or chairs 43.13

    blacksmith days 1.00 550.00 550.00

    Labour days 1.00 400.00 400.00

    3920.63

    45 Brick work in cement sand 1:5 in

    foundation upto D P C

    cube 10648.00

    per cube

    materials

    bricks nos 1450.00 2.80 4060.00

    wastage 5% 203.00cement cwts 4.00 485.00 1940.00

    sand cube 0.25 4000.00 1000.00

    water gal 150.00 0.30 45.00

    Labour

    mason days 3.00 600.00 1800.00

    Labour days 4.00 400.00 1600.00

    10648.00

    46 Brick work in cement sand 1:8 in

    foundation upto D P C

    cube 10339.67

    per cube

    materials

    bricks nos 1450.00 2.80 4060.00

    wastage 5% 203.00

    cement cwts 2.33 485.00 1131.67

    sand cube 0.38 4000.00 1500.00

    water gal 150.00 0.30 45.00

    Labour

    mason days 3.00 600.00 1800.00

    Labour days 4.00 400.00 1600.00

    10339.67

    Construction-BSR 24

  • 8/12/2019 Imperial BSR

    25/193

    47 Brick work in cement sand 1:5 in 4 thick

    walls in ground floor

    sq 4447.50

    per sq

    materials

    bricks nos 550.00 2.80 1540.00

    wastage 5% 77.00

    cement cwts 1.30 485.00 630.50

    sand cube 0.10 4000.00 400.00

    water gal 50.00 0.30 15.00

    Labour

    mason days 1.50 600.00 900.00

    Labour days 2.00 400.00 800.00

    scaffolding 5% 85.00

    4447.50

    489" thick bri ck wall cement sand 1:5 in

    ground floor

    sq 8429.60

    per sq

    materialsbricks nos 1090.00 2.80 3052.00

    wastage 5% 152.60

    cement cwts 3.00 485.00 1455.00

    sand cube 0.20 4000.00 800.00

    water gal 115.00 0.30 34.50

    Labour

    mason days 2.25 600.00 1350.00

    Labour days 3.75 400.00 1500.00

    scaffolding 3% 85.50

    8429.60

    49 Brick work 13 thick in cement sand 1:5

    in superstructure in ground floor

    sq 12611.70

    per sq

    materials

    bricks nos 1630.00 2.80 4564.00

    wastage 5% 228.20

    cement cwts 4.50 485.00 2182.50

    sand cube 0.30 4000.00 1200.00

    water gal 170.00 0.30 51.00

    Labour

    mason days 3.50 600.00 2100.00

    Labour days 5.50 400.00 2200.00

    scaffolding 2% 86.0012611.70

    Construction-BSR 25

  • 8/12/2019 Imperial BSR

    26/193

    50 9" thick brick wall cement sand 1:8 in

    superstructure in ground floor

    sq 7914.35

    per sq(.75cubes)

    materials

    bricks nos 1090.00 2.80 3052.00

    wastage 5% 152.60

    cement cwts 1.75 485.00 848.75

    sand cube 0.30 4000.00 1200.00

    water gal 115.00 0.30 34.50

    Labour

    mason days 2.25 600.00 1350.00

    Labour days 3.00 400.00 1200.00

    scaffolding 3% 76.50

    7914.35

    51 4 thick brick wall (wirecut) in cement

    sand 1:5 in ground floor

    sq 7604.75

    (facing to brick work measured separately)

    per sq

    materials

    wire cut bricks nos 550.00 8.75 4812.50

    wastage 2% 96.25

    cement cwts 1.20 485.00 582.00

    sand cube 0.08 4000.00 320.00

    water gal 30.00 0.30 9.00

    Labour

    mason days 1.50 600.00 900.00

    Labour days 2.00 400.00 800.00

    scaffolding 5% 85.00

    7604.75

    52 9" thick in cement and sand 1:5 with wire

    cut brick

    sq 14726.00

    (facing to brick work measured separately)

    per sq

    materials

    wire cut bricks nos 1080.00 8.75 9450.00

    wastage 4% 378.00

    cement cwts 2.50 485.00 1212.50

    sand cube 0.18 4000.00 720.00

    water gal 100.00 0.30 30.00Labour

    mason days 2.25 600.00 1350.00

    Labour days 3.75 400.00 1500.00

    scaffolding 3% 85.50

    14726.00

    Construction-BSR 26

  • 8/12/2019 Imperial BSR

    27/193

    53 13 thick brick wall (wire cut) in cement

    sand 1:5 in ground floor

    cube 22484.25

    (facing to brick work measured separately)

    per sq

    materials

    wire cut bricks nos 1630.00 8.75 14262.50

    wastage 2% 285.25

    cement cwts 4.50 485.00 2182.50

    sand cube 0.30 4000.00 1200.00

    water gal 50.00 0.30 15.00

    Labour

    mason days 3.75 600.00 2250.00

    Labour days 5.50 400.00 2200.00

    scaffolding 2% 89.00

    22484.25

    54 Extra over for facing including raised

    pointing 1/8" thick in cement sand 1:1mixture in ground floor

    sq 4705.50

    per sq

    materials

    cement cwts 0.50 485.00 242.50

    sand cube 0.01 4000.00 40.00

    acid gal 0.10 200.00 20.00

    water gal 10.00 0.30 3.00

    Labour

    mason days 5.00 600.00 3000.00

    Labour days 3.50 400.00 1400.00

    4705.50

    553" thick f loor paved in cement mortor 2:5

    in ground floor

    sq 3765.50

    per sq

    materials

    bricks nos 350.00 2.80 980.00

    cement cwts 1.20 485.00 582.00

    sand cube 0.11 4000.00 440.00

    water gal 45.00 0.30 13.50

    Labour

    mason days 1.25 600.00 750.00

    Labour days 2.50 400.00 1000.00

    3765.50

    Construction-BSR 27

  • 8/12/2019 Imperial BSR

    28/193

    56Steps 1'-1" x0' -6" in bri ck in cement and

    sand 1:5 with " thi ck cement and sand 1:2

    rendering including necessary excavation

    l.ft 128.30

    per 10 l.ft

    materials

    bricks nos 120.00 2.80 336.00

    cement cwts 0.50 485.00 242.50

    sand cube 0.05 4000.00 200.00

    water gal 15.00 0.30 4.50

    Labour

    mason days 0.50 600.00 300.00

    Labour days 0.50 400.00 200.00

    rate per 10 l.ft 1283.00

    rate per l.ft 128.30

    57Br ick drains in cement sand 1:5 , 9" wide

    and 6-9" average depth including cement

    rendering " thick 1:2 to exposed feceswith 1'-6" ramp in cluding necessary

    excavation

    l.ft 223.60

    per 10 l.ft

    materials

    bricks nos 140.00 2.80 392.00

    cement cwts 0.80 485.00 388.00

    sand cube 0.05 4000.00 200.00

    water gal 20.00 0.30 6.00

    Labour

    mason days 1.25 600.00 750.00

    Labour days 1.25 400.00 500.00

    rate per 10 l.ft 2236.00

    rate per l.ft 223.60

    Construction-BSR 28

  • 8/12/2019 Imperial BSR

    29/193

    58 Brick drains in cement sand 1:5 , 9" wide

    and 6-9" average depth including cement

    rendering " thick 1:2 to exposed feces

    with 1'-6" without ramp including

    necessary excavation

    l.ft 191.20

    per 10 l.ft

    materials

    bricks nos 110.00 2.80 308.00

    cement cwts 0.70 485.00 339.50

    sand cube 0.04 4000.00 160.00

    water gal 15.00 0.30 4.50

    Labour

    mason days 1.00 600.00 600.00

    Labour days 1.25 400.00 500.00

    rate per 10 l.ft 1912.00

    rate per l.ft 191.20

    59 8" thick hollow blocks in cement and sand

    mortor 1:5 in ground floor (cavitiesunfilled)

    sq 7852.75

    per sq

    10x10 area ( size of each block 16x8x8)

    materials

    hollow cement block 16x8x8 nos 112.00 45.00 5040.00

    wastage 5% 252.00

    cement cwts 0.75 485.00 363.75

    sand cube 0.06 4000.00 240.00

    Labour

    mason days 1.50 600.00 900.00

    Labour days 2.50 400.00 1000.00

    scaffolding 3% 57.007852.75

    60 4" thick hollow block masonry in cement

    and sand mortor 1"5 with cavities unfilled

    sq 5312.00

    per sq

    10x10 area ( size of each block 16x8x4)

    materials

    cement block 16x8x4 nos 112.00 30.00 3360.00

    wastage 5% 168.00

    cement cwts 0.40 485.00 194.00

    sand cube 0.03 4000.00 120.00Labour

    mason days 1.00 600.00 600.00

    Labour days 2.00 400.00 800.00

    scaffolding 5% 70.00

    5312.00

    Construction-BSR 29

  • 8/12/2019 Imperial BSR

    30/193

    61 Random rubble masonry in cement mortor

    1:5 in foundation

    cube 10600.00

    per cube (14" tk)

    materials

    rubble 6-9 cube 1.30 1650.00 2145.00

    cement cwts 5.00 485.00 2425.00

    sand cube 0.30 4000.00 1200.00

    water gal 100.00 0.30 30.00

    Labour

    mason days 4.00 600.00 2400.00

    Labour days 6.00 400.00 2400.00

    10600.00

    62 Random rubble masonry in cement mortor

    1:5 in superstructure

    cube 11465.00

    per cube (14" tk)

    materials

    rubble 6-9 cube 1.30 1650.00 2145.00

    cement cwts 5.00 485.00 2425.00sand cube 0.30 4000.00 1200.00

    water gal 100.00 0.30 30.00

    Labour

    mason days 4.50 600.00 2700.00

    Labour days 7.00 400.00 2800.00

    scaffolding 3% 165.00

    11465.00

    63 Pressed floor tiles bedded in cement

    mortor 1:2 and pointing in neat cement in

    ground floor

    sq.ft 8723.75

    per sq

    materials

    pressed tile 8x8 nos 225.00 15.00 3375.00

    wastage 5% 168.75

    cement cwts 1.25 485.00 606.25

    sand cube 0.07 4000.00 280.00

    wax polish lb 0.25 125.00 31.25

    coloured pigment lb 0.25 150.00 37.50

    cotton waste lb 2.00 12.50 25.00

    Labour

    mason days 4.00 600.00 2400.00

    Labour days 4.00 400.00 1600.00

    Labour for polishing days 0.50 400.00 200.008723.75

    64Glazed til e fixed to walls including bedding

    in cement motor 1:2 and raking in ground

    f loor .(special s measured separately)

    sq.ft 12387.50

    per sq

    Construction-BSR 30

  • 8/12/2019 Imperial BSR

    31/193

    materials

    glazed tile 6x6 nos 400.00 15.00 6000.00

    wastage 10% 600.00

    cement cwts 2.50 485.00 1212.50

    sand cube 0.11 4000.00 440.00

    white cement kg 1.00 35.00 35.00

    Labour

    mason days 4.00 600.00 2400.00

    Labour days 4.00 400.00 1600.00

    Labour for cleaning days 0.25 400.00 100.00

    12387.50

    65Terr azzo fl oor ti les on " thi ck cement and

    sand 1:2 in ground floor

    sq.ft 12948.75

    per sq

    materials

    terrazzo tiles 12x12 nos 100.00 75.00 7500.00

    wastage 5% 375.00

    cement cwts 1.25 485.00 606.25sand cube 0.07 4000.00 280.00

    coloured pigment lb 2.00 150.00 300.00

    wax polish lb 0.50 125.00 62.50

    cotton waste lb 2.00 12.50 25.00

    Labour

    mason days 4.00 600.00 2400.00

    Labour days 3.00 400.00 1200.00

    Labour for polishing days 0.50 400.00 200.00

    12948.75

    Construction-BSR 31

  • 8/12/2019 Imperial BSR

    32/193

    66Timber frame work for calicut pattern til e

    hip roof in single storey buil ding consisting

    of wal l pl ate beam r idge plate raf ters etc..

    (Preservative treatment to be measured

    separately)

    sq 9383.33

    per 6.0 sq

    materials

    Timber class 1 cu.ft 34.00 1100.00 37400.00

    wastage 10% 3740.00

    reeper 2x1 class 1 l.ft 660.00 10.00 6600.00

    wastage 10% 660.00

    wire nail 6" long lb 8.00 50.00 400.00

    wire nail 2" long lb 2.00 50.00 100.00

    Labour

    carpenter days 7.00 600.00 4200.00

    Labour days 8.00 400.00 3200.00

    total for 6 sq 56300.00

    per sq 9383.3367Roof coveri ng wi th cali cut pattern clay til es

    in single storeyed buil ding

    sq 24375.00

    (timber frame work and ridge covering

    measured separately)

    per 6.0 sq

    materials

    clay tile nos 750.00 11.00 8250.00

    Labour

    carpenter days 3.00 600.00 1800.00

    Labour days 3.00 400.00 1200.00

    total for 6 sq 11250.00

    per sq 1875.00

    68Timber fr ame work f or corr ugated asbestos

    asheet roof i n single storeyed bui ldi ng

    sq 5203.47

    per 3.6 sq

    materials

    timber purlin cu.ft 13.25 1100.00 14575.00

    wastage 10% 1457.50

    Labour

    carpenter days 2.50 600.00 1500.00

    Labour days 3.00 400.00 1200.00

    per 3.6 sq 18732.50per sq 5203.47

    Construction-BSR 32

  • 8/12/2019 Imperial BSR

    33/193

    69Roof covering wi th cor rugated asbestos

    sheet (timber fr ame work and ri dge

    coveri ng measur ed separately )

    sq 3492.22

    per 3.6 sq

    materials

    asbestos corrugated sheet sq.ft 420.00 26.00 10920.00

    roofing screws and washers nos 72.00 3.50 252.00

    Labour

    carpenter days 1.00 600.00 600.00

    Labour days 2.00 400.00 800.00

    per 3.6 sq 12572.00

    per sq 3492.22

    70One layer half round clay til es over

    corr ugated asbestos roof coveri ng

    sq 4050.00

    per sq

    materials

    half round clay tile sq 650.00 5.00 3250.00

    Labour days 2.00 400.00 800.004050.00

    71Asbestos close fi ttings ri dging fixed

    complete with roofi ng screws or bolts

    (Hook)

    l.ft 97.37

    per 13'4" length

    materials

    ridges3'8"long pair 4.00 250.00 1000.00

    roofing screws or bolt nos 16.00 3.00 48.00

    carpenter days 0.25 600.00 150.00

    Labour days 0.25 400.00 100.00

    per 13'4" length 1298.00

    per l.ft 97.37

    72Ridging coveri ng with calicut pattern ri dge

    til es bedded in cement lime mortor 1:1:4

    l.ft 125.68

    per 12 l.ft ridging

    materials

    ridge tile nos 9.00 70.00 630.00

    cement cwts 0.33 800.00 266.67

    sand cube 0.02 7200.00 144.00

    slaked lime lbs 15.00 4.50 67.50

    colouring powder lb 0.50 200.00 100.00

    mason days 0.25 750.00 187.50

    Labour days 0.25 450.00 112.50

    per 12 l.ft ridging 1508.17

    per l.ft 125.68

    73 x9" h igh valance board fixed wi th brass

    screws to ends of r afters ( for til e roofing)

    l.ft 120.75

    per 100 l.ft

    Construction-BSR 33

  • 8/12/2019 Imperial BSR

    34/193

    materials

    timber planks 1", class 1 sq.ft 75.00 110.00 8250.00

    wastage 5% 412.50

    brass screws 1" nos 70.00 3.75 262.50

    Labour

    carpenter days 3.00 600.00 1800.00

    Labour days 3.00 400.00 1200.00

    scaffolding 5% 150.00

    total per 100 l.ft 12075.00

    rate per ft 120.75

    74 x9" h igh barge board f ixed with brass

    screws at 2'-0" centr es to sides of r afters

    l.ft 120.00

    timber planks 1", class 1 sq.ft 75.00 110.00 8250.00

    wastage 5% 412.50

    brass screws 1" nos 50.00 3.75 187.50

    Labour

    carpenter days 3.00 600.00 1800.00

    Labour days 3.00 400.00 1200.00scaffolding 5% 150.00

    total per 100 l.ft 12000.00

    rate per ft 120.00

    Construction-BSR 34

  • 8/12/2019 Imperial BSR

    35/193

    7518 BWG (1.2mm) galvani sed iron sheet

    valley gutter 3'-0" gir th over al l once bent

    with end laps not less than 9" width

    including " tongued and grooved planks

    laid to slope and prof il e on timber members

    l.ft 741.75

    consider 15 ft

    materials

    G.I.Sheet 8x4 nos 2.00 2200.00 4400.00

    wood preservative gal 0.25 115.00 28.75

    cement cwts 0.10 800.00 80.00

    slaked lime cwts 0.05 300.00 15.00

    sand cube 0.01 4000.00 40.00

    planks " sq.ft 50.00 90.00 4500.00

    wire nail 1 lb 2.00 50.00 100.00

    labour

    fixing boarding and applying wood

    preservativecarpenter days 1.00 600.00 600.00

    Labour days 1.00 400.00 400.00

    making and fixing G.I.sheet

    tinker days 0.50 325.00 162.50

    mason days 0.50 600.00 300.00

    building sides

    mason days 0.50 600.00 300.00

    Labour days 0.50 400.00 200.00

    total for 15 ft 11126.25

    per l.ft 741.75

    Construction-BSR 35

  • 8/12/2019 Imperial BSR

    36/193

    7618 BWG (1.2mm) galvanised iron fl ashing

    1'-6" gir th overal l 3 times bent with end

    laps not less than 6" lead soldered turned

    and tucked up to not l ess than 6" in to chase

    out in wall and poin ted in cement mor tor

    1:2 l ower end dressed over roof coveri ng not

    less than 1'-0" wide

    l.ft 204.50

    consider 15 ft

    materials

    G.I.Sheet 8x4 nos 1.00 2200.00 2200.00

    cement cwts 0.05 800.00 40.00

    sand cube 0.01 4000.00 40.00

    soldering lead lb 1.00 250.00 250.00

    Labour

    cutting bending soldering and fixing

    tinker days 0.50 325.00 162.50

    mason days 0.13 600.00 75.00Labour days 0.75 400.00 300.00

    total for 15 ft 3067.50

    per l.ft 204.50

    77 Timber framework for 4'-0"x4'-0" flat

    asbestos ceiling (sheet measured separately

    ) comprising of 4x2 joists and 2x2 bearers

    in class 1 timber

    sq 6008.20

    per 1.95 sq

    materials

    Timber cl 1 cu.ft 8.00 1100.00 8800.00

    nails 2" lb 1.00 50.00 50.00

    fibre/plastic plug nos 26.00 2.00 52.00

    cement cwts 0.22 800.00 178.57

    sand cube 0.02 4000.00 80.00

    brush 2"( use) nos 1.00 41.75 41.75

    tarnap gal 0.33 125.00 41.67

    Labour

    carpenter days 2.50 600.00 1500.00

    mason days 0.50 600.00 300.00

    Labour days 1.50 400.00 600.00

    scaffolding 3% 72.00

    total for 1.95 sq 11715.99

    per sq 6008.20

    78Horizontal ceili ng lini ng using 4'-0" x4'-0"

    f lat asbestos cement sheets fi xed with and

    including beading and cove mouldings on

    timber frame work.(timber frame work and

    pain ting measur ed separately)

    sq 4253.08

    Construction-BSR 36

  • 8/12/2019 Imperial BSR

    37/193

    per 1.95 sq

    materials

    asbestos flat sheet sq.ft 210.00 15.00 3150.00

    cove moulding halmilla 2x2 l.ft 60.00 35.00 2100.00

    beading 1x halmilla l.ft 125.00 10.00 1250.00

    clout nails" lbs 0.25 50.00 12.50

    brass screws 1 nos 8.00 3.75 30.00

    labour

    carpenter days 1.50 600.00 900.00

    labour days 2.00 400.00 800.00

    scaffolding 3% 51.00

    per 1.95 sq 8293.50

    per sq 4253.08

    79 " thick tongued and grooved lunumidella

    ceiling boards fixed horizontal on 4x2 class

    1 timber joists at 2'-0" centres with 1"

    brass nails

    sq 9545.35

    consider room 15'0"x13'0" (1.95sq)materials

    timber joists 4x2 (class 1) l.ft 115.00 55.00 6325.00

    lunumidella ceiling planks (x6) sq.ft 215.00 27.00 5805.00

    cement cwts 0.03 800.00 21.43

    sand cube 0.04 4000.00 160.00

    brass nails 1 kg 4.00 100.00 400.00

    Labour

    making holes, fixing joists, and making

    good

    carpenter days 1.00 600.00 600.00

    mason days 1.00 600.00 600.00

    Labour days 3.00 400.00 1200.00fixing ceiling board

    carpenter days 3.00 600.00 1800.00

    Labour days 4.00 400.00 1600.00

    scaffolding 3% 102.00

    total for 1.95 sq 18613.43

    per sq 9545.35

    80 " x6" wi de tongued and grooved

    lunumidella ceil ing boards fi xed to

    underside of roof raf ters (existing) wi th 1"

    brass nail s including levell ing with timber

    stri ps where necessary

    sq 6125.56

    consider room 15'0"x12'0" (1.80sq)

    materials

    lunumidella ceiling planks sq.ft 220.00 27.00 5940.00

    timber strips2x l.ft 40.00 4.00 160.00

    wire nail kg 2.00 100.00 200.00

    brass nails 1 kg 4.00 100.00 400.00

    Construction-BSR 37

  • 8/12/2019 Imperial BSR

    38/193

    Labour

    carpenter days 3.00 600.00 1800.00

    Labour days 6.00 400.00 2400.00

    scaffolding 3% 126.00

    total for 1.80 sq 11026.00

    per sq 6125.56

    81 Door single hung 3'3"x7'0" high overall

    with frame having 1" thick sash and

    3"x2' timber frame.(glazing

    ironmongery and painting measured

    separately) class 1 timber

    sq.ft 346.46

    per 22.75 sq.ft (3'3"x7'0")

    materials

    frame

    timber 4x3 cl I cu.ft 1.50 1100.00 1650.00

    spur stone nos 2.00 25.00 50.00

    fibre/plastic plug with 4" brass screw nos 6.00 7.00 42.00

    dowels M.S. 5/8" nos 2.00 15.00 30.00sash

    timber planks 1 sq.ft 14.00 140.00 1960.00

    timber planks 1" sq.ft 5.00 110.00 550.00

    Labour

    carpenter days 5.00 600.00 3000.00

    Labour days 1.50 400.00 600.00

    total for 22.75 sq 7882.00

    per sq 346.46

    Construction-BSR 38

  • 8/12/2019 Imperial BSR

    39/193

    82 Door glazed and panelled double hung

    4'x7' high overall with frame including 1'

    thick sash and 3x2 frame.(glazing

    ironmongery and painting measured

    separately)

    sq.ft 295.19

    per 28.00 sq.ft= 4x7

    materials

    frame

    timber 4x3 cl I cu.ft 0.67 1100.00 733.33

    spur stone nos 2.00 25.00 50.00

    fibre/plastic plug with 4" brass screw nos 6.00 7.00 42.00

    dowels M.S. 5/8" nos 2.00 15.00 30.00

    sash

    timber planks 1 sq.ft 16.00 140.00 2240.00

    timber planks 1" sq.ft 7.00 110.00 770.00

    Labour

    carpenter days 6.00 600.00 3600.00

    Labour days 2.00 400.00 800.00per 28.00 sq.ft 8265.33

    per sq 295.19

    83 Plywood door single hung 3'1"x6' 11"

    overall with frame having 1" thick sash

    and 3"x2" frame.(ironmongery and

    painting measured separately)

    sq.ft 198.71

    per 21.75 sq.ft (3'1"x6'11")

    materials

    frame

    timber 4x3 cl I cu.ft 1.80 1100.00 1980.00

    spur stone nos 2.00 25.00 50.00fibre/plastic plug with 4" brass screw nos 6.00 7.00 42.00

    sash

    plywood sash 6'9"x2'9" nos 1.00 1400.00 1400.00

    Labour

    carpenter days 0.75 600.00 450.00

    Labour days 0.38 400.00 150.00

    mason(fixing frame) days 0.25 600.00 150.00

    Labour(fixing frame) days 0.25 400.00 100.00

    per 21.75 sq.ft 4322.00

    per sq.ft 198.71

    Construction-BSR 39

  • 8/12/2019 Imperial BSR

    40/193

    84 Door ledged braced and battened single

    hung2'6"x6'6" overall with frame having

    7/8" thick tongued and grooved planks and

    3"x2" frame (ironmongery and

    painting measured separately)

    sq.ft 394.28

    per 16.25 sq.ft

    materials

    frame

    timber 4x3 cl I cu.ft 1.70 1100.00 1870.00

    spur stone nos 2.00 25.00 50.00

    fibre/plastic plug with 4" brass screw nos 6.00 7.00 42.00

    dowels M.S. 5/8" nos 2.00 15.00 30.00

    sash

    timber planks 1" sq.ft 21.00 110.00 2310.00

    brass screw 1 doz 3.00 35.00 105.00

    Labour

    carpenter days 2.25 600.00 1350.00

    Labour days 1.00 400.00 400.00mason for fixing frame days 0.25 600.00 150.00

    Labour for fixing frame days 0.25 400.00 100.00

    per 16.25 sq.ft 6407.00

    per sq.ft 394.28

    85 Windows glazed 7'x4' high overall with

    frame comprising 3 nos openable sashes

    and 3"x2" frame and mullions. (glazing

    ironmongery and painting measured

    separately)

    sq.ft 368.32

    per window 7x4, sashes= 28 sq.ft

    materials

    frame

    timber 4x3 cl I cu.ft 3.20 1100.00 3520.00

    fibre/plastic plug with 4" brass screw nos 4.00 7.00 28.00

    sash

    timber sash 3x1 sq.ft 9.25 180.00 1665.00

    labour

    carpenter days 6.00 600.00 3600.00

    Labour days 2.50 400.00 1000.00

    mason for fixing frame days 0.50 600.00 300.00

    Labour for fixing frame days 0.50 400.00 200.00

    per 28 sq ft 10313.00

    per sq.ft 368.32

    Construction-BSR 40

  • 8/12/2019 Imperial BSR

    41/193

    861/8" clear sheet panes exceeding 1' but not

    exceeding 4 sq.ft cut and fi xed with timber

    beading to doors and windows

    sq.ft 61.11

    consider sash 3'0"x4'0" high with 3"x1"

    style and 4nos glass panes

    per 9.0 sq.ft

    materials

    glass pane 1/8" sq.ft 9.00 30.00 270.00

    beading x l.ft 30.00 1.50 45.00

    brass panel pin doz 4.00 5.00 20.00

    Labour

    glazier sq.ft 0.50 30.00 15.00

    Labour days 0.50 400.00 200.00

    per 9.0 sq.ft 550.00

    per sq.ft 61.11

    87But hinges 5x2 brass pair 256.50

    per 1pairs

    But hinges 5x2 brass nos 1.50 87.50 131.25brass screws doz 2.00 1.75 3.50

    carpenter days 0.25 600.00 150.00

    Labour days 0.25 400.00 100.00

    per 1pairs 384.75

    per pair 256.50

    88Tee hinges 6" x12" pair 302.63

    per pair

    Tee hinges 6"x12" pair 1.00 50.00 50.00

    iron screws doz 1.50 1.75 2.63

    carpenter days 0.25 600.00 150.00

    Labour days 0.25 400.00 100.00

    302.63

    89Rim lock nos 550.00

    Rim lock with screws nos 1.00 300.00 300.00

    carpenter days 0.25 600.00 150.00

    Labour days 0.25 400.00 100.00

    550.00

    90Mortice lock nos 1100.00

    Mortice lock with screws nos 1.00 600.00 600.00

    carpenter days 0.50 600.00 300.00

    Labour days 0.50 400.00 200.00

    1100.00

    91Casement stays nos 430.00per 4 nos

    Casement stays nos 4.00 40.00 160.00

    brass screws nos 16.00 1.25 20.00

    carpenter days 0.25 600.00 150.00

    Labour days 0.25 400.00 100.00

    430.00

    Construction-BSR 41

  • 8/12/2019 Imperial BSR

    42/193

    92Door closer(hydraulic) nos 1901.17

    Door closer nos 1.00 1650.00 1650.00

    brass screws nos 8.00 0.15 1.17

    carpenter days 0.25 600.00 150.00

    Labour days 0.25 400.00 100.00

    1901.17

    93Tower / skeleton brass bolts nos 612.50

    Tower / skeleton brass bolts nos 1.00 100.00 100.00

    brass screws nos 10.00 1.25 12.50

    carpenter days 0.50 600.00 300.00

    Labour days 0.50 400.00 200.00

    612.50

    94Brass bolt 4" nos 555.00

    Brass bolt 4" nos 1.00 45.00 45.00

    brass screws nos 8.00 1.25 10.00

    carpenter days 0.50 600.00 300.00

    Labour days 0.50 400.00 200.00

    555.00

    95Casement fasteners nos 115.00

    per 6 nos

    Casement fasteners nos 4.00 40.00 160.00

    brass screws nos 24.00 1.25 30.00

    carpenter days 0.50 600.00 300.00

    Labour days 0.50 400.00 200.00

    per 6 nos 690.00

    per no 115.00

    96Spring loaded fanl ight catches nos 138.33

    per 6 nos

    fanlight catches nos 6.00 50.00 300.00

    brass screws doz 2.00 15.00 30.00

    carpenter days 0.50 600.00 300.00

    Labour days 0.50 400.00 200.00

    per 6 nos 830.00

    per no 138.33

    97Draw r ings nos 38.33

    per 6 nos

    Draw rings nos 6.00 15.00 90.00

    brass screws doz 1.00 15.00 15.00

    carpenter days 0.13 600.00 75.00

    Labour days 0.13 400.00 50.00

    per 6 nos 230.00per no 38.33

    98 " thick thick DPC in cement sand 1:2

    fi ni shed with 2 coats hot tar and blinded

    with sand

    sq 3426.75

    cement cwts 2.25 485.00 1091.25

    sand cube 0.11 4000.00 440.00

    Construction-BSR 42

  • 8/12/2019 Imperial BSR

    43/193

    bitumen gal 1.50 75.00 112.50

    firewood lbs 10.00 3.00 30.00

    water gal 10.00 0.30 3.00

    mason days 1.25 600.00 750.00

    labour days 2.50 400.00 1000.00

    3426.75

    995/8" thick plastering to wall in lime and

    sand 2:5 including f loating with l ime putty

    sq 2032.19

    slaked lime cwts 1.30 300.00 390.00

    sand cube 0.07 4000.00 280.00

    water gal 10.00 0.30 3.00

    mason days 1.00 600.00 600.00

    Labour days 1.75 400.00 700.00

    scaffolding 3% 59.19

    2032.19

    1005/8" thick plasteri ng to wall in cement sand

    1:3 including cement f loating

    sq 2185.66

    cement cwts 1.40 485.00 679.00

    sand cube 0.06 4000.00 240.00

    water gal 10.00 0.30 3.00

    mason days 1.00 600.00 600.00

    Labour days 1.50 400.00 600.00

    scaffolding 3% 63.66

    2185.66

    101 3/8" thick plastering to soffit slab in

    cement and sand 1:3 including floating

    with lime putty

    sq 3182.50

    cement cwts 0.80 485.00 388.00

    slaked lime cwts 0.06 300.00 18.00

    sand cube 0.05 4000.00 200.00

    water gal 5.00 0.30 1.50

    mason days 2.50 600.00 1500.00

    Labour days 2.50 400.00 1000.00

    scaffolding 3% 75.00

    3182.50

    Construction-BSR 43

  • 8/12/2019 Imperial BSR

    44/193

    102 3/8" thick plastering to sides and soffit of

    beam in cement and sand 1:3 includuing

    floating with lime putty

    sq 2603.33

    cement cwts 0.80 485.00 388.00

    slaked lime cwts 0.06 300.00 18.00

    sand cube 0.03 4000.00 120.00

    water gal 5.00 0.30 1.50

    mason days 2.00 600.00 1200.00

    Labour days 2.00 400.00 800.00

    scaffolding 3% 75.83

    2603.33

    103 5/8" thick to wall in lime cement and sand

    1:1:5 finished semi rough with wooden

    float

    sq 1947.73

    cement cwts 0.80 485.00 388.00

    slaked lime cwts 0.40 300.00 120.00

    sand cube 0.07 4000.00 280.00

    water gal 10.00 0.30 3.00mason days 1.00 600.00 600.00

    Labour days 1.25 400.00 500.00

    scaffolding 3% 56.73

    1947.73

    104 5/8" thick plastering to wall in lime cement

    and sand 1:1:5 finished smooth with lime

    putty floating

    sq 2421.53

    cement cwts 0.80 485.00 388.00

    slaked lime cwts 0.60 300.00 180.00

    sand cube 0.07 4000.00 280.00

    water gal 10.00 0.30 3.00

    mason days 1.50 600.00 900.00

    Labour days 1.50 400.00 600.00

    scaffolding 3% 70.53

    2421.53

    105 " thick plastering in cement and sand 1:3

    finished smooth

    sq 1921.95

    cement cwts 1.07 485.00 518.95

    sand cube 0.05 4000.00 200.00

    water gal 10.00 0.30 3.00

    mason days 1.00 600.00 600.00

    Labour days 1.50 400.00 600.00

    1921.95

    Construction-BSR 44

  • 8/12/2019 Imperial BSR

    45/193

    106 " thick rendering in cement and sand 1:2

    in floors finished smooth

    sq 2230.50

    cement cwts 1.50 485.00 727.50

    sand cube 0.05 4000.00 200.00

    water gal 10.00 0.30 3.00

    mason days 1.00 600.00 600.00

    Labour days 1.50 400.00 600.00

    Labour for curing days 0.25 400.00 100.00

    2230.50

    107 ' th ick rendering in cement and sand 1:3

    fi ni shed smooth

    sq 2821.75

    cement cwts 1.75 485.00 848.75

    sand cube 0.08 4000.00 320.00

    water gal 10.00 0.30 3.00

    mason days 1.25 600.00 750.00

    Labour days 2.00 400.00 800.00

    Labour for curing days 0.25 400.00 100.00

    2821.75108 ' th ick rendering in cement and sand 1:2

    in fl oors fi nished smooth

    sq 3064.25

    cement cwts 2.25 485.00 1091.25

    sand cube 0.08 4000.00 320.00

    water gal 10.00 0.30 3.00

    mason days 1.25 600.00 750.00

    Labour days 2.00 400.00 800.00

    Labour for curing days 0.25 400.00 100.00

    3064.25

    109 " thick rendering in cement and sand 1:2

    in coloured cement fl oors fin ished smooth

    sq 3814.25

    cement cwts 2.25 485.00 1091.25

    sand cube 0.08 4000.00 320.00

    coloured pigment lb 5.00 150.00 750.00

    water gal 10.00 0.30 3.00

    mason days 1.25 600.00 750.00

    Labour days 2.00 400.00 800.00

    Labour for curing days 0.25 400.00 100.00

    3814.25

    Construction-BSR 45

  • 8/12/2019 Imperial BSR

    46/193

    110" x6" ski rti ng in cement and sand 1:3

    projected or fl ush to wall s fi ni shed with

    fl oating including forming groove

    l.ft 44.80

    per 10 l.ft

    cement cwts 0.10 485.00 48.50

    sand cube 0.00 4000.00 12.00

    coloured pigment lb 0.25 150.00 37.50

    mason days 0.38 600.00 225.00

    Labour days 0.31 400.00 125.00

    per 10 l.ft 448.00

    per l.ft 44.80

    111 Prepare and apply one coat of preservative

    (oil type) to structural timber including

    touching up out ends etc. after fixing

    sq 743.50

    wood presrvative ltr 2.75 115.00 316.25

    brush 3"(1/10use) nos 1.00 21.00 21.00

    painter days 0.75 275.00 206.25Labour days 0.50 400.00 200.00

    743.50

    112Prepare sur face of steel truss and apply two

    coats of ant icorosive primer

    sq 1630.88

    anticorrosive ltr 2.25 230.00 517.50

    terpentine/thinner lit 0.15 100.00 15.00

    wire brush nos 1.00 65.00 65.00

    brush 2"(1/8use) nos 1.00 20.88 20.88

    painter days 1.50 275.00 412.50

    Labour days 1.50 400.00 600.00

    1630.88

    113 Apply one coat of anti-corrosive primer

    and two coats enamel paint on already

    shop primed and erected steel roof truss

    sq 1744.37

    anticorrosive ltr 0.20 230.00 46.00

    enamel ltr 1.33 380.00 506.67

    terpentine/thinner lit 0.20 100.00 20.00

    brush 2"(1/5use) nos 1.00 33.40 33.40

    painter days 2.50 275.00 687.50

    Labour days 1.00 400.00 400.00

    scaffolding3% 50.81

    1744.37

    Construction-BSR 46

  • 8/12/2019 Imperial BSR

    47/193

    114Prepare and apply two coats primer and

    fi ni shing coat of enamel pain t to mil d steel

    (angle/flat) gate

    sq 2243.47

    consider 50 sq.ft

    anticorrosive ltr 1.50 230.00 345.00

    enamel ltr 0.67 380.00 253.33

    terpentine/thinner lit 0.20 100.00 20.00

    wire brush nos 0.50 65.00 32.50

    brush 2"(1/5use) nos 1.00 33.40 33.40

    painter days 0.50 275.00 137.50

    Labour days 0.75 400.00 300.00

    per 50 sq.ft 1121.73

    per sq 2243.47

    115 Painting steel on new work with 2 coats of

    ani-corrosive paint

    sq 599.23

    anticorrosive ltr 0.67 230.00 153.33

    brush 2"(1/5use) nos 1.00 33.40 33.40

    painter days 1.50 275.00 412.50599.23

    116Painti ng new timber work wi th two coats

    wood preservati ve

    sq 228.40

    wood presrvative ltr 0.50 115.00 57.50

    brush 2"(1/5use) nos 1.00 33.40 33.40

    painter days 0.50 275.00 137.50

    228.40

    117Prepari ng and painti ng wood work wi th

    primer and two coats namel painte

    sq 1692.95

    wood primer ltr 0.75 105.00 78.75

    enamel ltr 2.50 380.00 950.00

    brush 2"(1/10 use) nos 1.00 16.70 16.70

    sand paper nos 2.00 17.50 35.00

    painter days 1.50 275.00 412.50

    Labour days 0.50 400.00 200.00

    1692.95

    Construction-BSR 47

  • 8/12/2019 Imperial BSR

    48/193

  • 8/12/2019 Imperial BSR

    49/193

    121cement washing to wall s of single storeyed

    buil ding 2 coats

    sq 173.51

    per 10 sq

    cement sq 0.63 485.00 303.13

    coir brush 6" nos 1.00 40.00 40.00

    water gal 5.00 0.30 1.50

    painter days 2.00 275.00 550.00

    Labour days 2.00 400.00 800.00

    scaffolding 3% 40.50

    per 10 sq 1735.13

    per sq 173.51

    122Painti ng walls with emulsion pain t 2 coats 349.49

    emulsion ist coat lit 0.17 312.50 52.08

    emulsion 2nd coat lit 0.14 312.50 44.64

    brush 6"(1/10 use) nos 1.00 40.30 40.30

    water gal 0.10 0.30 0.03

    painter days 0.75 275.00 206.25scaffolding 3% 6.19

    349.49

    123Prepare and apply one coat alkali resistant

    primer and 2 coats of emul sion paint to

    soff it of slabs

    sq 1344.04

    primer lit 0.90 377.00 339.30

    emulsion lit 1.50 312.50 468.75

    brush 6"(1/10 use) nos 1.00 40.30 40.30

    painter days 1.75 275.00 481.25

    scaffolding 3% 14.44

    1344.04

    124Varn ishing two coats with copal varni sh

    after sand paperi ng

    sq 1127.50

    Varnish lit 1.80 400.00 720.00

    brush 3"(1/3 use) nos 1.00 70.00 70.00

    painter days 0.50 275.00 137.50

    Labour days 0.50 400.00 200.00

    1127.50

    125Wax polishing to timber in panels & floors sq 396.25

    Wax polish lb 0.75 125.00 93.75

    sand paper nos 6.00 17.50 105.00

    floor brush(1/10 use) nos 1.00 15.00 15.00flannel cloth yrds 0.50 65.00 32.50

    Labour days 0.38 400.00 150.00

    396.25

    126" dia PVC pipe fixed to walls (special s

    paid separately)

    l.ft 19.93

    per 10 l.ft

    Construction-BSR 49

  • 8/12/2019 Imperial BSR

    50/193

    pvc pipe l.ft 13.00 7.10 92.30

    clip and nail nos 3.00 6.75 20.25

    solvent cement gms 2.00 1.20 2.40

    plumber days 0.13 275.00 34.38

    Labour days 0.13 400.00 50.00

    per 10 l.ft 199.33

    per l.ft 19.93

    127 " dia PVC pipes to wal ls (specials paid

    separately)

    l.ft 27.45

    per 10 l.ft

    pvc pipe l.ft 13.00 12.50 162.50

    clip and nail nos 3.00 8.00 24.00

    solvent cement gms 3.00 1.20 3.60

    plumber days 0.13 275.00 34.38

    Labour days 0.13 400.00 50.00

    per 10 l.ft 274.48

    per l.ft 27.45

    1281" dia. Pvc pipe fi xed to wall s (specials paidseparately)

    l.ft 28.17

    per 100 l.ft

    pvc pipe 1" l.ft 100.00 18.75 1875.00

    wastage 5% 93.75

    socket 1" nos 8.00 12.00 96.00

    solvent cement gms 32.00 1.20 38.40

    clip and nail 1 nos 35.00 10.75 376.25

    plumber days 0.50 275.00 137.50

    Labour days 0.50 400.00 200.00

    per 100 l.ft 2816.90

    per l.ft 28.17

    1291" dia. Pvc pipe fi xed to wall s (special s

    paid separately)

    l.ft 42.17

    per 100 l.ft

    pvc pipe 1" l.ft 100.00 28.50 2850.00

    wastage 5% 0.00

    socket 1" nos 8.00 37.00 296.00

    solvent cement gms 48.00 1.20 57.60

    clip and nail 1 nos 35.00 14.50 507.50

    plumber days 0.75 275.00 206.25

    Labour days 0.75 400.00 300.00

    per 100 l.ft 4217.35

    per l.ft 42.17

    Construction-BSR 50

  • 8/12/2019 Imperial BSR

    51/193

    130 1" dia. Pvc pipe fixed to walls (specials

    paid separately)

    l.ft 62.43

    per 100 l.ft

    pvc pipe 1" l.ft 100.00 42.50 4250.00

    wastage 5% 212.50

    socket 1" nos 8.00 60.00 480.00

    solvent cement gms 64.00 1.20 76.80

    clip and nail 1 nos 35.00 20.50 717.50

    plumber days 0.75 275.00 206.25

    Labour days 0.75 400.00 300.00

    6243.05

    62.43

    1312" dia. Pvc pipe fi xed to wall s (specials paid

    separately)

    l.ft 102.50

    per 100 l.ft

    pvc pipe 2" l.ft 100.00 72.00 7200.00

    wastage 5% 360.00

    socket 2" nos 8.00 126.00 1008.00solvent cement gms 112.00 1.20 134.40

    clip and nail nos 35.00 29.75 1041.25

    plumber days 0.75 275.00 206.25

    Labour days 0.75 400.00 300.00

    10249.90

    102.50

    1323" dia. Pvc pipes f ixed to wall s (specials

    paid separately )

    l.ft 274.91

    per 100 l.ft

    pvc 3" pipe l.ft 100.00 170.00 17000.00

    wastage 5% 850.00

    socket 3" nos 8.00 510.00 4080.00

    solvent cement gms 200.00 1.20 240.00

    clip and screw nos 35.00 132.75 4646.25

    plumber days 1.00 275.00 275.00

    Labour days 1.00 400.00 400.00

    27491.25

    274.91

    133excavation for l aying to 3" dia. Pvc pipes

    in groung not less than 1'6" deep ,

    backfi ll ing and compacting

    l.ft 9.00

    per 100 l.ft

    Labour days 2.25 400.00 900.00

    9.00

    Construction-BSR 51

  • 8/12/2019 Imperial BSR

    52/193

    134Chasing bri ckwork for laying " to 1"

    dia. Pvc pipes and making good average

    depth 2ft (pipes and special s paid

    separately)

    l.ft 30.89

    per 100 l.ft

    cement cwts 0.10 485.00 48.50

    sand cube 0.01 4000.00 40.00

    mason days 3.00 600.00 1800.00

    Labour days 3.00 400.00 1200.00

    3088.50

    30.89

    135Chasing brickwork f or laying 1" to 3" dia.

    Pvc pipes in ground or f loor and maki ng

    good. Average depth 3" .(pipes and special s

    measured separately)

    l.ft 37.17

    per 100 l.ft

    cement cwts 0.20 485.00 97.00

    sand cube 0.03 4000.00 120.00mason days 3.50 600.00 2100.00

    Labour days 3.50 400.00 1400.00

    3717.00

    37.17

    136" dia pvc specials viz elbows/bend/socket no 18.53

    per 10 specials

    " dia pvc elbows/bend/socket no 10.00 9.25 92.50

    solvent cement gms 20.00 1.20 24.00

    plumber days 0.25 275.00 68.75

    185.25

    18.53

    137 " dia. PVC specials viz

    elbows/bend/socket

    no 22.73

    per 10 specials

    " dia. PVC elbows/bend/socket no 10.00 12.25 122.50

    solvent cement gms 30.00 1.20 36.00

    plumber days 0.25 275.00 68.75

    227.25

    22.73

    Construction-BSR 52

  • 8/12/2019 Imperial BSR

    53/193

    1381" dia. PVC specials viz elbows/bend/socket no 29.93

    per 10 specials

    1" dia. PVC elbows/bend/socket no 10.00 18.25 182.50

    solvent cement gms 40.00 1.20 48.00

    plumber days 0.25 275.00 68.75

    299.25

    29.93

    1391" dia. PVC special s viz

    elbows/bend/socket

    no 51.08

    per 10 specials

    1" dia. PVC elbows/bend/socket no 10.00 37.00 370.00

    solvent cement gms 60.00 1.20 72.00

    plumber days 0.25 275.00 68.75

    510.75

    51.08

    1401" dia. PVC special s viz

    elbows/bend/socket

    no 83.35

    per 10 specials

    1" dia. PVC elbows/bend/socket no 10.00 60.00 600.00

    solvent cement gms 80.00 1.20 96.00

    plumber days 0.50 275.00 137.50

    833.50

    83.35

    1412" dia. PVC specials viz elbows/bend/socket no 156.55

    per 10 specials

    2" dia. PVC elbows/bend/socket no 10.00 126.00 1260.00

    solvent cement gms 140.00 1.20 168.00

    plumber days 0.50 275.00 137.50

    1565.50

    156.55

    1422" dia. PVC special s viz

    elbows/bend/socket

    no 342.75

    per 10 specials

    2" dia. PVC elbows/bend/socket no 10.00 305.00 3050.00

    solvent cement gms 200.00 1.20 240.00

    plumber days 0.50 275.00 137.50

    3427.50

    342.75

    Construction-BSR 53

  • 8/12/2019 Imperial BSR

    54/193

    1433" dia. PVC special s viz elbows/bend/socket no 552.55

    per 10 specials

    3" dia. PVC elbows/bend/socket no 10.00 510.00 5100.00

    solvent cement gms 240.00 1.20 288.00

    plumber days 0.50 275.00 137.50

    5525.50

    552.55

    144" dia. PVC special viz TEES no 24.35

    per 10 tees

    " dia. PVC TEES no 10.00 7.00 70.00

    solvent cement gms 30.00 1.20 36.00

    plumber days 0.50 275.00 137.50

    243.50

    24.35

    145 " dia specials viz TEE no 31.15

    per 10 tees

    " dia TEE no 10.00 12.00 120.00solvent cement gms 45.00 1.20 54.00

    plumber days 0.50 275.00 137.50

    311.50

    31.15

    1461" dia. PVC specials viz TEES no 40.95

    per 10 tees

    1" dia. PVC TEES no 10.00 20.00 200.00

    solvent cement gms 60.00 1.20 72.00

    plumber days 0.50 275.00 137.50

    409.50

    40.95

    1471" dia. PVC specials TEE no 54.55

    per 10 tees

    1" dia. PVC TEE no 10.00 30.00 300.00

    solvent cement gms 90.00 1.20 108.00

    plumber days 0.50 275.00 137.50

    545.50

    54.55

    1481" dia. PVC specials viz TEE no 93.90

    per 10 tees

    1"dia. PVC TEE no 10.00 52.00 520.00

    solvent cement gms 120.00 1.20 144.00

    plumber days 1.00 275.00 275.00939.00

    93.90

    Construction-BSR 54

  • 8/12/2019 Imperial BSR

    55/193

    1492" dia. PVC specials viz TEE no 132.70

    per 10 tees

    2" dia. PVC TEE no 10.00 80.00 800.00

    solvent cement gms 210.00 1.20 252.00

    plumber days 1.00 275.00 275.00

    1327.00

    132.70

    1502" dia. PVC specials viz TEE no 223.25

    per 10 tees

    2" dia. PVC TEE no 10.00 146.00 1460.00

    solvent cement gms 300.00 1.20 360.00

    plumber days 1.50 275.00 412.50

    2232.50

    223.25

    1513" dia. PVC special s viz tees no 419.45

    per 10 tees

    3" dia. PVC tees no 10.00 335.00 3350.00

    solvent cement gms 360.00 1.20 432.00plumber days 1.50 275.00 412.50

    4194.50

    419.45

    1524" dia. Glazed earthware pipes laid on 6"

    thi ck bedding in cement concrete 1:3:6

    including excavation anerage 2'0" depth

    backf il li ng with selected excavated materi als

    and concrete haunching to join ts.

    l.ft 220.38

    per 100 l.ft

    materials

    EW pipe 4" no 50.00 80.00 4000.00

    concrete 1 3 6 (1) cube 0.75 12233.33 9175.00

    yarn lbs 2.00 35.00 70.00

    cement jointing cwts 0.50 485.00 242.50

    excavation cube 4.00 1400.00 5600.00

    Labour

    laying concrete bedding

    Labour days 1.50 400.00 600.00

    laying and testing pipes

    plumber days 2.00 275.00 550.00

    Labour days 2.00 400.00 800.00

    backfilling 0.00Labour days 2.50 400.00 1000.00

    per 100 l.ft 22037.50

    220.38

    1534" dia. C.I.soil /vent pipe fixed veri cally to

    walls jointed with cement caulking

    .(Specials measured separately)

    l.ft 212.30

    Construction-BSR 55

  • 8/12/2019 Imperial BSR

    56/193

    per 6'0" length

    materials

    C.I.pipe 4" l.ft 6.00 155.00 930.00

    wastage 10% 93.00

    yarn lbs 0.31 35.00 10.94

    timber plug6x6x2 no 1.00 48.00 48.00

    iron screws 3" nos 2.00 3.00 6.00

    cement cwts 0.02 485.00 8.66

    Labour

    plumber days 0.25 275.00 68.75

    Labour days 0.25 400.00 100.00

    scaffolding 5% 8.44

    per 6'0" 1273.79

    per l.ft 212.30

    154 4" dia. C I pipes fixed to walls jointed with

    lead caulking (specials measured

    separately)

    l.ft 362.02

    per 6' lengthC.I.pipe 4" l.ft 6.00 155.00 930.00

    wastage 10% 93.00

    lead lbs 6.00 150.00 900.00

    yarn lbs 0.31 35.00

    timber plug6x6x2 no 1.00 48.00 48.00

    iron screws 3" nos 2.00 3.00 6.00

    firewood lbs 0.06 3.00 0.19

    Labour

    plumber days 0.25 275.00 68.75

    Labour days 0.25 400.00 100.00

    add 10% for sundries 16.88

    scaffolding 5% 9.28per 6' length 2172.09

    per l.ft 362.02

    Construction-BSR 56

  • 8/12/2019 Imperial BSR

    57/193

    1554" dia stoneware gul ley with 6x6x6 gull ey

    box including excavation 4" cement

    concr ete 1 2 4 base surrounded by 4"

    thi ck cement and sand 1:5 extended 6"

    above top of gull ey box including maki ng

    connection " cement and sand 1:2

    rendering internall y and exposed faces

    fi ni shed smooth with neat cement fl oating

    and providing G I grating on top of gulley

    no 1407.64

    per no

    materials

    S.W. gulley 4" nos 1.00 450.00 450.00

    excavation cube 0.04 1400.00 56.00

    brick work 4 sq 0.06 4447.50 244.61

    concrete1 2 4 cube 0.01 14965.33 119.72

    rendering 1 2, " sq 0.01 2230.50 22.31

    G.I.grating 4" nos 1.00 15.00 15.00mason days 0.50 600.00 300.00

    Labour days 0.50 400.00 200.00

    1407.64

    156 Manhole 2x2 internally with invert depth

    not exceeding 2ft including excavation ,

    backfilling 6" cement concrete 1 2 4 base

    with 3/8" dia. Mild steel rods at 4" c/c

    bothways , forming channels and benching

    in similar concrete 4" walls in brick in

    cement 1:5 " thick cement and sand 1:2

    rendering internally and exposed surfaces

    including channels benching and 2" thickRCCremovable cover slab 2'3"x2'3" inlet

    and outlet connection all complete to

    working order

    no 5829.79

    excavation cube 0.35 1400.00 490.00

    concrete 1 2 4 cube 0.07 14965.33 1047.57

    brick work 4 sq 0.33 4447.50 1467.68

    rendering 1 2 sq 0.28 2230.50 624.54

    cover slab no 1.00 300.00 300.00

    mason days 1.50 600.00 900.00

    Labour days 2.50 400.00 1000.00

    5829.79

    157 22x16 glazed fireclay wash basin with "

    dia. Chromium plated pillar tap , waste

    plug chromium plated waste chain and

    stay including fixing wash basin on

    brackets (water supply and waste water

    connection measured separately)

    no 3991.16

    Construction-BSR 57

  • 8/12/2019 Imperial BSR

    58/193

    wash basin nos 1.00 2800.00 2800.00

    tap nos 1.00 250.00 250.00

    waste plug and chain nos 1.00 150.00 150.00

    wooden plug no 4.00 15.00 60.00

    brass screws 1 no 6.00 3.75 22.50

    cement cwts 0.02 485.00 8.66

    mason days 0.50 600.00 300.00

    Labour days 1.00 400.00 400.00

    3991.16

    158 Sink 24x15x7 overall vitreous china with

    rubber plug and chromoum plated chain

    waste carried on iron brackets painted and

    fixed to walls (water supply and waste

    water connection measured separately)

    nos 2448.66

    Sink 24x15x7 nos 1.00 1750.00 1750.00

    L iron brackets nos 2.00 55.00 110.00

    cement cwts 0.02 485.00 8.66tapered wooden plug2" tk nos 2.00 25.00 50.00

    brass screws 1 no 8.00 3.75 30.00

    mason days 0.50 600.00 300.00

    Labour days 0.50 400.00 200.00

    2448.66

    159 Closet pedestal type with L/L flushing

    cistern flush pipe double plastic seat cover

    " dia. Stop cock trap supplied and fixed

    complete to working order

    nos 5601.16

    low level suite complete nos 1.00 4500.00 4500.00

    stop cock " nos 1.00 250.00 250.00

    cement cwts 0.02 485.00 8.66

    sand cube 0.00 4000.00 10.00

    brass screws 1 kg 2.00 3.75 7.50

    mason days 0.25 600.00 150.00

    plumber days 1.00 275.00 275.00

    Labour days 1.00 400.00 400.00

    5601.16

    Construction-BSR 58

  • 8/12/2019 Imperial BSR

    59/193

    160Closet squatting type with trap including

    high level ci stern fi xed complete with fl ush

    pipe and " dia. Stop cock, all complete to

    worki ng order

    nos 3734.75

    squatting pan with trap nos 1.00 750.00 750.00

    C.I.cistern with 1 flush pipe chain and over

    flow pipe

    nos

    1.00 1550.00

    1550.00

    clip nos 1.00 25.00

    wooden plug no 5.00 15.00 75.00

    brass screws 1 no 12.00 3.75 45.00

    stop cock nos 1.00 250.00 250.00

    cement cwts 0.25 485.00 121.25

    metal cube 0.01 3200.00 16.00

    sand cube 0.00 4000.00 10.00

    mason days 0.50 485.00 242.50

    plumber days 1.00 275.00 275.00

    Labour days 1.00 400.00 400.00

    3734.75

    Construction-BSR 59

  • 8/12/2019 Imperial BSR

    60/193

    161 Vitreous china bidet suite fixed complete to

    working order

    no #VALUE!

    bidet no 1.00 b #VALUE!

    plumber days 0.00

    Labour days 0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    162 4 no. Bowl type urinal with trap and 2 gal.

    Capacity automatic flushing cistern andspreaders complete to working orders

    no #VALUE!

    urinal no a b #VALUE!

    cistern no 0.00

    rawl plugs no 0.00

    spreader no 0.00

    wooden plugs no 0.00

    brass screws 1 no 0.00

    cement cwts 0.00

    sand cube 0.00

    mason cube 0.00

    plumber days 0.00Labour days 0.00

    0.00

    0.00

    0.00

    163 6" dia.half round pvc eaves gutter fixed to

    timber valance board including gutter

    joiner and brackets fixed at 18" c/c(other

    specials paid separately)

    l.ft #VALUE!

    eves gutter length no a b #VALUE!

    joiner no 0.00

    gutter brackets no 0.00

    brass screws no 0.00

    solvent cement gms 0.00

    plumber days 0.00

    Labour days 0.00

    scaffolding 5% 0.00

    0.00

    Construction-BSR 60

  • 8/12/2019 Imperial BSR

    61/193

  • 8/12/2019 Imperial BSR

    62/193

  • 8/12/2019 Imperial BSR

    63/193

    0.00

    170 Mild steel reinforcement to lintols slab

    beams or columns bent to shape laid in

    position and tied with G I wire as directed

    cwts 2870.10

    materials

    Tor steel including transport to site cwts 1.00 1600.00 1600.00

    wastage 15% 240.00

    binding wire 16 BWG lbs 1.50 35.00 52.50

    add 1.5% of steel cost for spacers or chairs 27.60

    blacksmith days 1.00 550.00 550.00

    Labour days 1.00 400.00 400.00

    2870.10

    Construction-BSR 63

  • 8/12/2019 Imperial BSR

    64/193

    s.no description unit

    rate in

    imperial 24.20%

    rate in

    metric

    1 Removing top soil to a depth not exceeding

    6" & depositing as directed within site

    sq 400.00 476.00 43.00

    2 Excavation over site to reduce level in anymaterial except rock requiring blasting

    including depositing and levelling as

    directed upto a distance not exceeding 30ft

    cube 650.00 773.50 229.45

    3 Excavation in trenches for walls/column pits

    in soft/loose soil from 0-5ft deep and

    depositing excavated material to a distance

    not exceeding 30ft . (earth work support to

    be paid separately). cube 400.00 476.00 141.20

    4 Excavation in trenches for walls/column pitsin ordinary soil from 0-5ft deep and

    depositing excavated material to a distance

    not exceeding 30ft . cube 900.00 1071.00 317.70

    5 Excavation in trenches for walls/column pits

    in hard dense soil from 0-5ft deep and

    depositing excavated material to a distance

    not exceeding 30ft . cube 1400.00 1666.00 494.20

    6 Excavation in trenches for walls/column pits

    in mud/wet soil from 0-5ft deep and

    depositing excavated material to a distance

    not exceeding 30ft . cube 2400.00 2856.00 847.20

    7 Excavation in trenches for walls/column pits

    in soft distintegrated rock (not requiring

    blasting) up to a depth of 5ft and depositing

    excavated material to a distance not

    exceeding 30ft . (earth work support to be

    paid separately). cube 1000.00 1190.00 353.00

    8 Excavation in trenches for walls/column pits

    in hard rock requiring blasting up to a depth

    of 5ft and depositing excavated material to

    a distance not exceeding 30ft . (earth worksupport to be paid separately).

    cube 1860.00 2213.40 656.58

    9 Benching rock in foundation in 3"-6"

    steps.(Blasting prohibited) sq.ft 123.13 146.52 1324.63

  • 8/12/2019 Imperial BSR

    65/193

    10 Anti-termite treatment on excavated

    foundation and compacted soil under floors

    sq 1806.00 2149.14 194.15

    11 Earthwork-backfilling & compacting cube 400.00 476.00 141.20

    12 Backfilling to trenches with importedmaterial cube 1090.00 1297.10 384.77

    13 Filling under floors including levelling

    watering and compacting in 3" layers with

    available and selected earth at site cube 800.00 952.00 282.40

    14 Filling under floors including levelling

    watering and compacting in 3" layers with

    imported selected earth at site cube 1490.00 1773.10 525.97

    15 Cutting turf sods loading to hand cards and

    transporting upto 30 yards laying andwatering for 30 days .(Royalty for turf

    pegging and transport beond 30 yards paid

    separately) sq 1818.00 2163.42 195.44

    16 Earth work support (open planking ) in

    trenches upto a depth of 5ft sq 3114.06 3705.73 334.76

    17 Earth work support (close planking ) in

    trenches upto a depth of 5ft sq 4747.92 5650.02 510.40

    18 Earth work support (close planking ) in

    deep excavation in trenches upto 15ft

    depth sq 5290.28 6295.43 568.70

    19 Mixing concrete 1 3 6 (1") cube 12233.33 14557.67 4318.37

    20Mixing concrete 1 2 5 (1") cube 13213.33 15723.87 4664.31

    21 Mixing concrete 1 2 4 (") cube 14965.33 17808.75 5282.76

    22 Mixing concrete 1 1 3 (") cube 16887.33 20095.93 5961.23

    23 Mixing concr