The Passive House in Austria from pipedream to national standard Johannes Kislinger IG Passivhaus Austria march 07, 2012
Transcript
Page 1: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs

The Passive House in Austria – from pipe‐dream to national standard

Johannes Kislinger IG Passivhaus Austriagmarch 07, 2012

Page 2: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs
Page 3: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs

Thermal refurbishment Primary School Building 1998

Page 4: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs

First Passivhaus Kindergarten 2003

Page 5: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs

Innovation of the project

• A Kindergarten as public building realized as a Passive House.

• The demand of the users for a single storey building. 

• Full occupation during working hours from 8 – 12. 

Page 6: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs

Floor layout/ section

Page 7: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs

Floor layout/ section

Page 8: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs

Planning tools for Optimizing

Heizw�rmebedarf Passivhauskindergarten Ziersdorf, unterschiedliche Berechnungsverfahren: Planungstool und dynamische Simulation

36.235.4

40.0

25.0

30.0

35.0

Wh/

m?J

ahr]

PHPP2002

13.7 13.114.3

11.5

16.8

12.0

10.0

15.0

20.0

Hei

zw�

rmeb

edar

f [kW

Thermische Geb�udesimulation

5.0 5.0

0.0

5.0

Transmissions-w�rmeverluste

L�ftungs-w�rmeverluste Innere W�rmen Solare Gewinne Heizw�rme-bedarf

Page 9: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs

Stud frame / 95mm timber panel

Optimizing Details and Costs

Stud frame / 95mm timber panelpl

ane

hick

ness

Mas

s

EI M

J/m

2

P kg

CO

2 eq

u.

Pric

e €

th PE

GW

P

mineral stucco coating 0,010sheeting STO 0,012DWD 0,016DWD 0,016cellulose thermal insulation 0,360 19,62 82,39 3,92 19,48stud frame 0,360 4,63 21,74 -7,17 18,70vapour barriermassive timber construction 0,095 47,50 223,25 -73,63 69,80l l t 0 015clay plaster 0,015

0,508 327,38 -76,87 107,98TJI stud frame/ 40mm chipboard

J/m

2

WP

kg

equ.

plan

e

ness

Mas

s

ice

PEI M

J

GW

CO

2

mineral stucco coating 0,010sheeting STO 0 012

p

thic

kn M

Pr

sheeting STO 0,012DWD 0,016cellulose thermal insulation 0,360 19,31 81,12 3,86 19,48stud frame timber fractionstud frame

0,360 6,86 32,26 -10,64 60,400,360 2,92 49,57 -1,46

vapour barriermassive timber construction 0,040 20,00 94,00 -31,00 20,80clay plaster 0,015

0,443 256,95 -39,23 100,68

Page 10: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs

Sustainable developmentUse of locally available

materials and workforce

•99.2% recycledl i f fialuminum for roofing

•Locally made clayplasterplaster

•Straw bales fortherm insulationtherm.insulation

•Corn‐starch‐cellulose plaster forcellulose plaster foracoustic ceiling

•Weatherboardcladding from localfarmers directmarketing

Page 11: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs

Optimizing Costs

investment costs and costs of operation

total /m² net floor area%

investment costs € 1.320

net costs construction and f inished surfaces excl. furniture

100% € 1.150

passive house standard extra costs surplus therm. Insulation, fresh air ventilation, extra costs w indow s and door openings

9% € 109

ecological extra costs clay plaster, recycling roof, thermal insulation 5% € 61foamglass, perlite, cork in w indow s

savings 40 tonnes of CO²

€ / acosts of operation € 2.378

heat energy costs € 438

electrical energy costs € 1.940

Page 12: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs
Page 13: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs

After 8 weeks of construction

Page 14: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs

After 30 weeks of construction

Page 15: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs

Building of TomorrowBuilding of TomorrowMinistry of Innovationwww.hausderzukunft.at

Page 16: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs

Key Word: Passive House (2006)y ( )

1 Austria 1,11,2 Germany 1,0843 Switzerland 0,86

4 Slovenia 0,1025 Luxemburg 0,095 Luxemburg 0,096 Czech Rep. 0,0717 Belgium 0,0558 Italy 0,0549 Sweden 0,051

10 Norway 0,04510 Norway 0,04511 Denmark 0,04312 Slovakia 0,03313 France 0,02514 Poland 0,02415 Estonia 0,02315 Estonia 0,02316 Netherlands 0,01417 Irland 0,011

18 Great Britian 0 00518 Great Britian 0,00519 Hungary 0,00320 Spain /20 Latvia /20 Portugal /

Page 17: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs

Passivehouse Growth Rate in Austria

60.000

65.000

70.000 Residential passive house units total annual residential units in Austria

45.000

50.000

55.000

25 000

30.000

35.000

40.000

20 900

28.000

36.900

10.000

15.000

20.000

25.000

8.55011.500

15.750

20.900

0

5.000

10 40 50 80 100 120 150 200 300 500 800 1.1001.600 2.5004.600

Source:[Statistik Austria, IIBW], Prognosis [IIBW 2010][IG PH A Passivhaus Objektdatenbank]

Page 18: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs
Page 19: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs

Energy Efficiency Programmes in EuropeDirective 2010/31/EU on the Energy Performance of Buildings (EPBD‐recast)

100

120

%)

F: - 55 % (2012/2013); Net zero (2019/2020))DE: - 25 % (2009/2011); - 33 % (2012/2013)UK: - 25 % (2009/2010); - 25 % (2012/2013))

60

80

rove

men

t (

DenmarkEngland/Wales

40

60

cien

cy im

pr FranceGermanyNetherlandsIreland

0

20

ener

gy e

ffi Finland

Note: plans after 2016 are not known for all countries, eg Poland - DK, FR, DE: evolution of building energy consumption - England/Wales: Code of Sustainable homes - Poland: evolution of U values walls -

-20

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

year

*VLEB = Very low-energy buildings(Passive house or even „Zero-Energy-House level)

Page 20: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs
Page 21: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs

Carbon Emissions

Page 22: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs

Carbix Chart 

Page 23: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs

The world’s biggest Passive House

Lodenareal Innsbruck354 units 26.000 m²

Page 24: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs
Page 25: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs
Page 26: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs

IBO passive housebuilding component cataloguewww.ibo.atwww.ibo.at

Page 27: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs
Page 28: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs
Page 29: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs

Comparison Primary Construction

C / C i / l OI3

OI 3 index:  ‐30 < 100 ecological load

Component/ Construction unit area / volume OI3 mass GWP AP PEIkg CO² eq kg SO² eq MJ

total primary construction 264.088 370.546- 586 1.095.263 outer wall 320,00 -16,54 15.235,00 -20.540,00 52,00 83.738,00

columns 63,00 -23,21 5.040,00 -7.237,00 10,00 19.454,00columns steel 54,00 46,61 2.541,00 2.718,00 16,00 58.687,00slabs and construction 2.155,00 -22,86 172.831,00 -247.105,00 358,00 675.420,00slabs beams 97,50 19,20 48.770,00 -71.300,00 90,00 160.838,00roof 330 00 -15 86 19 671 00 -27 082 00 60 00 97 126 00roof 330,00 15,86 19.671,00 27.082,00 60,00 97.126,00

ecological keydata: timber construction OI3 v2,k: -28.24

Component/ Construction unit area / volume OI3 mass GWP AP PEIkg CO² eq kg SO² eq MJ

total primary construction 1.971.734 278.459 1.025 3.239.163 outer wall 320,00 26,65 153.600,00 20.808,00 68,00 230.072,00

l 60 00 4 58 14 024 00 2 234 00 83 00 29 421 00columns 60,00 4,58 14.024,00 2.234,00 83,00 29.421,00slabs and construction 2.155,00 67,09 1.564.530,00 221.498,00 749,00 2.583.979,00roof 330,00 67,09 239.580,00 33.919,00 125,00 395.691,00

ecological keydata: concrete construction OI3 v2,k: 91.89ecological keydata: concrete construction OI3 v2,k: 91.89

Page 30: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs
Page 31: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs

Solar Potential Real Estate Register      Vienna 

Page 32: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs

Green. Building. Solutions.Summer University Vienna, 22 July - 12 August 2012

Page 33: in –from pipe dream to national standard - YTONG BiH · Optimizing Costs investment costs and costs of operation total /m² net floor area % investment costs € 1.320 net costs

Illustration: www.astundnebel.at


Recommended