BP CHEMICALS (M) SDN. BHD 12 JAN – 12 JUN INDUSTRIAL TRAINING POLYTECHNIC KUCHING SARAWAK
Transcript
Page 1: Industrial training presentation

BP CHEMICALS (M) SDN. BHD

12 JAN – 12 JUN INDUSTRIAL TRAINING

POLYTECHNIC KUCHING SARAWAK

Page 2: Industrial training presentation

INDUSTRIAL TRAINING OBJECTIVE

The purpose of industrial training is to expose Polytechnic students to the world of work so that they can relate theoretical knowledge with application in industry. From the Industrial training Program, the students will also develop skills in work ethics, communication, practical and theory. Furthermore, this Industrial training Program will establish close relationship between the industry and Polytechnic. The objectives of the training are as follows:

Page 3: Industrial training presentation

• To integrate theory with practice• To introduce students to work culture and industrial

practices• To give opportunity to students to work with

industrial practitioners• To expose students to potential employers• To acquaint the Polytechnic students with industry

and its programs• Implement Health Safety and Environment (HSE)

practices at workplace.• Practical ethical professional work culture.• Acquire skills in communication, management and

team-work.

Page 4: Industrial training presentation

INDIVIDUAL OBJECTIVE

The following are my objectives for having this industrial training:

• Expose to the new working environment• To gain knowledge and exposure on equipments

use in chemical plant • To learn the technical knowledge• To practically apply theoretical knowledge learned • To enhance my leadership• To improve my soft skills

Page 5: Industrial training presentation

Overview of BPCM

Page 6: Industrial training presentation

Overview of BPCM• Located in the Gebeng Industrial Estate, 25 kilometers away

from Kuantan town, on the east coast of Peninsular Malaysia,

• BP Chemicals Malaysia (BPCM) was established in this region to further strengthen BP's position as the world's largest Purified Terephthalic Acid (PTA) producer.

• PTA is the preferred raw material in textiles, video and audio films, soft drink bottles and engineering resins

• It is a wholly owned BP business unit.• It operates a 600,000 metric ton PTA plant and this facility

employs about 219 full-time employees and hundreds of internal and external contractors.

Page 7: Industrial training presentation

• BPCM strives to be a world-class PTA supplier, committed to being a good corporate citizen by working towards its goal of no accidents, no harm to people, and no damage to the environment.

• To protect the environment, this PTA plant is equipped with advanced environmental protection facilities to ensure efficient waste treatment and minimal emissions.

• . Its community outreach program demonstrates its desire to have a measurable and sustainable positive impact on its surrounding communities

Page 8: Industrial training presentation

BPCM

An aromatic acid

Physically - White - Crystalline powder - Looks like powdered sugar

Raw material; paraxylene (PX) - Colourless - Flammable liquid; sweet odour - Separated from a mixed xylene stream; from refining of petroleum

PRODUCT

Page 9: Industrial training presentation

PTA

Fiber for clothing and

home furnishing

Polyester film and tape

Industrial and high

performance fiber polyesterElectrical

insulation

adhesive

Food and drink container packaging

coating

Page 10: Industrial training presentation

PROCESS OVERVIEW

• BPCM consist of two major sections which are Inside Battery Limit (ISBL) and Outside Battery Limit (OSBL). ISBL also divided into oxidation and purification unit for the production unit. OSBL is also divided into utility and waste water treatment. It is functioned to support the process of ISBL.

• Figure 1: Plant process overview

Page 11: Industrial training presentation

Overview of BPCM-PTA Process (Oxidation)

SOLVENT

PARAXYLENE

CATALYST

FEED MIXING

AIR

CRYSTALLIZATIONPrecipitation from Solvent

OXIDATION REACTIONCRUDE TA

TO STORAGE

STEAM TUBE DRYERRemove moistureFILTRATION

Separation TA Solids & HAc

Page 12: Industrial training presentation

Overview of BPCM-PTA Process (Purification)

CRUDE TA

FEED SLURRY

PROCESSWATER

HYDROGEN

HYDROGENATIONREACTION

CRYSTALLIZATIONPrecipitation from Solvent

CENTRIFUGING & FILTRATION

Remove p-Toluics

STEAM TUBE DRYERRemove moisture

PURIFIED TATO STORAGE

Process Water

Crude TA

Page 13: Industrial training presentation

MAINTENANCEORGANIZATION

Page 14: Industrial training presentation

MAINTENANCE MANAGERMr. David Eng

SECRETARY Tengku Putri

PLANNER

I&E SUPRITEN

DANTMr. Lim Su

Seng

INSTRUMENT

& analyzer supervisorMr. Amran Damrun Rani

I & C TECHNICIAN

: Mr. Hakim: Mr Zulhijah: Mr. Solehuddin( contract )Mr. Asean ( Contract )Mr. Imran( Contract )

ELECTRICALsupervisorMr. Mohd Azmi Othman

SHIFT COMPETENT PERSONMr. MustaphaMr. BurhanMr. TanaMr. Saad

DAILY COMPETENT PERSON

Mr. MasriMr Wan RozmanMr Mubin ( contractor)E&I Trainee ISAM

I & E ENGINEER

Ms. RozaimahMr.Azmi Mohd NoorMr. Mohd Noor HamzahUTP Trainee Intan

MECHANICAL

Page 15: Industrial training presentation

POWER DISTRIBUTION OF BPCM• Step down ration from 132kV to 11kV

• 132kV 11 kV

Page 16: Industrial training presentation

• Emergency generator of 3MW will supply electricity in any case of power failure.

Page 17: Industrial training presentation

Transformer Step down Supply to

TR1 132kV / 11kV BC 101 A

TR2 132kV / 11kV BC 101 B

TR3 132kV / 11kV Utilities/Plant

TR4 132kV / 11kV Utilities/Plant

Page 18: Industrial training presentation

EXPERIENCESELECTRICALS

• Servicing motor and breaker• Do trouble shoot for: lathe machine, welding , vacuum cleaner,

wiring , breaker, contactor, VCB, lighting building, heater for lab, 11kV breaker, switch box starter, RCCB and MCCB.

• Cathodic protection system for pipeline and tank storage• Install electrical equipment. Ex: socket, grounding for

discharge• Greasing motor• Test run generator• Electrical safety in hazardous area• Electrical isolation

Page 19: Industrial training presentation

Instrument

• Do installation/calibration of pressure transmitter

• Metler Toledo Training- new sensor• Calibration of pressure switch

Page 20: Industrial training presentation

Electrical tools

• Cable detector• Power quality• Multi meter• Avo meter

Page 21: Industrial training presentation

• Tripping tools• Clamp meter• Cathodic protection tools

Page 22: Industrial training presentation

• Insulation tester

• Pipe bending

Page 23: Industrial training presentation

•Smart field communicator

•Hand pump

•Panel for breaker test

Page 24: Industrial training presentation

•Simulator circuit breaker

•Thermal overload test

•Tool box

Page 25: Industrial training presentation

•Non flammable contact cleaner

• switching protection clothes

•Infrared cam

Page 26: Industrial training presentation

ELECTRICAL INSTALLATION

• Our main consideration of installation electrical equipment is ‘safety issue’

• Ex: Current leakage, Overflow

Page 27: Industrial training presentation

Trainee Activities

Service Breaker and Motor

Page 28: Industrial training presentation

Working at panel motor control center

Page 29: Industrial training presentation

415V Circuit breaker and motorcontact

Current transformer

Thermal overload

Circuit breaker

Start &stop indication

light

Reset button

Page 30: Industrial training presentation

Contact service

Page 31: Industrial training presentation

Breaker test

Page 32: Industrial training presentation

Breaker test bypass

Page 33: Industrial training presentation

Breaker test in ON position

Page 34: Industrial training presentation

Jumper to breaker testing equipment

Page 35: Industrial training presentation

Step for Breaker service• Check all connection and cable sleeve• Phase inlet & outlet stab connectors• Neutral inlet outlet stab connectors• Aux contact• Earth contact• Contactor terminals• Timer terminal• Fuse terminals• Current transducer terminals• Terminals outgoing (compartment)• Check abnormality patended supports• Service contactor• Lubricant moving mechanism• Function test rack in test pos. limit switch

Page 36: Industrial training presentation

• Function test remote off selector switch• Function test overload relay• 500V megger at close position

RE,YE,BE,RN,YN,BN, RY,RB,YB• Resistance check at open and close position

Page 37: Industrial training presentation

6.6kV breaker

Page 38: Industrial training presentation

Breaker part repairing

Page 39: Industrial training presentation

11kV Breaker operatingRepair in progress

Page 40: Industrial training presentation

Example motor

Page 41: Industrial training presentation

INDUCTION MOTOR

Page 42: Industrial training presentation

ROTOR & WINDING

Page 43: Industrial training presentation

MOTOR WINDINGS TESTMotor windings resistance checkMotor windings insulation test with earth 415v(500V), 6.6kV(1kV)Lubrication see rating plateClean motor head exchange cooling fan

Page 44: Industrial training presentation

Generator test run

Procedure to start

Page 45: Industrial training presentation

3mW generator procedure

• Check air compressor• Check generator and engine room• Check battery panel• Check master control panel at substation• Check generator control panel• Check & record meter reading• Start more than one hour• Stop generator

Page 46: Industrial training presentation

Overview of generator

Page 47: Industrial training presentation

troubleshoot

• Wiring installation• Breaker failure cannot energized. • Vacuum cleaner ,one motor carbon brush

failure • Plug direct on line starter

Page 48: Industrial training presentation

Repair

• Welding set• Vacuum• Wring installation• Plug and socket

Page 49: Industrial training presentation

Special project

Page 50: Industrial training presentation

Replaced sport light port storage

Page 51: Industrial training presentation

VSD install cable

Page 52: Industrial training presentation

Soft starter install cable

Page 53: Industrial training presentation

Cathodic protection pipeline and tank storage

• Cathodic protection effectively protects underground or submerged metallic structures through the use of a negative potential applied by an external source to the structure. Commonly, once the structure has been made sufficiently negative, environmental corrosion (soil or moisture) is resisted. The method is typically applied to iron or steel structures such as underground pipelines, storage tanks, the interior of water storage tanks, ocean pilings, and electrical transmission towers. Buried steel structures will revert back to their natural state as an iron oxide without proper intervention.

Page 54: Industrial training presentation

Example cathodic protection potential

Page 55: Industrial training presentation

Test point and cathodic panel

Page 56: Industrial training presentation

Aircond part

• Replace compressor ac 132kV substation

Page 57: Industrial training presentation

Instrument part

CalibrateInstall

training

Page 58: Industrial training presentation

instrument

• Calibrate pressure switch use SFC and hand pump transmitter

• Install transmitter analogue at shipping use for transmit pressure nitrogen gases to analogue meter.

• Training new pH sensor from metler toledo

Page 59: Industrial training presentation

calibration

Page 60: Industrial training presentation

ConclusionIndustrial training program in BPCM had given

opportunities to trainee to prepare himself as future E&I technician.

BPCM is one of the best company/ plant for trainee to have exposure on chemical production plant industry.

6 months period is the most suitable duration period for industrial training because it has enough time to

maximize the learning process.BPCM has a lot of employees who is willing to help to

make this industrial training program a success.

Page 61: Industrial training presentation

Thank You

• For all STAFF E&I MAINTENANCE Mr LIM SU SENG, Mr AZMEE, MR AZMI, Mr HARRIS, Mr MOHD NOOR, Mdm RUZAIMAH, Mr AMRAN, Mr HJ Masri, Mr Wan Rozman, Mr Mubin, Mr Mustapha, Mr Tana, Mr Burhani , Mr Saadudin, Mr Hj Hakim, Mr Zulhijah, Mr Asean, Mr Imran, Mr Soleh.

• Mentor,( Mr Wan Rozman, Mr Azmi and Mr Mubin).• CONTRACTOR ESPECIALLY WARGA HIKMAT (Mr MUBIN, Mr PAKYA, Mr HARITH, Mr ALI)• UTP TRAINEE INTAN


Recommended