  • 7/22/2019 Industrial Visit at Sewage Treatment Plant(STP) Bharwara Sushile

    1/17

    CO-GUIDED BY SUB-GUIDED BY

    MS. UZMA DILSHAD MR. SONKER

    DEPARTMENT OF CIVIL ENGG.

    PRESENTED BYSUSHILE KUMAR VERMA CE

    54

  • 7/22/2019 Industrial Visit at Sewage Treatment Plant(STP) Bharwara Sushile

    2/17

    Introduction

    UASB technology

    Flow Diagram

    Design Parameters Brief Description of units

    Screen

    Grit Chamber

    UASB ReactorChlorine contact tank

    Conclusion

  • 7/22/2019 Industrial Visit at Sewage Treatment Plant(STP) Bharwara Sushile

    3/17

    One of Asia's largest sewage treatment plants built at

    Bharwara Sewage Treatment plant in Gomti Nagar

    Lucknow .

    It is been design for the capacity 345 mld and extended in

    area about120 hectare land.

    The plants is basically based on the technology of up flow

    Anaerobic Sludge blanket Technology [UASBR]

    The plant is reduces Toxic level of waste water i.e reduces

    factor like as BOD, ph ,sulphide & fluoride contents.

    Work on the Rs 169 crore STP was started by Jal Nigam in

    July 2008 and originally, the project was to be completed

    within a year.

  • 7/22/2019 Industrial Visit at Sewage Treatment Plant(STP) Bharwara Sushile

    4/17

    UASB technology is based onAnaerobic process.

    3-phase seperation device is themost characteristics feature of UASBreactor.

    Wastewater flows upwards through a

    sludge blanket located in lower partof reactor, while upper part containsa three phase (solid, liquid, gas)separation system.

    It facilitates the collection of biogasand also provides internal recycling of

    sludge by disengaging adherent biogasbubbles from rising sludge particles. Superior settling characteristics ofgranular sludge allows higher sludgeconcentrations and consequentlypermitted.

  • 7/22/2019 Industrial Visit at Sewage Treatment Plant(STP) Bharwara Sushile

    5/17

  • 7/22/2019 Industrial Visit at Sewage Treatment Plant(STP) Bharwara Sushile

    6/17

    Design average flow

    345mld

    Peak factor

    1.50

    S.NO. PARAMETER INFLUENT

    EFFLUENT

    1. Total suspended solids mg/l 300-606

  • 7/22/2019 Industrial Visit at Sewage Treatment Plant(STP) Bharwara Sushile

    7/17

    Screening is the first unitoperation used atwastewater treatmentplants.

    Pre-treatment is done insceens and grit chamber.

    Screening removes objectssuch as rags, paper,plastics, and metals to

    prevent damage andclogging of downstreamequipment, piping, andappurtenances.

  • 7/22/2019 Industrial Visit at Sewage Treatment Plant(STP) Bharwara Sushile

    8/17

  • 7/22/2019 Industrial Visit at Sewage Treatment Plant(STP) Bharwara Sushile

    9/17

    Grit is sewage consist of coarse particle of sand, ash and clinkers,eggshells, bone chips and many inert material inorganic in nature.

    Grit chamber consists of a cylindrical tank in which the flow enterstangentially, creating a vortex flow pattern.

  • 7/22/2019 Industrial Visit at Sewage Treatment Plant(STP) Bharwara Sushile

    10/17

  • 7/22/2019 Industrial Visit at Sewage Treatment Plant(STP) Bharwara Sushile

    11/17

  • 7/22/2019 Industrial Visit at Sewage Treatment Plant(STP) Bharwara Sushile

    12/17

  • 7/22/2019 Industrial Visit at Sewage Treatment Plant(STP) Bharwara Sushile

    13/17

    The effluent received after polishingpond will be disinfectant in chlorinetank with a dose of approx 5 mg/l ofchlorine gas dosing.

    The chlorine contact time has beenkept about 30 minutes .

    The chlorine gas is contact with thetreat the sewage and will be capableto remove the faecal coliform bychemical reaction.

    It is hoped that MNP will reducebelow 10000 per hundred ml by theapplication of chlorine gas.

  • 7/22/2019 Industrial Visit at Sewage Treatment Plant(STP) Bharwara Sushile

    14/17

    Pre aeration tank has been

    produced to aerate the effluent

    from UASB rector to release

    the trapped gases. Aeration will

    remove sulphide. The pre

    aeration may also be useful to

    change the anaerobic nature of

    effluent of UASB to aerobic.

  • 7/22/2019 Industrial Visit at Sewage Treatment Plant(STP) Bharwara Sushile

    15/17

  • 7/22/2019 Industrial Visit at Sewage Treatment Plant(STP) Bharwara Sushile

    16/17

    After the commissioning of 345 mld STP at Lucknow it is

    hoped at the Gomti river will get rid of pollution of wastewater of nallas that effect the health of Gomti river will

    improve with the increase of Dissolved oxygen in the river

    and not only the life of Lucknow will improve but also

    aquatic life will survive in Gomti, the life line of Lucknow.

  • 7/22/2019 Industrial Visit at Sewage Treatment Plant(STP) Bharwara Sushile

    17/17

    FOR GIVING ME AVALUABLE TIME