OFFICE OF THE WATERSHED CONSULTANTS ORGANISATION (WASCO ) (PIA) IWMP – 15 P.S JALORE (UNDER INTEGRATED WATERSHED MANAGEMENT PROGRAMME) DETAILED PROJECT REPORT OF JALORE IWMP – 15 JALORE BLOCK: JALORE DISTRICT : JALORE AGRO CLIMATIC ZONE- IIB TOTAL GEOGRAPHICAL AREA – 4878 Hac. TOTAL EFFECTIVE AREA- 4878 Hac. TOTAL COST- 731.68 Lacs. UNIT COST- 15,000/Hac. SUBMITTED BY: WATERSHED CONSULTANTS ORGANISATION (WASCO) ROOPNAGAR, JALORE
Transcript
Page 1: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

OFFICE OF THE WATERSHED CONSULTANTS ORGANISATION

(WASCO ) (PIA) IWMP – 15 P.S JALORE (UNDER INTEGRATED WATERSHED MANAGEMENT PROGRAMME)

DETAILED PROJECT REPORT OF JALORE

IWMP – 15 JALORE BLOCK: JALORE DISTRICT : JALORE AGRO CLIMATIC ZONE- IIB TOTAL GEOGRAPHICAL AREA – 4878 Hac. TOTAL EFFECTIVE AREA- 4878 Hac. TOTAL COST- 731.68 Lacs. UNIT COST- 15,000/Hac.

SUBMITTED BY: WATERSHED CONSULTANTS ORGANISATION

(WASCO) ROOPNAGAR, JALORE

Page 2: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

CERTIFICATE

Certified that the undersigned have proposed the appropriate and need based activities

required in the watershed project area with active participation of beneficiaries along with

consultation of Watershed Committees(WCs). Approval of watershed project plan and DPR as been

obtained from WC, Gram Sabha. The plan and DPR document of IWMP 15 JALORE project, at

P.S.JALORE & AHORE District JALORE is technically sound, viable and appropriate for

implementation during the period 2011 to 2015.

We recommend that this plan be sanctioned and put to implementation.

Signature Signature Signature Signature Signature Signature

Chairman/ Secretary

WC

WDT members Project

Manager, wasco

Distt.Jalore

Sh. Sumer singh

Sh. Dasrath singh

Sh. Ranveer

Sh. G.S.Nathawat

Page 3: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

Detail of Project

I. Name of Project : IWMP 15 JALORE

II. Sanction No. & date of Project :No.f18(I-88)part-II/DWDSC/IWMP-VI/139-158 date-23-4-2012

III. Macro & Micro Nos : 6/1,2,3,4 & 8/1,2,3,5 & 10/3,4,5

IV. Deviation from Project Sanctioned : NA

Items As per Project Sanctioned As proposed in DPR

Project Area 4878.00 4878.00

Macro/Micro No 6/1,2,3,4 & 8/1,2,3,5 &

10/3,4,5

6/1,2,3,4 & 8/1,2,3,5 &

10/3,4,5

Name of Gram

Panchayats

Unn , Chawarcha , Meda Uprala Unn , Chawarcha , Meda

Uprala

Name of Villages Unn , Chawarcha , Meda Uprala

,Chiparwada , Burtara

,Rajanwadi , Kaniwada ,

Pandgra

Unn , Chawarcha , Meda

Uprala , Chiparwada , Burtara

,Rajanwadi , Kaniwada ,

Pandgra

Project Cost (Rs in Lakhs) 731.70 731.68

Page 4: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

DPR TEMPLATE

Index

S.NO. TOPICS P.NO.

1 Chapter Location General Features of watershed (Cost and Area details) Climatic and Hydrological information Other Development Schemes in the project area Details of infrastructure in the project areas Institutional arrangements (,DWDU,PIA,WDT,WC)

2 Chapter Basic Data ,Analysis and Scope 2.1 Demography Details 2.2 Development Indicators 2.3 Land use 2.4 Agriculture status and Productivity Gap Analysis 2.5 Horticulture/Vegetable/Floriculture status 2.6 Land holding pattern 2.7 Livestock status 2.8 Fodder status 2.9 Farm Implements 2.10 NREGS Status 2.11 Migration details 2.12 Livelihood Details. 2.13 Existing SHG 2.14 Ground Water details 2.15 Drinking Water Status 2.16 Water use efficiency 2.17 Slope details 2.18 Water Budgeting 2.19 Soil Details 2.20 Soil erosion status

3 Chapter Proposed Development Plan 4 Chapter Activity wise Total Abstract of cost 5 Chapter Annual Action Plan

5.1 Project fund 5.2 Convergence Plan

6 Chapter Project outcomes 7 Technical designs and estimates for proposed activities 8 Enclosures

8 .1 Maps

a. Location –District, block, village, watershed location map b. Map of Project with Watershed Boundary demarcation in cadastral map c. Land Use Land Cover map d. Existing water bodies, DLT e. PRA Map (along with photos & paper drawing) f. GIS based intervention map g. Treatment map ie proposed works on revenue map

8.2 Documents of Agreements:

Proceedings of gram sabha for EPA approval

Page 5: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

Proceedings of gram sabha Resolution for committee constitution Documents related to PRA exercise MoU – PIA – DWMA, PIA – WC(in case of NGO as PIA)

Page 6: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

CHAPTER – I

INTRODUCTION

Location:- Jalore-(IWMP) -15 Project is located in Jalore & Ahore block, of Jalore district. The project area is between the 25° 13 -25° 21' latitudes & 72° 42' - 72° 49' longitudes. It is at a distance of 6 &11 km from its Block head quarters and 11 Km from the district head quarters. There are 2364 no. of habitations in the Project area and other details are given below.

General features of watershed

S.No. Name of Project (as per GOI) Jalore (IWMP) -15

(a) Name of Catchment Jalore (IWMP)-15

(b) Name of watershed area(local name) Kaniwara w/s

© Project Area 4878.00

(d) Net treatable Area 4878.00

e) Cost of Project 731.71 Lack

f) Cost/hectare 15000/ha.

g) Year of Sanction 2011-12

h) Watershed Code 6/1,2,3,4

8/1,2,3,5

10/3,4,5

i) No. of Gram Panchayats

in project area

3

j) No. of villages in project area 8

k) Type of Project Desert

l) Elevation (metres) 113

m) Major streams 9.6 km

n) Slope range (%) 0-3%

Page 7: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

Macro/

micro

Name of Gram Panchayat

Name of Villages Covered

Census code of villages Area

6 / 3. Unn Pandagara 02288200 241.21

Kaniwara 02288000 103.38

Unn 02287900 371.31

Meda Uparla Meda Uparla 02294500 25.38

6 / 2. Unn Pandagara 02288200 398.02

Kaniwara 02288000 3.05

Rajnwadi 02288100 327.44

Meda Uparla Meda Uparla 02294500 17.28

8 / 1. Unn Pandagara 02288200 361.12

Meda Uparla Meda Uparla 02294500 10.77

8 / 3. Unn Pandagara 02288200 150.51

Chwarcha Cheeparwara 02288300 144.88

Meda Uparla Meda Uparla 02294500 50.75

8 / 5. Unn Pandagara 02288200 0.46

Chwarcha Chwarcha 02288500 487.09

Budtara 02288400 96.6

Meda Uparla Meda Uparla 02294500 456.09

10 / 2. Meda Uparla Meda Uparla 02294500 326.73

10 / 5. Meda Uparla Meda Uparla 02294500 136.99

10 / 4. Meda Uparla Meda Uparla 02294500 347.09

10 / 3. Meda Uparla Meda Uparla 02294500 349.39

Page 8: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

6 / 4. Unn Pandagara 02288200 5.71

Kaniwara 02288000 105.29

Unn 02287900 27.94

Rajnwadi 02288100 26.74

6 / 1. Unn Kaniwara 02288000 224.86

Unn 02287900 11.2

Rajnwadi 02288100 43.02

8 / 2. Unn Pandagara 02288200 41.98

4892.28

The watershed area falls in Agroclimatic Zone-093 .The soil texture is sandy lomy The average rainfall is 423

mm.The temperatures in the area are in the range between 35--42 centigrade during summer and 23—28

centigrade during winter. The major crop in the area is Bajra 34.64% land is under cultivation50.04% land is

fallow, and 8.82% land is wasteland.3.27% land is irrigated through wells & Tubewell’s

222 No of households are BPL(9.39% households) 233 are landless households (9.86%

households) and 1908 household are small and marginal farmers ( 80.74 %household) .Average land holding

in the area is 1.02 ha. 76.89% area is single cropped area and 2.51% is double cropped. The main source of

irrigation is well. The average annual rainfall (10 years) in the area is 423 mm. The Major streams in the

Watershed are Jawai stream. The major festivals in the village are Holi, Deewali, krishana janamaastmi,

Navratra, Gangor, Raksha-bandhan. At present this village is having 11307 population with Communities like

Rajput, Choudhary, Dewasi, Kumhar, Suthar, Megwal, Brahaman and Bhil.

Page 9: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

Climatic and Hydrological information

1. Average Annual Rainfall(mm)

Year Average Annual Rainfall(mm)

1 2002-03 660.60 mm

2 2003-04 314.20 mm

3 2004-05 320.60 mm

4 2005-06 713.20 mm

5 2006-07 368.00 mm

6 2007-08 343.60 mm

7 2008-09 198.60 mm

8 2009-10 534.8 mm

9 2010-11 582.40 mm

10 2011-12 196.80 mm

Average Rain fall 423.28

2 Average Monthly rainfall (last ten years)

Month Rainfall(mm)

i) June 44.84

ii) July 123.63

iii) August 179.56

iv) September 75.25

3 Temperature (Degree C)

Season Max Min

i) Summer Season 42 35

ii) Winter Season 25 13

Page 10: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

iii) Rainy Season 35 30

4 Potential Evaporation Transpiration (PET) (mm/day)

Season PET

i) Summer 1.17

ii) Winter 0.53

iii) Rainy 0.31

5 Runoff

i) Peak Rate (cum/hr) 210.33

ii) Total run off volume of rainy season (ha.m.) 0.021

iii) Time of return of maximum flood 1 to 3 Years

iv)Periodicity of Drought in village area 2011

Other Development Schemes in the project area

S. No Scheme Name of the

department

Key

interventions

under the

Scheme

Targeted

Beneficiaries

Provisions under the

Scheme

1 TFC, SFC, BRGF,

SGSY, IAY, TSC,

SDPS, Old Age

Pension, State

widow pension,

Center Old age

Pension, IGNDPS,

Central Palanhar

scheme

Schemes from

Sttae and

central govt.

Excavation of

Talab/ Nadi

Construction

of Gravel

Road

Construction

of marginal

bund and

WHS

Old Age,

Widow,

orphan, BPL

Sanittaion block

construction, penison,

support for orphan

children’s guardian etc

Page 11: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

Details of infrastructure in the project areas

S.No Parameters Status

(i) No. of villages connected to the main road by an all-weather road

8

(ii) No. of villages provided with electricity 8

(iii) No. of households without access to drinking water Nil

No. of educational institutions : (iv)

Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)

(P)

16

(S)

1

(HS)

1

(VI)

-

(v) No. of villages with access to Primary Health Centre -

(vi) No. of villages with access to Veterinary Dispensary -

(vii) No. of villages with access to Post Office 3

(viii) No. of villages with access to Banks -

(ix) No. of villages with access to Markets/ mandis -

(x) No. of villages with access to Agro-industries -

(xi) Total quantity of surplus milk 510 Ltr.

No. of milk collection centres (xii)

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))

(U)

-

(S)

-

(PA)

1

(O)

-

(xiii) No. of villages with access to Anganwadi Centre 8

(xiv) Any other facilities with no. of villages (please specify) -

(xv) KVK Kesvana(Jalore)

(xvi) cooperative society 2

(xvii) NGOs 2

(xviii) Credit institutions

(i) Bank -

Page 12: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

(ii) Cooperative Society 2

(xix) Agro Service Centre's Jalore

Institutional arrangements (PIA, WDT,WC, Secretary)

WASCO Details

PIA particulars

S.No Particulars Details of WASCO

1. PIA WASCO Sh. G.S.Nathawat Project officer

2. Address with contact no., website Wasco c/o Bhawar lal Mali Near Railway Station

District Jalore

3. Telephone 9414236454

4. Fax -

5. E-mail [email protected]

S.No Particulars Details of PIA

6. Name of PIA Watershed Consultanta Organisation (WASCO)

7. Designation Project officer

8. Address with contact no., website Sh. G.S.Nathawat Project officer Wasco c/o

Bhawar lal Mali Near Railway Station District Jalore

9. Telephone 9414236454

10. Fax

11. E-mail [email protected]

Page 13: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

WDT Particulars:

S.No Name of WDT member M/F Age Qualification

Experience in

watershed(Yrs)

Description of

professional training

Role/ Function

1 Sh. Sumer singh F 46 B.Sc(A.g) 22 Yes Agronomist

2 Sh. Dasrath singh F 63 Rtd.VA 40 Yes Animal Husbandry

3 Sh. Ranveer F 43 . B.A Sociology

18 Yes Social scientist

4 Sh. G.S.Nathawat M 48 B.E.(A.g) 20 Yes Watershed Management & Soil Conservetion

Page 14: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

Details of Watershed Committees (WC)

S.N. Name

of WCs

Date of Gram

Sabha for WC

Date of Registratio

n as a Society (dd/mm/

yyyy

Designation Name M/F

SC/ST/OBC/

GEN

Landless/

MF/SF/ BF

Name of UG/ SHG

Educational qualification

President Sh. Ranchoda Ram s/o Pooraram M SC B.F - Viiith

Secretary Sh. Charan singh s/o Shambhu singh M GEN - B.A IInd year

Member Smt. Ganga Devi w/o Bhubaram M SC - Sakshar

Sh. Navaram s/o Swroopram M OBC - Sakshar

Smt. Lahri Devi w/o Bada jee F ST - Sakshar

Sh. Shanti Devi s/o Jeta ram M OBC - Sakshar

Sh. Hanumanaram s/o Markaram F SC - Sakshar

Sh. Mohanpuri s/o Vashanpuri M OBC - Sakshar

Sh. Vijay singh s/o Raghunath singh M GEN. - Sakshar

Smt. Shobha kanwar w/oPanne singh F GEN. - Sakshar

1 Mera Uprla

15/01/2013

-

Sh. Ranveer Singh S/o Guman Singh F GEN - B.A.

President Sh. Shukh singh s/o Hemant singh M GEN - Vth

Secretary Sh. Bhawar Singh s/o Javan singh M GEN - 10 th

Member Smt. Kan singh w/o Bhop singh M GEN - Sakshar

Sh. Mool Singh S/o Pep singh M GEN - Sakshar

Sh. Man singh S/o Chamna ji purohit M GEN - Sakshar

Smt. Dai devi W/o BhoobaRam F OBC - Sakshar

Sh. Tararam s/o Gajja jee M OBC - Vth

Smt. Parbidevi w/o Bheemaram F SC - Sakshar

2 Unn 20/09/2012

Smt. Chatti w/o Hansa ram F ST - Sakshar

Page 15: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

Smt. Kawli w/o Sava ram F OBC - Vth

Sh. Ranveer Singh S/o Guman Singh F GEN - B.A.

Designation Name M/F

SC/ST/

OBC/

Gen

Landless/MF/SF/ BF

Name of UG/ SHG

Educational qualification

President Sh.Keshar singh s/o Parbhu singh M GEN - VIIIth

Secretary Sh.Bhanwar Lal s/o Bhomaram M SC - Xth

Member Sh.Nathu ram s/o Nava jee M GEN - VIIIth

Sh. Ram singh s/o Tej singh M GEN - Sakshar

Sh. Pomaram s/o Chunnilal M SC - Sakshar

Sh. Pemaram s/o Bhagaram M SC - Sakshar

Smt. Rambhadevi w/o Motaram F SC - Sakshar

Smt.Madhudevi w/o Pukhraj F ST - Sakshar

S.N. Name of

WCs

Date of Gram Sabha for WC

Date of Registratio

n as a Society

(dd/mm/yyyy

Smt.Dhaku devi w/o Makaram F ST - Sakshar

3

Chanwrcha

20/09/2012 - Sh. Rakmadevi w/o Khetaram F OBC LS - Sakshar

Sh. Ranveer Singh S/o Guman Singh F GEN - B.A.

Page 16: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

Problems and scope of improvement in the project area:

The socio economic conditions of the area can be improved through increased production which can be

achieved through expansion in cultivated area and productivity enhancement. 2411.33 ha land is arable

wasteland and 725.53 ha is fallow can be brought under cultivation.

78.88 ha is only irrigated and with efforts this can be increased to 210 ha. The productivity gap of major crops in

the area as compared with district and with areas in the same agro climatic zones indicate potential to increase

the productivity. The demonstration of improved package of practices, improved varieties, increased irrigation

facilities and soil conservation measures under the project can bridge this gap. Due to small land holdings in the

area focus of the project would be on diversification in agriculture (horticulture, vegetables, green houses, Agro

forestry, fodder crops)and diversification in Livelihoods(Agriculture, Animal husbandry, self employment)

1410.10 Quintal fodder scarcity can be met out through Pasture development .Improved animal Husbandry

practices can increase the productivity of livestock. 45820 no of persons migrate due to Employment this

migration can be checked through creation of employment opportunities in the project area through increase in

production and diversification in agriculture and Livelihoods as mentioned above.

CHAPTER- II

Socio economic Features, Problems and Scope

Table 2.1 Population & Household Details:

Total Population

Male Female Total SC ST

5468 5839 11307 2389 1159

Household Details

BPL household L. Less

Small Farmer

M. B Farmer

Total household

SC household

ST household

222 233 413 1495 2363 458 223

Page 17: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

Table 2.2 Development indicators

S. No. Development Indicators State Project Area

1 Per capita income (Rs.) 16260 16150

2 Poverty ratio 0.22 26.55

3 Literacy (%) 0.604 40.78

4 Sex Ratio 921 1016

5 infant mortality rate - 5.90

6 maternal mortality ratio - 0.04

The table indicates poor socio economic conditions.

Table 2.3 Land Use

S.No Present land use Area in Hact.

1 Total geographical area 4892.28

i Non arable land 1755.37

ii Arable land 3136.91

2 Non arable land -

i Forest land 0

ii Panchayat & pasture land 1508.22

iii Govt. waste land 141.09

iv Area not available for development (Habitation, roads, mines, rails etc.

106.06

3 Arable land -

i Irrigated 348.60

ii Un irrigated 2031.79

Total arable land 2380.20

4 Land available for treatment -

i Non arable land 1741.09

ii Arable land 3136.91

Total 4878.00

Page 18: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

Land Use Total area in Ha.

Private Panchayat Government Community Total

Agriculture Land

3136.91 3136.91

Temporary fallow

445.4 445.4

Permanent Fallow

108.2 108.2

Cultivated Rainfed

2031.79 2031.79

Cultivated irrigated

348.6 348.6

Net Sown Area

2380.39 2380.39

Net Area sown more than once

0

Forest Land

0 0

Waste Land

204.5 204.5

Pastures 0 1741.09 1741.09

Others 26.35 26.35

Total 4878.00

The project area has 445.40 ha of cultivable wasteland . 553.60 ha of fallow land (total 4878 ha) can be brought

under cultivation if some irrigation source can be provided through Construction of WHS like Khadin, Tanka,

Farm ponds etc. and also through demonstration of rainfed varieties of crops. Construction of WHS can also

increase in area under irrigation which is only 17% 348.60 ha. (7.10% of the project area)is under wastelands

and can be brought under vegetative cover, with reasonable effort .Activities like Earthen check dams,

Vegetative filter strip, V-ditches, staggered trenches ,WHS (Johad) Afforestation of wastelands and Pasture

development will be taken up on these lands

Pasture development the land use table shows that there is 1741.09 hectare pasture land (35.69%)This

Page 19: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

emphasizes the need for taking up pastureland development works through sowing of promising species of

grasses and plantation

Table 2.4 .a Agriculture and Horticulture status and fuel availability.

Cropping Status

Rain fed Irrigated Total

Area Production

Productivity

Area Production

Productivity

Area

Production

S.No

Season

Crop sown

Varieties

(ha) (Ton) (kg/ha)

Varieties

(ha) (Ton) (kg/ha) (ha)

(Ton)

1 Kharif

Bajra HHB 67

835 668 800 - 835 668

211.5 423 211.5 Moong K851 423

0

500 -

0

Bajra+ HHB 67

12.6 700 168 12.6

168

-

Caster Avni 284 241.4 850 2844

241.4

Gvar RGC 936

322 161 500 358 161

2031 2068

2 Rabi Mustered

359 71 85.20 1200 71 85.20

Zeera RJ 19 136 111.52 820 136 111.52

Tarameera

Local 23 17.25 750 23 17.25

Isabgol RI 89 82 53.3 650 82 53.3

Wheat Raj 3077

36 86.40 2400 36 86.40

Lucern T-9 - - - - -

Page 20: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

**Write for each crop: The farmers are using WCC 75 ,Raj. 171, varieties of Bajra, whereas varieties like HHB 67 , RCB2 can increase the production.

Crop Rotation**will vary from project to project

Bajra - Fallow

Moong - Mustered

Fallow - Jeera

Fallow - Isabgoal

Cluster Bean - Fallow

Fallow - Tarameera

Caster - Caster

The table 2.3 shows that only 348.60 ha is (17%) is double cropped area. Also the crop rotation shows that

fallow lands are there. This indicates that there is scope for change in crop rotation in fields where there are

fallow lands through Soil and Water conservation measures, crop demonstration and diversification in

Table 2.4.b Abstract of cropped Area(ha)

Area under Single crop 2031.79

Area under Double crop 348.60

Area under Multiple crop -

Page 21: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

agriculture. Soil and Water conservation measures besides putting fallow lands under cultivation can

change the area under single cropping to double and multiple cropping.

Table 2.4.c Productivity Gap Analysis (The table can also be given in bar chart form)

Analysis of the above table indicate that besides national gap there is wide gap in productivity within

state and even within same agro climatic zones.

The reasons for this variation are

The farmers are using varieties WCC-75,Raj.171 of Bajra. whereas the recommended varieties like HHB

67, RCB -2 provide 18 qnt. yield (write for all crops)

Lack of Availability of good quality seeds of desired crop and variety in adequate quantities and time to

the farmers.

Availability of water for cultivation

The productivity gap and reasons of it indicate potential to increase the productivity through crop

demonstration .Crop demonstrations would be carried out on improved crops/ varieties, improved

agronomic practices. INM, IPM, Mixed cropping, distribution of fodder seed mini kit. Demonstration of

improved methods and economics of fodder crops cultivation and also distribution foundation seeds of

Forage Crops for further multiplication, introduction of fodder crops in the existing crop rotations.

Productivity kg/ha

Name of the crop India

Highest Average in Rajasthan

Highest Average of Agro climatic zone District Project Area

Wheat 2708 2751 2200 2200 2150

Mustured 1095 1203 1250 1250 1150

Zeera - 339 500 500 450

Isab gol - 476 600 600 550

Bajra 886 679 750 750 850

Guar - 277 400 400 550

Ground nut 866 1310 1000 1000 950

Moong - 312 450 450 450

Caster - 997 800 800 800

Page 22: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

Table 2.5 Existing area under horticulture/Vegetables/Floriculture (ha)

Activity Area Species Varieties Recommended varieties Production

Horticulture - - - - -

Vegetables 5 Chilly local - -

Floriculture - - - - -

Medicinal Plants - - - - -

Table 2.6 Land holding Pattern in project area

Total House

Land holding (ha) irrigation source wise Land holding (ha)Social group wise

holds Rain Type of Farmer

Irrigated (source) fed Total Gen SC ST OBC BPL

(i)Large farmer 140 56.81 354.75 411.56 180.7 85.38 23.44 122.04 -

(ii) Small farmer 413 46.82 348.81 395.63 157.14 95.95 32.82 109.72 -

(iii) Marginal farmer 1355 244.97 2084.75 2329.72 797.93 892.55 78.06 561.18 -

(iv) Landless person 233 - - - -- - - - -

(V)No. of BPL households 222 - - - - - - - -

Total 2363 348.60 2788.31 3136.91 1135.77 1073.88 134.32 792.94 -

74.48% land holdings belong to small and marginal farmers who own 88.05% of total cultivated area. Horticulture/vegetables could be more economical to Small and marginal farmers with irrigation source. For large farmers with no irrigation facility Horticulture/vegetables will be promoted in a part of land with farm

Page 23: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

pond/Tanka construction. The following activities will be more beneficial for small land holdings and for diversification and income for large farmers.

Setting of Vermi Compost Units - Keeping in view the side effect of residues of chemicals and fertilizers on human health the emphasis would be on cultivation of organic produce through motivating farmers and providing assistance for production of organic input, vermi compost.

Production and distribution of quality seed – There is need to ensure that good quality seed is available for cultivators for which adequate seed production would be initiated in watershed areas with the assistance of private sector and agriculture department technologies

Sprinklers and pipelines for efficient water management practices emphasis on demonstration of sprinklers with adequate financial support and convergence/private partnership.

Table 2.7 Livestock Status - animals/milk production / average yield.

S.No. Description of animals

Population in No.

Yield(milk/ mutton/Wool)

Equ. cow units

Dry matter requirement

per year (7Kg per animal.)

Total requirement in

M.T.

1 Cows

Indigenous 3315 4 ltr. per day 3315 8469825 8469.825

Hybrid 6 ltr. per day 0 0 0

2 Buffaloes 897 7 ltr. per day 897 2291835 2291.835

3 Goat 13650 2 ltr. per day 13650 7411950 7411.95

4 Sheep 27100 ½ kg per no. 27100 14715300 14715.3

5 Camel 756 - 756 1931580 1931.58

6 Horse 12 - 12 30660 30.66

7 Piggery - - - - -

Total 45820 - 45820 34851150 34851.15

Besides breed In spite of the large number of livestock, production is less hence increase in productivity across all species, is a major challenge. To reduce production of unproductive cattle and improve the productivity by improving the breeds by breeding management following activities will be taken up

distribution crossbreed rams Castration Artificial insemination Distribution of superior Breeding bulls for use in Cattle and Buffalo

Breeding improvement other animal husbandry practices like better health, hygiene and feeding practices can increase productivity of livestock. Hence Activities like Animal health camps ,Urea-Molasses treatment demonstration ,demonstration of improved methods of conservation and utilization of Forage crops are proposed.

Page 24: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

Table 2.8 Existing area under fodder (ha)

S.No Item Unit Area/Quantity

1 Existing Cultivable area under Fodder

Ha 950/6650

2 Production of Green fodder Tonns/year 15/900

3 Production of Dry fodder Tonns/ Year 55/24500

4 Area under Pastures Ha 705/1410

5 Production of fodder Tonns/year 33460

6 Existing area under Fuel wood Ha -

7 Supplementary feed Kgs/ day 1/1125

8 Silage Pits No -

9 Availability of fodder tonns 33460

i.Requirement of fodder= 34851 tonns

ii. Availability of fodder = 33460 tonns.

Deficiency of fodder = 34851-33460 = 1391 tonns.

The table above shows there is fodder deficiency (Requirement is 34851 tonns and 33460 tonns

To minimize the large and expanding gap between feed and fodder resource availability and demand there is need for

Increase in area under fodder crops Increase in productivity of fodder crops Development of pastures And reduction in large number of livestock production through replacement by few but productive animals

Table 2.9 Agriculture implements

S. No Implements Nos.

1 Tractor 84

2 Sprayers-manual/ power 24

3 Cultivators/Harrows 22

4 Seed drill 22

5 Any Other 90

Page 25: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

Farm mechanization and seed banks: As discussed earlier 88.05% land holdings belong to small and

marginal farmers who own only 74% of total cultivated area so owning of big farm implements by individual

farmers is not economical so SHG would be promoted to buy farm implements and rent to farmer

Table 2.10 NREGA Status - No. of Card Holder, activities taken so far, employment status.

S. no. Name of village Total No .of job cards

Employment Status

Activity taken up so far

1 Chanwarcha 260 200

2 Burtera 244 198

3 Chiparwada 274 230

4 Meda Uparla

5 Pandgara

6 Unn

7 Kaniwada

8 Rajnwadi

8

Table 2.11 Migration Details

Name of village

No. of persons

migrating

No. of days per year of

migration

Major reason(s)

for migrating

Distance of destination of migration from the village (km)

Occupation during migration

Income from such

occupation (Rs. in lakh)

Chanwarcha

68 315 22.5

Burtera 56 315 18.5

Chiparwada 63 315

Employment , livestock grazing &

350 to 2000 km

Employment &

Business 20.83

Page 26: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

Meda Uparla

85 183 16.9

Pandgara 28 300 8

Unn 92 300 21

Kaniwada 26 300 7

Rajnwadi 32 305 8

The migration can be check by creation of employment opportunities, enhancing farm level economy, increases the income of the people engaged in animal husbandry by dairy, poultry and marketing and value addition. (As discussed earlier) and diversification in livelihoods .

The existing livelihoods Village are given below

Table 2.12 (a)Major activities (On Farm)

Name of activity No of House holds Average annual income from the

Cultivators 1908 129/Lac

Dairying 53 3.20 lac

Poultry - -

Piggery - -

Landless Agri. Labourers 233 12.62 lac

Page 27: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

The efforts for increase in income through off farm activities will be made under livelihood component through assistance to SHG or individuals

Table 2.13( a ) Status of Existing SHG

S.No Name of SHG Members Activity involved

Monthly income

Fund avai.

Assistance available

Source of assistance

Training received

1 Ganga maSHG 10 Saving 500 - - - YES

2 Ashova mata SHG 12 Saving 1200 - - - YES

3 Laxmi SHG 11 Saving 550 - - - YES

4 Hanuman SHG 10 Saving 500 - - - Yes

5 Laxmi SHG 10 Saving 500 - - - YES

6 Sarswati Ma SHG 10 Saving 500 - - - YES

Table 2.12(b)Major activities (Off Farm)

Name of activity Households/individuals Average annual income from the

Artisans - -

Carpenter 130 13

Blacksmith 2 0.20

Leather Craft - -

Porter 56 5.60

Mason 76 7.60

Others specify (Cycle Repair ,STD, Craft etc)

10 1.20

Page 28: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

7 Mahadev SHG 10 Saving 500 - - - YES

8 Nagneshwari SHG 11 Saving 550 - - - YES

9 Ganesh SHG 10 Saving 500 - - - YES

10 Chamunda SHG 10 Saving 500 - - - YES

11 Sita vikas SHG 12 Saving 600 - - - YES

The table indicates existence of number of groups in the area also these need to be strengthened through trainings and financial assistance

II. Technical Features

Table 2.14 Ground Water

S.No Source No. Functional depth (meter)

Dry Area irrigated

Water availability

(days)

i) Dug wells 258 148

ii) Shallow tube wells - -

iii) Pumping sets 169 149

iv) Deep Tube Wells 68 48

Total 512 380

Page 29: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

Table 2.15 Availability of drinking water

S.No

Name of the village

Drinking water requirement Ltrs/day

Present availability of drinking water Ltrs/day

No. of drinking water sources available

No. functional

No. requires repairs

No.

defunct

1 Chanwarcha

26229 25500 4 GLR 3 1

2 Burtera 20874 20000 3 GLR 2 1

3 Chiparwada

28644 24500 3 GLR 2 1

4 Meda Uparla

26586 28000 3 GLR 2 1

5 Pandgara 18837 19500 4 GLR 4 0 1

6 Unn 44751 48500 4 GLR 4 0

7 Kaniwada

12369 13500 1 GLR 1 0

8 Rajnwadi 6657 7800 2 GLR 2 0

Table 2.16 Water Use efficiency

Area (Hectare) Name of major crop

through water saving

through water conserving agronomic

Any other (pl. specify)

Total

Page 30: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

Mustard 60% 20% - -

Zeera 60% 20% - -

Castur 60% 20% - -

The tables above indicate need for judicious use of available Water. Encouraging optimum use of water through installation of sprinklers on every operational wells

Table 2.17 Slope details.

Slope of Watershed

S.No. Slope percentage

Area in hectares

1 0 to 3% 4340.63

2 3 to 8% 284.26

3 8 to 25% 253.11

4 > 25%

As most of the area has slope less than 3% construction of contour bunds can solve the problem of water erosion in agriculture fields and protect washing of top soil and manures/fertilisers

Page 31: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

Table 2.18Water Budgeting

Water Budgeting

Total available runoff(cum) use Stranges table

Rain fall 425 mm

Type of Catchment Area in ha. Yield of runoff from catchment per ha.(cum.) use Stranges table

Total Runoff in cum

Good 2011 493 991423

Average 850 369.75 314287

Bad 2017 232 467944

Total 1773654

Runoff trapped in existing structures Runoff to beTrapped in proposed structures:

S. No. Name no Storage Capacity (cum)

S. No. Name no

Storage Capacity (cum)

i) WHS(earthen) 2 3000 i) WHS(earthen) 20 30000

ii) Khadin 2 5000 ii) Khadin 3 7500

iii) Farm Ponds 6 6000

iv) talab 6 8000 Iii) Tanka 30 2240

v) Anicuts 2 2000 iv) dug out pond 6 8000

talab 11 15000

24000 62740

Page 32: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

Runoff trapped in existing & proposed structures =24000+62740=86740 cum.

% Runoff trapped = total runoff trapped x100/Total available runoff=04.89%

Height of all the structures proposed is between less to 2metre. There is no structures whose water impounding height is more than 2 metre.

The water budgeting indicates potential for water harvesting in the area

Table 2.19 Soil details

S.No. Soil Profile

A Major Soil Classes Area in hectares

1 II class 3491.90

2 III class 75.02

3 Iv class 1311.08

Soil Depth :

B Depth (Cms.) Area in hectares

1 0.00 to 7.50 -

2 7.50 to 45.00 4878.00

3 > 45.00

The analysis of table shows need to improve and maintain soil fertility. Soil health card to every farmer every

C Soil fertility Status Kg/ha Recommended

N 50-70 80-90

P 20-30 40-50

K 10-15 20-30

Micronutrients 10-500 ppm 100-500

Page 33: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

crop season will be provided, which will include the recommendation for Application micro nutrient and fertilizers

Table 2.20 Erosion details

Erosion status in project Area

Cause Type of erosion

Area affected (ha)

Run off(mm/ year)

Average soil loss (Tonnes/ ha/ year)

Water erosion

a Sheet 3491.90

b Rill 75.02

c Gully 1311.08

Sub-Total 4878.00

Wind erosion

Total for project

14-19

The need is:

To check land degradation To reduce excessive biotic pressure by containing the number and increase of livestock To check cultivation on sloping lands without adequate precautions of soil and water conservation measures To discourage cultivation along susceptible nallah beds To check Faulty agriculture techniques To check Uncontrolled grazing and developed cattle tracks To check Deforestation of steep slopes To check erosive velocity of runoff, store Runoff, to arrest silt carried by runoff and to recharge Ground

Water structures life Earthen check dams, gully plugs, Bank Stabilisation, Loose stone check Dams, Gabions, Earthen embankment (Nadi) and Anicuts would be taken up.

Page 34: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

CHAPTER – III

Proposed Development Plan: The Activities are indicative addition /deletion in activities will be as per local conditions

A) Preparatory phase activities Capacity Building Trainings and EPA The IEC activities like Kalajathas, Group meetings, door to door campaign, slogans and wall writings etc.

were carried out in all the habitations of Jalore (IWMP)15 Micro Watershed. A series of meetings were

conducted with GP members, community and discussed about the implementation of IWMP programme.

User groups were also formed. Grama Sabhas were conducted for approval of EPA (Village), for selecting

the watershed committee and approval of DPR.

S.no Name of the Gram Panchayat Date on which Grama Sabha approved EPA

1 Meda Uparla 20.2.2013

2 Unn 27.2.2013

3 Chanwarcha 14.1.2013

S. No

Name of villages

Amount earmarked

for EPA

Entry Point Activities (

category)

No. of works

Estimated cost

Works completed

Expenditure incurred Remarks

1 Rajanwadi 304000 2 304000

2 Pandgra 789100 3 789100

3 Unn 199600 3 199600

4 Kaniwada 158100 3 158100 1 75000

5 Meda uprla 1038000 13 1038000 1 55000

6 Chawarcha 146600 2 146600

7 chiparwada 146600 2 146600

8 Burtra 146600 2 146600

Total 2928600 2928600 130000

Page 35: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

The PRA exercise was carried out in all the villages on the dates shown below:

S.no Name of the village/Habitation Date on which PRA conducted

1 Chanwarcha 10/10/2012

2 Burtera 8/10/2012

3 Chiparwada 8/10/2012

4 Meda Uparla 12/10/2012

5 Pandgara 14/12/2012

6 Unn 13/12/2012

7 Kaniwada 12/12/2012

8

Rajnwadi 11/12/2012

Transact walk were carried out involving the community for Social mapping, Resource mapping. Detailed

discussions and deliberations with all the primary stakeholders were carried out.

Socio-economic survey was carried out during 20-9-2012 to 20-12-2012 (dates) period covering all the

households and primary data on demography, Land holdings, Employment status, Community activities etc. was

collected as mentioned in chapter 2. WAPCOS was assigned the work of preparing various thematic

layers using Cartosat-1 and LISS-3 imageries for Creation, development and management of geo-spatial

database depicting present conditions of land (terrain), water and vegetation with respect to watershed under

different ownerships at village level

Various thematic layers provided by WAPCOS are :

Delineation of Macro/Micro watershed boundaries. Digitised Khasara maps of the villages falling in project area. Network of Drainage lines, existing water bodies, falling in the project area. Base maps (transport network, village/boundaries, and settlements). Land Use / Land cover map. Contours at 1 meter interval, slope map

Based on GIS thematic layers, Field visits , PRA and analysis of benchmark data (as discussed in chapter 2)

final Treatment plan on revenue map for implementation has been framed. Thus each intervention identified

has been marked on revenue map (map enclosed in DPR as annexure------).The GIS based intervention map,

PRA based intervention map are annexed as ------.

Page 36: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

. CAPACITY BUILDING

Table- List of approved Training Institutes@ for Capacity Building in the project area

S. No. Project Stakeholders

Total no. of

persons

No. of persons to be

trained

No. of Training to

be organised

Financial ( Rs. In

lacs)

1 PIAs 7 7 30 0.525

2 WDTs 4 4 15 0.15

3 UGs 240 240 12 5.76

4 SHGs 300 300 10 4.5

5 WCs 36 36 15 0.81

6 GPs 45 45 30 2.025

7 Community 11307 800 8 6.4

8

EXPOSURE TOUR (INTER

STATE) 11307 240 2 3.84

9 EXPOSURE TOUR ( ) 11307 160 1 1.92

10 PM/SLNA 5 5 5 0.5

11 OTHERS 1000 1000 2.84

TOTAL 29.27

Page 37: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

Table-, Education & Communication (IEC) activities in the project area (1% of

total Project cost.)

1 2 4

S. No.

Activity Allocation out of 1% of total Project cost Expected Outcome

(may quantify, wherever possible)

I year

II year

III year

IV year

V year

1 ekWMy #QVkWi okVj gkjosZfVx LVªDplZ ¼iapk;r lfefr, jktho xkW/kh lsok dsUnz ;k vU; iapk;r lfefr Lrjh; utnhdh ljdkjh Hkou ½A

0-20 1.46 1.46

0.25 0.25

0

2 tyxzg.k {ks= xfrfof/k;kas dks n’kkZrk gqvk POP / CLAY / WOOD / PLASTIC ls cuk gqvk ekWMyA

0

3 MhLiys cksMZs@IysxDlh cksMZ@

0-10

0.48 0.48

4 okWy isfUVax&tyxzg.k xfrfof/k;ksa] y{;ks o izkfIr vkfn dks n’kkZrh gqbZ A

0.2 0.2

0 5 tyxzg.k fodkl laca/kh eqfnzr iEiysVl@fyQ ysVl@pkVZ@iksLVj@vkfnA

0.2 0.2 0.03 0.43

6 Ukkjk ys[ku

0-25

1.2 1.2

0.25 0.3 0.55 7 lQyrk dh dgkuh;ksa dh ohfM;ksaxzkQh@QksVksxzkQh@ y?kqfQYe ,oa d"kdks ls lk{kjkrdkj @ okrkZ A

0

8 fucU/k o okn&fookn izfr;ksfxrk 0.05 0.05 0.05 0.05 0.2

0.2 0.15 0.35 9 jsfM;ksa@nwjn’kZu ij okrkZ o foKkiu

0-15

0

0.1 0.1 0.2 10 lkaLdfrd R;kSgkj @ esys vkfn ds volj ij iznZ’kuh

0

0.15 0.15 0.15 0.45 11 uqDdM+ ukVd

0-10

0

Page 38: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

12 dViqryh izn’kZu 0.08 0.08

13 jkf= xks"Bh 0.1 0.1 0.1 0.1 0.1 0.5

14 Hkw laj{k.k lIrkg 0.08 0.08 0.08 0.24

15 psruk jSyh 0.05 0.05 0.05 0.15

16 tyxzg.k fodkl dk lans’k nsus okys lkaLdfrd dk;ZØe 0.15 0.15 0.15

0.45

0.05 0.05 0.02 0.12 17 d"kd fnol dk vk;kstu ,oa {ks= Hkze.k fnol dk vk;kstu bR;kfn

0-20

18 dqy 3.89 0.96 1.38 0.93 0.15 7.31

B)Livelihood Action Plan (LAP):

An awareness programme has been undertaken at Gram Sabha for communication & sensitization of the target beneficiaries. Livelihood Action Plan is a pre requisite for availing the funds under the livelihood component. LAP has been prepared by the PIA in consultation with WDT, WC & the members of SHG,SC/ST, women, landless/ assetless households. Details of funds available & their utilisation is as under :

(i) Total project cost Rs.731.68 Lacs. (ii) Funds available under livelihood component is 9% of total project cost= Rs.65.84 Lacs.

(a) Seed money for SHGs as revolving fund = Rs.65.84 Lacs.

(minimum 60% of livelihood component)

- - No. Of SHG to be formed31 Nos.

--- No of persons (members) in SHGs 325 Nos.

(b) Seed money for enterprising individuals = Rs.11.50 lcs

(maximum 10% of livelihood component)

-- No of persons identified as enterprising individuals 236 Nos.

Page 39: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

S. No. Item Numbers Revolving fund/Seed money % of LAP

1 SHG

a Existing 11 16.37 24

b New 20 30 46

Sub Total 31 46.37

2 Enterprising individuals 236 11.80 18

3

Enterprising SHG/Federations

of SHG 2 7.67 12

Total 65.84 100

Proposed Activities (On Farm)*

Name of activity* No of SHGs Revolving fund

Fisheries

Dairying 20 10.00

Poultry

Piggery

Goatery 35 12.25

Bee keeping

Sericulture

Nursery 10 2.00

Maize dehusker

Dal mill 5 2.5

Oil mill

Others (specify) 8 3.2

Total 78 29.95

Page 40: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

Proposed Major activities (Off Farm)**

Name of activity* No of SHGs Revolving fund

Artisans

Carpenter 1 .50

Blacksmith

Leather Craft

Porter

Mason 10 .80

Eco tourism

Agro processing

Blacksmith

Candle making 20 10.00

Dona Pattal 5 .80

Sewing / Knitting 10 4.50

Tea Stall 4 .80

General Store 5 1.25

Mobile repair 2 .40

Mechanic / Misc. shop 4 .80

Others (specify) 2 .50

Total 63 20.35

Page 41: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

List of persons & Proposed Activities. ( 10% of (9%)

S. Activity Proposed No. of

Per

son

Category

SC /ST /Others

Project

fun

d Rev

olving

Contribution

1 Carpenter

1 OBC / Other 0.40

3 Cycle repair 5 SC /ST /Others 0.80

4 Potter 1 SC /ST /Others .25

5 Mason 10 SC /ST /Others .35

6 Foot wear 1 SC 0.30

7 Sheep(20+1=21No.) 25 SC /ST /Others 12.50

8 Goat(10+1=11No.) 20 SC /ST /Others 8

9 Other 1 0.04

Total

15.44

(c) Funds for Enterprising SHG/Federations of SHG

(Maximum 30 % of livelihood activities)= Rs.15.44 Lacs

The funding for major livelihood activities will enable the enterprising SHGs/SHG federation to avail a

composite loan for undertaking major livelihood activities or to upscale activities as recommended by the

WC & approved by WCDC in consultation with line departments.

C) Production Plan:

An awareness programme has been undertaken at Gram Sabha for communication & sensitization of the

target beneficiaries. Production System & micro enterprises Action Plan is pre-requisite for availing the

funds under the Production System & micro enterprises component. Production plan has been prepared by

Page 42: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

the PIA in consultation with WDT, WC & the members of Users Group. Details of funds available & their

utilisation is as under :

(iii) Total project cost Rs.731.68 Lacs.

(iv) Funds available under Production System & Micro enterprises component is 10% of total project

cost= Rs.73.16 Lacs.

Proposed Activities for production system & Micro enterprises

List of persons & Proposed Activities. ( 10% of (9%)

S. No.

Activity Proposed Name of Person

Category

SC /ST /Others

Project fund Revolving

Contribution

Crop Demonstration /Fodder Demonstration 520 SC /ST /Others 11.50 0.00

Agro Forestry 140 SC /ST /Others 10.45 0.47

Dry land Horticulture 130 SC /ST /Others 2.96 0.00

Homestead Kitchen Garden 1650 SC /ST /Others 2.00 0.00

i Compost Pit 81 SC /ST /Others 0.00 0.00

ii Vermi Compost Unit 225 SC /ST /Others 0.00 0.00

Plantation in pastureland 80 SC /ST /Others 14.90 0.78

Over seeding in Non Arable land 93 SC /ST /Others 1.02 0.05

Water Tank. 48 SC /ST /Others 11.70 0.44

HDPE/ PVC Pipe 20 SC /ST /Others 0.00 0.00

Nepesek Spraier by hand mounted 190 SC /ST /Others 0.00 0.00

Nepesek Spraier by foot mounted 95 SC /ST /Others 0.00 0.00

Hand rotetary duster 90 SC /ST /Others 0.00 0.00

Seed cum fertilizer drill 6 SC /ST /Others 0.00 0.00

Isopam (Threser) 8 SC /ST /Others 0.00 0.00

54.52 1.74

Page 43: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

S. No. Activity Proposed Individual / Group Activity Category

SC /ST /Others

Project fund Contribution

1 Distribution of Buffalo bulls

Group Activity SC /ST /Others 0 0

2 Mangers Distribution

Individual SC /ST /Others 8.08 lac 0.36 lac

3 Animal Health Camps

Group Activity SC /ST /Others 6.60 lac 0

Page 44: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

CHAPTER – VI EXPECTED OUT COMES

1 2 3 4 5 6

S. No. Item Unit of measurement

Pre-project Status

Expected Post-project Status Remarks

1 Status of water table (Depth to Ground water level) Meters 115-120 112-117

2 Ground water structures repaired/ rejuvenated No. - -

3 Quality of drinking water Description Salty Clean

4 Availability of drinking water Description 8 Moths 12 Months

5 Change in irrigated Area Ha 348.60 1023

6 Change in cropping/ land use pattern Description - -

7 Area under agricultural crop Ha

I Area under single crop Ha 2031.79 2650

Ii Area under double crop Ha 348.60 1023

Iii Area under multiple crop Ha - 40

8 Change in cultivated Area Ha 2031.79 2650

Yield of Bajra q/ha 8 12

Yield of Wheat q/ha 24 26

Yield of Gram q/ha - -

9 yield of major crops of area

Yield of Mustard q/ha 12 15

Production of Bajra q/ha 8 12 10 production of major crops of

Production of Wheat q/ha 24 26

Page 45: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

Production of Gram q/ha - -

Production of Mustard q/ha 12 15

11 Area under vegetation Ha 5 30

12 Area under horticulture Ha - 36

13 Area under fuel Ha - 90

14 Area under Fodder Ha 1725 2500

15 Fodder production Q 33460 36500

16 Milk production Litres/day 19950 21500

17 SHGs Active No. - 25

18 No. of livelihoods No. 45820 48730

19 Income Rs.in la 0.33 0.65

20 Migration No. 450 80

21 SHG Federations formed No. - 1

Page 46: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

13

Critical Assumption

No severe droughts/ unexpected floods/ natural disasters Adequate funds are allocated for the same and released on time. There is no significant pest/ disease attack, and if so, then it will have been contained before irreversible damage is done. Adverse market conditions do not persist long. Sound macro-economic and growth conditions continue and the benefits are widely distributed particularly in the rural areas. Facilitating agencies and resource providers have the required competent staff so that timely and appropriate technical advice and

services are provided to farmers whenever required. The Capacity Building Plan is implemented, monitored and modified to address evolving needs and feedback from participants. The execution of the Women’s Empowerment Pedagogy is regularly monitored by the District and State level Implementing

Agencies Means of Verification of indicators

Baseline surveys like household income ,expenditure, health and nutrition etc at the beginning, mid-term and end of the project period Annual participatory assessment by communities during project period. Regular project monitoring reports prepared by project monitoring teams/ agencies. Membership and other Records, Minutes of Meetings maintained by the SHGs, WCs/ Individual beneficiaries/project-related village and local

bodies/PRIs. External review missions Data maintained by Government department (Revenue, Agriculture, Groundwater, Irrigation, Animal Husbandry

Page 47: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

14

CHAPTER VII TECHNICAL DESIGNS AND ESTIMATES

Technical designs and estimates for proposed activities.

For Estimates GKN of the districts should be used. For Production System activities, rates of Agriculture/Horticulture/Animal Husbandry should be

used.

CHAPTER - VIII Enclosures -

h. Location –District, block, village, watershed location map i. Map of Jalore 15 IWMP Project (Watershed Boundary demarcation in cadastral & Topo Sheet) j. PRA Map (along with photos & paper drawing) k. Treatment map (Indicate proposed works) l. Cadastral Map on watershed boundary m. Information on Soils, Soil fertility, Land capability, Soil chemical problems like salinity, alkalinity n. Land Use Land Cover map o. Information on existing water harvesting structures & well inventory along with GPS co-ordinates. p. High resolution, latest Remote Sensing Satellite data

Documents of Agreements:

Proceedings of gram sabha for EPA approval

Proceedings of gram sabha Resolution for committee constitution

MoU – PIA – DWMA, PIA – WC(in case of NGO as PIA)

Page 48: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

15

PROPOSED DEVELOPMENT PLAN IWMP 15 JALORE STATE: RAJASTHAN UNIT COST: RS. 15000/- Hac. DISTRICT: JALORE GEOGRAPHICAL AREA: 4878.00 Hac. AGROCLIMATIC ZONE: 093 EFFECTIVE AREA: 4878.00 NAME OF THE BLOCK: jalore (I) ARABLE LAND: 3136.91 NAME OF WATERSHED: Jalore (IWMP)-15 ( II) NON ARABLE LAND: 1741.09 CATEGORY OF WATERSHED: DESERT AREA TOTAL : 4878.00 Hac IRRIGATION PERCENTAGE: TOTAL COST: 731.68 Lacs

From W/S

Convergence Fund

S.No Activity Unit Quantity Unit Cost

Total Cost

Beneficiary contribution

1 2 3 4 5 6.00

Cost from

Project Fund

Convergence Fund

9.00 A Preparatory phase activities capacity

22 % building trainings & EPA

I Administration cost 10% 0 0 73.17 73.17 0.00 0.00 II Monitoring 1% 0 0 7.32 7.32 0.00 0.00 III Evaluation 1% 0 0 7.32 7.32 0.00 0.00 Total 12% 0 0 87.80 87.80 0.00 0.00 I Preparatory Phase (Entry Point Activity) 4% 0 0 29.27 29.27 0.00 0.00

II Institution And Capacity Building 5% 0 0 36.59 36.59 0.00 0.00

III Preparation of Detailed Project Report (DPR) 1% 0 0 7.32 7.32 0.00 0.00

Total 10% 0 0 73.17 73.17 0.00 0.00 B Natural resource management (56%)

Arable Land Conservation Measures 56% (1) Vegetative Bund Ha 950 22500 213.75 65.25 148.50 0.00

Page 49: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

16

(2) Earthen Bund with Pitching No. 228 22500 51.30 46.17 0.00 5.13 (3) Bank Stabilisation ha 120 66200 79.44 71.50 0.00 7.94 (4) Dug out Pond No. 17 32000 5.44 2.24 3.20 0.00 (5) Water Harvesting Tanka / Structure No. 13 97500 12.68 11.41 0.00 1.27 (6) Wasteweir / Stone out let No. 15 67000 10.05 9.05 0.00 1.01 (7) khadin 200 m No. 19 120000 22.80 20.52 0.00 2.28

Total 395.46 226.13 151.70 17.63 II Non Arable Land Conservation

Measures (1) Ditch Cum Bund Fencing Mt. 7821 121 9.46 8.99 0.00 0.47 (2) Contour Furrow in Pasture Land Hac. 130 10350 13.46 12.78 0.00 0.67 (3) Contour Furrow in Non Arable Land Hac. 194 9100 17.65 16.77 0.00 0.88 (4) Earthen Bund with Pitching No. 69 58500 40.37 38.35 0.00 2.02 (5) Dug out Pond No. 15 57000 8.55 3.42 5.13 0.00 (6) Water Harvesting Tanka No. 17 97500 16.58 4.88 11.70 0.00 (7) Wasteweir No. 12 67000 8.04 7.64 0.00 0.40 (8) Deeping of nadi No. 31 57000 17.67 0.00 17.67 0.00

Total 131.77 92.82 34.50 4.45

III Drainage Line Treatment (1) Earthen Bund with Pitching No. 41 58500 23.99 22.79 0.00 1.20 (2) Wasteweir No. 15 67000 10.05 9.55 0.00 0.50 (3) kadin 400 m No. 4 350000 33.58 31.90 0.00 1.68 (4) Loose stone check dam I ,II , III No. 72 18000 12.96 12.31 0.00 0.65 (5) Dykes No. 10 150000 15.00 14.25 0.00 0.75 Total 95.58 90.80 0.00 4.78 Total Watershed Development Works 622.80 409.75 186.20 26.85 C Production System 10% 10% I Arable Land Production System (1) Crop Demonstration /Fodder No. 520 5225 27.17 11.50 15.68 0.00

Page 50: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

17

Demonstration

(2) Agro Forestry No. 140 7800 10.92 10.45 0.00 0.47 (3) Dry land Horticulture No. 130 7400 9.62 2.96 6.66 0.00 (4) Homestead Kitchen Garden No. 1650 500 8.25 2.00 6.25 0.00 (5) i Compost Pit No. 81 2300 1.86 0.00 1.86 0.00 (6) ii Vermi Compost Unit No. 225 2700 6.08 0.00 6.08 0.00 (7) Plantation in pastureland No. 80 19600 15.68 14.90 0.00 0.78 (8) Over seeding in Non Arable land Hac 93 1150 1.07 1.02 0.00 0.05 (9) Water Tank. No. 68 24375 16.58 15.75 0.00 0.83

(10) HDPE/ PVC Pipe No. 20 15000 3.00 0.00 3.00 0.00 (11) Nepesek Spraier by hand mounted No. 190 650 1.24 0.00 1.24 0.00 (12) Nepesek Spraier by foot mounted No. 95 850 0.81 0.00 0.81 0.00 (13) Hand rotetary duster No. 90 775 0.70 0.00 0.70 0.00 (14) Seed cum fertilizer drill No. 6 15000 0.90 0.00 0.90 0.00 (15) Isopam (Threser) No. 16 20000 3.20 0.00 3.20 0.00

Total - 107.06 58.57 46.36 2.13 III Live Stock Management (1) Distribution of Buffalo bulls No. 9 35000 3.15 0.00 3.15 0.00 (2) Mangers Distribution No. 398 2100 8.36 8.00 0.00 0.36 (3) Animal Health Camps No. 72 15000 10.80 6.60 4.20 0.00 Total 22.31 14.60 7.35 0.36 Total Production System 129.37 73.16 53.71 2.50

D Household Production System& Micro Enterprises-Goat and Sheep Rearing, Service sector Carpentry Tailoring, Blacksmith, Repair shop for Cycle. 9% 236 31000 73.16 65.84 0.00 7.32

E. Consolidation 3% 3 2195244 21.95 21.95 0.00 0.00

Grand Total 1008.26 731.68 239.91 36.67

Page 51: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

18

PROPOSED DEVELOPMENT PLAN UNN

STATE: RAJASTHAN UNIT COST: RS. 15000/- Hac. DISTRICT: JALORE GEOGRAPHICAL AREA: 2425.89 Hac. AGROCLIMATIC ZONE: 093 EFFECTIVE AREA: 2425.89 NAME OF THE BLOCK: jalore (I) ARABLE LAND: 1073.60 NAME OF WATERSHED: Jalore (IWMP)-15 (II) NON ARABLE LAND: 1352.29 CATEGORY OF WATERSHED: DESERT AREA TOTAL : 2425.89 Hac IRRIGATION PERCENTAGE: TOTAL COST: 363.78 Lacs

From W/S Convergence Fund S.No Activity Unit Quantity Unit Cost

Total Cost

Beneficiary

contribution

Name of

Scheme

1 2 3 4 5 6

Quantity

Unit Cost

Cost from

Project Fund

Quantity

Unit Cost

Convergence Fund

9.00 A Preparatory phase

activities capacity 22 % building trainings & EPA

I Administration cost 10% 0 0 36.38

8 0 0 36.39 0.00 0.00 0.00 0.00

II Monitoring 1% 0 0 3.639 0 0 3.64 0.00 0.00 0.00 0.00

III Evaluation 1% 0 0 3.639 0 0 3.64 0.00 0.00 0.00 0.00

Total 12% 0 0 43.66

6 43.67 0.00 0.00

I Preparatory Phase (Entry Point Activity) 4% 0 0

14.555 0 0 14.56 0.00 0.00 0.00 0.00

II Institution And Capacity Building 5% 0 0

18.194 0 0 18.19 0.00 0.00 0.00 0.00

III

Preparation of Detailed Project Report (DPR) 1% 0 0 3.639 0 0 3.64 0.00 0.00 0.00 0.00

Total 10% 0 0 36.38

8 36.39 0.00 0.00

Page 52: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

19

B Natural resource management (56%)

Arable Land Conservation Measures 56%

(1) Vegetative Bund ha 250

22500 56.25 130 22500 29.25 120.00

22500.00 27.00 0.00

MNREGA

(2) Earthen Bund with Pitching No. 70

22500 15.75 70 22500 14.18 0.00 0.00 0.00 1.58

(3) Bank Stabilisation No. 50 6620

0 33.10 50 66200 29.79 0.00 0.00 0.00 3.31

(4) Dug out Pond No. 6

32000 1.92 3 32000 0.96 3.00

32000.00 0.96 0.00

MNREGA

(5) Water Harvesting Tanka / Structure No. 8

97500 7.80 8 97500 7.02 0.00 0.00 0.00 0.78

(6) Wasteweir / Stone out let No. 8

67000 5.36 8 67000 4.82 0.00 0.00 0.00 0.54

(7) khadin 200 m No. 12 1200

00 14.40 12 12000

0 12.96 0.00 0.00 0.00 1.44

Total 134.5

8 98.98 27.96 7.64 II Non Arable Land

Conservation Measures

(1) Ditch Cum Bund Fencing Mt. 4250 121 5.14 4250 121 4.89 0.00 0.00 0.00 0.26

(2) Contour Furrow in Pasture Land Hac. 80

10350 8.28 80 10350 7.87 0.00 0.00 0.00 0.41

(3) Contour Furrow in Non Arable Land Hac. 151 9100 13.74 151 9100 13.05 0.00 0.00 0.00 0.69

(4) Earthen Bund with Pitching No. 35

58500 20.48 35 58500 19.45 0.00 0.00 0.00 1.02

(5) Dug out Pond No. 8

57000 4.56 4 0 2.28 4.00

57000.00 2.28 0.00

MNREGA

(6) Water Harvesting Tanka No. 6

97500 5.85 5 0 4.88 1.00

97500.00 0.98 0.00

MNREGA

(7) Wasteweir No. 6 6700

0 4.02 6 67000 3.82 0.00 0.00 0.00 0.20

Page 53: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

20

(8) Deeping of nadi No. 12

57000 6.84 0 0 0.00 12.00

57000.00 6.84 0.00

MNREGA

Total 68.91 56.23 10.10 2.58

III Drainage Line Treatment

(1) Earthen Bund with Pitching No. 35

58500 20.48 35 58500 19.45 0.00 0.00 0.00 1.02

(2) Wasteweir No. 8 6700

0 5.36 8 67000 5.09 0.00 0.00 0.00 0.27

(3) kadin No. 1 8670

00 8.67 1 86700

0 8.24 0.00 0.00 0.00 0.43

(4) Loose stone check dam I ,II , III No. 34

18000 6.12 34 18000 5.81 0.00 0.00 0.00 0.31

(5) Dykes No. 7 1500

00 10.50 7 15000

0 9.98 0.00 0.00 0.00 0.53 Total 51.13 48.57 0.00 2.56

Total Watershed Development Works

254.61 203.78 38.06 12.78

C Production System 10% 10%

I Arable Land Production System

(1) Crop Demonstration /Fodder Demonstration No. 300 5225 15.68 200 0 10.45 100.00

5225.00 5.23 0.00

Ag. Deptt

(2) Agro Forestry No. 40 7800 3.12 40 7800 2.96 0.00 0.00 0.00 0.16

(3) Dry land Horticulture No. 40 7400 2.96 20 0 1.48 20.00 7400.0

0 1.48 0.00 NHM

(4) Homestead Kitchen Garden No. 650 500 3.25 400 0 2.00 250.00 500.00 1.25 0.00

Ag. Deptt

(5) i Compost Pit No. 30 2300 0.69 0 0 0.00 30.00 2300.0

0 0.69 0.00 Ag.

Deptt

(6) ii Vermi Compost Unit No. 100 2700 2.70 0 0 0.00 100.00

2700.00 2.70 0.00

Ag. Deptt

(7) Plantation in pastureland No. 40

19600 7.84 40 19600 7.45 0.00 0.00 0.00 0.39

(8) Over seeding in Non Arable land Hac 30 1150 0.35 30 1150 0.33 0.00 0.00 0.00 0.02

Page 54: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

21

(9) Water Tank. No. 28

24375 6.83 28 24375 6.48 0.00 0.00 0.00 0.34

(10) HDPE/ PVC Pipe No. 4

15000 0.60 0 0 0.00 4.00

15000.00 0.60 0.00

Ag. Deptt

(11) Nepesek Spraier by hand mounted No. 65 650 0.42 0 0 0.00 65.00 650.00 0.42 0.00

Ag. Deptt

(12) Nepesek Spraier by foot mounted No. 25 850 0.21 0 0 0.00 25.00 850.00 0.21 0.00

Ag. Deptt

(13) Hand rotetary duster No. 20 775 0.16 0 0 0.00 20.00 775.00 0.16 0.00

Ag. Deptt

(14) Seed cum fertilizer drill No. 1

15000 0.15 0 0 0.00 1.00

15000.00 0.15 0.00

Ag. Deptt

(15) Isopam (Threser) No. 4

20000 0.80 0 0 0.00 4.00

20000.00 0.80 0.00

Ag. Deptt

Total - 45.75 31.15 13.69 0.91

III Live Stock Management

(1) Distribution of Buffalo bulls No. 2

35000 0.70 0 0 0.00 2.00

35000.00 0.70 0.00 AH

(2) Mangers Distribution No. 157 2100 3.30 157 2100 3.13 0.00 0.00 0.00 0.16 (3) Animal Health

Camps No. 24 1500

0 3.60 14 0 2.10 10.00 15000.

00 1.50 0.00 AH Total 7.60 5.23 2.20 0.16

Total Production System 53.34 36.39 15.89 1.07

D

Household Production System& Micro Enterprises-Goat and Sheep Rearing, Service sector Carpentry Tailoring, Blacksmith, Repair shop for Cycle. 9% 117

31000 36.27 117 31000 32.64 0.00 0.00 0.00 3.63

E. Consolidation 3% 1 1091651 10.92 1

1091651 10.92 0.00 0.00 0.00 0.00

Grand Total 435.2

0 363.78 53.94 17.48

Page 55: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

22

PROPOSED DEVELOPMENT PLAN MEDA UPARLA STATE: RAJASTHAN UNIT COST: RS. 15000/- Hac. DISTRICT: JALORE GEOGRAPHICAL AREA: 1723.54 Hac. AGROCLIMATIC ZONE: 093 EFFECTIVE AREA: 1723.54 NAME OF THE BLOCK: jalore ( I) ARABLE LAND: 1415.80 NAME OF WATERSHED: Jalore (IWMP)-15 (II) NON ARABLE LAND: 307.74 CATEGORY OF WATERSHED: DESERT AREA TOTAL : 1723.54 Hac IRRIGATION PERCENTAGE: TOTAL COST: 258.69 Lacs

From W/S Convergence Fund S.No Activity Unit Quantity Unit Cost

Total Cost

Beneficiary

contribution

Name of

Scheme

1 2 3 4 5 6

Quantity Unit Cost

Cost from

Project Fund

Quantity

Unit Cost

Convergence Fund

9.00 A Preparatory phase

activities capacity 22 % building trainings & EPA

I Administration cost 10% 0 0 25.853 0 0 25.85 0 0 0.00 0.00 II Monitoring 1% 0 0 2.585 0 0 2.59 0 0 0.00 0.00 III Evaluation 1% 0 0 2.585 0 0 2.59 0 0 0.00 0.00 Total 12% 0 0 31.024 31.02 0.00 0.00

I Preparatory Phase (Entry Point Activity) 4% 0 0 10.341 0 0 10.34 0 0 0.00 0.00

II Institution And 5% 0 0 12.927 0 0 12.93 0 0 0.00 0.00

Page 56: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

23

Capacity Building

III

Preparation of Detailed Project Report (DPR) 1% 0 0 2.585 0 0 2.59 0 0 0.00 0.00

Total 10% 0 0 25.853 25.85 0.00 0.00 B Natural resource

management (56%)

Arable Land Conservation Measures 56%

(1) Vegetative Bund ha 550 22500 123.75 130 9915 29.25 420 22500 94.50 0.00

MNREGA

(2) Earthen Bund with Pitching No. 120 22500 27.00 120 22500 24.30 0 0 0.00 2.70

(3) Bank Stabilisation ha 45 66200 29.79 45 66200 26.81 0 0 0.00 2.98

(4) Dug out Pond No. 7 32000 2.24 1 32000 0.32 6 32000 1.92 0.00

MNREGA

(5) Water Harvesting Tanka / Structure No. 4 97500 3.90 4 97500 3.51 0 0 0.00 0.39

(6) Wasteweir / Stone out let No. 4 67000 2.68 4 67000 2.41 0 0 0.00 0.27

(7) khadin 200 m No. 5 120000 6.00 5 12000

0 5.40 0 0 0.00 0.60 Total 195.36 92.00 96.42 6.94

II Non Arable Land Conservation Measures

(1) Ditch Cum Bund Fencing Mt. 2571 121 3.11 2571 121 2.96 0 0 0.00 0.16

(2) Contour Furrow in Pasture Land Hac. 25 10350 2.59 25 10350 2.46 0 0 0.00 0.13

(3) Contour Furrow in Non Arable Land Hac. 25 9100 2.28 25 9100 2.16 0 0 0.00 0.11

(4) Earthen Bund with Pitching No. 30 58500 17.55 30 58500 16.67 0 0 0.00 0.88

(5) Dug out Pond No. 4 57000 2.28 2 0 1.14 2 57000 1.14 0.00

MNREGA

Page 57: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

24

(6) Water Harvesting Tanka No. 3 97500 2.93 0 0 0.00 3 97500 2.93 0.00

MNREGA

(7) Wasteweir No. 4 67000 2.68 4 67000 2.55 0 0 0.00 0.13

(8) Deeping of nadi No. 8 57000 4.56 0 0 0.00 8 57000 4.56 0.00

MNREGA

Total 37.97 27.93 8.63 1.41

III Drainage Line Treatment

(1) Earthen Bund with Pitching No. 4 58500 2.34 4 58500 2.22 0 0 0.00 0.12

(2) Wasteweir No. 3 67000 2.01 3 67000 1.91 0 0 0.00 0.10

(3) kadin No. 2 742000 14.84 2 74200

0 14.10 0 0 0.00 0.74

(4) Loose stone check dam I ,II , III No. 22 18000 3.96 22 18000 3.76 0 0 0.00 0.20

(5) Dykes No. 2 150000 3.00 2 15000

0 2.85 0 0 0.00 0.15 Total 26.15 24.84 0.00 1.31

Total Watershed Development Works 259.48 144.78 105.05 9.65

C Production System 10% 10%

I Arable Land Production System

(1) Crop Demonstration /Fodder Demonstration No. 100 5225 5.23 0 0 0.00 100 5225 5.23 0.00

Ag. Deptt

(2) Agro Forestry No. 80 7800 6.24 80 7800 5.93 0 0 0.00 0.31 (3) Dry land Horticulture No. 40 7400 2.96 20 0 1.48 20 7400 1.48 0.00 NHM

(4) Homestead Kitchen Garden No. 650 500 3.25 0 0 0.00 650 500 3.25 0.00

Ag. Deptt

(5) i Compost Pit No. 31 2300 0.71 0 0 0.00 31 2300 0.71 0.00 Ag.

Deptt

(6) ii Vermi Compost Unit No. 100 2700 2.70 0 0 0.00 100 2700 2.70 0.00 Ag.

Deptt (7) Plantation in

pastureland No. 30 19600 5.88 30 19600 5.59 0 0 0.00 0.29 (8) Over seeding in Non Hac 41 1150 0.47 41 1150 0.45 0 0 0.00 0.02

Page 58: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

25

Arable land (9) Water Tank. No. 27 24375 6.58 27 24375 6.25 0 0 0.00 0.33

(10) HDPE/ PVC Pipe No. 6 15000 0.90 0 0 0.00 6 15000 0.90 0.00

Ag. Deptt

(11) Nepesek Spraier by hand mounted No. 60 650 0.39 0 0 0.00 60 650 0.39 0.00

Ag. Deptt

(12) Nepesek Spraier by foot mounted No. 20 850 0.17 0 0 0.00 20 850 0.17 0.00

Ag. Deptt

(13) Hand rotetary duster No. 30 775 0.23 0 0 0.00 30 775 0.23 0.00

Ag. Deptt

(14) Seed cum fertilizer drill No. 4 15000 0.60 0 0 0.00 4 15000 0.60 0.00

Ag. Deptt

(15) Isopam (Threser) No. 6 20000 1.20 0 0 0.00 6 20000 1.20 0.00

Ag. Deptt

Total - 37.51 19.69 16.86 0.96

III Live Stock Management

(1) Distribution of Buffalo bulls No. 3 35000 1.05 0 0 0.00 3 35000 1.05 0.00 AH

(2) Mangers Distribution No. 188 2100 3.95 188 2100 3.75 0 0 0.00 0.20 (3) Animal Health Camps No. 26 15000 3.90 16 0 2.40 10 15000 1.50 0.00 AH Total 8.90 6.15 2.55 0.20

Total Production System 46.41 25.84 19.41 1.16

D

Household Production System& Micro Enterprises-Goat and Sheep Rearing, Service sector Carpentry Tailoring, Blacksmith, Repair shop for Cycle. 9% 84 31000 26.04 84 31000 23.44 0 0 0.00 2.60

E. Consolidation 3% 1 775593 7.76 1 77559

3 7.76 0 0 0.00 0.00 Grand Total 396.56 258.69 124.46 13.41

Page 59: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

26

PROPOSED DEVELOPMENT PLAN CHAWARCHA STATE: RAJASTHAN UNIT COST: RS. 15000/- Hac. DISTRICT: JALORE GEOGRAPHICAL AREA: 728.57 Hac. AGROCLIMATIC ZONE: 093 EFFECTIVE AREA: 728.57 NAME OF THE BLOCK: jalore (I) ARABLE LAND: 647.51 NAME OF WATERSHED: Jalore (IWMP)-15 (II) NON ARABLE LAND: 81.06 CATEGORY OF WATERSHED: DESERT AREA TOTAL : 728.57 Hac IRRIGATION PERCENTAGE: TOTAL COST: 109.21 Lacs

From W/S Convergence Fund S.No Activity Unit Quantity

Unit Cos

t

Total Cost

Beneficiary contribution

Name of

Scheme

1 2 3 4 5 6

Quantity

Unit Cost

Cost from

Project Fund

Quantity

Unit Cost

Convergence Fund

9.00 A Preparatory phase

activities capacity 22 % building trainings & EPA

I Administration cost 10% 0 0 10.92

9 0 0 10.93 0 0 0.00 0.00 II Monitoring 1% 0 0 1.093 0 0 1.09 0 0 0.00 0.00 III Evaluation 1% 0 0 1.093 0 0 1.09 0 0 0.00 0.00

Total 12% 0 0 13.11

4 13.11 0.00 0.00

I Preparatory Phase (Entry Point Activity) 4% 0 0 4.371 0 0 4.37 0 0 0.00 0.00

II Institution And Capacity Building 5% 0 0 5.464 0 0 5.46 0 0 0.00 0.00

III Preparation of Detailed Project Report (DPR) 1% 0 0 1.093 0 0 1.09 0 0 0.00 0.00

Total 10% 0 0 10.92

9 10.93 0.00 0.00 B

Natural resource 56%

Page 60: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

27

management (56%)

Arable Land Conservation Measures

(1) Vegetative Bund ha 150

22500 33.75 30 9915 6.75 120 22500 27.00 0.00

MNREGA

(2) Earthen Bund with Pitching No. 38 22500 8.55 38

22500 7.70 0 0 0.00 0.86

(3) Bank Stabilisation ha 25 66200 16.55 25

66200 14.90 0 0 0.00 1.66

(4) Dug out Pond No. 4

32000 1.28 3 0 0.96 1 32000 0.32 0.00

MNREGA

(5) Water Harvesting Tanka / Structure No. 1

97500 0.98 1

97500 0.88 0 0 0.00 0.10

(6) Wasteweir / Stone out let No. 3 67000 2.01 3

67000 1.81 0 0 0.00 0.20

(7) khadin 200 m No. 2 120000 2.40 2

120000 2.16 0 0 0.00 0.24

Total 65.52 35.15 27.32 3.05 II Non Arable Land

Conservation Measures (1) Ditch Cum Bund Fencing Mt. 1000 121 1.21 1000 121 1.15 0 0 0.00 0.06

(2) Contour Furrow in Pasture Land Hac. 25

10350 2.59 25

10350 2.46 0 0 0.00 0.13

(3) Contour Furrow in Non Arable Land Hac. 18

9100 1.64 18 9100 1.56 0 0 0.00 0.08

(4) Earthen Bund with Pitching No. 4 58500 2.34 4

58500 2.22 0 0 0.00 0.12

(5) Dug out Pond No. 3

57000 1.71 0 0 0.00 3 57000 1.71 0.00

MNREGA

(6) Water Harvesting Tanka No. 8

97500 7.80 0 0 0.00 8 97500 7.80 0.00

MNREGA

(7) Wasteweir No. 2 67000 1.34 2

67000 1.27 0 0 0.00 0.07

(8) Deeping of nadi No. 11

57000 6.27 0 0 0.00 11 57000 6.27 0.00

MNREGA

Total 24.90 8.66 15.78 0.46 III Drainage Line Treatment

Page 61: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

28

(1) Earthen Bund with Pitching No. 2 58500 1.17 2

58500 1.11 0 0 0.00 0.06

(2) Wasteweir No. 4 67000 2.68 4

67000 2.55 0 0 0.00 0.13

(3) kadin No. 1

1007000 10.07 1

1007000 9.57 0 0 0.00 0.50

(4) Loose stone check dam I ,II , III No. 16

18000 2.88 16

18000 2.74 0 0 0.00 0.14

(5) Dykes No. 1 150000 1.50 1

150000 1.43 0 0 0.00 0.08

Total 18.30 17.39 0.00 0.92

Total Watershed Development Works

108.71 61.19 43.10 4.42

C Production System 10% 10%

I Arable Land Production System

(1) Crop Demonstration /Fodder Demonstration No. 120

5225 6.27 20 0 1.05 100 5225 5.23 0.00

Ag. Deptt

(2) Agro Forestry No. 20 7800 1.56 20 7800 1.56 0 0 0.00 0.00

(3) Dry land Horticulture No. 50 7400 3.70 0 0 0.00 50 7400 3.70 0.00 NHM

(4) Homestead Kitchen Garden No. 350 500 1.75 0 0 0.00 350 500 1.75 0.00

Ag. Deptt

(5) i Compost Pit No. 20

2300 0.46 0 0 0.00 20 2300 0.46 0.00

Ag. Deptt

(6) ii Vermi Compost Unit No. 25

2700 0.68 0 0 0.00 25 2700 0.68 0.00

Ag. Deptt

(7) Plantation in pastureland No. 10

19600 1.96 10

19600 1.86 0 0 0.00 0.10

(8) Over seeding in Non Arable land Hac 22

1150 0.25 22 1150 0.24 0 0 0.00 0.01

(9) Water Tank. No. 13

24375 3.17 13

24375 3.01 0 0 0.00 0.16

(10) HDPE/ PVC Pipe No. 10

15000 1.50 0 0 0.00 10 15000 1.50 0.00

Ag. Deptt

Page 62: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

29

(11) Nepesek Spraier by hand mounted No. 65 650 0.42 0 0 0.00 65 650 0.42 0.00

Ag. Deptt

(12) Nepesek Spraier by foot mounted No. 50 850 0.43 0 0 0.00 50 850 0.43 0.00

Ag. Deptt

(13) Hand rotetary duster No. 40 775 0.31 0 0 0.00 40 775 0.31 0.00

Ag. Deptt

(14) Seed cum fertilizer drill No. 1

15000 0.15 0 0 0.00 1 15000 0.15 0.00

Ag. Deptt

(15) Isopam (Threser) No. 6

20000 1.20 0 0 0.00 6 20000 1.20 0.00

Ag. Deptt

Total - 23.80 7.72 15.82 0.27 III Live Stock Management (1)

Distribution of Buffalo bulls No. 4 35000 1.40 0 0 0.00 4 35000 1.40 0.00 AH

(2) Mangers Distribution No. 53

2100 1.11 53 2100 1.11 0 0 0.00 0.00

(3) Animal Health Camps No. 22

15000 3.30 14 0 2.10 8 15000 1.20 0.00 AH

Total 5.81 3.21 2.60 0.00 Total Production System 29.62 10.93 18.42 0.27

D

Household Production System& Micro Enterprises-Goat and Sheep Rearing, Service sector Carpentry Tailoring, Blacksmith, Repair shop for Cycle. 9% 35

31000 10.85 35

31000 9.77 0 0 0.00 1.09

E. Consolidation 3% 1 328000 3.28 1

328000 3.28 0 0 0.00 0.00

Grand Total 176.5

0 109.21 61.52 5.77

Page 63: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

30

CHAPTER V ANNUAL ACTION PLAN THROUGH PROJECT FUND

STATE: RAJASTHAN UNIT COST: RS. 15000/- Hac.--- DISTRICT: JALORE GEOGRAPHICAL AREA: 4878.00- Hac AGROCLIMATIC ZONE: 093 EFFECTIVE AREA: 4878.00 Hac NAME OF THE BLOCK: jalore (I) ARABLE LAND:- 3136.91 Hac NAME OF WATERSHED: Jalore (IWMP)-15 (II) NON ARABLE LAND:- 1741.09 Hac CATEGORY OF WATERSHED: DESERT AREA IRRIGATION PERCENTAGE: TOTAL COST:- 731.68- Lacs ---------------

1st year 2nd year 3st year 4st year 5st year S.No Activity Unit Quantity Total Cost

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

1 2 3 4 6.00 7 8.00 9 10.00 11 12.00 13 14.00 15 16.00 A Preparatory phase

activities capacity 22 % building trainings & EPA

I Administration cost 10% 0 73.17 14.63 14.63 14.63 14.63 14.63

II Monitoring 1% 0 7.32 1.46 1.46 1.46 1.46 1.46

III Evaluation 1% 0 7.32 1.46 1.46 1.46 1.46 1.46

Total 12% 87.80 0 17.56 0 17.56 0 17.56 0 17.56 0 17.56

I Preparatory Phase (Entry Point Activity) 4% 0 29.27 29.27

II Institution And Capacity Building 5% 0 36.59 7.32 7.32 7.32 7.32 7.32

III

Preparation of Detailed Project Report (DPR) 1% 0 7.32 7.32 0.00 0.00 0.00 0.00

Total 10% 73.17 0 43.91 0 7.32 0 7.32 0 7.32 0 7.32 B

Natural resource 56%

Page 64: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

31

management (56%)

Arable Land Conservation Measures

(1) Vegetative Bund Hac. 290 65.25 0 0.00 120 27.00 60 13.50 60 13.50 50 11.25

(2) Earthen Bund with Pitching No. 228 46.17 0 0.00 125 25.31 75 15.19 28 5.67 0 0.00

(3) Bank Stabilisation Hac. 120 71.50 0 0.00 100 59.58 20 11.92 0 0.00 0 0.00 (4) Dug out Pond No. 7 2.24 0 0.00 5 1.60 2 0.64 0 0.00 0 0.00

(5) Water Harvesting Tanka / Structure No. 13 11.41 0 0.00 10 8.78 2 1.76 1 0.88 0 0.00

(6) Wasteweir / Stone out let No. 15 9.05 0 0.00 7 4.22 5 3.02 1 0.60 2 1.21

(7) khadin 200 m No. 19 20.52 2 2.16 5 5.40 6 6.48 6 6.48 0 0.00 Total 0 226.13 2.16 131.89 52.49 27.13 12.46

II Non Arable Land Conservation Measures 0 0.00

(1) Ditch Cum Bund Fencing Mt. 7821 8.99 0 0.00 2100 2.42 3500 4.03 2000 2.20 221 0.35

(2) Contour Furrow in Pasture Land Hac. 130 12.78 0 0.00 60 5.90 40 3.93 30 2.95 0 0.00

(3) Contour Furrow in Non Arable Land Hac. 194 16.77 0 0.00 70 6.06 100 8.65 24 2.07 0 0.00

(4) Earthen Bund with Pitching No. 69 38.35 0 0.00 48 26.68 21 11.67 0 0.00 0 0.00

(5) Dug out Pond No. 6 3.42 0 0.00 4 2.28 2 1.14 0 0.00 0 0.00

(6) Water Harvesting Tanka No. 5 4.88 0 0.00 2 1.95 3 2.93 0 0.00 0 0.00

(7) Wasteweir No. 12 7.64 0 0.00 6 3.82 4 2.55 2 1.27 0 0.00 (8) Deeping of nadi 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 Total 0 92.82 0.00 49.10 34.89 8.49 0.35

III Drainage Line Treatment 0 0.00

(1) Earthen Bund with Pitching No. 41 22.79 0 0.00 14 7.78 10 5.56 10 5.56 7 3.89

(2) Wasteweir No. 15 9.55 0 0.00 4 2.55 4 2.55 4 2.55 3 1.91 (3) kadin 400 m No. 4 31.90 0 9.57 2 8.02 1 8.24 1 6.08 0 0.00

Page 65: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

32

(4) Loose stone check dam I ,II , III 72 12.31 0 0.00 30 5.13 20 3.42 21 3.59 1 0.17

(5) Dykes 10 14.25 0 0.00 4 5.70 4 5.70 2 2.85 0 0.00 Total 0 90.80 9.57 29.18 25.46 20.63 5.97

Total Watershed Development Works 0 409.75 11.73 210.16 112.84 56.25 18.78

C Production System 10% 10% 0 0.00

I Arable Land Production System 0 0.00

(1) Crop Demonstration /Fodder Demonstration No. 220 11.50 0 0.00 150 7.85 70 3.65 0 0.00 0 0.00

(2) Agro Forestry No. 140 10.45 0 0.00 130 9.71 10 0.74 0 0.00 0 0.00 (3) Dry land Horticulture No. 40 2.96 0 0.00 40 2.96 0 0.00 0 0.00 0 0.00

(4) Homestead Kitchen Garden No. 400 2.00 0 0.00 400 2.00 0 0.00 0 0.00 0 0.00

(5) i Compost Pit No. 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 (6) ii Vermi Compost Unit No. 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 (7) Plantation in

pastureland No. 80 14.90 0 0.00 50 9.31 30 5.59 0 0.00 0 0.00

(8) Over seeding in Non Arable land Hac 93 1.02 0 0.00 90 0.98 3 0.03 0 0.00 0 0.00

(9) Water Tank. No. 68 15.75 0 0.00 20 4.63 20 4.63 22 5.10 6 1.38 (10) HDPE/ PVC Pipe No. 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 (11) Nepesek Spraier by

hand mounted No. 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

(12) Nepesek Spraier by foot mounted No. 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

(13) Hand rotetary duster No. 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 (14) Seed cum fertilizer

drill No. 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

(15) Isopam (Threser) No. 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 Total - 0 58.57 0.00 37.44 14.64 5.10 1.38

III Live Stock Management 0 0.00

(1) Distribution of Buffalo No. 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

Page 66: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

33

bulls (2) Mangers Distribution No. 398 8.00 0 0.00 350 7.04 48 0.96 0 0.00 0 0.00 (3) Animal Health Camps No. 44 6.60 0 0.00 32 4.80 10 1.50 2 0.30 0 0.00 Total 0 14.60 0.00 11.84 2.46 0.30 0.00

Total Production System 0 73.16 0.00 49.28 17.11 5.40 1.38

D

Household Production System& Micro Enterprises-Goat and Sheep Rearing, Service sector Carpentry Tailoring, Blacksmith, Repair shop for Cycle. 9% 236 65.84 0 0.00 90 25.11 60 16.74 60 16.74 26 7.25

E. Consolidation 3% 3 21.95 11.00 10.95 Grand Total 0 731.68 73.19 309.42 182.57 114.21 52.29

Page 67: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

34

CHAPTER V ANNUAL ACTION PLAN THROUGH CONVERGENCE FUND

STATE: RAJASTHAN UNIT COST: RS. 15000/- Hac.--- DISTRICT: JALORE GEOGRAPHICAL AREA: 4878.00- Hac. AGROCLIMATIC ZONE: 093 EFFECTIVE AREA: 4878.00 Hac NAME OF THE BLOCK: jalore ( I) ARABLE LAND:-- 3136.91 Hac NAME OF WATERSHED: Jalore (IWMP)-15 ( II) NON ARABLE LAND:-- 1741.09 Hac CATEGORY OF WATERSHED: DESERT AREA TOTAL : 4878.00 Hac IRRIGATION PERCENTAGE: TOTAL COST: 239.91 Lacs

1st year 2st year 3st year 4st year 5st year S.No Activity Unit Qua

ntity Unit Cost

Total Cost

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 2 3 4 5 6.00 7 8.00 9 10.00 11 12.00 13 14.00 15 16.00 A Preparatory phase

activities capacity 22% building trainings & EPA

I Administration cost 10% 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 II Monitoring 1% 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 III Evaluation 1% 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 Total 12% 0 0 0.00 0 0.00 0 0.00 0.000 0.00 0.000 0.00 0.000 0.00

I Preparatory Phase (Entry Point Activity) 4% 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

II Institution And Capacity Building 5% 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

III Preparation of Detailed Project Report (DPR) 1% 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

Total 10% 0.00 0 0.00 0 0.00 0.000 0.00 0.000 0.00 0.000 0.00 B Natural resource

management (56%)

Arable Land Conservation Measures 56%

(1) Vegetative Bund Mt. 660 2250 148.50 250 56.25 380 85.50 10 2.25 0 0.00 20 4.50

Page 68: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

35

0

(2) Earthen Bund with Pitching No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

(3) Bank Stabilisation

(4) Dug out Pond No. 10 3200

0 3.20 2 0.64 3 0.96 5 1.60 0 0.00 0 0.00

(5) Water Harvesting Tanka / Structure No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

(6) Wasteweir / Stone out let No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

(7) khadin 200 m No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 Total 151.70 252 56.89 383 86.46 15.00 3.85 0.00 0.00 20.00 4.50

II Non Arable Land Conservation Measures

(1) Ditch Cum Bund Fencing Mt. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

(2) Contour Furrow in Pasture Land Hac. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

(3) Contour Furrow in Non Arable Land Hac. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

(4) Earthen Bund with Pitching No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

(5) Dug out Pond No. 9 5700

0 5.13 5 2.85 4 2.28 0 0.00 0 0.00 0 0.00

(6) Water Harvesting Tanka No. 12

97500 11.70 2 1.95 4 3.90 4 3.90 2 1.95 0 0.00

(7) Wasteweir No. 0 6700

0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

(8) Deeping of nadi No. 31 5700

0 17.67 10 5.70 5 2.85 10 5.70 7 3.99 0 0.00 Total 34.50 0 10.50 0 9.03 0.00 9.60 0.00 5.94 0.00 0.00

III Drainage Line Treatment

(1) Earthen Bund with Pitching No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

(2) Wasteweir No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 (3) kadin 400 m No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

Page 69: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

36

(4) Loose stone check dam I ,II , III No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

(5) Dykes No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 Total 0 0.00 0 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Watershed Development Works 186.20 252 67.39 0 95.49 15.00 13.45 0.00 5.94 20.00 4.50

C Production System 10% 10%

I Arable Land Production System

(1) Crop Demonstration /Fodder Demonstration No. 300 5225 15.68 100 5.23 100 5.23 100 5.23 0 0.00 0 0.00

(2) Agro Forestry No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 (3) Dry land Horticulture No. 90 7400 6.66 20 1.48 20 1.48 20 1.48 20 1.48 10 0.74

(4) Homestead Kitchen Garden No. 1250 500 6.25 250 1.25 500 2.50 500 2.50 0 0.00 0 0.00

(5) i Compost Pit No. 81 2300 1.86 25 0.58 25 0.58 31 0.71 0 0.00 0 0.00 (6) ii Vermi Compost Unit No. 225 2700 6.08 75 2.03 50 1.35 100 2.70 0 0.00 0 0.00 (7) Plantation in

pastureland No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 (8) Over seeding in Non

Arable land Hac 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 (9) Water Tank. No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

(10) HDPE/ PVC Pipe No. 20

15000 3.00 5 0.75 5 0.75 5 0.75 5 0.75 0 0.00

(11) Nepesek Spraier by hand mounted No. 190 650 1.24 45 0.29 45 0.29 45 0.29 55 0.36 0 0.00

(12) Nepesek Spraier by foot mounted No. 95 850 0.81 20 0.17 45 0.38 20 0.17 10 0.09 0 0.00

(13) Hand rotetary duster No. 90 775 0.70 20 0.16 30 0.23 30 0.23 10 0.08 0 0.00 (14) Seed cum fertilizer drill

No. 6 1500

0 0.90 1 0.15 2 0.30 2 0.30 1 0.15 0 0.00 (15) Isopam (Threser)

No. 16 2000

0 3.20 4 0.80 8 1.60 4 0.80 0 0.00 0 0.00 Total - 46.36 12.87 14.69 15.16 2.90 0.74

III Live Stock Management

Page 70: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

37

(1) Distribution of Buffalo bulls No. 9

35000 3.15 2 0.70 5 1.75 2 0.70 0 0.00 0 0.00

(2) Mangers Distribution No. 0 2100 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 (3) Animal Health Camps

No. 28 1500

0 4.20 12 1.80 12 1.80 4 0.60 0 0.00 0 0.00 Total 7.35 0 2.50 0 3.55 0.00 1.30 0.00 0.00 0.00 0.00

Total Production System 53.71 0 15.37 0 18.24 0.00 16.46 0.00 2.90 0.00 0.74

D

Household Production System& Micro Enterprises-Goat and Sheep Rearing, Service sector Carpentry Tailoring, Blacksmith, Repair shop for Cycle. 9% 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

E. Consolidation 3% 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 Grand Total 239.91 252 82.76 0 113.73 15.00 29.91 0.00 8.84 0.00 5.24

Page 71: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

38

PRODUCTION MEASURE THROUGH CONVERGENCE

Unn Meda Uprala Chanwarcha Total S.no Name of Activity Unit Unit Cost

Qty. Cost Qty. Cost Qty. Cost Qty. Cost

1 HDPE/ PVC Pipe

No. 20 300000 5 75000 10 150000 5 75000 20 300000

2

Nepesek Spraier by hand mounted

No. 190 123500 75 48750 75 48750 40 26000 190 123500

3

Nepesek Spraier by foot mounted

No. 95 80750 30 25500 35 29750 30 25500 95 80750

4 Hand rotetary duster No. 90 69750 25 19375 40 31000 25 19375 90 69750

5 Seed cum fertilizer drill No. 6 240000 2 80000 2 80000 2 80000 6 240000

6 Isopam (Threser) 16 320000 4 80000 6 120000 6 120000 16 320000

Total 1134000 328625 459500 345875 1134000

Page 72: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

39

MODEL ESTIMATE OF LOOSE STONE CHECK DAM (LSCD)- Type- A

Length of chec

kdam= 10m.

Bottom width 1.5 Top width 0.8 Height 1.0

Dimension (in m.) Unit Amount Amount S.no. Item No.

L. W./ TW.

BW. D./H/

Quantity Unit

Labour Metrial

Rate

Labour Metrial

1 Earth work in loose soil for construction of bund including ramming compaction and dressing up to the lead of 50m and lift 1.5 m

1 10 1.5 0.2 1.50 Cum 89 0 89.00 133.50 0.00 133.50

2 R. R. dry Stone masonary (write item detail as per BSR language)

In Foundation 1 10 1.5 0.2 1.50 Cum 340.8 914.20 1255.00 511.20 1371.30 1882.50

Head wall 1 10 0.8 1.5 1.0 11.50 Cum 340.8 914.20 1255.00 3919.20 10513.30 14432.50

Head wall extension 2 2 0.75 0.3 0.90 Cum 340.8 914.20 1255.00 306.72 822.78 1129.50

. Vol. 13.90 4870.62 12707.38 17578.00

Contingency 527.34

Page 73: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

40

labour 4870.62

metrial 12707.38

Total cost 18105.34

Say 18000.00

Page 74: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

41

Model Estimate of Sub-Surface Dykes

Length of SSD = 80 m Bottom width= 3 Mtr Depth = 2.50 m

S.No. Item No. Length Bottom width

Depth /Height

Qty Unit Unit rate (Rs.) Amount (Rs)

1Earthwork excavation in hard soil up to 1.5 m lift of soil 1 50 3 2.5 375cum 89 33375

Earthwork excavation in hard soil more than 1.5 m lift of soil 180Cum 101 18180

2Transportation of black cotton soil for the SSD lead up to 20 km 1 50 3 2.5 375cum 209.13 78423.75

3Hiring of tractore 25 hp with POL for the compaction of soil

10 days 10

days ( 8 hours per day) 1650 16500

146478.75

Contingency 4394.36

Labour 51555 Say 150000

Material 98445

150000

Page 75: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

42

COST ESTIMATE tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12

yEckbZ 100 ehVj dk;Z dk uke& esMcUnh

nj jkf’k Ø-la-

fooj.k ek=k bdkbZ Je lkexzh dqy Je dqy

1 Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd 200.00 ehVj 0.47 0.00 0.47 94.00 94.00

2 feV~Vh dk dk;Z cU/k esa ¼lw[kh ;k xhyh½ 15 lseh ijr esa Mkyuk] <syksa dks rksMuk] ?kkl&ikr rFkk dadj chudj vyx djuk rFkk feV~Vh dh njslh djuk 1-5 eh0 mBkuk rFkk 50 ehVj nwjh ds fy,A dBksj feV~Vh esa feV~Vh dh dqVkbZ ekuo }kjk ;k Iysu jksyj }kjk A 240.00 ?k-eh- 89.00 0.00 89.00 21360.00 21360.00

3 cht cqokbZ cuk;s x;s fjt ij 200.00 ehVj 0.60 0.00 0.60 120.00 120.00

4 fMofyax fof/k ls okfudh chp cqokbZ dk;Z 670.00 ux@100 9.9 0.00 66.33 66.33

5 chtks dh ek=k 1- ?kke.k ?kkl cht 2.00 fd-xzk - 85.00 - 170.00

6 okfudh cht 2.00 fd-xzk - 25.00 - 50.00

;ksx 21640.33 21860.33

tksMk 3% dUVkstsUlh 655.81

;ksx 22516.14

ykxr Je Hkkx 21640.33

ykxr lkexzh Hkkx 875.81

dqy ;ksx 22516.14

Say 22500.00

: 225 @ehVj

Page 76: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

43

MODEL ESTIMATE

tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12

dk;Z dk uke& esMcUnh yEckbZ 100 ehVj

Ø-la-

fooj.k y-xpkS-xx- = dqy ek=k

1 Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd 2x 100 = 200 ehVj

2 feV~Vh dk dk;Z cU/k esa ¼lw[kh ;k xhyh½ 15 lseh ijr esa Mkyuk] <syksa dks rksMuk]

?kkl&ikr rFkk dadj chudj vyx djuk rFkk feV~Vh dh njslh djuk 1-5 eh0

mBkuk rFkk 50 ehVj nwjh ds fy,A dBksj feV~Vh esa feV~Vh dh dqVkbZ ekuo }kjk

;k Iysu jksyj }kjk A

100x(0.30+3.7)x 1.20 2

= 240. ?k-eh-

3 /kkeu@?kkl cht cqokbZ cuk;s x;s fjt ij nks ykbZuksa esa 2 x 100 = 200 eh-

4 fMofyax fof/k ls okfudh chp cqokbZ dk;Z

= 100x100 = 666.66 say 670 15

5 chtks dh ek=k 1- ?kke.k ?kkl cht

200 ehVj @ 1 fdyks@100 ehVj =2 fdyks

6 okfudh cht

200 ehVj @ 1 fdyks@100 ehVj =2 fdyks

Page 77: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

44

COST ESTIMATE tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12 dk;Z dk uke&vdf"k Hkwfe ij Mx vkmV iks.M+

nj jkf’k Ø-la-

fooj.k ek=k bdkbZ Je Lkexzh @dqy Je dqy 1 Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd 195.00 ehVj 0.47 0.47 91.65 91.65 2 feV~Vh dk dk;Z cU/k esa ¼lw[kh ;k xhyh½ 15 lseh

ijr esa Mkyuk] <syksa dks rksMuk] ?kkl&ikr rFkk dadj chudj vyx djuk rFkk feV~Vh dh njslh djuk 1-5 eh0 mBkuk rFkk 50 ehVj nwjh ds fy,A dBksj feV~Vh esa feV~Vh dh dqVkbZ ekuo }kjk ;k Iysu jksyj }kjk A 206.40 ?k-eh- 89.00 89.00 18369.60 18369.60

3 cht cqokbZ cuk;s x;s fjt ij 135.00 ehVj 0.60 0.60 81.00 81.00 4 fMofyax fof/k ls okfudh chp cqokbZ dk;Z

450.00 ux@100 9.9 9.9 44.55 44.55 5 chtks dh ek=k 1- ?kke.k ?kkl cht 1.00 fd-xzk - 85.00 - 85.00 6 okfudh cht 1.00 fd-xzk - 25.00 - 25.00 7 15 ls 30 lseh eksVs] gFkkSMs ls rjkls gq,s ,dy

iRFkj dh fifpax leLr mBku ds lkFk] vkiwfrZ lfgr 10.40 ?k-eh- 222.00 1188.00 2308.80 12355.20

;ksx 20895.60 31052.00 tksMk 3% dUVkstsUlh 931.56 ;ksx 31983.56 ykxr Je Hkkx 20895.60 ykxr lkexzh Hkkx 11087.96 dqy ;ksx 31983.56 Say 32000.00

Page 78: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

45

MODEL ESTIMATE

tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12

dk;Z dk uke&vdf"k Hkwfe ij Mx vkmV iks.M+ Ø-la- fooj.k y-xpkS-xx- = dqy ek=k 1

Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd

4x 14 = 56 ehVj 4x6 = 24 ehVj ;ksx = 80 ehVj

y uhps ls pkS mij ls pkS0 x0 dqy ek=k

2 feV~Vh dk dk;Z cU/k esa ¼lw[kh ;k xhyh½ 15 lseh ijr esa Mkyuk] <syksa dks rksMuk] ?kkl&ikr rFkk dadj chudj vyx djuk rFkk feV~Vh dh njslh djuk 1-5 eh0 mBkuk rFkk 50 ehVj nwjh ds

fy,A dBksj feV~Vh esa feV~Vh dh dqVkbZ ekuo }kjk ;k Iysu jksyj

}kjk A

80 3.7 0.6 1.2 206.4

3 /kkeu@?kkl cht cqokbZ cuk;s x;s fjt ij nks ykbZuksa esa

2 x 42 = 84

eh- fd-xzk- - 2.5 - 4

fMofyax fof/k ls okfudh chp cqokbZ dk;Z

= 42x100 = 280

15 fd-xzk- - 2.5 - 5

chtks dh ek=k 1- ?kke.k ?kkl cht 42 ehVj @ 1 fdyks@100 ehVj =0.42 fdyks say 1 fd-xzk-

6

okfudh cht 42 ehVj @ 1 fdyks@100 ehVj =0.42 fdyks say 1 fd-xzk- 7 15 ls 30 lseh eksVs] gFkkSMs ls

rjkls gq,s ,dy iRFkj dh fifpax leLr mBku ds lkFk] vkiwfrZ lfgr 42x0.23 x1.0=9.66 ?k-eh-

Page 79: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

46

MODEL ESTIMATE

tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12 dk;Z dk uke&vdf"k Hkwfe ij Mx vkmV iks.M+

nj jkf’k Ø-la- fooj.k ek=k bdkbZ Je lkexzh@dqy Je dqy 1 Mkx csfyax 2-5 ls 5 lseh

xgjkbZ rd ¼ft-Lr-nj-vuq-2010i-la025 dz-la- 182½ 195.00 ehVj 0.47 0.47 91.65 91.65

2 feV~Vh dk dk;Z cU/k esa ¼lw[kh ;k xhyh½ 15 lseh ijr esa Mkyuk] <syksa dks rksMuk] ?kkl&ikr rFkk dadj chudj vyx djuk rFkk feV~Vh dh njslh djuk 1-5 eh0 mBkuk rFkk 50 ehVj nwjh ds fy,A dBksj feV~Vh esa feV~Vh dh dqVkbZ ekuo }kjk ;k Iysu jksyj }kjk A¼ft-Lr-nj 481.25 ?k-eh- 89.00 89.00 42831.25 42831.25

3 cht cqokbZ cuk;s x;s fjt ij ¼ft-Lr-nj-vuq-2010i-la0 20 dz-la-129½ 135.00 ehVj 0.60 0.60 81.00 81.00

4 fMofyax fof/k ls okfudh chp cqokbZ dk;Z ¼ft-Lr-nj-vuq-2010i-la0 25dz-la-184½ 450.00 ux@100 9.9 9.9 44.55 44.55

5 chtks dh ek=k 1- ?kke.k ?kkl cht 1.00 fd-xzk - 85.00 - 85.00

6 okfudh cht 1.00 fd-xzk - 25.00 - 25.00 7 15 ls 30 lseh eksVs] gFkkSMs ls

rjkls gq,s ,dy iRFkj dh fifpax leLr mBku ds lkFk] vkiwfrZ lfgr 10.40 ?k-eh- 222.00 1188.00 2308.80 12355.20

;ksx 45387.25 55513.65 tksMk 3% dUVkstsUlh 1665.41 ;ksx 57179.06 ykxr Je Hkkx 45357.25 ykxr lkexzh Hkkx 11821.81 dqy ;ksx 57179.06 Say 57000.00

Page 80: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

47

MODEL ESTIMATE

tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12

dk;Z dk uke&vdf"k Hkwfe ij Mx vkmV iks.M+ Ø-la- fooj.k y-xpkS-xx- = dqy ek=k 1

Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd

2x 97 = 195 ehVj

y uhps ls pkS mij ls pkS0 x0 dqy ek=k

2 feV~Vh dk dk;Z cU/k esa ¼lw[kh ;k xhyh½ 15 lseh ijr esa Mkyuk] <syksa dks rksMuk]

?kkl&ikr rFkk dadj chudj vyx djuk rFkk feV~Vh dh njslh djuk 1-5 eh0 mBkuk rFkk 50 ehVj nwjh ds fy,A dBksj feV~Vh esa feV~Vh dh dqVkbZ ekuo }kjk ;k Iysu

jksyj }kjk A

100 4.5 1 1.75 481.25

3 /kkeu@?kkl cht cqokbZ cuk;s x;s fjt ij nks ykbZuksa esa 2 x 67.75 =135 eh-

4

fMofyax fof/k ls okfudh chp cqokbZ dk;Z

= 68x100 = 453 say 450

15 5

chtks dh ek=k 1- ?kke.k ?kkl cht 68 ehVj @ 1 fdyks@100 ehVj =0.68 fdyks say 1 fd-xzk-

6

okfudh cht 68 ehVj @ 1 fdyks@100 ehVj =0.68 fdyks say 1 fd-xzk- 7 15 ls 30 lseh eksVs] gFkkSMs ls

rjkls gq,s ,dy iRFkj dh fifpax leLr mBku ds lkFk] vkiwfrZ lfgr 52x1.00 x0.20=10.40 ?k-eh-

Page 81: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

48

COST ESTIMATE

tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12 dk;Z dk uke& df"k Hkwfe ij osthVsfVo caM yEckbZ izfr gSDV;j 60 eh0 {kS=Qy% 01 gSDVs;j

nj jkf’k Ø-la-

fooj.k ek=k bdkbZ Je lkexzh@dq

y Je dqy 1

Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd

120.00

ehVj

0.47 0.47 56.40 56.40 2 feV~Vh dk dk;Z cU/k

esa ¼lw[kh ;k xhyh½ 15 lseh ijr esa Mkyuk] <syksa dks rksMuk] ?kkl&ikr rFkk dadj chudj vyx djuk rFkk feV~Vh dh njslh djuk 1-5 eh0 mBkuk rFkk 50 ehVj nwjh ds fy,A dBksj feV~Vh esa feV~Vh dh dqVkbZ ekuo }kjk ;k Iysu jksyj }kjk A 111.00

?k-eh-

89.00 89.00 9879.00 9879.00 3 /kkeu@?kkl cht

cqokbZ cuk;s x;s fjt ij nks ykbZuksa esa 120.00

ehVj 0.60 0.60 72.00 72.00

4 /kkeu ?kkl cht 1.00 fd-xzk - 85.00 85.00

;ksx 10007.40 10092.40

tksMk 3% dUVkstsUlh 302.77

;ksx 10395.17

ykxr Je Hkkx 10007.40

ykxr lkexzh Hkkx 387.77

dqy ;ksx 10395.17

Say 10350.00

Page 82: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

49

MODEL ESTIMATE tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12

dk;Z dk uke& df"k Hkwfe ij osthVsfVo caM yEckbZ izfr gSDV;j 60 eh0 {kS=Qy% 01 gSDVs;j

Ø-la- fooj.k y-xpkS-xx- = dqy ek=k Yk- pkS- x dqy bdkbZ 1

Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd

60 2 1 120 eh0 2 feV~Vh dk dk;Z cU/k

esa ¼lw[kh ;k xhyh½ 15 lseh ijr esa Mkyuk] <syksa dks rksMuk] ?kkl&ikr rFkk dadj chudj vyx djuk rFkk feV~Vh dh njslh djuk 1-5 eh0 mBkuk rFkk 50 ehVj nwjh ds fy,A dBksj feV~Vh esa feV~Vh dh dqVkbZ ekuo }kjk ;k Iysu jksyj }kjk A 60 1.85 1 111

/k0eh0

3 /kkeu@?kkl cht cqokbZ cuk;s x;s fjt ij nks ykbZuksa esa 60 2 1 120 eh0

4 /kkeu ?kkl cht 100 ehVj @1-00 fd-xzk-@100eh0 & 1-00 fd-xzk- na; 1-00 fd-xzk- 1 fdyks

Page 83: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

50

COST ESTIMATE

tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12 dk;Z dk uke& tylaxzg.k Vkadk {kerk & 22446 yhVj

nj jkf’k Ø-la- fooj.k ek=k bdkbZ Je lkexzh@dqy Je dqy

1 uhao] [kkbZ rFkk ukyk vkfn ds fy, 1-5 eh- xgjkbZ rd feV~Vh dh [kqnkbZ djuk] ry dks dwVuk]ikuh Mkyuk cxy dks laokjuk [kqnh feV~Vh dks ckgj fudkyuk uhao Hkjus ds ckn [kkyh LFkkuks dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj dh nwjh rd fuLrkj.k djukA

i l[r] fpduh]dadj feV~Vh esa 15.17 ?k-eh- 89.00 89.00 1350.13 1350.13 ii fo?kfVr p~Íku

13.21 ?k-eh- 141.00 141.00 1862.61 1862.61 2 i feV~Vh dh 1-5 eh- mBku ds vfrfjDr 4-5

eh- dh xgjkbZ rd dh mBku ds fy, 9.52 ?k-eh- 12.00 12.00 114.24 114.24 3 lhesUV dkadzhV uhao ;k Q”kZ esa 40 fe-eh- ek

dh iRFkj feV~Vh@bZVs lhesUV jsr elkyk esa 1 lhesUV]4 jsr % 8 feV~Vh vuqikr esa feykdj Mkyuk rFkk dqVkbZ djuk rjkbZ lesrA ¼ft-Lr-nj-vuq-2010la”kks- ist la-6 vkbZVe la- 11v½ 9.50 ?k-eh- 240.00 1835.00 2280.00 17432.50

4 lsUVfjax&”kVfjax dk vkj-lh-lh- Nr] Lysc] che]NTts fyUVy vkfn Mkyus ds fy, yxuk 4-5 ehVj ÅapkbZ rd ds fy, rFkk gVkuk vkfn fo”ks’k fooj.k ds vuqlkj ¼ft-Lr-nj-vuq-2010 la”kks- ist la-10 vkbZVe la- 45½ 26.84 o-eh- 22.05 128.00 591.82 3435.52

5 lhesUV dkdzhaV 1%1%5%3 feJ.k dh izofyr lhesaV dkdzhaV esa Mkyuk rFkk vkiwfrZ djuk] Nr dh Lyse] NTts] che] fyVy vkfn esa]nckuk] rjkbZ djuk rFkk lrg dks 1 % 3 lhesUV elkys ls lery djuk lesar ijUrq LVªh rFkk “kVfjax dh dher vyx ls ¼ft-Lr-nj-vuq-2010 la”kks- ist la- 9 vkbZVe la- 37½ 4.29 ?k-eh- 602.10 3719.00 2583.01 15954.51

6 uhao rFkk dqlhZ esa izFke Js.kh bZVks dh fpukbZ lhesUV ctjh 16 ;k 18 elkys esa e; cxy dh f>jh can djus rFkk rjkbZ lesrAlhesUV elkyk 1%6¼ft-Lr-nj-vuq-2010la”kks- ist la-7 vkbZVe la-16 v½ 5.31 ?k-eh- 147.00 3782.00 780.57 20082.42

7 lhesUV IykLVj nhokj ij 1%4 vuqikr esa lhesUV ctjh feykdj dj tksMks dks dqjsnus rFkk rjkbZ lfgr 20 fe-eh- ¼ft-Lr-nj-vuq-2010 la”kks- ist la- 13 vkbZVe la- 67c½ 33.88 o-eh- 27.93 151.00 946.27 5115.88

8 iRFkj ds fljny ¼fyVy½ dh vkiwfrZ dj] fpukbZ esa mi;ksx dh xbZ elkys esa mls yxkukA ¼ft-Lr-nj-vuq-2010 la”kks- ist la- 8 vkbZVe la- 31½ 2.10 o-eh- 162.00 1020.00 340.20 2142.00

9 vOoy ntsZ dh iRFkj dh ifÍ;ks dh Nr Mkyuk]Åij RkFkk uhps ls tksMks esa iRFkj dh phi ds lkFk 1%4 vuqikr esa lhesUV elkys ls Hkjuk ¼ft-Lr-nj-vuq-2010 la”kks- ist la- 9 vkbZVe 9.41 o-eh- 14.70 1107.00 138.33 10416.87

Page 84: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

51

la- 36½ 10 50 eh-eh- eksVkbZ esa lhesUV dadzhV 1%2%4 feJ.k

ftlesa 1 lhesaV 2 ctjh 4 iRFkj dh ;k bZV dh 12 eh- ukHkh; fxV~Vh ds lkFk feykdj ]dwVuk]nckuk rFkk rjkbZ vkfn lesrA ¼ft-Lr-nj-vuq-2010 la”kks- ist la- 11 vkbZVe la- 58v½ 16.71 o-eh- 34.00 249.00 568.14 4160.79

11 lhesaV IykLVj nhokj ij 1%6 vuqikr esa lhesaV&ctjh feykdj tksMks dks dqjsnus rFkk rjkbZ lesrA ¼c½ 20 eh-eh ¼ft-Lr-nj-vuq-2010la”kks-istla-13vkbZVe la- 68c½ 78.69 o-eh- 27.93 151.00 2197.81 11882.19

12 ,Y;wfefu;e dk <Ddu ¼0.45×0.45) ¼cktkj nj½ 1.00 ux 0 600.00 0.00 600.00

;ksx 13753.13 94549.66 tksMk 3% dUVkstsUlh 2836.49 ;ksx 97386.15 ykxr Je Hkkx 13753.13 ykxr lkexzh Hkkx 83633.02 dqy ;ksx 97386.15 say 97500.00

Page 85: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

52

MODEL ESTIMATE

tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12 dk;Z dk uke& tylaxzg.k Vkadk {kerk 22446 yhVj

Ø-la-

fooj.k y-xpkS-xx- = dqy ek=k 1 uhao] [kkbZ rFkk ukyk vkfn ds fy, 1-5 eh- xgjkbZ rd feV~Vh

dh [kqnkbZ djuk] ry dks dwVuk]ikuh Mkyuk cxy dks laokjuk [kqnh feV~Vh dks ckgj fudkyuk uhao Hkjus ds ckn [kkyh LFkkuks dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj dh nwjh rd fuLrkj.k djukA

i l[r] fpduh]dadj feV~Vh esa Vakdk& /4×(3.35)2×1.50=13.21?k-eh- vkxksj& /4×(9.50)2 &(9.05)2×0.30=

1.96 ;ksx=15.17 ?k-eh

ii fo?kfVr p~Íku ¼ft-Lr-nj-vuq-2010 la”kks- ist la- 5 vkbZVe la- 2c l n½

Vakdk& /4×(3.35)2×1.50=13.21?k-eh-

2 i feV~Vh dh 1-5 eh- mBku ds vfrfjDr 4-5 eh- dh xgjkbZ rd dh mBku ds fy,

13.21 ?ku-eh-

3 lhesUV dkadzhV uhao ;k Q”kZ esa 40 fe-eh- ek dh iRFkj feV~Vh@bZVs lhesUV jsr elkyk esa 1 lhesUV]4 jsr % 8 feV~Vh vuqikr esa feykdj Mkyuk rFkk dqVkbZ djuk rjkbZ lesrA ¼ft-Lr-nj-vuq-2010la”kks- ist la- 6vkbZVe la- 11v½

Vakdk& /4×(3.35)2×0.15=1.32?k-eh- vkxksj /4×[(9.05)2

x(3.50)2]×0.15=8.20 ?k-eh- ;ksx=9.52 ?k-eh

4 lsUVfjax&”kVfjax dk vkj-lh-lh- Nr] Lysc] che]NTts fyUVy vkfn Mkyus ds fy, yxuk 4-5 ehVj ÅapkbZ rd ds fy, rFkk gVkuk vkfn fo”ks’k fooj.k ds vuqlkj ¼ft-Lr-nj-vuq-2010 la”kks- ist la-10 vkbZVe la- 45½

×3.05×2.85=26.84o-eh

5 lhesUV dkdzhaV 1%1%5%3 feJ.k dh izofyr lhesaV dkdzhaV esa Mkyuk rFkk vkiwfrZ djuk] Nr dh Lyse] NTts] che] fyVy vkfn esa]nckuk] rjkbZ djuk rFkk lrg dks 1 % 3 lhesUV elkys ls lery djuk lesar ijUrq LVªh rFkk “kVfjax dh dher vyx ls ¼ft-Lr-nj-vuq-2010 la”kks- ist la- 9 vkbZVe la- 37½

/4×[(3.35)2 x(3.05)2]×2.85=4.29?k-eh-

6 uhao rFkk dqlhZ esa izFke Js.kh bZVks dh fpukbZ lhesUV ctjh 16 ;k 18 elkys esa e; cxy dh f>jh can djus rFkk rjkbZ lesrAlhesUV elkyk 1%6¼ft-Lr-nj-vuq-2010 la”kks- ist la- 7 vkbZVe la- 16 v½

/4×[(3.50)2 x(3.05)2]×0.60=1.38?k-eh- /4×[(9.50)2 x(9.05)2]×0.60=3.93 ?k-eh-

;ksx=5.31 ?k-eh

7 lhesUV IykLVj nhokj ij 1%4 vuqikr esa lhesUV ctjh feykdj dj tksMks dks dqjsnus rFkk rjkbZ lfgr 20 fe-eh- ¼ft-Lr-nj-vuq-2010 la”kks- ist la- 13 vkbZVe la- 67c½

×3.05×2.85 =27.29 o-eh- ×3.50×0.60 = 6.59 o-eh-

;ksx=33.88 o-eh- 8 iRFkj ds fljny ¼fyVy½ dh vkiwfrZ dj] fpukbZ esa mi;ksx dh

xbZ elkys esa mls yxkukA ¼ft-Lr-nj-vuq-2010 la”kks- ist la- 8 vkbZVe la- 31½

2×3.50×0.30=2.10 o-eh-

9 vOoy ntsZ dh iRFkj dh ifÍ;ks dh Nr Mkyuk]Åij RkFkk uhps ls tksMks esa iRFkj dh phi ds lkFk 1%4 vuqikr esa lhesUV elkys ls Hkjuk ¼ft-Lr-nj-vuq-2010 la”kks- ist la- 9 vkbZVe la- 36½

/4×(3.50)2=9.61 o-eh- ?kVk;k 0-45×0.45 =0.20 o-eh-

=9.41 o-eh-

10 50 eh-eh- eksVkbZ esa lhesUV dadzhV 1%2%4 feJ.k ftlesa 1 lhesaV 2 ctjh 4 iRFkj dh ;k bZV dh 12 eh- ukHkh; fxV~Vh ds lkFk feykdj Mkyuk]dwVuk]nckuk rFkk rjkbZ vkfn lesrA ¼ft-Lr-nj-vuq-2010 la”kks- ist la- 11 vkbZVe la- 58v½

/4×(3.05)2=7.30 o-eh- /4×(3.50)2=9.61 o-eh-

;ksx= 16.71 o-eh- ?kVk;k 0-45×0.45 =0.20 o-eh-

=16.71 o-eh- 11 lhesaV IykLVj nhokj ij 1%6 vuqikr esa lhesaV&ctjh feykdj

tksMks dks dqjsnus rFkk rjkbZ lesrA ¼c½ 20 eh-eh ¼ft-Lr-nj-vuq-2010la”kks- ist la-13 vkbZVe la-68c½

/4×[(9.50)2 x(3.50)2]=61.23 o-eh- 9.50×0.30=8.94 o-eh- 9.05×0.30=8.52 o-eh-

;ksx =78.69 o-eh-12 ,Y;wfefu;e dk <Ddu ¼0.45×0.45)

¼cktkj nj½ 1 uax

Page 86: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

53

COST ESTIMATE

tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12 dk;Z dk uke& osLV os;j

nj jkf”k Ø-la- fooj.k ek=k bdkbZ Je dqy Je dqy

1 uhao] [kkbZ rFkk ukyk vkfn ds fy, 1-5 eh- xgjkbZ rd feV~Vh dh [kqnkbZ djuk] ry dks dwVuk]ikuh Mkyuk cxy dks laokjuk [kqnh feV~Vh dks ckgj fudkyuk uhao Hkjus ds ckn [kkyh LFkkuks dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj dh nwjh rd fuLrkj.k 1- l[r] fpduh]dadj feV~Vh esa 4.52 ?k-eh- 89.00 89.00 402.28 402.28

2 lhesUV dkadzhV uhao ;k Q”kZ esa 20 fe-eh- ek dh iRFkj feV~Vh@bZVs lhesUV jsr elkyk esa 1 lhesUV 3 jsr % 6 feV~Vh vuqikr esa feykdj Mkyuk rFkk dqVkbZ djuk rjkbZ lesrA ¼ft-Lr-nj-vuq-2010la”kks- ist la-14 vkbZVe la- 138½ 1.00 ?k-eh- 240.00 2589.00 240.00 2589.00

3 ,uhdV gsrq iRFkjksa dh fpukbZ 1%4 lhesUV ctjh elkys esa uho esa vf/kjpuk esa 18.63 ?k-eh- 232.26 2322.00 4327.00 43285.86

4 osj)k iRFkj dk 23 ls-eh- mpkbZ esa [kMatk yxkuk rFkk feV~Vh ls Hkjuk rFkk [kaMts dk gksnk ess ls fudyh vfrfjDr feV~Vh dk 50 eh0 rd fuLrkj.k djukA lq[ks iRFkj esaA 2.19 o-eh- 205.80 1049.20 450.70 2297.75

5 lhesUV IykLVj nhokj ij 1%6 vuqikr esa lhesUV ctjh feykdj dj tksMks dks dqjsnus rFkk rjkbZ lfgr 25 fe-eh- 7.13 o-eh- 27.93 123.07 199.14 877.49

6 50 eh-eh- eksVkbZ esa lhesUV dadzhV 1%2%4 feJ.k ftlesa 1 lhesaV 2 ctjh 4 iRFkj dh 12 eh- ukHkh; fxV~Vh ds lkFk feykdj Mkyuk]dwVuk]nckuk rFkk rjkbZ vkfn lesrA 5.08 o-eh- 255.31 3120.00 1296.97 15849.60

;ksx 6916.10 65274.98 tksMk 3% dUVkstsUlh 1958.25 ;ksx 67233.23 ykxr Je Hkkx 6916.10 ykxr lkexzh Hkkx 60317.12 dqy ;ksx 67233.23 say 67000.00

Page 87: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

54

MODEL ESTIMATE tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12 dk;Z dk uke& osLV os;j Ø-la-

fooj.k y-xpkS-xx- = dqy ek=k 1

uhao] [kkbZ rFkk ukyk vkfn ds fy, 1-5 eh- xgjkbZ rd feV~Vh dh [kqnkbZ djuk] ry dks dwVuk]ikuh Mkyuk cxy dks laokjuk [kqnh feV~Vh dks ckgj fudkyuk uhao Hkjus ds ckn [kkyh LFkkuks dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj dh nwjh rd fuLrkj.k l[r] fpduh]dadj feV~Vh esa

H.W. 1x7.50x2.50x2.00=37.50 ?ku fQV S.W.2x9.00x2.00x2.00=72.00 W.W. 4x2.00x2.00x2.00=32.00 A.P.1x7.50x3.25x0.75x=18.28 159.78 ?ku fQV 4.52 ?ku ehVj

2 lhesUV dkadzhV uhao ;k Q”kZ esa 20 fe-eh- ek dh iRFkj feV~Vh@bZVs lhesUV jsr elkyk esa 1 lhesUV]3 jsr % 6 feV~Vh vuqikr esa feykdj Mkyuk rFkk dqVkbZ djuk rjkbZ lesrA

H.W. 1x7.5x2.5x0.15=9.37 ?ku fQV S.W.2x9.0x2.0x0.15=18.00 W.W. 4x2.00x2.00x0.15=8.00 35.37 ?ku fQV 1.00 ?ku ehVj

3 ,uhdV gsrq iRFkjksa dh fpukbZ 1%4 lhesUV ctjh elkys esa uho esa vf/kjpuk esa

H.W. 1x7.5x2.5x1.50=28.12 ?ku fQV S.W.2x9.0x2.0x1.5=54.00 W.W. 4x2.00x2.00x1.5=24.00 H.W. 1x7.5x2.5+1.50/2x1.00=15.00 2 S.W.2x9.0x1.50x1.00=27.00 S.W. 2x9.00+3.00/2x1.50=40.50 2 W.W. 4x2.00x1.50x1.00=12.00 200.62 say 18.63 ?ku0eh-

4 osj)k iRFkj dk 23 ls-eh- mpkbZ esa [kMatk yxkuk rFkk feV~Vh ls Hkjuk rFkk [kaMts dk gksnk ess ls fudyh vfrfjDr feV~Vh dk 50 eh0 rd fuLrkj.k djukA lq[ks iRFkj esaA

1x7.50x3.15=23.62 o-fQV- Say 2.19 o-eh-

5

lhesUV IykLVj nhokj ij 1%4 vuqikr esa lhesUV ctjh feykdj dj tksMks dks dqjsnus rFkk rjkbZ lfgr 25 fe-eh-

H.W. 1x7.50x1.00=7.50 o-fQV H.W. 1x7.50x1.50=11.25 S.W2x9.00x1.00=18.00

S.W.2x9.00+3.00x2.15=30.00 2

W.W.4x3.50x1.00=14.00 80.75 ?kVk;k 2x2.5+1.5x1.00=4.00

2 =76.75

say 7.13 o-eh- 6

50 eh-eh- eksVkbZ esa lhesUV dadzhV 1%2%4 feJ.k ftlesa 1 lhesaV 2 ctjh 4 iRFkj dh ;k bZV dh 12 eh- ukHkh; fxV~Vh ds lkFk feykdj Mkyuk]dwVuk]nckuk rFkk rjkbZ vkfn lesrA

H.W 1x7.50x1.50=11.25 o-fQV- S.W 4x3.75x1.50=22.50 S.W.2x3.00x1.50=9.00

W.W.4x2.00x1.50=12.00 = 54.75

say 5.08

Page 88: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

55

COST ESTIMATE tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12 dk;Z dk uke&pjkxkg Hkwfe ij [kkbZ Qsaflax yEckbZ 100 ehVj

nj jkf”k Ø-la- fooj.k ek=k bdkbZ Je dqy Je dqy

1 Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd ¼ft-Lr-nj-vuq-2010i-la025 dz-la- 182½ 200 ehVj 0.47 0.47 94.00 94.00

2 uho] [kkbZ ijukyk esa 1-5 xgjkbZ rd feVV~h dk [kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk]cxy dks laokjuk][kqnh feV~Vhdks ckgj fudkyuk] uhoa Hkjus ds ckn [kkyh LFkkuksa dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj nwjh rd fuLrkj.k djukA l[r feV~Vh esaA [kkbZ gsrq 110 ?k-eh- 89.00 89.00 9790.00 9790.00

3 fMcfyax fof/k ls okfudh cht cqokbZ dk;Z 2000 ux@100 9.9 9.90 198.00 198.00

4 okfudh chtksa dh jkf'k 2.00 fd-xzk - 25.00 50.00 5 15 lseh xgjh VªsUp [kksndj Fkksj

yxkuk 100 ehVj 16.67 16.67 1667.00 1667.00 ;ksx 11749.00 11799.00 tksMk 3% dUVkstsUlh 353.97 ;ksx 12152.97 ykxr Je Hkkx 11749.00 ykxr lkexzh Hkkx 403.97 dqy ;ksx 12152.97 Say 12100.00

Rs.121 / meter

Page 89: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

56

MODEL ESTIMATE

tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12 dk;Z dk uke&pjkxkg Hkwfe ij [kkbZ Qsaflax 100 ehVj ¼ 1 gSDV;j½

Ø-la- fooj.k y-xpkS-xx- = dqy ek=k

1 Mkx csfyax 2-5 ls 5 lseh- xgjkbZ rd 1 gSDV;j @ 100 eh0@gSDVs;j

=100 ehVj 2x100 ehVj = 200 ehVj

2 uho] [kkbZ ijukyk esa 1-5 xgjkbZ rd feVV~h dk [kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk]cxy dks laokjuk][kqnh feV~Vhdks ckgj fudkyuk] uhoa Hkjus ds ckn [kkyh LFkkuksa dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj nwjh rd fuLrkj.k djukA l[r feV~Vh esaA [kkbZ gsrq

200x(1.60+0.60)x1.0 2

= 110.00 ?k-eh

3 fMcfyax fof/k ls okfudh cht cqokbZ dk;Z rhu ykbzuksa esa 15&15 lseh nwjh ij

3x100=300x100 15

=2000 uax 4 okfudh chtksa dh ek=k 100 eh0 @ 2 fdyks@100 eh0

=2 fd-xzk

5 15 lseh xgjh VªasUp [kksndj Fkksj yxkuk 100 ehVj

Page 90: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

57

MODEL ESTIMATE tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12 dk;Z dk uke&vdf"k Hkwfe ij dUVwj QjksZ {kS=Qy% 1-00 gSDVj

Ø-la- fooj.k y-xpkS-xx- = dqy ek=k 1 , Qsze ysoy ls 8 ls 15 ehVj {kSfrt vUrjky esa leksPp js[kk

ij ys vkmV dk dk;Z

1 gSDV;j @ 800eh0@gSDVs;j=800 eh0 2 Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd 800 eh- 3 uho] [kkbZ ijukyk esa 1-5 xgjkbZ rd feVV~h dk [kqnkbZ djuk]

ry dks dwVuk] ikuh Mkyuk]cxy dks laokjuk][kqnh feV~Vhdks ckgj fudkyuk] uhoa Hkjus ds ckn [kkyh LFkkuksa dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj nwjh rd fuLrkj.k djukAl[r]fpduh] dadj] feV~Vh esaA uhoa gsr 800 ehx1/2x0.60x0.30=72.00 ?ku0eh0

4 cht cqokbZ cuk;s x;s fjt ij 800 eh- 5 cht dh ek=k ¼/kke.k½ 800 eh- @ 1 fd-xzk-@100 ehVj=8 kg

Page 91: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

58

MODEL ESTIMATE tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12 dk;Z dk uke&vdf"k Hkwfe ij dUVwj QjksZ {kS=Qy% 1-00 gSDVj

nj jkf”k Ø-la- fooj.k ek=k bdkbZ Je dqy Je dqy 1 , Qsze ysoy ls 8 ls 15 ehVj {kSfrt

vUrjky esa leksPp js[kk ij ys vkmV dk dk;Z

800 eh- 1.15 1.15 920.00 920.00 2 Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd 800 eh- 0.47 0.47 376.00 376.00 3 uho] [kkbZ ijukyk esa 1-5 xgjkbZ rd feVV~h

dk [kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk]cxy dks laokjuk][kqnh feV~Vhdks ckgj fudkyuk] uhoa Hkjus ds ckn [kkyh LFkkuksa dks gsrq 72 ?k-eh- 89.00 89.00 6408.00 6408.00

4 cht cqokbZ cuk;s x;s fjt ij 800 eh- 0.60 0.60 480.00 480.00 5 cht dh ek=k ¼/kke.k½ 8 fd-xzk- - 85.00 - 680.00 ;ksx 8184.00 8864.00 tksMk 3% dUVkstsUlh 265.92 ;ksx 9129.92 ykxr Je Hkkx 8184.00 ykxr lkexzh Hkkx 945.92 dqy ;ksx 9129.92 Say 9100.00

Page 92: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

59

MODAL ESTIMATE Name of Watershed :- IWMP JALORE 15 / 2011-12 Name of Work : Crop/Fodder Demonstration

Seed D.A.P MOP Urea Insectisides Culture

S.No.

Details Area/ Demo. (Hec.) Qty.

(kg.)

Amt. Qty.(kg.)

Amt. Qty.(kg.

)

Amt.

Qty.(M.L)

Amt. Qty.(M.L)

Amt. No. of Packt.

Amt.

Amount/ Demo

Kharif Session 1. Single crop (i) Moong

0.04 8 440.00 35.00 350.00 0 0 0 0 500 175.00 1 10.00

975.00

(ii) Cluster Bean (Guar)

0.04 8 192.00 10.00 400.00 0 0 0 0 500 175.00 1 10.00 777.00

Say 675 A

2. Intercropping Moong + Bajra

0.04 4

+ 1

250.00 80.00 800.00 0 0 10 50.00 500 175.00 2 20.00

1295.00

Say 1300

B Rabi Session (i) Mustered 0.04 1.50 75.00

25.0

0 250.00 10 40.

00 40 200.00 500 175.00 1 10.00 750.00

C Fodder Demos. (i) Lucern

0.02 3 1250.00 0.00 0.00 60 216.00

10 50.00 0.00 0.00 1 10.00 1526.00

Say 1525

Page 93: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

60

Cost ESTIMATE

tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12 dk;Z dk uke&uhcwa Qynkj ikS/kksa dh ;wfuV ;wfuV dk {kS=Qy% 0-20 gSDVs;j¼55 ikS/ks@;wfuV½

Ø-la- fooj.k y-xpkS-xx- = dqy ek=k 1 uho] [kkbZ ijukyk esa 1-5 xgjkbZ rd feVV~h dk [kqnkbZ

djuk] ry dks dwVuk] ikuh Mkyuk]cxy dks laokjuk][kqnh feV~Vhdks ckgj fudkyuk] uhoa Hkjus ds ckn [kkyh LFkkuksa dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj nwjh rd fuLrkj.k djukA l[r]fpduh] 55x0.90x0.90x0.90= 40.09 ?k-eh

2 xkscj dh [kkn 55 xMMs~ @ 10 fd-xzk-@xM~Mk =550 fd-xzk- 3 lqqijQkLQsV 55 xMMs~ @ 0.25 fd-xzk-@xM~Mk=13.75 fd-xzk-

say 14 fd-xzk- 4 iksVk'k 55 xMMs~ @ 0.05 fd-xzk-@xM~Mk=2.75 fd-xzk-

say 3.00 fd-xzk- 5 ;wfj;k 55 xMMs~ @ 0.10 fd-xzk-@xM~Mk=5.50 fd-xzk-

say 6.00 fd-xzk- 6 nhed dh jksdFkke gsrq dhVuk'kd nokbZ ¼,UMkslYQku

4% pw.kZ½ 55 xMMs~ @ 0.10 fd-xzk-@xM~Mk=5.50 fd-xzk-

say 6.00 fd-xzk- 7 ikS/ks jksi.k djuk 55 8 ikS/kksa dh dher 55 9 ikS/kks ij yxus okys dhMs edksMks ds fu;aU=.k gsrq

eksuksdzksVksQkWl 36 b-lh 0.25 yhVj-@;wfuV 10 ikS/kksa essa moZjd ,oa nokbZ Mkyuk 110 10 ;wfuV

Page 94: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

61

MODEL ESTIMATE tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12 dk;Z dk uke&uhcwa Qynkj ikS/kksa dh ;wfuV ;wfuV dk {kS=Qy% 0-20 gSDVs;j¼55 ikS/ks@;wfuV½

nj jkf”k Ø-la- fooj.k ek=k bdkbZ Je dqy Je dqy 1 uho] [kkbZ ijukyk esa 1-5 xgjkbZ rd feVV~h

dk [kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk]cxy dks laokjuk][kqnh feV~Vhdks ckgj fudkyuk] uhoa Hkjus ds ckn [kkyh LFkkuksa dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj nwjh rd fuLrkj.k djukA l[r]fpduh] 40.09 ?k-eh- 89.00 89.00 3568.01 3568.01

2 xkscj dh [kkn 550 fd-xzk- - 4.00 - 2200.00 3 lqqijQkLQsV 14 fd-xzk- - 6.00 84.00 4 iksVk'k 3.00 fd-xzk- - 6.00 - 18.00 5 ;wfj;k 6 fd-xzk- - 6.00 - 36.00 6 nhed dh jksdFkke gsrq dhVuk'kd nokbZ

¼,UMkslYQku 4% pw.kZ½ 6 fd-xzk- - 15.00 90.00 7 ikS/ks jksi.k djuk

¼ft-Lr-nj-vuq-2010i-la0 20 dz-la-128c½ 55 la[;k 3.00 3.00 165.00 165.00 8 ikS/kksa dh dher 55 la[;k - 25.00 - 1375.00 9 ikS/kks ij yxus okys dhMs edksMks ds fu;aU=.k

gsrq eksuksdzksVksQkWl 36 b-lh 0.25 yhVj - 360.00 - 90.00 10 ikS/kksa essa moZjd ,oa nokbZ Mkyuk

¼ft-Lr-nj-vuq-2010i-la0 47 dz-la-5½ 110 la[;k 0.21 0.21 23.10 23.10 ;ksx 3756.11 7649.11 tksMk 3% dUVkstsUlh 229.47 ;ksx 7878.58 ykxr Je Hkkx 3756.11 ykxr lkexzh Hkkx 4122.47 dqy ;ksx 7878.58 Say 7800.00

Page 95: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

62

MODEL ESTIMATE

tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12 dk;Z dk uke&csj Qynkj ikS/kksa dh ;wfuV ;wfuV dk {kS=Qy% 0-20 gSDVs;j¼55 ikS/ks@;wfuV½

nj jkf”k Ø-la- fooj.k ek=k bdkbZ Je dqy Je dqy 1 uho] [kkbZ ijukyk esa 1-5 xgjkbZ rd

feVV~h dk [kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk]cxy dks laokjuk][kqnh feV~Vhdks ckgj fudkyuk] uhoa Hkjus ds ckn [kkyh LFkkuksa dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj nwjh rd fuLrkj.k djukA l[r]fpduh] 40.09 ?k-eh- 89.00 89.00 3568.01 3568.01

2 xkscj dh [kkn 550 fd-xzk- - 4.00 - 2200.00 3 lqqijQkLQsV 20 fd-xzk- - 6.00 120.00 4 iksVk'k 5.00 fd-xzk- - 6.00 - 30.00 5 ;wfj;k 12 fd-xzk- - 6.00 - 72.00 6 nhed dh jksdFkke gsrq dhVuk'kd nokbZ

¼,UMkslYQku 4% pw.kZ½ 6 fd-xzk- - 15.00 90.00 7 ikS/ks jksi.k djuk

¼ft-Lr-nj-vuq-2010i`-la0 20 dz-la-128c½ 55 la[;k 3.00 3.00 165.00 165.00 8 ikS/kksa dh dher 55 la[;k - 15.00 - 825.00 9 ikS/kks ij yxus okys dhMs edksMks ds

fu;aU=.k gsrq eksuksdzksVksQkWl 36 b-lh 0.25 yhVj - 360.00 - 90.00 10 ikS/kksa essa moZjd ,oa nokbZ Mkyuk

¼ft-Lr-nj-vuq-2010i`-la0 47 dz-la-5½ 110 la[;k 0.21 0.21 23.10 23.10 ;ksx 3756.11 7183.11 tksMk 3% dUVkstsUlh 215.49 ;ksx 7398.60 ykxr Je Hkkx 3756.11 ykxr lkexzh Hkkx 3642.49 dqy ;ksx 7398.60 Say 7400.00

Page 96: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

63

MODEL ESTIMATE tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12 dk;Z dk uke&csj Qynkj ikS/kksa dh ;wfuV ;wfuV dk {kS=Qy% 0-20gSDVs;j¼55 ikS/ks@;wfuV½ Ø-la-

fooj.k y-xpkS-xx- = dqy ek=k 1 uho] [kkbZ ijukyk esa 1-5 xgjkbZ rd

feVV~h dk [kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk]cxy dks laokjuk][kqnh feV~Vhdks ckgj fudkyuk] uhoa Hkjus ds ckn [kkyh LFkkuksa dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj nwjh rd fuLrkj.k djukA l[r]fpduh] 55x0.90x0.90x0.90= 40.09 ?k-eh

2 xkscj dh [kkn 55 xMMs~ @ 10 fd-xzk-@xM~Mk =550 fd-xzk- 3

lqqijQkLQsV 55 xMMs~ @ 0.35 fd-xzk-@xM~Mk =19.25 fd-xzk- say 20 fd-xzk-

4 iksVk'k

55 xMMs~ @ 0.08 fd-xzk-@xM~Mk =4.4 fd-xzk- say 5.00 fd-xzk-

5 ;wfj;k 55 xMMs~ @ 0.22 fd-xzk-@xM~Mk=12.10 fd-

xzk- say 12.00 fd-xzk- 6 nhed dh jksdFkke gsrq dhVuk'kd

nokbZ ¼,UMkslYQku 4% pw.kZ½ 55 xMMs~ @ 0.10 fd-xzk-@xM~Mk =5.50 fd-

xzk- say 6.00 fd-xzk- 7 ikS/ks jksi.k djuk 55 8 ikS/kksa dh dher 55 9 ikS/kks ij yxus okys dhMs edksMks ds

fu;aU=.k gsrq eksuksdzksVksQkWl 36 b-lh 0.25 yhVj-@;wfuV 10 ikS/kksa essa moZjd ,oa nokbZ Mkyuk 110

10 ;wfuV

Page 97: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

64

MODEL ESTIMATE tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12

dk;Z dk uke& ukyk fLFkjhdj.k ¼cSd LVfcykbZts'ku½ yEckbZ 100 ehVj

nj jkf“k Ø-la-

fooj.k ek=k bdkbZ Je lkexzh@dqy Je dqy

1 Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd

200.00 ehVj 0.47 0.47 94.00 94.00

2 feV~Vh dk dk;Z cU/k esa ¼lw[kh ;k xhyh½ 15 lseh ijr esa Mkyuk] <syksa dks rksMuk] ?kkl&ikr rFkk dadj chudj vyx djuk rFkk feV~Vh dh njslh djuk 1-5 eh0 mBkuk rFkk 50 ehVj nwjh ds fy,A dBksj feV~Vh esa feV~Vh dh dqVkbZ ekuo }kjk ;k Iysu jksyj }kjk A

410.00 ?k-eh- 89.00 89.00 36490.00 36490.00

3 cht cqokbZ cuk;s x;s fjt ij 200.00 ehVj 0.60 0.60 120.00 120.00 4 fMofyax fof/k ls okfudh chp

cqokbZ dk;Z 670.00 ux@100 9.9 9.9 66.33 66.33

5 chtks dh ek=k 1- ?kke.k ?kkl cht

2.00 fd-xzk - 85.00 - 170.00

6 okfudh cht 2.00 fd-xzk - 25.00 - 50.00 7 15 ls 30 lseh eksVs] gFkkSMs ls

rjkls gq,s ,dy iRFkj dh fifpax leLr mBku ds lkFk] vkiwfrZ lfgr

23.00 ?k-eh- 73.50 1188.00 1690.50 27324.00

;ksx 36770.33 64314.33 tksMk 3% dUVkstsUlh 1929.43

;ksx 66243.76 ykxr Je Hkkx 36770.33 ykxr lkexzh Hkkx 29473.43 dqy ;ksx 66243.76 Say 66200.00

:662 @ehVj

MODEL ESTIMATE

tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12

Page 98: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

65

dk;Z dk uke& ukyk fLFkjhdj.k ¼cSd LVfcykbZts'ku½ yEckbZ 100 ehVj Ø-la-

fooj.k y-xpkS-xx- = dqy ek=k 1 Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd 2x 100 = 200 ehVj 2 feV~Vh dk dk;Z cU/k esa ¼lw[kh ;k xhyh½ 15 lseh ijr

esa Mkyuk] <syksa dks rksMuk] ?kkl&ikr rFkk dadj chudj vyx djuk rFkk feV~Vh dh njslh djuk 1-5 eh0 mBkuk rFkk 50 ehVj nwjh ds fy,A dBksj feV~Vh esa feV~Vh dh dqVkbZ ekuo }kjk ;k Iysu jksyj }kjk A

100x(0.33+5.33)x 1.45 2

= 410. ?k-eh- 3 /kkeu@?kkl cht cqokbZ cuk;s x;s fjt ij nks ykbZuksa

esa 2 x 100 = 200 eh- 4

fMofyax fof/k ls okfudh chp cqokbZ dk;Z

= 100x100 = 666.66 say 670

15 5 chtks dh ek=k 1- ?kke.k ?kkl cht 200 ehVj @ 1 fdyks@100 ehVj =2 fdyks 6 okfudh cht 200 ehVj @ 1 fdyks@100 ehVj =2 fdyks 7 15 ls 30 lseh eksVs] gFkkSMs ls rjkls gq,s ,dy iRFkj

dh fifpax leLr mBku ds lkFk] vkiwfrZ lfgr 100x0.23 x1.0=23 ?k-eh-

Page 99: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

66

COST ESTIMATE

tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12 100 ikS/ks dk;Z dk uke& pjkxkg Hkwfe ij o{kkjksi.k dk;Z

nj jkf”k Ø-

la- fooj.k ek=k bdkbZ Je dqy Je dqy v 1

vfxze enk dk;Z %& 45x45x45 lseh- eki ds xM~Ms djuk dBksj feV~Vh 400 xM~Ms@gSDVj

100 la[;k 7.40 7.40 740.00 740.00 c 2

okuLifrd dk;Z%& ikS/ks jksi.k djuk

100 la[;k 3.20 3.20 320.00 320.00 3 ikS/kksa dh dher 108 la[;k 0 5.00 0 540.00 4 ikS/kks dks miyC/k ikuh fiykuk 15 yhVj@ikS/kksa

ikS/kksjksi.k ds le;

100 la[;k 1.90 1.90 190.00 190.00 5 ikS/ks jksi.k ds le; Mh,ih Mkyuk

3.00 fd-xzk- 0.00 15.00 0.00 45.00 6 ikS/kksa dk ifjogu ikS/ks HkjkbZ ,oa [kkyh djkbZ

lfgr 5 fdeh nwjh rd ds fy, 108

la[;k@1000 0.00 740.00 0.00 79.92

7 Fkkoyk cukuk de ls de 50 lseh v)Z O;kl dk lk/kkj.k tehu esa

100 la[;k 2.60 2.60 260.00 260.00

Page 100: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

67

8 j[kj[kkc%& ikS/kksa dks miyC/k ikuh fiykuk 15 yhVjA ikS/kksa

800 la[;k 1.90 1.90 1520.00 1520.00 9 ikS/kksa dh fujkbZ xqMkbZ djuk 15 lseh xgjkbZ rd

,oa 45 lseh v)ZO;kl rd

400 la[;k 1.30 1.30 520.00 520.00 10 ikuh dk ifjogu 5 fdeh nwjh rd ds fy,

12000 yhVj@1000

0 29.83 0 357.96 11 nhed fu;U=.k gsrq ,UMksalYQku 4% pw.kZ 10 fd-xzk- 0 15.00 0 150.00 12 ikS/kks esa moZjd ,oa dhV uk”kd nokbZ Mkyuk

200 la[;k 0.25 0.25 50.00 50.00 ;ksx 3600.00 4772.88 tksMk 3% dUVkstsUlh 143.19 ;ksx 4916.07 ykxr Je Hkkx 3600.00 ykxr lkexzh Hkkx 1316.07 dqy ;ksx 4916.07 Say 4900.00

49@izfr ikS/kk

Page 101: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

68

MODEL ESTIMATE

tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12 dk;Z dk uke& pjkxkg Hkwfe ij o{kkjksi.k dk;Z 100 ikS/ks Ø-la- fooj.k y-xpkS-xx- = dqy ek=k v 1

vfxze enk dk;Z %& 45x45x45 lseh- eki ds xM~Ms djuk dBksj feV~Vh 400 xM~Ms@gSDVj

100 xM~Ms

c 2

okuLifrd dk;Z%& ikS/ks jksi.k djuk

100 ikS/ks

3 ikS/kksa dh dher 108 (100+8 8% ikS/kksa dk mrjkbZ HkjkbZ [kjkck) 4 ikS/kks dks miyC/k ikuh fiykuk 15 yhVj@ikS/kksa

ikS/kksjksi.k ds le; 100

5 ikS/ks jksi.k ds le; Mh,ih Mkyuk 100 ikS/ksa @0.03 fd-xzk-@ikS/kk =3.00 fd-xzk- 6 ikS/kksa dk ifjogu ikS/ks HkjkbZ ,oa [kkyh djkbZ

lfgr 5 fdeh nwjh rd ds fy, 108

7 Fkkoyk cukuk de ls de 50 lseh v)Z O;kl dk lk/kkj.k tehu esa

100

8 j[kj[kkc%& ikS/kksa dks miyC/k ikuh fiykuk 15 yhVjA ikS/kksa

2x4x100=800 (2 o"kZ rd izfr o"kZ 4 ckj ikuh fiykuk)

9 ikS/kksa dh fujkbZ xqMkbZ djuk 15 lseh xgjkbZ rd ,oa 45 lseh v)ZO;kl rd

2(2x100)=400 (2 o"kZ rd izfr o"kZ 2 ckj fujkbZ xqMkbZ djuk)

10 ikuh dk ifjogu 5 fdeh nwjh rd ds fy, 8x100=800 @ 15yhVj@izfr ikS/kk 12000 yhVj ¼ 2 o"kZ rd pkj&pkj ckj ikuh fiykuk½

11 nhed fu;U=.k gsrq ,UMksalYQku 4% pw.kZ [email protected] fd-xzk-@ikS/kk =10 fd-xzk- 2 o"kZ rd 12 ikS/kks esa moZjd ,oa dhV uk”kd nokbZ Mkyuk 2x100=200 ikS/kk ¼2 ckj½

Page 102: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

69

COST ESTIMATE tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12 dk;Z dk uke&pjkxkg Hkwfe ij ?kkl cht cqokbZ dk; {kS=Qy% 1-00 gSDVj

nj jkf”k Ø-

la- fooj.k ek=k bdkbZ Je dqy Je dqy

1

pjkxkg gsrq ?kkl cht cqokbZ dk;Z 6 ls 8 fd-xzzk-@gsSDVj VªsDVj }kjk tqrkbZ ls

1.00 gSDV;j 55.35 431.35 55.35 431.35

2 cht dh jkf'k ¼/kke.k½

8.00 fd-xzk- - 85.00 - 680.00

;ksx 55.35 1111.35 tksMk 3%

dUVkstsUlh 33.34 ;ksx 1144.69 ykxr Je Hkkx 55.35 ykxr lkexzh Hkkx 1089.34 dqy ;ksx 1144.69 Say 1150.00

Page 103: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

70

MODEL ESTIMATE

tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12 dk;Z dk uke & pjkxkg Hkwfe ij ?kkl cht cqokbZ dk;Z

{kS=Qy% 1-00

gSDVj Ø-la- fooj.k y-xpkS-xx- = dqy ek=k

1

pjkxkg gsrq ?kkl cht cqokbZ dk;Z 6 ls 8 fd-xzzk-@gsSDVj VªsDVj }kjk tqrkbZ ls

1 gSDV;j

2 cht dh jkf'k ¼/kke.k½

8 fdyks izfr gSDV;j

Page 104: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

71

MODAL ESTIMATE Name of watershed –IWMP jalore 15 /2011-12 Name of Work– Home stead kitchen graden

S.No Name of Vegitable Seed Quantity Rate Amount

1 Tomato 10 gm 130/10gm 130.00

2 Brinjal 10 gm 20/10gm 20.00

3 Lady finger 100 gm 100/500gm 20.00

4 Onion 20 gm 100/100gm 20.00

5 Radish 10 gm 20/10gm 20.00

6 Chilli 10 gm 80/10gm 80.00

7 Caaliflower 10 gm 210/10gm 210.00

Total 500.00 Rs. 500 Per No.

Page 105: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

72

COST ESTIMATE

tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12 dk;Z dk uke & oehZ dEiksLV ;wfuV

nj jkf”k Ø-la- fooj.k ek=k bdkbZ Je dqy Je dqy 1

uho] [kkbZ ijukyk esa 1-5 xgjkbZ rd feVV~h dk [kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk]cxy dks laokjuk][kqnh feV~Vhdks ckgj fudkyuk] uhoa Hkjus ds ckn [kkyh LFkkuksa dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj nwjh rd fuLrkj.k djukA l[r]fpduh] 0.49 ?k-eh 89.00 89.00 43.61 43.61

2 izFke Js.kh dh bZVksa dh 112fe0eh0 rFkk 75 fe0eh0 eksVkbZ esa uhoa rFkk vf/kjpuk esa lhesUV&ctjh elkyk 1%4 esa fpukbZ dk dk;Z djuk e; rjkbZ ds A 3.30

oxZ eh- 77.40 402.00 255.42 1326.60

3 dspqvkas dh ek=k e; dYpj lfgr 5.00 fd-xzk- - 200.00 - 1000.00 4

IykfLVd “khV uhps fcNkus gsrq 2.81 oxZ eh- - 100.00 - 281.00

;ksx 299.03 2651.21 tksMk 3% dUVkstsUlh 79.54 ;ksx 2730.75 ykxr Je Hkkx 299.03 ykxr lkexzh Hkkx 2431.72 dqy ;ksx 2730.75 Say 2700.00

Page 106: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

73

2700@ ;wfuV

MODEL ESTIMATE

tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12

dk;Z dk uke & oehZ dEiksLV ;wfuV

Ø-la- fooj.k y-xpkS-xx- = dqy ek=k 1 uho] [kkbZ ijukyk esa 1-5 xgjkbZ rd feVV~h

dk [kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk]cxy dks laokjuk][kqnh feV~Vhdks ckgj fudkyuk] uhoa Hkjus ds ckn [kkyh LFkkuksa dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj nwjh rd fuLrkj.k djukA l[r]fpduh]

2x1.85 x0.12 x0.075=0.033 ?k-eh- 2x0.90 x0.12 x0.075=0.016 ?k-eh-

;ksx = 0.049 ?k-eh- 2 izFke Js.kh dh bZVksa dh 112fe0eh0 rFkk 75

fe0eh0 eksVkbZ esa uhoa rFkk vf/kjpuk esa lhesUV&ctjh elkyk 1%4 esa fpukbZ dk dk;Z djuk e; rjkbZ ds A

2x1.85 x0.60=2.22 oxZ ehVj 2x0.90 x0.60=1.08 oxZ ehVj

;ksx = 3.30 oxZ ehVj

3 dspqvkas dh ek=k e; dYpj lfgr 5 fdyks 4 IykfLVd “khV uhps fcNkus gsrq 1x2.25 x1.25=2.81 oxZ ehVj

Page 107: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

74

COST ESTIMATE tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12 dk;Z dk uke & dEiksLV fiV ;wfuV

nj jkf”k Ø-

la- fooj.k ek=k bdkbZ Je dqy Je dqy

1 uho] [kkbZ ijukyk esa 1-5 xgjkbZ rd feVV~h dk [kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk]cxy dks laokjuk][kqnh feV~Vhdks ckgj fudkyuk] uhoa Hkjus ds ckn [kkyh LFkkuksa dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj nwjh rd fuLrkj.k djukA l[r]fpduh] dadj] feV~Vh esaA 14.40 ?k-eh 89.00 89.00 1281.60 1281.60

2 flaxy lqij QkLQsV 150.00 fd-xzk- - 5.00 - 750.00 3 ;wfj;k 25.00 fd-xzk- 7.00 - 175.00 4 dYpj iSfdaV 3.00 la[;k - 15.00 - 45.00 ;ksx 1281.60 2251.60 tksMk 3% dUVkstsUlh 67.55 ;ksx 2319.15 ykxr Je Hkkx 1281.60 ykxr lkexzh Hkkx 1037.55 dqy ;ksx 2319.15 Say 2300.00

2300@ fiV

Page 108: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

75

MODEL ESTIMATE

tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12 dk;Z dk uke&ukMh fjisfjax dk;Z esMk mijyk Ø-la-

fooj.k y uhps ls pkS

mij ls pkS0 x0

dqy ek=k

1 Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd 230 0 0 0 230 2 taxy dh lQkbz Hkkjh >kfM;ks ¼T;qfyQyksjks½ rFkk 30 lsa-eh- yisV

ds ikS/kks dks dkVus lesarA 230 38 0 0 8740 3 feV~Vh dk dk;Z cU/k esa ¼lw[kh ;k xhyh½ 15 lseh ijr esa Mkyuk]

<syksa dks rksMuk] ?kkl&ikr rFkk dadj chudj vyx djuk rFkk feV~Vh dh njslh djuk 1-5 eh0 mBkuk rFkk 50 ehVj nwjh ds fy,A dBksj feV~Vh esa feV~Vh dh dqVkbZ ekuo }kjk ;k Iysu jksyj }kjk A

230 6 2.3 1.8 1718

4 ,uhdV gsrq iRFkjksa dh fpukbZ 1%4 lhesUV ctjh elkys esa uho esa vf/kjpuk esa

31 0.6 0 0.3 5.58

5 15 ls 30 lseh eksVs] gFkkSMs ls rjkls gq,s ,dy iRFkj dh fifpax leLr mBku ds lkFk] vkiwfrZ lfgr 180 2 0 0.23 82.8

Page 109: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

76

COST ESTIMATE

tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12

dk;Z dk uke&ukMh fjisfjax dk;Z esMk mijyk

nj jkf’k Ø-la- fooj.k ek=k bdkbZ Je dqy Je dqy

1 Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd 230.00 ehVj 0.47 0.47 108.10 108.10 2 taxy dh lQkbz Hkkjh >kfM;ks

¼T;qfyQyksjks½ rFkk 30 lsa-eh- yisV ds ikS/kks dks dkVus lesarA 8740.00 o-eh- 1.90 1.90 16606.00 16606.00

3 feV~Vh dk dk;Z cU/k esa ¼lw[kh ;k xhyh½ 15 lseh ijr esa Mkyuk] <syksa dks rksMuk] ?kkl&ikr rFkk dadj chudj vyx djuk rFkk feV~Vh dh njslh djuk 1-5 eh0 mBkuk rFkk 50 ehVj nwjh ds fy,A dBksj feV~Vh esa feV~Vh dh dqVkbZ ekuo }kjk ;k Iysu jksyj }kjk A 1718.10 ?k-eh- 89.00 89.00 152910.90 152910.90

4 ,uhdV gsrq iRFkjksa dh fpukbZ 1%4 lhesUV ctjh elkys esa uho esa vf/kjpuk esa 5.58 ?k-eh- 232.26 2322 12.96 129.57

5 15 ls 30 lseh eksVs] gFkkSMs ls rjkls gq,s ,dy iRFkj dh fifpax leLr mBku ds lkFk] vkiwfrZ lfgr 82.80 ?k-eh- 73.5 1188.00 - 98366.40

;ksx 169637.96 268120.97 tksMk 3% dUVkstsUlh 8043.63 ;ksx 276164.60 ykxr Je Hkkx 169637.96 ykxr lkexzh Hkkx 106526.64 dqy ;ksx 276164.60 Say 255000.00

Page 110: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

77

COST ESTIMATE

tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12 dk;Z dk uke& ikaMxjk ,fudV fjis;fjax

nj jkf’k Ø-la-

fooj.k ek=k bdkbZ Je dqy Je dqy 1 Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd 215.00 ehVj 0.47 0.47 101.05 101.05 2 taxy dh lQkbz Hkkjh >kfM;ks ¼T;qfyQyksjks½ rFkk 30 lsa-eh- yisV ds ikS/kks dks

dkVus lesarA 3440.00 o-eh- 1.90 1.90 6536.00 6536.00 3 uhao] [kkbZ rFkk ukyk vkfn ds fy, 1-5 eh- xgjkbZ rd feV~Vh dh [kqnkbZ djuk]

ry dks dwVuk]ikuh Mkyuk cxy dks laokjuk [kqnh feV~Vh dks ckgj fudkyuk uhao Hkjus ds ckn [kkyh LFkkuks dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj dh nwjh rd fuLrkj. 43.20 ?k-eh- 89.00 89.00 3844.80 3844.80

4 lhesUV dkadzhV uhao ;k Q”kZ esa 20 fe-eh- ek dh iRFkj feV~Vh@bZVs lhesUV jsr elkyk esa 1 lhesUV 3 jsr % 6 feV~Vh vuqikr esa feykdj Mkyuk rFkk dqVkbZ djuk rjkbZ lesrA ¼ft-Lr-nj-vuq-2010la”kks- ist la-14 vkbZVe la- 138½ 12.96 ?k-eh- 240 2589 3110.40 33553.44

5 feV~Vh dk dk;Z cU/k esa ¼lw[kh ;k xhyh½ 15 lseh ijr esa Mkyuk] <syksa dks rksMuk] ?kkl&ikr rFkk dadj chudj vyx djuk rFkk feV~Vh dh njslh djuk 1-5 eh0 mBkuk rFkk 50 ehVj nwjh ds fy,A dBksj feV~Vh esa feV~Vh dh dqVkbZ ekuo }kjk ;k Iysu jksyj }kjk A 1427.60 ?k-eh- 89 89.00 127056.40 127056.40

6 feVVh ds c.M ds Hkjko dh rjQ etcwrh gsrq iRFkjksa dh fpukbZ 1%4 lhesUV ctjh elkys esa uho esa vf/kjpuk esa 30.24 ?k-eh- 232.26 2322.00 7023.54 70217.28

7 ,uhdV gsrq iRFkjksa dh fpukbZ 1%4 lhesUV ctjh elkys esa vf/kjpuk esa 17.38 ?k-eh- 232.26 2322.00 4035.75 40347.07

8 feVVh ds c.M ds Hkjko dh rjQ etcwrh gsrq iRFkjksa dh fpukbZ 1%4 lhesUV ctjh elkys esa uho esa vf/kjpuk esa 172.20 ?k-eh- 232.26 2322.00 39995.17 399848.40

9 lhesaV IykLVj nhokj ij 1%4 vuqikr esa lhesaV&ctjh feykdj tksMks dks dqjsnus rFkk rjkbZ lesrA ¼c½ 20 eh-eh 416.00 o-eh- 23.52 92.48 9784.32 38471.68

10 15 ls 30 lseh eksVs] gFkkSMs ls rjkls gq,s ,dy iRFkj dh fifpax leLr mBku ds lkFk] vkiwfrZ lfgr 27.60 ?k-eh- 205.8 1255.00 5680.08 34638.00

;ksx 207167.51 754614.12 tksMk 3% dUVkstsUlh 22638.42

Page 111: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

78

;ksx 777252.55 ykxr Je Hkkx 207167.51 ykxr lkexzh Hkkx 570085.03 dqy ;ksx 777252.55 Say 706000.00

Page 112: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

79

MODEL ESTIMATE

uke ty xzg.k {ks=& tkyksj iwmp 15 dk;Z dk uke& ikuh dh Vadh

{kerk 30000 yhVj

nj jkf’k Ø-la- fooj.k ek=k bdkbZ Je dqy Je dqy

1 uhao] [kkbZ rFkk ukyk vkfn ds fy, 1-5 eh- xgjkbZ rd feV~Vh dh [kqnkbZ djuk] ry dks dwVuk]ikuh Mkyuk cxy dks laokjuk [kqnh feV~Vh dks ckgj fudkyuk uhao Hkjus ds ckn [kkyh LFkkuks dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj dh nwjh rd fuLrkj. 12.89 ?k-eh- 89 89.00 1147.03 1147.03

2 lhesUV dkadzhV uhao ;k Q'kZ esa 40 fe eh ukeh; eki dh fxVVh lhesaUV jsr elkyk esa 1lhesUV %4jsr %8 fxVVh vuqikr esa feykdj Mkyuk rFkk dqVkbZ djuk rjkb lesr 8.24 ?k-eh- 240.00 2589.00 1978.56 21343.72

3 uho rFkk dqlhZ esa iRFkj dh cs jnk <ksdk lhesUV ctjh 1%4 elkys esa e; cxy dh f>jh cUn djuk rjkb vkfnA uho esavf/kjpuk esa 4.64 ?k-eh- 232.26 2322.00 1078.62 10783.37

4 uho rFkk dqlhZ esa iRFkj dh cs jnk <ksdk lhesUV ctjh 1%4 elkys esa e; cxy dh f>jh cUn djuk rjkb vkfnA uho esavf/kjpuk esa 25.00 ?k-eh- 232.26 2322.00 5806.50 58050.00

5 lhesaV IykLVj nhokj ij 1%4 vuqikr esa lhesaV&ctjh feykdj tksMks dks dqjsnus rFkk rjkbZ lesrA ¼c½ 20 eh-eh 35.00 o-eh- 23.52 116.00 823.20 4060.00

6 vOoy ntsZ dh iRFkj dh ifÍ;ks dh Nr Mkyuk]Åij RkFkk uhps ls tksMks esa iRFkj dh phi ds lkFk 1%4 vuqikr esa lhesUV elkys ls Hkjuk 13.44 o-eh- 14.70 1107.00 197.57 14878.08

7 ,Y;wfefu;e dk <Ddu 1.00 u0 0.00 400.00 0.00 400.00 8 ikuh lIykb gsrq ikbZi duSD'ku e; lkexzh 1.00 u0 270.00 2400.00 270.00 2400.00 ;ksx 11301.48 113062.20 tksMk 3% dUVkstsUlh 3391.87 ;ksx 116454.06 ykxr Je Hkkx 11301.48 ykxr lkexzh Hkkx 105152.59 dqy ;ksx 116454.06

Say 116500.00

Page 113: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

80

MODEL ESTIMATE uke ty xzg.k {ks=& tkyksj iwmp 15 dk;Z dk uke& ikuh dh Vadh {kerk 30000 yhVj

Ø-la-

fooj.k y-xpkS-xx- = dqy ek=k 1 uhao] [kkbZ rFkk ukyk vkfn ds fy, 1-5 eh- xgjkbZ rd feV~Vh dh [kqnkbZ djuk]

ry dks dwVuk]ikuh Mkyuk cxy dks laokjuk [kqnh feV~Vh dks ckgj fudkyuk uhao Hkjus ds ckn [kkyh LFkkuks dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj dh nwjh rd fuLrkj. 1.00 4 3 0.30 3.60

2.00 4.8 0.9 0.60 5.18 2.00 3.8 0.9 0.60 4.10 12.89 2 lhesUV dkadzhV uhao ;k Q'kZ esa 40 fe eh ukeh; eki dh fxVVh lhesaUV jsr elkyk

esa 1lhesUV %4jsr %8 fxVVh vuqikr esa feykdj Mkyuk rFkk dqVkbZ djuk rjkb lesr 1.00 4 3 0.30 3.60

2.00 4.8 0.9 0.30 2.59 2.00 3.8 0.9 0.30 2.05 8.24 3 uho rFkk dqlhZ esa iRFkj dh cs jnk <ksdk lhesUV ctjh 1%4 elkys esa e; cxy dh

f>jh cUn djuk rjkb vkfnA uho esa vf/kjpuk esa

2.00 4.8 0.9 0.30 2.59 2.00 3.8 0.9 0.30 2.05 4.64 4 uho rFkk dqlhZ esa iRFkj dh cs jnk <ksdk lhesUV ctjh 1%4 elkys esa e; cxy dh

f>jh cUn djuk rjkb vkfnA uho esa vf/kjpuk esa

2.00 4.5 0.625 2.50 14.06 2.00 3.5 0.625 2.50 10.94 25.00

Page 114: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

81

5 lhesaV IykLVj nhokj ij 1%4 vuqikr esa lhesaV&ctjh feykdj tksMks dks dqjsnus rFkk rjkbZ lesrA ¼c½ 20 eh-eh 2.00 4 2.5 20.00

2.00 3 2.5 15.00 35.00 6 vOoy ntsZ dh iRFkj dh ifÍ;ks dh Nr Mkyuk]Åij RkFkk uhps ls tksMks esa iRFkj

dh phi ds lkFk 1%4 vuqikr esa lhesUV elkys ls Hkjuk 1.00 4.2 3.2 13.44 13.44 7 ,Y;wfefu;e dk <Ddu 1.00 1.00 8 ikuh lIykb gsrq ikbZi duSD'ku e; lkexzh 1.00 1.00

Page 115: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

82

MODEL ESTIMATE

uke ty xzg.k {ks=& tkyksj iwmp 15

dk;Z dk uke& ikuh dh [ksyh

Ø-la- fooj.k y-xpkS-xx- = dqy ek=k

1 uhao] [kkbZ rFkk ukyk vkfn ds fy, 1-5 eh- xgjkbZ rd feV~Vh dh [kqnkbZ djuk] ry dks dwVuk]ikuh Mkyuk cxy dks laokjuk [kqnh feV~Vh dks ckgj fudkyuk uhao Hkjus ds ckn [kkyh LFkkuks dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj dh nwjh rd fuLrkj. 1.00 10.00 1.3 0.30 3.90

2.00 1.6 0.25 0.60 0.48 2.00 10.3 0.25 0.60 3.09 7.47 2 lhesUV dkadzhV uhao ;k Q'kZ esa 40 fe eh

ukeh; eki dh fxVVh lhesaUV jsr elkyk esa 1lhesUV %4jsr %8 fxVVh vuqikr esa feykdj Mkyuk rFkk dqVkbZ djuk rjkb lesr 1.00 10.00 1.3 0.30 3.90

2.00 1.6 0.25 0.20 0.16 2.00 10.3 0.25 0.20 1.03 5.09 3 uho rFkk dqlhZ esa izFke Js.kh bZVksa dh fpukbZ

lhesUV ctjh 1%6 elkys esa e; cxy dh f>jh cUn djuk rjkb vkfnA vf/kjpuk esa

Page 116: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

83

2.00 1.6 0.45 0.40 0.58 2.00 10.3 0.45 0.40 3.71 4.28 4 uho rFkk dqlhZ esa izFke Js.kh bZVksa dh fpukbZ

lhesUV ctjh 1%6 elkys esa e; cxy dh f>jh cUn djuk rjkb vkfnA vf/kjpuk esa

2.00 1.6 0.25 0.75 0.60 2.00 10.3 0.25 0.75 3.86 4.46 5 lhesaV IykLVj nhokj ij 1%4 vuqikr esa

lhesaV&ctjh feykdj tksMks dks dqjsnus rFkk rjkbZ lesrA ¼c½ 20 eh-eh 4.00 1.6 0.75 4.80

4.00 10.3 0.75 30.90 35.70 6 ikuh lIykb gsrq ikbZi duSD'ku e; lkexzh 1.00 1.00

Page 117: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

84

MODEL ESTIMATE

uke ty xzg.k {ks=& tkyksj iwmp 15

dk;Z dk uke& ikuh dh [ksyh nj jkf’k Ø-la-

fooj.k ek=k bdkbZ Je dqy Je dqy 1 uhao] [kkbZ rFkk ukyk vkfn ds fy, 1-5 eh- xgjkbZ

rd feV~Vh dh [kqnkbZ djuk] ry dks dwVuk]ikuh Mkyuk cxy dks laokjuk [kqnh feV~Vh dks ckgj fudkyuk uhao Hkjus ds ckn [kkyh LFkkuks dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj dh nwjh rd fuLrkj. 7.47 ?k-eh- 89 89.00 664.83 664.83

2 lhesUV dkadzhV uhao ;k Q'kZ esa 40 fe eh ukeh; eki dh fxVVh lhesaUV jsr elkyk esa 1lhesUV %4jsr %8 fxVVh vuqikr esa feykdj Mkyuk rFkk dqVkbZ djuk rjkb lesr 5.09 ?k-eh- 240.00 2589.00 1221.60 13178.01

3 uho rFkk dqlhZ esa izFke Js.kh bZVksa dh fpukbZ lhesUV ctjh 1%6 elkys esa e; cxy dh f>jh cUn djuk rjkb vkfnA vf/kjpuk esa 4.28 ?k-eh- 147.00 3782.00 629.75 16202.09

4 uho rFkk dqlhZ esa izFke Js.kh bZVksa dh fpukbZ lhesUV ctjh 1%6 elkys esa e; cxy dh f>jh cUn djuk rjkb vkfnA vf/kjpuk esa 4.46 ?k-eh- 147.00 3782.00 655.99 16877.18

5 lhesaV IykLVj nhokj ij 1%4 vuqikr esa lhesaV&ctjh feykdj tksMks dks dqjsnus rFkk rjkbZ lesrA ¼c½ 20 eh-eh 35.70 o-eh- 23.52 116.00 839.66 4141.20

8 ikuh lIykb gsrq ikbZi duSD'ku e; lkexzh 1.00 u0 135.00 450.00 135.00 450.00 ;ksx 4146.83 51513.30 tksMk 3% dUVkstsUlh 1545.40 ;ksx 53058.70 ykxr Je Hkkx 4146.83 ykxr lkexzh Hkkx 48911.87 dqy ;ksx 53058.70 say 53000.00

Page 118: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

85

MODEL ESTIMATE

uke ty xzg.k {ks=& tkyksj iwmp 15

dk;Z dk uke& ikuh dh [ksyh nj jkf’k Ø-la-

fooj.k ek=k bdkbZ Je dqy Je dqy 1 uhao] [kkbZ rFkk ukyk vkfn ds fy, 1-5 eh- xgjkbZ rd feV~Vh dh [kqnkbZ

djuk] ry dks dwVuk]ikuh Mkyuk cxy dks laokjuk [kqnh feV~Vh dks ckgj fudkyuk uhao Hkjus ds ckn [kkyh LFkkuks dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj dh nwjh rd fuLrkj. 4.02 ?k-eh- 89 89.00 357.78 357.78

2 lhesUV dkadzhV uhao ;k Q'kZ esa 40 fe eh ukeh; eki dh fxVVh lhesaUV jsr elkyk esa 1lhesUV %4jsr %8 fxVVh vuqikr esa feykdj Mkyuk rFkk dqVkbZ djuk rjkb lesr 2.64 ?k-eh- 240.00 2589.00 633.60 6834.96

3 uho rFkk dqlhZ esa izFke Js.kh bZVksa dh fpukbZ lhesUV ctjh 1%6 elkys esa e; cxy dh f>jh cUn djuk rjkb vkfnA vf/kjpuk esa 2.48 ?k-eh- 147.00 3782.00 365.15 9394.49

4 uho rFkk dqlhZ esa izFke Js.kh bZVksa dh fpukbZ lhesUV ctjh 1%6 elkys esa e; cxy dh f>jh cUn djuk rjkb vkfnA vf/kjpuk esa 2.59 ?k-eh- 147.00 3782.00 380.36 9785.93

5 lhesaV IykLVj nhokj ij 1%4 vuqikr esa lhesaV&ctjh feykdj tksMks dks dqjsnus rFkk rjkbZ lesrA ¼c½ 20 eh-eh 20.70 o-eh- 23.52 116.00 486.86 2401.20

8 ikuh lIykb gsrq ikbZi duSD'ku e; lkexzh 1.00 u0 135.00 450.00 135.00 450.00 ;ksx 2358.75 29224.35 tksMk 3% dUVkstsUlh 876.73 ;ksx 30101.08 ykxr Je Hkkx 2358.75 ykxr lkexzh Hkkx 27742.33 dqy ;ksx 30101.08 say 30100.00

Page 119: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

86

MODEL ESTIMATE

uke ty xzg.k {ks=& tkyksj iwmp 15

dk;Z dk uke& ikuh dh [ksyh Ø-la-

fooj.k y-xpkS-xx- = dqy ek=k 1 uhao] [kkbZ rFkk ukyk vkfn ds fy, 1-5 eh-

xgjkbZ rd feV~Vh dh [kqnkbZ djuk] ry dks dwVuk]ikuh Mkyuk cxy dks laokjuk [kqnh feV~Vh dks ckgj fudkyuk uhao Hkjus ds ckn [kkyh LFkkuks dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj dh nwjh rd fuLrkj. 1.00 5 1.3 0.30 1.95

2.00 1.6 0.25 0.60 0.48 2.00 5.3 0.25 0.60 1.59 4.02 2 lhesUV dkadzhV uhao ;k Q'kZ esa 40 fe eh

ukeh; eki dh fxVVh lhesaUV jsr elkyk esa 1lhesUV %4jsr %8 fxVVh vuqikr esa feykdj Mkyuk rFkk dqVkbZ djuk rjkb lesr 1.00 5 1.3 0.30 1.95

2.00 1.6 0.25 0.20 0.16 2.00 5.3 0.25 0.20 0.53 2.64 3 uho rFkk dqlhZ esa izFke Js.kh bZVksa dh fpukbZ

lhesUV ctjh 1%6 elkys esa e; cxy dh f>jh cUn djuk rjkb vkfnA vf/kjpuk esa

Page 120: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

87

2.00 1.6 0.45 0.40 0.58 2.00 5.3 0.45 0.40 1.91 2.48 4 uho rFkk dqlhZ esa izFke Js.kh bZVksa dh fpukbZ

lhesUV ctjh 1%6 elkys esa e; cxy dh f>jh cUn djuk rjkb vkfnA vf/kjpuk esa

2.00 1.6 0.25 0.75 0.60 2.00 5.3 0.25 0.75 1.99 2.59 5 lhesaV IykLVj nhokj ij 1%4 vuqikr esa

lhesaV&ctjh feykdj tksMks dks dqjsnus rFkk rjkbZ lesrA ¼c½ 20 eh-eh 4.00 1.6 0.75 4.80

4.00 5.3 0.75 15.90 20.70 6 ikuh lIykb gsrq ikbZi duSD'ku e; lkexzh 1.00 1.00

Page 121: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

88

COST ESTIMATE

tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12

dk;Z dk uke& 'ke'kku /kkV fuekZ.k dk;Z eki QqVks esa nj jkf'k Ø-

l- fof'k"V ¼nj vuqlph ls½ la[;k yEckbZ pkSMkbZ ÅpkbZ

ek=k bdkbZ ?k-eh@o-eh- Je dqy Je lkexzh dqy

uhao esa 1-5 eh- xgjkbZ rd feV~Vh [kqnkbZ djuk ry dks dqVuk cxyks dks lgh djuk vkSj [kwnh gqbZ feV~Vh dks ckgj fudkyuk rFkk cph gqbZ feV~Vh dks 30 ehVj rd dh nwjh rd fuLrkj.k djuk

dBksj feV~Vh eas 2 15 2.50 2.50 187.5 5.31 2 10 2.50 2.50 125 3.54 2 8 2 2 64 1.81 2 2 2 2 16 0.45 3 20.00 2.50 2.50 375 10.63 2 17.5 2.50 2.50 218.75 6.20

1

27.95 89 89 2487.99 0.00 2487.99 flesUV dadzhV uhao esa 40 ,e ,e eki dh flesUV jsV elkyk vuwikr esa feykdj Mkyuk rFkk dqVkbZ djkuk rFkk lery djuk

1%5%10 flesUV dadzhV 2 15 2.5 0.5 37.5 1.06 2 10 2.5 0.5 25 0.71 2 8 2 0.5 16 0.45 2 2 2 0.5 4 0.11 3 20 2.5 0.5 75 2.13 2 17.5 2.5 0.5 43.75 1.24

2

5.70 240 2589 1369.05 13399.55 14768.60 uhao rFkk dwlhZ esa iRFkj dh csjnk] <ksdk fpukbZ lhesUV ctjh ek'kkys ls cxy dh f>jh cUn djuk rFkk rjkbZ djuk

3

flesUV ctjh 1%6 esa 2 14.5 2 2 116 3.29 2 10.5 2 2 84 2.38

Page 122: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

89

2 7.5 1.5 1.5 33.75 0.96 2 2.5 1.5 1.5 11.25 0.32 3 19.5 2 2 234 6.63 2 18 2 2 144 4.08 17.66 232.26 2322 4101.42 36902.15 41003.57

vf/kjpuk esa csjnk iRFkj dh <ksdk fpukbZ dqlhZ ry ls 4-5 eh- ÅpkbZ rd 30 lseh ;k blls vf/kd eksVkbZ dh nhokj ds fy;s

flesUV elkyk 1% 6 2 7 1.25 2 35 0.99 2 3 1.25 2 15 0.43 3 19 1.5 2 171 4.85 2 18.5 1.5 2 111 3.15

4

9.41 232.26 2322 2185.67 19665.35 21851.02 5 flesUV IykLVj 1% 6 25 fe- eh- eksVkbZ 2 8 2 32 2.97 2 4 2 16 1.49 2 20 2 80 7.43 2 20 2 80 7.43 2 17.5 6 210 19.52 2 9 6 108 10.04 48.88 23.52 116 1149.77 4520.86 5670.63 7 vOoy ntsZ dh iVVh;k yxkus dk dk;Z 1 18 9 162 15.06 14.7 1107 221.32 16445.41 16666.729 8 22 xst 22 dh ukyhnkj pnnj yxkus dk

dk;Z 1 20 20 400 37.17

1 15 15 225 20.91 58.09 39 606 2265.3346 32934.48 35199.814 9 yksgs ds ,sxy dk dk;Z L.S 10000 10000 dqy ;ksx 13780.544 133867.81 147648.36 Contingency 4429.45 ;ksx 152077.80

Je 13780.54

lkexzh 138297.30

152077.80

Say 152000.00

Page 123: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

90

MODEL ESTIMATE

tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12 dk;Z dk uke&vdf"k Hkwfe ij Mx vkmV iks.M+ Ø-la- fooj.k y-xpkS-xx- = dqy ek=k 1 Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd 2x 194 = 388 ehVj

y uhps ls pkS mij ls pkS0 x0 dqy ek=k

2 feV~Vh dk dk;Z cU/k esa ¼lw[kh ;k xhyh½ 15 lseh ijr esa Mkyuk] <syksa dks rksMuk]

?kkl&ikr rFkk dadj chudj vyx djuk rFkk feV~Vh dh njslh djuk 1-5 eh0 mBkuk rFkk 50 ehVj nwjh ds fy,A dBksj feV~Vh esa feV~Vh dh dqVkbZ ekuo

}kjk ;k Iysu jksyj }kjk A

200 5 1.8 1.5 1020

3 /kkeu@?kkl cht cqokbZ cuk;s x;s fjt ij nks ykbZuksa esa 2 x 135 =270 eh-

4

fMofyax fof/k ls okfudh chp cqokbZ dk;Z

= 136x100 = 906 say 900

15 5 chtks dh ek=k 1- ?kke.k ?kkl cht 136 ehVj @ 1 fdyks@100 ehVj =1.36 fdyks say 2 fd-xzk- 6 okfudh cht 136 ehVj @ 1 fdyks@100 ehVj =1.36 fdyks say 2 fd-xzk- 7 15 ls 30 lseh eksVs] gFkkSMs ls rjkls gq,s

,dy iRFkj dh fifpax leLr mBku ds lkFk] vkiwfrZ lfgr 108x1.00 x0.20=21.60 ?k-eh-

Page 124: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

91

COST ESTIMATE

tyxzg.k {ks= dk uke & vkbZ MCY;w ,e ih tkykSj 15 @ 2011&12 dk;Z dk uke& [kM+hu yEckbZ 200 ehVj

nj jkf’k Ø-

la- fooj.k ek=k bdkbZ Je dqy Je dqy 1 Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd 388.00 ehVj 0.47 0.47 182.36 182.36 2 feV~Vh dk dk;Z cU/k esa ¼lw[kh ;k xhyh½ 15 lseh ijr esa Mkyuk]

<syksa dks rksMuk] ?kkl&ikr rFkk dadj chudj vyx djuk rFkk feV~Vh dh njslh djuk 1-5 eh0 mBkuk rFkk 50 ehVj nwjh ds fy,A dBksj feV~Vh esa feV~Vh dh dqVkbZ ekuo }kjk ;k Iysu jksyj }kjk A 1020.00 ?k-eh- 89.00 89.00 90780.00 90780.00

3 cht cqokbZ cuk;s x;s fjt ij 270.00 ehVj 0.60 0.60 162.00 162.00 4 fMofyax fof/k ls okfudh chp cqokbZ dk;Z 900.00 ux@100 9.9 9.9 89.10 89.10 5 chtks dh ek=k 1- ?kke.k ?kkl cht 2.00 fd-xzk - 85.00 - 170.00 6 okfudh cht 2.00 fd-xzk - 25.00 - 50.00 7 15 ls 30 lseh eksVs] gFkkSMs ls rjkls gq,s ,dy iRFkj dh fifpax

leLr mBku ds lkFk] vkiwfrZ lfgr 21.60 ?k-eh- 222.00 1188.00 4795.20 25660.80 ;ksx 96008.66 117094.26 tksMk 3% dUVkstsUlh 3512.83 ;ksx 120607.09 ykxr Je Hkkx 96008.66 ykxr lkexzh Hkkx 24598.43 dqy ;ksx 120607.09 Say 120000.00

Page 125: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

92

Model Estimate of Tool Kit

Household Production System( for Marginal farmer and Land less labour )

Service sector- Tool Kit Specification Trade wise Detail of tools requirement in one set

1. One set of carpentry tools COST RS. 4000/ Kit

S.No. Name of tools Specification Quantity

1 Hand saw Size 15” 1 No

2 Hand saw Size 12” 1 No

3 Screw driver Size 8”x25mm 1 No

4 Combination pliers Size 8”Make – Taparia 1 No

5 Charsi with handle Size 25 mm 1 No

6 Charsi with handle Size 18 mm 1 No

7 Charsi with handle Size 10 mm 1 No

8 Wooden Randda Big- Made of Sagwan 1 No

9 Wooden Randda Small – Made of Sagwan 1 No

10 File half round Make JK 1 No

Page 126: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

93

11 File regular Make JK 1 No

12 Tee Bar carpenter frame

(shikanja) for wooden frame

Size 4’x2” 1 No

13 Stone silly Size 6”- ISI Mark 1 No

14 Basola with handle Weight 800 gram 1 No

15 Ball peen harmmer Weight 300 gram Make Ambica 1 No

16 Cross peen hammer Weight 500 gram – Make Ambica 1 No

17 Measurement tape Size 10 feet- Make Freeman 1 No

18 Pincer Size 200 mm- 1 No

19 Girmit Size ½ “ 1 No

20 Tri Square Size 8” 1 No

21 Hand Operated drill Size ¼ “ 1 No

22 Steel box for Tools Size( 22”x11”) – G.I. sheet 1 No

2. One set of Mason tools COST RS. 2000/ Kit

S.No. Name of tools Specification Quantity

1 Karni Size – Big- 1 No

2 Karni Size – small 1 No

Page 127: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

94

3 Mashtar wooden Size 36” Made of Sagwan 1 No

4 Mashtar wooden Size 24 “ Made of Sagwan 1 No

5 Mashtar wooden Size 15” Made of Sagwan 1 No

6 Gurmala 1 No

7 Soot 1 No

8 Sabbal Heavy iron 1 No

9 L shape measurement (Gunia) 1 No

10 Level pipe(25 foot) 5 mm 1 No

11 Chiesal Size 6” , 8” Make – Taparia 1 No

12 Ball pine hammer Weight 500 gm Make – Ambica 1 No

13 Cross pine hammer Weight 300 gm Make – Ambica 1 No

14 Aluminium rib Size 60” x 4”x 1.5” 1 No

15 Measurement tape Size 10 feet Make – Freemans 1 No

16 Canvas bag for above tools Made of Heavy canvas 1 No

Page 128: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

95

3 . One set of Pottery Tools COST RS. 12000/ Kit

S.No. Name of tools Specification Quantity

1 Clay lump beating hammer MS pat. Size – D 100 – 120 mm x T5-6mm. with iron pipe handle

1

2 Wooden hammer(Thapa) Sheesam Wood. Size – D6-7”x T1.25”. handle- L6”

1

3 Tasla MS Sheet. Size- D15”. SWG-20

1

4 Spade (Phawda) MS sheet. Size L 10 “x w10”. SWGT-20. fitted with Wooden Handle

1

5 Kamdai Wooden Size- 2”x 1-1.25” approx. Arc. Shap

6 Pindi Cement Various Sizes

3

7 Decoration tools MS (Banki, Sua. Piyali. Patti) 8

Page 129: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

96

8 Decoration Wheel Size- H 16” x D 12-15”. Tripod Structure. Fitted with double Ball Bearing. Iron sheet 5 mm

1

9 Manual Potter Wheel Outer Dia- inner plate size – D-300mm x T-20mm. T-WT- 17 kg minimum (Casted iron body). Tripod Casted Iron Structure with Ball bearing. 2 nos. of outer rings made of T or steal of 12 mm Dia. Cross Wooden Support Structure.

1

10 Electric Potter wheel Structure dimension (25”x16”x16”) iron angle (iron angle structure 35-5) casted iron wheel dia 23”. Ball bearing -2 (6206) sealed. Shaft dia 2”. V- belt pully, WT 23-25 kg.

1

Page 130: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

97

4. One set of Footwear(Mojari) Tools COST RS. 12000/ Kit

S.No. Name of tools Specification Quantity

1 Hummer Ball Pane Drop forged steel. Induction hardened. Seasoned wood handle. WT- 300 gms with wooden handle. Nylon hammer (L 240 mm. head size L80x D300mm)

2 Wooden Block Size- L 18”x W4”x T 4” 1

3 Pincer Size – 8” 1

4 Scissors Size- 9”. Steel Body. Brass Handle 1

5 Bodam / Shoe anvil Graded CI with 3 phases. WT – 4 kg . approx.

1

6 Cutting Blade Set (Ramp) Steel with Wooden Handle. Size- L 150x W30X T6mm

set

7 Stitching Awl Steel with Sheesham Wood Handle 1

8 Sharpening Stone Size- 150x50x25mm. 109 no. 1

9 Shoe measuring Tape Size—2’ fibre/ good quality plastic material

1

10 Lock Punch Set Steel 1

Page 131: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

98

11 Eye let setting tool Steel 1

12 Round whole punch set Steel, Size – L 100 Range- 1 to 10 1 set(10 pcs.)

13 Design punch Set En-9 steel. Size – L100 1 set(3 pcs.)

14 Zig zag Steel Scissors Steel, Size- 81/2”. Grooves on cutting edge.

1

15 Pattern Cutting Knife Steel, Size – 6” 1

16 PP Block Size- L 6” x W 6” x T 20mm 1

17 Steel Scale Size-12” and 24” 1

18 Leather Scraping Brush Size- 8” with wooden Handle 1

19 Adhesive Brush Size- 10 mm. 12 mm. 25 mm 1

20 Spring Divider Steel- Size 9” 1

21 Sant Steel- H 6” WT – 1 kg. 1

22 Sizzeore Passing Steel- Size 8” 1

23 Thread Cutter Steel with plaste handle. Size- L 100 mm

1

24 Number sety Steel Set of 10

25 Capsol Punch Size (8-10-12-16) Set

Page 132: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

99

26 Brush Size 10 mm. 12mm.25mm 1

Machine Tools 1

27 HD Flat Bad Swing Machine 31 K. Branded Company 1

Page 133: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

100

5. One set of Blacksmith Tools COST RS. 6000/ Kit

S.No. Name of tools Specification Quantity

1 Big Hammer Ghon – 5 kg 1

2 Hammer Ghon – 1 kg 1

3 Hammer Ghon – ½ kg 1

4 Anvil- chouka Ghon – 10 kg 1

5 Chisel- 3 Nos Ghon – 1 kg,500 kg. 750gm 1

6 Meaurement tape 3 MTR 1

7 Tringle 6” 1

8 Plie Taparia 8” 1

9 Scra drive 10” Tapana 1

10 Tin 10” 1

11 Hand operated electric hand drill - 1

12 Sansasi- flat and round - 1

13 Table Vice - 1

14 Haksa Frame Poland type - 1

Page 134: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

101

6 One set of Cycle Mechanic Tools COST RS. 6000/ Kit

S.No. Name of tools Specification Quantity

1 Hammer 500gm 60.00

2 Hammer 1 kg 100.00

3 Plies 8” Taparia 180.00

4 Screw driver Taparia 6”-8”-12” 250.00

5 Pincer- 6” 6” 100.00

6 Nose plier-6” 6” 100

7 Alignment equipment cycle wheel 1000

8 Anivil – Chowka 5 kg 500.00

9 Screw wrench 10” 150.00

10 Hexa Frame polaud type 120.00

11 Spanner Set fix type 8 pcs 8 pcs 380.00

12 Electric hand drill machine 2000.00

13 Hand Skipper 10” 100.00

Page 135: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

102

14 Solution 50.00

15 Water Pump Plier 100.00

16 Punch 6” 50.00

17 Hand Scissors 8” 120.00

18 Oil cane 250 gm 80.00

Page 136: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

103

Design Khadin

Village: Meda uparla

Khasra No.:538,539,548,547

Hydro Geological Data

1. Area of Catchment, A 312.00 ha

2. Total Length of Run 1890.00 mtr

3. Total Fall/Relief of the Catchment 8.00 mtr

4. 1 Hr. Rainfall for 25 years Frequency 90.00 mm

5. Contour interval of Submergence area in m 1.00 mtr

6. Area of first contour in ha 1.50 ha

second Contour 2.80 ha

third contour 3.10 ha

fourth contour 4.60 ha

fifth contour 0.00 ha

sixth contour 0.00 ha

seventh contour 0.00 ha

7. Height at FTL 2 mtr

8. Yield of the Catchment, by Strange's Table

Yield of the Catchment per hectare Area in Cum

Good Catchment Avg. Catchment Bad Catchment

Total Monsoonal Rainfall in mm

Factor Area Factor Area Factor Area

Toatal Yield Cum

425 493 156 369.75 93.6 232 62.4 125993.40

Page 137: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

104

Total expected Yield of Catchment = 12.60

9. Storage Capacity of the Khadin at FTL, by Symphson's formula

V= h/3 [(A1+An)+4(A2+A4+…+An-1)+2(A3+A5+….+An-2)]

V= Storage Volume of Khadin in ha-m

A= Area of the contours, ha

n= Total no. of contours

h= Contour interval, m

Volume V= 12.43 ha-m

By readjusting the height of Crest/ FTL to have app. Capacity, FTL= 2 Mtr

10. Top width of the bund= H/5+1.50

.= 1.90

or say 2.00 Mtr

11. Total Length of Bund corresponding to above height 960.00 Mtr

12. Time of Concentration 54.66 minute

13. Intensity of Rainfall Corresponding to Time of Concentration 94.00 mm/hour

14. Average Runoff Coefficent 0.25

15. Peak Rate of Runoff 20.37 m3/sec.

Hydraulic Design

1. Available Crest Length 30.00 mtr

2. Available impounding depth 2.00 mtr

3. Heigth of flood above Crest to accommodate peak discharge 0.54 mtr

Structural Design

A. Fetch Length according to impounding at HFL 280.00 mtr

B. Free Board provided 0.35

Page 138: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

105

C. Gross heigth of Structure at waste weir 1.19 Say

1. Length of Headwall 30.00

2. Top width of Headwall 0.60

3. Bottom width of Headwall 0.84 Say

4. Height of Headwall 0.30

5. Length of Headwall Extention 2.19 Say

6. Top width of Headwall Extention 0.45

7. Bottom width of Headwall Extention 0.45

8. Height of Headwall Extention 1.19 Say

9. Length of Sidewall 1.64 Say

10. Top width of Sidewall 0.60

11. Bottom width of Sidewall 0.60

12. Height of Sidewall at head wall Ext. junction 1.19 Say

13. Length of Sidewall Extention 1.22 Say

14. Top width of Sidewall Extention 0.60

15. Bottom width of Sidewall Extention 0.60

16. Height of Sidewall Extention 0.81 Say

17. Length of Toewall 30.00

18. Width of Toewall 0.45

19. Hieght of Toewall 0.30

20. Width of Apron 1.64 Say

Page 139: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

106

Earth work calculation for Earthen Bund of Khadin

Village: Meda uparla

Khasra No.:538,539,548,547

Side slope, upstream side = 1.5

Side slope, downstream side = 2

Chainage No.

Chain Length NSL TBL Height Bottom

Width Top

Width Cross

Section

Avg. Cross

Section Qty.

1 30 218.00 218.00 0.00 2.00 2.00 0.00 0.00 0.00

2 30 217.90 218.00 0.10 2.35 2.00 0.22 0.11 3.26

3 30 217.90 218.00 0.10 2.35 2.00 0.22 0.22 6.52

4 30 217.80 218.00 0.20 2.70 2.00 0.47 0.34 10.31

5 30 217.70 218.00 0.30 3.05 2.00 0.76 0.61 18.41

6 30 217.70 218.00 0.30 3.05 2.00 0.76 0.76 22.73

7 30 217.50 218.00 0.50 3.75 2.00 1.44 1.10 32.93

8 30 217.50 218.00 0.50 3.75 2.00 1.44 1.44 43.13

9 30 217.40 218.00 0.60 4.10 2.00 1.83 1.63 49.01

10 30 217.20 218.00 0.80 4.80 2.00 2.72 2.28 68.25

11 30 217.20 218.00 0.80 4.80 2.00 2.72 2.72 81.60

12 30 217.00 218.00 1.00 5.50 2.00 3.75 3.24 97.05

13 30 216.80 218.00 1.20 6.20 2.00 4.92 4.33 130.05

14 30 216.70 218.00 1.30 6.55 2.00 5.56 5.24 157.16

15 30 216.60 218.00 1.40 6.90 2.00 6.23 5.89 176.81

16 30 216.40 218.00 1.60 7.60 2.00 7.68 6.96 208.65

Page 140: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

107

17 30 216.30 218.00 1.70 7.95 2.00 8.46 8.07 242.06

18 30 216.20 218.00 1.80 8.30 2.00 9.27 8.86 265.91

19 30 216.00 218.00 2.00 9.00 2.00 11.00 10.14 304.05

20 30 216.20 218.00 1.80 8.30 2.00 9.27 10.14 304.05

21 30 216.40 218.00 1.60 7.60 2.00 7.68 8.48 254.25

22 30 216.50 218.00 1.50 7.25 2.00 6.94 7.31 219.26

23 30 216.50 218.00 1.50 7.25 2.00 6.94 6.94 208.13

24 30 216.60 218.00 1.40 6.90 2.00 6.23 6.58 197.51

25 30 216.60 218.00 1.40 6.90 2.00 6.23 6.23 186.90

26 30 216.70 218.00 1.30 6.55 2.00 5.56 5.89 176.81

27 30 216.80 218.00 1.20 6.20 2.00 4.92 5.24 157.16

28 30 217.00 218.00 1.00 5.50 2.00 3.75 4.33 130.05

29 30 217.10 218.00 0.90 5.15 2.00 3.22 3.48 104.51

30 30 217.30 218.00 0.70 4.45 2.00 2.26 2.74 82.12

31 30 217.40 218.00 0.60 4.10 2.00 1.83 2.04 61.31

32 30 217.50 218.00 0.50 3.75 2.00 1.44 1.63 49.01

Total 960 30.10 174.6 4048.99

Page 141: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

108

Detailed & Abstract of Estimate for Khadin

Village: Meda uparla Khasra No.:538,539,548,547

Details of Measurement S.

No. Item Item Ref. Unit No. L B H Qty. Rate Amount

Earthen Bund 1 Dag belling, 5-10 cm deep Mtr 2 960 1920.00 0.47 902.40 2 Jungle clearance, ordinary jungle Sqm 1 960 7.94 7618.91 1.90 14475.93 3 Earth work for embankment in dry or wet in layers

of 15 cm, breaking of clods, picking of grasses, pebbles etc. & dressing in given profile including 1.5 mtr of lift & 50 mtr of lead, in hard soil

Cum As per Earth work Calculation chart 4048.99 89.00 360359.89 4 Sowing of grass seeds on ridges in 5 lines Mtr 5 930 4650.00 1.30 6045.00 5 Supply of grass seeds (Dhaman/ Sewan/Stylo

Hamata etc,)

Kg 10 1 10.00 85.00 850.00 6 Spreading of quarry rubbish which have 40% of

stone spals or kankar or Murrum on bund surface including supply, watering & ramming etc. complete

Sqm 1 960 2.47 0.08 189.43 376.00 71225.34 7 Dry stone pitching with 15-23 cm long hammer

dressed singel stone including supply & all lead & lift, on upstream side of bund

Cum 1 240 3.06 0.2 146.85 1188.00 174456.23 Sub Total A 628314.79

Waste Weir Earth work for excavation in foundation trenches in dry or moist soil & back filling of soil in jhiri & disposal of excavated of soil in required profile including 1.5 mtr of lift & 50 mtr of lead, in hard soil

Head Wall 1 30 1.14 0.75 25.65

Head Wall Extention 1 2.3 0.75 0.75 1.29 Side Wall 2 1.7 0.9 0.75 2.30

Side wall extention/ Wing walls 2 1.25 0.9 0.5 1.13 Apron 1 30 1.7 0.45 22.95

Toe wall/ Cut off wall 1 30 0.75 0.5 11.25

1

Cum 64.56 89.00 5746.17 PCC in Foundation Providing and laying cement concrete incduding curring compection etc.complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). Less : Deduct for hand broken aggregates used in place of crusher broken

Head Wall 1 30 1.14 0.3 10.26

Head Wall Extention 1 2.3 0.75 0.3 0.52

2

Side Wall 2 1.7 0.9 0.3 0.92

Page 142: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

109

Side wall extention/ Wing walls 2 1.25 0.9 0.3 0.68 Apron 1 30 1.7 0.3 15.30

Toe wall/ Cut off wall 1 30 0.75 0.3 6.75 Cum 34.42 2589.00 89114.67

Stone Kharanja in CM (1:8) in soling stones upto plinth including filling of jhiri, curing etc

Apron 1 30 1.7 0.15 7.65

3

Cum 7.65 1188.00 9088.20 Stone Masonry For Foundation Random Rubble stone masonry for foundation and plinth in cement sand mortar above 30cm thick wall in: cement mortar 1:6 (1cement : 6sand)

Head Wall 1 30 0.84 0.45 11.34 Head Wall Extention 1 2.30 0.45 0.45 0.47

Side Wall 2 1.7 0.9 0.45 1.38 Side wall extention/ Wing walls 2 1.25 0.9 0.2 0.45

Toe wall/ Cut off wall 1 30 0.75 0.2 4.50

4

Cum 18.13 2322.00 42104.25 Stone Masonry For Super structure in Random Rubble stone masonry for foundation and plinth in cement sand mortar above 30cm thick wall in: cement mortar 1:6 (1cement : 6sand)

Head Wall 1 30 0.72 0.3 6.48 Head Wall Extention 1 2.30 0.45 1.25 1.29

Side Wall 2 1.70 0.6 1.13 2.30 Side wall extention/ Wing walls 2 1.25 0.6 1 1.50

Toe wall/ Cut off wall 1 30 0.45 0.3 4.05

5

Cum 15.62 2322.00 36266.74 Plaster in CM (1:4 ), 25 mm thick

Head Wall 1 30 0.3 9.00 Head Wall Extention 2 2.3 1.25 5.75

Side Wall 4 1.70 1.13 7.65 Side wall extention/ Wing walls 4 1.25 1 5.00

Toe wall/ Cut off wall 2 30 0.3 18.00 1 30 0.45 13.50

6

Sqm 58.90 151.00 8893.90 Sub Total B 191213.93 Total 819528.73 Add: Contingencies @ 3% 24585.86 Grand Total 844115.00 Say Rs. 8.43 lac

Page 143: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

110

2.00 M

2:1

2.00 M

9.00 M

Cross Section of Khadin

Page 144: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

111

Design Khadin

Village: Chavarcha

Khasra No.: 832,834,836,837

Hydro Geological Data

1. Area of Catchment, A 285.00 ha

2. Total Length of Run 1350.00 mtr

3. Total Fall/Relief of the Catchment 8.00 mtr

4. 1 Hr. Rainfall for 25 years Frequency 90.00 mm

5. Contour interval of Submergence area in m 1.00 mtr

6. Area of first contour in ha 1.70 ha

second Contour 2.90 ha

third contour 3.40 ha

fourth contour 5.25 ha

fifth contour 0.00 ha

sixth contour 0.00 ha

seventh contour 0.00 ha

7. Height at FTL 2 mtr

8. Yield of the Catchment, by Strange's Table

Yield of the Catchment per hectare Area in Cum

Good Catchment Avg. Catchment Bad Catchment

Total Monsoonal Rainfall in mm

Factor Area Factor Area Factor Area

Toatal Yield Cum

425 493 142.5 369.75 85.5 232 57 115090.13

Total expected Yield of Catchment = 11.51

9. Storage Capacity of the Khadin at FTL, by Symphson's formula

Page 145: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

112

V= h/3 [(A1+An)+4(A2+A4+…+An-1)+2(A3+A5+….+An-2)]

V= Storage Volume of Khadin in ha-m

A= Area of the contours, ha

n= Total no. of contours

h= Contour interval, m

Volume V= 13.70 ha-m

By readjusting the height of Crest/ FTL to have app. Capacity, FTL= 2 Mtr

10. Top width of the bund= H/5+1.50

.= 1.90

or say 2.00 Mtr

11. Total Length of Bund corresponding to above height 720.00 Mtr

12. Time of Concentration 37.06 minute

13. Intensity of Rainfall Corresponding to Time of Concentration 111.00 mm/hour

14. Average Runoff Coefficent 0.25

15. Peak Rate of Runoff 21.97 m3/sec.

Hydraulic Design

1. Available Crest Length 27.00 mtr

2. Available impounding depth 2.00 mtr

3. Heigth of flood above Crest to accommodate peak discharge 0.61 mtr

Structural Design

A. Fetch Length according to impounding at HFL 190.00 mtr

B. Free Board provided 0.29

C. Gross heigth of Structure at waste weir 1.20 Say

1. Length of Headwall 27.00

Page 146: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

113

2. Top width of Headwall 0.60

3. Bottom width of Headwall 0.84 Say

4. Height of Headwall 0.30

5. Length of Headwall Extention 2.20 Say

6. Top width of Headwall Extention 0.45

7. Bottom width of Headwall Extention 0.45

8. Height of Headwall Extention 1.20 Say

9. Length of Sidewall 1.65 Say

10. Top width of Sidewall 0.60

11. Bottom width of Sidewall 0.60

12. Height of Sidewall at head wall Ext. junction 1.20 Say

13. Length of Sidewall Extention 1.37 Say

14. Top width of Sidewall Extention 0.60

15. Bottom width of Sidewall Extention 0.60

16. Height of Sidewall Extention 0.91 Say

17. Length of Toewall 27.00

18. Width of Toewall 0.45

19. Hieght of Toewall 0.30

20. Width of Apron 1.65 Say

Page 147: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

114

Earth work calculation for Earthen Bund of Khadin Village: Chavarcha

Khasra No.: 832,834,836,837

Side slope, upstream side = 1.5

Side slope, downstream side = 2

Chainage No.

Chain Length NSL TBL Height Bottom

Width Top

Width Cross

Section

Avg. Cross

Section Qty.

1 30 216.00 216.00 0.00 2.00 2.00 0.00 0.00 0.00

2 30 215.90 216.00 0.10 2.35 2.00 0.22 0.11 3.26

3 30 215.70 216.00 0.30 3.05 2.00 0.76 0.49 14.63

4 30 215.50 216.00 0.50 3.75 2.00 1.44 1.10 32.93

5 30 215.30 216.00 0.70 4.45 2.00 2.26 1.85 55.42

6 30 215.10 216.00 0.90 5.15 2.00 3.22 2.74 82.12

7 30 214.90 216.00 1.10 5.85 2.00 4.32 3.77 113.03

8 30 214.70 216.00 1.30 6.55 2.00 5.56 4.94 148.13

9 30 214.50 216.00 1.50 7.25 2.00 6.94 6.25 187.43

10 30 214.30 216.00 1.70 7.95 2.00 8.46 7.70 230.92

11 30 214.20 216.00 1.80 8.30 2.00 9.27 8.86 265.91

12 30 214.10 216.00 1.90 8.65 2.00 10.12 9.69 290.81

13 30 214.00 216.00 2.00 9.00 2.00 11.00 10.56 316.76

14 30 214.20 216.00 1.80 8.30 2.00 9.27 10.14 304.05

15 30 214.50 216.00 1.50 7.25 2.00 6.94 8.10 243.11

Page 148: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

115

16 30 214.70 216.00 1.30 6.55 2.00 5.56 6.25 187.43

17 30 214.80 216.00 1.20 6.20 2.00 4.92 5.24 157.16

18 30 215.00 216.00 1.00 5.50 2.00 3.75 4.33 130.05

19 30 215.10 216.00 0.90 5.15 2.00 3.22 3.48 104.51

20 30 215.20 216.00 0.80 4.80 2.00 2.72 2.97 89.06

21 30 215.30 216.00 0.70 4.45 2.00 2.26 2.49 74.66

22 30 215.30 216.00 0.70 4.45 2.00 2.26 2.26 67.72

23 30 215.40 216.00 0.60 4.10 2.00 1.83 2.04 61.31

24 30 215.50 216.00 0.50 3.75 2.00 1.44 1.63 49.01

Total 720.00 24.80 134.80 3209.44

Page 149: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

116

Detailed & Abstract of Estimate for Khadin Village: Chavarcha Khasra No.: 832,834,836,837

Details of Measurement S. No. Item Item

Ref. Unit No. L B H Qty. Rate Amount Earthen Bund

1 Dag belling, 5-10 cm deep Mtr 2 720 1440.00 0.47 676.80 2 Jungle clearance, ordinary jungle Sqm 1 720 6.13 4411.64 1.90 8382.11 3 Earth work for embankment in

dry or wet in layers of 15 cm, breaking of clods, picking of grasses, pebbles etc. & dressing in given profile including 1.5 mtr of lift & 50 mtr of lead, in hard soil

Cum As per Earth work Calculation chart 3209.44 89.00 285639.94 4 Sowing of grass seeds on ridges

in 5 lines

Mtr 5 693 3465.00 1.30 4504.50 5 Supply of grass seeds (Dhaman/

Sewan/Stylo Hamata etc,)

Kg 10 1 10.00 85.00 850.00 6 Spreading of quarry rubbish

which have 40% of stone spals or kankar or Murrum on bund surface including supply, watering & ramming etc. complete

Sqm 1 720 2.03 0.08 117.06 376.00 44013.00 7 Dry stone pitching with 15-23

cm long hammer dressed singel stone including supply & all lead & lift, on upstream side of bund

Cum 1 180 2.52 0.2 90.74 1188.00 107803.52 Sub Total A 451869.87

Waste Weir Earth work for excavation in foundation trenches in dry or moist soil & back filling of soil in jhiri & disposal of excavated of soil in required profile including 1.5 mtr of lift & 50 mtr of lead, in hard soil

Head Wall 1 27 1.14 0.75 23.09

Head Wall Extention 1 2.2 0.75 0.75 1.24 Side Wall 2 1.6 0.9 0.75 2.16

Side wall extention/ Wing walls 2 1.4 0.9 0.5 1.26 Apron 1 27 1.6 0.45 19.44

Toe wall/ Cut off wall 1 27 0.75 0.5 10.13

1

Cum 57.31 89.00 5100.37 2 PCC in Foundation Providing

and laying cement concrete incduding curring compection

Page 150: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

117

etc.complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). Less : Deduct for hand broken aggregates used in place of crusher broken

Head Wall 1 27 1.14 0.3 9.23 Head Wall Extention 1 2.2 0.75 0.3 0.50

Side Wall 2 1.6 0.9 0.3 0.86 Side wall extention/ Wing walls 2 1.4 0.9 0.3 0.76

Apron 1 27 1.6 0.3 12.96 Toe wall/ Cut off wall 1 27 0.75 0.3 6.08

Cum 30.38 2589.00 78664.18 Stone Kharanja in CM (1:8) in soling stones upto plinth including filling of jhiri, curing etc

Apron 1 27 1.6 0.15 6.48

3

Cum 6.48 1188.00 7698.24 Stone Masonry For Foundation Random Rubble stone masonry for foundation and plinth in cement sand mortar above 30cm thick wall in: cement mortar 1:6 (1cement : 6sand)

Head Wall 1 27 0.84 0.45 10.21 Head Wall Extention 1 2.2 0.45 0.45 0.45

Side Wall 2 1.6 0.9 0.45 1.30 Side wall extention/ Wing walls 2 1.4 0.9 0.2 0.50

Toe wall/ Cut off wall 1 27 0.75 0.2 4.05

4

Cum 16.50 2322.00 38316.48 Stone Masonry For Super structure in Random Rubble stone masonry for foundation and plinth in cement sand mortar above 30cm thick wall in: cement mortar 1:6 (1cement : 6sand)

Head Wall 1 27 0.72 0.3 5.83 Head Wall Extention 1 2.2 0.45 1.20 1.19

Side Wall 2 1.6 0.6 1.1 2.11 Side wall extention/ Wing walls 2 1.4 0.6 1 1.68

Toe wall/ Cut off wall 1 27 0.45 0.3 3.65

5

Cum 14.46 2322.00 33569.15 6 Plaster in CM (1:4 ), 25 mm

thick

Page 151: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

118

Head Wall 1 27 0.3 8.10 Head Wall Extention 2 2.2 1.20 5.28

Side Wall 4 1.6 1.1 7.04 Side wall extention/ Wing walls 4 1.4 1 5.60

Toe wall/ Cut off wall 2 27 0.3 16.20 1 27 0.45 12.15 Sqm 54.37 151.00 8209.87

Sub Total B 171558.29 Total 623428.16 Add: Contingencies @ 3% 18702.84 Grand Total 642131 Say Rs. 6.40 lac

2.00 M

2:1

2.00 M

9.00 M

Cross Section of Khadin

Page 152: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

119

Design Khadin

Village: meda uprla

Khasra No.: 888,882,710,705,708

Hydro Geological Data

1. Area of Catchment, A 382.00 ha

2. Total Length of Run 1480.00 mtr

3. Total Fall/Relief of the Catchment 8.00 mtr

4. 1 Hr. Rainfall for 25 years Frequency 90.00 mm

5. Contour interval of Submergence area in m 1.00 mtr

6. Area of first contour in ha 2.10 ha

second Contour 3.70 ha

third contour 3.90 ha

fourth contour 5.10 ha

fifth contour 0.00 ha

sixth contour 0.00 ha

seventh contour 0.00 ha

7. Height at FTL 2 mtr

8. Yield of the Catchment, by Strange's Table

Yield of the Catchment per hectare Area in Cum

Good Catchment Avg. Catchment Bad Catchment

Total Monsoonal Rainfall in mm

Factor Area Factor Area Factor Area

Toatal Yield Cum

425 493 191 369.75 114.6 232 76.4 154261.15

Total expected Yield of Catchment = 15.43

9. Storage Capacity of the Khadin at FTL, by Symphson's formula

Page 153: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

120

V= h/3 [(A1+An)+4(A2+A4+…+An-1)+2(A3+A5+….+An-2)]

V= Storage Volume of Khadin in ha-m

A= Area of the contours, ha

n= Total no. of contours

h= Contour interval, m

Volume V= 15.03 ha-m

By readjusting the height of Crest/ FTL to have app. Capacity, FTL= 2 Mtr

10. Top width of the bund= H/5+1.50

.= 1.90

or say 2.00 Mtr

11. Total Length of Bund corresponding to above height 1010.00 Mtr

12. Time of Concentration 41.21 minute

13. Intensity of Rainfall Corresponding to Time of Concentration 107.00 mm/hour

14. Average Runoff Coefficent 0.25

15. Peak Rate of Runoff 28.38 m3/sec.

Hydraulic Design

1. Available Crest Length 30.00 mtr

2. Available impounding depth 2.00 mtr

3. Heigth of flood above Crest to accommodate peak discharge 0.67 mtr

Structural Design

A. Fetch Length according to impounding at HFL 260.00 mtr

B. Free Board provided 0.34

C. Gross heigth of Structure at waste weir 1.31 Say

1. Length of Headwall 30.00

Page 154: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

121

2. Top width of Headwall 0.60

3. Bottom width of Headwall 0.84 Say

4. Height of Headwall 0.30

5. Length of Headwall Extention 2.31 Say

6. Top width of Headwall Extention 0.45

7. Bottom width of Headwall Extention 0.45

8. Height of Headwall Extention 1.31 Say

9. Length of Sidewall 1.73 Say

10. Top width of Sidewall 0.60

11. Bottom width of Sidewall 0.60

12. Height of Sidewall at head wall Ext. junction 1.31 Say

13. Length of Sidewall Extention 1.52 Say

14. Top width of Sidewall Extention 0.60

15. Bottom width of Sidewall Extention 0.60

16. Height of Sidewall Extention 1.01 Say

17. Length of Toewall 30.00

18. Width of Toewall 0.45

19. Hieght of Toewall 0.30

20. Width of Apron 1.73 Say

Page 155: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

122

Earth work calculation for Earthen Bund of Khadin

Village: meda uprla

Khasra No.: 888,882,710,705,708

Side slope, upstream side = 1.5

Side slope, downstream side = 2

Chainage No.

Chain Length NSL TBL Height Bottom

Width Top

Width Cross

Section

Avg. Cross

Section Qty.

1 30 222.00 222.00 0.00 2.00 2.00 0.00 0.00 0.00

2 30 221.90 222.00 0.10 2.35 2.00 0.22 0.11 3.26

3 30 221.80 222.00 0.20 2.70 2.00 0.47 0.34 10.31

4 30 221.70 222.00 0.30 3.05 2.00 0.76 0.61 18.41

5 30 221.50 222.00 0.50 3.75 2.00 1.44 1.10 32.93

6 30 221.40 222.00 0.60 4.10 2.00 1.83 1.63 49.01

7 30 221.30 222.00 0.70 4.45 2.00 2.26 2.04 61.31

8 30 221.20 222.00 0.80 4.80 2.00 2.72 2.49 74.66

9 30 221.10 222.00 0.90 5.15 2.00 3.22 2.97 89.06

10 30 221.00 222.00 1.00 5.50 2.00 3.75 3.48 104.51

11 30 220.90 222.00 1.10 5.85 2.00 4.32 4.03 121.01

12 30 220.70 222.00 1.30 6.55 2.00 5.56 4.94 148.12

13 30 220.60 222.00 1.40 6.90 2.00 6.23 5.89 176.81

14 30 220.50 222.00 1.50 7.25 2.00 6.94 6.58 197.51

15 30 220.40 222.00 1.60 7.60 2.00 7.68 7.31 219.26

16 30 220.30 222.00 1.70 7.95 2.00 8.46 8.07 242.06

Page 156: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

123

17 30 220.20 222.00 1.80 8.30 2.00 9.27 8.86 265.91

18 30 220.10 222.00 1.90 8.65 2.00 10.12 9.69 290.81

19 30 220.00 222.00 2.00 9.00 2.00 11.00 10.56 316.76

20 30 220.10 222.00 1.90 8.65 2.00 10.12 10.56 316.76

21 30 220.20 222.00 1.80 8.30 2.00 9.27 9.69 290.81

22 30 220.40 222.00 1.60 7.60 2.00 7.68 8.48 254.25

23 30 220.40 222.00 1.60 7.60 2.00 7.68 7.68 230.40

24 30 220.50 222.00 1.50 7.25 2.00 6.94 7.31 219.26

25 30 220.60 222.00 1.40 6.90 2.00 6.23 6.58 197.51

26 30 220.70 222.00 1.30 6.55 2.00 5.56 5.89 176.81

27 30 220.80 222.00 1.20 6.20 2.00 4.92 5.24 157.16

28 30 220.90 222.00 1.10 5.85 2.00 4.32 4.62 138.56

29 30 221.00 222.00 1.00 5.50 2.00 3.75 4.03 121.01

30 30 221.10 222.00 0.90 5.15 2.00 3.22 3.48 104.51

31 30 221.10 222.00 0.90 5.15 2.00 3.22 3.22 96.53

32 30 221.20 222.00 0.80 4.80 2.00 2.72 2.97 89.06

33 30 221.30 222.00 0.70 4.45 2.00 2.26 2.49 74.66

34 20 221.50 222.00 0.50 3.75 2.00 1.44 1.85 36.95

Total 1010.00 37.60 199.60 4926.01

Page 157: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

124

Detailed & Abstract of Estimate for Khadin Village: meda uprla Khasra No.: 888,882,710,705,708

Details of Measurement S.

No. Item Item Ref. Unit No. L B H Qty. Rate Amount

Earthen Bund 1 Dag belling, 5-10 cm deep Mtr 2 1010 2020.00 0.47 949.40 2 Jungle clearance, ordinary

jungle

Sqm 1 1010 9.07 9163.45 1.90 17410.56 3 Earth work for embankment in

dry or wet in layers of 15 cm, breaking of clods, picking of grasses, pebbles etc. & dressing in given profile including 1.5 mtr of lift & 50 mtr of lead, in hard soil

Cum As per Earth work Calculation

chart 4926.01 89.00 438415.11 4 Sowing of grass seeds on

ridges in 5 lines

Mtr 5 980 4900.00 1.30 6370.00 5 Supply of grass seeds

(Dhaman/ Sewan/Stylo Hamata etc,)

Kg 10 1 10.00 85.00 850.00 6 Spreading of quarry rubbish

which have 40% of stone spals or kankar or Murrum on bund surface including supply, watering & ramming etc. complete

Sqm 1 1010 3.08 0.08 248.95 376.00 93606.51 7 Dry stone pitching with 15-23

cm long hammer dressed singel stone including supply & all lead & lift, on upstream side of bund

Cum 1 252.5 3.82 0.2 192.99 1188.00 229275.68 Sub Total A 786877.26

Waste Weir Earth work for excavation in foundation trenches in dry or moist soil & back filling of soil in jhiri & disposal of excavated of soil in required profile including 1.5 mtr of lift & 50 mtr of lead, in hard soil

Head Wall 1 30 1.14 0.75 25.65

1

Head Wall Extention 1 2.3 0.75 0.75 1.29

Page 158: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

125

Side Wall 2 1.7 0.9 0.75 2.30 Side wall extention/ Wing

walls 2 1.5 0.9 0.5 1.35

Apron 1 30 1.7 0.45 22.95 Toe wall/ Cut off wall 1 30 0.75 0.5 11.25

Cum 64.79 89.00 5766.20 PCC in Foundation Providing and laying cement concrete incduding curring compection etc.complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). Less : Deduct for hand broken aggregates used in place of crusher broken

Head Wall 1 30 1.14 0.3 10.26

Head Wall Extention 1 2.3 0.75 0.3 0.52 Side Wall 2 1.7 0.9 0.3 0.92

Side wall extention/ Wing walls

2 1.5 0.9 0.3 0.81

Apron 1 30 1.7 0.3 15.30 Toe wall/ Cut off wall 1 30 0.75 0.3 6.75

2

Cum 34.56 2589.00 89464.19 Stone Kharanja in CM (1:8) in soling stones upto plinth including filling of jhiri, curing etc

Apron 1 30 1.7 0.15 7.65

3

Cum 7.65 1188.00 9088.20 Stone Masonry For Foundation Random Rubble stone masonry for foundation and plinth in cement sand mortar above 30cm thick wall in: cement mortar 1:6 (1cement : 6sand)

Head Wall 1 30 0.84 0.45 11.34 Head Wall Extention 1 2.3 0.45 0.45 0.47

Side Wall 2 1.7 0.9 0.45 1.38

4

Side wall extention/ Wing 2 1.5 0.9 0.2 0.54

Page 159: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

126

walls Toe wall/ Cut off wall 1 30 0.75 0.2 4.50

Cum 18.22 2322.00 42313.23 Stone Masonry For Super structure in Random Rubble stone masonry for foundation and plinth in cement sand mortar above 30cm thick wall in: cement mortar 1:6 (1cement : 6sand)

Head Wall 1 30 0.72 0.3 6.48 Head Wall Extention 1 2.3 0.45 1.25 1.29

Side Wall 2 1.7 0.6 1.13 2.30 Side wall extention/ Wing

walls 2 1.5 0.6 1 1.80

Toe wall/ Cut off wall 1 30 0.45 0.3 4.05

5

Cum 15.92 2322.00 36963.34 Plaster in CM (1:4 ), 25 mm thick

Head Wall 1 30 0.3 9.00 Head Wall Extention 2 2.3 1.25 5.75

Side Wall 4 1.7 1.13 7.65 Side wall extention/ Wing

walls 4 1.5 1 6.00

Toe wall/ Cut off wall 2 30 0.3 18.00 1 30 0.45 13.50

6

Sqm 59.90 151.00 9044.90 Sub Total B 192640.05 Total 979517.31 Add: Contingencies @ 3% 29385.52 Grand Total 1008903 Say Rs. 10.07 lac

Page 160: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

127

2.00 M

2:1

2.00 M

9.00 M

Cross Section of Khadin

Page 161: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

128

Design Khadin

Village: Rajnwadi

Khasra No.: 276 ,539 ,548 ,547

Hydro Geological Data

1. Area of Catchment, A 417.00 ha

2. Total Length of Run 1880.00 mtr

3. Total Fall/Relief of the Catchment 8.00 mtr

4. 1 Hr. Rainfall for 25 years Frequency 90.00 mm

5. Contour interval of Submergence area in m 1.00 mtr

6. Area of first contour in ha 2.10 ha

second Contour 3.70 ha

third contour 4.20 ha

fourth contour 5.90 ha

fifth contour 0.00 ha

sixth contour 0.00 ha

seventh contour 0.00 ha

7. Height at FTL 2 mtr

8. Yield of the Catchment, by Strange's Table

Yield of the Catchment per hectare Area in Cum

Good Catchment Avg. Catchment Bad Catchment

Total Monsoonal Rainfall in mm

Factor Area Factor Area Factor Area

Toatal Yield Cum

425 493 208.5 369.75 125.1 232 83.4 168395.03

Total expected Yield of Catchment = 16.84

Page 162: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

129

9. Storage Capacity of the Khadin at FTL, by Symphson's formula

V= h/3 [(A1+An)+4(A2+A4+…+An-1)+2(A3+A5+….+An-2)]

V= Storage Volume of Khadin in ha-m

A= Area of the contours, ha

n= Total no. of contours

h= Contour interval, m

Volume V= 16.30 ha-m

By readjusting the height of Crest/ FTL to have app. Capacity, FTL= 2 Mtr

10. Top width of the bund= H/5+1.50

.= 1.90

or say 2.00 Mtr

11. Total Length of Bund corresponding to above height 970.00 Mtr

12. Time of Concentration 54.32 minute

13. Intensity of Rainfall Corresponding to Time of Concentration 94.00 mm/hour

14. Average Runoff Coefficent 0.25

15. Peak Rate of Runoff 27.22 m3/sec.

Hydraulic Design

1. Available Crest Length 30.00 mtr

2. Available impounding depth 2.00 mtr

3. Heigth of flood above Crest to accommodate peak discharge 0.66 mtr

Structural Design

A. Fetch Length according to impounding at HFL 280.00 mtr

B. Free Board provided 0.35

C. Gross heigth of Structure at waste weir 1.31 Say

Page 163: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

130

1. Length of Headwall 30.00

2. Top width of Headwall 0.60

3. Bottom width of Headwall 0.84 Say

4. Height of Headwall 0.30

5. Length of Headwall Extention 2.31 Say

6. Top width of Headwall Extention 0.45

7. Bottom width of Headwall Extention 0.45

8. Height of Headwall Extention 1.31 Say

9. Length of Sidewall 1.73 Say

10. Top width of Sidewall 0.60

11. Bottom width of Sidewall 0.60

12. Height of Sidewall at head wall Ext. junction 1.31 Say

13. Length of Sidewall Extention 1.47 Say

14. Top width of Sidewall Extention 0.60

15. Bottom width of Sidewall Extention 0.60

16. Height of Sidewall Extention 0.98 Say

17. Length of Toewall 30.00

18. Width of Toewall 0.45

19. Hieght of Toewall 0.30

20. Width of Apron 1.73 Say

Page 164: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

131

Earth work calculation for Earthen Bund of Khadin Village: Rajnwadi

Khasra No.: 276 ,539 ,548 ,547

Side slope, upstream side = 1.5

Side slope, downstream side = 2

Chainage No.

Chain Length NSL TBL Height Bottom

Width Top

Width Cross

Section

Avg. Cross

Section Qty.

1 30 215.00 215.00 0.00 2.00 2.00 0.00 0.00 0.00

2 30 214.90 215.00 0.10 2.35 2.00 0.22 0.11 3.26

3 30 214.90 215.00 0.10 2.35 2.00 0.22 0.22 6.52

4 30 214.80 215.00 0.20 2.70 2.00 0.47 0.34 10.31

5 30 214.70 215.00 0.30 3.05 2.00 0.76 0.61 18.41

6 30 214.60 215.00 0.40 3.40 2.00 1.08 0.92 27.56

7 30 214.50 215.00 0.50 3.75 2.00 1.44 1.26 37.76

8 30 214.50 215.00 0.50 3.75 2.00 1.44 1.44 43.13

9 30 214.40 215.00 0.60 4.10 2.00 1.83 1.63 49.01

10 30 214.30 215.00 0.70 4.45 2.00 2.26 2.04 61.31

11 30 214.20 215.00 0.80 4.80 2.00 2.72 2.49 74.66

12 30 214.20 215.00 0.80 4.80 2.00 2.72 2.72 81.60

13 30 214.10 215.00 0.90 5.15 2.00 3.22 2.97 89.06

14 30 214.00 215.00 1.00 5.50 2.00 3.75 3.48 104.51

15 30 213.90 215.00 1.10 5.85 2.00 4.32 4.03 121.01

Page 165: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

132

16 30 213.90 215.00 1.10 5.85 2.00 4.32 4.32 129.52

17 30 213.80 215.00 1.20 6.20 2.00 4.92 4.62 138.56

18 30 213.70 215.00 1.30 6.55 2.00 5.56 5.24 157.16

19 30 213.00 215.00 2.00 9.00 2.00 11.00 8.28 248.36

20 30 213.10 215.00 1.90 8.65 2.00 10.12 10.56 316.76

21 30 213.20 215.00 1.80 8.30 2.00 9.27 9.69 290.81

22 30 213.30 215.00 1.70 7.95 2.00 8.46 8.86 265.91

23 30 213.30 215.00 1.70 7.95 2.00 8.46 8.46 253.72

24 30 213.40 215.00 1.60 7.60 2.00 7.68 8.07 242.06

25 30 213.50 215.00 1.50 7.25 2.00 6.94 7.31 219.26

26 30 213.60 215.00 1.40 6.90 2.00 6.23 6.58 197.51

27 30 213.70 215.00 1.30 6.55 2.00 5.56 5.89 176.81

28 30 213.80 215.00 1.20 6.20 2.00 4.92 5.24 157.16

29 30 213.80 215.00 1.20 6.20 2.00 4.92 4.92 147.60

30 30 213.90 215.00 1.10 5.85 2.00 4.32 4.62 138.56

31 30 214.00 215.00 1.00 5.50 2.00 3.75 4.03 121.01

32 30 214.20 215.00 0.80 4.80 2.00 2.72 3.24 97.05

33 10 214.40 215.00 0.60 4.10 2.00 1.83 2.28 22.75

Total 970.00 32.40 179.40 4048.75

Page 166: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

133

Detailed & Abstract of Estimate for Khadin Village: Rajnwadi Khasra No.: 276 ,539 ,548 ,547

Details of Measurement S.

No. Item Item Ref. Unit

No. L B H Qty. Rate Amount Earthen Bund 1 Dag belling, 5-10 cm deep Mtr 2 970 1940.00 0.47 911.80 2 Jungle clearance, ordinary jungle Sqm 1 970 8.15 7909.91 1.90 15028.83 3 Earth work for embankment in dry or wet

in layers of 15 cm, breaking of clods, picking of grasses, pebbles etc. & dressing in given profile including 1.5 mtr of lift & 50 mtr of lead, in hard soil

Cum As per Earth work Calculation chart 4048.75 89.00 360338.75 4 Sowing of grass seeds on ridges in 5 lines Mtr 5 940 4700.00 1.30 6110.00 5 Supply of grass seeds (Dhaman/

Sewan/Stylo Hamata etc,)

Kg 10 1 10.00 85.00 850.00 6 Spreading of quarry rubbish which have

40% of stone spals or kankar or Murrum on bund surface including supply, watering & ramming etc. complete

Sqm 1 970 2.65 0.08 206.03 376.00 77466.44 7 Dry stone pitching with 15-23 cm long

hammer dressed singel stone including supply & all lead & lift, on upstream side of bund

Cum 1 242.5 3.29 0.2 159.72 1188.00 189742.89 Sub Total A 650448.70

Waste Weir Earth work for excavation in foundation trenches in dry or moist soil & back filling of soil in jhiri & disposal of excavated of soil in required profile including 1.5 mtr of lift & 50 mtr of lead, in hard soil

Head Wall 1 30 1.14 0.75 25.65

Head Wall Extention 1 2.3 0.75 0.75 1.29 Side Wall 2 1.7 0.9 0.75 2.30

Side wall extention/ Wing walls 2 1.5 0.9 0.5 1.35 Apron 1 30 1.7 0.45 22.95

Toe wall/ Cut off wall 1 30 0.75 0.5 11.25

1

Cum 64.79 89.00 5766.20 PCC in Foundation Providing and laying cement concrete incduding curring compection etc.complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). Less : Deduct for hand broken aggregates used in place of crusher broken

2

Head Wall 1 30 1.14 0.3 10.26

Page 167: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

134

Head Wall Extention 1 2.3 0.75 0.3 0.52 Side Wall 2 1.7 0.9 0.3 0.92

Side wall extention/ Wing walls 2 1.5 0.9 0.3 0.81 Apron 1 30 1.7 0.3 15.30

Toe wall/ Cut off wall 1 30 0.75 0.3 6.75 Cum 34.56 2589.00 89464.19

Stone Kharanja in CM (1:8) in soling stones upto plinth including filling of jhiri, curing etc

Apron 1 30 1.7 0.15 7.65

3

Cum 7.65 1188.00 9088.20 Stone Masonry For Foundation Random Rubble stone masonry for foundation and plinth in cement sand mortar above 30cm thick wall in: cement mortar 1:6 (1cement : 6sand)

Head Wall 1 30 0.84 0.45 11.34 Head Wall Extention 1 2.3 0.45 0.45 0.47

Side Wall 2 1.7 0.9 0.45 1.38 Side wall extention/ Wing walls 2 1.5 0.9 0.2 0.54

Toe wall/ Cut off wall 1 30 0.75 0.2 4.50

4

Cum 18.22 2322.00 42313.23 Stone Masonry For Super structure in Random Rubble stone masonry for foundation and plinth in cement sand mortar above 30cm thick wall in: cement mortar 1:6 (1cement : 6sand)

Head Wall 1 30 0.72 0.3 6.48 Head Wall Extention 1 2.3 0.45 1.25 1.29

Side Wall 2 1.7 0.6 1.13 2.30 Side wall extention/ Wing walls 2 1.5 0.6 1 1.80

Toe wall/ Cut off wall 1 30 0.45 0.3 4.05

5

Cum 15.92 2322.00 36963.34 Plaster in CM (1:4 ), 25 mm thick

Head Wall 1 30 0.3 9.00 Head Wall Extention 2 2.3 1.25 5.75

Side Wall 4 1.7 1.13 7.65 Side wall extention/ Wing walls 4 1.5 1 6.00

Toe wall/ Cut off wall 2 30 0.3 18.00 1 30 0.45 13.50

6

Sqm 59.90 151.00 9044.90 Sub Total B 192640.05 Total 843088.75 Add: Contingencies @ 3% 25292.66 Grand Total 868381 Say Rs. 8.67 lac

Page 168: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

135

2.00 M

2:1

2.00 M

9.00 M

Cross Section of Khadin

Page 169: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

136

CROSS-SECTION OF NALLAH BUNDING Top width Based on seepage line check Slope of seepage line 4:1

0.6 Stone Pitching 2:1 1.5:1 US DS 1.5 0.9 2.25 3

0.45 3.6 1.8 0.45 5.85 10.75 m

CS = (Tw+Bw) *Ht 2 CS = 4.8375 Sq.m. Average Cross section 4.84 Sq.m.

Page 170: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

137

CROSS SECTION OF CONTOUR FURROW

………………………

.............. …………………………..

……………………………

G.L

0.30

Cross Sec.= 1/2x0.60x0.30

= 0.09 sqm.

Page 171: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

138

CROSS SECTION OF DITCH CUM BUND FENCINGH ..................... ..................... ......................

......................... ......................... .......................... ......................... ................

G.L

1.0

0.60

Cross Sec.= ((1.60+0.0.60) )x1.00

2

= 1.10 Sqm

Page 172: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

139

PLAN

Jalore 15 IWMP 9.50

Capacity 20446 Ltr

3.5 3.05 5.55

9.50 3.5 m

ROOF GL 0.3 0.3 3.4

3.05 3.00 cc 1:4:8 0.15 3.35

Not to Scale

Page 173: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

140

Plan of Dug out Pond Arable Land Bund

14.00

14.00 14.00 14.00

Outer Length 14.00 mtr

Inner Length 6.00 mtr

Outer Width 14.00 mtr

Inner Width 6.00 mtr

Depth 2.00 mtr

Upper Area 196.00 Qum

Lower Area 36.00 Qum

Page 174: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

141

Plan of Dug out Pond Non Arable Land

Bund

37.75

15 11 33.75

Outer Length 37.75 mtr

Inner Length 33.75 mtr

Outer Width 15 mtr

Inner Width 11 mtr

Depth 1 mtr

Upper Area 566.25

Lower Area 371.25

Page 175: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

142

CROSS-SECTION OF VEGETATIVE BUND IN ARABLE LAND Top width = Based on seepage line check Slope of seepage line 3:1

0.6 1.5:1 1:1 US DS 1 0.6 1 1.5

0.1 1.8 1.2 0.45 m 3.1

4.11 m CS = (Tw+Bw) *Ht 2 CS = 1.85 Sq.m. Average Cross section 1.85 Sq.m. Length 1.00 m. Quantity 1.85 Cu.m.

Page 176: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

143

Goswara Total Project Area

Big Small Marginal S.No Farmer Area

Farmer Area Farmer Area Farmer Area GEN 789 1135.77 63 180.7 153 157.14 573 797.93 OBC 529 792.94 42 122.04 121 109.72 366 561.18 SC 486 1073.88 28 85.38 103 95.95 355 892.55 ST 104 134.32 7 23.44 36 32.82 61 78.06

TOTAl 1908 3136.91 140 411.56 413 395.63 1355 2329.72 Govt. Land 1741.09 0 0 0 0 0 0

Grand Total 4878 140 411.56 413 395.63 1355 2329.72

Page 177: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

144

tekcUnh xk¡o : esMkmijyk Ø- l- [kljk u- dkLrdkj dk uke {kS=Qy

1 130,313 Kuiya Ranchhoda Talchha pi.Lachha Tipu beva Lachha koum Rebari Sa.deh khatedar

3.88

2 131 Tipu Dharampatni Lachchha koum Rebari Sa.deh khatedar

1.94

3 132 to 135 Virka vald Sankla koum Rebari sa.deh khatedar

5.31

4 136 to 138 Kheta vald Vena koum Rebari Sa.Chhiparwada Teh.Ahore khatedar

7.24

5 139 Santosh Patni Virsingh Koum Rajput Sa.Lisana Tah.Kishangharbas Dist.Alwar Khatedar Na.S.469,393,398

2.43

6 143 to 146, 148 to 153, 157,159, 161,163, 164, 165, 175,177, 180, 186,260

Munesh Putra Prakash Koum harijan Sa. Tigdana Tah.V Dist.Bhivani(hariyana) Khatedar

34.42

7 162 Parbaram Putra Gebaram koum Meghwal Sa.Bagra Khatedar Na.S.367,377,437,446

1.87

8 166,167, 788, 789, 811

Ladaram Putra Devaji Koum Bhil Sa.Bagra Khatedar Na.S. 369,382,387,419

7.34

9 171 Bhudaram Shantilal PI.Chhogla Shrimati Sukidevi beva Chhogla Koum Meghwansi Sa.deh khatedar RaHan:- SBBJ Branch Jalore Na.S. 352

1.8

10 172, 173, 182, 191 Ramkunwar putra Chhotaram Jati Meghwal Sa.Rajod Tah.Jayal Dist.Nagour khatedar Na.S.397,399,402,430,436,445

6.66

11 174 Daliya vald Faglu koum Rebari Sa.deh khatedar

0.96

Page 178: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

145

12 176, 733 Kuiya vald Khetiya koum Meghwansi sa.deh khatedar Rahan:-Ja.s.bhu.vi. Bank Jalore

2.29

13 178,179, 576, 578, 579, 2269/577

Mangiya Putra Lakhiya Koum Meghwansi sa.deh khatedar

2.92

14 181 Munesh putra Prakash Koum Harijan Sa.Tigdana Tah.V Dist.Bhivani(hariyana) Mu. Lerki Beva Dla Koum Meghwansi Sa.deh khatedar Na.S.416

2.04

15 183 Chhoga vald Puriya Koum Meghwansi Sa.deh Ramkuvar putra Chhotaram koum Meghwal Nivaas Rajod Teh.Jayal Dist.Nagour khatedar Na.S.470,471

2.43

16 184 Ummed Bharti vald Hanjar Bharti koum Sami.sa.deh khatedar

2.32

17 185 Kishorsingh vald Bhopsingh koum Rajput Sa.deh khatedar

2.33

18 187 Juja vald Mula koum Rebari sa.deh khatedar

2.27

19 188, 189 Ranchhoda vald Neti Kapu beva Neti koum Rebari Sa.deh khatedar

4.72

20 190,193 Chandrakanwar Joje Narsinghdan vald Hamirsingh koum Charan sa.Mirgesar Teh.Baali Dist.Pali khatedar

4.33

21 192 Oti putri Champa joje Natha koum Rebari sa.deh khatedar

0.77

22 194 to 196 Devisingh vald Nimbsingh koum Rajput Sa.Aaipura Teh.Ahore khatedar

4.86

23 197, 198 Nema vald Punma koum Rebari sa.deh khatedar

2.47

24 200, 289 Pankanwar Dharmpatni Nimbsingh koum Rajput sa.Aaipura tah.Ahore khatedar

1.62

Page 179: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

146

25 201, 262 to 264, 268, 277, 278, 280, 283 to 285, 290, 598, 1081 to 1084, 223/2186, 254/2191, 292/2241, 1254/2169

Gram Panchayat Meda Uparla 89.53

26 249, 250, 253, 261 Dhiraj kumar putra Mishrimal koum Khatri Sa.Pavta Partham Polo Jodhpur Khatedar Na.S. 487,492,504,553

3.95

27 251,814,848 Sankalaram Pakaram pi.Ganesha Dharmi beva Ganesha koum Meghwansi sa.deh khatedar

5

28 252,107/2163 Panaram Khetaram pi.Visaram Hanja Putri Visaram Narayani patni Visaram Naba Panaram Khetaram Hanja Ki Vli Mata Narayani Patni Visaram Timaram Bhimaram pi.Ladiya Koum Sargara Sa.Deh khatedar Rahan:- Ja.S.Bhu.Vi.Bank Li.Branch Jalore Na.S.527

2.66

29 254 Kuiyaram vald Ukiya koum Meghwansi sa.deh khatedar Rahan:- Ja.S.Bhu.VI.Bank Li.Shakha Li.Jalore Na.S. 499

2.43

30 255 Kuiyaram vald Uka Deva vald Daya koum Meghwansi sa.deh khatedar Na.S.499

2.46

31 256, 587 Verilal vald Magji Koum Purohit Sa.Sankarana Tah.Ahore khatedar

2.42

32 257 Purki devi Beva Lakaram koum Rebari Sa.deh khatedar Na.S.356

2.45

33 258 Kuiya Baliya Goga pi.Chopa koum Rebari sa.deh khatedar

2.25

34 259 Ragiya Soniya Chanda pi.Chuniya Koum Sargara Sa.deh khatedar Sa.N.364,445

2.51

35 265 Ravatsingh vald Motisingh koum Rajput sa. Deh khatedar

2.45

Page 180: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

147

36 266 Lachhiya s/o Bhima Koum Rebari Sa.deh khatedar

2.64

37 267 Ganesha vald Mula koum Rebari Sa.deh khatedar

2.42

38 269, 272 Jivaram vald Bhomaram koum Sargara Sa.Maylawas khatedar

4.24

39 271 Rama Mada Pi.Sada Huki beva Sada koum Sargara Sa.deh khatedar

0.88

40 274, 275, 276 Bhagta vald Virma koum Rebari Sa.deh khatedar

2.51

41 279, 920 Barkat ali vald nenji Koum Musalman Sa.Jalore khatedar Na.S. 481

1.37

42 281 Galiya Tagiya pi.Dola koum Meghwansi sa.Thanvla Teh.Ahore khatedar

2.45

43 282 Hukidevi Joje Kuiyaram koum Sargara Sa.Uun Khatedar

1.66

44 286 Jetun banu patni Bhurekha Khokhar Jati Mesalman Sa.Jalore Khatedar

2.26

45 287 Khetaram putra Dolaji koum Meghwal sa.Bagra khatedar Na.S. 378,383,384,385,386,388,389,418

2.32

46 291 Dipa Gepa Pi.Saviya Sagrama vald Hartana Hanja Beva Hartana koum Rebari sa.deh khatedar

2.48

47 292 Dipa vald Saviya koum Rebari sa.deh khatedar

3.24

48 293, 294, 312 Vadnadevi patni Pithaji koum Rebari Sa.Deh khatedar

4.04

49 295 Bholaram Ranchhodaram pi.Kera Koum Rebari Sa.deh khatedar Na.S.523

2.45

50 298 Jovaram vald Javanaram koum Rebari sa.deh khatedar

2.21

51 300 to 302 Kuiya Piraram pi.Dala Mu.Lerki deva Dala koum Meghwansi sa.deh khatedar Na.S.416

1.62

52 303 Ratiya vald Rupi koum Rebari Sa.deh khatedar

2.16

53 304 Jepa Kuiya Bagiya pi.Parbuda Mu.Sagni beva Parbuda Koum Rebari Sa.deh khatedar

2.21

Page 181: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

148

54 305, 306, 309 Miyalal vald Mega Koum Rebari Sa.deh khatedar

1.57

55 310, 311 Jaysingh vald Badarsingh Koum Rajput Sa.deh khatedar

1.86

66 314,315 Hakma vald Rama koum Rebari Sa.Madalpura Khatedar

1.64

57 316 Daud kha vald Annekha koum Sipahi Musalman Sa.Madlpura Hal.Meda Uuparla khatedar Rahan:- SBBJ branch Siyana Na.S.555

1.62

58 317 Ibrahim kha Daud kha Rekha patni Suban kha koum Sipahi Musalman sa.Madlpura hal Meda Uparla Khatedar Rahin:- Ibrahim kha ka hi.SBBJ shakha SIYana Rahan:- Rekha Patni Subankha SBBJ Sakha Siyana Na.s. 552,555

1.97

59 423 to 427, 437 to 439 , 456, 460, 466, 467, 478, 486, 2034, 2040 to 2042, 2044 to 2048, 2071, 2072, 2075, 2076, 2158, 420/2165, 473/ 2242, 481/2196

Bhagwan Karshi Sahkari Samiti Gram Meda Uparla

69.67

60 428, 430,431,552,553, 2275/533

Bhanwarsingh vald Bhagsingh Koum Ravna Rajput Sa.Bhainswada Khatedar Rahan:- MGB Branch Jalore Na.S.535,550

7.19

61 429, 2280/549 Virka vald Samti koum Rebari sa.deh khatedar

4.02

62 432, 435, 436, 455, 462, 468

Virka Kesa Pi.Sankla Koum Rebari Sa.Deh khatedar

6.84

63 433,549,550 Kuiya vald Vagiya Rambha beva Vagiya koum rebari sa.deh khatedar

4.01

64 434 Pabuda Jogiya pi.Pelada Kanaram Udaram PI.Vaga Lungi beva Vaga Koum Rebari Sa.deh khatedar

1.78

65 461 Maliya vald Hira Koum Sargara Sa.deh khatedar Na.S. 407

0.76

Page 182: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

149

66 464 Harji Puraram Ranchhodaram beva Deva 1/2 Virka vald Sankla 1/2 koum Rebari sa.deh khatedar

2.5

67 465 Bhriya Soma Pi.Chhoga Koum Sargara Sa.Deh khatedar Na.S 533

1.49

68 469 Aambiya Sarupa Pi.Ramiya Sopu beva Ragiya Deva Nava koum Rebari sa,deh khatedar

2.44

69 470 Uka vald Megha koum Rebari sa.deh khatedar

2.31

70 471 to 473 Tejsingh vald Harisingh 1/3 Madansingh vald Harisingh 1/3 hi.Bagsingh vald Harisingh 1/3 hi.Koum Rajput sa.Kaniwada Teh.Ahore khatedar

7.29

71 474 to 476, 1911 Saviya vald Dana koum Rebari sa.deh khatedar

9.38

72 477, 479, 480,481,532

Chanda Chamna pi.Virka koum Rebari sa.deh khatedar Rahan:-SBBJ Branch Siyana

6.73

73 482 Prakash Manchharam Puran Kailash pi.Madudas Sukhi beva Madudas Bhanwardas Ramesh Pi.Rupadas Shanti beva Rupdas Gulabdas vald

1.31

74 483, 485, 487,1019,1020,1021, 1022, 1023,

Jogsingh vald Shersingh Koum Rajput Sa.Ahore khatedar(Hal Deh) Rahan:- Ja.S.Bhu.Vi.bank Li.Branch Jalore Bavj Rupay-52000/-

32.7

75 491 Mathradevi patni Umaram Jati Rebari Sa.Ahore khatedar Na.S.345,362,363

0.04

76 509, 1091,1093, Madaram Putra Lakha Purki beva Lakha Motiya vald Jetha 1/2 Piyaram vald Pelada Hartinga vald Parka Madaram putra Lakha Purki beva Lakha Motaram vald Jetha Aa

3.35

77 510 Aasiya vald Purkha Koum Rebari sa.deh khatedar

1.73

78 511,512,547, 700 Rameshsingh Bherusingh pi.Dhuksingh Bhanwarsingh Shetansingh Dilipsingh pi.Jaisingh Dhuksingh vald Amring koum Rajput Sa.deh khatedar Na.S.462,548

4.59

Page 183: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

150

79 513,514, 701, 715 Moka Fusa Bhava Bhapa pi.Raviya Kuiya Marka Pi.Valiya Koum Sargara Jaysingh Jethusingh Ranjitsingh pi.Badiya Koum Rajput Sa.deh khatedar

8.04

80 515, 866 Piyaram vald Pelaji Koum rebari sa.deh khatedar

3.74

81 516, 702, 716,718 Champa Talchha Nema pi.Naviya 1/2 Jamnadevi patni Chouparam Chouthi devi patni Talchharam Sitadevi patni Nemaram koum Meghwansi 1/2 sa.deh khatedar

5.2

82 517,764 Kuiya vald Darja koum Meghwansi sa.deh khatedar

4.26

83 518 to 521 Jotibai beva Amichand Bhupendrakumar Narpatraj Nemichand Rajkumar Pi.Amichand Aruna putri Amichand koum Mahajan sa.Ahore khatedar Na.S.351

1.44

84 522,523, 525 Manoharlal vald Achla koum Suthar sa.deh khatedar Na.s.459

2.04

85 524 Kuiyaram vald Darjiya koum Meghwansi Sa.deh khatedar Na.S. 413

0.95

86 526 Sitadevi patni Shankarlal Jati Sargara Sa.Shantinagar Suraj Pol Ke bahar Jalore khatedar Na.S.341,343

4.62

87 527 Madaram putra Lakha Purki beva Lakha Motiya vald Jetha 1/5 Hi.Piyaram vald Pelada Hartinga vald Parka Madaram vald Lakhara

4.35

88 528,544 Piyaram vald Pelada Hartinga vald Parka Morki Sita Dheli Amiyo Putri Lakaram Madaram vald

5.16

89 529,530, 611 to 613 Narendrasingh vald Shambhusingh Koum Rajput Sa.Umrlai Tehsil pachpadra Khatedar Rahan:- SBBJ Brancah Siyana

9.42

90 531 Bhanu patni Mohanlal Koum Sargara Sa.Bhainswada Tah.Ahore khatedar Na.S.522

3.25

91 533, 2274/532 Omprakash putra Sohanram koum Meghwansi 1/2 sa.Jalore deva vald Daya 1/2 koum Meghwansi sa.deh khatedar Na.s.499,501

4.28

Page 184: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

151

92 534 to 540 Kamla beva Dudiya Ranchhodaram Chhoutharam Parsaram pi.Dudiya Naba.vli Mata Kamla beva Dudiya Hanja beva Chuniya Pakaram Ramaram pi.Virka Uki w/o Virka Suresh Naresh Kanaram pi.Kuya Satidevi Patni Kuya Naba.Suresh Naresh Kanaram Ki.Vli Mata Satidevi patni

13.65

93 543, 713, 766,769, 841 to 843

Jaysingh Jethusingh Ranjitsingh pi.Badarsingh koum Rajput Sa.deh khatedar Rahan:- Ranjitsingh Ka.Hi.Jalore Sahkari Bhumi Vikash Bank Branch Jalore Bavj Rashi Rupay-22800/-

16.15

94 545 to 546 Aamba Vagata Arjunsingh Pi.Chimana koum Rajput sa deh khatedar Rahin (1) kha.n.57.132.Rakba 155 Bigha 18 Birava Gat ka 2/3 Hi Vagata Aejun pi.Chimna rahan

5.34

95 548 Mega Samiya Tiloka Lala Pi.Piya Koum Meghwansi Sa.Deh khatedar

1.48

96 554 to 556, 559 Ramsingh Rupsingh pi.Bhika Koum Rajput sa.deh khatedar Na.S.486

11.51

97 557 Ramsingh Rupsingh Pi.Bhiksingh Koum Rajput Sa.Deh Khatedar

0.17

98 563 to 570 Manchharam vald Bhupa Sa.Bithuda 1.62 Bhika vald Hema 1.62 Tulsi putri Bhaliya 2.06 Mangiya vald Lakhiya 1.62 Sundar Ghuti Putriya Sanvaliya Bagdaram Dudaram Jesaram Rameshkumar Pi.Sanvaliya 2.10 Khima Jetha pi.Lumba 2.37 Vagiya vald Hema 1.71 He.Koum Meg

4.55

99 571,711 Talchhi putri Bhaliya Koum Meghwansi Sa.deh khatedar Rahan:-Ja.S.Bhu.VI.Bank Li.Branch Jalore Bavj Rupay 90000/-

2.2

100 572 to 574 Manchharam vald Bhupa Sa.Bithuda 1.62 Bhika vald Hema 1.62 Tulsi putri Bhaliya 2

1.97

101 577 Narsaram vald Gajaram koum Meghwal Sa.Leta Khatedar

3.85

102 580, 581, 996 to 998 Tariya Nema pi.Jodha koum Sargara sa.deh khatedar

6.29

Page 185: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

152

103 582, 583,589, 585/2168, 2268/578

Bagdaram Dudaram Jesaram Ramesh Kumara Pi.Sanvaliya Sundar Ghuti Putriya Sanvaliya Koum Meghwansi Sa.deh khatedar Na.s. 482,563

3.82

104 584, 585 Khima Jetha pi.Lumba Koum Meghwansi sa.deh khatedar Na.s. 423

1.47

105 588, 590,591,592, 594, 858

Chelaram Dungaram Pakaram pi.Jotiya Shrimati Soni beva Jotiya 1/2 hi.Sugni Sumti putri Jagta 1/2 hi.Koum Meghwansi sa.deh khatedar Rahan:-Dungaram Pakaram V Soni ka hi.Ja.S.Bhu.VI.Bank Branich Jalore Na.S.431

7.19

106 593, 693,867, 1086 to 1088

Javana Bhima Bheriya Mularam vald Sarupa Tima vald Hukma Harchand Joraram pi.Bhabuta Pankhu Putri Bhabuta Ansi patni Bhabuta Naba Harchand Joraram ki Vliya Mata Ansi patni Bhabuta Mu.Pokdi beva Motiya koum Sargara Sa.deh khatedar Na.S.365,436,497,534,564

6.31

107 595 to 597 Joga vald Hanjiya Naba Kudrati vli Poni beva Galba Vardaram Amraram pi.Galba Ragiya Pira pi.Lachchha Ramesh vald Darjiya naba.Vli Manki beva Darjiya 1/2 koum Sargara Sa.deh Dudaram vald Vagta koum Meghwansi 1/2 sa.Kuaada Teh.Ahore khatedar

1.98

108 608, 609, 610, 826, 830 , 831,

Gayatri devi patni Sanvlaram koum meghwal Sa.Ramdev Colony Jalore khatedar Na.s. 365,488,490,502,537

5.5

109 614, 615, 616, 617 Arjun vald Chimansingh 1/2 Jaysingh Jetusingh Ransingh pi.Badarsingh HI.1/2 koum Rajput

3.86

110 663 Jesaram Motaram pi.Jetha Samda beva Jetha Pokdi beva Vagta Jagtaram Mafaram Bhanwarlal pi.Vagta Paras Nena pi.Mitha mu.Sita Beva Mitha Shanti beva Taga 1/4 hi.Manga Jabra pi.Ganesha 1/4 Hi.Babu vald Kupa1/4 Paka vald Masra Kadna beva Masra Pura Khuma Samd

1.62

Page 186: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

153

111 664 to 665 Jesaram Motaram pi.Jetha Samda beva Jetha Pokdi beva Vagta J

2.45

112 666 Jamnadevi patni Durgaram koum Meghwal sa.Jalore Khatedar Rahan:- SBBJ Branch Jalore Na.S.512,530,547

1.7

113 667,706, 707,717 Chuki Joje Chhoga putri Panna Koum Meghwansi sa.Pandwara Teh.Ahore khatedar Rahan:- SBBJ Branch Jalore Na.S. 352

3.28

114 688, 2284/687 Chandansingh Charansingh pi.Shambhusingh Anaskanwar beva Shambhusingh Kou Rajput Sa.deh khatedar Na.S. 468,469

0.92

115 689 to 596 Rameshsingh Bherusingh pi.Dhuksingh Bhanwarsingh Shetansingh Dilipsingh pi.Jaisingh Dhuksingh vald Amring Koum Rajput Hi.B.1/4 Mu.Poni beva Masraram Somaram Goparam pi.Masraram Sakaram Bhubaram Bhuraram Baburam pi.Kapura 1/4 Joga vald Hanjiya Nabalig Ka k

30.43

116 697 to 698 Joga vald Hanjiya Naba Kudrati vli Poni beva Hanjiya Manki beva Galba Vardaram Amraram Pi.Galba Ragiya Pira pi.Lachchha Ramesh vald Darjiya Naba Kudrati Vli Manki beva Darjiya 1/3 Mangiya vald Samiya 1/3 koum sargara Pabuda Jagiya pi.Pelaji Kanaram Udara

3.93

117 699 Rameshsingh Bherusingh pi.Dhuksingh Bhanwarsingh Shetansingh Dilipsingh pi.Jaisingh Dhuksingh vald Amring Koum Rajput Hi.B.1/4 Mu.Poni beva Masraram Somaram Goparam pi.Masraram Sakaram Bhubaram Bhuraram Baburam pi.Kapura 1/4 Joga vald Hanjiya Nabalig Ka k

2.97

118 703, 704 Ranaram Putra Mulaji Mangiya goud Luta Koum Sargara Sa.Deh khatedar Na.s. 452

3.76

Page 187: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

154

119 705, 708,710, 765 Mega Samiya Tiloka Lala pi.Patiya 1/3 Magni Putri Hariya Naba.vli Samda beva Hariya Mangiya Rupa pi.Jagta 1/3 Galiya Tagiya Pi.Dola 1/3 koum Meghwansi Sa.Thanvala Tah.Ahore khatedar

8.72

120 709, 741 to 744, 750 Mathra beva Tariya Javana Gopa Punma Pi.Tariya Koum Meghwansi sa.deh khatedar

4.67

121 712 Poni beva Masraram Somaram Goparam pi.Masraram Sakaram Bhubaram Bhuraram Baburam pi.Kapura Hamiya vald Rupa Uda vald Ravta Ragiya Soniya Pakiya Chanda PI.Chuniya Oma vald Karniya Pataram vald Amriya 5/6 HI.Sakiya vald Kesa 1/5 koum Sargara sa.deh khateda

3.63

121 714, 759 Galba vald Dharma koum Meghwansi sa.deh khatedar Na.s.488,490

4.97

122 719 Rupsingh Shetansingh pi.Savsingh koum Rajput Sa.Dudsi khatedar Rahan:- Rupsingh Ka Hi.SBBJ branch Bagra Na.S. 486,554

2.67

123 720,775, 2281/2263 Dalaram goud Parka Koum Sargara Sa.deh khatedar

4.66

124 721, 2263/618 Obaram Manglaram pi.Magiya Pankhi Antri Putriya Magiya Shanti patni Magiya Moti vald Tikma Sargara Sa.deh khatedar Na.s.540

3.68

125 722 to 723 Aamba Vagata Arjunsingh Pi.Chimana koum Rajput sa deh khatedar Rahin (1) kha.n.57.132.Rakba 155 Bigha 18 Birava Gat ka 2/3 Hi Vagata Aejun pi.Chimna rahan Rs.70.000 /- main SBBJ Braanch Jalore (2) kha.n. 57.132.198.gat ka Purn hi. Rahan Rs.30.000/- year

10.69

126 724, 731, 732, 754, 822, 886, 887

Tariya Virka Mega Nema pi.Dhupa Hi.B.1/2 Bhura vald Narsa Mu.Gerki beva Radiya Gheva Vald Radiya Lila Bhatki putri Jagta Naba Rafik Bhura vald Narsa 1/2 koum Meghwansi Sa.deh B.Hi.B. khatedar

8.07

Page 188: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

155

127 725,734, 739, 740 Gerki beva Radiya Gheva vald Radiya KoumMeghwansi sa.deh khatedar Na.S. 412

2.67

128 726 Prema vald Kla koum Sargara Sa.deh khatedar

2.24

129 727, 729, 730, 736, 879

Fuliya Virma Bhamariya pi.Kuiya Sita beva Kuiya 1/2 Sagrama sa.deh khatedar Na.s. 537

7.05

130 728, 737, 751, 833 ,834, 836

Poni beva Masraram Somaram Goparam pi.Masraram Sakaram Bhubaram Bhuraram Baburam pi.Kapura Koum Sargara Sa.Deh khatedar

7.46

131 735,745,746 Kupa Rajiya pi.Soniya Kanheyalal vald Maliya poni beva Pitiya Chuniya Pi.Patiya koum Sa.deh khatedar

2.94

132 738, 710/2160, 2295/495

Lalit Arjun Shravan pi.Mogiya Sita Saroj Putriya Mogiya Sundar patni Mogiya Naba.Arjun Shravan Saroj Ki Vli Mata Sundar patni Mogiya koum Garuda Sa.Deh khatedar Na.S. 428,429,475,525

7.34

133 747 to 749, 752, 752/2201

Sukhi devi Patni Motiram Jati sargara Sa.Kuaada Hal Jalore khatedar

5.19

134 753 Kapura Bhima pi.Bena koum Meghwal sa.deh 1/2 hi.Khetaram putra Dolaji Jati Meghwal

1.17

135 755, 757,819, 871,872,873

Kapura Bhima pi.bena koum Meghwansi sa.deh khatedar

5.48

136 756, 823,824 Kaniya Vald Taliya Koum Meghwansi sa.deh Ramkumar putra Chhotaram Jati Meghwal Sa.Ranod Teh.Jayal Jilla Nagore khatedar Rahan:-Kaniya Ka hi.Ja.S.Bhu.VI.bank Li.Shakha Jalore Bavaj rupay 95000/- Na.s.400

2.79

137 760 Aamba Vagata Arjunsingh Pi.Chimana koum Rajput sa deh khatedar Rahin (1) kha.n.57.132.Rakba 155 Bigha 18 Birava Gat ka 2/3 Hi Vagata Aejun pi.Chimna rahan Rs.70.000 /- main SBBJ Braanch Jalore (2) kha.n. 57.132.198.gat ka Purn hi. Rahan Rs.30.000/- year

4.95

Page 189: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

156

138 761 Vijaysingh vald Rugnathsingh koum Rajput sa.deh khatedar

2.33

139 762 , 763, 888, 889, Hemsingh Vajesingh Pi.RughnathSingh Narpatsingh Harsansingh pi.Sardarsingh Bharatsingh putra Bhopsingh Pavankanwar beva Bhopsingh koum Rajput Sa.Deh khatedar Na.S.473,478,479,496

5.07

140 767, 768 Kalu Putri Chela Huki patni Chela Shankar vald Sadla koum Sargara 1/2 Chhatarsingh vald Arjunsingh koum Rajput 1/2 sa.deh khatedar Rahan:- Chela Shankar pi.Sadla koum Sargara 1/2 Ja.S.Bhu.Vi.bank shakha Jalore Na.s. 515

4.37

141 770 Kesaram putra Hakmaran koum Meghwal Sa.Dhanpur Khatedar Na.S. 366,433,434,438,450

1.72

142 771,806, 991, 1085 Moya vald Deva koum Sargara sa.deh khatedar Na.S.348

6.12

143 772,773,878, 992,993,

Pana vald Mana koum Sargara sa.deh khatedar

5.81

144 774 Manju beva Rama Arjun Ganpat Manohar pi.Rama Hina Sita Putriya Rama Naba.vli Mata Manju Beva Rama Mada Vald Sada Huki beva Sada koum Sargara sa.deh Parbaram Putra Gebaram koum Meghwal Sa.Bagra Shanti beva Tariya Gita Matra Putriya Tariya koum Sargara Sa.d

3

145 779, 780 Parbaram Putra Gebaram 1/2 Hi.Koum Meghwal Sa.Bagra Chelaram Dungaram Pakaram Pi.Jotiya Shrimati Soni beva Jotiya 1/2 hi.Koum Meghwansi Sa.deh khatedar Sa.Deh khatedar Rahan:- Dungaram Pakaram v Soni ka.Hi.Ja.S.Bhu.Vi.Bank Branch Jalore Na.S.431

4.09

Page 190: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

157

146 781 Chelaram Dungaram Pakaram pi.Jotiya Shrimati Soni beva Jotiya 1/6 Sugni Sumti putri Jagta 1/6 koum Meghwansi Pabuda Jagiya pi.Pelaba Kanaram Udaram pi.Baga Lungi beva Vaga 1/3 koum Rebari Joga vald Hanjiya Naba Kudarati vli Poni beva Hanjiya Galba Ragiya

0.6

147 782 Saluda vald Mejla Daliya vald Raji Prema Praga Jamta Pi.Nathiya Oti Beva Nathiya 1/2 Lakha vald Kheta Mu.Dharmi beva Kheta 1/2 hi.Koum Rebari Sa.deh khatedar

0.55

148 783 Samiya vald Rajiya Koum Sargara Sa.Deh khatedar

0.66

149 784 Chelaram Dungaram Pakaram pi.Jotiya Shrimati Soni beva Jotiya 1/6 Sugni Sumti putri Jagta 1/6 koum Meghwansi Pabuda Jagiya pi.Pelaba Kanaram Udaram pi.Baga Lungi beva Vaga 1/3 koum Rebari Joga vald Hanjiya Naba Kudarati vli Poni beva Hanjiya Galba Ragiya

0.6

150 785 Chelaram Dungaram Pakaram pi.Jotiya Shrimati Soni beva Jotiya 1/6 Sugni Sumti putri Jagta 1/6 koum Meghwansi Pabuda Jagiya pi.Pelaba Kanaram Udaram pi.Baga Lungi beva Vaga 1/3 koum Rebari Joga vald Hanjiya Naba Kudarati vli Poni beva Hanjiya Galba Ragiya

0.85

151 786 Chelaram Dungaram Pakaram pi.Jotiya Shrimati Soni beva Jotiya 1/6 Sugni Sumti putri Jagta 1/6 koum Meghwansi Pabuda Jagiya pi.Pelaba Kanaram Udaram pi.Baga Lungi beva Vaga 1/3 koum Rebari Joga vald Hanjiya Naba Kudarati vli Poni beva Hanjiya Galba Ragiya

0.58

152 787 Chelaram Dungaram Pakaram pi.Jotiya Shrimati Soni beva Jotiya 1/6 Sugni Sumti putri Jagta 1/6 koum Meghwansi Pabuda Jagiya pi.Pelaba Kanaram Udaram pi.Baga Lungi beva Vaga 1/3 koum Rebari Joga vald Hanjiya Naba Kudarati vli Poni beva Hanjiya Galba Ragiya

0.7

Page 191: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

158

153 790 Mohanlal Tiyaram pi.Natharam Koum megawansi Sa.Deh khatedar Na.S.457

1.2

154 791 Faludevi Patni Polaram Koum Meghwal Sa.Ramdeo Colony Jalore khatedar Na.s.470,536

387

155 792 Manju beva Rama Arjun Ganpat Manohar pi.Rama Hina Sita Putriya Rama Naba.vli Mata Manju Beva Rama Mada Vald Sada Huki beva Sada koum Sargara sa.deh Parbaram Putra Gebaram koum Meghwal Sa.Bagra Shanti beva Tariya Gita Matra Putriya Tariya koum Sargara Sa.d

1.48

156 793 Tagaram Putra Pataji Jati Meghwal Sa.Bagara 1/3 Tariya Nema Pi.Jodha 1/3 Javanaram Bhimaram pi.Bheriya Koum Sargara Sa.deh khatedar Na.S. 359,472,474

2.7

157 794,795 Vikramsingh Manoharsingh pi.Jaysingh Shrimati Pankajdevi beva Jaysingh koum Vald Mangiya Koum Ravna rajput Sa.deh khatedar

0.94

158 796 Mohanpuri Ranchhodpuri pi.Vashanpuri Shyama Kumari putri Sohanpuri Naba.Ki Vliya Dadi Santoki beva Vashanpuri koum Somi Sa.deh khatedar

0.71

159 797 Poni beva Masraram Somaram Goparam pi.Masraram Sakaram Bhubaram Bhuraram Baburam pi.Kapura Hamiya vald Rupa Uda vald Ravta Ragiya Soniya Pakiya Chanda PI.Chuniya Oma vald Karniya Pataram vald Amriya 5/6 HI.Sakiya vald Kesa 1/5 koum Sargara sa.deh khateda

0.29

160 798 to 805 Devaram putra Dalaram Koum Meghwal Sa.Rajod Teh.Jayal Dist.Nagour 1/2 hi.Kamla Putri Tara Javana Gopa Punma pi.Tara Javana Gopa Punma PI.Tara 1/2 Hi.Koum Meghwansi

6.34

161 810 Shesaram Lakhmaram Chhaganaram pi.Tejaram mu.Kesi beva Tejaram Mu.Kesi beva Tejaram koum meghwansi Sa.Thanwala Tah.Ahore khatedar

2.9

Page 192: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

159

162 815 to 817, 850,853 to 855

Mahipalsingh putra Prithvisingh Jati Rajput sa.Ahore khatedar

3.13

163 818 Chuniya vald Mula koum Suthar sa.deh khatedar

2.4

164 820 Doliya vald Parbhuda koum Meghwansi sa.deh khatedar

2.23

164 821 Doliya vald Parbhuda koum Meghwansi sa.deh khatedar

0.2

166 825 Taloka Vald Godiya 1/2 Hi Koum Meghwansi Sa.Deh Shrimati Gayatri devi Sanvlaram 1/2 hi.Koum Meghwal Sa.Jalore khatedar Na.S.380,562

2.69

167 827 to 829, 832,835 Bhera Chhoga Ranchhoda pi.Puriya Koum Meghwansi Sa.deh khatedar Na.S. 470,471,536

4.14

168 837 to 839 Narpatsingh Harsingh pi.Sardarsingh Koum Rajput sa.deh khatedar Rahan:- Ja.S.Bhu.VI.Bank Li.Branch Jalore Bavj 66,400/-Na.S. 974

1.88

169 844 to 846,1002 Chhogla vald Khasa koum Meghwansi Sa.deh khatedar Rahan:-Kh.No.844,845 Rakba 2.74 Rahan:- Jalore Sahkari Bhumi Vikash Bank Limiteda Jalore Na.S.410

4.78

170 847 Rupi patni Sava koum Meghwansi Sa.Narnavaas khatedar

2.22

171 849 Joju deva Bhura koum Meghwansi sa.Sanwada Teh.Ahore khatedar

2.5

172 851 Bagda vald Butiya koum Sargara Sa.deh khatedar

0.5

173 852 Bagda vald Butiya koum Sargara Sa.deh khatedar

2

174 862 Mokaram Fusaram Bhavaram Bhaparam PI.Raviya KoumSargara Sa.deh khatedar

2.43

175 863 Mokaram Fusaram Bhavaram Bhaparam Pi.Raviya Kuiya Marka Pi.Valiya Koum Sargaram Sa.deh khatedar

1.83

176 864 Vikramsingh Manoharsingh pi.Jaysingh Shrimati pankajdevi beva Jaysingh koum Ravna Rajput sa.deh khatedar

2.78

Page 193: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

160

177 865 Neti Bhera pi.Kesha 2/3 Lakha Rama pi.Virka Mu.Lachchhu beva Virka 1/3 koum Rebari sa.deh kahtedar

1.13

178 868 to870 Lakaram Sakaram Chimnaram pi.Kistura Koum Mena Sa.Uun Khatedar

3.66

179 874 Khima vald Ganesha koum Sargara sa.Uun khatedar

2.46

180 875 Doliya Dudiya Bhoma pi.Prabhu koum Meghwansi Sa.deh khatedar

3.22

181 876 to 877 Poni beva Masraram Somaram Goparam pi.Masraram Sakaram Bhubar

2.54

182 880 to 885 Gayataridevi patni Sanvlaram jati Meghwal Sa.Ramdev Colony Jalore 1/6 hi.Kamla Putri Tara Javana Gopa Punma pi.Tara Javana Gopa Punma pi.Tara 1/12 Hi.Moya Tiya pi.Natha 1/12 hi.Shrimati Rupi devi patni Savaram koum Meghwansi Sa.Narnawas 1/6 hi.Dola vald P

7.36

183 890 to 894 Pura vald Vaja Jesaram Motaram PI.Jetha Samda beva Jetha 1/4 Jagta Motiya pi.Mupiya 1/4 Obaram Manglaram pi.Mapiya Pankhi Antri Putri Putriya Magiya Shanti Patni Moti vald Tikma 1/4 Dalaram Goud Parka Hi.1/4 Koum Sargara Sa.deh khatedar Na.s.517

11.38

184 895 Paka vald Masra mu.Kadna beva Masra 1/4 Pura Khuma Amra pi.Vaja 3/4 Koum Sargara Sa.Deh khatedar

2.55

185 896 to 898, 1043, 1044

Mahendra vald Ratiya(Naba.)Chatra vald Naviya koum Sargara Sa.deh khatedar Rahan:- Ja.S.Bhu.VI.bank Li.Jalore Rupay 10500/- Gat Kh.No.191/1 Hal 896 Se 898 tak Na.S.526

9.05

186 899,900 Chhogla vald Mota koum Sargara Sa.Sanwada Teh.Ahore khatedara

2.53

187 902, 903 Hanuman vald Lichhmna koum Ravna Rajput Sa.Deh khatedar

4

188 964 Vagta Medla Keva Dla Jora Maga Harupa Pi.Faglu Ranchhod vald Neti Kapu beva Neti koum Rebari B.Hi.B.sa.deh khatedar

0.86

Page 194: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

161

189 965,966 Magiya vald Faglu Koum Rebari Sa.Deh khatedar

1.59

190 967 Lila Bhatki putri Jagta Naba.Rafik Bhura vald Narsa koum Meghwansi Sa.Deh khatedar

2.65

191 968 Jajiya Dipa Ganesha Varda pi.Mula koum Rebari Sa.deh khatedar

2.43

192 969, 970 Kupa Rajiya pi.Soniya koum Meghwansi Sa.deh khatedar Na.S. 411

2.87

194 972,984 Ranjitsingh putra Harisingh koum Sodha Rajput sa.Madka Tah.Vav Dist.Banaskanta(guj.)khatedar

1.73

195 973 to 976, 1849 Chunaram vald Nagaram Koum Choudhary Sa.Sanwada Teh.Ahore khatedar

2.25

198 979, 982 Sumti beva Bhomaram Rataram vald Bhomaram 1/4 Gena vald Khuma 1/4 Thanaram vald Genaji 1/4 Koum Ghanchi sa.Sanwada Tah.Ahore khatedar

3.6

199 980 , 981 Bhuda Gopiya Besara PI.Savda Koum Rebari Sa.deh khatedar

3.73

200 983, 985 Soniya Bhudiya Pi.Lumba Koum Ghanchi Sa.Sanwada Tah.Ahore khatedar

1.72

201 986, 987,1906 Puna Dipa Chhoga Pi.Sada Devilal Mangilal Pi.Lachha Poni w/o Lachha Koum Ghanchi Sa.Sanwada Tah.Ahore khatedar

4.39

202 988, 989, 1014, 1015 Chuna vald Jetha koum Sargara Sa.Budtara Teh.Ahore khatedar Rahan:- Ja.S.Bhu.VI.Bank Branch Jalore

4.82

203 990 Joriya vald Darga koum Sargara sa.deh khatedar

1.81

205 995 Joga vald Hanjiya naba Kudrati vli Poni Beva Galba Vardaram Amraram Pi.Galba Ragiya Pira pi.Lachchha Ramesh vald Darjiya naba.Vli Manki beva Darjiya koum Sargara Sa.deh khatedar

1.21

208 1003, 1005 to 1007 Lachhiya vald Kala Koum Bhambhi Sa.Thanwala Khatedar

3.94

210 1008, 1012,1013 Lachha Narsa Vela Kana Jeta Pi.Bhima koum Rebari Sa.deh khatedar

2.43

Page 195: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

162

211 1009 to 10 Piyaram vald Pelada Hartinga vald Parka Morki Sita Dheli Amiyo Putri Lakaram Madaram vald Lakaram Purki beva Lakaram Motaram vald Jetha Asiya Khode Nimba Jujiya G

3.3

212 10,111,018 Moka vald Darga 2/3 koum Ghanchi Kesa Virka Sakiya Aadiya Daya Pi.Daniya 1/3 Koum Meghwansi sa.Sanwada Tah.Ahore Khatedar Rahan:-Moka Ka.hi.Ja.S.Bhu.VI.Bank Jalore

3.49

213 1016,1017, 1098, 1099, 1904, 1908, 1934

Uka vald Dola 1/2 Daya vald Virka 1/2 koum Ghanchi Sa. Sanwada teh.Ahore khatedar

8.88

214 1024 Kamla beva Dudiya Ranchhodaram Chhoutharam Parsaram pi.Dudiya Naba.vli Mata Kamla beva Dudiya Hanja beva Chuniya Pakaram Ramaram pi.Virka Uki w/o Virka Suresh Nare

2.62

216 1026,1035, 1094, 1095

Moya vald Pi.Virma Koum Sargara Sa.deh khatedar Na.S.395

3.82

217 1027, 1032, to 1034, 1027/2175

Sankliya Dharma Uka Pi.Mega Saluda Labuda Roniya Pi.Bhava Koum Rebari Sa.deh khatedar Na.S. 376

1.53

221 1031, 1076 Mularam Punmaram Thanaram Parbaram Pi.Khangara Damodar putra Ranchhodaram Koum Ghanchi 1/2 Magna vald Varda 1/2 koum Meghwansi Sa.Sanwada Tah.Ahore Khatedar Rahan:- Magna vald Varda 1/2 hi.Ja.S.Bhu.Vi.Bank Branch Jalore

2.38

222 1036, 1051 Habtaram Girdhari Ganesharam Pi.Vela Nema vald Sarupa Koum Bhil Sa.Sanwada Tah.Ahore khatedar

3.64

223 1037 Kamla beva Dudiya Ranchhodaram Chhoutharam Parsaram pi.Dudiya Naba.vli Mata Kamla beva Dudiya Hanja beva Chuniya Pakaram Ramaram pi.Virka Uki w/o Virka Suresh Naresh Kanaram pi.Kuya Satidevi Patni Kuya Naba.Suresh Naresh Kanaram Ki.Vli Mata Satidevi patni

0.15

Page 196: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

163

224 1038 to 1040, 1105, 1106, 1935 to 1938, 1963 to 1965, 1967,1968

Mangiya Kuiya Pi.Kupa Goud Khangara 3/4 Devi putri Jasiya patni Chhoga 1/4 hi.Koum Ghanchi Sa.Sanwda Tah.Ahore khatedar Na.S.361

17.39

225 1041, 1045 Muliya vald Doliya Koum Koum Ghanchi Mu.Nenu beva Himtaram Hansaram Pi.Khima Mu.Jati beva lachchha Nemaram Vald Lachchha Sarupa Vela Pi.Bhima Koum Meghwansi Sa.Sanwada Tah.Ahore khatedar

3.29

226 1042 Chagankanwar Joje Jogsingh Koum Rajput Sa.deh khatedar Na.S.493,560

1.82

227 1046 Kaliya vald Mupa Koum Ghanchi Sa.sanwada teh.Ahore Khatedar Na.S. 432

2.71

229 1048, 1056 Sharda beva Isha Kapraram Fusaram Papu pi.Isha Seventy Putri Isha Naba.Ki Vli Mata Sharda Beva Isha koum Sargara Sa.deh khatedar Na.S.415

1.73

230 1049, 1909,1983, 1980

Sakiya vald Bhika 1/2 Sakiya Neka Jagiya PI.Valiya w1/2 Hi.Koum Ghnchi Sa.Sanwada Tah.Ahore khatedar

7.1

232 1052, 1053, 1064, 1100, 1101, 1107, 1891 to 1893, 1969, 1970

Ladaram Pekaram PI. Jodha Ramaram Magaram Kasturaram Khetaram Bheraram pi.Parba Mu.Gavri beva Ravta Narsaram Vagaram Nenaram Jogaram pi.Ravta koum Ghanchi Sa.Sanwada Tah.Ahore Ramlal putra Punmaji Ghanchi Sa.Rodla 1/15 Tah.Ahore khatedar Na.S.375

20.03

233 1054,1055, 1057, 1058

Mohammad Salim vald Jahur Mohammad Koum Musalman Sa.Jalore khatedar

17.22

234 1059 to 1062 Partapa vald Bhuta Koum Ghanchi Sa.Sanwada Tah.Ahore khatedar

2.35

235 1065 to 66. Poni beva Masraram Somaram Goparam pi.Masraram Sakaram Bhubaram Bhuraram Baburam pi.Kapura Hamiya vald Rupa

1.55

236 1068 Roniya Kuiya Pi.Mula Koum Sargara Sa.Deh khatedar Na.S.401,402

2.03

Page 197: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

164

237 1069, 1077 to 1080 Roniya Kuiya pi.Muliya 1/2 Javana Bhima pi.Bheriya Sangi Lerki Siya Putriya Bheriya 1/2 koum Sargara Sa.Deh khatedar Na.S.524

8.82

238 1070 Mangiya Virka Pi.Rajiya Koum Ghanchi Sa.Sanwada Tah.Ahore khatedar

1.32

239 1071, 1980 Bhoma Sagrama PI.Oka Kasturaram Mangilal pi.Mula Magi w/o Mula Nenaram Nemaram Khetaram PI.Jasiya Gatu beva Jasiya Koum Ghanchi Sa.sanwada Tah.Ahore khatedar

2.66

240 1072 Ladiya vald Dla Koum Ghanchi Sa.Sanwada Tah.Ahore khatedar

1.04

245 1090 Piyaram vald Pelada Hartinga vald Parka Morki Sita Dheli Amiyo Putri Lakaram Madaram vald Lakaram Purki beva Lakaram Motaram vald Jetha Asiya Khode Nimba Jujiya Ganesha Diya Varda PI.Mula 1/4 koum Rebari Lachchha Narsa Vela Kana Jeta pi.Bhima 1/4 Koum R

2

247 1096 to 97 Poni beva Masraram Somaram Goparam pi.Masraram Sakaram Bhubaram Bhuraram Baburam pi.Kapura Hamiya vald Rupa Uda vald Ravta Ragiya Soniya Pakiya Chanda PI.Chuniya Oma vald Karniya Pataram vald Amriya 5/6 HI.Sakiya vald Kesa 1/5 koum Sargara sa.deh khateda

2.23

248 1102 to 1103 Rameshsingh Bherusingh pi.Dhuksingh Bhanwarsingh Shetansingh Dilipsingh pi.Jaisingh Dhuksingh vald Amring Koum Rajput Hi.B.1/4 Mu.Poni beva Masraram Somaram Goparam pi.Masraram Sakaram Bhubaram Bhuraram Baburam pi.Kapura 1/4 Joga vald Hanjiya Nabalig Ka k

1.58

249 1104 Hindu Muliya Dipa Chuniya Saka pi.Satiya Koum Ghnchi Sa.Sanwada Tah.Ahore khatedar

1.38

251 1850 t0 1853 Kupa vald Soniya koum Meghwansi sa.deh khatedar

3.24

252 1854 Khima vald Jeta koum Mena sa.dah khatedar Na.s. 382

0.55

Page 198: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

165

253 1894 to 1898 Ladaram Pekaram pi.Jodha koum Ghanchi Sa.Sanwada Tah.Ahore khatedar

12.86

254 1899 to 1903 Samdi Patni Samelaji putra Venaji Koum Rebari Sa.deh khatedar Na.S.477

13.04

255 1905 Muliya vald Doliya Koum Ghanchi Sa.Sanwada Tah.Ahore Khatedar

1.89

256 1907 Bhabuta vald Khima Umaram Bagdaram PI. Jhaliya Gavri w/o Jhaliya Magiya vald Valiya Koum Ghanchi Sa.Sanwada tah.Ahore khatedar

2.64

257 19,101,939 Rakma beva Jodiya Koum Ghanchi Sa.Sanwada Tah.Ahore khatedar

5.66

258 1912, 1818/2239 Sundar putra Jayprakash koum Seni Sa.Todapur Tah.Helimandi Dist.Gudgaon(Hariyana) Khatedar Na.S.368,432,435,441,448,464

1.06

259 1913 Rakma beva Jodiya Koum Ghanchi 1/2 Margi patni Magaram Bhikaram Putra Magaram Jetharam Putra Magaram koum Ghanchi 1/2 Sa.Sanwada Tah.Ahore khatedar

0.84

260 1914 Moda Chatra Habta Pi.Kana Koum Ghanchi Sa.Sanwada Tah.Ahore khatedar

1.58

261 1930 Hansiya vald Thaniya koum Ghnchi Sa.Sanwada Tah.Ahore khatedar

1.71

262 1931 to 1933 Jesaram vald Kesa Geri Beva Kesa Mangilal Jagaram Khangaram pi.Mula Suki beva Mula Uki Devi Gavridevi Sodidevi Putriya Mula Koum Chanchi Sa.sanwada Teh.Ahore Khatedar

3.45

263 1940 Daya Punma Magiya Fula pi.Tikma koum Ghanchi Sa.Sanwada Teh.Ahore khatedar

4.59

264 1955 to 1958, 1792/2178

Samela vald Rama koum Rebari Sa.Revada Tah.Shivaganj Khatedar

2.49

269 1966 Umaram Bagdaram pi.Jhaliya Gavri w/o Jhaliya Dalaram Kishore kumar pi.Magiya Kishore Kumar Naba.vli Mata Chhavni beva Magiya koum Ghanchi sa.Sanwada teh.Ahore khatedar Na.S.495

1.51

Page 199: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

166

270 1971, 1972 Bhikaram Jetharam Pi.Magaram koum Ghanchi Sa.Sanwada Tah.Ahore Khatedar

1.07

271 1973,1978, 1979, 1984 to 1986

Pokdiya Mana Jagiya Sakiya Neka Tariya Pi.Valiya Koum Ghanchi Sa.deh khatedar

4.66

272 1974 Bhabuta vald Khima koum Ghanchi Sa.Sanwada Tah.Ahore khatedar

1.54

273 1975 Bhabuta vald Khima koum Ghanchi Sa.Sanwada Tah.Ahore khatedar

5.36

274 1976 Bhabuta vald Khima koum Ghanchi Sa.Sanwada Tah.Ahore khatedar

4.32

275 1977 Bhabuta vald Khima koum Ghanchi Sa.Sanwada Tah.Ahore khatedar

3.02

276 1981, 1982 Mularam Punmaram Thanaram Parbaram PI.Khangara Damodar putra Ranchhodaram Bhamri beva Ranchhodaram Koum Ghanchi Habtiya vald Lumba Koum Ghanchi Sa.Sanwada Tah.Ahore khatedar

4.69

277 1988, 1989,1991 Deva Kaliya pi.Bhuba 1/3 Vagta vald Rupi 1/3 Sa.deh Samela vald Dunga 1/3 sa.Chhiparwada Koum Rebari Khatedar

7.71

278 1990 Samela vald Dunga koum Rebari Sa.Chhiparwada Tah.Ahore khatedar

0.09

279 1992 Babriya vald Vena Koum Rebari Sa.deh khatedar

2.04

281 1994 Gayatri patni Ummedkumar Jati Maali Sa.Jalore Khatedar na.s.440

2.31

283 1996 to 1997 Jivaram Laduram Devaram pi.Jerupram Koum patel Choudhary Sa.Basni Silawata Teh.Jodhpur Khatedar

4.32

284 1998 Jotiya vald Samartha koum Rebari Sa.deh khatedar

2.42

285 1999, 2000 Lachhiya vald Moti Koum Rebari Sa.Deh khatedar

6.49

286 2001 Jivaram Laduram Devaram pi.Jerupram Koum patel Choudhary Sa.Basni Silawata Teh.Jodhpur Khatedar

0.8

Page 200: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

167

287 2002 Jivaram Laduram Devaram pi.Jerupram Koum patel Choudhary Sa.Basni Silawata Teh.Jodhpur Khatedar

8.35

288 2003 Jivaram Laduram Devaram pi.Jerupram Koum patel Choudhary Sa.Basni Silawata Teh.Jodhpur Khatedar

2.36

289 2004 Mejla vald Deva Koum Rebari Sa.deh khatedar

7.2

290 2005 to 2006 Methi beva Nimba Teja PI.Nimba koum Rebari Sa.Deh khatedar

2.4

291 2007 to 2010 Jalaram vald Sanvlaram Vagtaram vald Goklram Koum patel Choudhary Sa.Basni Silawata Teh.Jodhpur Khatedar

8.05

292 2012 Niba vald Ravta Koum Rebari Sa.deh khatedar

2.4

293 2013 Sadla vald Hata koum Rebari Sa.deh khatedar

2.43

294 2014, 2270/686, , 2271/687,2272/688

Bhagwansingh Gulabsingh pi.Ravatsingh Koum Rajput Sa.Jhak Tah.Bhinmal khatedar

4.8

295 2015, 2016 Dunga vald Babra Koum Rebari Sa.deh khatedar

2.29

296 2017 Chena vald Khangara koum Rebari sa.deh khatedar

2.4

298 2019, 2020 Dhiro beva Puniya koum Rebari sa. Deh khatedar

2.25

299 2024 Puranmal vald Mangilal Koum Jat Sa.Bhainsava Tah.Sambharlake Dist.Jaipur hal Deh khatedar

1.76

300 2030 Varda Dipa Mala Virka koum Rebari Sa.Deh khatedar

1.75

301 2043 Jivaram Laduram Devaram pi.Jerupram Koum patel Choudhary Sa.Basni Silawata Teh.Jodhpur Khatedar

14.93

302 2049 Natharam Kuiyaram Karnaram pi.Hartinga koum Rebari sa.deh khatedar

2.45

303 2050 Jita vald Vena koum Rebari sa.deh khatedar

2.3

Page 201: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

168

304 20,512,052 Saviya vald Hira koum Rebari sa.deh khatedar

2.37

305 2053, 2054, 2059 to 2060

Dharmi beva Bhava Koum Rebari sa.deh khatedar

31.25

306 2055, 2056 Harji vald Jiva koum Rebari sa.deh khatedar

2.43

307 2057 Samdadevi Patni Samelaji koum Rebari Sa.deh khatedar Na.S.534

2.43

308 2058 Mejla vald Kana koum Rebari Sa.deh khatedar

2.28

309 2070 Prema Praga Jamta Pi.Nathiya Oti Beva Nathiya Koum Rebari Sa.deh khatedar

1.4

310 2073 Saluda Labuda Roniya Pi.Bhava Koum Rebari Sa.Deh khatedar

1.46

311 2074 Prema Chamna Koum Rebari sa.deh khatedar

1.52

312 2077 Thakri Karmi Vajiya PI.Maliya Koum Rebari Sa.deh khatedar

1.59

313 2078 Virka vald Joga Naba.Kudrati vli Mata Uki beva Joga koum rebari sa.deh khatedar

1.53

314 2079 Devaram Vald Saviya koum Rebari Sa.deh khatedar

1.48

315 2081 Modiya Laliya Paraga pi.Joga koum Rebari Sa.deh khatedar

1.4

316 2082 Pelaja vald Bhura Koum Rebari Sa.deh khatedar

1.55

317 2083 Mantradevi patni Khangararam Matrodevi patni Madaram Piridevi Patni Hamiraram 3/4 Laliya vald Jiva 1/4 koum Rebari Sa.deh khatedar Na.S.453

2.45

318 2293/495 Indu Patni Shyam Sundar koum Garuda Sa.Sanwada Teh.Ahore Khatedar Na.S.428,429,475

0.8

319 1070/2173 Kuiya putra Molaji Jati Sargara Sa.deh khatedar Na.s. 454

0.83

320 1670/2171 Kuya vald Hema koum Ghanchi sa.Sanwada Teh.Ahore hi.1/2 Hansraj Vald Kishna 1/2 koum Ghanchi sa.Ahore Khatedar

0.31

Page 202: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

169

321 2256/403 Kevaram vald Faglu koum Devasi(Rebari)sa.deh khatedar

0.16

322 631/2245 Korkanwar beva Premsingh Rupsingh Aambsingh Bhagvatsingh Mahendrasingh pi.Premsingh Naba.Bhagvatsingh Mahendrasingh ki valiya Mata Korkanwar beva Premsigh koum Rajput Sa.deh khatedar Rahan:- Korkanwar Rupsingh Aambsingh ka hi.SBBJ Sakha Siyana

5.84

323 802/2159 Galba vald Dharma 1/2 Hi.Jagiya Kesa pi.Suriya 1/2 koum Meghwansi sa.deh khatedar

1.39

324 2294/495 Gita patni Narayanlal Koum Garuda Sa.Budtra Teh.Ahore khatedar Na.s. 428,429,475

0.8

325 211/2221 Javana vald Sabla koum Rebari Sa.deh khatedar

0.22

326 419/2164 Tararam Sonaram Bhanaram pi.Hartiya koum Sargara sa.deh khatedar

0.1

327 2122/2243 Dalpatsingh vald Mansingh Koum Rajput Sa.Himmatnagar c/o Doulatsingh Nivasi teh.Himmatnagar Dist.Sanbar kanta Gujrat khatedar

3.24

328 1835/2193 Pabudevi beva Vijaysingh koum Rajput Sa.deh khatedar

0.5

329 2296/380 Piraram Putra Dalaram Koum Meghwansi Sa.Deh Na.S.506

0.05

330 2289/493 Pepidevi Patni Devaji koum Rebari Sa.deh khatedar

0.16

331 2286/493 Bhanwarkanwar Patni Babusingh Koum Rajput Sa.deh khatedar

0.16

332 1238/2162, 1286/2161

Bhakraram putra Sheraram koum Choudhary Sa.Narnadi Tah.Luni Dist.Jodhpur khatedar Na.S.546

0.85

333 454/2189 Bhima Tariya PI.Khana koum Meghwal sa.Chhiparwada Tah.Ahore khatedar Rahan:-Bhima Putra Khana Ka.Hi.1/2 Ja.S.Bhu.Vi.Bank Li.Jalore

0.5

334 2283/1156 Bhomaram putra Hemaji Koum Meghwal Sa.Sayla Tah.Sayla Khatedar Na.S.500

1.29

Page 203: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

170

335 1273/2187, 1273/2222

Magiya vald Tikma Koum Sargara Sa.Kuaada Khatedar Rahan:-Ja.S.Bhu.Vi.bank Li.Branch Jalore

0.25

336 536/2167 Madaram putra Lakha Purki beva Lakha Motiya vald Jetha 1/5 Hi.Piyaram vald Pelada Hartinga vald Parka Madaram vald Lakharam Purki beva Lakharam Motaram vald Jetha Aasiya Khode Nimba Jujiya Ganesha Dipa Varda pi.Mula 4/5 Hi.Koum Rebari Sa.Deh khatedar Na.S

3.22

337 2287/493 Mulki patni Bhuraram Koum Rebari Sa.deh khatedar

0.32

338 1245/2170 Mularam Diparam Chunaram Sakaram PI.Sataram Koum Ghanchi Sa.Sanwada Tah.Ahore khatedar B.Hi.B.

0.27

339 2257/403 Medlaram vald Kanaji koum Koum Devasi(Rebari)Sa.deh khatedar

0.16

340 2255/403 Medlaram vald Meghaji koum Devasi(dewasi) sa.deh khatedar

0.24

341 2277/1136, 2278/1147, 2279/1148

Motiya vald Jetha Koum Rebari Sa.Deh khatedar Rahan:-MGB Branch Jalore Na.S. 455,456

1.15

342 2285/686 Laxman Bharti Chela Dungar Bharti koum Sawami Sa.Hanumanji Mandir Desu Tah.Ahore khatedar

3.23

343 499/2166, 2253/499 Lalit kumar Jagdishbhai Bhikhabhai Amritbhai Dipakbhai pi.Kaliya Koum Bhambhi Sa.Muleti tah.Bhiloda Dist.Sabarkanta(Guj)Khatedar Na.S.350

0.97

344 2087/2177 Lakhiya Lasiya pi.Kala Koum Rebari Sa.Takhtpura Khatedar

0.65

345 2261/403 Vardaram vald Mala Koum Dewasi(rebari)sa.deh khatedar

0.32

Page 204: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

171

346 2259/403 Samela vald Prabhuji Koum Devasi(Rebari) sa.deh khatedar

0.24

347 2292/495 Saraswati patni Brajlal koum Garuda Sa.Sanwada Tah.Ahore khatedar Na.S.428,429,475

0.8

348 2260/403 Savdaram vald Mala koum Devasi(rebari)sa.deh khatedar

0.32

349 2254/403 Savaram Putra Ravtaji koum Rebari Sa.deh khatedar

0.8

350 2258/403 Savaram vald Magaji Koum Devasi(rebari) sa.deh khatedar

0.16

351 2291/495 Sita Patni Gordhanji koum Garuda sa.Sanwada Tah.Ahore khatedar Na.S.428,429,475

0.8

352 2288/493 Seju patni Babra Jati Rebari Sa.deh khatedar

0.32

353 2290/493 Songidevi patni Joitaji koum Rebari Sa.deh khatedar

0.18

354 2262/618 Soma bhai Putra Manaji koum Sargara Sa.Nosra tah.Ahore khatedar

2.84

355 1404/2252 Himtaram vald Nagaram koum Ghanchi Sa.Sanwada Tah.Ahore khatedar

1.88

356 2297/500 Hirabhai Putra Pujabhai Koum Harijan Sa.Mutedi Tah.Idat Dist.Sabarkanta(Guj) khatedar Na.S.507

2.47

357 1575/2176 Hirka vald Tola koumMeghwansi Sa.deh khatedar

0.2

tekcUnh xk¡o&dkuhokMk Øe la- [kljk ua dk'rdkj dk uke {kS=Qy

1 3 to 7

Kuiya vald Magiya 1/3 koum bhil I Kaniya Ravta Chamna Pi.Ganiya 1/9 Dayaram Masraram Pi.Ganesha Ruparam 6.73

Page 205: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

172

2 9 , 12 ,17 Kantilal Bhanwarlal Pi.Durgalal Koum luhar sa.Jalore Khatedar 7.88

3 13 to 14

Kukaram Suresakumar pi.Lumba Chatru w/o Lumba Bhikharam vald Ragiya Poni w/o Ragiya Koum Garuda 1/2 4.65

4 15 ,18 ,19 ,20

Achalsingh Meghisingh Pi.Ummedsingh Jabarsingh Harisingh Kundansingh Magsingh pi.Sultansingh 2/3 Hi.Chhelsingh Rupsingh Aabsingh Sursingh Prithvisingh Premsingh Pi.Manoharsingh Jethusingh Nathusingh Bhagwatsingh pi.Dalpatsingh Bhursingh vald DHokalsingh1/3 Hi.Koum Rajput Sa.deh khatedar 3.2

5 35 ,66,72 ,72 ,77 ,92 ,94, 138-140 ,142 ,143 ,148 , 196

Gram Panchayat UNN -------------Gochar ----------- Aabadi ---------------- 40.56

6 67 Gram Panchayat UNN -------------Gochar ----------- Aabadi ---------------- 20.36

7 70 JalPraday Vibhag ----------------- 12.65

8 78 to 79 Jodhsingh Jivsingh Manalsingh Shankarsingh Pi.Amring koum Purohit Sa.deh khatedar 3.93

9 80 , 83,84,104,175,290,338/289

Harisingh vald Nensingh koum Rajput sa deh khatedar Rahan MGb Bravnch Jalore mn.63 19.36

10 81 ,82,86 to89,106,176,285 -289

Khimsingh vald Jaysingh koum Rajput Sa.deh khatedar 20.66

11 85 , 105 Harisingh vald Nensingh koum Rajput sa deh khatedar Rahan MGb Bravnch Jalore mn.64 3.1

Page 206: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

173

12 90

Vajaram Habtaram Hokaram vald Samiya jamna beva Samiya kaniya vald Gana Daya vald Haka Ruparam Gajaram Bheraram Talsaram Mitharam pi.Bhura Viju w/o Bhura 1/2 Kaniya Ravta Chamna pi.Guniya 1/3 Dayaram Masraram pi.Ganesha Ruparam Gajaram Bheraram Talsaram Mitharam pi.Bhura Viju w/o Bhura koum Meghwansi 1/2 Sa.deh khaatedar Rahin:- Ravta ka hi.MGB jalore 0.06

13 93 , 252 ,253 , 313 ,318 ,319

Shambhusingh vald Gumansingh Bhanwarsingh Sukhsingh Ratansingh Chandrasingh Indrasingh Pi.Himmatsingh koum Rajput Sa.deh khatedar 4.85

14 95 to 102

Achalsingh Meghisingh Pi.Ummedsingh Jabarsingh Harisingh Kundansingh Magsingh pi.Sultansingh 2/3 Hi.Chhelsingh Rupsingh Aabsingh Sursingh Prithvisingh Premsingh Pi.Manoharsingh Jethusingh Nathusingh Bhagwatsingh pi.Dalpatsingh Bhursingh vald DHokalsingh1/3 Hi.Koum Rajput Sa.deh khatedar Rahin:- Harisingh Magsingh Sultansingh Ka Hissa Tatha Bhursingh s/o Dhokalsingh Ka 1/9 Hissa Marwad Gramin Bank Shakha Jalore Jabarsingh Kundansingh pi.Sultansingh Koum Rajput Ka Hissa Marwad Gramin Bank shakha Jalorea 6.46

Page 207: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

174

15 107 to 110 ,113

Vajaram Habtaram Hokaram vald Samiya jamna beva Samiya kaniya vald Gana Daya vald Haka Ruparam Gajaram Bheraram Talsaram Mitharam pi.Bhura Viju w/o Bhura 1/2 Kaniya Ravta Chamna pi.Guniya 1/3 Dayaram Masraram pi.Ganesha Ruparam Gajaram Bheraram Talsaram Mitharam pi.Bhura Viju w/o Bhura koum Meghwansi 1/2 Sa.deh khaatedar Rahin:- Ravta ka hi.MGB jalore 8.85

16 112 to 120

Bhima Suriya Hema Hira pi.Jagta 1/24 Kheta Chuniya Parkhiya Nopla v Dhupa pi.Bharta 5/24 Kaniya Ravta Chamna pi. Guniya 1/12 Dayaram Masraram pi.Gunesha 1/4 Ruparam Gajaram Bheraram Talsaram Mitharam pi.Bhura Viju w/o Bhura 1/6 Vajaram Habtaram Hokaram vald Samiya Jamna Beva Samiya Kaniya vald Gana Daya vald Hakaji Ruparam Gajaram Bheraram Talsaram Mitharam pi.Bhura VIju w/o Bhura B.HI.B. Vajaram Habtaram HOkaram vald Samiya Jamna beva Samiya Gamna pi.Sadiya 1/4 Koum Meghawansi sa.deh khatedar 19.8

17 121 ,214,215,305,306,

Kukaram Sureshkumar pi. Lumba Chatru w/o Bhikharam vald Ragiya Poni /wo Ragiya koum garg 1/2 Hi. Jhaliya vald Vardiya 1/6 Jepriya vald Tipu 1/6 Vagiya vald Samartha 1/6 koum Rebari sa.deh khatedar Rahan :- Bhikharam V Poni Ka Hi.SBBJ Rama MN 50 9.36

18 122 ,123,235-238

Kukaram Sureshkumar pi.Lumba Chatru w/o Lumba 1/4 Bhikharam vald Ragiya Poni w/o Ragiya 1/4 Narayan vald Sataram 1/2 Koum Garg(Garuda)sa.deh khatedar Rahan:-Bhikharam V Poni Ka Hi.SBBJ Rama MN 51,66 2.84

Page 208: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

175

19 124

Bhima Suriya Hema Hira pi.Jagta 1/24 Kheta Chuniya Parkhiya Nopla v Dhupa pi.Bharta 5/24 Kaniya Ravta Chamna pi. Guniya 1/12 Dayaram Masraram pi.Gunesha 1/4 Ruparam Gajaram Bheraram Talsaram Mitharam pi.Bhura Viju w/o Bhura 1/6 Vajaram Habtaram Hokaram vald Samiya Jamna Beva Samiya Kaniya vald Gana Daya vald Hakaji Ruparam Gajaram Bheraram Talsaram Mitharam pi.Bhura VIju w/o Bhura B.HI.B. Vajaram Habtaram HOkaram vald Samiya Jamna beva Samiya Gamna pi.Sadiya 1/4 Koum Meghawansi sa.deh khatedar 3.92

20 125 Chelaram Himtaram pi.Noparam koum Meghwal sa.deh khatedar 1.23

21 126 to 137

Achalsingh Meghisingh Pi.Ummedsingh Jabarsingh Harisingh Kundansingh Magsingh pi.Sultansingh 2/3 Hi.Chhelsingh Rupsingh Aabsingh Sursingh Prithvisingh Premsingh Pi.Manoharsingh Jethusingh Nathusingh Bhagwatsingh pi.Dalpatsingh Bhursingh vald DHokalsingh1/3 Hi.Koum Rajput Sa.deh khatedar 16.36

22 144 ,145,166,167,213,216,217,234

Shaitansingh vald Hanvantsingh 1/3 Amarsingh vald Hanvantsingh 1/3 Jabaersingh vald Hanvantsingh1/3 koum Rajput 9.48

23 146 , 147 149 , 150 , 157

Shaitansingh vald Hanvantsingh 1/3 Amarsingh vald Hanvantsingh 1/3 Jabaersingh vald Hanvantsingh1/3 koum Rajput 8.32

24 151, 156 , 302 , 309 , 328

Shaitansingh vald Hanvantsingh 1/3 Amarsingh vald Hanvantsingh 1/3 Jabaersingh vald Hanvantsingh1/3 koum Rajput 19.88

Page 209: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

176

25 152 -153 ,312 ,314 Khangarsingh Pukhsingh pi.Bahadursingh koum Rajput Sa.deh khatedar 5.3

26 154 ,155 ,164

Rana vald Sona Malaram Navaram Bablaram Shankarkumar pi.Kaluram Tulsidevi w/o Kaluram Devaram Gorkharam Kishanaram pi.Vagaram koum Gwariya sa.deh khatedar MN 57 4.45

27 158

Shaitansingh vald Hanvantsingh 1/3 Amarsingh vald Hanvantsingh 1/3 Jabaersingh vald Hanvantsingh1/3 koum Rajput sa deh khatedar Rahin Amar singh ka Hi MGB jalore MN.52.71 0.23

28 159 , 162 Thanaram Vachanaram pi.Pabuji Koum Gwariya Sa.deh Hal Jalore khatedar MN 52 12.35

29 160

Jhaliya vald Vardiya Gepriya vald TipuVagiya vald Samartha Rebari 1/2 Amra vald Deva 1/6 Koum Mena sa.deh Purnaram vald Jetharam koum Meghwal Sa.Rajod TEh.Jayal Dist.Nagour 1/6 Hansaram Ragaram Javanaram pi.Kesa Mu.Kokudevi beva Kesa Jaga vald Narsa 1/6 koum Meghwansi Sa.deh khatedar MN 60 V shu.p.s. 0.45

30 161 Hariya Beva Amaraya koumMena sa deh khatedar 0.59

31 163

Jhaliya vald Vardiya Gepriya vald TipuVagiya vald Samartha Rebari 1/2 Amra vald Deva 1/6 Koum Mena sa.deh Purnaram vald Jetharam koum Meghwal Sa.Rajod TEh.Jayal Dist.Nagour 1/6 Hansaram Ragaram Javanaram pi.Kesa Mu.Kokudevi beva Kesa Jaga vald Narsa 1/6 koum Meghwansi Sa.deh khatedar MN 60 V shu.p.s. 2.74

Page 210: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

177

32 165 Farsa Daya pi.Punma koum Garuda (garg)Sa.Deh khatedar 1.34

33 168 ,173 ,174 ,206 Hajriya vald Kukhsingh koum Ravana RajPut sa deh khatedar 6.27

34 169 -172

Jhaliya vald Vardiya Gepriya vald TipuVagiya vald Samartha Rebari 1/2 Amra vald Deva 1/6 Koum Mena sa.deh Purnaram vald Jetharam koum Meghwal Sa.Rajod TEh.Jayal Dist.Nagour 1/6 Hansaram Ragaram Javanaram pi.Kesa Mu.Kokudevi beva Kesa Jaga vald Narsa 1/6 koum Meghwansi Sa.deh khatedar MN 60 V shu.p.s. 6.27

35 197 to 198

Shaitansingh vald Hanvantsingh 1/3 koum Hisssa Amarsingh vald Hanvantsingh 1/3 koum RajPut 1/2 kukaram Suresh kumar Pi.Lumba Chatru w/o Lumba Bhikharam vald Ragiya Poni w/o 1/2 koum Garuda sa deh khatedar Rahan Bhikaram v Poni ka Hi SBBJ Rama rahin -Amarsingh vald Hanvantsingh ka hi MGB jalore Mn. 4.62

36 199 ,201 to 202

Ganga w/o Punma Kesaram Shankarlal pi.Punma Vanaram Ramaram pi.Gangaram Achalaram Devaram Kasturaram pi.Veniya koum Bavri sa.deh khatedar I 2.29

37 200 to 205

Shaitansingh vald Hanvantsingh 1/3 koum Hisssa Amarsingh vald Hanvantsingh 1/3 koum RajPut 1/2 kukaram Suresh kumar Pi.Lumba Chatru w/o Lumba Bhikharam vald Ragiya Poni w/o 1/2 koum Garuda sa deh khatedar Rahan Bhikaram v Poni ka Hi SBBJ Rama rahin -Amarsingh vald Hanvantsingh ka hi MGB jalore Mn 2.49

Page 211: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

178

38 207 to 208 ,212,221-226

Kuiya vald Magiya 1/3 Chatriya vald Gala 1/3 Ganesha Lachchha Shankar V Bhaniya pi.Valiya 1/3 koum Bhil sa.deh khatedar Rahin :- MGB Bank Jalore 9.46

39 209 Kuiya vald Magiya Koum Sa.deh khatedar 0.34

40 210 to 219

Bhimaram Suraram Hiraram Hemaram pi.Jagtiya Khetiya Chuniya Parkhiya Nopa Dhuda pi.Bharta Koum Meghwansi Sa.deh khatedar 3.44

41 220 Khangara Deviya pi.Chhabiya koum Rebari sa.deh khatedar 1.46

42 227 to 228 ,320-322

Gajendrasingh vald Vanesingh Antarkanwar beva Vanesingh Narpatsingh Balwantsingh Shetansingh Amarsingh Jabarsingh pi.Hanwantsingh Dhapkanwar beva Hanwantsingh koum Rajput Sa.deh khatedar Rahan:- Amarsingh Ka.Hi.MGB Jalore MN 62 11.12

43 229 to 244

Bhimaram Suraram Hiraram Hemaram pi.Jagtiya Khetiya Chuniya Parkhiya Nopa Dhuda pi.Bharta Koum Meghwansi Sa.deh khatedar 6.12

44 254 Lala Khangara Mada Hamira pi.Jiva koum Rebari sa.deh khatedar 4.56

45 255 Khima Rama Prabu pi.Neta koum Bhil Sa.deh khatedar 1.29

46 265 , 270 to 272 ,276-277,291-292

Gajendrasingh vald Vanesingh Antarkanwar beva Vanesingh koum Rajput Sa.deh khatedar 22.14

47 266 Chhatra vald Gala Jivi w/o Gala koum Bhil sa.deh khateadar 1.32

48 267 Mana vald Achala koum Rebari Sa.deh khatedar 1.56

49 268 Shankardas vald Pitharam koumSaad sa.deh 1.29

Page 212: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

179

khtedar

50 269 Modaram Lakharam pi.Moka koum Rebari Sa.deh khatedar 1.26

51 279 Indra putri Hariya Koum Ravna Rajput Sa.deh khatedar 3.66

52 293 to 301 , 310 ,311

Achalsingh Meghisingh Pi.Ummedsingh Jabarsingh Harisingh Kundansingh Magsingh pi.Sultansingh 2/3 Hi.Chhelsingh Rupsingh Aabsingh Sursingh Prithvisingh Premsingh Pi.Manoharsingh Jethusingh Nathusingh Bhagwatsingh pi.Dalpatsingh Bhursingh vald DHokalsingh1/3 Hi.Koum Rajput Sa.deh khatedar 27.01

53 308 , 315 ,

Bhima Suriya Hema Hira pi.Jagta Khetiya Chuniya Parkhiya Nopla Dhuda pi.Bharta Daya Masra pi.Ganesha Ruparam Gajaram Bheraram Talsaram Mitharam pi.Bhura Viju w/o Bhura Vajaram Habtaram Hokaram Vald Samiya Jamna beva Samiya Koum Meghwansi Sanwalaram vald Polaram koum Garuda(garg) Sangrama v Bhura pi.Gulab koum Garg sa.deh khatedar 4.05

54 316 to 317

Bhima Suriya Hema Hira pi.Jagta Khetiya Chuniya Parkhiya Nopla Dhuda pi.Bharta Daya Masra pi.Ganesha Ruparam Gajaram Bheraram Talsaram Mitharam pi.Bhura Viju w/o Bhura Vajaram Habtaram Hokaram Vald Samiya Jamna beva Samiya Koum Meghwansi Sanwalaram vald Polaram koum Garuda(garg) Sangrama v Bhura pi.Gulab koum Garg sa.deh khatedar 8.68

Page 213: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

180

55 323

Bhanwar singh Sukhasingh Ratansingh Chandsingh Indrasingh pi.Himmatsingh 2/3 Shaitansingh s/o Hanwantsingh 1/3 koum Rajput sa.deh khatedar 2.52

56 324 to 327

Posaram vald Devaram Koum Bhil 1/2 Sa.Bagra Teh.Jalore Thanaram Vachanaram Pi.Pabuji 1/4 sa.Kaniwara Hal Jalore Sultanaram putra Ranaji 1/4 Sa.Kaniwara Hal Ramseen Teh.Bhinmal Khatedar MN 53,59 5.83

57 329 ,330

Nasaram Himtaram pi.Lumba Peraja vald Chimna 2/3 Hi.Mangilal putra Sada 1/3 koum Jangid -Brahmin Sa.Bichhawadi khatedar 6.66

58 331 to 332

Achalsingh Meghisingh Pi.Ummedsingh Jabarsingh Harisingh Kundansingh Magsingh pi.Sultansingh 2/3 Hi.Chhelsingh Rupsingh Aabsingh Sursingh Prithvisingh Premsingh Pi.Manoharsingh Jethusingh Nathusingh Bhagwatsingh pi.Dalpatsingh Bhursingh vald DHokalsingh1/3 Hi.Koum Rajput Sa.deh khatedar 7.06

59 333

Bhimaram Suraram Hiraram Hemaram pi.Jagtiya Khetiya Chuniya Parkhiya Nopa Dhuda pi.Bharta Koum Meghwansi Sa.deh khatedar 1.87

tekcUnh xkao cqMrjk

Page 214: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

181

-स खसरा-न {ks=Qy लाभाथ @का तकार का नाम वग-

1 406 0.27 Jalmagn 2 408 1.35 2 se 5 Varsh Parti

3

409

9.1

Obaram Vald Valiya Poni Beva Jetharam Khetaram Vald jetharam ladiya Vald Jiva 1/4 Vagiya Vald Teja 1/4 Pratapa Puniya Hanjiya Pi. Motiya 1/4 Jeparam Muparam Hadmanaram Pi. Ota 1/4 Koum Suthar Sa. Deh Khatedar

4 412 2.4 Ghanaram Vald GaneshDas Koum Sad Sa.Deh Khatedar

5 413

3.83 Gjiya Vald Naviya 1/2 Mona Vald Naviya 1/2 Koum Mena Sa.Deh Khatedar

6 415

0.72 Lachhiya Vald Moda Joma Pi.Parbuda Koum Rebari Sa.Deh Khatedar

7 416 2.16 FakruKha AkbarKha Koum Musalman Sa. Ahore Khatedar

8 417 1.64 Lachhiya Vagera B.Kh.No.415 Khatedar

9 418 1.73 Shankarpuri Nathupuri Umpuri Chenpuri Pi. Rampuri Koum Swami Sa.Deh Khatedar

10 419 , 739 0.62 Shankarpuri vagera B.Kh.No. 418 Khatedar

11 420 2.18 Dharma Bagda Pi. Narsa koum Ravna Rajput Sa.Deh Khatedar

12 711 1.2 Obaram vald Vagera B.Kh.No. 125 Khatedar 13 712 0.35 Chhagandas Vagera B.Kh.No.80 Khatedar

14

713 to 715 2.57

Khasaram vald hakiya koum Nai sa.deh khatedar

15 716 2.14 Van Vibhag

16 717

1 Dharma putra Narsaji Mitki Patni Dharma koum RavnaRajput Sa.deh gair khatedar

17 718 2.3 2 se 5 varsh Parti

Page 215: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

182

18

719 to 751 1.2 Gram Panchayat Chavrchha

19 720 0.5 2 se 5 varsh parti

20 721

0.87 Babulal vald Kapuraram Laxmi patni Babulal koum Mehtar Sa.deh gair khatedar

21

722 to 727 7.01

Goparam vald Vagtaram Dlu patni Goparam koum Meghwal gair khatedar

22 728 1.5 Moyaram vald Mularam Shanti patni Moyaram koum Meghwal Sa.deh khatedar

23 729 0.74 2 se 5 varsh parti

24 730 0.02 Hansiya vald Bhika koum Suthar sa.deh Khatedar Rahin:- Indraj Badstur Jamabandi

25 731

0.02 Mahendrasingh vagera B.Kh.No. 147 Khatedar

26 732 0.02 Hanja Vald Hukma Vagera B.Kh.No. 134 Khatedar

27 733 0.01 Laduram Vagera B.Kh.No. 260 Khatedar

28 734 0.02 Pukiya Vald Badra Vdagera B.Kh.No. 232 Khatedar

29 735

0.01 Karansingh Jivraj pi.Narsing 1/8 vagera B.Kh.No. 239 Khatedar

30 736 3.04 Pancharam vald Okha koum Kumhar Sa. Chavarchha khatedar

31

737 to 738 2.34

Sankliya Vald Pema Koum Ravna Rajput Sa.Deh Khatedar

32 740 0.3 Hanjarimal putra Gamnaji Koum Meghwal Sa .gair Khatedar

33 741

0.85 Mahendrakumar Putra Masraji koum Mehtar Sa.deh gair Khatedar

34 742 0.9 2 se 5 Varsh Parti

35

743 to 744 2.4

Vashno Laxmi Putriyan Kera Koum purohit Sa.Deh khatedar

Page 216: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

183

36 745

1.1 Parasmal Putra Ragunathram koum meghwal Khatedar

37 746 5.9 Amarsingh Vagera B.Kh.No. 295 Khatedar

38 747

0.4 Laxmansingh Vald Devisingh Koum Rajput Sa.Deh Khatedar

39 748 0.4 Jivansingh vald Devisingh Koum Rajput Sa.deh khatedar

40 749

1.56 Amarsingh Vald Devisingh Koum Rajput Sa.Deh. Khatedar

41 750 0.8 Shiksa vibhag

42 752 0.7 Lachhiya Vald Bharting Koum Purohit Sa.Deh Khatedar

43 753

2.4 Chandrashekhar Yasvant kumar pi.Bhimdan Koum charan Sa.Sanwada khatedar

44 754 2.24 Nimba Putra Virka Koum Rebari Sa. Khatedar MN 291

45 755

0.6 Surta putra Gliya koum Sargara sa.Deh Khatedar MN 306

46 756 0.71 Hema vald Kaliya Koum Meghwansi Sa.deh khatedar

47 757

0.71 Pakiya vald Kaliya koum Meghwansi Sa.Deh Khatedar

48

758 to 760 11.07

Suriya vald Mna koum ghanchi B.Kh.No. 142 Khatedar

49

765

1.2

Bhalaram putra Vagaram Moki Patni Bhalaram koum Mehtar Sa.deh khatedar MN 296

50 766 1.2

Bissaram putra Laxmanaram Mamta patni Bissaram Koum dholi Sa.deh Khatedar MN 295

51 767

0.79 Diparam putra Glaji Champa Patni Diparam Koum Meghwal sa.deh Khatedar MN 290

52 768 1 Sati beva Sakuraram koum Sargara Sa.deh khatedar MN 305

Page 217: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

184

53

769

1

Madaram putra Sakuraram Soram patni Modaram koum Sargara Sa.deh Khatedar MN 300

54 770 1 Laxman putra Khimaram Hulasi Patni Laxman koum garg Sa.deh Khatedar 303

55

771

1

Mulki devi patni Dhiraram putra Ragunatharam koum Meghwal Sa.deh khatedar MN 301

56 772 0.84

Santoki Patni Tararam Tararam putra Khimaram koum garuda Sa.deh khatedar MN 304

57

773

1

Tikmdas Putra Muldas Chhagni patni Tikmdas Koum Sant (sad) Sa.deh khatedar MN 289

58 774 1.6

Bhanwarikanwari w/o Bhoparaj leela kanwar w/o Jabarsingh Koum purohit Sa.deh Khatedar MN 294

tekcUnh xkao paojNk

-स खसरा-न {ks=Qy लाभाथ @का तकार का नाम वग-

1

380 , 440 ,443 2.04 Pagdndiya tatha Rastae

2 381 0.71 Tagaram vald Viraji Koum bhil sa. bagra Teh. Jalore Khatedar

Page 218: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

185

3 382 to 383 5.1

Suki Hariya Putriyan Khetiya Mu.Lachhi Beva Khetiya 1/4 Poliya vald Soniya 1/4 koum Bhambi Putriya Vald Vida 1/2 koum Metha. Sa.deh khatedar

4

384 to 390 ,392 4.92

Sukhi beva Girdhari Putra Masra Kamiya pi.Girdhari Chhoga Bhima Tariya Hansiya Ramiya Pi.Sona 5/6 Hi.Koum Meghwal Sa.Deh Natha Vena 1/6 Koum Mena Sa.Agvari Khatedar

5 391 0.9 Sukhi beva Girdhari vagera B.Kh.No.384 Khatedar

6 393 to 398 7.69

Rugnatha vald Amra 1/5 Vajiya vald Amra 1/5 Lakhiya vald Amra 1/5 Tariya vald Amra 1/5 Praga Vald Amra 1/5 Koum Rebari Sa.deh khatedar

7 399 3.38 Sultan vald Jiva 1/2 vagera B.Kh.No. 11 Khatedar

8 400 1.04 Puniya vald Vida Koum Meena sa.deh khatedar

9 401 1.68 Venaram Sesaram Lalaram Pi.Pira koum Nai Sa.deh khatedar

10 402 0.77

Sukhi beva Girdhari Pura Masra Kniya pi.Girdhari Koum Bhambi sa.deh khatedar

11 403 2.08 2 Se 5 Varsh ki Perti

12 404 to 408 5.08

Sukhi beva vagera B.Kh.No.384 Khatedar

13 409 1.1 Sukhi beva Girdhari vagera B.Kh.No.402 Khatedar

Page 219: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

186

14 410 1.55 Chuniya vald Maga koum Bhambi Sa.deh khatedar

15 411 0.57 Manglaram Bhanwarlal pi.Hema Koum Luhar sa.deh khatedar

16 412 0.7

Velaram Vald Kesa1/2 Bhagaram Hariram Visaram Nagaram pi.Jogaram Mu.Poni beva Jogaram Hariram Visaram Nagaram Na.Ba.ke Kudrati Vliya mu.Poni mata Khud 1/2 Koum Bhil Sa. Deh Khateadar

17 413 0.4 Narayani w/o Ladaram Koum sargara Sa.deh khatedar

18 414 0.46

Kuyaram putra sana Dharmi d/o Sona w/o Sekharam sa.Blana Ji.Pali Gerki d/o Sona w/o Harataji Sa.Maladar Ji.Sirohi Khatedar

19 415 to 439 1.21 Ladiya B.Kh.No. 215 Khatedar

20

416 , 420 .423 ,437 ,438 ,454 ,457 ,464-470 13.26 Nadiya tatha Naale

21 417 1.05 Vena vagera B.Kh.no. 401 Khatedar

22 418 1.23

Viredrasingh vald Rajendra singh koum Rajput sa.Jodi Teh.V Ji. Churu Khatedar

Page 220: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

187

23 419 0.61 Jhalaram vald Thamaram Koum Bhil Sa.Bagra khatedar

24 421 0.83

Rama vald Daniya Mu.Hariyo Beva Galuda Kaluram Narayan Pi.Galuda Na.Ba.Vli mata Khud Koum Sargara Mohan Putra Deva Koum Gwariya Sa.deh khatedar

25 422 2.14 Narayan Kistura Pi.Khima Koum Harijan Sa.deh khatedar

26 424 1.22

Hemsingh vald Achalsingh koumRajput 3/5 Sa.deh Ladiya vald Kana 1/5 Movniya vald Ghamanda 1/5 koum Bhambi Sa.Balotra Khatedar

27 425 to 436 8.14

Hemsingh vagera B.Kh.No. 424 Khatedar

28 441 to 442 0.09

Chenaram vagera B.kh.No. 401 Khatedar

29 444 to 446 3.15

Khasiya vald Khangara koum Meghwansi Sa.Deh khatedar

30 447 1.61 2 Se 5 Varsh ki Perti

31 448 2.42 Baburam Piraram pi. Tima koum mena Sa.Deh khatedar

32 449 2.42 Baburam vagera B.Kh.No. 448 Khatedar

33 450 3.56

Babuda vald Tima2/3 Tima vald Voga 1/3 koum Mena Sa.deh khatedar

34 451 1.19 Mangiya Vald Raniya Koum Gwariya Sa.deh khatedar

35 452 2.42 Nemaram vald Raniya koum Gwariya sa.deh khatedar

Page 221: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

188

36 453 1.05 Motiya vald Ganesha koum Gwariya sa.deh khatedar

37 455 to 456 2.25

Vagiya Lala Bhura Rugnatha Movniya pi.Magiya Radha w/o Ganesha Shankarlal Shantilal pi.Ganesha Na.Ba. Vli Mata Radha w/o Ganesha Koum Bhambi Sa.deh khatedar

38 458 2.43 Manchhi beva Gopa koum Lavar Sa.deh khatedar

39 459 0.16

Manglaram Bhanwarlal pi.Hema 1/2 Mu.Manchhi beva Gova 1/2 koum Lavar Sa.deh khatedar

40 460 4.64 Lixmana vald Mna koum Choudhary Sa.Deh khatedar

41 461 2.42

Badli beva Jamtiya Aidansingh Ashokkumar Sureshkumar pi.Jamtiya koum Purohit Sa.deh Khatedar

42 462 to 463 2.1

Mangilal Shesaram Narayanlal pi.Khetiya Koum Meghwamsi sa.deh khatedar

43 471 1.62 Sarvjanik Nirman Vibhag ( P.W.D.)

44 472 6.17 2 Se 5 Varsh ki Perti

45 473 0.65 Laghu Beva Tara koum Bhil Sa.deh khatedar

46 474 0.5

Motaram vald Klaji Samda w/o Motaram Koum Bhil Sa.deh khatedar

47 475 to 476 2.82

Mota goud Ida koum Kalbi Sa.deh khatedar

Page 222: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

189

48 477 3.29 Havakanwar beva Achalsingh koum Rajput Sa.deh Khatedar

49 478 0.92 2 Se 5 Varsh ki Perti

50 479 2.99 Sona vagera B.kH.No. 228 Khatedar

51 480 to 481 1.96

Fuiya vagera B.Kh.No. 61 Khatedar

52 482 to 485 5.1

Shanti devi w/o Babulal Koum Mena Sa. Sankarna Khatedar

53 486 0.86 Savaram Vald Mularam koum Suthar sa.deh khatedar

54 487 0.28 Kalukha Ravat Kha Koum Moyla Sa.deh khatedar

55 488 0.83

Savaram Dungaram Samartha Pi.Mula Koum Suthar Sa.deh Khatedar

56 489 0.87 Savaram vagera B.Kh.No. 488 Khatedar

57 490 to 491 1.46

Hansaram Vald Punma Koum Bhil Sa.deh khatedar

58 492 1.83

Sonaram Khasaram Bhagaram Dayaram pi.Choliya koum Bhil Ranchhodaram Ratilal pi.Piraram Champa w/o Piraram Ranchhodaram Ratilal Na.Ba.Vli Mata Champa Khud 47/226 Koum bhil Hakim kha vald Kesiya Jalal kha Medakha Shakurkha pi. Imam koum Moyla 129/226 sa.deh khatedar

59 493 1.88 Fufi beva China koum Bhambi sa.seh khatedar

Page 223: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

190

60 494 2.11 Achiya vald Dla koum Bhambi sa.deh khatedar

61 495 1.11 Parba Bhoma Pi. Otiya Koum bhil sa.deh khatedar

62 496 0.87 Deva vald Kesa koum bhil sa.deh khatedar

63 497 1.85

Mada Mega Kishor Parsiya Narpat Rama pi.Himta Vagera Indraj Badstur Jamabandi

64 498 0.65 Mada Vagera B.Kh.No. 497 Khatedar

65 500 2.49

Madusingh Meghsingh Kishoresingh Parassingh Narpatsingh Ramsingh Pi.Himatsingh Sunder w/o Himatsingh koum purohit Sa.deh khatedar

tekcUnh : xk¡o dk uke Å.k Ø l [kljk u dkLrdkj {ks+=Qy

1 402 Gram Panchayaaat UNN Gochar 24.93

2 403-406 Luka Vaga Bada 1/3 Okha vald Gamana 1/3 Mangiya Juhariya Dudiya Pi. Dhaniya Pepi Poni Dhaniya Goma Chatera Gavri Shanti

3.31

Page 224: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

191

3 407 Tikamdas pokardas Pi.Javandas koum Sant 1/2 Vagta vald Amring Momta Bhuriya Pukhraj PI.Himta 1/2 koum Purohit sa deh khatedar

1.06

4 408 Tikamdas pokardas Pi.Javandas koum Sant 1/2 Vagta vald Amring Momta Bhuriya Pukhraj PI.Himta 1/2 koum Purohit sa deh khatedar

0.94

5 409 Hasingh babusingh Pi.Joita Ummeda vald vala Gunesha Pi.Dunga Jabersinghvald Ganeshaji koum Purohit sa deh khatedar

0.93

6 410 Hasingh babusingh Pi.Joita Ummeda vald vala Gunesha Pi.Dunga Jabersinghvald Ganeshaji koum Purohit sa deh khatedar

0.95

7 411 Ganeshsingh vald Dungarsingh 1/2 Bhagvansingh vald 1/2 koum Purohit sa deh khatedar

0.97

8 412 Ganeshsingh vald Dungarsingh 1/2 Bhagvansingh vald 1/2 koum Purohit sa deh khatedar

0.96

9 413 Hematsingh vald Punam koumsingh koum Purohti sa deh khatedar na.sn.370.439

1.74

10 414 11 415

12 416

Dudsingh vald Haratsignh Kansingh Tarsingh KaransinghPi. Dhanrupsingh nensingh Bhanvarlal Pi.Sonsingh 3/4 koum koum Purohit Mu leri Beva Jairup singh 1/4 koum Pukorhit sa deh khatedar Na.sn.42

1.53

13 417 Shanti fuki d/o khima koum Purohit sa deh khatedar

1.55

14 418 Punma Hadmata Deva Pi Ajiya 1/2 Margadevi w/o Vijaysingh Prakash singh vald Vijaysingh Naba .vali Mata Khud Margadevi Bhanvri w/o Darj

0.74

15 419 0.8

16 420 Hematsingh vald Punam koumsingh koum Purohti sa deh khatedar na.sn.370.439

1.56

Page 225: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

192

17 421 Jaysingh Pirsingh Bhonsingh Pi.Magaji Lila kunvar beva rannsingh koumPurohit sa deh khatedar

1.8

18 422 Khimsingh Putra Chunnilal koum Purohit sa deh khatedar na .sn.370

0.85

19 423 shree charbhujaji Maharaja ke bal bhog vake khatedar

0.01

20 424 shree charbhujaji Maharaja ke bal bhog vake khatedar

0.04

21 425 shree charbhujaji Maharaja ke bal bhog vake khatedar

1.51

22 426 shree charbhujaji Maharaja ke bal bhog vake khatedar

4.06

23 427 Shree Mahadevji bake deh khatedar 5.51

24 428 Modsingh vald Sartansingh ji koum Purohit sa UNN khatedar

0.77

25 429 Modsingh vald Sartansingh ji koum Purohit sa UNN khatedar

1.49

26 430 , 457 ,645 ,650

Bhuriya Tariya Pi.Moti HanajrimalShannkarsingh Pl.Himata Poni devi Beva Himta Udaysingh vald Tikma Mulaji s/o Maga koum Purohit sa deh khatedar

3.58

27 431 Hirsingh vald Shivntha 1/2 ShaitansinghVIjaysinghPi. Hemta Poni devi beva hemta 1/2 koum Purohit sadeh khatedar

1.02

28 432 Hirsingh vald Shivntha 1/2 ShaitansinghVIjaysinghPi. Hemta Poni devi beva hemta 1/2 koum Purohit sadeh khatedar

2.41

29 433 Harchand Toliya pi.Dhupa koum Purohoit sa deh khatedar

1.05

30 434 Vailsingh vald Sonsingh 1/2 JaysinghHadMansingh Pi.Punmaji 1/2 koum Purohit sa deh khatedar

0.83

31 435 Vailsingh vald Sonsingh 1/2 JaysinghHadMansingh Pi.Punmaji 1/2 koum Purohit sa deh khatedar

0.74

Page 226: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

193

32

436 ,453 , 463 , 466 ,608 ,628,667,705, 706

Bhuriya mangala Jomta Bhabuta Pi. Lachcha koum Purohit sa deh khatedar

9.23

33 437 Varju kunvar d/o Bhanvarsingh nensingh Kansingh Balvantsingh Pi.Maga Rajusingh dinesh singh Pi Maga Rajusingh denesh kumar Hadmatsingh

1.86

34 438 to 439 , 498 ,600

Deva Haraja Sona Taga Pi.Purkha Shukhsingh Pi.Chuniaya Bhuriya Sujiya Pi.Jera Gopalsingh Mahendra signh Mahendra Sujiya Pi.Gunesha Pi.atiya devi Gnesha koum Purohhit sa deh khatedar

3.5

35 440 Manshalal vald Harchand Pi. Haring koum Purohit sa deh khatedar

0.87

36 441 Manshalal vald Harchand Pi. Haring koum Purohit sa deh khatedar

0.89

37 442 38 443

39 444 Virdan vald Lachcha Kansingh Suresh kumar Pi.Verilal koum Purohit sadeh khatedar na.sn.399

1.02

40 445 Nensingh Sohansingh Babusingh Pi .Lachcha Hanjadevi w/o Lachcha kastura soniya Pi.hukma koum Purohit sa deh khatedar

0.86

41 446 Nensingh Sohansingh Babusingh Pi .Lachcha Hanjadevi w/o Lachcha kastura soniya Pi.hukma koum Purohit sa deh khatedar

0.8

42 447 Hindusingh vald Javanji Chanda beva Hadman koum Purohit sa deh khatedar

0.8

43 448 Hindusingh vald Javanji Chanda beva Hadman koum Purohit sa deh khatedar

0.84

44 449

45 450 Aashok Kumar Ramesh kumar Bhimsingh Pi.Ganesha Savita Beva Ganesh Shankarsingh s/o Pukharaj koum Purohot sa Deh khatedar

0.24

Page 227: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

194

46 451 Mangilal vald Varadsingh koum Purohit sa deh khatedar na.sn.419.450

1.25

47 452

48 454 satis kumar devi singh Suresh kumar Pi.Mula koum Purohit sa deh khatedar

0.75

49 455 50 456 Pagdandiya Or Raste (charahgah ke liye Nahi) 0.5

51 458 Modsingh vald sartansingh ji sa UNN 3/4 Lala Vald Moti koum Purohit sa Bisawari 1/4 khatedar

0.25

52 459 Modsingh vald sartansingh ji sa UNN 3/4 Lala Vald Moti koum Purohit sa Bisawari 1/4 khatedar

2.57

53 460 Modsingh vald sartansingh ji sa UNN 3/4 Lala Vald Moti koum Purohit sa Bisawari 1/4 khatedar

1.36

54 461 55 462

56 464

Pakiya Sohansingh Babusingh Pi. Lachhasingh Hartiya Pi.hukama Dayaram kuiya ram Harchand pi. Haniya diva devi Patni Ramesh kumar Mishra Chunnilal Babulal Pi surta koum sargara da deh khatedar na .sn. 406

0.59

57 465 58 467

59 468 to 470

Shankarsingh Chunnilal Babusingh Pi.Natha jamna kunvar beva Natha Hadmansingh Jethusingh Nensingh ganesha Gangaram vald Moti Sona Javara Pukharaj Harchand Pi JairuPa koum sa deh khatedar

2.37

60 471

Vagta Puna Pi Amra Tariya Ajiya Deva Pi sankla Pabu sankla Pabu Beva sankla 1/2 Narsaram vald Pabu beva Lakhma Chuniya Pi Akha Ganesha Ravta Cheliya Moya lala Pi Mithiya Fusiya vald Bhaga 1/4 Misra Chuniya Babu Chuniy

1.06

Page 228: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

195

61 472

Pakiya Sohansingh Babusingh Pi. Lachhasingh Hartiya Pi.hukama Dayaram kuiya ram Harchand pi. Haniya diva devi Patni Ramesh kumar Mishra Chunnilal Babulal Pi surta koum sargara da deh khatedar na .sn. 406

0.59

62 473

63 474 to478

Pakiya Sohansingh Babusingh Pi. Lachhasingh Hartiya Pi.hukama Dayaram kuiya ram Harchand pi. Haniya diva devi Patni Ramesh kumar Mishra Chunnilal Babulal Pi surta koum sargara da deh khatedar na .sn. 408

2.07

64 479

Vagta puna Pi.Amra Tariya Ajiya deva Pi.Sankla Pabu Beva sankla Pabu beva 1/2 Vidrunkunmar kailash kumar Chandra prakash Pi Narsa ram koshlya Mohan d/o Narsaram Chunya Babusingh Pi surta 1/4 koum Sargara sa deh khatedar Na.380

0.97

65 480

Cheliya vald Akhiya Hanja Putri Bhuba Kuiya Babu Mohan pi.Budiya Bhikharam Prakash Praveen singh Pi. Thana Sita w/o koum Sargara B hi .Barabar sadeh khatedar Rahan Gunesha Putra Cheliya ka hi Marvar Gramin Bank Jalore

1.29

66 481 Kuiya s/o Khasiya Galba Hanjiya Pi.dola Jetharam Kantilal Jogaram Pi.soniya Bheriya Shankriya Punma Pi.Choga koum sa Sargara sa deh khatedar

1.2

67 482

68 483 Mohanlal Natvarlal Praga Paniya Mukesh vald Prabhuda Uki devi beva Prabhuda koum Sargara sa dej khatedar

1.29

69 484 Nadiya or Nale (Charahgah) hetu 0.64

70 485 Kuiya s/o Khasiya Galba Hanjiya Pi.dola Jetharam Kantilal Jogaram Pi.soniya Bheriya Shankriya Punma Pi.Choga koum sa Sargara sa deh khatedar

1.82

71 486

Page 229: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

196

72 487 Mohanlal Natvarlal Praga Paniya Mukesh vald Prabhuda Uki devi beva Prabhuda koum Sargara sa dej khatedar

1.4

73 488 to 496

Vasiya vald Chuniya Surajmal Mangalaram Arjuram JogaramPi.Soniya Gajra Putri soniya 2/3 Tariya Pakiya Poliya pi.Hukma 1/3 =1/2 Babu Ashok Pi.Ravta Madanlal vald Mohan 1/2 jesa vald Vagta 1/2 =1/2 koum Nai (khavas) Sa deh khatedar Na.sn.391.449

1.41

74 489

Vasiya vald Chuniya Surajmal Mangalaram Arjuram JogaramPi.Soniya Gajra Putri soniya 2/3 Tariya Pakiya Poliya pi.Hukma 1/3 =1/2 Babu Ashok Pi.Ravta Madanlal vald Mohan 1/2 jesa vald Vagta 1/2 =1/2 koum Nai (khavas) Sa deh khatedar Na.sn.391.450

9.87

75 497 Nadiya or Nale (Charahgah) hetu 1.31

76 501 , 589 ,597,598

Bhopa Gamiya Pi.sardara Chagansingh vald Kisturasingh Suki devi Patni Kistursingh Manju Ansi Gita putriyan Kisturji 1/2 Mada koum Rana Shankariya Pi.Ravta 1/2 koum Purohit sa deh khatedar

1.8

77 505 to 506

JabersinghPutra Ganeshaji Ganesh vald Dunga koumPurohit sa deh khatedar Na.sn.385d/o Baghsingh Khangarsingh Polsinghpi.punmaji 1/4 Rupsingh Harchand Lal singh Pi.Chhoga 1/4 vald rama 1/2 koum Purohit sa deh khatedar Na.sn.383

1.42

78 507

79 508

Ganesh singh Harchand viramdev Aambalal Pi.Otaji 1/2 Ishwar singh Gajendra singh Pi.Arjun singh koum Rajput (2.48) h Kansingh vald Magsingh (0.2020)h 3/10 hi Neniya s/o Prabhu Rajendra singh Ashok singh Pi.Toliya Gavri kunvar beva Toliya Gavrikunvar 7/10=1/2 koum Purohit sa deh khatedar Rahan Ganesh singh ka hi Sbi Branch Aahore Na.sn.373.397.409.454

0.55

80 510 Pagdandiya Or Raste (charahgah ke liye Nahi) 0.8

Page 230: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

197

81 511 Jaysingh Prakash Pi.Harting koum Purohit B Hi B khatedar

1.68

82 512

83 513

Kana kistura Prabhu Pura Pi.Kisna B.hi Barabar koum Mena sa deh khatedar kistura vald kisna ka 1/4 Hi rahan Sahkari Bhumi Vikas BANK Ltd .Jalore Murthin

0.58

84 514

Kana kistura Prabhu Pura Pi.Kisna B.hi Barabar koum Mena sa deh khatedar kistura vald kisna ka 1/4 Hi rahan Sahkari Bhumi Vikas BANK Ltd .Jalore Murthin

0.56

85 515

Kana kistura Prabhu Pura Pi.Kisna B.hi Barabar koum Mena sa deh khatedar kistura vald kisna ka 1/4 Hi rahan Sahkari Bhumi Vikas BANK Ltd .Jalore Murthin

0.52

86 516 Pagdandiya Or Raste (charahgah ke liye Nahi) 0.16

87 517

Kana kistura Prabhu Pura Pi.Kisna B.hi Barabar koum Mena sa deh khatedar kistura vald kisna ka 1/4 Hi rahan Sahkari Bhumi Vikas BANK Ltd .Jalore Murthin

0.46

88 518 89 519

90 520 satis kumar devi singh Suresh kumar Pi.Mula koum Purohit sa deh khatedar

1.54

91 521

92 522 kamala devi d/o Juhara Dariya w/o juhara bhamra vald kering Vachansingh Rupsingh ajitsingh Pi.Maga koum sa deh khatedar na.sn.380

93 523

Mangilal Rana Pi . Hariting Varju devi w/o Surajmal Mukesh Jitendra Lalit Pi.Surajmal Manju devi Gita d/o Surajmal naba vali Mata Varju devi koum Purihit sa deh khatedar Na,sn,394

0.73

Page 231: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

198

94 524

Lalsingh Khimsingh Nensingh Jogsignh Vijaysignh Pi.Chuna Miradevi w/o 1/4 Lalsingh vald Chunji surajkunvar w/o Pukhraj Ranjitsingh Shaitansingh Bharatsingh Pi.Pukhraj Naba ,vali Mata Surajkunvar 1/4 Hachand Narayansingh Pi.Bhaviya Pabudevi beva BHaviya 1/2 koum Purohit sa deh khatedar Na.sn.395

0.85

95 525

Joga Momta Pi.Jerupa Natha Pi.sada 1/2 Vajiga vald Kisna Bhanvarsingh Bhabutsingh Padamsingh Arjunsingh pi.mana w/o khima mopji Laxmiji vald kistura Juhara Vajinga Karansingh Pi.Sarupa 1/2 koum Puorhit sa deh khatedar

0.44

96 526 to 527

Joga Momta Pi.Jerupa Natha Pi.sada 1/2 Vajiga vald Kisna Bhanvarsingh Bhabutsingh Padamsingh Arjunsingh pi.mana w/o khima mopji Laxmiji vald kistura Juhara Vajinga Karansingh Pi.Sarupa 1/2 koum Puorhit sa deh khatedar

1.41

97 528

Lalsingh Khimsingh Nensingh Jogsignh Vijaysignh Pi.Chuna Miradevi w/o 1/4 Lalsingh vald Chunji surajkunvar w/o Pukhraj Ranjitsingh Shaitansingh Bharatsingh Pi.Pukhraj Naba ,vali Mata Surajkunvar 1/4 Hachand Narayansingh Pi.Bhaviya Pabudevi beva BHaviya 1/2 koum Purohit sa deh khatedar Na.sn.395

0.83

98 529

Mangilal Rana Pi . Hariting Varju devi w/o Surajmal Mukesh Jitendra Lalit Pi.Surajmal Manju devi Gita d/o Surajmal naba vali Mata Varju devi koum Purihit sa deh khatedar Na,sn,394

0.85

99 530 to 640 Chhogsingh vald Javansingh koum sa deh khatedar Na.sn.462

2.61

100 531

Page 232: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

199

101 532

Chandrakunvar w/o Rannsingh Vikramsingh Ashok singh Pi.Rannsingh naba Vali Mata Chandra kunvar w/o Rannsinghw/o Rannsingh Jabersingh jabersignh Savji kesi Beva 1/2 koum Puorhit sa deh khatedar Na.sn.384

0.85

102 533

Chandrakunvar w/o Rannsingh Vikramsingh Ashok singh Pi.Rannsingh naba Vali Mata Chandra kunvar w/o Rannsinghw/o Rannsingh Jabersingh jabersignh Savji kesi Beva 1/2 koum Puorhit sa deh khatedar Na.sn.385

0.87

103 534 to 535

Ashok kumar Ramesh kumar Bhimsingh Pi.Ganesh Shankarsingh s/o Pukharaj 1/2 Ota vald Thana 1/2 =)=1/2 Kansingh vald Magsingh 1/5 kansingh vald Magsingh Neniya vald Prabhu Rajendra singh Ashok singh Pi.Toliya Gavri Kunvar Beva Toliya Gavri kunvar beva Toliya 4/5 )=1/2 koum Purohit sa deh khatedar na.sn.408

1.87

104 536 to 537

Bhura Chuna Tagiya Veraya Bhamriya Pi Lachcha 1/4 Vijaysingh Hadmansingh Babuasingh Pi.Sartana 1/4 =1/2 Chhogsingh Kesarsingh Mansingh Pi.Chimna Na.s

2.01

105 538

Rikhbchand Indarsingh Pi.vagta Pi.Sumtidevi w/o Vagta Hindu Saviya Lumba Pi.Javana Shankarsingh vald Javarasingh kamla Lila Putriyan Javaraji Poni devi Patni Javrji Tarsingh Vald Shivnath Parvati beva Shivnath koum Purohit sa deh khatedar Na.sn.448

1.82

106 542

Dhokla vald Bharta vaga Juhara koum Meghvanshi Khangararam Pola Pi. Punma jabersingh s/o Khimsingh Tariya Vald mota koum Purohit sa deh khatedar Pirsingh 1/2 koum Purohit sa deh khatedar Na.sn.430

0.4

107 543 to 544

Dhokla vald Bharta vaga Juhara koum Meghvanshi Khangararam Pola Pi. Punma jabersingh s/o Khimsingh Tariya Vald mota koum Purohit sa deh khatedar Pirsingh 1/2 koum Purohit sa deh khatedar Na.sn.430

1.21

Page 233: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

200

108 545

Liladevi w/o Sanvalsinngh Hajarimal Kamalsingh Dinesh kumar Vikramsingh Asbadevi Huliya devi Sumitra devi d/o Sanvalsingh Laliya Chagna Pi.Chhoga 1/2 Khima vald Javana 1/2 koum sa deh khatedaar Na.sn.373

1.68

109 546 to 548

Deva Darja Sona Taga Pi.Purkha Sukhsingh kegarsingh Pi.Chuniya Sukhi devi w/o Bhuriya Sujiya PI.Jeram Goapal singh Mahendar Pi.Gunesha Atiya devi beva Gunesha 1/2 Manchalal Maganlal vald vala 1/2 koum Purohit sa deh khatedar

1.91

110 549 Manshalal vald koum Purohit sa deh khatedar 0.4 111 550 Devraj vald vala koum Purohit sa deh khatedar 0.48 112 551 Aasulal vald Vala oum Purohit sa deh khatedar 0.37 113 552

114 553 Chunnilal vald Gangaram koum Purohit sa deh khatedar

0.85

115 554 Ranchoda vald Hakiya Meghvanshi sa deh khatedar

1.87

116 555 to 557 ,752

Bhuriya Mangala jomta Bhabuta pi Lachcha 1/2 sa deh tejaji sardaring pi. Ramaji Kailash Ganpat Pi .Chunnilal indradevi w/o Chunilal sa Thanvla 1/2 koum Purohit sa deh khatedar

4.06

117 558

118 559

Shanti fuki d/o Khima 1/2 lachiya vald Rama 1/4 koum Rupsingh Harchand 1/4 Rupsingh lal singh Pi.Chhoga Nathiya vald Pira 1/4 koum Purohit sa deh khatedar

0.67

119 560

Shanti fuki d/o Khima 1/2 lachiya vald Rama 1/4 koum Rupsingh Harchand 1/4 Rupsingh lal singh Pi.Chhoga Nathiya vald Pira 1/4 koum Purohit sa deh khatedar

0.39

120 561

Shanti fuki d/o Khima 1/2 lachiya vald Rama 1/4 koum Rupsingh Harchand 1/4 Rupsingh lal singh Pi.Chhoga Nathiya vald Pira 1/4 koum Purohit sa deh khatedar

0.44

Page 234: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

201

121 568 Harisingh vald Bhavji koum Purohit sa deh khatedar

0.8

122 569

123 570 Dinesh singh vald Gumansingh Jodhsingh Surajmal Pi.Hukma singh Mangilal Parasmal Pi.Javarsingh koum Purohit sa deh khatedar

1.77

124 571 Vagsingh Bhopsingh Arjunsingh Pi Vagta Hastudevi w/o Vagta koum Purohit sa deh khatedar

0.79

125 572 to 573

Jodhsingh Jivsingh Mangal singh Shankarsingh Pi.Amaring Sankalsingh mohansinghPi.Bhima Mukunvar Beva Bhima Mulkunvar beva Bhima 1/2CHagansingh vald Kistursingh sukidevi Patni KistursinghManju Ansi Gita Putriyan kistursingh Bhhopsingh Gumansingh Pi.sardar 1/2 koumPurohit sa deh khatedar Na.sn.381.40.

1.65

126 574 Vagsingh Bhopsingh Arjunsingh Pi Vagta Hastudevi w/o Vagta koum Purohit sa deh khatedar

0.87

127 575 Vagsingh Bhopsingh Arjunsingh Pi Vagta Hastudevi w/o Vagta koum Purohit sa deh khatedar

1.58

128 576 Harisingh vald Pi.Joita Ummeda Pi.Vala koum Purohit sa deh khatedar

0.52

129 577

JabersinghPutra Ganeshaji Ganesh vald Dunga koumPurohit sa deh khatedar Na.sn.385Baghsingh Khangarsingh Polsinghpi.punmaji 1/4 Rupsingh Harchand Lal singh Pi.Chhoga 1/4 vald rama 1/2 koum Purohit sa deh khatedar Na.sn.383

0.52

130 578

131 579

Shavlal verilal Vaghsingh Devisingh Lalji Kishore singh Pi.Girdhari 1/2 Girdhari 1/2 Balvantsingh Bhanvarsingh Javbersingh Ramesh kumar kailash kumar Bhursignh Pi.deva Kesi w/o Deva koum Purohit sa deh khatedar

1.04

Page 235: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

202

132 580

Shivlal Verialal Vagsingh devi singh lalji Kishore Pi. Girdhari Balvantsingh Bhanvarsingh Pi.Girshari balvantsingh Bhanvarsingh Jabersingh Hiralal Ramesh kumar kailash kumar Bhursingh Pi.devisingh vald Adring hi 2/3 koumPurohit sa deh khatedar

2.27

133 581 to 583 ,703 to704 , 797

Bhanvarsignh kansingh Shankarsingh Pi. Achla kapura Hansiya Pi. Kesra kooum Purohit sa deh khatedar

7.05

134 587 Nensingh Mohansingh Babusingh Pi Lachcha Hanja devi W/o Lachcha kastura Soniya pi Hukma koum Purohit sa deh khatedar

1.06

135 588 hirsingh vald Shivnath 1/4 shaitansingh Vijaysingh Pi.himta poni devi beva Hemta 1/4 Nathu 1/2 = 1/2 koum Purohit sa deh khatedar

0.94

136 590 hirsingh vald Shivnath 1/4 shaitansingh Vijaysingh Pi.himta poni devi beva Hemta 1/4 Nathu 1/2 = 1/2 koum Purohit sa deh khatedar

1.14

137 594

Ganesh singh Harchand viramdev Aambalal Pi.Otaji 1/2 Ishwar singh Gajendra singh Pi.Arjun singh koum Rajput (2.48) h Kansingh vald Magsingh (0.2020)h 3/10 hi Neniya s/o Prabhu Rajendra singh Ashok singh Pi.Toliya Gavri kunvar beva Toliya Gavrikunvar 7/10=1/2 koum Purohit sa deh khatedar Rahan Ganesh singh ka hi Sbi Branch Aahore Na.sn.373.397.409.454

0.96

138 601 Pagdandiya Or Raste (charahgah ke liye Nahi) 0.56 139 602 140 603 Nadiya or Nale (Charahgah) hetu 0.03

141 606 Harisingh vald Pi.Joita Ummeda Pi.Vala koum Purohit sa deh khatedar

0.87

142 607

Chagansingh vald kistursingh Sukidevi Patni kistursingh Manju Ansi Gita Putri yan Kistursingh Bhopji Gumansingh Pi.sardarigji koum sa deh khatedar Na.sn.381.402

1.03

143 609 satis kumar devi singh Suresh kumar Pi.Mula koum Purohit sa deh khatedar

0.94

Page 236: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

203

144 610

Chandra kunvar w/o Rannsingh Vikramsingh Ashok singh vald Rannsingh vald Rannsingh Nabavali Mata Chandra kunvar w/o Rannsingh Jabersingh Pi . Savji kesi Beva Savji koum Purohit sa deh khatedar

0.61

145 611

Bhuriya Mangala Jomta Bhabuta Pi.Lachcha sa deh Tejaji Sardarinji Pi.Ramaji kailash Ganpat Pi.Chunnilal sa Thanvala Vald Fusa Koum Purohit sa deh khatedar

1.44

146 612 to 613 ,619

Bhuriya mangla Joyta Bhabuta Pi Lachcha sa deh tejaji sardaringji Pi.ramaji kailash Ganpatsingh Pi.chunnilal sa Thanvla Varju d/o Bhanvarsingh Nensingh kesarsingh

1.41

147 614

148 615

Kushalraj Vald Jaysingh Sourabh Daku Huli Puteiyan Jaysingh Sunghi devi Patni Jaysingh nensingh vald Himatsingh koum Purohit sa deh khatedar Na.sn.447

0.36

149 616 Tarsingh juharsignh Sonsingh Pi.vagta koum Purohit sa deh khatedar

0.42

150 617 Tarsingh juharsignh Sonsingh Pi.vagta koum Purohit sa deh khatedar

0.59

151 618 Bhursingh Bhanvarsingh Tagsingh ChunsinghVersingh Pi. Lachcha singh koum Purohit sa deh khatedar na.sn.435

0.39

152 620 Dudsingh vald Harasingh koum Puroihit sa deh khatedar Na.sn.427

0.61

153 621 Dudsingh vald Harasingh koum Puroihit sa deh khatedar Na.sn.428

0.69

154 622 Kansingh vald Magsingh Koum Purohit sa deh khatedar

0.69

155 623

Marga devi w/o Vijaysingh Prakash vald vijaysingh Naba.Mata Marga devi Bhanavri w/o vijay alPesh darja Mohansingh darja alPesh vald Rekha Shobha Lata d/o Darja mohan singh Bhanvrsingh Pi. Chopa Sugan kunvar beva Chopa koum Purohit sa deh khatedar Na.sn.393

0.01

Page 237: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

204

156 624 satis kumar devi singh Suresh kumar Pi.Mula koum Purohit sa deh khatedar

0.44

157 625 Niwas ya Was (charahgah ke liye Nahi 1.82 158 626 Jalmagan (Charahgah hetu) 0.34 159 627 Pagdandiya Or Raste (charahgah ke liye Nahi) 15.11 160 629

161 630 Bhuriya mangla Joyta Bhabuta Pi Lachcha sa deh tejaji

0.28

162 631 ,633-635 Nensingh vald Magsingh rajusingh Dineshsingh hadmarsin

4.17

163 632 Kansingh vald Magsingh Koum Purohit sa deh khatedar

0.05

164 636 to 637 Hanja Beva Bhopa vald Momta tikma Pi.jiva ArjunsignhGordhan singhMangilal Pi.Jiva

2.38

165

638 , 639 , 679 ,692 ,693 , 743 ,764 ,765

dineshsingh vald Gamiya Jodha Surajmal Pi.Hukma Mangilal Parasmal Pi.Juhara 1/2 ashok kumar Ramesh kumar bhimsingh Pi.Ganesha savita Devi beva Ganesha Shankarsinghs/o Pukhiya 1/2 koum purohit sa deh khatedar

10.65

166 641 Chhogsingh vald Javansingh koum sa deh khatedar Na.sn.463

0.81

167 642 Hadmansingh vald vajiya koum Purohit1/2 sa deh khatedar jogiya Momta Pi. Pi.Jairupa ko purohit 1/2 sa deh khatedar

1.26

168 643 Madusingh Ransingh Shankarsingh Pi.Ravat singh koum Purohit sa deh khatedar Na.sn.431

1.25

169 644 Madusingh Ransingh Shankarsingh Pi.Ravat singh koum Purohit sa deh khatedar Na.sn.432

1.25

170 646 Vijaysingh Hanuman singh vald Babusingh Pi.Sultansingh koum Purohit sa deh khatedar na.sn.378

1.73

Page 238: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

205

171 647

Shivlal verilal kishore singh Vachansingh Pi.Jairupa Jaisingh vald Lachcha Nensingh valdKoum Purohit sa deh khatedar Pi.Sardaring Gavri kunvar w/o Sardaring Gitad evi w/o Nensingh Gulabsingh Rajusignh Paras devi Hansudevi lalita kumari V santosh kumari d/o Nenasingh Nabalig Lalita kumari Gitadevi w/o nensingh Joyta KaransinghPi.Bhagvana koum Purohitsa deh khatedar

1.47

172 648 to 649 Chunnilal Berilal Pi.Lachcha 1/2 Vijaysingh Hanumansingh Babusingh Pi.Sirataring Sadna w/o Sartaring 1/2 koum Purohit sa deh khatedar

2.02

173 651

Ganesh singh Harchand viramdev Aambalal Pi.Otaji 1/2 Ishwar singh Gajendra singh Pi.Arjun singh koum Rajput (2.48) h Kansingh vald Magsingh (0.2020)h 3/10 hi Neniya s/o Prabhu Rajendra singh Ashok singh Pi.Toliya Gavri kunvar beva Toliya Gavrikunvar 7/10=1/2 koum Purohit sa deh khatedar Rahan Ganesh singh ka hi Sbi Branch Aahore Na.sn.373.397.409.454

2.59

174 658

Punma Hadmata Deva Pi Ajiya 1/2 Margadevi w/o Vijaysingh Prakash singh vald Vijaysingh Naba .vali Mata Khud Margadevi Bhanvri w/o Darja alpesh vald Darja rekah soubha Lata d/o Daraja Mohansingh Bhanvarsingh Pi .Chopa Sugan kunvar w/o Chopa Shankarsingh Harsnsingh Pi.Tagiya Bhanvri w/o Vald Mangiya vald Kapura 1/2 koum sa deh khatedar Na,sn.393.

1.16

Page 239: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

206

175 659

Punma Hadmata Deva Pi Ajiya 1/2 Margadevi w/o Vijaysingh Prakash singh vald Vijaysingh Naba .vali Mata Khud Margadevi Bhanvri w/o Darja alpesh vald Darja rekah soubha Lata d/o Daraja Mohansingh Bhanvarsingh Pi .Chopa Sugan kunvar w/o Chopa Shankarsingh Harsnsingh Pi.Tagiya Bhanvri w/o Vald Mangiya vald Kapura 1/2 koum sa deh khatedar Na,sn.393.

1.2

176 660

177 661

Chunnilal vald Gangaram Natha Jogiya Momta Pi.Jairupa 1/2 Khima Laxmi Chand vald Kistura Magnidevi beva Kistura Mahendra vald Bhopji Bagsu kunvar beva Bhopji Hadmansingh vald Vajingji Ummedsingh JabersinghPi.Jahara Vijayraj Karnasingh Pi.sarupa 1/2 koum Purohit sa deh khatedar

1.28

178 662

Chunnilal vald Gangaram Natha Jogiya Momta Pi.Jairupa 1/2 Khima Laxmi Chand vald Kistura Magnidevi beva Kistura Mahendra vald Bhopji Bagsu kunvar beva Bhopji Hadmansingh vald Vajingji Ummedsingh JabersinghPi.Jahara Vijayraj Karnasingh Pi.sarupa 1/2 koum Purohit sa deh khatedar

1.48

179 663 Shivnathsingh jaysingh Prakash singh Devisingh Pi.Hartingh koum Purohit sa deh khatedar

2.45

180 664 Modsingh Narayansingh Pi. Sartana Lachcha vald Rama koum Purohit sa deh khatedar

1.33

181 665 Modsingh Narayansingh Pi. Sartana Lachcha vald Rama koum Purohit sa deh khatedar

1.21

182 666

Jodhsingh Jivsingh Mangal singh Shankarsingh Pi.Amaring Sankalsingh mohansinghPi.Bhima Mukunvar Beva Bhima Mulkunvar beva Bhima 1/2CHagansingh vald Kistursingh sukidevi Patni KistursinghManju Ansi Gita Putriyan kistursingh Bhhopsingh Gumansingh Pi.sardar 1/2 koumPurohit sa deh khatedar Na.sn.381.40.

2.34

Page 240: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

207

183 668

184 669

Lalsingh Khimsingh Nensingh Jogsignh Vijaysignh Pi.Chuna Miradevi w/o 1/4 Lalsingh vald Chunji surajkunvar w/o Pukhraj Ranjitsingh Shaitansingh Bharatsingh Pi.Pukhraj Naba ,vali Mata Surajkunvar 1/4 Hachand Narayansingh Pi.Bhaviya Pabudevi beva BHaviya 1/2 koum Purohit sa deh khatedar Na.sn.395

1.07

185 670

Lalsingh Khimsingh Nensingh Jogsignh Vijaysignh Pi.Chuna Miradevi w/o 1/4 Lalsingh vald Chunji surajkunvar w/o Pukhraj Ranjitsingh Shaitansingh Bharatsingh Pi.Pukhraj Naba ,vali Mata Surajkunvar 1/4 Hachand Narayansingh Pi.Bhaviya Pabudevi beva BHaviya 1/2 koum Purohit sa deh khatedar Na.sn.395

1.55

186 671 to 672 Bhuriya Mangal Jamta Bhabuta Pi.Lachcha 1/2 Satis kumar devi singh suresh kumar Pi.Mula koum purohit sa deh khatedar

2.47

187 673 Manshalal Harchand Pi.Harting koum Purohit sa deh khatedar

0.94

188 674 HirsinghPutra Shivnath Shaitansingh Vijaysingh Pi Himta Ponidevi Himta koum Purohit sa deh khatedar

0.97

189 675

kanji vald Javanji 1/2 Hanja beva Bhopa tikma Mobta Pi . Jiva 1/3 Ashok vald Shivnath kana Pi.Javana Johdha Himta Karna Pi.Punma 2/3 koum Puruhit sa deh khatedar

0.86

190 678

Vald shivnath Parvati Beva shankarsingh vald Javarji kamla Lila Putriyan Poni Patni Javarji Lumba Sava Pi.Javana koum Purohit sa deh khatedar na.sn.448

2.32

191 680 Ashok kumar vald Shivnath Kansingh vald Javansingh koum Purohit sa deh khatedar Na.sn.418

0.75

192 681 Mangilal vald Varadsingh koum Purohit sa deh khatedar na.sn.419.450

1.38

193 682 Khimsingh Lachching koum Purohit sa deh khatedar na.sn.419 450

1.3

Page 241: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

208

194 683 Pelad singh Javansingh koum Purohit sa deh kkhatedar

2.09

195 684 Vagsingh Bhopsingh Arjunsingh Pi Vagta Hastudevi w/o vagji vald Vagta Mangilal vald koum Purohit sa deh khatedar

2.57

196 685 Hematsingh vald Punam koumsingh koum Purohti sa deh khatedar na.sn.370.439

2.77

197 686 to 687 Bhura Chuna Tagiya Veraya Bhamriya Pi Lachcha 1/4 Vijaysingh Hadmansingh Babuasingh Pi.Sartana 1/

2.34

198 688 Pagdandiya Or Raste (charahgah ke liye Nahi) 1.2

199 689

Shivlal verilal kishore singh Vachansingh Pi.Jairupa Jaisingh vald Lachcha Nensingh valdKoum Purohit sa deh khatedar Pi.Sardaring Gavri kunvar w/o Sardaring Gitad evi w/o Nensingh Gulabsingh Rajusignh Paras devi Hansudevi lalita kumari V santosh kumari d/o Nenasingh Nabalig Lalita kumari Gitadevi w/o nensingh Joyta KaransinghPi.Bhagvana koum Purohitsa deh khatedar

2.23

200 690

201 691

Varju kunvar d/o Bhanvarsingh nensingh Kansingh Balvantsingh Pi.Maga Rajusingh dinesh singh Pi Maga Rajusingh denesh kumar Hadmatsingh pi.kesarsingh CHamPakunvar Putri kesar Mohankunvar Patni Dariya kunvar beva Mansingh 1/4 kesa 1/4 Ganesha va jodha Pi Pratapa 1/2 koum Purohit sa deh khatedar Na.sn.416

2.38

202 694

Shankarsingh Chunnilal Babusingh Pi.Natha jamna kunvar beva Natha Hadmansingh Jethusingh Nensingh ganesha Gangaram vald Moti Sona Javara Pukharaj Harchand Pi JairuPa koum sa deh khatedar

1.25

Page 242: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

209

203 695

Shankarsingh Chunnilal Babusingh Pi.Natha jamna kunvar beva Natha Hadmansingh Jethusingh Nensingh ganesha Gangaram vald Moti Sona Javara Pukharaj Harchand Pi JairuPa koum sa deh khatedar

1.25

204 697 Hematsingh vald Punam koumsingh koum Purohti sa deh khatedar na.sn.370.439

2.48

205 698 Shivnath jesingh pi.Harting koum Purohit sa deh khatedar

2.59

206 699 Manshalal Harchand Pi.Harting koum Purohit sa deh khatedar

1.38

207 700 Manshalal Harchand Pi.Harting koum Purohit sa deh khatedar

1.42

208 701

Dudsingh vald Haratsignh Kansingh Tarsingh KaransinghPi. Dhanrupsingh nensingh Bhanvarlal Pi.Sonsingh 3/4 koum koum Purohit Mu leri Beva Jairup singh 1/4 koum Pukorhit sa deh khatedar Na.sn.42

1.29

209 702

Dudsingh vald Haratsignh Kansingh Tarsingh KaransinghPi. Dhanrupsingh nensingh Bhanvarlal Pi.Sonsingh 3/4 koum koum Purohit Mu leri Beva Jairup singh 1/4 koum Pukorhit sa deh khatedar Na.sn.42

1.3

210 707

211 708 Hematsingh vald Punam koumsingh koum Purohti sa deh khatedar na.sn.370.439

2.22

212 709 Harchand toliya Pi dhupa 1/2Tarachand Mota Hi vachansingh Rupsingh Ajits1/2 koum Purohit sadeh khatedar

2.79

213 710 Bhursingh Bhanvarsingh vald pi Moti Hajarimal shankarlal Pi.Himta koum Purohit sa deh khatedar

1.76

214 711 Mangilal vald Varadsingh koum Purohit sa deh khatedar na.sn.419.450

1.19

215 712 Kastursingh Lachchsinngh koum Purohit sa deh khatedar

0.01

216 713 Vachnsingh Rupsingh Ajitsingh Pi Maga Javara Bhamra Pi kera koum Purohit sa deh khatedar

1.1

Page 243: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

210

217 714 Vachnsingh Rupsingh Ajitsingh Pi Maga Javara Bhamra Pi kera koum Purohit sa deh khatedar

1.18

218 715

Varju kunvar d/o Bhanvarsingh nensingh Kansingh Balvantsingh Pi.Maga Rajusingh dinesh singh Pi Maga Rajusingh denesh kumar Hadmatsingh pi.kesarsingh CHamPakunvar Putri kesar Mohankunvar Patni Dariya kunvar beva Mansingh 1/4 kesa 1/4 Ganesha va jodha Pi Pratapa 1/2 koum Purohit sa deh khatedar Na.sn.416

2.32

219 716 Vagsingh Bhopsingh Arjunsingh Pi Vagta Hastudevi w/o Vagta koum Purohit sa deh khatedar

2.21

220 717 Hasingh babusingh Pi.Joita Ummeda vald vala Gunesha Pi.Dunga Jabersinghvald Ganeshaji koum Purohit sa deh khatedar

1.18

221 718 Hasingh babusingh Pi.Joita Ummeda vald vala Gunesha Pi.Dunga Jabersinghvald Ganeshaji koum Purohit sa deh khatedar

1.25

222 719

Chandrakunvar w/o Rannsingh Vikramsingh Ashok singh Pi.Rannsingh naba Vali Mata Chandra kunvar w/o Rannsinghw/o Rannsingh Jabersingh jabersignh Savji kesi Beva 1/2 koum Puorhit sa deh khatedar Na.sn.384

2.86

223 728 Manshalal Harchand Pi.Harting koum Purohit sa deh khatedar

0.89

224 729 Manshalal Harchand Pi.Harting koum Purohit sa deh khatedar

0.86

225 730 Manshalal Harchand Pi.Harting koum Purohit sa deh khatedar

2.01

226 731

Shankarsingh Chunnilal Babusingh Pi.Natha jamna kunvar beva Natha Hadmansingh Jethusingh Nensingh ganesha Gangaram vald Moti Sona Javara Pukharaj Harchand Pi JairuPa koum sa deh khatedar

1.3

Page 244: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

211

227 732

Shankarsingh Chunnilal Babusingh Pi.Natha jamna kunvar beva Natha Hadmansingh Jethusingh Nensingh ganesha Gangaram vald Moti Sona Javara Pukharaj Harchand Pi JairuPa koum sa deh khatedar

1.39

228 733 Vailsingh vald Sonsingh 1/2 JaysinghHadMansingh Pi.Punmaji 1/2 koum Purohit sa deh khatedar

1.44

229 734 Vailsingh vald Sonsingh 1/2 JaysinghHadMansingh Pi.Punmaji 1/2 koum Purohit sa deh khatedar

0.96

230 735 to736

Chaturbhan Pukhraj Harisingh Narpatsingh Karnasingh Kishoresingh Pi.BhoPa Tagu kunvar beva Bhopa Tarsignh Juharsingh Sohansingh Pi.Vagta Sunil Ja

1.42

231 737 Vailsingh vald Sonsingh 1/2 JaysinghHadMansingh Pi.Punmaji 1/2 koum Purohit sa deh khatedar

0.75

232 738 to 739 Bhura Chuna Tagiya Veraya Bhamriya Pi Lachcha 1/4 Vijaysingh Hadmansingh Babuasingh Pi.Sartana 1/

2.36

233 740

Shankarsingh Chunnilal Babusingh Pi.Natha jamna kunvar beva Natha Hadmansingh Jethusingh Nensingh ganesha Gangaram vald Moti Sona Javara Pukharaj Harchand Pi JairuPa koum sa deh khatedar

0.99

234 741 Vagji vald Vagtaji 1/2 Vagsingh Bhopsingh Arjunsingh pi.Vagta Hastu devi w/o Vagta 1/2 koum Purohit sa deh khatedar

1.3

235 742

Balvantsingh Bhanvarsingh Jabersingh Pi.devisinghHirsingh Ramesh kailash singhBhursignh Pi ,devisignh vald Adring koum Purohit sa deh khatedar

2.1

236 744 Hematsingh vald Punam koumsingh koum Purohti sa deh khatedar na.sn.370.439

2.62

237 745

Page 245: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

212

238 746

Mangilal vald Rana Pi.Haring Varju devi w/o Surajmal Mukesh Jitendra Lalit pi.surajmal manju devi Gita devi d/o Surajmal naba. Vali mata Varju devi 1/2 sona vald Vagta 1/2koum Purohit sa deh khatedar na.sn.394

2.42

239 747 Khimsingh Putra Shivnath koum Purohit sa deh khatedar Na.sn.420

1.17

240 748

Liladevi w/o Sanvalsinngh Hajarimal Kamalsingh Dinesh kumar Vikramsingh Asbadevi Huliya devi Sumitra devi d/o Sanvalsingh Chagansingh Lalsingh Pi.Chhogsingh koum Purohit B.KH sa deh khatedar Na.sn.372

1.29

241 749 to751 Nensingh sohansingh Babusingh Pi Lacha Hanja devi w/o Lachcha w/o kastura soniya pi.huk

2.6

242 753 243 754 244 755

245 756 Kansingh vald Magsingh Koum Purohit sa deh khatedar

2.43

246 757 Jaysingh Pirsingh Bhonsingh Pi.Magaji Lila kunvar beva rannsingh koumPurohit sa deh khateda

2.59

247 758 Nadiya or Nale (Charahgah) hetu 0.6

248 759 Shivlal verilal Vaghsingh devisingh lalsingh kishoresingh Pi.Girdhari 1/2 sadu vald Hira 1/2 koum Purohit sa deh khatedar

2.31

249 760 Lalsingh Khimsingh Nensingh Jogsignh Vijaysignh Pi.Chuna Miradevi w/o 1/4 Lalsingh vald Chunji surajkunvar w/o Pukhraj Ranjitsingh

2.42

250 761 kushal raj Vald jaysingh Sourabah Daku Huli Putriyan Jaysingh sungi devi Patni Jaysingh Nensingh Put

1.63

251 762 Babulal vald Bhudramal koum Purohit sa Unn HI 3.38Bhudramal vald Jayram koum Purohit sa unn Hi 3.38 H kesar singh vald Chamnaji jaysingh va

1.11

Page 246: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

213

252 763 Rakesh kumar Niramal kumar Pi.Pirsingh Shantidevi beva Pirsingh koum Purohit sa deh khatedar

2.73

253 766 to 767 devi singh vald Mulaji koum Purohit sa deh khatedar

2.27

254 768 to 769 771

Jodhsingh Jivsingh Mangal singh Shankarsin 1.17

255 770 Babulal vald Bhudramal koum Purohit sa Unn HI 3.38Bhudramal vald Jayram koum Purohit sa unn Hi 3.38 H kesar singh vald Chamnaji jaysingh va

1.32

256 772 to 773 Punma Hadmata Deva Pi Ajiya 1/2 Margadevi w/o Vijaysingh Prakash singh vald Vijaysingh Naba .vali Mata Khud Margadevi Bhanvri w/o Darj

2.51

257 774 258 775

259 776 Jaysingh Pirsingh Bhonsingh Pi.Magaji Lila kunvar beva rannsingh koumPurohit sa deh khateda

2.64

260 777 to 778 Ganesh singh Harchand viramdev Aambalal Pi.Otaji 1/2 Ishwar singh Gajendra singh Pi.Arjun singh koum Rajput (2.48) h Kansingh vald

2.48

261 779 Pagdandiya Or Raste (charahgah ke liye Nahi) 1.99

262 780 Jethidevi w/o Dipsingh sa Hariji ChamPa devi w/o Kansingh sa Sakrana koum purohit sa khtedar

1.26

263 781 Rupsingh Harchand lalasingh Pi.Chhoga koum Purohit sa deh khatedar

0.55

264 782 Rupsingh Harchand lalasingh Pi.Chhoga koum Purohit sa deh khatedar

1.79

265 783 Hadmana kalyan Pi jodha kooum Purohit sa deh khatedar

1.31

266 784 to 785

Bhuriya Tariya Pi.Moti hanjarimal Shankarsingh Pi.Hemta Ponidevi beva Hemta vald Maga 1/2 Hirsingh vald Shivnath 1/4 Shaitansingh vijaysingh Pi.Hemata Ponide

2.48

Page 247: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

214

267 786 to 788

Chunnilal vald Gangaram Pukhraj vald Natha 1/3 koum Khimji Laxmichand pi.kisturji Mahendra singh s/o Bhopji Bagsukunvar beva Bhopji Hadmansingh vald Vajiga Bhanvarsingh Bhabutsingh Padamsingh ArjunsinghPi.Mana khatedar Na sn.399

1.15

268 787 Virdan vald Lachcha Kansingh Suresh kumar Pi.Verilal koum Purohit sadeh khatedar na.sn.399

0.33

269 789 Virdan vald Lachcha Kansingh Suresh kumar Pi.Verilal koum Purohit sadeh khatedar na.sn.399

0.46

270 790

Ganesh singh Harchand viramdev Aambalal Pi.Otaji 1/2 Ishwar singh Gajendra singh Pi.Arjun singh koum Rajput (2.48) h Kansingh vald Magsingh (0.2020)h 3/10 hi Neniya s/o Prabhu Rajendra singh Ashok singh Pi.Toliya Gavri kunvar beva Toliya Gavrikunvar 7/10=1/2 koum Purohit sa deh khatedar Rahan Ganesh singh ka hi Sbi Branch Aahore Na.sn.373.397.409.454

2.36

271 791 Hasingh babusingh Pi.Joita Ummeda vald vala Gunesha Pi.Dunga Jabersinghvald Ganeshaji koum Purohit sa deh khatedar

2.4

272 792 Nensingh Sohansingh Babusingh Pi .Lachcha Hanjadevi w/o Lachcha kastura soniya Pi.hukma koum Purohit sa deh khatedar

1.28

273 793 Nensingh Sohansingh Babusingh Pi .Lachcha Hanjadevi w/o Lachcha kastura soniya Pi.hukma koum Purohit sa deh khatedar

1.15

274 794 Pagdandiya Or Raste (charahgah ke liye Nahi) 0.35

275 795 Shivlal verilal Vaghsingh devisingh lalsingh kishoresingh Pi.Girdhari 1/2 sadu vald Hira 1/2 koum Purohit sa deh khatedar

2.04

Page 248: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

215

276 796

Liladevi w/o Sanvalsinngh Hajarimal Kamalsingh Dinesh kumar Vikramsingh Asbadevi Huliya devi Sumitra devi d/o Sanvalsingh Laliya Chagna Pi.Chhoga 1/2 Khima vald Javana 1/2 koum sa deh khatedaar Na.sn.373

0.87

277 798 Pagdandiya Or Raste (charahgah ke liye Nahi) 1.42 278 799

279 800 Jagmala Tolaram lumba Pi.Chela koum Mehavanshi sa deh khatedar Na.sn.388

2.51

280 801 Manshalal vald Maganlal Devraj Aasulal vald vala sa deh khatedar

0.01

281 802 Manshalal vald Maganlal Devraj Aasulal vald vala sa deh khatedar

0.2

282 803 Manshalal vald koum Purohit sa deh khatedar 0.59

283 804

Kana kistura Prabhu Pura Pi.Kisna B.hi Barabar koum Mena sa deh khatedar kistura vald kisna ka 1/4 Hi rahan Sahkari Bhumi Vikas BANK Ltd .Jalore Murthin

1.75

284 805

Kana kistura Prabhu Pura Pi.Kisna B.hi Barabar koum Mena sa deh khatedar kistura vald kisna ka 1/4 Hi rahan Sahkari Bhumi Vikas BANK Ltd .Jalore Murthin

1.08

285 806

Kana kistura Prabhu Pura Pi.Kisna B.hi Barabar koum Mena sa deh khatedar kistura vald kisna ka 1/4 Hi rahan Sahkari Bhumi Vikas BANK Ltd .Jalore Murthin

1.06

286 807 Modsingh Bhimsingh Shaitansingh Pi.Harisingh KOumRajput sa deh khatedar

0.83

287 808 Dargaram vald Bhutiya koum Megahvanshi sadeh khatedar

1.13

288 809 Sakaram vald Bhutiya koum Purohit sa deh khatedar

1.11

289 941/640 Pelad singh Javansingh koum Purohit sa deh kkhatedar

1.22

290 578/873 Bagh singh vald Girdhari singh koum Purohit sa deh khatedar

0.39

Page 249: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

216

tekcUnh xkao lojlk

Ø-l

a-

[kljk u

a-

{kS=Q

y

ykHkkFkhZ@dk'rdkj dk uke 1 391 0.44 Hadman vald Babra koum Ghanchi sa deh 388 khatedar 2 392 0.58 Shantiya vald Gamna koum.Mena sa deh khatedar

3 393 0.35 Virka Bhabhuta Ranchoda Pi.Choga Vagta vald Nava

koum mena sa deh khatedar 4 394 0.35 Kanka Radha Mira d/o Virda koum .Mena sa deh khatedar 5 395 0.36 Shankaralal vagerah Genaram B.kh.n 364 khatedar 6 400 0.62 Basrah Sadar 7 401 0.52 Bherusingh vagerah B.kh.n.155 khatedar 8 402 0.73 Mangilal vald deva koum jangid Brahmin sa deh khatedar 9 403 0.68 Ganesha Aamba vagerah B.kh.n.386 khatedar

10 404 0.33 Basrah Sadar 11 405 0.57 Basrah Sadar 12 406 0.72 Mangilal vagerah B.kh.n.385 khatedar 13 407 1.1 Sukhiya Kapura Pi.Pelad koum .Ghanchi sa deh khatedar 14 408 0.66 Mangilal vald deva koum jangid Brahmin sa deh khatedar

Page 250: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

217

15 409

1.7 Aashram Putra Hariya koum Jangid Brahmin sadeh khatedar mn.240

16 414 0.95 Ravta vald vena Hastu vagerah B.kh.n.413 khatedar 17 415 0.77 Basrah Sadar 18 416 1.64 Jitendrasingh vagerah B.kh.n.321 khatedar 19 417 2.03 Bherusingh vagerah B.kh.n.155 khatedar 20 418 2.14 Basrah Sadar

21 419

0.12 Raghunathsingh vald vaghsingh koum purohit sa deh khatedar mn.227

22 420 0.56 gea.mu .nala 23 421 0.72 Hadman vald Babra koum Ghanchi sa deh khatedar 24 422 2.3 Basrah Sadar 25 575 2.6 Virendra vald rajendar vageradh B.kh.n.412 khatedar

26 576 0.57

Kesiya 1/4 Bhima 1/4 Pi Kukla Bhatiya Hansraj Ganesha Pi.Teja na .ba.vali Bhatiya w/o Teja 1/4 Movan vald Masriya Nabalig ki valiya Varju beva Masriya 1/4 koum Sargara sa deh khatedar

27 577 4.6 Basrah Sadar 28 578 0.63 Sarupa Kupa Pi .shivdan vagerah B.kh.n.278 khatedar

29

579

0.78

Sarupa Kupa Shivdan Motaram Vald Sesha ram Dhepi w/o Sesha ram koum Kumhar 4/2 Raghunathsingh vald Vagh singh 4/2 koum Purohit sa deh khatedar mn.227

30 580 1.1 Premsingh vald Jasraj koum purohit sa dah khatedar

31

581

0.82

Raju beva Chunnilal Mahendra Chagansingh Pi Bhopsingh Jadavi kunvar d/o Bhopsingh Ugam devi w/o Bhopsingh Naju w/o Chunnilal Javara vald Hema koum Purohit sa khatedar mn.294

32 582 0.74

Shayamasingh Putra Mada 1/3 Satis Ranchoud singh Pi Bhabuta 1/3 Jogsingh Somsingh Pi Pira 1/3 Koum Purohit sa deh khatedar

33 583 1.17 Baghsingh vald Jairupsingh koum Purohit sa deh khatedar 34 584 1.14 Sarupa Kupa Pi Shivdan vagerah B.kh.n. 278 khatedar

Page 251: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

218

35 586 0.92 Juhar singh vagerah B.kh.n.485 khatedar 36 587 0.92 Sukhdev Mulsingh vagerah B.kh.n.476 khatedar 37 588 1.08 Ganesharam vagerah B.kh.n.194 khatedar

38 589

1.12 Sakudevi W/o Jutha Satis kumar Babu singh Pi Jutha Koum .Purohit sa deh khatedar

39 590 0.66 Vijay singh Mohabbat singh Girdhari singh vagerah B.kh.n.475 khatedar

40 591

1.08 Jugraj singh Bhanusingh Rannsingh Pi .Mana koum Purohit sa deh kahteadar

41 592 0.63 Rupsingh vald Vagtaji koum Purohit sa deh khatedar Rahan MGB Harji mn.262

42 593 0.77 Basrah Sadar 43 594 0.77 Babusingh vald Prahlad koum Purohit sa khatedar 44 595 2.46 Basrah Sadar 45 596 1.62 Kesiya 1/4 Bhima 1/4 vagerah B.kh.n.576 sa deh khatedar

46

597

2.83

Pavan Putra Raymal 1/3 koum Harijan sa Tigrana Tah.Dist Bhivani (Hariyana ) Kuka Putra Punma 1/3 Hiriya Deviya Pi Laxmana 1/3 koum Garuda sa deh khatedar

47 598 2.52 Basrah Sadar 48 599 1.53 Shanti Ruparam Vagerah B.kh.n.299 khatedar 49 600 0.35 Shankarlal vald Genaram Vagerah B.kh.n.364 khatedar 50 601 1.88 Shanti Ruparam Vagerah B.kh.n.299 khatedar

51 602 0.96

Manoj Kumar vald Kasmira 1/3 koum Saini TodaPura Dist.Gudgaon (Hariyana ) Jodha Peka Chopa Pi .Kapura 1/3 Jivi w/o Ganesha Sesharam Ranchoudaram Pi Ganesha 1/3 Koum Jangid Brahmin sa deh khatedar mn.244

52 603 1.02 Basrah Sadar 53 604 1.66 Sariya vald Nava koum Nai sa deh khatedar

54 605

5.4 Moda vald Bhaga 1/2 jagiya vald Bhika 1/2 koum Kalbi sa deh khatedar mn.245

Page 252: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

219

55 606 2.36 Aasulal Shantilal Karanlal Pi Juhar mal koum .Purohit sa deh khatedar

56 607 4.12 Gajaram vagerah B.kh.n.257 khatedar 57 608 4.04 Nathu vald Nava koum Jangid Brahmin sa deh khatedar

58 609

0.43 Aasulal Shantilal Karanlal Pi Juhar mal koum .Purohit sa deh khatedar

59 610 2.54 Mangiya Virda Pi Bhaga koum Mali sa deh khatedar 60 611 3.87 Gea.mu Rasta 61 612 2.56 Sujaram Mishreemal Vagerah B.kh.n.270 khatedar 62 613 0.46 Chunni beva Neniya koum sa deh khatedar 63 614 0.98 Basrah Sadar 64 615 2.06 Mohanvald Khama 1/2 vagerah B.kh.n.568 Khatedar 65 616 1.75 Khasa Uka Pi Dunga koum Mena sa deh khatedar

66

617

1.98

Bhubaram vald Cholaya Hariya Vasna Joti d/o Cholaya Piraram vald Bhuri D/o Hema 2/3 Bhamra Bhaka Pi kaniya 1/3 koum Mena sa deh khatedar mn.307

67 618 2.04 Sujaram vagerah B.kh.n.270 khatedar 68 619 1.55 Bhubaram vagerah B.kh.n.617 khatedar 69 620 1.55 Bhubaram vagerah B.kh.n.617 khatedar 70 621 4.24 Manojkumar vagerah B.kh.n.602 khatedar 71 622 2.36 Manojkumar vagerah B.kh.n.602 khatedar 72 623 1.98 Manhilal vald deva koum Jangid Brahmin sa deh khatedar 73 624 1.25 Manoj kumar vagerah B.kh.n.602 khatedar 74 625 4.16 Khetaram vaherah B.kh.n.473 khatedar 75 626 1.21 Maga vald Padma vagerah B.kh.n. 286 khatedar 76 627 1.1 Shanti w/o Ruparam vagerah B.kh.n.299 khatedar

77 628 1

Prithvisingh vald Mada Urf Madusingh 1/2 Hira singh vald Mada urf Madu singh 1/2 1/3 koum Purohit sa deh khatedar rahan Prithvi singh ka hi MGB.Harji

78 629 0.96 Basrah Sadar

Page 253: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

220

79 630 2.09 Kistursingh vald tara koum Purohit sa deh khatedar rahan MGB bank Harji mn.261

80 631 1.45 Prithvisingh vagerah B.kh.n.628 khatedar 81 632 1.41 Khimsingh vald Tarsingh koum Purohit sa deh khatedar

82

633

0.6

Jiva vald gena 1/2 Mangla Pukhraj Pi .Sanvla 1/2 koum Purohit sa deh khatedar rahan Pukhraj vald sanvla ka hi SBBJ Bank .Branch Aahore

83 634 1.05 Mangla Pukhraj pi sanvlakoum purohit sa deh khatedar 84 635 0.85 Jiva vald Gena koum Purohit sa deh khatedar 85 636 1.37 Chuniya puriya Pi .Chimna koum .Mena sa deh khatedar 86 637 1.24 Chena vald chopa koum Bhil sa deh khatedar

87 638 2.05 Gaja vald Kesa koum mena sa Kuaada Tah.Aahore khatedar

88 639 2.6 gea .mu . Rasta 89 640 0.16 6 year ya adhik parti Jutai hetu

90

641

0.68

Mukhraj vald Dana Pira vald Sona 1/2 Ganesh singh Narpat singh Lal singh Pi Rajig 1/4 koum Pabu devi w/o sardara devi singh Santosh kumar Pi .Sardara 1/4 koum Purohit sa deh khatedar rahan Ganesh singh ka hi MGB Harji mn.300

91 642 0.52 Basrah Sadar 92 643 0.62 Basrah Sadar 93 644 1.08 Basrah Sadar

94

645

3.63

Prithvisingh vald Urf Madu singh 1/3 Hari singh vald Mada Urf Madu singh 1/3 Prithvi Harisingh Pi Mada Urf Madusingh 1/3 koum Purohit sa deh khatedar rahan Prithvi singh ka Hi MGB Harji

95 647 0.66 vijay singh Bhimsingh vagerah B.kh.n.472 khatedar 96 648 0.74 Barli bai w/o Manig Vagerah B.kh.n.468 khatedar

97 649

1.84 Pukhraj Kaniyaram Masiyaram Trikmaram Nenaram Pi.Vaga koum .Jangid Brahmin sa deh khatedar

98 650 2.45 Basrah Sadar

Page 254: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

221

99 651

0.79 Samratha vald Naviya Koum Kumhar sa deh khatedar mn.288

100 652 0.4 Joita vald Bharting koum Purohit .sa deh khatedar 101 653 0.48 Basrah Sadar 102 654 1.1 Joitaram vald Bharting koum Purohit sa deh khatedar 103 655 0.7 Basrah Sadar 104 656 0.52 Prithvisingh vagerah B.kh.n.645 khatedar 105 657 0.5 Basrah Sadar 106 658 1.29 Khimsingh vald Tarsingh koum Purohit sa deh khatedar 107 659 1.25 Vijay singh vagerah B.kh.n.475 khatedar 108 660 1.83 Hanja vagerah B.kh.n.324 khatedar 109 661 1.29 Vijay singh vagerah B.kh.n.475 khatedar 110 662 2.72 Sukhdev Mulsingh vagerah B.kh.n.476 khatedar 111 663 1.35 Vijay singh vagerah B.kh.n.472 khatedar 112 664 1.12 Badli bai w/o manig vagerah B.kh.n.468 khatedar 113 665 1.21 Basrah Sadar 114 666 0.58 Vijay singh Bhimsingh vagerah B.kh.n. 472 khatedar 115 667 0.58 Vijay singh Bhimsingh vagerah B.kh.n. 472 khatedar 116 668 0.58 Vijay singh Bhimsingh vagerah B.kh.n. 472 khatedar 117 669 1.4 Sukhdev Mulsingh vagerah B.kh.n.476 khatedar 118 670 2.1 Panki Joje Magaji Putri Mada koum Purohit 119 671 2.4 Sujaram Mishreemal Vagerah B.kh.n.270 khatedar 120 672 0.57 gea.mu .Rasta 121 673 1.6 gea,mu.Aagore 122 674 1.11 gea.mu .Rasta 123 675 1.69 ganeshmal vagerah B.kh.n.267 khatedar 124 676 1.75 ganeshmal vagerah B.kh.n.267 khatedar 125 677 1.29 Vijay singh Bhim singh vagerah B.kh.n.472 khatedar 126 678 1.98 Vijay singh Bhim singh vagerah B.kh.n.472 khatedar

127 679

1.09 Kisturaram vald Kenaram koum .ghanchi sa. Deh. Khatedar rahan M.G.B.Harji mn.,283.298

Page 255: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

222

128 680 1.96 Pukhraj vald Dana Pira vald Sona 1/2 vagerah B.kh.n.641 khatedar

129 681 0.48 Basrah Sadar 130 682 2.02 Poni devi vagerah B.kh.n. 121 khatedar 131 683 2.68 Ganesha Aamba vagerah B.kh.n.386 khatedar 132 684 1.36 Poni devi vagerah B.kh.n. 121 khatedar 133 685 1.2 Kisturaram vagerah B.kh.n.679 khatedar 134 686 2.92 Ganesha vagerah B.kh.n.386 khatedar 135 687 1.8 Poni devi vagerah B.kh.n. 121 khatedar 136 688 1.81 Kisturaram vagerah B.kh.n.125 khatedar 137 689 1.36 Kisturaram vagerah B.kh.n.125 khatedar 138 690 1.21 Saviya Kapura Pi .Prahlad Koum Ghanchi sa deh khatedar

139 691

2.12 lalsingh Khimsingh Pi.dola 1/2 kana Putra Pratapa 1/2 Purohit sa deh khatedar

140 692 1.32

Manoj kumar Putra Kashmira koum Saini 1/2 sa TodaPur Dist .Gudgaon (Hariyana ) Mansingh vald Ratan singh koum Rajput 1/2 sa Tisana Tah.Kisangarh Dist .Alwar khatedar

141 693 1.69 Bhamriya vald Virdan koum purohit sa deh khatedar

142 694 1.53 Pukhraj vald Dana Pira vald Sona 1/2 vagerah B.kh.n.641 khatedar

143 695 0.28 Vijaysingh Bhimsingh vagerah 472 khatedar 144 696 0.27 Vijay singh Bhimsingh vagerah B.kh.n.472 khatedar 145 697 0.44 Vijay singh Bhimsingh vagerah B.kh.n.472 khatedar 146 698 2.5 Manoj kumar vagerah B.kh.n.692 khatedar

147 699

1.56 Bhanwarsingh vald Bhag singh koum Purohit sa dah khatedar

148 700 1.01 Bhanvra Jesa vagerah B.kh.n. 62 khatedar 149 701 0.8 Basrah Sadar 150 702 2.24 Basrah Sadar 151 703 2.4 Ota Goud Prabhu koum.Purohit sa .deh khatedar

Page 256: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

223

152 704 0.86 Basrah Sadar 153 705 2.34 Basrah Sadar 154 706 1.05 Badli bai w/o manig vagerah B.kh.n.468 khatedar 155 707 1.28 Vijaysingh Bhimsingh vagerah 472 khatedar 156 708 0.95 Basrah Sadar 157 709 0.35 Prithvi singh vald Mada vagerah B.kh.n.645 khatedar 158 710 1.22 badli bai vagerah B.kh.n. 468 khatedar

159 711

3.01 Sankalchand vagerah Chatra Koum Chipa sa Charli Khatedar

160 712 2.15 Motiya vald Bhaniya Umiya vald Sanvariya Hanja w/o Babriya koum Sargara sa deh khatedar

161 713 1.63 Juharsingh vald Nathusingh Purohit sa deh khatedar 162 714 1.96 Samratha vald Naviya Koum Kumhar sa deh khatedar

163

715

2.87

Sujaram Mishreemal kanaram Pi.Bhura Sayti Movan Lila d/o Bhura Hanja devi w/o Bhura Ramesh kumar Vald Kapuraram Mamta Sheela d/o Kapuraram Sesha mona Pi .Khama .1/2 Ubhi devi w/o Kpuraram koum .Ghanchi sa deh khatedar

164 716 4.6 Hanja w/o Prabhu Pragaram vald Prabhu koum .Jangid Brahmin sa deh khatedar mn.255

165 717 1.48 Bhavani singh vald Mada koum Purohit sa deh khatedar

166 718 3.1

Gelu w/o Bhabuta Gamana Jeta Pi.Bhabuta Fuli w/o Pemaram Balvanth Ramesh Pi.Pemaram koum sa deh khatedar

167

719

2.9

Vaga vald Hema Chunnilal vald Jepa 2/3 Tija Saruapa Bhera Pi.Vagta 1/3 Vagta koum Kalbi sa deh khatedar mn. 253. 254

168 720 0.96

Sukhdev Mulchand Lalchand Pi Ravta Vijay singh Mohabbat singh Girdhari singh Pi.Bai 2/3 Gamiya Arjunsingh Pi.Chopa 1/3 koum Purohit sa deh khatedar

169 721 1.38 Nathiya saviya vagerah B.kh.n.11 khatedar. 170 722 1.2 Nathiya saviya vagerah B.kh.n.11 khatedar.

Page 257: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

224

171 724 0.92 gea.mu.Nada 172 725 0.62 Virendra vald rajendar vageradh B.kh.n.412 khatedar

173 726 0.97 Pavan Putra Raymal koum Harijan sa Tigrana Tah.Dist Bhivani (Hariyana ) sa deh khatedar mn.232.256

174 727 1.13 Basrah Sadar 175 728 0.68 6year ya adhik parti Jutai hetu 176 729 1.92 Chagnaram vagerah B.kh.n. 98.khatedar 177 730 0.88 Chagnaram vagerah B.kh.n. 98.khatedar 178 731 0.41 Vijay singh vagerah B.kh.n.475 khatedar 179 732 0.52 Vijay singh vagerah B.kh.n.475 khatedar 180 733 0.6 Vijay singh vagerah B.kh.n.Mohabbat singh 475 khatedar 181 734 0.6 Basrah Sadar 182 735 3.07 Chagnaram vagerah B.kh.n. 98.khatedar 183 736 1.06 Basrah Sadar

184

737

2.73

Sundar beva Jesing Prameshwar Kumar Putra Jesingh Nabalig ke Vali Mata Sundar Beva Jesingh Hansiya Vald Tara koum Purohit sa deh khatedar

185 738 0.85

Laxman kumar Guneshmal Suthila Bai w/o Guneshmal 1/2 Bhanvar lal vald Naga 1/2 Koum .Rawal sa deh khatedar

186 739 0.9 Babu Urf Mohan vald Khama Rawal sa deh khatedar 187 740 0.74 Basrah Sadar 188 741 0.86 Laxman kumar vagerah B.kh.n. 738 khatedar 189 742 1.12 sukhdev Mulsingh vagerah B.kh.n.476 khatedar

190 754 0.28

Virendra singh vald Rajendra Koum .Rajput 1/2 sa deh Jodi Tah.dist .Churu Ghevar Pukhiya Pi .Himta 1/2 koum Rawal sa deh khatedar mn.225.242

191 755 0.44 Basrah Sadar 192 756 0.89 Surajmal vald jesa vagerah B.kh.n.487 khatedar 193 768 2.4 Gram panchayat Chavrcha .khatedar

194 769

1.41 Manoj kumar Putra Kashmira koum Saini 1/2 vagerah B.kh.n.692 khatedar.

Page 258: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

225

195 777 1.74 Gram panchayat Chavrcha .khatedar 196 778 0.6 Gram panchayat Chavrcha .khatedar 197 779 1.28 Gram panchayat Chavrcha .khatedar 198 780 0.43 Gram panchayat Chavrcha .khatedar

199 781

1.84 Khangara Darja Amra kla mula Sariya pi .Chimna koum.Mena sa deh khatedar

200 782 0.78

Laxman vald moti Babulal Timaram Pi .Dana Dhanki Putri dana vald 1/3 Piraram vald Chela Bhavra Maka Pi 1/3 Galba Shankarlal Dudiya Piraram Pomaram Chunaram Pi .dhana 1/3 koum Mena sa deh khatedar

201 783 1.44 Basrah Sadar

202 784 1.4 Khangara Darja Vagerah B.kh.n. 781 koum sa deh khatedar

203 785 1.4 lichman vald Moti vagerah B.kh.n.782 khatedar 204 786 1.4 lichman vald Moti vagerah B.kh.n.782 khatedar 205 787 2.09 Gram panchayat Chavrcha .khatedar 206 788 2.8 Gram panchayat Chavrcha .khatedar 207 789 1.3 gea mu .rasta 208 790 0.93 Naju beva Chunnilal vagerah B.kh.n.581 khatedar 209 791 0.74 vaghsingh vald Jairupsingh koum purohit sa deh khatedar 210 792 0.75 Naju beva Chunilal vagerah B.kh.n.581 khatedar 211 793 1.76 Ramsingh B.kh.n.564 khatedar 212 794 0.71 Gram panchayat Chavrcha .khatedar 213 795 0.52 Jalmagan (nada)(Charagah hetu) 214 796 1 Gram panchayat Chavrcha .khatedar 215 797 0.52 Kanka Radha Mira d/o Virda koum .Mena sa deh khatedar 216 798 0.86 Pukhraj vald dana vagerah B.kh.n.641 khatedar 217 799 0.86 Basrah Sadar 218 800 0.41 Mangiya vald Javana vagerah B.kh.n.526 khatedar 219 801 0.6 Ramsingh vald Vagtaji koum Purohit sa deh khatedar 220 802 0.62 Naju beva Chunnilal vagerah B.kh.n.581 khatedar

Page 259: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

226

221 803 0.78 Pukhraj vald dana vagerah B.kh.n.641 khatedar 222 804 0.34 Badli bai w/o manig vagerah B.kh.n.468 khatedar 223 805 0.6 Chunni beva Neniya koum Rawal sa deh khatedar

224 806 1.3 Shayamsingh Putra mada 1/3 badrah Khasra n.582 khatedar

225 807 0.64 Naju vagerah B.kh.n.581 khatedar 226 808 0.62 Vijay singh vagerah B.kh.n.475 khatedar 227 809 1.06 Chunni beva Neniya koum Rawal sa deh khatedar 228 810 2.06 Geluw/o Bhabuta vagerah koum rawal sa deh khatedar 229 811 2.26 Virendrasingh Vagerah B.kh.n.718 khatedar 230 812 1.46 Mohan vald Khasa 1/2 vagerah B.kh.n.568 khatedar 231 813 1.42 Champalal vagerah B.kh.n.342 khatedar 232 814 0.83 Virendra B.kh.n.754 khatedar

233

815

1.18

Prithvisingh vald Urf Madu singh 1/6 Hari singh vald Mada Urf Madu singh 1/6 Joita vald Bharting 1/2 koum Purohit sa deh khatedar rahan Prithvi singh ka Hi MGB Harji

234 816 1.35 Basrah Sadar

235 817

2.45 Narhiya saviya Pi .1/2 Pema vald Jodha 1/2 koum purohit sa deh khatedar

236 818 0.93 Basrah Sadar 237 819 1.06 Basrah Sadar 238 820 1.52 Suresh singh vagerah B.kh.n. 01 khatedar 239 821 0.97 Pukhraj vagerah B.kh.n.641 khatedar 240 822 1.21 Pukhraj vald dana vagerah B.kh.n.641 khatedar 241 823 1.05 Basrah Sadar 242 824 1.04 Basrah Sadar 243 825 1.21 Mohan vald Khasa vagerah B.kh.n.568 kharedar 244 826 1.2 Virendra vald B.kh.n.754 khatedar 245 827 0.74 Mohan vald Khasa vagerah B.kh.n.568 kharedar 246 828 1.26 Mohan vald Khasa vagerah B.kh.n.568 kharedar 247 829 0.75 Champalal B.kh.n.342 khatedar

Page 260: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

227

248 830 0.56 Ramsingh vald Vagtaji koum Purohit sa deh khatedar 249 831 0.62 Basrah Sadar 250 832 3.1 Baghsingh vald Jairupsingh koum Purohit sa deh khatedar 251 833 3.8 Mangilal vald Samela 1/2 vagerah B.kh.n.558 khatedar

252 834 2.42 Bhikha Khaju Gafur Bhura Pi .Tana koum .Pijara sa deh khatedar

253 835

0.82 Sanvala Sakaram Bhubaram Jutharam Pi Laxmanaji koum .Kumhar sa deh khatedar

254 836 0.71 Bijraj vald Ajeting kooum Purohit sa deh khatedar 255 837 0.41 Basrah Sadar 256 838 1.41 Basrah Sadar

257 839

1.25 Devi singh Karansingh Joravarsingh Pihir singh koumPurohit sa deh khatedar

258 840 0.74 Moki d/o Bhoma w/o Udiya koum Mena sa Kuaada khatedar

259 841 0.05 Gea.mu Rasta 260 842 2.02 Sujaram Mishreemal Vagerah B.kh.n.270 khatedar 261 843 1.06 Shanti w/o Rupa ram vagerah B.kh.n. 299 khatedar 262 844 1.28 Sanvala sakaram vagerah B.kh.n. 835 khatedar 263 845 0.64 Mangla Pukhraj pi sanvlakoum purohit sa deh khatedar 264 846 0.56 Jiva vald Gena koum Purohit sa deh khatedar 265 847 1.62 Pki Joje Magaji koum .sa Thanvla khatedar 266 848 1.88 Ota Goud Prabhu koum.Purohit sa .deh khatedar 267 849 0.82 Mangiya vald Javana vagerah B.kh.n.526 khatedar 268 850 1.45 Mangiya vald Javana vagerah B.kh.n.526 khatedar 269 851 0.67 Basrah Sadar 270 852 1.1 Badli bai w/o manig vagerah B.kh.n.468 khatedar 271 853 0.56 Khimsingh vald Tarsingh koum Purohit sa deh khatedar 272 854 0.45 Prithvisingh vald Mada vagerah B.kh.n.645 khatedar 273 855 0.25 vijay singh Bhimsingh vagerah B.kh.n.472 khatedar 274 856 0.48 Ganesharam vagerah B.kh.n.194 khatedar

Page 261: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

228

275 857 0.48 Ganesharam vagerah B.kh.n.194 khatedar 276 858 1.07 Ramsingh vald Vagtaji koum Purohit sa deh khatedar

277 859

1.21 saku devi w/o Jutha satis kumar vagerah B.kh.n. 484 khatedar

278 860 0.77 Vijay singh Narayansingh Chunnilal koum Purohit sa deh kahtedar

279 861 0.66 Surajmal vald jesa vagerah B.kh.n.487 khatedar

280

863

1.49

Khasa uka Pi dunga 1/2 Samti vald Aasiya Mu.Galbi Beva Moda Bhamraram Vald Moda 1/2 koum Mena sa deh khatedar

281 864 1.23 khasa Uka vagerah B.kh.n.863 khatedar

282 865

0.94 Sanvala ram Sakaram Bhubaram Jutharam Pi Laxmanaji koum sa deh khatedar

283 866 1.2 Vijaysingh vagerah B.kh.n.475 khatedar 284 867 1.2 Vijaysingh vagerah B.kh.n.475 khatedar 285 868 1.17 Sukhdev Mulsingh vagerah B.kh.n.476 khatedar 286 869 1.39 Ramsingh vagerah B.kh.n.858 kahtedar 287 870 0.48 Surajmal vald jesa vagerah B.kh.n.487 khatedar 288 871 1.46 Bhavani singh vald Mada koum Purohit sa deh khatedar 289 872 0.86 Jomta Amra Vagerah B.kh.n.254 khatedar 290 873 1.18 Basrah Sadar 291 874 0.95 Basrah Sadar 292 875 0.98 Basrah Sadar 293 876 1.82 vaghsingh vald vagtaji Koum Purohit sa deh khatedar 294 877 1.87 Juharsingh vald Nathusingh Purohit sa deh khatedar

295 878 1.6

Jugraj singh Bhanusingh Rannsingh Pi Mana 1/2 Vijay singh Narayansingh Pi. Chunnilal 1/2 koum sadeh khatedar

296 879

2.81 Bhikha Khaju Gafur Bhura Pi .Tana koum .Pijara sa deh khatedar

297 880 1.42 jugrasingh Bhanusingh vagerah B.kh.n.878 khateadar 298 881 0.4 Ganesha Aamba vagerah B.kh.n.386 khatedar

Page 262: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

229

299 882 0.81 gea.mu .Rasta 300 883 0.31 Virma Bhabuta Vagerah B.kh.n.668 / 1078 khatedar 301 884 2.46 Chuniya puriya Pi .Chimna koum .Mena sa deh khatedar

302 885

1.92 bagha vald hema Chunnilal vald Jepa 2/3 Ravta vagerah B.kh.n.719 khatedar

303 888 1.6 Lal singh vald dola 1/2 vagerah koum Purohit B.kh.n.886 khatedar

304 889

3.64 Bhabutmal vald Chamna koum Mali .sa Aadvada Tah.Jalore khatedar

305 890 5.05 Kheta vald Choga koum Mali sa deh khatedar

306 891

5.84 Soni Bai w/o Savaram Jogaram devaram Pi.savaram Narsaram vald Bhabuta Kooumo Ghanchi sa deh khatedar

307 892 2.5 Sakaram Kapuram Pi Prahladji koum Ghanchi sa deh kahtedar

308

893

3.96

Badli bai w/o Manig Bhursingh pi. Sanval singh Pi.Manig Achlig vald Javana 1/2 Pema Jodha .1/2 Hira vald Bhola 1/3 koum Purohit sa deh khatedar

309 894 1.56 Basrah Sadar 310 895 1.06 Basrah Sadar 311 897 3.23 Surajmal vald jesa koum Purohit khatedar 312 898 0.84 Juhar vald Nathu singh koum Purohit sa deh khatedar 313 899 0.84 Surajmal vagerah B.kh.n.487 khatedar

314 900 0.88 Rupsingh vald Vagtaji koum Purohit sa deh khatedar Rahan MGB Harji mn.262

315 901 2.36 Bhamriya vald Virdan koum purohit sa deh khatedar 316 902 1.9 Lalsingh Khimsingh B.kh.n.436 khatedar 317 903 1 Hindu vald Hansa Koum Jangid Brahmin sa deh khatedar 318 904 1.08 Manoj Putra Kashmira vagerah B.kh.n. 692 khatedar

319 905

2.42 Lal singh vald dola 1/2 vagerah koum Purohit B.kh.n.886 khatedar

320 906 1.59 lal singh vald Khimsingh vagerah B.kh.n.436 khatedar

Page 263: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

230

321 907

1.6 Bhavarsingh vald Bhagsingh koum sa dah khatedar mn.282

322 908 1.01 Manoj Putra Kashmira vagerah B.kh.n. 692 khatedar 323 909 0.84 Lalsingh Khimsingh Pi.dola vagerah B.kh.n.436 khatedar 324 910 1.2 Lal singh vald Dola vagerah B.kh.n.886 khatedar 325 911 1.9 Mangiya vald Javana vagerah B.kh.n.526 khatedar 326 912 1.3 Bhanvra Jasa vagerah B.kh.n. 62 Khatedar 327 913 0.52 Lalsingh vagerah B.kh.n. 886 kkhatedar 328 914 1.5 Hadman vald Babra koum Ghanchi sa deh khatedar 329 935 3.96 Basrah Sadar

330 936 0.84 Vijay singh Narayansingh Chunnilal koum Purohit sa deh kahtedar

331 937 1.2 Ramsingh B.kh.n.858 khatedar 332 938 4.41 Prataparam vagerah B.kh.n.478 khatedar 333 939 1.05 Hindu vald Hansa Koum Jangid Brahmin sa deh khatedar 334 940 1.67 Nathiya saviya vagerah B.kh.n.11 khatedar. 335 941 0.22 gea mu .Nala 336 942 1.33 Hindu vald Hansa Koum Jangid Brahmin sa deh khatedar

337 943

1.91 Shayamsingh Putra mada 1/3 badrah Khasra n.582 khatedar

338 944 1.51 Basrah Sadar 339 945 2.32 Sanjay kumar vagerah B.kh.n.540 khatedar 340 946 0.78 Basrah Sadar 341 947 1 Naju beva Chunnilal vagerah B.kh.n.581 khatedar 342 948 1.31 Shayam Putra Mada vagerah B.kh.n. 582 khatedar

343 949

1.62 Pramsingh vald Jasraj koum Purohit sa deh khatedar mn.277

344 950 0.84 Shayam singh Putra mada Vagerah B.kh.n.582 khatedar 345 951 0.88 Shayamsingh Putra mada badrah Khasra n.582 khatedar 346 952 0.87 Shayamsingh Putra mada badrah Khasra n.582 khatedar 347 953 1.2 Trijo w/o Javara koum Purohit sa deh khatedar mn.268

Page 264: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

231

348 954 0.45 bagh singh vald Jairup singh vald koum sa deh khatedar 349 955 4.42 Basrah Sadar 350 964 0.71 Basrah Sadar

tekcUnh ¼jktuokMh½ Ø- l- [kljk u- dkLrdkj dk uke {ks=Qy

1 1 Posaram vald Devaram koum Bhil sa Bagra Tah .Jalore Khatedar

6.38

2 2 Posaram vald Devaram koum Bhil sa Bagra Tah .Jalore Khatedar

6.2

3 3

Jethu singh Obsingh Lakhasingh Pi. Bhawani singh sa deh khatedar koum Rajput sa deh khatedar Rahan Jethu v Ob singh ka hissa MGB Jalore na .sn.180

9.83

4 4

Lilu devi w/o Nemaram 1/2 koum Rebari Shaitansingh 1/2 koum Rajput sa deh khatedar na,sn,161 .161

3.25

5 5

Lilu devi w/o Nemaram 1/2 koum Rebari Shaitansingh 1/2 koum Rajput sa deh khatedar na,sn,161 .162

2.68

6 6

Ishwar singh Gaje singh Shaitan singh Pi Hari singh Laila kunwar w/o Hari singh Parbat singh Dungar singh Chhial singh Pi . Bhika singh Pratap singh Vikaram Prem singh Pi . Balwant singh

2.28

Page 265: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

232

7 7

Laksingh Okhsingh Dhank kunvar beva Narpat singh Purna singh Surendra singh Pi.Narpatsingh Na,ba,ki Vali mata Mu dhankkunvar beva Narpat singh vanesingh vald Khimsingh koum Rajput sa deh khatedar Rahan Vanesingh ka hissa MGB jalore

1.1

8 8 Bhanvar singh Achailsingh Pahaad singh Pi.Mohbbat singh koum Rajput sa deh khatedar

1.29

9 9

Jethu singh Obsingh Lakhasingh Pi. Bhawani singh sa deh khatedar koum Rajput sa deh khatedar Rahan Jethu v Ob singh ka hissa MGB Jalore na .sn.180

1.47

10 10

Bhanvar kunvar beva Jalamsingh GanPat singh Narayansingh Ummed singh Lalsingh Vanesingh Pi.Durjansigh Anaik kunvar Bhatu kunvar Putriyan Durjan singh Devi singh Gulab singh Ishawar singh pi.Khushal singh 6/7 Sugan kunvar w/o Khushal singh 1/7 =1/3 koum Rajput sa deh khatedar na sn.202

2.1

11 11 Gulab singh Putra Khushal singh koumRajput sa deh khatedar na.sn.196

0.85

12 12

Jogsingh Hanvanvantsingh Pi.Baghsingh Mangal singh Ratansingh Bhagvat singh pi. Tog singh Bank singh vald Bhop singh koum Rajput sa deh khatedar

0.9

13 13 Pefa singh vald Jiv singh koum Rajput sa deh khatedar rahan MGB Jalore

0.86

14 200

Sukh singh Khangar singh pi .Chunnilal Sukhi devi w/o Chunnilal koum Purohit sa deh khatedar sa UNN khatedar

2.29

15 201

Bhanvarsingh Uttamsingh Shaitansingh Vikramsingh Pi.Jorsingh Rassal kunvar w/o Jorsingh koum Rajput sa deh khatedar MGB.Branch Jalore

1.13

Page 266: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

233

16 202

Kuiyaram vald Mangaram mu.nenu Beva Mangaram lakharam Aadiya Hameera Chodaram Jamtaram Pi.Samratha koum Rebari sa deh khatedar

0.98

17 203 Pagdandiya or Raste (charagah ke liye nahi) 0.28

18 204

jay singh Punam singh Lal singh Jogsingh Pi. Dhupa Dhapu devi w/o Dhupa Ganesha vald Pratapa koum Purohit sa UNN. Khatedar

1.72

19 205 Chogsingh keshar singh Mansingh pi.Chamna koum Purohit sa UNN khatedar

1.48

20 206

Baank singh vald Bhopsingh koum Rajput sa deh khatedar Rahin----- jalore Sahkari Bhumi . Vi.BANK . Branch /. Jalore Murthin

4.23

21 207

Baank singh vald Bhopsingh koum Rajput sa deh khatedar Rahin----- jalore Sahkari Bhumi . Vi.BANK . Branch /. Jalore Murthin

1.53

22 208

Mangilal Sesaram Harish Ramesh Chagan Pi depa Bhadi Patni Dipa koum Meghvanshi sa pandgara Khatedar Na.sn.184

2.28

23 209

Bhanvarsingh Uttamsingh Shaitansingh Vikramsingh Pi.Jorsingh Rassal kunvar w/o Jorsingh koum Rajput sa deh khatedar MGB.Branch Jalore

1.22

24 210

Jogsingh Hanvanvantsingh Pi.Baghsingh Mangal singh Ratansingh Bhagvat singh pi. Tog singh Bank singh vald Bhop singh koum Rajput sa deh khatedar

1.14

25 211 Ganpat vald Durjan singh koum Rajput sa deh khatedar Rahan MGB Jalore

3.9

26 212 Bhanvar kunvar Beva Jalam singhkoum sa deh khatedar

1.7

27 213 Shaitansingh Vald Jorsingh Koum sa deh khatedar 0.92

Page 267: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

234

28 214

Laksingh Okhsingh Dhank kunvar beva Narpat singh Purna singh Surendra singh Pi.Narpatsingh Na,ba,ki Vali mata Mu dhankkunvar beva Narpat singh vanesingh vald Khimsingh koum Rajput sa deh khatedar

1.15

29 215 Punmaram vald Hakmaram koum Rebari sa deh khatedar na.sn.208

0.76

30 216 Lali divi w/o Jogi koum Dhanak sa Se Tah.V Dist .Bhivani (Hariyana ) khatedar

1.83

31 217 Mangalsingh vald Tog singh koum Rajput sa deh khatedar

0.82

32 218 Mangalsingh vald Tog singh koum Rajput sa deh khatedar

2.75

33 219 Bhanvar singh Achailsingh Pahaad singh Pi.Mohbbat singh koum Rajput sa deh khatedar

1.23

34 220

Lilu devi w/o Nemaram 1/2 koum Rebari Meena kunvar w/o Shaitansingh 1/2 koum Rajput sa deh khatedar na,sn,161

1.2

35 221

Lilu devi w/o Nemaram 1/2 koum Rebari Meena kunvar w/o Shaitansingh 1/2 koum Rajput sa deh khatedar na,sn,162

1.21

36 222 Pagdandiya or Raste (charagah ke liye nahi) 0.07

37 223

Lasi devi w/o Laliya Aadaram jamtaram Pi.Laliya 1/4 Khangararam Putra Jivaji 1/4 Madaram Putra Jivaji 1/4 Hameeraram Putra Jivaji 1/4 koum Rebari sa deh khatedar Na .sn.197

0.56

38 224

Bhanvar signh Achalsignh Pahaad singh Pi.Mohbbat singh Sukkunvar beva Mohbbat singh Jethu singh Obsingh Lakhsingh Pi. Bhavani singh 1/5 Mu Bhanvar kunvar Beva Jalamsingh Ganpat sing

2.74

39 225 Nadiya or Nale (Charahgah hetu) 0.03

40 226 Nadiya or Nale (Charahgah hetu) 0.74 41 227 Jhad Jankhad vale van (charahgah hetu ) 12.7

Page 268: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

235

42 228 Pagdandiya or Raste (charagah ke liye nahi) 1.01 43 229 Nadiya or Nale (Charahgah hetu) 1.03

44 230

Nathu vald Jamta Vajeer Movniya Bhamriya Pi.Chopa Alpesh vald rekha Shobha Lata Putriyan Darging koum Purohit sa UNN .Khatedar na.sn.179

3.1

45 231

Nathu vald Jamta Vajeer Movniya Bhamriya Pi.Chopa Alpesh vald rekha Shobha Lata Putriyan Darging koum Purohit sa UNN .Khatedar na.sn.180

1.32

46 232

Nathu vald Jamta Vajeer Movniya Bhamriya Pi.Chopa Alpesh vald rekha Shobha Lata Putriyan Darging koum Purohit sa UNN .Khatedar na.sn.181

1.49

47 233

Vijayaraj Mohanlal Bhanvarlal Pi.Chopa Sugana devi w/o Chopa Alpesh vald Darjing Bhanvari devi w/o Darjing Bhanvari devi w/o Rekha Shobha Lata d/o Darjing koum sa UNN khatedar Na sn .179

0.46

48 234

joghsingh Hanvantsingh pi. 11/31 Bank singh vald Bhopsingh Mangal singh Ratansingh Bhagvat singh pi. Tog singh Bhanvarkunvar beva jalamsingh Ganpat singh Narayansingh Ummed singh Lalsingh Vane singh pi.

4.46

49 235

Prakash vald Vijayrajji 1/2 Alpesh vald Darjing ji Bhanvri w/o Darjing Rekha Shobha Lata d/o Darjing ji 1/2 koum Purohit sa UNN Khatedar na.sn.179

2.24

50 236

Bijraj Bhanvarlal pi.Chopa Alpesh vald Darjing Rekha Shobha Lata d/o Darjing koum Purohit sa UNN B .hi.B . Khatedar na .sn . 179

1.94

51 237 Mangilal vald Kapura Jogsingh vald Bhopsingh koum Purohit sa UNN khatedar

1.28

52 238

Babulal vald Mohanlal Ahok kumar pi .Ravata soni Beva Ravta Jesa vald Vagta koum Nai sa UNN .khatedar

0.99

Page 269: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

236

53 239 Pagdandiya or Raste (charagah ke liye nahi) 0.45 54 240

55 241 Inda Raja vaga Pi .Bhabuta koum Kalbi sa Pandgara Khatedar na .sn.220.224.

2.72

56 242

Baank singh vald Bhopsingh Mangal singh Ratansingh Bhagvat singh pi.Tog singh koum Rajput sa deh khatedar

8.14

57 243

Baank singh vald Bhop singh Mangal singh Ratansingh Bhagvat singh pi.Tog singh Hanvant singh pi.vagh singh 1/4 Bhanvarsingh Achalsingh Pahadsingh Pi. Mohabbat singh mu.Suk kunvar beva Mohabbat singh

1.35

58 244

Jethu singh Obsingh Lakhasingh Pi. Bhawani singh sa deh khatedar koum Rajput sa deh khatedar Rahan Jethu v Ob singh ka hissa MGB Jalore na .sn.180

1.06

59 245 Bhanvar singh Achailsingh Pahaad singh Pi.Mohbbat singh koum Rajput sa deh khatedar

1.26

60 246

Laksingh Okhsingh Dhank kunvar beva Narpat singh Purna singh Surendra singh Pi.Narpatsingh Na,ba,ki Vali mata Mu dhankkunvar beva Narpat singh vanesingh vald Khimsingh koum Rajput sa deh khatedar Rahan Vanesingh ka hissa MGB jalore

0.73

61 247

Bhanvar singh Uttam singh Shaitan singh Vikramsingh Pi Jorsingh Rassal kunvar w/o Jorsingh Bhanvar singh Shaitan singh Uttam singh Vikram singh Pi.Jotsingh Ritu kunvar d/o Jorsingh Rassal kunvar w/o Jorsingh Meghsingh Nopsingh Pi.Karna singh Meghsingh Nopsingh Pi.karna singh koum Rajput sa deh khatedar na.sn.170

0.83

62 248 Pefa singh vald Jiv singh koum Rajput sa deh khatedar rahan MGB Jalore

0.85

Page 270: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

237

63 249

Sagar konwar beva Balwant singh Pratap singh Vikaram Prem singh Na.va.ke vali Mata Sagar kunwar beva Balwant koum Rajput sa deh khatedar

1.6

64 250

Jogsingh Hanvanvantsingh Pi.Baghsingh Mangal singh Ratansingh Bhagvat singh pi. Tog singh Bank singh vald Bhop singh koum Rajput sa deh khatedar

0.01

65 251

Jogsingh Hanvanvantsingh Pi.Baghsingh Mangal singh Ratansingh Bhagvat singh pi. Tog singh Bank singh vald Bhop singh koum Rajput sa deh khatedar

3.05

66 252

Mangalsingh vald Togsingh Ajitsingh vald Bhopsingh Jogsingh vald Baghsingh koum Rajput sa deh khatedar

3.1

67 253

Jethu singh Obsingh Lakhasingh Pi. Bhawani singh sa deh khatedar koum Rajput sa deh khatedar Rahan Jethu v Ob singh ka hissa MGB Jalore na .sn.180

1.82

68 254 Bhanvar singh Achailsingh Pahaad singh Pi.Mohbbat singh koum Rajput sa deh khatedar

2.15

69 255

Sagar konwar beva Balwant singh Pratap singh Vikaram Prem singh Na.va.ke vali Mata Sagar kunwar beva Balwant koum Rajput sa deh khatedar

3.68

70 256

Bhanvar singh Uttam singh Shaitan singh Vikramsingh Pi Jorsingh Rassal kunvar w/o Jorsingh Bhanvar singh Shaitan singh Uttam singh Vikram singh Pi.Jotsingh Ritu kunvar d/o Jorsingh Rassal kunvar w/o Jorsingh Meghsingh Nopsingh Pi.Karna singh Meghsingh Nopsingh Pi.karna singh koum Rajput sa deh khatedar na.sn.170

1.35

71 257 Pefa singh vald Jiv singh koum Rajput sa deh khatedar rahan MGB Jalore

2.31

72 258 Duda vald Sarta Kana Tariya Karna pi Dhupa koum Purohit sa UNN khatedar

1.82

Page 271: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

238

73 259 Duda vald Sarta Kana Tariya Karna pi Dhupa koum Purohit sa UNN khatedar

1.63

74 260 Chogsingh keshar singh Mansingh pi.Chamna koum Purohit sa UNN khatedar

1.33

75 261

Sonsingh Juhar singh Pukhraj singh Harchand pi Jairup singh koum Purohit sa UNN khatedar Na .sn. 217

0.89

76 262

Jabar singh Mahendra singh Jagdish singh Pi Vaghsingh Bhamri devi lila devi Gita devi Makilya devi d/o Vaghsingh Khangar singh Pol singh Pi . Punmaji koum Purohit sa UNN khatedar

0.94

77 263

Laksingh Okhsingh Dhank kunvar beva Narpat singh Purna singh Surendra singh Pi.Narpatsingh Na,ba,ki Vali mata Mu dhankkunvar beva Narpat singh vanesingh vald Khimsingh koum Rajput sa deh khatedar

3.56

78 264

Laksingh Okhsingh Dhank kunvar beva Narpat singh Purna singh Surendra singh Pi.Narpatsingh Na,ba,ki Vali mata Mu dhankkunvar beva Narpat singh vanesingh vald Khimsingh koum Rajput sa deh khatedar Rahan Vanesingh ka hissa MGB jalore

3.43

79 265

Jabar singh Mahendra singh Jagdish singh Pi Vaghsingh Bhamri devi lila devi Gita devi Makilya devi d/o Vaghsingh Khangar singh Pol singh Pi . Punmaji koum Purohit sa UNN khatedar

2.06

80 266 Varada Chhoga Pi .Galki beva Bhaga koum Meghvanshi sa deh khatedar

0.59

81 267

Pakiya vald Jagiya Sesiya pi.Kapura 1/3 Bagdaram vald Kesaram Vusa devi Tali devi do d/o kesaram 2/3 kom sargara sa Pandgara khatedar na.sn.169

0.45

82 268 Pagdandiya or Raste (charagah ke liye nahi) 0.55

Page 272: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

239

83 269 Sakaram vald Amariya koum Meghvanshi sa deh khatedar na .sn..221

1.75

84 270 -272 ,274

Bhanvar kunvar Jalamsingh Ganpat singh Narayan singh Ummed singh Lal singh Vanesingh Pi Durjan singh Anek kunvar Bhatu kunvar Putriyan Durjan singh

18.88

85 273 Jhad Jankhad vale van (charahgah hetu ) 1.65

86 275

Baank singh vald Bhopsingh Mangal singh Ratansingh Bhagvat singh pi.Tog singh koum Rajput sa deh khatedar

1.56

87 276

Devisingh Gulabsingh Ishawar singh Pi .Khushal singh 6/7 Sugan kunvar w/o Khushal singh 1/7=1/2 Hanvant singh Vald Vaghsingh 1/2 koum Rajput sa deh khatedar Rahin Hanvant singh vald Vaghsingh ka 1/2 Hi.M.G.B.Jalore Murthin

5.86

88 277

Dinesh vald Gumansingh Javaram Pi.Hukama 1/2 Mansaji Maganlal Devaraj Aasulal pi.Vala Jamna Putri Vala 1/2 koum Purohit sa UNN .khatedar na .sn.173

2.91

89 278 Jog singh Hanvant singh Pi bagh singh koum Rajput sa deh khatedar

90 279

Sagar konwar beva Balwant singh Pratap singh Vikaram Prem singh Na.va.ke vali Mata Sagar kunwar beva Balwant koum Rajput sa deh khatedar

1.25

91 280 Mangilal vald Varda koum Purohit sa UNN khatedar

0.67

92 281

Pakiya vald Jagiya Sesiya pi.Kapura 1/3 Bagdaram vald Kesaram Vusa devi Tali devi do d/o kesaram 2/3 kom sargara sa Pandgara khatedar na.sn.169

2.03

93 282

Devisingh Gulabsingh Ishawar singh Pi .Khushal singh 6/7 Sugan kunvar w/o Khushal singh 1/7 koum sa deh khatedar

0.65

94 283 Devaram vald Gomaji koum Kalbi sa Pand gara khatedar

1.13

Page 273: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

240

95 284 Varada Chhoga Pi .Galki beva Bhaga koum Meghvanshi sa deh khatedar

1.04

96 285 Tikmaram Galbaram Pi. Koum meghvanshi sa Pandagara khatedar

2.53

97 286

Pakiya vald Jagiya Sesiya pi.Kapura 1/3 Bagdaram vald Kesaram Vusa devi Tali devi do d/o kesaram 2/3 kom sargara sa Pandgara khatedar na.sn.169

0.35

98 287 Rupsingh Harchandra Lal singh Pi.Chhoga koum Purohit sa UNN khatedar

3.99

99 288 Rupsingh Harchandra Lal singh Pi.Chhoga koum Purohit sa UNN khatedar

2.53

100 289 Soniya vald pira koum Kalbi Sa Pandgara khatedar na.sn.220.224

3.14

101 290 Ranaram goud Putra Noparam koum Sargara sa Pandgara Khatedar Na.sn.175

1.02

102 291

Modiya vald Mana Nathiya Dhariya Sakiya Gopiya Pi.Karna Hanja beva Karna koum Sargara sa Bhagli Mahendra putra Ugamram koum Vadi sa Bucheti Cah .Bhopalgarh Dist .Jodhpur khatedar na .sn.227

2.98

103 292

Dineshsingh vald Gumansingh Javara Jodha Surajmal Pi .Hukma Mansaji Maganlal Devraj Aasulal pi. Vala Jamna Putri Vala koum Purohit sa UNN . Diva devi Patni Ramesh kumar koum Sargara sa UNN khatedar na.sn.173 .199

2.64

104 293

Dineshsingh vald Gumansingh Javara Jodha Surajmal Pi .Hukma Mansaji Maganlal Devraj Aasulal pi. Vala Jamna Putri Vala koum Purohit sa UNN . Diva devi Patni Ramesh kumar koum Sargara sa UNN khatedar na.sn.173 .200

2.25

Page 274: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

241

105 294

Dineshsingh vald Gumansingh Javara Jodha Surajmal Pi .Hukma Mansaji Maganlal Devraj Aasulal pi. Vala Jamna Putri Vala koum Purohit sa UNN . Diva devi Patni Ramesh kumar koum Sargara sa UNN khatedar na.sn.173 .201

1.8

106 295

Dinesh vald Gumansingh Javaram Pi.Hukama 1/2 Mansaji Maganlal Devaraj Aasulal pi.Vala Jamna Putri Vala 1/2 koum Purohit sa UNN .khatedar na .sn.173

2.43

107 296

jay singh Punam singh Lal singh Jogsingh Pi. Dhupa Dhapu devi w/o Dhupa Ganesha vald Pratapa koum Purohit sa UNN. Khatedar

0.56

108 297 Pagdandiya or Raste (charagah ke liye nahi) 0.55

109 298 Daraj Singh Pharakhsingh koumPurohit sa deh khatedar

110 299

jay singh Punam singh Lal singh Jogsingh Pi. Dhupa Dhapu devi w/o Dhupa Ganesha vald Pratapa koum Purohit sa UNN. Khatedar

1.22

111 300 Soniya vald pira koum Kalbi Sa Pandgara khatedar na.sn.220.224

1.57

112 301 6year ya Adhik parti (Jutai Hetu) 1.04

113 302 Ranchoda vald Mala Pira koum kalbi sa Pandgara Na .sn. 220.224

1.75

114 303 Ramesh kumar putra vaGaji koum Garuda Aahore khatedar Na .sn, 226

2.09

115 304

Modiya vald Mala koum Sargara sa Bhagli Mahendra Ugmaram koum sa Vadi sa Bucheti Cah .Bhopalgarh Dist. Jodhpur 8/11 Kapura vald Kupaji koum Bhil sa Pandgara 3/11 khatedar Na .sn. 227

4.56

116 305

Bhanvar sinhg Shaitansingh Uttamsingh Vikramsingh pi.Jorsingh Ritusingh d/o Jorsingh Rassalkunvar w/o Jorsingh Meghsingh Nopsingh Pi.Karna koum Rajput sa deh khatedar na.sn.170

2.95

117 306 Gram Panchayat UNN, 2.68 118 307 Gram Panchayat UNN, 30.18

Page 275: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

242

119 16/324 6 year ya Adhik Parti (jutai hetu ) 0.26 120 117/317 7 year ya Adhik Parti (jutai hetu ) 0.6 121 132/325 8 year ya Adhik Parti (jutai hetu ) 0.52 122 197/311 9 year ya Adhik Parti (jutai hetu ) 0.27 123 68/313 Nadiya Or nale (charagah Hetu ) 0.15 124 69/314 Nadiya Or nale (charagah Hetu ) 0.15

125 249/322

Ajet singh vald Bhopsingh Mangalsingh vald Togsingh kooum Rajput sa deh 1/2 Sakiya Mangla Chuniya Joita Muparam Nenaram Pi Hartiya koum Meghvanshi 1/2 sa Unna khatedar

0.31

126 255/323

Ajet singh vald Bhopsingh Mangalsingh vald Togsingh kooum Rajput sa deh 1/2 Sakiya Mangla Chuniya Joita Muparam Nenaram Pi Hartiya koum Meghvanshi 1/2 sa Unna khatedar

0.3

127 241/332 Inda Raja vaga Pi .Bhabuta koum Kalbi sa Pandgara Khatedar na .sn.220.224.

0.03

128 347/289 Inda Raja vaga Pi .Bhabuta koum Kalbi sa Pandgara Khatedar na .sn.220.224.

3.14

129 29/328

Ishwar singh Gaje singh Shaitan singh Pi Hari singh Laila kunwar w/o Hari singh Parbat singh Dungar singh Chhial singh Pi . Bhika singh Pratap singh Vikaram Prem singh Pi . Balwant singh

0.03

130 280/320

Sagar konwar beva Balwant singh Pratap singh Vikaram Prem singh Na.va.ke vali Mata Sagar kunwar beva Balwant koum Rajput sa deh khatedar

0.6

131 304/327

Sagar konwar beva Balwant singh Pratap singh Vikaram Prem singh Na.va.ke vali Mata Sagar kunwar beva Balwant koum Rajput sa deh khatedar

0.8

132 1/338 Ganesharam vald Sutaram koum bhil sa UNN khatedar na .sn.205

2.72

Page 276: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

243

133 109/309

Geri Beva Aniya Achiya vald Aniya 1/3 Punaram vald Fagiya Varju w/o 1/3 Joyta Sankliya Juhariya Pi.kaniya Hanja beva Kaniya 1/3 koum Bhil sa deh khatedar

0.12

134 109/335

Geri Beva Aniya Achiya vald Aniya 1/3 Punaram vald Fagiya Varju w/o 1/3 Joyta Sankliya Juhariya Pi.kaniya Hanja beva Kaniya 1/3 koum Bhil sa deh khatedar

1.65

135 263/315

Jabar singh Mahendra singh Jagdish singh Pi Vaghsingh Bhamri devi lila devi Gita devi Makilya devi d/o Vaghsingh Khangar singh Pol singh Pi . Punmaji koum Purohit sa UNN khatedar

0.94

136 269/316

Jabar singh Mahendra singh Jagdish singh Pi Vaghsingh Bhamri devi lila devi Gita devi Makilya devi d/o Vaghsingh Khangar singh Pol singh Pi . Punmaji koum Purohit sa UNN khatedar

1

137 200/326

jay singh Punam singh Lal singh Jogsingh Pi. Dhupa Dhapu devi w/o Dhupa Ganesha vald Pratapa koum Purohit sa UNN. Khatedar

0.32

138 38//329

Jethu singh Obsingh Lakhasingh Pi. Bhawani singh sa deh khatedar koum Rajput sa deh khatedar Rahan Jethu v Ob singh ka hissa MGB Jalore na .sn.180

0.02

139 211/334 Joraram vald Bhagaram koum Bhil sa deh khatedar na.sn.206

1.45

140 343/104 Nekaram vald Rugaram Mangi d/o Rugaramkoum Bhil sa Bhainsvara khatedar na.sn.223

0.34

141 167/331

Nain singh vald Mulsingh 1/2 Guman singh Prithvisingh Bharatsingh Prakash singh Bhopalsingh Chakarvartisingh Praveensingh pi.Tejraj Saa devi deva na .ba.ke vali Mata Suaa devi Tejraj 1/6 =2/3 Padamsingh Pukhraj Pi.Mulsingh 3/15 Gumansingh vald Tejraj singh 1/2 koum Purohit sa Sakrana Khatedar na.sn.187

0.01

Page 277: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

244

142 342/112 Prabaram vald somtiram koum rebari sa deh khatedar na.sn.198.213.222.

0.4

143 125/330 Pefa singh vald Jiv singh koum Rajput sa deh khatedar rahan MGB Jalore

0.01

144 1/312 Posaram vald Devaram koum Bhil sa Bagra Tah .Jalore Khatedar

0.05

145 340/269 Bagdaram vald Amriya koum Meghvanshi sa deh khatedar rahan MGB jalore na.sn,221

1.76

146 338/81

Baburam vald Dharma koum Mehtar (harijan ) sa Haeijan Basti Surajpol ke Under Jalore 1/2 Lumba vald Chuna koum Meghval Ragiya vald koum Garg sa kanivara 1/2 khatedar na.sn.166

1.86

147 285/310 Bhanvar singh Nensingh Pi.sona koum purohit khatedar na..sn 211

1.45

148 159/321 Magaram vald Ukaram koum Kalbi sa sakrana 0.36

149 291/318 Mangilal vald Kapura varda koum Purohit sa Unn khateedar

0.4

150 292/319 Mangilal vald Kapura varda koum Purohit sa Unn khateedar

0.7

151 346/289 Ranchoda vald Pira koum Kalbi sa Pandgara khatedar na.sn.220.224

3.14

152 341/103

Ranchoda ram vald Mokaram vald sapi Patni mokaram hanja Amiya Pabu Putriyan Mokaram koum Rebari sa deh khatedar na.sn.198.213.222

0.19

153 263/333

Laksingh Okhsingh Dhank kunvar beva Narpat singh Purna singh Surendra singh Pi.Narpatsingh Na,ba,ki Vali mata Mu dhankkunvar beva Narpat singh vanesingh vald Khimsingh koum Rajput sa deh khatedar

0.04

154 345/104

Vagtaram Nekaram Shankriya Pi Ruga Mangi Joti d/o Ruga Nekaram shankiriya Mithilal Saludaram Pi sanvalaram Rebari sa deh khatedar na sn.223

0.06

Page 278: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

245

155 263/336

Vanesingh vald Khimsingh 1/2 Laksingh vald Okhsingh mu Dak kunvar Beva Narpat singh Puran singh Surendra pi. Narpat singh na.ba.Kudrati vali mata mu dak kunvar beva Narpat 1/2 koum Rajput sa deh khatedar rahan Vanesingh ka Hissa .MGB jalore

2.85

156 116/337 Sanvalaram vald Polaram koum Garuda sa Kanivara khatedar na.sn.163

2.42

157 348/289

Soniya Ranchoda Pi Pira Indra Raja vaga Pi.Bhabuta koum sa Pandgara khatedar na.sn.220.224

0.11

158 339/179 Hiraram vald Aashram koum rebari sa Bhains vara Khatedar

0.16

159 160 161

162 Kul khasra .44 Bhumi ke Anusar kshetrafal 6.78

0.26 12.78 5.2 1.06 41.2 0.74 0.11 1.34 1.07 15.94 0.03

Page 279: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

246

tekcUnh ¼ikaMxjk½ Øe la- [kljk ua dk'rdkj dk uke {kS=Qy

1 1

Sankalchand vald Bhima Koum Purohit Sa.deh khatedar 2.25

2 2

Bhanwarkanwar w/o Nensingh Sujansingh Rajusingh pi.Nensingh Kailashkanwar Anekkanwar d/o Nensingh hi.5.67 koum Rajput Inda Rajiya 7.02

3 3 ,7,44-46

Chhogaram vald Javanaram 1/2 Khima vald Javana 1/2 koum Choudhary(Kalbi)Sa.deh khatedar Na.S. 208,215,218,219,224 7.13

4 4 ,54 ,131

Chhatarsingh vald Prithvisingh Koum Rajput sa.deh khatedar 12.19

5 5 , 53 ,130

Mulsingh Vald Prithvisingh koum Rajput Sa.deh khatedar Rahan:- SBI Ahore Na.S. 205 12.02

6 6

Khimaram Chhogaram pi.Javanaram Koum Kalbi Sa.deh khatedar Na.s. 211,223,226 1.69

Page 280: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

247

7 8

Vagta Putra Gaja Koum Choudhary Sa.deh khatedar Na.S.215 0.72

8 9

Joitaram Chhogaram Pi.Gajaji Koum Kalbi Sa.deh khatedar Na.s. 220 1.12

9 10 ,122 ,10/349

Joitaram Vagtaram Motaram Chhogaram pi.Gaja Mu.Pepi beva Gaja B.Hi.B. Koum kalbi Sa.deh khatedar Na.S. 209 14.11

10 11

Samartha Jepa Pi.Bhuda Koum Kalbi Sa.Chiparwada Khatedar 1.41

11 12

Umidevi Patni Indaram 1/2 Ganesharam vald Aadaram 1/2 koum Choudhary ( Kalbi ) Sa.deh khatedar Na.S. 218.219 2.46

12 13

Tararam Hiraram Vardaram Mangilal pi.Gaja Najudevi w/o Gaja Koum kalbi Sa.deh khatedar 1.42

13 14

Khimaram Tikmaram pi.Javanaram Koum Kalbi Sa.deh khatedar Na.S.227 2.28

14 15

Saviya vald Bhagwana 1/4 Khima Nathu Javana Deviya pi.Bhoma Mathara w/o Badra Kankar Kailash Kamla Umi d/o Badra Naba Vli Mata Mathra w/o Badra 1/4 Thaniya Sakiya 1.91

Page 281: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

248

15 16

Tararam Hiraram Vardaram Mangilal pi.Gaja Najudevi w/o Gaja Koum kalbi Sa.deh khatedar 1.25

16 17

Shankar Sujiya Balwant Aamba pi.Hakula Santok beva Hakula koum Ravna Rajput Sa.deh khatedar 0.94

17 18

Nathu Vald Bhoma Koum Ravna Rajput Sa.deh khatedar 0.80

18 19

Agiyarsi devi d/o Nabba Talsidevi w/o Nabba koum Ravna Rajput Sa.deh khatedar Na.S. 191 1.53

19 20

Tararam Hiraram Vardaram Mangilal pi.Gaja Najudevi w/o Gaja Koum kalbi Sa.deh khatedar 1.64

20 21

Tikma vald Gumiya Ganesha Shankariya Pi.Moti Koum Meghwansi(bhambi) Sa.deh khatedar Na.S. 212 1.46

21 22

Umidevi w/o Idaram Koum Kalbi Sa.Deh Khatedar Na.S. 204 0.72

22 23 ,126,173,177,178,285,371/179,372,363

Adiya vald Kesara koum kalbi sa.deh khatedar na.s. 174,221 Su.P.s. 1 7.19

23 24

Samartha Jepa Pi.Bhuda Koum Kalbi Sa.Chiparwada Khatedar 0.74

Page 282: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

249

24 25

Saviya vald Bhagwana Koum Ra.Rajput Sa.Deh khatedar 0.60

25 26 Sagrama vald Sada koum Kalbi Sa.deh khatedar 1.55

26 27 Pratapa vald Hema Koum Nai Sa.deh khatedar 0.38

27 28

Raniya Vaga pi.Girdhari Koum Ravna Rajput Sa.deh khatedar 1.63

28 29 ,212-216 ,225

Bhopalsingh Mangsingh Bherusingh Pi.Vajiya Liladevi d/o Vajiya Chukidevi w/o Vajiya 1/3 Thaniya Sakiya pi.Jamta 2/3 koum Ravna Rajput Sa.deh khatedar 7.32

29 30 ,40 ,202,228,230 242,244 , 273 279,282, 298

Nadiya Tatha Naale (Charagah Hetu) 22.97

30 31 ,37-38,206,292,

Bhima vald Jagta Umaram Virkaram Mularam pi.Raja Jatna w/o Raja Koum Kalbi Sa.deh khatedar Na.S.207 9.08

31 32 -34 ,100

Gokiya Poliya Pi.Hanjariya Tagiya Khasiya pi.Hansiya Koum Meghwansi(bhambi)sa.Deh khatedar Rahin:-Gokiya Poliya pi.Hanjariya Ka Hissa Marwad Gramin Bank Shakha Jalore Murthin 3.61

Page 283: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

250

32 35 ,297

Klaram Karmaram pi.Achala koum meghwansi(bhambi) sa.deh khatedar 4.57

33 36

Tikkma Glama Motiya pi.Jagiya Mu.Talsi beva Jagiya Manglaram Pukharam Lumbaram Ruparam pi.Rata Bhadi Patni Dipa Mangilal Sesaram Harish Ramesh Chhagan pi.D 1.26

34 39

Ranaram Goud Noparam Khetiya Darjiya Vaga Veliya pi.Devla Pyari Manju Hirki Shobha Putriyan Devla Ranaram Ruparam Lalaram pi.Gunesha Ghoya vald Bhaliya Dayi beva Bhaliya Koum Sargara sa.deh khatedar 0.78

35 41 Pagdandiya Tatha Raste 1.28

36 42

Sankalchand vald Bhima Koum Purohit Sa.deh khatedar 6.40

37 43 ,67-68

Bhanwarkanwar w/o Nensingh Sujansingh Rajusingh pi.Nensingh KailashKanwar Anekkanwar d/o Nensingh koum Rajput Sa.deh khatedar Rahan:- Sujansingh V Rajusingh Ka Hissa MGB Jalore Na. 5.48

Page 284: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

251

S.177,184

38 47 1.77

39 48,91,97, 105 ,110 ,112 ,118, 145, 193, 139,290

Indra Raja baga pi.Bhabuta Koum kalbi 8.79

40 49

41 50

Nimba vald Ravta Hemtaram Hansaram pi.BhubaRam Methidevi Vadkudevi d/o Bhubaram Dayidevi w/o Bhubaram 1/2 Virma vald Lakma Nabalik Kudrati vli Mu.Gavri beva Lakma 1/2 koum Kalbi Sa.deh khatedar Na.S. 187 3.10

42 51 Punma vald Ravta koum Kalbi Sa.deh khatedar 3.54

Page 285: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

252

43 52

Khimraj Sanvalsingh Arjunsingh Pravin Gopal Kailash pi. Lachhu Koum purohit Sa.Uun Khatedar 2.42

44 55 ,59

Tikma vald Gumiya Ganesha Shankariya Pi.Moti Koum Meghwansi(bhambi) Sa.deh khatedar Na.S. 212 3.74

45 56

Manjudevi Kamladevi d/o Savaram Amiyadevi w/o Savaram koum Kalbi sa.deh khatedar Na.S. 178,192 4.50

46 57 Nimba vald Ravta koum Kalbi Sa.deh khatedar 4.25

47 58

Jabarsingh vald raghunathsingh koum Rajput sa.deh khatedar 8.75

48 60 Pakiya Jasiya Sesiya pi.Kapura Koum Sargara 0.16

49 61

Pakaram Sesaram pi.Kapuraram Pabudevi patni Jagaram Harsanram Fusaram Sangramaram pi.Jagaram 1/3 Bagdaram vald Kesaram Bagdaram vald Kesaram Busadevi Tolidevi d/o Kesaram 1/3 Masraram Nemaram pi.Manaram 1/3 koum Sargada sa.deh khatedar Na.S.201,202,214 0.71

Page 286: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

253

50 62

Tararam Hiraram Vardaram Mangilal pi.Gaja Najudevi w/o Gaja Koum kalbi Sa.deh khatedar 6.11

51 63

Harisingh vald Chtarsingh Koum Rajput Sa.deh khatedar 1.11

52 64 ,306

Ummedsingh vald Karnsingh Laxmansingh vald Karnsingh Laxmansingh Na.Ba.Vli.Surajkanwar w/o Karnsingh Koum Rajput Sa.deh khatedar 7.76

53 65

Ummedsingh Laxmansingh pi.Karnsingh Umraokanwar Gudiyakamwar d/o Karnsingh SurajKanwar w/o Karnsingh koum Rajput Sa.deh khatedar Na.s. 193 1.70

54 66 ,82,-85

Bhagwatsingh vald Jethusingh Leharkanwar w/o Jethusingh Chandrakanwar d/o Jethusingh Koum Rajput Sa.deh khatedar Rahin:- Jethusingh Hi.MGB Shakha Jalore Na.S. 185 5.20

55 69 ,264 ,69/352

Bhaliya Vagta Pi.Sona Koum Kalbi Sa.deh khatedar 9.23

Page 287: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

254

56 70

Tararam vald Gajaji Koum Choudhari Parsiya Bhona Vikram pi.Ganesha Koum Ravna Rajpaut Sa.deh khatedar 2.20

57 71 Devaram vald Kana koum Rebari Sa.deh khatedar 1.54

58 72 ,278

Khetsingh RameshSingh Parbatsingh Mahendrasingh Madansingh pi.Mala Uki beva Mala koum Ravna Rajput sa.deh khatedar 3.37

59 73 Pagdandiya Tatha Raste 0.73

60 74 ,93

GopalDas Ranchhoddas pi.Santokdas Koum Saad Sa.deh khatedar Gopaldas ka Hi. Rahin :- Ja.S.Bhu.Vi.Bank Li.Jalore 6.39

61 75

Hemtaram Hansaram pi.Bhubaram Methidevi Vadkidevi d/o Bhubaram Dayidevi w/o Bhubaram 3/4 Virma vald Lakma 1/4 koum kalbi Sa.deh khatedar Na.S.179,187 3.37

62 76 -80 ,

Mulsingh Chatarsingh pi.Prithvisingh koum Rajput 1/6 Joitaram Vagtaram Mota ram Chhogaram pi.Gaja mu.Pepi beva Gaja B.Hi.B.1/3 Ranchhod vald Pira 1/6 Sona Ramchhoda 6.52

Page 288: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

255

pi.Pira Inda Raja Baga pi.Bhabuta 1/3 Koum Kalbi Sa.deh khatedar

63 81.158.172.181.227.. 274 286.299 303. 157/345 .

6 varsh se Ya adhik Parti ( Jutai Hetu) 120.53

64 86 TO 90

Ummedsingh Laxmansingh pi.Karnsingh Umraokanwar Gudiyakamwar d/o Karnsingh SurajKanwar w/o Karnsingh koum Rajput Sa.deh khatedar Na.s. 193 2.11

65 92 ,93/335

Varda Chhoga pi.Bhagwana Koum Meghwansi(Bhambi) Sa.deh khatedar Rahin:- Varda Chhoga pi.Bhagwana Ka Hissa DI.Bank Of Rajasthan LiMI.Jalore Murthin 4.33

66 94

Tikma vald Gumiya Ganesha Shankariya pi.Moti 1/2 koum Meghwansi Khangara vald Rainga 1/2 Koum Kumhar Sa.deh khatedar 2.45

67 95

Klaram Karmaram pi.Achala koum meghwansi(bhambi) 0.39

Page 289: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

256

sa.deh khateda

68 96 ,104,222

Kapuraram Ranaram GangaRam Pi.Kuplaram Sitadevi Sodibai w/o Kuplaram Bhika Jagiya pi.Kesiya Bagda champa Nabalig Kudrati Vli Mata Ansi beva Hansiya Koum bhil sa.deh khatedar Na.s. 189 2.03

69 99

Kasturaram vald Khimaram koum Meghwansi sa.deh khatedar Rahan:- MGB jalore Na.S. 203 1.85

70 101

Pakaram Sesaram pi.Kapuraram Pabudevi patni Jagaram Harsanram Fusaram Sangramaram pi.Jagaram 1/3 Bagdaram vald Kesaram Bagdaram vald Kesaram Busadevi Tolidevi d/o Kesaram 1/3 Masraram Nemaram pi.Manaram 1/3 koum Sargada sa.deh khatedar Na.S.201,202,214 0.65

Page 290: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

257

71 102

Pakaram Sesaram pi.Kapuraram Pabudevi patni Jagaram Harsanram Fusaram Sangramaram pi.Jagaram 1/3 Bagdaram vald Kesaram Bagdaram vald Kesaram Busadevi Tolidevi d/o Kesaram 1/3 Masraram Nemaram pi.Manaram 1/3 koum Sargada sa.deh khatedar Na.S.201,202,214 0.59

72 103 Pratapa vald Hema Koum Nai Sa.deh khatedar 1.29

73 106 ,116 ,117,122/321

Joita vald Gaja Koum kalbi sa.deh khatedar Rahin:- Di.Bank Of Rajasthan Limi.Shakha Jalore Murthin 11.15

74 107 TO 109

Virma Chhoga pi.Gula Babu Vasiya Kuka Bagdiya Pi.Lumba Kanka beva Lumba Ranaram vald Kupa Bhil Sa.deh khatedar 1.67

75 111

Joti beva Aadiya Kamla Geeta Putri Aadiya Virka vald Aadiya Geeta Virka Na.ba.ki Kudrati vli Mata Joki beva Aadiya Kaliya putra Chhoga Sodi beva Chhoga Koum bhil sa.deh khatedar 0.31

76 113 ,156 , 379/114 Deva vald Gata koum Bhil Sa.deh khatedar 2.05

Page 291: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

258

77 114 ,380 /156

Manglaram Putra Vardaram Margodevi Patni Vardaram koum Bhil Sa.deh khatedar Na.S.216 2.05

78 119 Sagrama vald Sada koum Kalbi Sa.deh khatedar 2.29

79 120

Sakiya Mogiya Kapura pi.Goma Mu.Sadno beva Goma Saviya Babriya pi.Koniya Sarudevi w/o Soniya Pepi d/o Soniya koum Bhil Sa.deh khatedar 0.61

80 121

Sakiya Mogiya Kapura pi.Goma Mu.Sadno beva Goma Saviya Babriya pi.Koniya Sarudevi w/o Soniya Pepi d/o Soniya koum Bhil Sa.deh khatedar 1.38

81 123 ,123/332

Karnsingh Jaysingh Arjunsingh Ashoksingh Pi.Tariya 6/7 Ugamkanwar w/o Sav.Tariya 1/7 Koum Ravna Rajput Sa.deh khatedar MN 175,180 6.25

82 124

Doli Banam Mandir Shri Sureshwar Sa.Pandagara Khatedar 4.59

83 125 ,336/134

Doli Banam Mandir Shri Sureshwar Sa.Pandagara Khatedar 6.03

84 127 - 129 ,236 ,237

Mangiya Rupa pi.Jetha Samda beva Jetha koum Kalbi Sa.deh khatedar 6.57

Page 292: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

259

85 132 -133

Mdaram Seringaram Ladaram pi.Malaram 1/2 Rupidevi w/o Malaram Mdaram Seringaram Ladaram pi.Malaram 1/2 Bhil Choudhary(kalbi) Sa.deh khatedar Na.S.232 6.34

86 134

Somsingh vald Hirsingh koum Rajput Sa.deh khatedar 1.37

87 135

Peparam vald Idaji 1/2 Piraram vald Idaji 1/2 Koum Choudhary sa.Thanvala khatedar 3.70

88 136-138

GopalKanwar Joje Indrasingh 1/4 Mulsingh Chatarsingh pi.Prathvisingh 1/4 Bhanwarkanwar w/o Nensingh Sujansingh vald Nensingh Rajusingh vald Nensingh KailashKanwar 6.25

89 139-142 ,143,309,310

Dhapukanwar Joje Jabarsingh koum Rajput Sa.deh khatedar Rahan:- SBBJ Jalore 5.83

90 144

Joriya vald Panna Koum Kalbi Sa.Sokarna hal Deh khatedar 1.42

91 146 Gram Panchayat Uun 5.82

92 147 TO 148

Tikma vald Gumiya Ganesha Shankariya Pi.Moti Koum Meghwansi(bhambi) Sa.deh khatedar Na.S. 212 1.14

Page 293: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

260

93 149

Sonaram Ranchhoda Pi.Pira Koum Kalbi Sa.deh khatedar Rahin :- Ranchhoda Vald Pira Ka Hissa Di.Bank Of Rajasthan LiMi.Shakha Jalore Murthin 3.04

94 150

Tararam Hiraram Vardaram Mangilal pi.Gaja Najudevi w/o Gaja Koum kalbi Sa.deh khatedar 2.29

95 151

Tikmaram vald Javanaram koum Kalbi Sa.deh khatedar Na,S.221,222 2.87

96 152-155 ,161

Saviya vald Bhagwana 1/4 Khima Nathu Javana Deviya pi.Bhoma Mathara w/o Badra Kankar Kailash Kamla Umi d/o Badra Naba Vli Mata Mathra w/o Bad 8.19

97 157

Hariram vald Kartaram koum meghwansi sa.deh khatedar na.s.203 0.88

98

99 159 Nivas ya Vaas( Charagah ke Liye Nhi) 0.03

100 160

Parasmal Utmaram Pi.Kuparam Ukidevi d/o Kuparam Kamladevi w/o Kuparam Mangiya vald Parbhu Koum Sargara sa.deh khatedar Na.S.169,170,190 1.88

101 162 Babuda Hakiya Pi.Chatra koum Sargaram Sa.deh 1.34

Page 294: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

261

khatedar

102 163 TO 165

Vachanaram vald Rughnatha Bhupiya vald Teja Naraniya Bhakaram pi.Puriya Sakaram Chukaram pi.Puraram Arjunram vald Naraynram Shoti d/o Puraram Koum Sargara Sa.deh khatedar Na.S. 197 1.38

103 167

Tikmaram vald Javanaram koum Kalbi Sa.deh khatedar Na,S.221,222 0.52

104 166 ,168-170

Ranaram Goud Noparam Khetiya Darjiya Vaga Veliya pi.Devla Pyari Manju Hirki Shobha Putriyan Devla Ranaram Ruparam Lalaram pi.Gunesha Ghoya vald Bhaliya 1.67

105 171 ShikSa Vibhag School 0.32

106 174

Hemtaram Hansaram Pi.Bhubaram Methidevi Vadkidevi d/o Bhubaram Dayidevi w/o Bhubaram Virma vald Lakma Koum Choudhary(Kalbi) Sa.deh khatedar Na.S.187 0.85

Page 295: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

262

107 175

Hemtaram Hansaram Pi.Bhubaram Methidevi Vadkidevi d/o Bhubaram Dayidevi w/o Bhubaram Virma vald Lakma Koum Choudhary(Kalbi) Sa.deh khatedar Na.S.187 0.97

108 176 ,179,

Indra vald Kesra Koum sa. Deh khatedar Na.S. 210.222 7.20.

109 180

Parasmal Utmaram Pi.Kuparam Ukidevi d/o Kuparam Kamladevi w/o Kuparam Mangiya vald Parbhu Koum Sargara sa.deh khatedar Na.S.169,170,190 1.20

110 182

Chuniya vald Chopa Mohanlal vald Veliya Koum bhil sa.deh khatedar 0.37

111 183

Devi Nathki Bagdi d/o Virmaram Sadnodevi w/o Virmaram Chuniya vald Chopla Mohanlal vald veliya Koum Bhil Sa.deh khatedar Na.S. 198 0.87

112 184 ,253

Chenaram Timaram Sesaram Idaram pi.LachchhaRam Koum Meghwansi Sa.deh khatedar Na.s.khatedar 1.24

Page 296: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

263

113 185 TO189

Hemtaram Hansaram pi.Bhubaram Methidevi Vadkidevi D/o Bhubaram Dayidevi w/o Bhubaram Virma vald Lakma 1/4 Tararam Hiraram Vardaram Mangilal pi. 7.62

114 190-192

Nimba vald Ravta 2/3 Thanaram vald Nimba 1/3 koum Choudhary(kalbi) Sa.deh khatedar 1.59

115 194

Samartha vald Rama Chotharam vald Rama Koum Kalbi Sa.deh khatedar Na.S.178 2.62

116 195

Samartha Chopa pi.Rama Koum Choudhary (kalbi) Sa.deh khatedar 1.28

117 196

Samartha Chopa pi.Rama Koum Choudhary (kalbi) Sa.deh khatedar 1.59

118 197

Samartha Chopa pi.Rama Koum Choudhary (kalbi) Sa.deh khatedar 4.91

119 198 -199 ,20,8219,220

Chatraram Mularam Samaram Devaram Ragaram pi.Gomaram Chatra Muliya Samiya Deva pi.Goma Koum Kaldbi Sa.deh khatedar Na.S.195 7.69

120 200

Mevadevi Patni Mula Uksingh Amarsingh Jorsingh pi.Mula Dariyakanwar Putri Mula 4.77

Page 297: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

264

Koum Ravna Rajput Sa.deh khatedar Na.S. 231

121 201-202

Bhanwarsingh Achalsingh Pahadsingh pi.Mobsingh Sukkanwar beva Mobsingh Harisingh Parbatsingh Chhelsingh Dungarsingh pi.Bhiksingh Pratapsingh Vikramsingh Premsingh pi.Balvantsin 3.11

122 204 ,217 ,247,265,108/,354

Virma Chhoga pi.Gula Babu Vasiya Kuka Bagdiya Pi.Lumba Kanka beva Lumba Chuniya valdChopla Mohanlal vald Veliya koum Bhil Sa.deh khatedar 5.01

123 205

Tararam Hiraram Vardaram Mangilal pi.Gaja Najudevi w/o Gaja Koum kalbi Sa.deh khatedar 1.65

124 207

Saviya vald Bhagwana Koum Ra.Rajput Sa.Deh khatedar 0.94

125 209

Kesiya vald Chamna koum meghwansi(Bhambi) Sa.deh khatedar Rahin:- Pura Hissa Rahin:-Marwad Gramin Bank shakha Ahore Murthin Rahan -MGb Jalore 3.05

Page 298: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

265

126 210

Chatraram Devaram Samaram pi.Gomaji Koum Kalbi Sa.deh khatedar 1.70

127 211

Kuiya vald Naviya Koum Meghwansi Sa.deh khatedar Rahin :- Marwad Gramin Bank Shakha Jalore Murthin 2.23

128 218

Bagdibai Patni Pitaram Nathibai Patni Kuyaram koum bhil sa.Harji khatedar 0.61

129 221

Sonaram Ranchhoda Pi.Pira Koum Kalbi Sa.deh khatedar Rahin :- Ranchhoda Vald Pira Ka Hissa Di.Bank Of Rajasthan LiMi.Shakha Jalore Murthin 2.01

130 223

Sonaram Ranchhoda Pi.Pira Koum Kalbi Sa.deh khatedar Rahin :- Ranchhoda Vald Pira Ka Hissa Di.Bank Of Rajasthan LiMi.Shakha Jalore Murthin 2.48

131 224 ,259 260 ,289

Khima Nathu Javana Deviya Pi.Bhoma Mu.Mathra Beva Badriya Kankar Kamla Kailash Putriya Badriya Umi Putri Badriya Na.Ba.Ki Kudrati Vli Mu.Mathra beva Badriya Koum Daroga (Ravna Rajput )Sa.deh khatedar 5.62

Page 299: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

266

132 226

Mevadevi Patni Mula Uksingh Amarsingh Jorsingh pi.Mula Dariyakanwar Putri Mula Koum Ravna Rajput Sa.deh khatedar Na.S. 231 1.49

133 229

Jalaram Ragaram Pi.Dudaram Gajidevi Sadnodevi Bhotidevi d/o Dudaram Chunidevi w/o Dudaram Hararam Devaram pi.Hemtaram Kankodevi w/o Hemtaram Kesiya vald Chimna Pakaram Fularam Dayaram Goparam pi.Aadaram Hariyadevi w/o Aadaram Bhudiya Shantiya pi.Chhogla Suki beva Chhogla Koum Meghwansi Sa.deh khatedar Na.S.172,188 0.78

134 231

Jalaram Ragaram Pi.Dudaram Gajidevi Sadnodevi Bhotidevi d/o Dudaram Chunidevi w/o Dudaram Hararam Devaram pi.Hemtaram Kankodevi w/o Hemtaram Kesiya vald Chimna Pakaram Fularam Dayaram Goparam pi.Aadaram Hariyadevi w/o Aadaram Bhudiya Shantiya 0.31

Page 300: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

267

pi.Chhogla Suki beva Chhogla Koum Meghwansi Sa.deh khatedar Na.S.172,188

135 232

Ruparam Bheraram Pi.Fuliya Urf Fuiyaram Dhopi w/o Fuliya Urf Fuiyaram koum Meghwansi Sa.deh khatedar Na.S. 182,203 1.13

136 233

Tagiya vald Hansaji Khasiya vald Hosaji Kuiya vald Navaji Kapura vald Lalaji koum Mehwansi sa.deh khatedar 0.96

137 234 ,235 ,235/360

Kuiya vald Nava 1/4 Kapura vald Lala 1/4 Vagiya Vald Hansiya 1/4 Khsiya vald Hansiya 1/4 Koum meghwansi sa.deh khatedar Rahin :- Khasiya vald Hansiya 1/4 Hi.Marwad Gramin Bank Shakha Jalore Murhin Rahan -Kuiya Ka Hissa MGB jalore 3.63

Page 301: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

268

138 238

Tikkma Glama Motiya pi.Jagiya Mu.Talsi beva Jagiya Manglaram Pukharam Lumbaram Ruparam pi.Rata Bhadi Patni Dipa Mangilal Sesaram Harish Ramesh Chhagan pi.Dipa Koum Meghwaansi(Bhambi) Sa.deh khatedar Rahin:- Rata s/o Joiya 1/3 Hi.Marwad Gramin Bank Shakha Jalore Murthin MN 213 3.51

139 240

Bhanwarsingh Achalsingh Pahadsingh pi.Mobsingh Sukkanwar beva Mobsingh Harisingh Parbatsingh Chhelsingh Dungarsingh pi.Bhiksing 1.80

140 241 ,287 ,19/331 ,270/341

Jalaram Ragaram pi.Dudaram Sundardevi Gajidevi Sadnodevi Bhodevi d/o Dudaram Chunidevi w/o Dudaram hararam Devaram pi.Hemtaram Kankodevi w/o Hemtaram koum Meghwal sa.deh khatedar MN 188 4.24

141 243 Ranaram vald Kupa Koum bhil Sa.deh khatedar 0.96

Page 302: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

269

142 246

Ranaram vald Kuparam 1/2 Bhika Jagiya pi.Kesiya 1/2 koum Bhil Sa.deh khatedar 1.86

143 248

SankalChand Mitharam Rajaram Vajaram Udaram Mancharam pi.Magaram Koum Bhil Sa.deh khatedar MN 217 1.76

144 249 Mangilal vald Ganesha koum Nai Sa.deh khatedar 0.40

145 250

Saviya vald Bhagwana Koum Ra.Rajput Sa.Deh khatedar 1.70

146 251

Parasmal Utmaram Pi.Kuparam Ukidevi d/o Kuparam Kamladevi w/o Kuparam Mangiya vald Parbhu Koum Sargara sa.deh khatedar Na.S.169,170,190 1.86

147 252

Shankar Sujiya Balwant Aamba pi.Hakula Santok beva Hakula koum Ravna Rajput Sa.deh khatedar 2.39

148 254

Devi Nathki Bagdi d/o Virmaram Sadnodevi w/o Virmaram Koum Bhil Sa.deh khatedar Na.S. 198 0.68

149 255

Raniya Vaga pi.Girdhari Koum Ravna Rajput Sa.deh khatedar 1.40

Page 303: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

270

150 256

Tikma Glaba Motiya pi.Jagiya mu.Talsi beva Jagiya Koum Meghwansi sa.deh khatedar 0.37

151 257

Tikma Glaba Motiya pi.Jagiya mu.Talsi beva Jagiya Koum Meghwansi sa.deh khatedar 2.25

152 258

Saviya vald Bhagwana Koum Ra.Rajput Sa.Deh khatedar 0.57

153 261 Gokiya s/o Hanjariya Koum Meghwal Sa.deh khatedar 0.92

154 262

Muliya vald Kesa Koum Meghwansi(Bhambi) Sa.deh khatedar 1.95

155 263 Bhupiya vald Jeta Koum Sargara Sa.deh khatedar 0.34

156 266

Raniya Vaga pi.Girdhari Koum Ravna Rajput Sa.deh khatedar 1.39

157 267

Vachanaram vald Ruga koum Sargara Sa.deh khatedar 0.90

158 268 -269 Mupa s/o Teja koum Sargara Sa.deh khatedar 1.20

159 270

Jalaram Ragaram Pi.Dudaram Gajidevi Sadnodevi Bhotidevi d/o Dudaram Chunidevi w/o Dudaram Hararam Devaram pi.Hemtaram Kankodevi w/o Hemtaram 1.03

Page 304: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

271

Kesiya vald Chimna Pakaram Fularam

160 271

Shankriya vald Rupa 1/2 Mu.Movan beva Galba Bhanwar Bharat pi.Galba Bhanwar Bharat Nabalig Ki Kudrati Vli marta Movan Beva Galba 1/2 koum Nai Sa.deh khatedar 2.02

161 272

Sakiya Mogiya Kapura Pi.Goma Mu.Sadno beva Goma Koum bhil Sa.deh khatedar 1.98

162 275

Hukma vald Jerupa KoumMeghwansi sa.deh khatedar 0.62

163 276-277

Tikkma Glama Motiya pi.Jagiya Mu.Talsi beva Jagiya Manglaram Pukharam Lumbaram Ruparam pi.Rata Bhadi Patni Dipa Mangilal Sesaram Harish Ramesh 3.11

164 280 -281 ,.

Bila Putri Narayan Pira Teja hadmana pi.Punma Uji beva Punma Nava vald Bhuba Raniya Vaga pi.Girdhari Koum Ravna Rajput Sa.deh khatedar 2.11

Page 305: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

272

165 283 Vala vald Rughnatha koum Sargara Sa.deh khatedar 0.68

166 284 ,288

Jabararam Natharam pi.Gunesharam Somti fila Roshana s/o Gunesharam koum bhil sa.Nabi Teh.Jalore Khatedar Na.S. 181 0.79

167 291

Vachanaram vald Rughnatha Bhupiya vald Teja Naraniya Bhakaram pi.Puriya Sakaram Chukaram pi.Puraram Arjunram vald Naraynram Shoti d/o Puraram Koum Sargara Sa.deh khatedar Na.S. 197 2.47

168 293 169 294

170 295

Pukaram Dhanaram Khangararam Rajaram pi.Molaram Dargi w/o Molaram koum Meghwansi sa.deh khatedar Na.S.203 1.76

171 296

Pakaram Sesaram pi.Kapuraram Pabudevi patni Jagaram Harsanram Fusaram Sangramaram pi.Jagaram 1/3 Bagdaram vald Kesaram Bagdaram vald Kesaram Busadevi Tolidevi d/o Kesaram 1/3 Masraram Nemaram 3.05

Page 306: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

273

pi.Manaram 1/3 koum Sargada sa.deh khatedar Na.S.201,202,214

172 300 TO 301 JalMagn (Charagah Hetu) 4.35

173 302 Pahadi Tatha Parvat(Charagah Hetu) 28.42

174 304

Bhimsingh vald Raghunathsingh koum Rajput Sa.Dodiyali Khatedar Na.s. 204 5.80

175 305

Bila putri Narayan Pira Teja Hadmata pi.Punma Raniya Vaga pi.Girdhari koum Ravna Rajput Sa.deh khatedar 6.31

176 307 8.26

177 308

Ugamkanwar w/o Joravarsingh koum Rajput Sa.Vediya Khatedar 14.40

178 311

Doli Banam Mandir Shri Hanumanji Sa.deh khatedar 12.97

179 312

Ugamkanwar w/o Joravarsingh koum Rajput Sa.Vediya Khatedar 2.85

180 313 Sarkari Van :- Van Vibhag 4.29 181 314 Sarkari Van :- Van Vibhag 19.84

Page 307: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

274

182 315 Sarkari Van :- Van Vibhag 9.83 183 316 Sarkari Van :- Van Vibhag 95.92 184 317 Sarkari Van :- Van Vibhag 149.09

185 179/356

Adiya Inda pi.Koum Kalbi Sa.deh khatedar Rahin Di.Bank Of Raj. Li Jalore 0.04

186 Kul Khasra 49 0.00 187 3.76 188 115.77 189 8.91 190 24.74 191 4.04 192 28.42 193 0.31 194 0.03

195 182/336

Kaliya s/o Chhoga Hodi w/o Chhoga Joti w/o Aadiya Virka s/o Aadiya koum Bhil Sa.deh khatedar 0.30

196 233/340 Khasiya s/o Hosa Koum meghwal Sa.deh khatedar 0.56

197 99/325

Khasiya Tagiya pi .Hansiya Gokiya Poliya pi.Hanjariya Koum Meghwansi(bhambi) sa.deh khatedar 1.02

198 253/343 Chena vald Lachchha Koum Meghwal Sa.deh khatedar 1.00

199 392/125

Chhogaram vald Javanaram Koum kalbi Sa.deh khatedar Na.S. 229 0.32

Page 308: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

275

200 368/67

Tararam Hiraram Vardaram Mangilal Pi.Gaja Najudevi w/o Gaja Bhaliya Vagta pi.Sonaji koum Choudhari sa.deh khatedar 0.12

201 62/351

Tararam Hiraram Vardaram Mangilal pi.Gaja Najudevi w/o Gaja Koum kalbi Sa.deh khatedar 0.03

202 238/361

Tikkma Glama Motiya pi.Jagiya Mu.Talsi beva Jagiya Manglaram Pukharam Lumbaram Ruparam pi.Rata Bhadi Patni Dipa Mangilal Sesaram Harish Rame 0.03

203 375/167

Tikmaram vald Javanaram koum Kalbi Sa.deh khatedar Na,S.221,222 0.51

204 194/318

Nimba vald Ravta 2/3 Thanaram vald Nimba 1/3 koum Choudhary(kalbi) Sa.deh khatedar 0.34

205 194/320

Nimba vald Ravta 2/3 Thanaram vald Nimba 1/3 koum Choudhary(kalbi) Sa.deh khatedar 2.25

Page 309: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

276

206 367/286

Nenu beva Mangilal Kuiyaram vald Mangilal Hamira vald Samarthaji Chandaram vald Samarthaji Jamtaram vald Samarthaji Aadaram vald Samarthaji Lakharam vald Samarthaji Mu.Sapu beva Samarthaji koum Rebari sa.Rajanvadi khatedar 1.92

207 382/286

Parabatgiri Chela Chetangiri Sureshwar Math Khatedar sa.deh.khatedar Na.S. 200 0.77

208 389/160

ParasKumar vald Jetaram koum Meghwal Sa.Keshavna Teh.Jalore Khatedar Na.S.170 0.01

209 390/333

ParasKumar vald Jetaram koum Meghwal Sa.Keshavna Teh.Jalore Khatedar Na.S.170 0.04

210 160/333

Parasmal Utmaram Pi.Kuparam Ukidevi d/o Kuparam Kamladevi w/o Kuparam Mangiya vald Parbhu Koum Sargara sa.deh khatedar Na.S.169,170,190 0.46

211 160/334

Parasmal Utmaram Pi.Kuparam Ukidevi d/o Kuparam Kamladevi w/o Kuparam Mangiya vald Parbhu Koum Sargara 0.50

Page 310: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

277

sa.deh khatedar Na.S.169,170,190

212 196/364 Punma vald Ravta koum Kalbi Sa.deh khatedar 0.96

213 378/286 Bagda vald Kesa Koum sargara Sa.deh khatedar 0.50

214 383/67 Mangilal vald Gajaji koum Kalbi Sa. Deh khatedar 0.64

215 369/67 Mangilal vald Gajaji koum Kalbi Sa. Deh khatedar 0.64

216 5/347

Mulsingh Chhatarsingh Pi.Prithvisingh koum Rajput Sa.deh khatedar 0.02

217 232/342

Ruparam Bheraram pi.Fuliya Urf Fuiyaram Dhopi w/o Fuliya Urf Fuiyaram koum Meghwansi sa.deh khatedar MN 182 1.18

218 18/236

Sakiya Thaniya Pi.Jasta koum Ra.Rajput Sa.deh khatedar 1.77

219 197/357

Samartha Chopa pi.Rama Koum Choudhary (kalbi) Sa.deh khatedar 0.04

Page 311: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

278

220 154/355

Saviya vald Bhagwana 1/4 Khima Nathu Javana Deviya pi.Bhoma Mathara w/o Badra Kankar Kailash Kamla Umi d/o Badra Naba Vli Mata Mathra w/o Badra 1/4 Thaniya Sakiya pi.Jamta Bhopalsing 0.02

221 25/327

Saviya vald Bhagwana Koum Ra.Rajput Sa.Deh khatedar 0.85

222 248/323

SankalChand Mitharam Rajaram Vajaram Udaram Mancharam pi.Magaram Koum Bhil Sa.deh khatedar MN 217 3.40

223 223/359

Sonaram Ranchhoda Pi.Pira Koum Kalbi Sa.deh khatedar Rahin :- Ranchhoda Vald Pira Ka Hissa Di.Bank Of Rajasthan LiMi.Shakha Jalore Murthin 0.04

224 384/302

JulFIkar Ali vald Jafar ali Koum Musalman Sa.Jalore Pattedar Avdhi Twenty Years 1.00

225 391/172

Deva vald Kana koum Rebari Sa.deh Pattedar Na.S.173 0.08

226 385/302

Pukhraj vald Lachchha koum Meghwal Sa.Sanwada pattedar Avdhi Twenty years 1.00

Page 312: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

279

227 386/302

Bhavaram vald Lachchha Koum Meghwal Sa.Sanwada Pattedar Avdhi Twenty Years 1.00

228 387/302

Rupkanwar w/o Bhimdan Charan Sa. Sanwada Pattedar Avdhi Twenty Years 1.00

229 388/302

Shamsher Ali Vald Fakir Ali Koum Muslaman Sa.Jalore Pattedar Avdhi Twenty Years 1.00

230 381/299 Govt.Upper Primary School Pandagara 1.61

Page 313: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

280

S.No Activities BSR Page & S.No. Labour Masson Metrial Total

1

Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd

GKN 2013 Page No18 Item no. 182

0.47 0 0 0.47

2

feV~Vh dk dk;Z cU/k esa ¼lw[kh ;k xhyh½ 15 lseh ijr esa Mkyuk] <syksa dks rksMuk] ?kkl&ikr rFkk dadj chudj vyx djuk rFkk feV~Vh dh njslh djuk 1-5 eh0 mBkuk rFkk 50 ehVj nwjh ds fy,A dBksj feV~Vh esa feV~Vh dh dqVkbZ ekuo }kjk ;k Iysu jksyj }kjk A¼ft-Lr-nj

GKN 2013 Page No 1 Item no. 2 b

89 0 0 89

3

uho] [kkbZ ijukyk esa 1-5 xgjkbZ rd feVV~h dk [kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk]cxy dks laokjuk][kqnh feV~Vhdks ckgj fudkyuk] uhoa Hkjus ds ckn [kkyh LFkkuksa dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj nwjh rd fuLrkj.k djukA l[r]fpduh]

GKN 2013 Page No 1 Item no. 2 b

89 0 0 89

4

1-50 ehVj ls T;knk [kqnkbZ ij vfrfjDr tksMus ;ksX;

GKN 2013 Page No 1 Item no. 3 12 0 0 12

5 fo/kfVr pVku GKN 2013 Page No

1 Item no. 2 c 141 0 0 141

4 cht cqokbZ cuk;s x;s fjt ij

GKN 2013 Page No 14 Item no. 130

0.6 0 0 0.6

Page 314: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

281

5

fMofyax fof/k ls okfudh chp cqokbZ dk;Z ¼ft-Lr-nj-vuq-2010i`-la0 25dz-la-184½

GKN Page No 18 Item no. 184

9.9 0 0 9.9

6 chtks dh ek=k 1- ?kke.k ?kkl cht GKN Page No Item no. 0 0 85 85

7 okfudh cht GKN Page No Item no. 0 0 25 25

8

15 ls 30 lseh eksVs] gFkkSMs ls rjkls gq,s ,dy iRFkj dh fifpax leLr mBku ds lkFk] vkiwfrZ lfgr

GKN 2013 Page No 18 Item no. 188 a

205.8 135 914.2 1255

9

, Qsze ysoy ls 8 ls 15 ehVj {kSfrt vUrjky esa leksPp js[kk ij ys vkmV dk dk;Z

GKN 2013 Page No 18 Item no. 183

1.15 0 0 1.15

10

15 ls 30 lseh eksVs] gFkkSMs ls rjkls gq,s ,dy iRFkj dh fifpax leLr mBku ds lkFk] vkiwfrZ lfgr

GKN 2013 Page No 15 Item no. 140

73.5 148.5 966 1188

11

lhesUV dkadzhV uhao ;k Q”kZ esa 20 fe-eh- ek dh iRFkj feV~Vh@bZVs lhesUV jsr elkyk esa 1 lhesUV 3 jsr % 6 feV~Vh vuqikr esa feykdj Mkyuk rFkk dqVkbZ djuk rjkbZ lesrA

GKN 2013 Page No 15 Item no.138

240 45 2304 2589

12

,uhdV gsrq iRFkjksa dh fpukbZ 1%4 lhesUV ctjh elkys esa uho esa vf/kjpuk esa

GKN 2013 Page No15 Item no.137

232.26 333 1756.74 2322

13

osj)k iRFkj dk 23 ls-eh- mpkbZ esa [kMatk yxkuk rFkk feV~Vh ls Hkjuk rFkk [kaMts dk gksnk ess ls fudyh vfrfjDr feV~Vh dk 50 eh0 rd fuLrkj.k djukA lq[ks iRFkj esaA

GKN 2013 Page No 18 Item no. 188 a

205.8 135 914.2 1255

Page 315: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

282

14

lhesUV IykLVj nhokj ij 1%6 vuqikr esa lhesUV ctjh feykdj dj tksMks dks dqjsnus rFkk rjkbZ lfgr 25 fe-eh-

GKN 2013 Page No 7 Item no. 68

27.93 58.5 64.57 151

15

lhesUV dadzhV 1%2%4 feJ.k ftlesa 1 lhesaV 2 ctjh 4 iRFkj dh 12 eh- ukHkh; fxV~Vh ds lkFk feykdj Mkyuk]dwVuk]nckuk rFkk rjkbZ vkfn lesrA

GKN 2013 Page No 15 Item no.139

255.31 45 2819.69 3120

16

taxy dh lQkbz Hkkjh >kfM;ks ¼T;qfyQyksjks½ rFkk 30 lsa-eh- yisV ds ikS/kks dks dkVus lesarA

GKN 2013 Page No 11 Item no. 96

1.9 0 0 1.9 17 uho rFkk dqlhZ esa izFke Js.kh bZVksa

dh fpukbZ lhesUV ctjh 1%6 elkys esa e; cxy dh f>jh cUn djuk rjkb vkfnA vf/kjpuk esa

ch ,l vkj tkyksj 2013 ist u0 2 dzekaad u0 16 v

147 444 3191 3782

18

vOoy ntsZ dh iRFkj dh ifÍ;ks dh Nr Mkyuk]Åij RkFkk uhps ls tksMks esa iRFkj dh phi ds lkFk 1%4 vuqikr esa lhesUV elkys ls Hkjuk ¼ft-Lr-nj-vuq-2010 la”kks- ist la- 9 vkbZVe la- 36½

ch ,l vkj tkyksj 2013 ist u0 4 dzekaad u0 36 l

14.7 29.25 1063.05 1107

19

50 eh-eh- eksVkbZ esa lhesUV dadzhV 1%2%4 feJ.k ftlesa 1 lhesaV 2 ctjh 4 iRFkj dh ;k bZV dh 12 eh- ukHkh; fxV~Vh ds lkFk feykdj Mkyuk]dwVuk]nckuk rFkk rjkbZ vkfn lesrA

ch ,l vkj tkyksj 2013 ist u0 4 dzekaad u0 36 l

34 67 148 249

Page 316: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

283

20

lsUVfjax&”kVfjax dk vkj-lh-lh- Nr] Lysc] che]NTts fyUVy vkfn Mkyus ds fy, yxuk 4-5 ehVj ÅapkbZ rd ds fy, rFkk gVkuk vkfn fo”ks’k fooj.k ds vuqlkj ¼ft-Lr-nj-vuq-2010 la”kks- ist la-10 vkbZVe la- 45½

ch ,l vkj tkyksj 2013 ist u0 5 dzekaad u0 45

22.05 9 96.95 128

21

45x45x45 lseh- eki ds xM~Ms djuk dBksj feV~Vh 400 xM~Ms@gSDVj

ch ,l vkj tkyksj 2013 ist u0 14 dzekaad u0 128 v

7.4 0 0 7.4

22 ikS/ks jksi.k djuk

ch ,l vkj tkyksj 2013 ist u0 14 dzekaad u0 129 c

3.2 0 0 3.2

23 ikS/kksa dh dher

cktkj nj vuqlkj

5 0 0 5

24

ikS/kksa dk ifjogu ikS/ks HkjkbZ ,oa [kkyh djkbZ lfgr 5 fd0eh- nwjh rd ds fy,

ch ,l vkj tkyksj 2013 ist u0 13 ,ao 18 dzekaad u0 121 10fdeh 190 l

0.74 0 0 0.74

Page 317: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

284

25

ikS/kks dks miyC/k ikuh fiykuk 15 yhVj@ikS/kksa ikS/kksjksi.k ds le;

ch ,l vkj tkyksj 2013 ist u0 14 dzekaad u0 131

1.9 0 0 1.9

26

Fkkoyk cukuk de ls de 50 lseh v)Z O;kl dk lk/kkj.k tehu esa

ch ,l vkj tkyksj 2013 ist u0 14 dzekaad u0 133 v

2.6 0 0 2.6

27

ikS/kksa dh fujkbZ xqMkbZ djuk 15 lseh xgjkbZ rd ,oa 45 lseh v)ZO;kl rd

ch ,l vkj tkyksj 2013 ist u0 14 dzekaad u0 132

1.3 0 0 1.3

28

pjkxkg gsrq ?kkl cht cqokbZ dk;Z 6 ls 8 fd-xzzk-@gsSDVj VªsDVj }kjk tqrkbZ ls

ch ,l vkj tkyksj 2013 ist u0 18 dzekaad u0 185 v

55.35 0 376 431.35

29

Dosjh jfol ftlesa 40 izfr'kr iRFkj ds Lyki gks ;ks ddaj ;k /kkmyk dks fcNkuk rFkk vkiwfrZ djuk ikuh fNmduk rFkk dqVuk

ch ,l vkj tkyksj 2013 ist u0 10 dzekaad u0 98

66.15 36 273.85 376

Page 318: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

285

Page 319: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

286

MAP OF THEMATIC LAYERS OF WATERSHED AREA IWMP -15 JALORE

Page 320: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

287

xzke iapk;r esM+k Åijyk dh xzke lHkk esa ** milfefr ¼tyxzg.k½ xzke iapk;r esM+k Åijyk ** dk xBu djrs gq, ih-vkbZ-, okLdks dh WDT Vhe ds LknL; ljiap ]okMZ iap] ,oa xzkeh.k leqnk;A

Page 321: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

288

xzke esM+k Åijyk ds tyxzg.k eas vkus okys mipkfjr gksus okys {ks= dh mifLFkr xzkeh.k leqnk; ,oa ykHkkfUorks tkudkjh nsrs ih-vkbZ-, okLdks dh WDT Vhe ds LknL;A

Page 322: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

289

xzke iapk;r paojNk esa **mi lfefr ¼tyxzg.k½ xzke iapk;r paojNk** ds xBu dh lwpuk dk vke pkSgVs ij pLik dj mifLFkr xzkeh.kksa dks lwpuk nh xbZA

Page 323: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

290

xzke iapk;r Å.k dh xzke lHkk esa ** milfefr ¼tyxzg.k½ xzke iapk;r Å.k ** dk xBu djrs gq, ih-vkbZ-, okLdks dh WDT Vhe ds LknL; ljiap] okMZ iap] lfpo ,oa xzkeh.k leqnk;A

Page 324: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

291

xzke iapk;r Å.k ds tyxzg.k {ks= esa vkus okys xkao dkuhokM+k esa lgHkkxh xzkeh.k vkdyu @lgHkkxh lh[k o fdz;k ¼ ih-vkj-, @ ih-,y-,½ ds rgr lkekftd ekufp+=.k }kjk vk/kkjHkwr lsokvksa ds LFkku dk vH;kl djrs mifLFkr xzkeh.k leqnk;A

Page 325: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

292

xzke iapk;r Å.k ds xzke dkfuokM+k ds tyxzg.k eas vkus okys {ks= dh mifLFkr xzkeh.k leqnk; ,oa ykHkkfUorks tkudkjh nsrs ih-vkbZ-, okLdks dh WDT Vhe ds LknL;A

Page 326: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

293

xzke iapk;r esM+k Åijyk esa lgHkkxh xzkeh.k vkdyu @lgHkkxh lh[k o fdz;k ¼ ih-vkj-, @ ih-,y-,½ ds rgr lkekftd ekufp+=.k }kjk vk/kkjHkwr lsokvksa ds LFkku dk vH;kl

djrs mifLFkr xzkeh.k leqnk;A ih-vkbZ-, okLdks dh WDT Vhe ds LknL;A

Page 327: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

294

xzke iapk;r esM+k Åijyk esa lgHkkxh xzkeh.k vkdyu @lgHkkxh lh[k o fdz;k ¼ ih-vkj-, @ ih-,y-,½ ds rgr lkekftd ekufp+=.k }kjk vk/kkjHkwr lsokvksa ds LFkku dk vH;kl

djrs mifLFkr xzkeh.k leqnk;A ih-vkbZ-, okLdks dh WDT Vhe ds LknL;A

Page 328: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

295

xzke iapk;r Å.k ds tyxzg.k eas vkus okys xkao jktuokM+h ds {ks= dh mifLFkr xzkeh.k leqnk; ,oa ykHkkfUorks tkudkjh nsrs ih-vkbZ-, okLdks dh WDT Vhe ds LknL;A

Page 329: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

296

xzke iapk;r Å.k ds tyxzg.k {ks= esa vkus okys xkao jktuokM+h esa lgHkkxh xzkeh.k vkdyu @lgHkkxh lh[k o fdz;k ¼ ih-vkj-, @ ih-,y-,½ ds rgr lkekftd ekufp+=.k }kjk vk/kkjHkwr lsokvksa ds LFkku dk vH;kl djrs mifLFkr xzkeh.k leqnk;A

Page 330: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

297

xzke iapk;r paojNk ds tyxzg.k {ks= esa vkus okys xkao NhijokM+k esa lgHkkxh xzkeh.k vkdyu @lgHkkxh lh[k o fdz;k ¼ih-vkj-, @ ih-,y-,½ ds rgr lkekftd ekufp+=.k }kjk vk/kkjHkwr lsokvksa ds LFkku dk vH;kl djrs mifLFkr xzkeh.k leqnk;A

Page 331: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

298

xzke iapk;r paojNk ds tyxzg.k {ks= esa vkus okys xkao paojNk esa lgHkkxh xzkeh.k vkdyu @lgHkkxh lh[k o fdz;k ¼ ih-vkj-, @ ih-,y-,½ ds rgr lkekftd ekufp+=.k }kjk vk/kkjHkwr lsokvksa ds LFkku dk vH;kl djrs mifLFkr xzkeh.k leqnk;A

Page 332: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

299

xzke iapk;r paojNk ds tyxzg.k {ks= esa vkus okys xkao paojNk esa lgHkkxh xzkeh.k vkdyu @lgHkkxh lh[k o fdz;k ¼ ih-vkj-, @ ih-,y-,½ ds rgr lkekftd ekufp+=.k }kjk vk/kkjHkwr lsokvksa ds LFkku dk vH;kl djrs mifLFkr xzkeh.k leqnk;A

Page 333: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

300

xzke iapk;r paojNk ds tyxzg.k {ks= esa vkus okys xkao cqM+rjk esa lgHkkxh xzkeh.k vkdyu @lgHkkxh lh[k o fdz;k ¼ ih-vkj-, @ ih-,y-,½ ds rgr lkekftd ekufp+=.k }kjk vk/kkjHkwr lsokvksa ds LFkku dk vH;kl djrs mifLFkr xzkeh.k leqnk;A

Page 334: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

301

Page 335: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

302

Page 336: IWMP 15 Jalore DPR Final 180613 - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · office of the watershed consultants organisation (wasco ) (pia) iwmp

303


Recommended