1
DETAILED PROJECT REPORT OF IWMP
(2011– 2016)
Micro Watershed & Micro Watershed Code No
: Bagulamari MWS
: Kakragaon MWS
: Naitamara MWS
: Naldoba MWS
IWMP project : BONGAIGAON- (KUJIA NALA IWMP)
Block : Dangtola Dev. Block
District : Bongaigaon
Name of the PIA : Divisional Soil Conservation Office, Barpeta Division,Barpeta, Assam
1
Contents
ACKNOWLEDGEMENT- CHAPTER 1
Introduction and Background
CHAPTER 2
General Description of Project Area
CHAPTER – 3
Base Line Information of Watershed
CHAPTER – 4
Institutional Building and Project Management
CHAPTER – 5
Management/Action Plan
CHAPTER 6
Capacity Building Plan
CHAPTER 7
Phasing of Programme and Budgeting
CHAPTER 8
Consolidation and Completion of Various Works
CHAPTER – 9
Expected Outcomes
2
CHAPTER 1 INTRODUCTION AND BACKGROUND
Project Background: 1 Name of the State Assam 2 Name of the project BONGAIGAON- (KUJIA NALA IWMP) 3 Name of the District Bongaigaon 4 Names of the Blocks Dangtola
5 Names of Gram Panchayats
1. Chikibiki 2. Kakragaon 3. Chaprakata 4. Atugaon 5. Tilokgaon 6. Bamunitila 7. Bidyapur
6 Names & Census Code of Villages covered
MWS Name Census Code
Block Name GP Name
Bagulamari MWS
Bagulamari 00402700 Dangtola Chikibiki Pachim Bhadra 00402600 Dangtola Kakragaon
Pub-Bhadra 00406200 Dangtola Kakragaon Pub-Bhadra No.1 00404800 Dangtola Kakragaon
Pub-Bhadra No.2 00404900 Dangtola Kakragaon
Rabhapara 00402000 Dangtola Chaprakata Saraikhoshra 00402900 Dangtola Chaprakata Tokeamari 00402800 Dangtola Chikibiki
Kakragaon MWS
Bhumeswar Hill N.C. 00404700 Dangtola Chikibiki
Dabli 00401800 Dangtola Kakragaon Kakragaon 00401900 Dangtola Kakragaon Kashugaon 00404400 Dangtola Atugaon Tangaigon 00403900 Dangtola Atugaon Tilpukhuri 00403700 Dangtola Atugaon
Naitamara MWS
Barchara 00402400 Dangtola Tilokgaon Didari 00401700 Dangtola Kakragaon Ghilaguri 00402100 Dangtola Kakragaon Naitamara 00402300 Dangtola Tilokgaon Tilakgaon 00402500 Dangtola Tilokgaon
Naldoba MWS
Bhandarani 00405500 Dangtola Bamunitila Durgamari 00405400 Dangtola Bidyapur Hallahguri 00403200 Dangtola Chikibiki Nachankhuti 00403100 Dangtola Chikibiki Naldoba 00405100 Dangtola Bidyapur Sikibiki 00403000 Dangtola Chikibiki
3
7 Four major reasons for selection of watershed
1. There is no means of water harvesting and conservation means to have a good crop round the year. 2. A large portion of the population is under poverty. 3. Acute shortage of drinking and irrigation water 4. There is no other sector available for livelihood for the landless and / or the poorest.
8 Name, Address , Phone No and Reg.No.. of the PIA(s)
Nagaon Soil Conservation Department, Nagaon,Assam
9 Date of approval of Watershed Development Plan by the DPC
10 Area of the Project (ha.) 6113 Ha
11 Area proposed to be treated (ha.) 4000 Ha
12 Financial Year of sanction 2011-12
13 Project duration 6 Years
14 Project Cost (Rs. in Lakhs) 480.00 Lakhs
15 Date of Sanction by State authority
16 Date of Release of 1st Installment of Central Assistance (To be filled by DoLR)
17 Any other, please specify
4
Integrated Watershed Management Programme (IWMP) is a modified programme of previous Drought Prone Areas Programme (DPAP), Desert Development Programme (DDP) and Integrated Wastelands Development Programme (IWDP) of the Department of Land Resources, Government of India. The scheme was launched during 2009-10. The main objectives of the IWMP are to restore the ecological balance by harnessing, conserving and developing degraded natural resources such as soil, vegetative cover and water. The outcomes are prevention of soil erosion, regeneration of natural vegetation, rain water harvesting and recharging of the ground water table. This enables multi-cropping and the introduction of diverse agro-based activities, which help to provide sustainable livelihoods to the people residing in the watershed area.
Every land area, regardless of its location, is part of a watershed. Some are hilly and others are relatively flat. Every watershed has a physical landscape a complex terrain of landforms, water resources, vegetation, animals and their habitats, human beings and the structures they have built. At the watershed scale, conflicts over water and land resources are inherently multi-attribute, multi-stakeholder, and multi-discipline decision problems. Watershed systems from those with many small tributaries to large-scale lake systems and river basins provide direct inputs to economic processes, serve as waste sinks for economic output, and provide ecosystem services that make life possible.
In recent years, the concepts of integrated watershed management have gained increasing
attention as strategies for sustainable resource use within a complex multi-institutional regulatory context. Watershed is a basic hydrologic unit, and hydrologic and ecologic processes govern the quality of soil and water resources within the watershed. Soil degradative processes are accentuated by anthropogenic factors. It is appropriate; therefore, that issues related to sustainable management of natural resources (e.g., food security and environment quality) are addressed within the context of watershed management.
Integrated Watershed management implies rational utilization of natural resources for optimal
and sustained production with minimum hazard to environment. It requires collection and analysis of
information from multiple services to ensure sustainable economic and social progress of a watershed. In India despite of having a good network of streams and rivers the region is facing the crisis of water stress and degradation of land, which in turns creates hurdles for million of farmers in practicing agriculture. In case of Assam, the Brahmaputra is the major river systems having a dense network of tributaries that have created a large fluvial base for the entire geographical area of the state. Assam experiences moderately hot and humid weather situation, through seasonal variation of pre-monsoon, monsoon, post-monsoon and dry-winter
5
Problems:
The Kijia Nala Watershed is located in the Eastern part of Bongaigaon District, Assam. The
geographically the project area is located between 90°24'11.386"E to 90°31'28.12"E longitude and 26°28'7.035"N to 26°21'18.92"N latitude. The watershed area covered 25 numbers of revenue villages under Dangtola Dev. Block. The total project area of the watershed is about 6113 Ha. The region is having a population density of 515 persons /sq.km with per capita agricultural land availability is of – 0.106 hectares, which itself indicates population pressure over the regions and its link with food security. From these perspectives also it is desired that the proposed intervention under IWMP programme can able to address these issues pragmatically.
The Kijia Nala Watershed is characterized by undulating topography with numerous streams and wetlands. The major problems of the watershed are – Firstly degradation and congestion of natural water bodies like wetlands and other natural drainage secondly, flood is a major concern for the watershed which cause instant devastation of the life and properties, thirdly, run-off originating from seasonal rain attain high velocity due to medium to steep gradient which prevail in the watershed and thereby causes all types of soil erosion hazards. Fourthly, lack of sufficient vegetal cover in the project area is a permanent factor effecting the infiltration and percolation of surface flow leading to severe moisture stress in the soil which affects the economy of the people in the long run. Besides above, the uneven rainfall, river bank erosion, lack of irrigation facilities, damage caused by pest and diseases in agricultural production etc are also important problems in the project area.
Need and Scope for Watershed Development
Degradation of soil and water resources is considered not only as an utmost constraint to sustainable
agricultural development but also a threat to the society. Poor ecosystem management has and will result in the impaired functioning of watershed and will continue to do so in the future and the need to protect and preserve the quality of the ecosystem is very essential. Due to rapid growth of population there is an excessive demand for more land both for agriculture and non-agriculture use. This has created a vast stretches of wastelands and some are on the verge of becoming wastelands. There is need to reverse the trend by treating wastelands. Land which is degraded by natural forces needs improvement by appropriate interventions.
6
Watershed management is the implementation of management systems that ensure the preservation, conservation and sustainable use of all land and water resources. Watershed management also integrates various aspects of forestry, agriculture, hydrology, ecology, soils etc. for choosing acceptable management alternative within the specific social and economic context. As mention above, the major problems of the Dimaru Watershed are degradation of Natural Resources, soil erosion, siltation etc. and therefore there is a huge scope for taking up watershed development activities in the watershed area.
There are challenges of eco-friendly sustainable development can be addressed by the watershed management through judicious use of land and water resources through proper empowerment of general
masses of the area. Proper measures for water harvesting in so doing farmers participatory watershed management approaches have to be adopted with more focuses on following aspects:
Farmer participatory approach through cooperation and not through contractual mode.
Use of new scientific tools for management and monitoring of watersheds through linking of on-
station and on-farm watersheds.
A holistic system’s approach to improve livelihoods of people and not merely conservation of soil and water compartmental approach.
A consortium of institutions for technical backstopping of the on-farm watersheds.
A micro-watershed within the watershed where farmers conduct strategic research with technical guidance from the scientists. Planned gradual shift from contractual mode of participation to consultative and collective mode of participation.
Low-cost soil and water conservation measures and structures throughout the top sequence to achieve equity.
Amalgamation of traditional knowledge and new knowledge for efficient management of natural resources.
Emphasis on individual farmer-based conservation measures for increasing productivity of individual farms and private economic gains along with community-based soil and water conservation measures for ecosystem services.
Minimize free supply of inputs for undertaking evaluation of technologies. Farmers are encouraged to evaluate new technologies themselves with empowerment.
Continuous monitoring, evaluation and refinement of options by the stakeholders.
Empowerment of community individuals and strengthening of village institutions for managing
natural resources.
7
Table No. 1.2 Need and Scope for Watershed Development
Project Name Project Type
Weightage
i ii Iii iv v vi vii ix x xi xii xiii
BONGAIGAON- (KUJIA NALA IWMP) Plain 5 3 5 3 0 0 10 7.5 15 15 0 10
*As per PPR
Slno. Criteria Max Score Ranges and Scores i Poverty index(%of
poor to population) 10 Above 80%
(10) 80 to 50 % (7.5)
50 to 20 % (5)
Below 20% (2.5)
ii % of SC/ST population
10 More than 40% (10)
20 to 40 % (5)
Less than 20% (3)
iii Actual wages 5 Actual wages are significantly lower than minimum wages (5)
Actual wages are equal to or higher than minimum wages (0)
iv % of small and marginal farmers
10 More than 80% (10)
50 to 80% (5)
Less than 50 (3)
v Ground water status
15 Over exploited (15)
Critical (10) Sub critical (5)
Safe (0)
vi Moisture index/ DPAP/DDP Block
10 -66.7 & below (10) DDP Block
-33.3 to -66.6 (5) DPAP Block
0 to -33.2 (0) Non DPAP/DDP Block
vii Area under assured irrigation
15 Less than 10% (15)
10 to 20% (10)
20 to 30% (5)
Above 30% (Reject)
viii Drinking water 10 No source (10)
Problematic village (7.5)
Partially covered (5)
Fully covered (0)
ix Degraded land 15 High – above 20% (15)
Medium – 10 to 20 % (10)
Low – less than 10 % of TGA (5)
8
x Productivity potential of the land
10 Lands with low production & where productivity can be significantly enhanced with reasonable efforts (10)
Land with moderate production & where productivity can be enhanced with reasonable efforts (5)
Lands with high production & where productivity can be marginally enhanced with reasonable efforts (0)
xi Contiguity to another watershed that has already been developed/treated
10 Contiguous to previously treated watershed & contiguity within the micro watersheds in the project (10)
Contiguity with in the micro watersheds in the project but non contiguous to previously treated watershed (5)
Neither contiguous to previously treated watershed nor contiguity within the micro watersheds in the project (0)
xii Cluster approach in the plains (more than one contiguous micro-watersheds in the project)
15 Above 6 micro-watersheds in cluster (15)
4 to 6 micro watersheds in cluster (10)
2 to 4 micro watersheds in cluster (5)
xiii Cluster approach in the hills (More than one contiguous micro- watersheds in the project)
15 Above 5 micro-watersheds in cluster (15)
3 to 5 micro watersheds in cluster (10)
2 to 3 micro watersheds in cluster (5)
Total 150 150 90 41 2.5
9
Table no.1.3: Watershed information
Sl no
Name of Project Watershed Code Villages to be Treated Geographical
Area(Ha) Treatable Area(Ha)
Approval Year
1 BO
NGAI
GAON
- (K
UJIA
NAL
A IW
MP)
Bagulamari MWS
Bagulamari 287
4000 Ha 2011-12
2 Pachim Bhadra 199
3 Pub-Bhadra 152
4 Pub-Bhadra No.1 98
5 Pub-Bhadra No.2 79
6 Rabhapara 186
7 Saraikhoshra 225
8 Tokeamari 224
9
Kakragaon MWS
Bhumeswar Hill N.C. 1142
10 Dabli 143
11 Kakragaon 132
12 Kashugaon 231
13 Tangaigon 171
14 Tilpukhuri 214
15
Naitamara MWS
Barchara 181
16 Didari 210
17 Ghilaguri 161
18 Naitamara 258
19 Tilakgaon 199
20
Naldoba MWS
Bhandarani 238
21 Durgamari 267
22 Hallahguri 238
23 Nachankhuti 334
24 Naldoba 252
25 Sikibiki 288
Total 6112
1
Table No.1.4: Status of other development project in the area Sl. no
Name of the programme/scheme
Sponsoring agency Objectives of the programme/scheme Year of
commencement Villages covered Estimated number of beneficiaries
1
The Mahatma Gandhi National Rural Employment Guarantee Act (MGNREGA)
Department of Rural Development, Ministry of Rural Development
Is to enhance livelihood security in rural areas by providing at least 100 days of guaranteed wage employment in a financial year to every household whose adult members volunteer to do unskilled manual work.
2009-10
--
2 National Rural Drinking Water Programme
Ministry of Drinking Water & Sanitation, Govt. of India
Source sustainability, community managed programmes and recognition of the gap between infrastructure created and service available Installation of a water source will not be considered as the criteria for fully covered habitation, but adequate water supply received by all household of the habitations will be the criteria. Change the lpcd (litres per capita per day) standard as a mean of measuring availability of water, but look at larger and various indicators of water security; Focus on ensuring household level drinking water security through preparation of village water security plans and household level water budgeting. Conjunctive use of surface and groundwater and focus on rainwater harvesting for recharge. For old and new ground water schemes, recharge mechanisms will be made mandatory; Need for social regulation of agricultural water for meeting the demand of drinking water; Revival of traditional systems of water conservation and introduction of catchment protection schemes for surface water;
2009
2
Table No. 1.5: Status of previous watershed programme
S. No Project name Year
started
Name of
villages
No. Of micro
watershed
Watershed
codes
Area under
treatment Funding source
Nodal agency PIA Total
cost
Expenditure incurred up to start of
IWMP
% financial completion
% physical completion
1 Moramanash River Watershed Dev. Project
2001-02
Deptt. Of Agriculture
Deptt. Of Agriculture 145
2 Tunia Water Shed Hariyali Project 2004-05 Deptt. Of
Agriculture 135
3 Tamranga Watershed Hariyali Project
2006-07 Deptt. Of Agriculture 54
1
CHAPTER 2
General Description of Project Area Table 2.1: Location Longitude 90°24'11.386"E to 90°31'28.12"E Latitude 26°28'7.035"N to 26°21'18.92"N State Assam District Bongaigaon Subdivision Bongaigaon Block Dangtola Panchayat 1. Chikibiki 2. Kakragaon 3. Chaprakata 4. Atugaon 5. Tilokgaon 6. Bamunitila 7.
Bidyapur
Villages Bagulamari Pachim Bhadra Pub-Bhadra Pub-Bhadra No.1 Pub-Bhadra No.2 Rabhapara Saraikhoshra Tokeamari Bhumeswar Hill N.C. Dabli Kakragaon Kashugaon Tangaigon Tilpukhuri Barchara Didari Ghilaguri Naitamara Tilakgaon Bhandarani Durgamari Hallahguri Nachankhuti Naldoba Sikibiki
Approach Road NH-37
2
Location of Watershed :
The Kujia Nala Watershed is located in the Eastern part of Bongaigaon District, Assam. The geographically the project area is located between 90°24'11.386"E to 90°31'28.12"E longitude and 26°28'7.035"N to 26°21'18.92"N latitude. The watershed area covered 25 numbers of revenue villages under Dangtola Dev. Block. The total project area of the watershed is about 6113 Ha.
Physiography:
The physiography of the project area is characterized by a number of swamps; water logged low areas, lakes and marshes. The builtup plain is an extensive alluvial plain which covers almost entire watershed area. The region has a lattice network of numerous river channels and it characterized with lakes and marshes. Owing to the intrusion of water from the river Brahmaputra during the monsoons, many swamps and marshes are created within this built up plain.
The area forms a significant part of the vast alluvial flood plain of the Brahmaputra, dominated by a profusion of depositional land forms including abandoned channels, not to mention vast lengths of wetland.
Climate:
The general climate of the district is characterised by hot and wet summers and dry, cool winters. The overall climate can be divided as pre-monsoon, post monsoon and winter. The pre-monsoon occurs from the month of March to May. The rainfall during this period range between twenty to thirty percent of the annual precipitation. The monsoon season starts in June and continues throughout the month of August. The post monsoon season extends from September to November; and thereafter, both temperature and
rainfall decreases to a cold and dry winter which starts from November and continues up to February. Post winter, from the month of February to April, is generally dry and pleasant. The mean of maximum and minimum temperatures varies from 29.90C to 18.90C and the average annual rainfall is 421.71cm. Maximum rainfall is received from the south west monsoon during June to August.
3
Rainfall Data of Bongaigaon District for Last 5 Years (2006-2010)
year January Feb ruary March April May June July August
Sept-ember
Oct-ober
November
Dece-mber
2006 0 23 13 59 186 187 160 157 180 62 22 23 2007 0 57 13 160 109 290 298 240 281 123.6 46 0 2008 17 3 62 160 100 254 161 288 216 94 0 0 2009 0 2 23 28 79 87 159 150 85 101 1 0 2010 0 0 46 169 206 226 163 363 161 106 6 3
Source: India Meteorological Department, HYDROMET DIVISION.
Variation in Rainfall : (from January to June)
Source: India Meteorological Department, HYDROMET DIVISION.
4
Variation in Rainfall : (from July to December)
Source: India Meteorological Department, HYDROMET DIVISION.
Annual Rainfall for Last Seven Years (in mm)
Year Total 2004 1669.5 2005 1429.4 2006 1320.9 2007 1637.7 2008 1813.5 2009 1296.3 2010 1800.6
Source: India Meteorological Department, HYDROMET DIVISION.
Graph : Variation in Annual Rainfall of Bongaigaon District, Assam for last 7 Years
5
Departures of Rainfall: Year year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2006 -100 24 -76 -54 -10 -44 -59 -54 -25 -53 11 148 2007 -100 211 -75 25 -47 -13 -24 -30 43 -7 128 -100 2008 24 -81 16 25 -51 -24 -59 -16 -9 -29 -100 -100 2009 -100 -90 -58 -78 -61 -74 -59 -56 -64 -24 -97 -99 2010 -100 -100 -15 32 1 -32 -58 6 -32 -20 -70 -66
(% Dep. are the Departures of rainfall from the long period averages of rainfall for the District.)
(Graph shown Departure of rainfall of Bongaigaon District since 2006 to 2010)
Drainage & Water bodies: The watershed area is endowed with mainly three perennial streams namely Champamati River,Kujia Nadi,Kanjbhur River, Ghoga Nadi,Ghoga Nadi, Bhandarani Nadi etc. Apart from the above streams the watershed is also endowed with many beels (wetlands).
6
Soil:
The general and average soil character of cultivable land in the watershed is mainly alluvial and composed of mixture of sand (course to loamy). From soil resource mapping and taxonomic classification carried by the Natural Bureau of Soil Survey and Land Use Planning (NBSSLUP) it is observed that there are basically three types of taxonomic classification of are found with the watershed namely - Fine Silty, Typic Udifluvents, Coarse-Silty, Mollic Fluvaquents and Fine Loamy Typic Dystrochrepts. The characteristics of Fine Silty, Typic Udifluvents is moderately deep, moderately well drained, very severe flooding associated with deep well drained sandy soils. The Coarse-Silty, Mollic Fluvaquents is deep well drained having loamy surface with very severe flooding and Fine Loamy Typic Dystrochrepts is charecterised by Deep, excessively drained, fine loamy soils occurring on moderately to steeply sloping side slopes having loamy surface with severe erosion.
Characteristics of Dominant Soil:
Particulars Fine Silty, Typic Udifluvents Coarse-loamy, Aeric Fluvaquents
Coarse-Silty, Mollic Fluvaquents
Morphology Valleys Valleys Valleys
Surface Texture loamy loamy loamy
Parent Material Alluvial Alluvial Alluvial Soil Depth Deep (> 100 cm) Deep (> 100 cm) Deep (> 100 cm) Particle Size Class Fine Silty Coarse-loamy Coarse-Silty Mineralogy Mixed Mixed Mixed Soil temperature regime Hyperthermic (220-280 C) Hyperthermic (220-280 C) Hyperthermic (220-280 C) Reaction (pH) Slightly Acidic (5.5 -6.5) Neutral (6.5-7.5) Neutral (6.5-7.5) Drainage Class Moderately Well Well Well Ground Water Depth Moderately deep (3 Mtr.) Moderately deep (3 Mtr.) Moderately deep (3 Mtr.) Slope Level to nearly level(0-1%) Level to nearly level(0-1%) Very gently Sloping (1-3%)
7
Ground Water:
The depth of ground water level in water table zone varies from 0.41 to 3.07 m bgl in the pre monsoon period and 0.56 to 3.41 m bgl during post monsoon period. The area is very much suitable for construction of ground water abstraction structures for discharge ranging from 100-300 M3/hr. Ground water occurs under water table conditions.
Economy:
The economy of the project area depends on agriculture. Paddy is the major crop and it cultivated in kharif and land remains uncultivated for rest of the year. The farming system is traditional. Low agricultural productivity, lack of irrigation facilities, damage cause by pest and diseases are the major
constraints for the agricultural development of the region. Further fishing, livestock rearing handloom and weaving are other important economic activities of the watershed area.
Land Use/ Land Cover:
The following landuse categories are identified through visual interpretation of remote Sensing Map and supported by field verification. The identified main landuse categories are –Agricultural land (kharif), Wetland and rural habitation including homestead plantation.
8
Table no: 2.2 Land Details S.
No. Names of villages Geographical Area of the village (ha) Forest Area (ha)
Land under agricultural use
(ha) Rain-fed area
(ha) Irrigated
Area Permanent
pastures (ha) Wasteland
Cultivable (ha) Non-cultivable (ha)
1 Bagulamari 287 8 212 184 29 0 21 0 2 Pachim Bhadra 199 1 117 108 8 0 43 0 3 Pub-Bhadra 152 0 128 93 35 0 0 0 4 Pub-Bhadra No.1 98 0 56 49 7 0 0 0 5 Pub-Bhadra No.2 79 0 49 35 14 0 0 0 6 Rabhapara 186 2 151 129 22 0 0 0 7 Saraikhoshra 225 0 132 132 0 0 70 0 8 Tokeamari 224 0 129 118 11 0 46 0 9 Bhumeswar Hill N.C. 1142 367 524 474 50 0 60 0
10 Dabli 143 0 111 85 26 0 0 0 11 Kakragaon 132 0 96 80 16 0 7 0 12 Kashugaon 231 189 20 0 20 0 21 0 13 Tangaigon 171 3 143 120 23 0 0 0 14 Tilpukhuri 214 11 149 128 21 0 3 0 15 Barchara 181 0 137 117 20 0 13 0 16 Didari 210 2 167 139 28 0 29 0 17 Ghilaguri 161 0 130 102 28 0 7 0 18 Naitamara 258 0 207 160 47 0 18 0 19 Tilakgaon 199 0 185 165 20 0 1 0 20 Bhandarani 238 0 207 207 0 0 3 0 21 Durgamari 267 0 237 222 15 0 2 0 22 Hallahguri 238 0 194 169 25 0 0 0 23 Nachankhuti 334 2 227 190 38 0 6 0 24 Naldoba 252 0 150 139 11 0 71 0 25 Sikibiki 288 0 187 170 17 0 63 0
Total 6112 585 4044 3515 529 0 485 0
9
Table No. 2.3: Details of the types of areas covered under the project 1 2 3
S. No. Name of Village No. of beneficiaries covered
MF SF LF Landless Total
1 Bagulamari 351 23 4 91 469 2 Pachim Bhadra 433 25 2 105 565 3 Pub-Bhadra 115 7 3 26 151 4 Pub-Bhadra No.1 77 5 0 19 101 5 Pub-Bhadra No.2 120 8 2 29 159 6 Rabhapara 40 3 0 10 53 7 Saraikhoshra 44 3 1 9 57 8 Tokeamari 172 11 3 42 228 9 Bhumeswar Hill N.C. 2 0 0 0 2 10 Dabli 105 7 2 26 140 11 Kakragaon 68 5 1 16 90 12 Kashugaon 114 8 2 28 152 13 Tangaigon 321 22 7 79 429 14 Tilpukhuri 81 7 0 21 109 15 Barchara 199 15 1 50 265 16 Didari 185 13 1 47 246 17 Ghilaguri 235 23 2 167 427 18 Naitamara 184 14 0 48 246 19 Tilakgaon 78 6 0 21 105 20 Bhandarani 150 10 2 38 200 21 Durgamari 359 25 3 85 472 22 Hallahguri 105 8 1 25 139 23 Nachankhuti 179 15 1 44 239 24 Naldoba 243 17 5 59 324 25 Sikibiki 270 19 5 66 360
Total 4230 299 48 1151 5728
10
Table No. 2.3: Details of the types of areas covered under the project 1 2 3 4 5 6 7
Sl. No. Name of the
Project
Name of the Agro-
climatic zone covers project area
Area in ha Names of the villages
Major soil types Major crops
a)Type b) Area in ha
a) Name
b) Area in ha
1
BONG
AIGA
ON-4
(KU
JIA N
ALA
IWMP
)
Lower Brahmaputra
Valley
287 Bagulamari Fine Loamy (Aeric Fluvaquents),Fine Loamy (Aquic Udifluvents) 287 Paddy 212 2 199 Pachim Bhadra Fine Loamy (Aquic Udifluvents) 199 Paddy 117 3 152 Pub-Bhadra Fine Loamy (Aeric Fluvaquents),Fine Loamy (Aquic Udifluvents) 152 Paddy 128 4 98 Pub-Bhadra No.1 Fine Loamy (Aeric Fluvaquents),Fine Loamy (Lithic Dystrochrepts) 98 Paddy 56 5 79 Pub-Bhadra No.2 Fine Loamy (Aeric Fluvaquents) 79 Paddy 49 6 186 Rabhapara Fine Loamy (Aeric Fluvaquents),Fine Loamy (Aquic Udifluvents) 186 Paddy 151 7 225 Saraikhoshra Fine Loamy (Aquic Udifluvents) 225 Paddy 132 8 224 Tokeamari Fine Loamy (Aquic Udifluvents) 224 Paddy 129 9 1142 Bhumeswar Hill N.C. Fine Loamy (Aeric Fluvaquents),Fine Loamy (Lithic Dystrochrepts) 1142 Paddy 524 10 143 Dabli Fine Loamy (Aeric Fluvaquents) 143 Paddy 111 11 132 Kakragaon Fine Loamy (Aeric Fluvaquents) 132 Paddy 96 12 231 Kashugaon Fine Loamy (Aeric Fluvaquents),Fine Loamy (Lithic Dystrochrepts) 231 Paddy 20 13 171 Tangaigon Fine Loamy (Aeric Fluvaquents),Fine Loamy (Lithic Dystrochrepts) 171 Paddy 143 14 214 Tilpukhuri Fine Loamy (Aeric Fluvaquents),Fine Loamy (Lithic Dystrochrepts) 214 Paddy 149 15 181 Barchara Fine Loamy (Aquic Udifluvents) 181 Paddy 137 16 210 Didari Fine Loamy (Aeric Fluvaquents),Fine Loamy (Aquic Udifluvents) 210 Paddy 167 17 161 Ghilaguri Fine Loamy (Aeric Fluvaquents),Fine Loamy (Aquic Udifluvents) 161 Paddy 130 18 258 Naitamara Fine Loamy (Aquic Udifluvents) 258 Paddy 207 19 199 Tilakgaon Fine Loamy (Aquic Udifluvents) 199 Paddy 185
11
1 2 3 4 5 6 7
Sl. No. Name of the
Project
Name of the Agro-
climatic zone covers project area
Area in ha Names of the villages
Major soil types Major crops
a)Type b) Area in ha
a) Name
b) Area in ha
20 238 Bhandarani Fine Loamy (Aeric Fluvaquents),Fine Loamy (Aquic Udifluvents) 238 Paddy 207 21 267 Durgamari Fine Loamy (Aeric Fluvaquents),Fine Loamy (Aquic Udifluvents) 267 Paddy 237 22 238 Hallahguri Fine Loamy (Aeric Fluvaquents),Fine Loamy (Aquic Udifluvents) 238 Paddy 194 23 334 Nachankhuti Fine Loamy (Aeric Fluvaquents),Fine Loamy (Aquic Udifluvents) 334 Paddy 227 24 252 Naldoba Fine Loamy (Aquic Udifluvents) 252 Paddy 150 25 288 Sikibiki Fine Loamy (Aquic Udifluvents) 288 Paddy 187
12
Table No. 2.5 Details of flood and drought in the project area 1 2 3 4 5
Sl. No. Particulars Villages
Periodicity
Not affected Zonation of Flood (1998-2007)
Frequency of Flood during 1998-2007
1 Flood No. of villages
Name(s) of villages
Bagulamari Moderate 5-6 Times
Pachim Bhadra Low 3-4 Times
Pub-Bhadra Moderate 5-6 Times
Pub-Bhadra No.1 Moderate 5-6 Times
Pub-Bhadra No.2 Moderate 5-6 Times
Rabhapara Low 3-4 Times
Saraikhoshra Moderate 5-6 Times
Tokeamari Moderate 5-6 Times
Bhumeswar Hill N.C. VeryLow 1-2 Times
Dabli High 7-8 Times
Kakragaon High 7-8 Times
Kashugaon Low 3-4 Times
Tangaigon Moderate 5-6 Times
Tilpukhuri Moderate 5-6 Times
Barchara Moderate 5-6 Times
Didari Moderate 5-6 Times
Ghilaguri VeryLow 1-2 Times
Naitamara VeryLow 1-2 Times
Tilakgaon VeryLow 1-2 Times
Bhandarani High 7-8 Times
Durgamari Low 3-4 Times
Hallahguri Moderate 5-6 Times
Nachankhuti VeryLow 1-2 Times
Naldoba Moderate 5-6 Times
Sikibiki Low 3-4 Times
Source of Flood Data: NRSC, Hyderabad
13
Table No. 2.6: Details of soil erosion in the project area 1 2 3 4 5
Cause Type of erosion
Area affected
(ha)
Run off Average soil loss (Tonnes/ ha/ year)
(mm/ year) Water erosion
Bagulamari MWS Sheet 508
Slight(<5 Ton ), Moderate(10-15 Ton ) ,Severe(20-40 Ton) Rill 16
Gully 1
Kakragaon MWS Sheet 712
Slight( < 5 Ton ),Severe(20-40 Ton) Rill 19 Gully 0
Naitamara MWS Sheet 353
Slight( < 5 Ton ),Severe(20-40 Ton) Rill 11 Gully 2
Naldoba MWS Sheet 567
Slight(<5 Ton ), Moderate(10-15 Ton ) ,Severe(20-40 Ton) Rill 15
Gully 0 Total 2204
14
Table No. 2.7 Details of the Soil pH Name of the Villages Soil Ph Soil Type
Bagulamari Neutral (6.5-7.5) Fine Loamy (Aeric Fluvaquents),Fine Loamy (Aquic Udifluvents)
Pachim Bhadra Neutral (6.5-7.5) Fine Loamy (Aquic Udifluvents)
Pub-Bhadra Neutral (6.5-7.5) Fine Loamy (Aeric Fluvaquents),Fine Loamy (Aquic Udifluvents)
Pub-Bhadra No.1 Neutral (6.5-7.5) Fine Loamy (Aeric Fluvaquents),Fine Loamy (Lithic Dystrochrepts)
Pub-Bhadra No.2 Neutral (6.5-7.5) Fine Loamy (Aeric Fluvaquents)
Rabhapara Neutral (6.5-7.5) Fine Loamy (Aeric Fluvaquents),Fine Loamy (Aquic Udifluvents)
Saraikhoshra Neutral (6.5-7.5) Fine Loamy (Aquic Udifluvents)
Tokeamari Neutral (6.5-7.5) Fine Loamy (Aquic Udifluvents)
Bhumeswar Hill N.C. Neutral (6.5-7.5) Fine Loamy (Aeric Fluvaquents),Fine Loamy (Lithic
Dystrochrepts)
Dabli Neutral (6.5-7.5) Fine Loamy (Aeric Fluvaquents)
Kakragaon Neutral (6.5-7.5) Fine Loamy (Aeric Fluvaquents)
Kashugaon Neutral (6.5-7.5) Fine Loamy (Aeric Fluvaquents),Fine Loamy (Lithic Dystrochrepts)
Tangaigon Neutral (6.5-7.5) Fine Loamy (Aeric Fluvaquents),Fine Loamy (Lithic Dystrochrepts)
Tilpukhuri Neutral (6.5-7.5) Fine Loamy (Aeric Fluvaquents),Fine Loamy (Lithic Dystrochrepts)
Barchara Neutral (6.5-7.5) Fine Loamy (Aquic Udifluvents)
Didari Neutral (6.5-7.5) Fine Loamy (Aeric Fluvaquents),Fine Loamy (Aquic Udifluvents)
Ghilaguri Neutral (6.5-7.5) Fine Loamy (Aeric Fluvaquents),Fine Loamy (Aquic Udifluvents)
Naitamara Neutral (6.5-7.5) Fine Loamy (Aquic Udifluvents)
Tilakgaon Neutral (6.5-7.5) Fine Loamy (Aquic Udifluvents)
Bhandarani Neutral (6.5-7.5) Fine Loamy (Aeric Fluvaquents),Fine Loamy (Aquic Udifluvents)
Durgamari Neutral (6.5-7.5) Fine Loamy (Aeric Fluvaquents),Fine Loamy (Aquic Udifluvents)
Hallahguri Neutral (6.5-7.5) Fine Loamy (Aeric Fluvaquents),Fine Loamy (Aquic Udifluvents)
Nachankhuti Neutral (6.5-7.5) Fine Loamy (Aeric Fluvaquents),Fine Loamy (Aquic Udifluvents)
Naldoba Neutral (6.5-7.5) Fine Loamy (Aquic Udifluvents)
Sikibiki Neutral (6.5-7.5) Fine Loamy (Aquic Udifluvents)
Note: Fine Loamy (Fluvaquentic Dystrochrepts) localy known as Old Alluvial Soil
15
Table No.2.7.1 Climatic Condition
Sl No Year (2008) /month Average
Monthly Rain fall(in mm)
Average Annual rainfall(in mm)preceding 5 years
Temp(0C) Wind Velocity
Open pan evaporation (mm
per day) Relative
Humidity(RH) Average
Annual run off(mm/year)
Max Min
1 January 0.00
1836
24 10.8 4.08 2.58 95
890
2 February 8.40 25.1 11.3 3.84 3.3 87 3 March 40.30 28.1 15.3 4.02 4.25 91 4 April 160.80 31.3 21.3 3.62 4.75 95 5 May 210.50 31.7 23.8 3.19 4.81 95 6 June 208.90 31.7 25.8 3.07 4.37 99 7 July 486.30 32.9 26.1 2.99 4.15 97 8 August 254.80 31.9 25.8 2.79 4.45 99 9 September 155.30 30.9 25 2.74 3.71 97 10 October 77.10 31 22.9 3.09 3.05 98 11 November 0.60 27 17.7 3.74 2.81 94 12 December 5.70 25 11.4 4.03 2.31 85
13 Average Monthly Rain fall(in mm) 134.06 29.22 19.77
16
Table No.-2.8 Physiographic Features
Name of MWs Elevation(MSL) Slope Range(%) Order of Watersh
ed Major Stream
Toposequence Average annual soil loss(Ton /
hectare/year) (Soil series)
Bagulamari MWS
Maximum - 207 mtr., Minimum - 45 mtr. Average - 60 mtr.
Maximum Slope - 30.80 %, Average Slope- 1.70 %
Champamati River,Kujia Nadi,Kanjbhur River
Fine Loamy (Aeric Fluvaquents),Fine Loamy (Aquic Udifluvents),Fine Loamy (Lithic Dystrochrepts)
Slight(<5 Ton ), Moderate(10-15 Ton ) ,Severe(20-40 Ton)
Kakragaon MWS Maximum - 478 mtr., Minimum - 50 mtr. Average - 156 mtr.
Maximum Slope - 70 %, Average Slope- 18.60 %
Kujia Nadi,Ghoga Nadi,
Fine Loamy (Aeric Fluvaquents,Fine Loamy (Lithic Dystrochrepts)
Slight( < 5 Ton ),Severe(20-40 Ton)
Naitamara MWS Maximum -56 mtr., Minimum - 45 mtr. Average - 52 mtr.
Maximum Slope - 2.30 %, Average Slope- 0.60 %
Kanjbhur River,Duramari Nadi,Champamati River
Fine Loamy (Aeric Fluvaquents),Fine Loamy (Aquic Udifluvents),
Slight( < 5 Ton ),Severe(20-40 Ton)
Naldoba MWS Maximum - 50 mtr., Minimum - 40 mtr. Average - 45 mtr.
Maximum Slope - 6.90 %, Average Slope- 1.00 %
Champamati River,Bhandarani Nadi
Fine Loamy (Aeric Fluvaquents),Fine Loamy (Aquic Udifluvents),
Slight(<5 Ton ), Moderate(10-15 Ton ) ,Severe(20-40 Ton)
Table No. 2.9 Watershed characteristics Shape index of the watershed Length of main
stream Drainage density Average slope Watershed relief Perimeter of the
watershed
- 11947 0.10 1.20% Plain 117519
17
CHAPTER – 3 BASE LINE INFORMATION OF WATERSHED
Table No. 3.1: Demographic features: 1 2 3.00 4 5 S.No Feature Male Female Total
1
Population 13741 13454 27195 SC 678 690 1368 ST 934 938 1872 BC 3298 3229 6527 Others 8831 8597 17428
2 Children(0-6 years) 2355 2372 4727 3 Sex Ratio (Female per Thousand Male) 979
4 Literacy 59.46% 47.57% 53.58% Literates 8171 6400 14571 Illiterates 5570 7054 12624
5
Work Force 21897 6418 28315 Agriculture 16423 4814 21236 Industrial/Business 4379 1284 5663 Service 1095 321 1416
6 Birth Rate - - - 7 Death Rate - - -
Table No. 3.2: Livestock details: 1 2 3
S.No Feature No./ quantity) 1 Milch Animals
Cows 2692 Buffaloes 12 Goat, sheep 6301
2 Draft Animals Ox He Buffalo
3 Others Poultry 1317 Piggery 374
4 Total Milk production from milch animals (ltrs/day) 673
5 Fodder Availability Dry (Abundant/Sufficient/ Scarce) Sufficient Green (Abundant/Sufficient/ Scarce) Scarce (occasionaly)
6 Fuel wood Availability (Abundant/Sufficient/Scarce) Scarce
18
Table No.3.3: Socio- economic status:
1 2 3 4 5 6
S. No Type Total HHs
No. of BPL HHs
Land Holding (Ha) Annual Gross Income (Rs.) Rain fed Irrigated
SC ST Others Total SC ST Others SC ST Others
1 Marginal 4230 1950 130 192 2361 5 8 29 15000 15000 17000 47000 2 Small Farmers 299 55 59 457 42 32 135 25000 25000 25000 75000 3 Big farmers 48 46 63 151 31 55 178 60000 60000 70000 190000 4 Landless 1151 1151 - - - - - - - - - -
Total 5728 3101 231 314 2970 78 95 342 100000 100000 112000 312000
19
Table No. 3.4: Migration Details: 1 2 3 4 5 6 7
Name of Village No. of persons migrating
No. of days per year of migration
Major reason(s) for migrating
Distance of destination of migration from the
village (km)
Occupation during
migration
Income from such
occupation (Rs.)
M F Total
Bagulamari 52 2 54
100
Lack in sufficient employment
generation, For Better Opportunity , Lack of
irrigation facility, Mono Crop Area etc.
2 km to 50 Km Daily labour,
business, vegetable
vendor
Average Rs. 20,000/- per
Annum
Pachim Bhadra 62 3 65 Pub-Bhadra 17 1 17 Pub-Bhadra No.1 11 1 12 Pub-Bhadra No.2 17 1 18 Rabhapara 6 0 6 Saraikhoshra 6 0 7 Tokeamari 25 1 26 Bhumeswar Hill N.C. 0 0 0 Dabli 15 1 16 Kakragaon 10 0 10 Kashugaon 17 1 17 Tangaigon 47 2 49 Tilpukhuri 12 1 13 Barchara 29 1 30 Didari 27 1 28 Ghilaguri 47 2 49 Naitamara 27 1 28 Tilakgaon 12 1 12 Bhandarani 22 1 23 Durgamari 52 2 54 Hallahguri 15 1 16 Nachankhuti 26 1 27 Naldoba 36 2 37 Sikibiki 40 2 41 Total 630 29 659
20
Table No. 3.5: Details of Community Based Organizations existing in the watershed village: 1 2 3 4 5 6 7 8 9
S. No.
Type of Group
Total no. of CBOs No. of members No. of ST in each category
No. of SC in each category
No. of Others in each category
No. of BPL in each category Bank linkage
With only Men
With only
Women With both Total M F Total M F Total M F Total M F Total M F Total
No. of
SHGs
Bank Loan
Amount (Rs.)
1
SHG 26 152 - 178
(i) Landless 181 1620 1801 12 122 134 16 135 151 153 1363 1516 181 1620 1801
(ii) MF 38 213 251 4 18 22 7 21 28 27 174 201 38 213 251 (iii) SF 12 38 50 2 6 8 1 4 5 9 28 37 0 0 0 (iv) LF 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 231 1871 2102 18 146 164 24 160 184 189 1565 1754 219 1833 2052
2
UGs
(i) Landless
(ii) MF (iii) SF (iv) LF
Total 3 VSS 4 FG/ FC[1] 5 WUA 6 F-SHG-C 7 F-SHG-B 8 PG 9 PC
10
Other related Groups (Specify)
21
Table No. 3.6: Infrastructure Facilities: 1 2 3 4 5
S.No Infrastructure type No./Quantity Distance (km) Status (description)
1 Educational Institutions Anganwadi 34 Primary School 29 Secondary school 1 Govt. College - Vocational Institutions - 2 Service Institutions Bank - Post office 12 Primary Health Care Center 3 Veterinary Center 1 Markets/ Village Haat 7
3 No. of bore wells/pump sets (Functional) -
4 No. of Milk collection centers
- ( Union/ Society/ Pvt. Agency/Others)
Total Quantity of surplus milk -
5 Road Connectivity (to main road by an all-weather road) (Yes/No) Yes
6 Bus facility (Yes/No) Yes 7 No. of HHs provided electricity 4870
8 No. of HHs with access to drinking water 5100
9 Access to Agro Industries (Yes/No) No
10 Any other facilities (specify-------------)
22
Table No.3.7 Land use pattern (in Hectares)
S. No Village
Geog
raph
ical
Area
#
Fore
st A
rea
Com
munit
y Lan
d
Land
und
er N
on
Agric
ultur
e Use
Perm
anen
t Pa
stur
es
Land
Und
er
misc
ellan
eous
us
e
Uncultivated Private land Cultivated area
Net Sown Area
Net Area sown more than once
Gross Cropped Area Temporary
fallow Permanent
Fallow Cultivated
Rainfed Cultivated Irrigated
1 Bagulamari 287 8 0 14 0 32 21 0 184 29 212 29 241
2 Pachim Bhadra 199 1 0 12 0 27 43 0 108 8 117 8 125
3 Pub-Bhadra 152 0 0 7 0 17 0 0 93 35 128 35 163
4 Pub-Bhadra No.1 98 0 0 13 0 30 0 0 49 7 56 7 62
5 Pub-Bhadra No.2 79 0 0 9 0 21 0 0 35 14 49 14 63
6 Rabhapara 186 2 0 10 0 24 0 0 129 22 151 22 173
7 Saraikhoshra 225 0 0 7 0 16 70 0 132 0 132 0 132
8 Tokeamari 224 0 0 15 0 34 46 0 118 11 129 11 140
9 Bhumeswar Hill N.C. 1142 367 0 57 0 134 60 0 474 50 524 50 574
10 Dabli 143 0 0 10 0 22 0 0 85 26 111 26 138
11 Kakragaon 132 0 0 9 0 20 7 0 80 16 96 16 112
12 Kashugaon 231 189 0 0 0 0 21 0 0 20 20 20 40
13 Tangaigon 171 3 0 8 0 18 0 0 120 23 143 23 165
14 Tilpukhuri 214 11 0 15 0 36 3 0 128 21 149 21 170
15 Barchara 181 0 0 9 0 22 13 0 117 20 137 20 157
16 Didari 210 2 0 4 0 8 29 0 139 28 167 28 194
17 Ghilaguri 161 0 0 7 0 17 7 0 102 28 130 28 158
18 Naitamara 258 0 0 10 0 23 18 0 160 47 207 47 254
19 Tilakgaon 199 0 0 4 0 9 1 0 165 20 185 20 205
20 Bhandarani 238 0 0 9 0 20 3 0 207 0 207 0 207
23
S. No Village
Geog
raph
ical
Area
#
Fore
st A
rea
Com
munit
y Lan
d
Land
und
er N
on
Agric
ultu
re U
se
Perm
anen
t Pa
stur
es
Land
Und
er
misc
ellan
eous
us
e
Uncultivated Private land Cultivated area
Net Sown Area
Net Area sown more than once
Gross Cropped Area Temporary
fallow Permanent
Fallow Cultivated
Rainfed Cultivated Irrigated
23 Nachankhuti 334 2 0 30 0 69 6 0 190 38 227 38 265
24 Naldoba 252 0 0 10 0 22 71 0 139 11 150 11 160
25 Sikibiki 288 0 0 12 0 27 63 0 170 17 187 17 203
Total 6112 585 0 299 0 698 485 0 3515 529 4044 529 4574
Table No. 3.8: Details of Common Property Resources:
S.No
CPR Total Area (ha) Area available for treatment (ha)
Particulars Area owned/ In possession of
Pvt. persons
Govt. PRI Any other (Pl.
Specify) Pvt.
persons Govt.
PRI Any other
(Pl. Specify) (specify dept.) (specify
deptt.) 1 Wasteland/ degraded land - 485 - - - 485 - - 2 Pastures - - - - - - - - 3 Orchards - - - - - - - - 4 Village Forest 11 - - - - - - - 5 Forest - 585 - - - - - - 6 Village Ponds/ Tanks 7 - - - - - - - 7 Community Buildings - - - - - - - - 8 Weekly Markets 3 - - - - - - - 9 Permanent markets - - - - - - - -
10 Temples/ Places of worship - - - - - - - - 11 Others (Pl. specify) - - - - - - - -
Total 21 1070 0 0 0 485 0 0
24
Table No. 3.9: Agriculture implements: 1 2 3
S. No Implements Nos. 1 Tractor 3 2 Sprayers-manual/ power 11 3 Cultivators/Harrows 2 4 Seed drill -
Table No. 3.11: Crops & Cropping pattern 1 2 3 4 5 6
S. No Season Crop sown
Rain fed Irrigated Total Ar
ea (h
a)
Prod
uctio
n (T
on/yr
)
Prod
uctiv
ity
(Kgs
/ha)
Cost
of
culti
vatio
n (R
s. /h
a)
Area
(ha)
Prod
uctio
n(To
n/yr
)
Prod
uctiv
ity
(Kgs
/ha)
Cost
of
culti
vatio
n (R
s. /h
a)
Area
(ha)
Prod
uctio
n (T
on/yr
)
Prod
uctiv
ity
(Kgs
/ha)
Cost
of
culti
vatio
n (R
s. /h
a)
1 Kharif Autumn Paddy 3235 4852.5 1500 9000 0 0 0 0 3235 4852.5 1500 9000
2 Rabi
Winter Paddy 0 0 0 0 529 1270 2400 12000 529 1270 2400 12000 Mustard 10 7.5 750 3700 0 0 0 0 10 7.5 750 3700 Black gram 5 3.3 660 3400 0 0 0 0 5 3.3 660 3400 Lentil 8 3.6 450 3400 0 0 0 0 8 3.6 450 3400 Green gram 2 0.98 490 3400 0 0 0 0 2 0.98 490 3400
3 Summer Summer Paddy 255 892.5 3500 9000 0 0 0 0 255 892.5 3500 9000 Total 3515 5760 7350 31900 529 1270 2400 12000 4044 7030 9750
Table No. 3.10: Crop Classification 1 2 3
S. No Crop classification Area (Hec) 1 Single crop 3427
2 Double crop 597
3 Multiple crop -
25
Table No. 3.12: Land capability Classification
S.No Land type Total Area (ha) Soil Texture*
Based on Depth (cms)- Based on Slope (%) (mention area in ha)
Erosion
Land class
(mention area in ha) (mention area in ha)
V. S
hallo
w (0
.75)
Shal
low
(7.5
-22.
5)
Mod
erat
e De
ep
(22.
5-45
.00)
Deep
(45.
0-90
.0)
Very
. Dee
p (>
90)
Nea
rly L
evel
(0-2
)
Mod
erat
e sl
ope
(2-
6)
Stro
ng s
lope
(6-1
5)
Stee
p (>
15)
Water Wind
Sheet Rill Gully
1 I 592 Fine Loamy 0 0 0 0 592 592 0 0 0 2 II 1834 Fine Loamy 0 0 0 0 1834 0 1834 0 0 3 III 1036 Fine Loamy 0 0 0 0 1036 0 0 1036 0 4 IV 575 Fine Loamy 0 0 0 0 575 0 0 0 575 5 V 350 Fine Loamy 0 0 0 0 350 48 169 96 37 6 VI 72 Fine Loamy 0 0 0 0 72 15 29 13 15 7 VII 662 Fine Loamy 0 0 0 0 662 0 0 0 662 8 VIII 991 Fine Loamy 0 0 0 0 991 127 401 226 237 Total 6112 0 0 0 0 6112 782 2433 1371 1526 0 0 0 0
* Soil texture (sandy-clay, clayey, loamy-clay, gravel)
Table No.3.13: Irrigation facilities: 1 2 3 4
S.No Type of the Source Nos. Command area (in ha)
1 Ponds 72 125
2 Open wells 2 -
3 Bore wells 12 32
4 Canal irrigation - -
5 Natural spring head 89 372
26
Table No. 3.14: Status of water table 1 2 3 4 6 7 8
S.No
Source (open well)** Plot No of the source
Name of the Owner*
Date of recording
Dept
h of w
ater
tabl
e fro
m
grou
nd le
vel (
in mt
s)
Source located at (ridge/middle/valley) Remarks
1
Deep Tubewell
SC4563979 15/04/2013 - Valley Above Permissible Limit Iron[0.50 mg/l],Turbidity[10.00 NTU] 2 P0001926430 spot source 05/06/2013 - Valley Above Permissible Limit Iron[0.50 mg/l] 3 SC4563982 01/06/2013 - Valley Above Permissible Limit Iron[0.50 mg/l]
4 SC4563982 05/06/2013
- Valley Above Permissible Limit Iron[0.70 mg/l]
5 SC31737 19/06/2013 - Valley Below Permissible Limit Iron[0.30 mg/l],Chloride[68.00 mg/l],pH[7.27 pH]
6 SC31737 29/06/2013 - Valley Below Permissible Limit Iron[0.30 mg/l],Chloride[84.00 mg/l],pH[7.18 pH]
7 PU0001989224 spot source 04/08/2013 - Valley Below Permissible Limit Iron[0.30 mg/l],Chloride[48.00 mg/l],pH[7.34 pH]
8 PU0001989581 spot source 11/08/2013 - Valley Above Permissible Limit Iron[0.34 mg/l] 9 SC2832660 02/06/2013 - Valley Above Permissible Limit Iron[1.00 mg/l] 10 SC4563965 02/06/2013 - Valley Above Permissible Limit Iron[1.00 mg/l] 11 SC2987741 23/06/2013 - Valley Above Permissible Limit Turbidity[6.00 NTU] 12 SC30549 28/06/2013 - Valley Above Permissible Limit Iron[0.50 mg/l] 13 SC4563962 20/06/2013 - Valley Above Permissible Limit Iron[0.50 mg/l]
14 SC30826 18/06/2013 - Valley Below Permissible Limit Iron[0.30 mg/l],Chloride[82.00 mg/l],pH[6.87 pH]
15 SC26937 04/06/2013 - Valley Above Permissible Limit Iron[0.50 mg/l]
27
16
SC39197 04/06/2013 - Valley Above Permissible Limit Iron[0.70 mg/l]
17 SC4564164 03/06/2013
- Valley Below Permissible Limit Iron[0.30 mg/l],Nitrate[0.80 mg/l],Chloride[26.00 mg/l],pH[7.21 pH]
18 PU0001989224 spot source 04/08/2013 - Valley Below Permissible Limit Iron[0.30 mg/l],Chloride[48.00 mg/l],pH[7.34 pH]
19 PU0001989311 spot source 04/08/2013 - Valley Above Permissible Limit Iron[0.31 mg/l]
20 Delivery Point H3363268 11/08/2013 - Valley Below Permissible Limit Iron[0.12 mg/l],Chloride[46.00 mg/l],pH[6.68 pH]
21 Openwell SC30459 02/07/2013 - Valley Above Permissible Limit Iron[0.50 mg/l] 22
Shallow Tubewell
PU0001926426 spot source 05/06/2013 - Valley Above Permissible Limit Iron[1.00 mg/l]
23 P0001926685 spot source 29/06/2013 - Valley Below Permissible Limit Iron[0.10 mg/l],Chloride[82.00 mg/l],pH[7.18 pH]
24 PU0001926684 spot source 29/06/2013 - Valley Below Permissible Limit Iron[0.30 mg/l],Chloride[88.00 mg/l],pH[6.92 pH]
25 P0001926380 spot source 12/06/2013 - Valley Above Permissible Limit Iron[0.50 mg/l]
26 PU0001926713 spot source 18/06/2013 - Valley Below Permissible Limit Iron[0.30 mg/l],Chloride[68.00 mg/l],pH[6.87 pH]
27 P0001926491 spot source 04/06/2013 - Valley Above Permissible Limit Iron[0.50 mg/l] 28 P0001926588 spot source 03/07/2013 - Valley Above Permissible Limit Iron[0.70 mg/l] 29 PU0001926587 spot source 03/07/2013 - Valley Above Permissible Limit Iron[1.00 mg/l] 30 P0001926185 spot source 13/06/2013 - Valley Above Permissible Limit Iron[0.40 mg/l]
31 PU0001926216 spot source 29/06/2013 - Valley Below Permissible Limit Iron[0.20 mg/l],Chloride[68.00 mg/l],pH[7.27 pH]
32 PU0001989315 spot source 04/08/2013 - Valley Above Permissible Limit Iron[0.34 mg/l] Source: National Rural Drinking Water Programme, Govt. of India
28
Table No. 3.15: Assessment of drinking water facility*: S.No Item Units Quantity Source
1 Drinking water requirement Ltrs/day 81585 Tube Well, Govt Supply, Ring Well
2 Present availability of drinking water Ltrs/day 67716
3 No. of drinking water sources available Nos 6497
a) Functional Nos 6497
b) Need Repairing Nos -
c) Defunct Nos -
4 Short fall if any Ltrs/day 13869
5 No. of families getting drinking water from out side the Micro watershed area
Nos -
6 Requirement of new drinking water sources (if any) Nos. -
* based on the observation from the field Table No. 3.16: Surface water resources
S.No Type of water resource Nos Area irrigated (Ha) Storage capacity (Cu.m)
1 Tank - - -
2 Pond 72 125 -
3 Lake - - -
4 Check dam - - -
5 Percolation tank - - -
6 Channel/Canal - - -
7 Any others (specify--------------) - - - Table No. 3.17 Ground Water Structures to be repaired
S.No Type of structure
No. available
No. to be Repaired No. to be rejuvenated
No. with no interventions required Total
NILL
29
Table No. 3.18: Existing Water Saving Practices
Name of the Major Crop Area (Ha)
Under water saving devices$
Under water conserving agronomic practices#
Any other Total
Current water Saving status as against flood
irrigation. (Cu.m) (Pl. Specify)
NIL
Table No. 3.19: Details of existing livelihoods 1 2 3 4
S. No. Name of activity
No. of beneficiaries
Pre-project average income per HH (Rs.)
SC ST Others Total Women
1 Dairy 55 75 240 369 122 45000 2 Goatary 68 94 287 449 148 30000
3 Duckery 27 37 96 161 53 25000
4 Poultry 82 131 958 1171 387 25000 TOTAL 233 337 1581 2151 710
Table No. 3.20: Existing functional assets (Works already completed under different schemes including works undertaken by farmers independently)
1 2 3 4 5 6
S.lNo Name of the work
Plot No. Quantity (No./RMTs) Amount spent (Rs.) Programme
NILL
30
Table No.3.21 PROBLEM TYPOLOGY OF THE WATERSHED 1 2 3 4 S.No Problem area Problem analysis Proposed interventions to overcome problems
1 Soil Conservation (slope, erosion, soil loss, rainfall, productivity, etc)
River Bank Erosion, Soil Erosion, Siltation & high soil loss in upland area. Sheet erosion is combatively high in many places.
Construction of graded bund, field bund to protect the soil erosion and siltation problems. Applying Bio-engineering (Vetiver Plantation) to protect the river bank from erosion.
2 Water conservation (Water budget, Ground water norms, productivity)
Degradation of Natural Resource like congestion of natural drainage, degradation of wetland etc. Lack of water storage facility cause scarcity of water during winter. Run-off originated from seasonal rain attains high velocity due to medium to steep prevailed in the watershed and thereby causes all types of soil erosion hazards. Loss of productivity due to waterlogging
Restoration of drainage channel by excavation and reclamation. Reclamation of natural water bodies (beels) by excavating and constructing periphery bund etc. Increase water storage capacity. Construction of Farm Pond for water harvesting/storage. Along with water distribution channel for irrigation. Construction of Nullabund to check the water stagnant/waterlogging problem.
3 Crop coverage – {80% of w/s area should be with canopy}
Rabi crop area is very low because of lack of irrigation facilities. Mono cropping Inundation problem during summer (kharif) Low vegetative cover
Agro-forestry, fuel wood plantation Turmeric & Banana Plantation
4 Agriculture productivity (crop wise compare with dist. average)
Low agricultural productivity due to high flood during summer, lack of irrigation facility, erratic and uncertain rainfall, low cropping intensity, lack of location-specific technologies to match the high ecological diversity of rainfed area etc.
Brick canal and water storage farm pond for irrigation for both Rabi & Kharif crop.
5 Livestock productivity (Milk Yield, Meat yield, Eggs, Wool Yield, Kidding etc.)
Scarcity of fodder during flood period. Lack of secure shelter during flood period Inadequate nutrition due to lack of grazing land. Diseases which reduce the production potential of livestock.
Promotion of Marketing facilities through SHG Promotion of Dairy, Piggery, goatery, Duckery and Poultry farming activities.
6 Existing Livelihood Less income generating activities. Promotion of Dairy, Piggery, goaery, Duckery and
31
activities for Asset less persons
Their present occupation is Daily Labour, Rikswa Pullers etc.
Poultry farming activities. Promotion of weaving activities for asset less woman.
7 Community Based Organizations & Social capital base
Most of the SHG are not functional. Formation of SHG, User groups for promotion of various income generating activities
8 Capacity Building (participation, training, awareness of watershed community
In many villages it is observed that the Participation in Gram Sabha is very low due to lack of awareness towards watershed development activities.
Conducting Awareness programmes among the villagers. Providing training in respect to each activities proposed for watershed development as well as livelihood generation.
9 Others (specify) Lack of Marketing Facilities Providing Market Promotion Centres along with Low Cost go-down for storage of various products.
32
CHAPTER – 4 Institutional Building and Project Management
Table No. 4.1 Details of SHGs & UGs newly formed under IWMP: 1 2 3 4 5 6 7 8 9
Sl. No.
Type of Group
Total no. of CBOs No. of members No. of ST in
each category No. of SC in
each category
No. of Others in each
category No. of BPL in each category
Bank linkage
With only Men
With only Women
With both Total M F Total M F Total M F Total M F Total M F Total
No. of SHGs
Amount (Rs)
1 SHG
(i) Landless
(ii) MF (iii) SF (iv) LF
Total
2 UGs
(i) Landless
(ii) MF (iii) SF (iv) LF
Total *Account no. of Watershed Committee, PIA.
33
4.2: Details of Watershed Committees (WC) Name of
WCs Date of
Registration as a Society
NO. of Members
in WC Designation name M/F SC ST SF MF LF Landless UG SHG GP Any
Other Educational Qualification Function/Assigned
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Bogulamari WC -- 11
President Madon Barman M Yes B.A. Over all supervision of WC & Project works
Secretary Monoj Kumar Barman M Yes H.S.L.C.
Collection of project fund with the WDT (L) from the PIA smooth functioning of the project works
Member Nur Alom Shekh M Yes H.S.L.C. Co-operate with Pre.
Member Abdul Mozid M Yes H.S.L.C. & Secy. in all respect
Member Abdul Wahab M Yes Class-X Member Altab Ali M Yes H.S.L.C. Member Sattar Ali M Yes H.S.L.C. Member Nur Hussain Bhuya M Yes H.S.L.C. Member Raher Ali M Yes H.S.L.C. Member Supen Adhikary M Yes H.S.L.C. Member Bhubon Mohon
Barman M Yes H.S.L.C.
Kakragaon WC -- 10
President Rajanti Kanta Barman M Yes H.S.L.C.
Over all supervision of WC & Project works
Secretary Monoram Doimari M Yes H.S.L.C.
Collection of project fund with the WDT (L) from the PIA smooth functioning of the project works
Member Monoj Harlalka M Yes H.S.L.C. Member Golam Mostafa M Yes H.S.L.C. Member Lohit Rava M Yes Yes H.S.L.C. Co-operate with
Pre.
Member Abdul Rahim M Yes Class-X & Secy. in all respect
Member Milon Singha M Yes H.S.L.C. Member Jitendra Choudhury M Yes H.S.L.C.
34
Name of WCs
Date of Registration as a Society
NO. of Members
in WC Designation name M/F SC ST SF MF LF Landless UG SHG GP Any
Other Educational Qualification Function/Assigned
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Member Anita Barman F Yes H.S.L.C. Member Bidyashri Musahary F Yes H.S.L.C.
Noitamari WC -- 10
President Sachin Basumatary M Yes H.S.L.C. Over all supervision of WC & Project works
Secretary Moten Ch. Singha M Yes H.S.L.C.
Collection of project fund with the WDT (L) from the PIA smooth functioning of the project works
Member Ratan Singha M Yes H.S.L.C. Member Kamol Singha M Yes H.S.L.C. Member Ratan Barman M Yes H.S.L.C. Co-operate with
Pre.
Member Raja Narzary M Yes H.S.L.C. & Secy. in all respect.
Member Brojen Roy M Yes H.S.L.C. Member Jogodish Ch. Rava M Yes Class-X Member Purnima Singha F Yes H.S.L.C. Member Sewali Singha F Yes H.S.L.C.
Noldoba WC --- 10
President Abdur Rofik Mondal M Yes H.S. Over all supervision of WC & Project works
Secretary Hannan Ali M Yes H.S.L.C
Collection of project fund with the WDT (L) from the PIA smooth functioning of the project works
Member Nur Islam Sk. M Yes H.S.L.C Member Jolinur Mondol M Yes Class-X Co-operate with
Pre. Member Abdulla Sarkar M Yes H.S. & Secy. in all
respect. Member Barek Ali M Yes H.S.L.C Member Sonali Adhikari F Yes H.S.L.C Member Saleha Begum F Yes Class-X Member Kailash Barman M Yes B.A. Member Dipali Barman F Yes H.S.L.C
35
Table No 4.3: WDT Particulars:
S.No Names of WDT
members M/F# Age Qualification / Experience Description of professional
training Role/ Function*
1 Sri Nabin Choudhury M 54 Agri. Engineering Three Years 6 Month Soil Conservation Training
Training for Management of IWMP Project & Accountancy, Awareness etc.
2 Sri Achyut Talukdar M 49 M.A. -- 3 Sri Abdul Rezzak M 51 3 Years Diploma in Civil
Engineering --
4 Md. Abu Tayab Khan M 46 Agril. MSc Agril. Trainer 5 Sri Abani Kumar Singha M 42 DDR (B.Sc.) Forestry Training
Table No. 4.4: PIA particulars 1 2 3 S.No Particulars Details of PIA Type of
organization# Govt. Department
Name of organization
Department of Soil Conservation
Designation & Address
Project Manager, WCDC, Bongaigaon & Divisional Officer, Barpeta Soil Conservation Division, Barpeta
Telephone +919435651191 Fax E-mail [email protected] # In column no. 8.1.6 (1), only the letter assigned to each type, as given below, needs to be typed.
Table No. 4.5 Bank Account Details Name of WC/PIA
Name of the
Bank/Place
Account No.
Name of the Signatory
Address
Noitamari MWC
-Nil- -Nil- WDT Leader & Secretary
Noitamri, G.P. Noitamri, Block- Dangtol,
Bongaigaon Kakragaon
MWC -Nil- -Nil- WDT Leader &
Secretary Kakragaon, G.P.
Kakragaon, Block- Dangtol, Bongaigaon
Noldoba MWC
-Nil- -Nil- WDT Leader & Secretary
Noldoba, G.P. Noldoba, Block- Dangtol,
Bongaigaon Bogulamari
MWC -Nil- -Nil- WDT Leader &
Secretary Bogulamari,
G.P.Bogulamari, Block- Dangtol,
Bongaigaon
A Line Dept B Autonomous organization E Zila Parishad F Intermediate Panchayat
C Govt. Institute D Research Bodies G Voluntary Organisations H Any other (please specify).
36
Table No. 4.8 Convergence plan with IWMP 1 2 3 4 5 6 7
S. No. Names of Departments
with Schemes converging with IWMP
Name of activity/task/structure proposed under convergence Period of Support
Reference no. of activity/ task/
structure in DPR
Estimated Fund Proposed Under
Convergence (in Rs.)
Level of decision taken for
convergence
(a) Structures (Years)
Block/district (b) livelihoods (c) Capacity Building (d) Any other (pl. specify)
NIL
37
Institutional Mechanisms: Fig. 11 Flow Chart of Institutional Arrangement from District to watershed level
NLDC National Level Data Centre DoLR Department of Land Resource NRAA National Rainfed Area Authority SLNA State Level Nodal Agency C.E.O Chief Executive Officer MIS Management Information System GIS Geographical Information System SLDC State Level Data Cell F.O. Financial Officer T.E. Technical Expert DEO Data Entry Operator DWDU District Water Development Unit DDC District Data Cell WC Watershed Committee PIA Project Implementation Agency PIU Project Implementation Unit WDT Watershed Development Team SHG Self Help Group WDTM Watershed Development Team Member UG User Group
4.6.2 Fund Flow mechanisms – flow chart,
DoLR, Gol
SLNA - ASSAM
NRAA, GoI
Chairman
MIS
GIS
SLDC
Admn. Officer F.O.
C.E.O. RDD SS, Finance, PCC, Director Soil, DoLR, NREGA, Water, Agril, F&E, DoLR, NGO, Expert, PIA
DWDU
PIA/PIU
WC
SHG UG
T.E. (W/M)
T.E. (Agr.)
T.E. (GIS.)
T.E. (GIS.)
Ac. Astt./ Off. Astt, DEO
NLDC
Chairman Project Manager WCDC T.E. (Agri, W/M, S/M, Mang., F.O
Com. Opp. Off. Astt.
DDC
National Level Institutional Arrangement
State Level Institutional Arrangement
WDT MEMBER
District Level Institutional Arrangement
Project Level Institutional Arrangement
38
4.6.3 List of Watershed Records to be maintained A) AT WATERSHED COMMITTEE LEVEL
Registration Certificate
Bylaws
Detail Project Report
Annual Action Plan
Cash Book
Project Fund Passbook
Watershed Development Fund Pass book
DoLR, Gol (90%)
Govt. of Assam (10%)
STATE LEVEL NODAL AGENCY, ASSAM
(100%)
PROJECT IMPLEMENTATION AGENCY (PIA)
(TRAINING, OVERHEAD, EPA)
WATERSHED COMMITTEE
DWDU
39
Ledger Book
Asset Register
Vouchers
Land Details
Measurement Book
Audit Report/ Social Audit Report
Photo Documents
Project Completion Report
Common Guidelines
MoU between Watershed Committee and Project Implementing Agency
Revenue Records.
B) AT PROJECT IMPLEMENTING AGENCY LEVEL
Cash Book
Computerized Accounting System
Vouchers
4.7 Documents of Agreements: 4.7.1) Watershed Committee Registration certificate - (under Process)
4.7.2 MoU – PIA – DWDU, PIA – WC - (under Process)
4.7.3 Resolution of Gram Sabha ,Aam Sabha, WC approving action plan#
#the resolution should be done village wise and needs to be approved in Gram/Aam Sabha
40
4.8 Project Implementation Project Implementation involves a number of activities. Among them, the major activities are- securing community participation, co-ordination of activities and project management & Controlling, Monitoring. Co-ordination is the process whereby more people or organizations work together to deal collectively with a shared objective. The rationale for co-ordination shall be-
1. To take immediate corrective action for problems encountered in implementation of the project. 2. To promote better relationship among organizations, institution, departments and individuals
connected with the project and to harmonies resources and activities for the achievements of the project objectives.
3. To establish cordial relationship between the target population of the project and all the other
section of the society. 4. Team building which include recruiting people with appropriate qualification for positions in the
organization, orienting new people to their position to help them learn about their responsibilities and providing training when necessary to upgrade people’s skills.
Project Management & Controlling means managing activities to ensure progress towards the project objectives. 1. Measuring progress of project by comparing the current situation with established goals and
objectives. 2. Submitting reports to account for project activities and finance 3. Monitoring performance to document the way people carry out their responsibilities. 4. Providing feedback to people on a regular, informal basis including positive feedback and
constructive criticism. 5. Adjusting plans to respond to changes in the internal and external organizational environment.
Monitoring is an important part of project implementation which is a process of routinely gathering information on all aspects of the project. The monitoring shall be continuous and it should be in
place before start-up. The first level monitoring shall be done by the project staff. The DWDU and PIA shall be responsible for monitoring the staff and task under them and Project Manager shall be responsible for monitoring all aspects of the project. The second level monitoring shall be done by third party.
41
The monitoring team shall be collected the report through field visit, progress and measures performance including financial reporting. Step for Monitoring Process:
Defining the objectives of the monitoring system;
Designing a programme to systematically monitor achievements;
Selection of indicators/parameters to be monitored, the location, methods/processes and
frequency of observations and the information processing and reporting procedure are important; and
Organizing, motivating and training people to obtain, convey and use the information. Monitoring Tools
Semi-structured interviews;
Community workshops to evaluate the extent of adoption and resulting achievements from conservation practices.
Observation and measurement of easily quantifiable field indicators.
Farmers’ own records can be prepared which provides vital information to great details.
Ground photographs taken from the same place depicting before and after remedial
measures, details concerning landscape CPR’s changes in the status of natural resources.
Community evaluation of certain simple technical, ecological, economical, social and essential services indicators.
Remote sensing satellite imageries and aerial photographs taken at the start of the plan
are repeated periodically.
Geographical Information Systems (GIS)
Video monitoring.
Comparison with demonstration and research plots/ farms.
Comparison with demonstration and research micro-watersheds.
Hydro-meteorological measuring.
Using the information gathered by other institutional and private enterprises.
Combination of above mentioned tools.
42
PIS Tasks Responsibility
Project Co-ordination
Immediate corrective action for problem encountered
DWDU, Project Manager, WDT Member
Create Relationship among staff and Institution
Project Manager
Team Building & Capacity Building DWDU/PIA/Project Manager
Co-operation and Network Development DWDU/PIA/Project Manager
Project Management & Controlling
Progress of Project Project Manager
Report generating to account project activities and financial statement
PIA/ Project Manager
Performance monitoring PIA/ Project Manager/DWDU
Monitoring 1st Level Monitoring
Staff Performance Work Performance Target achievement
DWDU/Project Manager/PIA
2nd Level Monitoring
Work Quality
Deviation Report Financial statement
DWDU/ Third Party
43
Role & Responsibility of different Institution during Project Implementation
SLNA
Prepare a perspective and strategic plan
Provide technical support to DWDU
Ensure regular and quality on-line monitoring
Identify potential PIAs
Providing professional technical support to Project Implementing
Carry out regular monitoring, evaluation and learning.
Ensure smooth flow of funds to watershed development projects.
Ensure timely submission of required documents to SLNA / Nodal
DWDU
PIA
Technical guidance to WC
Undertake community organization and training for the village communities Undertake community organization and training for the village communities
Supervise watershed development activities
Monitor and review the overall project implementation
Inspect and authenticate project accounts
Set up institutional arrangements for post-project operation
44
CHAPTER – 5 Management/Action Plan
Description on methodology of plan adopted a) Awareness generation interventions :
i. Awareness campaign through Gram Sabha in each villages of watershed area. Awareness generation programme will be conducted for all project stakeholders at watershed level with the basic purpose of educating them and creating more interest regarding various aspects of the IWMP project.
ii. Awareness campaign through distribution of pamphlet and brochures describing about the IWMP project.
b) Initial Orientation program: For successful completion of the project, orientation of both project personnel and watershed communities according to the changing perspective is imperative and it will enhance skills and competence of project staff to work with the villagers. Various training, awareness programme and seminar shall be conducted to build necessary skills and competence among the project officials, PRIs, especially GPs and other Communities Based Organizations (CBOs) about planning, implementation and management of various project activities.
c) Formation process UGs & Watershed Committee : The User Group and Watershed Committee are formed through Gram Sabha and awareness programme.
d) DPR preparation process: In consideration of the objective & terms of reference of the programme , the Methodology adopted for Preparing The DPR are-
45
A. Survey : 1. Socio-Economic Survey:
a) Collection of data to find out the strength, weakness, opportunity and threat of the project area and assessment of local resources. It also includes collection of water sample, soil sample and testing shall be done in laboratory to find out its problem & prospects.
b) Total household enumeration – include collection of household data related to social as well economic status of the member. It also include Land use, Agriculture including
area, productivity, cropping intensity, Horticulture, Livestock and Fisheries, Forests and Grass land, Livelihood Status, Hydrology and Water Resources, Soil and Moisture Conservation and Efficient use of Water.
2. Physiographic Survey: a. A Physical survey has conducted using GPS/Total Station in the study area to identify
the location, distribution and availability of the local resources and to identify the location, morphology and other physiographic conditions that proposed for any intervention.
b. Collection of satellite imagery, toposheets, weather data, data related to natural calamities like damage by flood, earthquake etc.
B. PRA:
After collection of baseline data of the study areas PRA has conducted among the villagers in village level to find out the intervention which are proposed for implementation. The PRA The process is expected to enhance identification of the felt needs of the people, bringing forth consensus, the empowerment of local disadvantaged groups, integration of local knowledge
systems into project design, two‐way learning process between the project and local people,
political commitment and support, accountability in local governance. The PRA methodology utilizes different tools to seek its goal of a participatory approach for addressing any issue. The
following tools were used by the research team in the exercise under consideration: a. Resource mapping: Resource Mapping has done to identify valuable resource, Ensure
that everyone has access to the resources they need, avoid duplication of services and resource, enhance service, Identify flexible funding strategies, use data to make informed decision and cultivate new partnerships and relationship.
46
b. Social mapping: Social mapping is used to present information on village layout, social infrastructure, demography, language-religion-culture groups, health, wealth, other, etc. This provides an overview of the socio-economic aspects.
c. Focus Group Discussion: A focus group discussion (FGD) is a group discussion of approximately 6 - 12 persons guided by a facilitator, during which group members talk freely and spontaneously about a certain topic. A FGD is a qualitative method and its purpose is to obtain in-depth information on concepts, perceptions and ideas of a group. A FGD aims to be more than a question-answer interaction. The idea is that group members discuss the topic among themselves, with guidance from the facilitator. A FGD also helps
to bring out the perceptions of the weaker stake-holders in an issue, which otherwise will not come up.
d. Transect Walk: A transect walk is a walk taken by participants and facilitator through the area of interest, observing, asking, listening, looking, identifying different zones, seeking problems and possible solutions. The finding are documented and they can be mapped on to a transect diagram or map. Transects are an ideal point of departure for a research/planning process in a village, because we establish the villagers as the experts on living condition of that area.
e. Seasonality: Seasonality analysis has done to identify seasonal resources. Water availability in different sources at different times, cropping pattern is clearly recognized through seasonality tool.
f. Trend line: In Trend-line, graphs are created for long-term changes over time based on the local people’s accounts of the past, of how things close to them have changed - ecological histories, land use and cropping patterns, customs and practices, trends in fuel use, etc. Although secondary data may be available on these, a local perspective facilitates the design of development initiatives.
g. Time line: Time line has helped us in identifying important past events. With this
information the team is better informed about the area, community, progress and the problems. The team conducted semi-structured interviews to obtain oral histories of past events. These oral histories can provide details on local events, how the community perceived them, and the eventual impact of these events on the local area and the community.
C. Analysis: Considering the objective of the study analysis has been done - i. Analysis of Household data (Which shall include socio-economic data) ii. Analysis of physical data (Weather Data, Soil, water quality, flood etc.)
47
iii. Analysis of data collected for proposed Intervention and its outcome etc. D. Mapping: Mapping and analysis has done in GIS Platform using ARC GIS and the Satellite
Image interpretation shall be done by ERDAS Software. The data that collected for any intervention has analyzed in GIS Platform using satellite imagery and Google Earth. The following Maps for the study shall be prepared using GIS-
a. Location Map b. Watershed Map c. Relief Map d. Drainage Map
e. Slope map f. Soil Map g. Land Use / Land cover map h. Map showing Proposed Intervention in Different Phase
48
5.2 Details of Natural Resource Management Activities Table No. 5.2.1 Soil and Moisture Conservation structures & Surface Water Treatment 1 2 3 4 5 6 7 8 9 10 11 12 13
Sl. No.
Name of the
Activities (Structures)
Name of the Hamlet / Village
Plot Numbers
( including Name of the local Patch)
Name of Beneficiaries
Area (in Ha)/
Dimension ( in M/ Sq. M / CuM)
of Structure
Unit Cost
Total Cost (in
Rs.) Contribution
Total Grant
Amount (in Rs)
Year of Implementation
(1st/2nd/3rd/4th/5th)
GPS Point
Long Lat
1
Graded Bund
Bagulamari - - 1500 218 327000 16350 327000 3rd Year 90°25'12.587"E 26°25'4.613"N
2 Pachim Bhadra - - 2000 218 436000 21800 436000 3rd Year 90°27'6.833"E 26°25'37.201"N
3 Pub-Bhadra - - 1100 218 239800 11990 239800 3rd Year 90°27'40.713"E 26°25'38.994"N 4 Rabhapara - - 1200 218 261600 13080 261600 3rd Year 90°27'57.785"E 26°26'44.342"N 5 Tokeamari - - 1500 218 327000 16350 327000 3rd Year 90°25'58.652"E 26°25'32.808"N 6 Dabli - - 700 218 152600 7630 152600 3rd Year 90°28'19.38"E 26°27'45.051"N 7 Kakragaon - - 1000 218 218000 10900 218000 3rd Year 90°28'4.38"E 26°27'16.898"N 8 Tilpukhuri - - 3000 218 654000 32700 654000 3rd Year 90°29'39.383"E 26°27'24.821"N 9 Barchara - - 1200 218 261600 13080 261600 3rd Year 90°26'0.088"E 26°25'47.508"N 10 Didari - - 900 218 196200 9810 196200 3rd Year 90°27'36.355"E 26°27'17.276"N 11 Ghilaguri - - 900 218 196200 9810 196200 3rd Year 90°27'0.397"E 26°27'18.66"N 12 Naitamara - - 1200 218 261600 13080 261600 3rd Year 90°25'36.582"E 26°26'34.281"N 13 Bhandarani - - 1000 218 218000 10900 218000 3rd Year 90°26'10.384"E 26°21'41.003"N 14 Durgamari - - 2500 218 545000 27250 545000 3rd Year 90°26'10.313"E 26°22'44.063"N 15 Tangaigon - - 1400 218 305200 15260 305200 4th Year 90°30'43.34"E 26°26'49.797"N 16 Hallahguri - - 1500 218 327000 16350 327000 5th Year 90°25'50.235"E 26°23'15.828"N 17 Nachankhuti - - 1700 218 370600 18530 370600 5th Year 90°25'9.772"E 26°24'13.003"N 18 Naldoba - - 1500 218 327000 16350 327000 5th Year 90°26'49.098"E 26°23'22.434"N
Sub Total 25800 3924 5624400 281220 5624400 1 Periphery
Bund Hallahguri - - 1500 218 327000 16350 327000 3rd Year 90°25'51.468"E 26°23'19.816"N
2 Nachankhuti - - 1000 218 218000 10900 218000 3rd Year 90°25'47.499"E 26°23'39.971"N Sub Total 2500 436 545000 27250 545000
49
1 2 3 4 5 6 7 8 9 10 11 12 13
Sl. No.
Name of the
Activities (Structures)
Name of the Hamlet / Village
Plot Numbers
( including Name of the local Patch)
Name of Beneficiaries
Area (in Ha)/
Dimension ( in M/ Sq. M / CuM)
of Structure
Unit Cost
Total Cost (in
Rs.) Contribution
Total Grant
Amount (in Rs)
Year of Implementation
(1st/2nd/3rd/4th/5th)
GPS Point
Long Lat
1 Boulder Pitching
Bagulamari - - 250 1665 416250 20813 416250 4th Year 90°24'48.072"E 26°24'57.824"N 2 Sikibiki - - 350 1665 582750 29138 582750 4th Year 90°26'2.936"E 26°24'18.72"N
Sub Total 600 3330 999000 49950 999000
Total 28900 7690 7168400 358420 7168400 Table No. 5.2.2 Water Harvesting Structures
1 2 3 4 5 6 7 8 9 10 11 12 13
Sl. No. Name of the
Activities (Structures)
Name of the Hamlet / Village
Plot Noumbers
( including Name of the local Patch)
Name of Beneficiaries
Area (in Ha)/
Dimension ( in M/ Sq. M / CuM)
of Structure
Unit Cost
Total Cost (in
Rs.) Contribution
Total Grant
Amount (in Rs)
Year of Implementation
(1st/2nd/3rd/4th/5th)
GPS Points
Long Lat
1 Reclamation of Marshy Land
Hallahguri - - 4765 346 1648643 82432 1648643 3rd Year 90°25'52.313"E 26°23'21.417"N 2 Nachankhuti - - 1943 346 672180 33609 672180 3rd Year 90°25'48.397"E 26°23'39.194"N
Sub Total 6708 692 2320823 116041 2320823 1 Decongesation
Drainage Channel
Bagulamari - - 150 355 53250 2662.5 53250 3rd Year 90°25'1.668"E 26°25'3.74"N 2 Kashugaon - - 3000 355 1065000 53250 1065000 3rd Year 90°29'8.623"E 26°24'47.005"N 3 Barchara - - 1500 355 532500 26625 532500 3rd Year 90°25'45.989"E 26°26'7.482"N
Sub Total 4650 1065 1650750 82537.5 1650750 1
Slab Culvert (Sluice Type)
Bagulamari - - 1 84500 84500 4225 84500 3rd Year 90°25'12.53"E 26°24'48.678"N 2 Pachim Bhadra - - 1 84500 84500 4225 84500 3rd Year 90°27'15.374"E 26°25'37.416"N 3 Pub-Bhadra - - 1 84500 84500 4225 84500 3rd Year 90°27'39.032"E 26°25'29.905"N
50
1 2 3 4 5 6 7 8 9 10 11 12 13
Sl. No. Name of the
Activities (Structures)
Name of the Hamlet / Village
Plot Noumbers
( including Name of the local Patch)
Name of Beneficiaries
Area (in Ha)/
Dimension ( in M/ Sq. M / CuM)
of Structure
Unit Cost
Total Cost (in
Rs.) Contribution
Total Grant
Amount (in Rs)
Year of Implementation
(1st/2nd/3rd/4th/5th)
GPS Points
Long Lat
4 Tokeamari - - 1 84500 84500 4225 84500 3rd Year 90°25'59.272"E 26°25'26.007"N 5 Dabli - - 1 84500 84500 4225 84500 3rd Year 90°28'9.574"E 26°27'44.237"N 6 Kakragaon - - 1 84500 84500 4225 84500 3rd Year 90°28'11.833"E 26°27'21.538"N 7 Tilpukhuri - - 1 84500 84500 4225 84500 3rd Year 90°29'30.483"E 26°27'25.041"N 8 Barchara - - 1 84500 84500 4225 84500 3rd Year 90°25'53.966"E 26°25'53.41"N 9 Didari - - 1 84500 84500 4225 84500 3rd Year 90°27'24.676"E 26°26'35.222"N
10 Ghilaguri - - 1 84500 84500 4225 84500 3rd Year 90°26'54.901"E 26°27'20.169"N 11 Naitamara - - 1 84500 84500 4225 84500 3rd Year 90°25'36.68"E 26°26'31.173"N 12 Bhandarani - - 1 84500 84500 4225 84500 3rd Year 90°26'5.342"E 26°21'18.104"N 13 Durgamari - - 1 84500 84500 4225 84500 3rd Year 90°26'11.985"E 26°22'56.053"N 14 Tangaigon - - 1 84500 84500 4225 84500 4th Year 90°30'50.956"E 26°26'58.42"N 15 Hallahguri - - 1 84500 84500 4225 84500 5th Year 90°25'59.134"E 26°23'19.619"N 16 Nachankhuti - - 2 84500 169000 8450 169000 5th Year 90°25'9.772"E 26°24'14.256"N 17 Naldoba - - 1 84500 84500 4225 84500 5th Year 90°27'8.007"E 26°23'38.302"N
Sub Total 18 1436500 1521000 76050 1521000 1
Pond
Bagulamari - - 1 96000 96000 4800 96000 2nd Year 90°25'11.491"E 26°24'50.11"N 2 Pachim Bhadra - - 1 96000 96000 4800 96000 2nd Year 90°27'15.686"E 26°25'36.022"N 3 Pub-Bhadra No.1 - - 1 96000 96000 4800 96000 3rd Year 90°28'12.296"E 26°26'26.208"N 4 Rabhapara - - 1 96000 96000 4800 96000 3rd Year 90°27'49.654"E 26°26'34.135"N 5 Bagulamari - - 1 96000 96000 4800 96000 4th Year 90°24'42.921"E 26°25'12.258"N 6 Pachim Bhadra - - 1 96000 96000 4800 96000 4th Year 90°27'0.767"E 26°25'33.377"N 7 Pub-Bhadra - - 1 96000 96000 4800 96000 4th Year 90°27'42.335"E 26°26'6.242"N 8 Pub-Bhadra No.1 - - 1 96000 96000 4800 96000 4th Year 90°28'16.622"E 26°26'29.854"N 9 Pub-Bhadra No.2 - - 1 96000 96000 4800 96000 4th Year 90°28'1.561"E 26°25'13.041"N
51
1 2 3 4 5 6 7 8 9 10 11 12 13
Sl. No. Name of the
Activities (Structures)
Name of the Hamlet / Village
Plot Noumbers
( including Name of the local Patch)
Name of Beneficiaries
Area (in Ha)/
Dimension ( in M/ Sq. M / CuM)
of Structure
Unit Cost
Total Cost (in
Rs.) Contribution
Total Grant
Amount (in Rs)
Year of Implementation
(1st/2nd/3rd/4th/5th)
GPS Points
Long Lat
10 Rabhapara - - 1 96000 96000 4800 96000 4th Year 90°27'45.821"E 26°26'28.118"N 11 Saraikhoshra - - 1 96000 96000 4800 96000 4th Year 90°26'19.216"E 26°25'19.942"N 12 Tokeamari - - 1 96000 96000 4800 96000 4th Year 90°25'49.001"E 26°24'52.034"N 13 Dabli - - 1 96000 96000 4800 96000 4th Year 90°28'5.257"E 26°28'6.426"N 14 Kakragaon - - 1 96000 96000 4800 96000 4th Year 90°28'4.157"E 26°27'16.037"N 15 Kashugaon - - 1 96000 96000 4800 96000 4th Year 90°28'27.232"E 26°27'28.74"N 16 Tangaigon - - 1 96000 96000 4800 96000 4th Year 90°30'49.822"E 26°26'55.944"N 17 Tilpukhuri - - 1 96000 96000 4800 96000 4th Year 90°26'39.943"E 26°25'58.784"N 18 Barchara - - 1 96000 96000 4800 96000 4th Year 90°25'50.756"E 26°26'11.783"N 19 Didari - - 1 96000 96000 4800 96000 4th Year 90°27'9.255"E 26°26'48.091"N 20 Ghilaguri - - 1 96000 96000 4800 96000 4th Year 90°26'54.544"E 26°27'35.818"N 21 Naitamara - - 1 96000 96000 4800 96000 4th Year 90°25'24.772"E 26°26'50.976"N 22 Tilakgaon - - 1 96000 96000 4800 96000 4th Year 90°26'25.155"E 26°25'50.191"N 23 Bhandarani - - 1 96000 96000 4800 96000 4th Year 90°26'4.768"E 26°21'16.959"N 24 Durgamari - - 1 96000 96000 4800 96000 4th Year 90°26'15.957"E 26°22'20.705"N 25 Hallahguri - - 1 96000 96000 4800 96000 4th Year 90°25'45.069"E 26°23'12.327"N 26 Nachankhuti - - 1 96000 96000 4800 96000 4th Year 90°25'9.711"E 26°24'28.543"N 27 Naldoba - - 1 96000 96000 4800 96000 4th Year 90°26'55.552"E 26°23'46.728"N 28 Sikibiki - - 1 96000 96000 4800 96000 4th Year 90°26'3.856"E 26°24'23.172"N 29 Pub-Bhadra - - 1 96000 96000 4800 96000 5th Year 90°27'39.702"E 26°25'20.299"N 30 Pub-Bhadra No.2 - - 1 96000 96000 4800 96000 5th Year 90°27'59.142"E 26°25'7.556"N 31 Saraikhoshra - - 2 96000 192000 9600 192000 5th Year 90°26'26.906"E 26°24'40.628"N 32 Tokeamari - - 1 96000 96000 4800 96000 5th Year 90°25'59.571"E 26°25'26.67"N 33 Dabli - - 1 96000 96000 4800 96000 5th Year 90°28'10.035"E 26°27'44.241"N
52
1 2 3 4 5 6 7 8 9 10 11 12 13
Sl. No. Name of the
Activities (Structures)
Name of the Hamlet / Village
Plot Noumbers
( including Name of the local Patch)
Name of Beneficiaries
Area (in Ha)/
Dimension ( in M/ Sq. M / CuM)
of Structure
Unit Cost
Total Cost (in
Rs.) Contribution
Total Grant
Amount (in Rs)
Year of Implementation
(1st/2nd/3rd/4th/5th)
GPS Points
Long Lat
34 Kakragaon - - 1 96000 96000 4800 96000 5th Year 90°28'13.767"E 26°27'19.589"N 35 Kashugaon - - 1 96000 96000 4800 96000 5th Year 90°29'4.344"E 26°24'29.013"N 36 Tangaigon - - 1 96000 96000 4800 96000 5th Year 90°30'50.988"E 26°26'57.888"N 37 Tilpukhuri - - 1 96000 96000 4800 96000 5th Year 90°29'30.772"E 26°27'38.795"N 38 Barchara - - 1 96000 96000 4800 96000 5th Year 90°25'16.132"E 26°25'37.922"N 39 Didari - - 1 96000 96000 4800 96000 5th Year 90°27'19.624"E 26°26'24.556"N 40 Ghilaguri - - 1 96000 96000 4800 96000 5th Year 90°26'43.895"E 26°27'13.098"N 41 Naitamara - - 1 96000 96000 4800 96000 5th Year 90°25'35.239"E 26°26'30.879"N 42 Tilakgaon - - 1 96000 96000 4800 96000 5th Year 90°26'22.311"E 26°25'46.515"N 43 Bhandarani - - 1 96000 96000 4800 96000 5th Year 90°26'15.239"E 26°21'48.424"N 44 Durgamari - - 1 96000 96000 4800 96000 5th Year 90°26'11.717"E 26°22'55.78"N 45 Hallahguri - - 1 96000 96000 4800 96000 5th Year 90°25'58.84"E 26°23'20.536"N 46 Nachankhuti - - 1 96000 96000 4800 96000 5th Year 90°25'33.469"E 26°23'52.602"N 47 Naldoba - - 1 96000 96000 4800 96000 5th Year 90°26'52.119"E 26°23'13.164"N 48 Sikibiki - - 2 96000 192000 9600 192000 5th Year 90°26'3.878"E 26°23'44.03"N
Sub Total 50 4608000 4800000 240000 4800000 1 RCC Check
Dam Kashugaon - - 25 41700 1042500 52125 1042500 2nd Year 90°29'13.493"E 26°24'13.309"N
2 Barchara - - 25 41700 1042500 52125 1042500 2nd Year 90°25'47.777"E 26°26'7.576"N Sub Total 50 83400 2085000 104250 2085000
1 Brick Canal
Kashugaon - - 1000 680 680000 34000 680000 2nd Year 90°28'58.959"E 26°25'0.647"N 2 Barchara - - 900 680 612000 30600 612000 2nd Year 90°26'4.758"E 26°26'9.997"N
Sub Total 1900 1360 1292000 64600 1292000 Total 6131017 13669573 683479 13669573
53
Table No. 5.2.3 Vegetative Covers 1 2 3 4 5 6 7 8 9 10 12 13
Sl. No. Name of the Activities
Name of the Hamlet / Village
Plot Numbers
( including Name of the local Patch)
Name of Beneficiaries
Area (in
Sqm) Unit Cost
Total Cost (in
Rs.) Contribution
Total Grant
Amount (in Rs)
Year of Implementation
(1st/2nd/3rd/4th/5th)
GPS Points
Long Lat
1
Agro Forestry
Rabhapara - - 1 116000 116000 5800 116000 4th Year 90°27'49.877"E 26°26'49.651"N 2 Saraikhoshra - - 1 116000 116000 5800 116000 4th Year 90°26'28.768"E 26°25'11.829"N 3 Tokeamari - - 0.5 116000 58000 2900 58000 4th Year 90°25'49.026"E 26°25'16.271"N 4 Dabli - - 0.5 116000 58000 2900 58000 4th Year 90°28'0.066"E 26°28'7.567"N 5 Kakragaon - - 0.5 116000 58000 2900 58000 4th Year 90°28'3.716"E 26°27'21.625"N 6 Kashugaon - - 0.5 116000 58000 2900 58000 4th Year 90°29'14.117"E 26°24'58.457"N 7 Tangaigon - - 0.5 116000 58000 2900 58000 4th Year 90°30'22.208"E 26°27'15.381"N 8 Tilpukhuri - - 0.5 116000 58000 2900 58000 4th Year 90°29'16.927"E 26°27'38.827"N 9 Didari - - 1 116000 116000 5800 116000 4th Year 90°27'5.403"E 26°26'48.507"N
10 Ghilaguri - - 1 116000 116000 5800 116000 4th Year 90°26'53.326"E 26°27'36.677"N 11 Naitamara - - 0.5 116000 58000 2900 58000 4th Year 90°24'55.959"E 26°26'44.594"N 12 Tilakgaon - - 0.5 116000 58000 2900 58000 4th Year 90°26'56.696"E 26°26'23.761"N 13 Bhandarani - - 0.5 116000 58000 2900 58000 4th Year 90°25'35.424"E 26°21'55.388"N 14 Sikibiki - - 1 116000 116000 5800 116000 4th Year 90°26'3.479"E 26°24'0.427"
Sub Total 9.5 1624000 1102000 55100 1102000 1
Bio engineering (Vetiver Plantation)
Bagulamari - - 2000 150 300000 15000 300000 5th Year 90°25'17.612"E 26°25'15.111"N 2 Pachim Bhadra - - 500 150 75000 3750 75000 5th Year 90°27'26.093"E 26°25'16.52"N 3 Pub-Bhadra - - 3000 150 450000 22500 450000 5th Year 90°27'38.151"E 26°25'9.001"N 4 Pub-Bhadra No.1 - - 800 150 120000 6000 120000 5th Year 90°28'9.077"E 26°26'30.458"N 5 Rabhapara - - 1200 150 180000 9000 180000 5th Year 90°27'57.588"E 26°26'26.983"N 6 Saraikhoshra - - 3000 150 450000 22500 450000 5th Year 90°26'37.81"E 26°25'1.282"N 7 Tokeamari - - 800 150 120000 6000 120000 5th Year 90°25'31.35"E 26°24'51.562"N
8 Bhumeswar Hill N.C - - 1000 150 150000 7500 150000 5th Year 90°28'41.575"E 26°27'25.766"N
9 Kakragaon - - 500 150 75000 3750 75000 5th Year 90°28'24.489"E 26°27'6.129"N
54
1 2 3 4 5 6 7 8 9 10 12 13
Sl. No. Name of the Activities
Name of the Hamlet / Village
Plot Numbers
( including Name of the local Patch)
Name of Beneficiaries
Area (in
Sqm) Unit Cost
Total Cost (in
Rs.) Contribution
Total Grant
Amount (in Rs)
Year of Implementation
(1st/2nd/3rd/4th/5th)
GPS Points
Long Lat
10 Barchara - - 600 150 90000 4500 90000 5th Year 90°25'22.618"E 26°25'42.567"N 11 Tilakgaon - - 1800 150 270000 13500 270000 5th Year 90°26'37.898"E 26°25'59.684"N 12 Bhandarani - - 1500 150 225000 11250 225000 5th Year 90°26'10.506"E 26°20'59.358"N 13 Durgamari - - 2400 150 360000 18000 360000 5th Year 90°26'34.726"E 26°22'23.971"N 14 Hallahguri - - 900 150 135000 6750 135000 5th Year 90°26'9.804"E 26°23'15.878"N 15 Nachankhuti - - 700 150 105000 5250 105000 5th Year 90°25'36.428"E 26°24'31.129"N 16 Naldoba - - 200 150 30000 1500 30000 5th Year 90°26'18.124"E 26°23'37.939"N 17 Sikibiki - - 2600 150 390000 19500 390000 5th Year 90°26'14.938"E 26°23'52.557"N
Sub Total 23500 2550 3525000 176250 3525000
1 Fuel Wood
Bhumeswar Hill N.C - - 10 27200 272000 13600 272000 4th Year 90°28'48.979"E 26°26'6.276"N
2 Sikibiki - - 10 27200 272000 13600 272000 5th Year 90°26'35.037"E 26°24'7.294"N Sub Total 20 54400 544000 27200 544000
1 Horticultural Plantation
Bhumeswar Hill N.C - - 3 144500 433500 21675 433500 5th Year 90°29'0.384"E 26°25'28.006"N
2 Kashugaon - - 1 144500 144500 7225 144500 5th Year 90°28'55.746"E 26°24'58.178"N 3 Sikibiki - - 2 144500 289000 14450 289000 5th Year 90°26'6.156"E 26°23'58.844"N
Sub Total 6 433500 867000 43350 867000 TOTAL 23536 2114450 6038000 301900 6038000
55
5.3: Structure or Activity Wise Details of Engineering Structure and Vegetative Measures Table No.5.3.1 : Engineering structures for Soil Conservation Measures (SMC)
1 2 3 4
S. No.
Name of structures
Area (ha) Farmers Total units (No./
cu.m./ rmt) UNIT COST
(Rs)
Proposed plan Estimated cost* (Rs. in lakh) Farmers contribution Grant
Portion M W O T (Rs. in lakh) (Rs. in
lakh) A PRIVATE LAND - - 1 Graded Bund - - 25800 218 5.62 47.81 2.81 56.24 562440 5624400 2 Periphery Bund - - 2500 218 0.55 4.63 0.27 5.45 54500 545000
3 Boulder Pitching - - 600 1665 1.00 8.49 0.50 9.99 99900 999000
Grand total (A+B) 0 0 28900 2101 7 61 4 72 716840 7168400 (M – Materials, W- wages, O- others, T – Total)
5.3.2: Details of engineering structures for Water Harvesting WHS
1 2 3 4
S. No. Name of structures
Proposed plan Total units (No./ cu.m./
rmt)
UNIT COST Estimated cost* Farmers contribution (Rs) (Rs. in lakh) (Rs)
M W O T A2 Common structures 1 Reclamation of Marshy Land 6708 346 2.32 19.73 1.16 23.21 232082 2 Decongesation Drainage Channel 4650 355 1.65 14.03 0.83 16.51 165075 3 Slab Culvert (Sluice Type) 18 84500 1.52 12.93 0.76 15.21 152100 4 Pond 50 96000 4.80 40.80 2.40 48.00 480000 5 RCC Check Dam 50 41700 2.09 17.72 1.04 20.85 208500 6 Brick Canal 1900 680 1.29 10.98 0.65 12.92 129200
Grand total 13376 223581 13.67 116.19 6.83 136.70 1366957
56
Table No. 5.3.3: Details of activities connected with vegetative cover in watershed works 1 2 3 4
S. No. Name of structure/ work
Proposed plan
Area (sqm)
Unit Cost(Rs)
Estimated cost (Rs. in lakh)
Farmer Contribution (Rs. in lakh) Grant (Rs. in lakh)
1 Agro Forestry 10 116000 11.02 55100.00 11.02 2 Bio engineering (Vetiver Plantation) 23500 150 35.25 176250.00 35.25 3 Fuel Wood 20 27200 5.44 27200.00 5.44 4 Horticultural Plantation 6 144500 8.67 43350.00 8.67
Grand total 23536 287850 60.38 301900.00 301900.00
57
CHAPTER 6 CAPACITY BUILDING PLAN
Table No. 6.1 Details of Capacity Building 1 2 3 4 5 6 7 8 9 10
Sl. No.
Name of the Training & Exposure ( Knowledge, Skill, etc. at both Being and Doing level)
Number of
events
Number of Participants in
an event
Total Number of days per
event
Total Traineedays (=
3 x 4 x 5) Cost per
Traineeday (in Rs)
Total Cost required for the programme (= 6
x7 ; in Rs.)
Total Grant Amount (in
Rs) Year of Implementation (1st/2nd/3rd/4th/5th)
Mass Meeting 1 MassMeeting 10 500 1 5000 20.39 101971 101971 1st, 3rd , 4th
Subtotal 10 500 1 5000 20.39 101971 101971 Awarness Meeting
1 Awarness Meeting 25 200 1 5000 27.70 138518 138518 1st, 2nd Subtotal 25 200 1 5000 27.70 138518 138518
Publicity Materials 1 Publicity Materials - - - - - 180480 180480 1st, 2nd
Subtotal 0 0 0 0 0 180480 180480 Institutional Building
1 WC Formation & Registration, etc. - - - - - 45120 45120 1st, 2nd 2 UG Formation - - - - - 18048 18048 2nd, 3rd, 4th, 5th 3 SHG Formation - - - - - 32035 32035 2nd, 3rd, 4th, 5th
Subtotal 0 0 0 0 0 95203 95203 TRAINING
1 DWDU 2 60 1 120 752 90240 90240 1st Year 2 PIA/WDT 7 20 2 280 698 195370 195370 1st, 2nd , 3rd, 4th 3 Watershed Committee 10 11 2 220 601 132202 132202 2nd, 3rd 4 User Group 12 20 2 480 497 238685 238685 2nd. 3rd, 4th, 5th 3 SHG 12 20 2 480 534 256282 256282 2nd. 3rd, 4th, 5th
Subtotal 43 131 9 1580 3082 912778 912778 EXPOSURE VISIT
1 Farmers/ WC Members 4 20 4 320 847 271171 271171 2nd. 3rd, 4th, 5th 2 PIA/WDT 4 10 4 160 1743 278842 278842 2nd. 3rd, 4th, 5th
Subtotal 8 30 8 480 2590 550013 550013
58
1 2 3 4 5 6 7 8 9 10
Sl. No.
Name of the Training & Exposure ( Knowledge, Skill, etc. at both Being and Doing level)
Number of
events
Number of Participants in
an event
Total Number of days per
event
Total Traineedays (=
3 x 4 x 5) Cost per
Traineeday (in Rs)
Total Cost required for the programme (= 6
x7 ; in Rs.)
Total Grant Amount (in
Rs) Year of Implementation (1st/2nd/3rd/4th/5th)
PARTICIPATION IN EXHIBITION 1 SHG/UG 2 20 4 160 1145 183187 183187 2nd. 3rd, 4th, 5th
Subtotal 2 20 4 160 1145 183187 183187 SEMINER & WORKSHOP
1 Seminer & Workshop 1 80 1 80 1173 93850 93850 2nd Year, 4th Year Subtotal 1 80 1 80 1173 93850 93850
GRAND TOTAL 89 961 24 12300 8038 2256000 2256000
59
COST OF CAPACITY BUILDING COMPONENT WISE BREAKUP (Rs. In Lakh)
(OUT OF 5% OF THE TOTAL FUND ALLOCATION)
Particulars 1st yr 2nd yr 3rd yr 4th yr 5th Yr Total 1 IEC
1.1 Mass Meeting 0.45 0.00 0.34 0.23 0.00 1.02 1.2 Awareness Meeting 0.34 1.05 0.00 0.00 0.00 1.39 1.3 Publicity Materials 0.45 1.35 0.00 0.00 0.00 1.80
sub-total 1.24 2.40 0.34 0.23 0.00 4.21 2 Institutional Building
2.1 WC Formation & Registration, etc. 0.11 0.34 0.00 0.00 0.00 0.45 2.2 UG Formation 0.00 0.07 0.06 0.04 0.02 0.18 2.3 SHG Formation 0.00 0.05 0.15 0.07 0.06 0.32
sub-total 0.11 0.45 0.21 0.11 0.07 0.95 3 Capacity Building
3.1 Training (DWDU) 0.45 0.45 0.00 0.00 0.00 0.90 3.2 Training ( PIA& WDT) 0.45 0.68 0.41 0.42 0.00 1.95 3.3 Training (WC) 0.00 0.79 0.53 0.00 0.00 1.32 3.4 Training (UG) 0.00 0.79 0.72 0.50 0.38 2.39 3.5 Training (SHG) 0.00 0.79 0.72 0.56 0.49 2.56 3.6 Exposure Visit (Farmers/WC Members) 0.00 1.13 0.56 0.68 0.34 2.71 3.7 Exposure Visit (Officers/PRI) 0.00 0.68 0.56 0.90 0.65 2.79 3.8 Participation in Exhibition 0.00 0.68 0.45 0.37 0.33 1.83 3.9 Seminer & Workshop 0.00 0.19 0.00 0.74 0.00 0.94
sub-total 0.90 6.17 3.96 4.18 2.18 17.40 Total 2.26 9.02 4.51 4.51 2.26 22.56
60
CHAPTER 7
PHASING OF PROGRAMME AND BUDGETING Table No. 7.1: Phasing of the action plan 1 2 3 4 5 6 7 8 9 10 11
S.No Component Activities Unit Unit Cost 1 year 2nd year 3rd year 4th year 5th year Total
(Rs.) Phy (No)
Fin (Rs.)
Phy (No) Fin (Rs.) Phy
(No) Fin (Rs.) Phy (No) Fin (Rs.) Phy
(No) Fin (Rs.) Phy (No) Fin (Rs.)
1 Entry Point Activities (4%)
Sub Total of Entry Point Activity 0 1920000 0 0 0 0 0 0 0 0 0 1920000
2 Institution & Capacity Building (5%)
i) Poor HHs in Watersheds to be covered under SHGs
SC No. - 22 - 44 - 66 - 88 - 44 - 264 - ST No. - 22 - 44 - 66 - 88 - 44 - 264 - BC No. - 22 - 44 - 66 - 88 - 44 - 264 - OC No. - 22 - 44 - 66 - 88 - 44 - 264 -
ii) Awareness Generation (events) to be conducted
Pamphlets distribution No. 1.25 8400 10500 20000 25000 0 0 0 0 0 0 28400 35500 Wall posters No. 1.5 8000 12000 20000 30000 0 0 0 0 0 0 28000 42000
Wall writings/Flex Postering No. 2500 9 22500 32 80000 0 0 0 0 0 0 41 102500
Mass meetings No. 10197 4 40788 0 0 3 30591 3 30591 0 0 10 101970
iii) Orientation programmes to GP, WC,UG, SHG,VO, VSS, WUA, Societies, Elected reps.
No.
iv) Formation of UGs No. 0 0 0 7000 0 5500 0 3500 0 2000 0 18000 No. of women No. - - - - - - - - - - - - - No. of men No. - - - 150 - 420 - 210 - 340 - - 1120 vi) Formation of Watershed No. 0 14000 0 42000 0 0 0 0 0 0 0 56000
61
1 2 3 4 5 6 7 8 9 10 11
S.No Component Activities Unit Unit Cost 1 year 2nd year 3rd year 4th year 5th year Total
(Rs.) Phy (No)
Fin (Rs.)
Phy (No) Fin (Rs.) Phy
(No) Fin (Rs.) Phy (No) Fin (Rs.) Phy
(No) Fin (Rs.) Phy (No) Fin (Rs.)
Committee No. of women No. - 9 - - - - - - - - - - 9 No. of men No. 38 - - - - - - - - - - 38
vii) Regular Meetings to be conducted
Watershed Committee No. UGs/LGs No. VO/SHGs No. Gram Panchayat No. viii) No. of Planning events No. ix) Registration of WC No.
x) Self Monitoring events (planning, review of activities through tool)
No.
xi) Convergence meetings with LDs/other institutions
No.
xii) Social Audit events No. xiii) Trainings & Exposures a) DWDU Level No.Trgs 2 1 0 1 0 0 0 0 0 0 0 2 - Women No. - 10 - 10 - - - - - - - 20 - Men No. 50 50 - - - - - - 100 - b) On PIA Level No. trgs 7 1 - 2 - 2 - 2 - - - 7 - Women No. - 5 - 10 - 10 - - - - - 25 - Men No. - 15 - 30 - 30 - - - - - 75 - c) On WC Level No. trgs 10 0 - 5 - 5 - - - - - 10 - Women No. - 0 - 25 - 25 - - - - - 50 - Men No. - 0 - 30 - 30 - - - - - 60 -
c) On Natural Resource Management No. trgs 12 0 - 4 - 4 - 2 - 2 - 8 -
Women No. - - - - - - - - - - - - -
62
1 2 3 4 5 6 7 8 9 10 11
S.No Component Activities Unit Unit Cost 1 year 2nd year 3rd year 4th year 5th year Total
(Rs.) Phy (No)
Fin (Rs.)
Phy (No) Fin (Rs.) Phy
(No) Fin (Rs.) Phy (No) Fin (Rs.) Phy
(No) Fin (Rs.) Phy (No) Fin (Rs.)
Men No. 240 - - 80 - 80 - 40 - 40 - 240 - d) On Enterprise Promotion No. trgs 6 - - 2 - 2 - 1 - 1 - 6 - Women No. 100 - - 30 - 30 - 15 - 15 - 90 - Men No. 20 - - 10 - 10 - 5 - 5 - 30 -
e) On Productivity Enhancement No. trgs 6 - - 2 - 2 - 1 - 1 - 6 -
Women No. 100 - - 30 - 30 - 15 - 15 - 90 - Men No. 20 - - 10 - 10 - 5 - 5 - 30 - f) Exposure Visits Nos 8 - - 3 - 1 - 2 - 2 - 8 - Women No. 40 - - 15 - 5 - 10 - 10 - 40 - Men No. 80 - - 30 - 10 - 20 - 20 - 80 -
Sub Total IB & CB {Do not sum Men & Women under CB events (a to f)}[1] 0 240000 0 960000 0 480000 0 480000 0 240000 0 2400000
3 Productivity Enhancement (10%) A) Animal Husbandry i) Dairy No. 135000 0 0 0 0 2 270000 0 0 6 810000 8 1080000 ii) Goatery No. 69000 0 0 7 483000 17 1173000 21 1449000 3 207000 48 3312000 B) Fisheries
Semi-Intensive pisciculture with heavy stocking & multiple harvesting
Hec 314000 0 0 0 0 0 0 0 0 1.3 408200 1.3 408200
Sub-Total PE 0 0 7 483000 19 1443000 21 1449000 10.3 1425200 57.3 4800200 4 Livelihood for Assetless (9%) i) Goatery NO 25000 0 0 19 475000 24 600000 29 725000 24 600000 96 2400000 v) Poultry No. 25000 0 0 0 0 33 825000 29 725000 15 375000 77 1925000 Sub-Total LA 0 0 19 475000 57 1425000 58 1450000 39 975000 173 4325000 5 Natural Resource Management (56%) I) WHS (MI Works)
a Slab Culvert (Sluice Type) No 84500 0 0 0 0 13 1098500 1 84500 4 338000 18 1521000
63
1 2 3 4 5 6 7 8 9 10 11
S.No Component Activities Unit Unit Cost 1 year 2nd year 3rd year 4th year 5th year Total
(Rs.) Phy (No)
Fin (Rs.)
Phy (No) Fin (Rs.) Phy
(No) Fin (Rs.) Phy (No) Fin (Rs.) Phy
(No) Fin (Rs.) Phy (No) Fin (Rs.)
b Pond NO 96000 0 0 2 192000 2 192000 24 2304000 22 2112000 50 4800000
d Decongesation Drainage Channel RM 355 0 0 0 0 4650 1650750 0 0 0 0 4650 1650750
e Reclamation of Marshy Land CUM 346 0 0 0 0 6708 2320968 0 0 0 0 6708 2320968
a Brick Canal RM 680 0 0 1900 1292000 0 0 0 0 0 0 1900 1292000 b RCC Check Dam NO 41700 0 0 50 2085000 0 0 0 0 0 0 50 2085000
II Soil Moisture Conservation (SMC)
a Graded Bund RM 218 0 0 0 0 19700 4294600 1400 305200 4700 1024600 25800 5624400 b Periphery Bund RM 218 0 0 0 0 2500 545000 0 0 0 0 2500 545000 c Boulder Pitching SQM 1665 0 0 0 0 0 0 600 999000 0 0 600 999000 II Vegetative Cover (VC)
a Bio engineering (Vetiver Plantation) SQM 150 0 0 0 0 0 0 0 0 23500 3525000 23500 3525000
b Agro Forestry HEC 116000 0 0 0 0 0 0 9.5 1102000 0 0 9.5 1102000 Horticultural Plantation HEC 144500 0 0 0 0 0 0 0 0 6 867000 6 867000 c Fuel Wood HEC 27200 0 0 0 0 0 0 12 326400 8 217600 20 544000 Sub Total NRM: 0 0 1952 3569000 33573 10101818 2046.5 5121100 28240 8084200 65811.5 26876118 6a WDF Collected Rs. 303300 864511 492833 679440 2340084
64
2 3 4 5 6 7 8 9 10 11 11
Component Activities Unit Unit Cost 1 year 2nd year 3rd year 4th year 5th year 6th Year Total
(Rs.) Phy (No)
Fin (Rs.)
Phy (No)
Fin (Rs.)
Phy (No)
Fin (Rs.)
Phy (No)
Fin (Rs.)
Phy (No)
Fin (Rs.)
Phy (No)
Fin (Rs.)
Phy (No) Fin (Rs.)
Administration
a WC office expenditure Rs. 6000 4 24000 4 24000 4 24000 4 24000 4 24000 4 24000 24 144000
b WS secretary Salary Rs 18000 4 72000 4 72000 4 72000 4 72000 4 72000 4 72000 24 432000
c Stationary & miscillaneous Rs. 384000 384000 864000 864000 864000 864000 4224000
Sub Total Admin 24000 8 480000 8 480000 8 960000 8 960000 8 960000 8 960000 48 4800000 Table No. 7.2 Estimated Benefit Cost Ratio
S.No. Name of the activity Total Cost (Rs.) Total Benefit expected * (Rs.) BCR Remarks
1 EPA 1920000 2112000 1.1
2 NRM 22093418 32256390 1.46
3 Prpductivity Enhancement 4800200 8160340 1.7
4 Livelihood for Asset less 4335000 7803000 1.8
5 Institution and Capacity building 2400000 2880000 1.2
6 Overall 35548618 53211730 1.49
Overall
65
Table No. 8.1: Consolidation of Action Plan
Component
Allocation by Year (Rs. In Lakh)
Phase -I: Preparatory Phase- II: Work Phae - III: Consolidation Total
1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year
Administrative 4.800 4.800 9.600 9.600 9.600 9.600 48.000
Monitoring 0.000 2.400 0.000 1.200 0.000 1.200 4.800
Evaluation 0.000 2.400 0.000 1.200 0.000 1.200 4.800
Entry Point Acty 19.200 0.000 0.000 0.000 0.000 0.000 19.200
Instituation&CB 2.400 9.600 4.800 4.800 2.400 0.000 24.000
DPR 2.400 2.400 0.000 0.000 0.000 0.000 4.800
Watershed Development works 0.000 36.000 100.800 50.400 81.600 0.000 268.800
livelihood activities (Asset less) 0.000 4.800 14.400 14.400 9.600 0.000 43.200
Production system & microenterprise 0.000 4.800 14.400 14.400 14.400 0.000 48.000
Consolidation 0.000 0.000 0.000 0.000 0.000 14.400 14.400
TOTAL 28.800 67.200 144.000 96.000 26.400 480.000
66
Table No. 9.2: Summarize in the table given below (Quantifiable indicators)
1 2 3 4 5 6
S. No. Item Unit of measurement
Pre-project Status
Expected Post-project Status Remarks
1 Status of water table (Depth to Ground water level)
Meters
2 Ground water structures repaired/ rejuvenated
No.
3 Quality of drinking water Description 4 Availability of drinking water Description 5 Increase in irrigation potential Hec. 6 Change in cropping/ land use
pattern Description
7 Area under agricultural crop Hec. I Area under single crop Hec.
Ii Area under double crop
Hec.
iii Area under multiple crop
Hec.
8 Net increase in crop production area
Hec.
9 Increase in area under Vegetation/Forest
Hec.
10 Increase in area under horticulture
Hec.
11 Increase in area under fuel Hec. 12 Increase in area under Fodder Hec. 13 Increase in milk production Litres/day 14 Environmental Impact
Change in Soil Loss Perenniality of flow and change in Run-off Recharge of ground water
14 No. of SHGs Promoted No. 15 Increase in no. of livelihoods No. 16 Increase in income Rs. 17 Status of Migration No. 18 SHG Federations formed No. 19 Credit linkage with banks Rs. 20 Resource use agreements 21 WDF collection & management Rs. 22 Summary of lessons learnt Description
67
Table No.9.3: Backward and Forward Linkages
Type of Marketing Facility Name of the institution Pre-project (no.) Expected post project status
(A) Backward linkages
(i) Seed certification Govt. of Assam No Will be done (ii) Seed supply system Co-operative and
Agriculture Dept. No Strong Seed supply
system will be developed (iii) Fertilizer supply system Co-operative and local
fertilizer dealer No Strong Fertilizer supply
system will be developed (iv) Pesticide supply
system Local Pesticide Dealer No Strong Pesticide supply
system will be developed (v) Credit institutions Co-operative Bank, SHG,
Local Bank, Nodal Bank etc.
SHG Internal Credit link will be developed among SHG, Local Bank, Co-operative Bank etc. and external credit link from commercial / nodal banks.
(vi) Water supply Water User Group No Will be developed (vii) Extension services KVK, ATMA, Agriculture
Dept., NGOs ATMA, Agri Dept., NGO Strong extension services
will be developed among all institutions
(viii) Nurseries SHG, Horticulture Nursery, Local Nursery
Local Nursery Strong extension services will be developed among all institutions
(ix) Tools/machinery suppliers
Ag Deptt Ag Deptt Will Continued
(x) Price Support system Ag Deptt, Vetty Dept. Ag Deptt Will Continued (xi) Labour Local wage labour Local wage labour Strong network will be
developed (B) Forward linkages Strong network will be
developed (i) Harvesting/threshing
machinery Local level Local level Strong network will be
developed (ii) Storage (including cold
storage) Local level Local level Strong network will be
developed (iii) Road network Local level Local level Strong network develop (iv) Transport facilities Local level Local level Strong network develop (v) Markets / Mandis Local committee,
Cooperative No Institution will take initiative
so that beneficiearies will get better opportunities.
(vi) Agro and other Industries
Local committee, Cooperative
No Institution will take initiative so that beneficiearies will get better opportunities.
(vii) Milk and other collection centres
Local committee, Cooperative
No Institution will take initiative so that beneficiearies will get better opportunities.
68
Village Wise Interventions (Natural Resourse Management) Name of Micro Watershed Bagulamari MWS Name of Village Bagulamari Activities Related to Surface Water Treatment (Rs. In Lakh) (Rs. In Lakh) (Rs. In Lakh) (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR) TOTAL 1st Year 2nd Year 3rd Year 4th Year 5th Year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Decongesation Drainage Channel RM 355 150 0.53 0 0.00 0 0.00 150 0.53 0 0.00 0 0.00 Pond NO 96000 2 1.92 0 0.00 1 0.96 0 0.00 1 0.96 0 0.00 Graded Bund RM 218 1500 3.27 0 0.00 0 0.00 1500 3.27 0 0.00 0 0.00 Slab Culvert (Sluice Type) NO 84500 1 0.85 0 0.00 0 0.00 1 0.85 0 0.00 0 0.00 Bio engineering (Vetiver Plantation) SQM 150 2000 3.00 0 0.00 0 0.00 0 0.00 0 0.00 2000 3.00 Boulder Pitching SQM 1665 250 4.16 0 0.00 0 0.00 0 0.00 250 4.16 0 0.00 Name of Micro Watershed Bagulamari MWS Name of Village Pachim Bhadra Activities Related to Surface Water Treatment 0.00 (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR) TOTAL 1st Year 2nd Year 3rd Year 4th Year 5th Year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Pond NO 96000 2 1.92 0 0.00 1 0.96 0 0.00 1 0.96 0 0.00 Graded Bund RM 218 2000 4.36 0 0.00 0 0.00 2000 4.36 0 0.00 0 0.00 Slab Culvert (Sluice Type) NO 84500 1 0.85 0 0.00 0 0.00 1 0.85 0 0.00 0 0.00 Bio engineering (Vetiver Plantation) SQM 150 500 0.75 0 0.00 0 0.00 0 0.00 0 0.00 500 0.75 Name of Micro Watershed Bagulamari MWS Name of Village Pub-Bhadra Activities Related to Surface Water Treatment (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR) TOTAL 1st Year 2nd Year 3rd Year 4th Year 5th Year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Pond NO 96000 2 1.92 0 0.00 0 0.00 0 0.00 1 0.96 1 0.96 Graded Bund RM 218 1100 2.40 0 0.00 0 0.00 1100 2.40 0 0.00 0 0.00 Slab Culvert (Sluice Type) NO 84500 1 0.85 0 0.00 0 0.00 1 0.85 0 0.00 0 0.00 Bio engineering (Vetiver Plantation) SQM 150 3000 4.50 0 0.00 0 0.00 0 0.00 0 0.00 3000 4.50 Name of Micro Watershed Bagulamari MWS
69
Name of Village Pub-Bhadra No.1 Activities Related to Surface Water Treatment (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR) TOTAL 1st Year 2nd Year 3rd Year 4th Year 5th Year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Pond NO 96000 2 1.92 0 0.00 0 0.00 1 0.96 1 0.96 0 0.00 Bio engineering (Vetiver Plantation) SQM 150 800 1.20 0 0.00 0 0.00 0 0.00 0 0.00 800 1.20 Name of Micro Watershed Bagulamari MWS Name of Village Pub-Bhadra No.2 Activities Related to Surface Water Treatment (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR) TOTAL 1st Year 2nd Year 3rd Year 4th Year 5th Year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Pond NO 96000 2 1.92 0 0.00 0 0.00 0 0.00 1 0.96 1 0.96 Name of Micro Watershed Bagulamari MWS Name of Village Rabhapara Activities Related to Surface Water Treatment (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR) TOTAL 1st Year 2nd Year 3rd Year 4th Year 5th Year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Pond NO 96000 2 1.92 0 0.00 0 0.00 1 0.96 1 0.96 0 0.00 Graded Bund RM 218 1200 2.62 0 0.00 0 0.00 1200 2.62 0 0.00 0 0.00 Bio engineering (Vetiver Plantation) SQM 150 1200 1.80 0 0.00 0 0.00 0 0.00 0 0.00 1200 1.80 Agro Forestry HEC 116000 1 1.16 0 0.00 0 0.00 0 0.00 1 1.16 0 0.00 Name of Micro Watershed Bagulamari MWS Name of Village Saraikhoshra Activities Related to Surface Water Treatment (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR) TOTAL 1st Year 2nd Year 3rd Year 4th Year 5th Year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Pond NO 96000 3 2.88 0 0.00 0 0.00 0 0.00 1 0.96 2 1.92 Bio engineering (Vetiver Plantation) SQM 150 3000 4.50 0 0.00 0 0.00 0 0.00 0 0.00 3000 4.50 Agro Forestry HEC 116000 1 1.16 0 0.00 0 0.00 0 0.00 1 1.16 0 0.00 Name of Micro Watershed Bagulamari MWS Name of Village Tokeamari Activities Related to Surface Water Treatment (Rs. In Lakh) (Rs. In Lakh)
70
Name of Intervention Unit Rate (in INR) TOTAL 1st Year 2nd Year 3rd Year 4th Year 5th Year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Pond NO 96000 2 1.92 0 0.00 0 0.00 0 0.00 1 0.96 1 0.96 Graded Bund RM 218 1500 3.27 0 0.00 0 0.00 1500 3.27 0 0.00 0 0.00 Slab Culvert (Sluice Type) NO 84500 1 0.85 0 0.00 0 0.00 1 0.85 0 0.00 0 0.00 Bio engineering (Vetiver Plantation) SQM 150 800 1.20 0 0.00 0 0.00 0 0.00 0 0.00 800 1.20 Agro Forestry HEC 116000 0.5 0.58 0 0.00 0 0.00 0 0.00 0.5 0.58 0 0.00 Name of Micro Watershed Kakragaon MWS Name of Village Bhumeswar Hill N.C Activities Related to Surface Water Treatment (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR) TOTAL 1st Year 2nd Year 3rd Year 4th Year 5th Year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Bio engineering (Vetiver Plantation) SQM 150 1000 1.50 0 0.00 0 0.00 0 0.00 0 0.00 1000 1.50 Fuel Wood HEC 27200 10.0 2.72 0 0.00 0 0.00 0 0.00 6 1.63 4 1.09 Horticultural Plantation Hec 144500 3.0 4.34 0 0.00 0 0.00 0 0.00 0 0.00 3 4.34 Name of Micro Watershed Kakragaon MWS Name of Village Dabli Activities Related to Surface Water Treatment (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR) TOTAL 1st Year 2nd Year 3rd Year 4th Year 5th Year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Pond NO 96000 2 1.92 0 0.00 0 0.00 0 0.00 1 0.96 1 0.96 Graded Bund RM 218 700 1.53 0 0.00 0 0.00 700 1.53 0 0.00 0 0.00 Slab Culvert (Sluice Type) NO 84500 1 0.85 0 0.00 0 0.00 1 0.85 0 0.00 0 0.00 Agro Forestry HEC 116000 0.5 0.58 0 0.00 0 0.00 0 0.00 0.5 0.58 0 0.00 Name of Micro Watershed Kakragaon MWS Name of Village Kakragaon Activities Related to Surface Water Treatment (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR) TOTAL 1st Year 2nd Year 3rd Year 4th Year 5th Year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Pond NO 96000 2 1.92 0 0.00 0 0.00 0 0.00 1 0.96 1 0.96 Graded Bund RM 218 1000 2.18 0 0.00 0 0.00 1000 2.18 0 0.00 0 0.00 Slab Culvert (Sluice Type) NO 84500 1 0.85 0 0.00 0 0.00 1 0.85 0 0.00 0 0.00
71
Bio engineering (Vetiver Plantation) SQM 150 500 0.75 0 0.00 0 0.00 0 0.00 0 0.00 500 0.75 Agro Forestry HEC 116000 0.5 0.58 0 0.00 0 0.00 0 0.00 0.5 0.58 0 0.00 Name of Micro Watershed Kakragaon MWS Name of Village Kashugaon Activities Related to Surface Water Treatment (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR) TOTAL 1st Year 2nd Year 3rd Year 4th Year 5th Year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Decongesation Drainage Channel RM 355 3000 10.65 0 0.00 0 0.00 3000 10.65 0 0.00 0 0.00 Pond NO 96000 2 1.92 0 0.00 0 0.00 0 0.00 1 0.96 1 0.96 Brick Canal RM 680 1000 6.80 0 0.00 1000 6.80 0 0.00 0 0.00 0 0.00 RCC Check Dam NO 41700 25 10.43 0 0.00 25 10.43 0 0.00 0 0.00 0 0.00 Agro Forestry HEC 116000 0.5 0.58 0 0.00 0 0.00 0 0.00 0.5 0.58 0 0.00 Horticultural Plantation Hec 144500 1.0 1.45 0 0.00 0 0.00 0 0.00 0 0.00 1 1.45 Name of Micro Watershed Kakragaon MWS Name of Village Tangaigon Activities Related to Surface Water Treatment (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR) TOTAL 1st Year 2nd Year 3rd Year 4th Year 5th Year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Pond NO 96000 2 1.92 0 0.00 0 0.00 0 0.00 1 0.96 1 0.96 Graded Bund RM 218 1400 3.05 0 0.00 0 0.00 0 0.00 1400 3.05 0 0.00 Slab Culvert (Sluice Type) NO 84500 1 0.85 0 0.00 0 0.00 0 0.00 1 0.85 0 0.00 Agro Forestry HEC 116000 0.5 0.58 0 0.00 0 0.00 0 0.00 0.5 0.58 0 0.00 Name of Micro Watershed Kakragaon MWS Name of Village Tilpukhuri Activities Related to Surface Water Treatment (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR) TOTAL 1st Year 2nd Year 3rd Year 4th Year 5th Year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Pond NO 96000 2 1.92 0 0.00 0 0.00 0 0.00 1 0.96 1 0.96 Graded Bund RM 218 3000 6.54 0 0.00 0 0.00 3000 6.54 0 0.00 0 0.00 Slab Culvert (Sluice Type) NO 84500 1 0.85 0 0.00 0 0.00 1 0.85 0 0.00 0 0.00 Agro Forestry HEC 116000 0.5 0.58 0 0.00 0 0.00 0 0.00 0.5 0.58 0 0.00 Name of Micro Watershed Naitamara MWS
72
Name of Village Barchara Activities Related to Surface Water Treatment (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR) TOTAL 1st Year 2nd Year 3rd Year 4th Year 5th Year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Decongesation Drainage Channel RM 355 1500 5.33 0 0.00 0 0.00 1500 5.33 0 0.00 0 0.00 Pond NO 96000 2 1.92 0 0.00 0 0.00 0 0.00 1 0.96 1 0.96 Graded Bund RM 218 1200 2.62 0 0.00 0 0.00 1200 2.62 0 0.00 0 0.00 Slab Culvert (Sluice Type) NO 84500 1 0.85 0 0.00 0 0.00 1 0.85 0 0.00 0 0.00 Brick Canal RM 680 900 6.12 0 0.00 900 6.12 0 0.00 0 0.00 0 0.00 Bio engineering (Vetiver Plantation) SQM 150 600 0.90 0 0.00 0 0.00 0 0.00 0 0.00 600 0.90 RCC Check Dam NO 41700 25 10.43 0 0.00 25 10.43 0 0.00 0 0.00 0 0.00 Name of Micro Watershed Naitamara MWS Name of Village Didari Activities Related to Surface Water Treatment (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR) TOTAL 1st Year 2nd Year 3rd Year 4th Year 5th Year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Pond NO 96000 2 1.92 0 0.00 0 0.00 0 0.00 1 0.96 1 0.96 Graded Bund RM 218 900 1.96 0 0.00 0 0.00 900 1.96 0 0.00 0 0.00 Slab Culvert (Sluice Type) NO 84500 1 0.85 0 0.00 0 0.00 1 0.85 0 0.00 0 0.00 Agro Forestry HEC 116000 1 1.16 0 0.00 0 0.00 0 0.00 1 1.16 0 0.00 Name of Micro Watershed Naitamara MWS Name of Village Ghilaguri Activities Related to Surface Water Treatment (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR) TOTAL 1st Year 2nd Year 3rd Year 4th Year 5th Year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Pond NO 96000 2 1.92 0 0.00 0 0.00 0 0.00 1 0.96 1 0.96 Graded Bund RM 218 900 1.96 0 0.00 0 0.00 900 1.96 0 0.00 0 0.00 Slab Culvert (Sluice Type) NO 84500 1 0.85 0 0.00 0 0.00 1 0.85 0 0.00 0 0.00 Agro Forestry HEC 116000 1 1.16 0 0.00 0 0.00 0 0.00 1 1.16 0 0.00 Name of Micro Watershed Naitamara MWS Name of Village Naitamara Activities Related to Surface Water Treatment (Rs. In Lakh) (Rs. In Lakh)
73
Name of Intervention Unit Rate (in INR) TOTAL 1st Year 2nd Year 3rd Year 4th Year 5th Year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Pond NO 96000 2 1.92 0 0.00 0 0.00 0 0.00 1 0.96 1 0.96 Graded Bund RM 218 1200 2.62 0 0.00 0 0.00 1200 2.62 0 0.00 0 0.00 Slab Culvert (Sluice Type) NO 84500 1 0.85 0 0.00 0 0.00 1 0.85 0 0.00 0 0.00 Agro Forestry HEC 116000 0.5 0.58 0 0.00 0 0.00 0 0.00 0.5 0.58 0 0.00 Name of Micro Watershed Naitamara MWS Name of Village Tilakgaon Activities Related to Surface Water Treatment (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR) TOTAL 1st Year 2nd Year 3rd Year 4th Year 5th Year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Pond NO 96000 2 1.92 0 0.00 0 0.00 0 0.00 1 0.96 1 0.96 Bio engineering (Vetiver Plantation) SQM 150 1800 2.70 0 0.00 0 0.00 0 0.00 0 0.00 1800 2.70 Agro Forestry HEC 116000 0.5 0.58 0 0.00 0 0.00 0 0.00 0.5 0.58 0 0.00 Name of Micro Watershed Naldoba MWS Name of Village Bhandarani Activities Related to Surface Water Treatment (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR) TOTAL 1st Year 2nd Year 3rd Year 4th Year 5th Year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Pond NO 96000 2 1.92 0 0.00 0 0.00 0 0.00 1 0.96 1 0.96 Graded Bund RM 218 1000 2.18 0 0.00 0 0.00 1000 2.18 0 0.00 0 0.00 Slab Culvert (Sluice Type) NO 84500 1 0.85 0 0.00 0 0.00 1 0.85 0 0.00 0 0.00 Bio engineering (Vetiver Plantation) SQM 150 1500 2.25 0 0.00 0 0.00 0 0.00 0 0.00 1500 2.25 Agro Forestry HEC 116000 0.5 0.58 0 0.00 0 0.00 0 0.00 0.5 0.58 0 0.00 Name of Micro Watershed Naldoba MWS Name of Village Durgamari Activities Related to Surface Water Treatment (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR) TOTAL 1st Year 2nd Year 3rd Year 4th Year 5th Year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Pond NO 96000 2 1.92 0 0.00 0 0.00 0 0.00 1 0.96 1 0.96 Graded Bund RM 218 2500 5.45 0 0.00 0 0.00 2500 5.45 0 0.00 0 0.00 Slab Culvert (Sluice Type) NO 84500 1 0.85 0 0.00 0 0.00 1 0.85 0 0.00 0 0.00
74
Bio engineering (Vetiver Plantation) SQM 150 2400 3.60 0 0.00 0 0.00 0 0.00 0 0.00 2400 3.60 Name of Micro Watershed Naldoba MWS Name of Village Hallahguri Activities Related to Surface Water Treatment (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR) TOTAL 1st Year 2nd Year 3rd Year 4th Year 5th Year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Reclamation of Marshy Land CUM 346 4765 16.49 0 0.00 0 0.00 4765 16.49 0 0.00 0 0.00 Pond NO 96000 2 1.92 0 0.00 0 0.00 0 0.00 1 0.96 1 0.96 Graded Bund RM 218 1500 3.27 0 0.00 0 0.00 0 0.00 0 0.00 1500 3.27 Slab Culvert (Sluice Type) NO 84500 1 0.85 0 0.00 0 0.00 0 0.00 0 0.00 1 0.85 Periphery Bund RM 218 1500 3.27 0 0.00 0 0.00 1500 3.27 0 0.00 0 0.00 Bio engineering (Vetiver Plantation) SQM 150 900 1.35 0 0.00 0 0.00 0 0.00 0 0.00 900 1.35 Name of Micro Watershed Naldoba MWS Name of Village Nachankhuti Activities Related to Surface Water Treatment (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR) TOTAL 1st Year 2nd Year 3rd Year 4th Year 5th Year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Reclamation of Marshy Land CUM 346 1943 6.72 0 0.00 0 0.00 1943 6.72 0 0.00 0 0.00 Pond NO 96000 2 1.92 0 0.00 0 0.00 0 0.00 1 0.96 1 0.96 Graded Bund RM 218 1700 3.71 0 0.00 0 0.00 0 0.00 0 0.00 1700 3.71 Slab Culvert (Sluice Type) NO 84500 2 1.69 0 0.00 0 0.00 0 0.00 0 0.00 2 1.69 Periphery Bund RM 218 1000 2.18 0 0.00 0 0.00 1000 2.18 0 0.00 0 0.00 Bio engineering (Vetiver Plantation) SQM 150 700 1.05 0 0.00 0 0.00 0 0.00 0 0.00 700 1.05 Name of Micro Watershed Naldoba MWS Name of Village Naldoba Activities Related to Surface Water Treatment (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR) TOTAL 1st Year 2nd Year 3rd Year 4th Year 5th Year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Pond NO 96000 2 1.92 0 0.00 0 0.00 0 0.00 1 0.96 1 0.96 Graded Bund RM 218 1500 3.27 0 0.00 0 0.00 0 0.00 0 0.00 1500 3.27 Slab Culvert (Sluice Type) NO 84500 1 0.85 0 0.00 0 0.00 0 0.00 0 0.00 1 0.85 Bio engineering (Vetiver Plantation) SQM 150 200 0.30 0 0.00 0 0.00 0 0.00 0 0.00 200 0.30
75
Name of Micro Watershed Naldoba MWS Name of Village Sikibiki Activities Related to Surface Water Treatment (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR) TOTAL 1st Year 2nd Year 3rd Year 4th Year 5th Year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Pond NO 96000 3 2.88 0 0.00 0 0.00 0 0.00 1 0.96 2 1.92 Bio engineering (Vetiver Plantation) SQM 150 2600 3.90 0 0.00 0 0.00 0 0.00 0 0.00 2600 3.90 Boulder Pitching SQM 1665 350 5.83 0 0.00 0 0.00 0 0.00 350 5.83 0 0.00 Agro Forestry HEC 116000 1 1.16 0 0.00 0 0.00 0 0.00 1 1.16 0 0.00 Fuel Wood HEC 27200 10.0 2.72 0 0.00 0 0.00 0 0.00 6 1.63 4 1.09 Horticultural Plantation Hec 144500 2.0 2.89 0 0.00 0 0.00 0 0.00 0 0.00 2 2.89
Village Wise Interventions (Production System) TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Name of Micro Watershed Bagulamari MWS Name of Village Bagulamari Details of allied / other activities (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 5th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 69000 2 1.38 0 0.00 1 0.69 0 0.00 1 0.69 0 0.00 Dairy NO 135000 1 1.35 0 0.00 0 0.00 0 0.00 0 0.00 1 1.35 Name of Micro Watershed Bagulamari MWS Name of Village Pachim Bhadra Details of allied / other activities (Rs. In Lakh) (Rs. In Lakh)
76
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 69000 2 1.38 0 0.00 0 0.00 1 0.69 1 0.69 0 0.00 Dairy NO 135000 1 1.35 0 0.00 0 0.00 0 0.00 0 0.00 1 1.35 Name of Micro Watershed Bagulamari MWS Name of Village Pub-Bhadra Details of allied / other activities (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 69000 2 1.38 0 0.00 0 0.00 1 0.69 1 0.69 0 0.00 Dairy NO 135000 1 1.35 0 0.00 0 0.00 0 0.00 0 0.00 1 1.35 Name of Micro Watershed Bagulamari MWS Name of Village Pub-Bhadra No.1 Details of allied / other activities (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 69000 2 1.38 0 0.00 0 0.00 1 0.69 1 0.69 0 0.00 Name of Micro Watershed Bagulamari MWS Name of Village Pub-Bhadra No.2 Details of allied / other activities (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 69000 2 1.38 0 0.00 0 0.00 1 0.69 1 0.69 0 0.00 Dairy NO 135000 1 1.35 0 0.00 0 0.00 0 0.00 0 0.00 1 1.35 Name of Micro Watershed Bagulamari MWS Name of Village Rabhapara Details of allied / other activities (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 69000 2 1.38 0 0.00 0 0.00 1 0.69 1 0.69 0 0.00 Name of Micro Watershed Bagulamari MWS Name of Village Saraikhoshra
77
Details of allied / other activities (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 69000 2 1.38 0 0.00 1 0.69 0 0.00 1 0.69 0 0.00 Dairy NO 135000 1 1.35 0 0.00 0 0.00 1 1.35 0 0.00 0 0.00 Name of Micro Watershed Bagulamari MWS Name of Village Tokeamari Details of allied / other activities (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 69000 2 1.38 0 0.00 0 0.00 1 0.69 1 0.69 0 0.00 Name of Micro Watershed Kakragaon MWS Name of Village Bhumeswar Hill N.C Details of allied / other activities (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Name of Micro Watershed Kakragaon MWS Name of Village Dabli Details of allied / other activities (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 69000 2 1.38 0 0.00 0 0.00 1 0.69 1 0.69 0 0.00 Name of Micro Watershed Kakragaon MWS Name of Village Kakragaon Details of allied / other activities (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 69000 2 1.38 0 0.00 1 0.69 0 0.00 1 0.69 0 0.00 Name of Micro Watershed Kakragaon MWS Name of Village Kashugaon Details of allied / other activities (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year
78
INR) Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Goatery No. 69000 2 1.38 0 0.00 0 0.00 1 0.69 1 0.69 0 0.00 Dairy NO 135000 1 1.35 0 0.00 0 0.00 0 0.00 0 0.00 1 1.35 Name of Micro Watershed Kakragaon MWS Name of Village Tangaigon Details of allied / other activities (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 69000 2 1.38 0 0.00 0 0.00 1 0.69 1 0.69 0 0.00 Name of Micro Watershed Kakragaon MWS Name of Village Tilpukhuri Details of allied / other activities (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 69000 2 1.38 0 0.00 1 0.69 0 0.00 0 0.00 1 0.69 Name of Micro Watershed Naitamara MWS Name of Village Barchara Details of allied / other activities (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 69000 2 1.38 0 0.00 0 0.00 1 0.69 1 0.69 0 0.00 Dairy NO 135000 1 1.35 0 0.00 0 0.00 1 1.35 0 0.00 0 0.00 Name of Micro Watershed Naitamara MWS Name of Village Didari Details of allied / other activities (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 69000 2 1.38 0 0.00 1 0.69 0 0.00 0 0.00 1 0.69 Name of Micro Watershed Naitamara MWS Name of Village Ghilaguri Details of allied / other activities (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year
79
INR) Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Goatery No. 69000 2 1.38 0 0.00 0 0.00 1 0.69 1 0.69 0 0.00 Name of Micro Watershed Naitamara MWS Name of Village Naitamara Details of allied / other activities (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 69000 2 1.38 0 0.00 0 0.00 1 0.69 1 0.69 0 0.00 Name of Micro Watershed Naitamara MWS Name of Village Tilakgaon Details of allied / other activities (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 69000 2 1.38 0 0.00 0 0.00 1 0.69 1 0.69 0 0.00 Name of Micro Watershed Naldoba MWS Name of Village Bhandarani Details of allied / other activities (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 69000 2 1.38 0 0.00 0 0.00 1 0.69 1 0.69 0 0.00 Name of Micro Watershed Naldoba MWS Name of Village Durgamari Details of allied / other activities (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 69000 2 1.38 0 0.00 1 0.69 0 0.00 0 0.00 1 0.69 Name of Micro Watershed Naldoba MWS Name of Village Hallahguri Details of allied / other activities (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Semi-Intensive pisciculture Hec 314000 0.65 2.04 0 0.00 0 0.00 0 0.00 0 0.00 0.65 2.04
80
Goatery No. 69000 2 1.38 0 0.00 0 0.00 1 0.69 1 0.69 0 0.00 Name of Micro Watershed Naldoba MWS Name of Village Nachankhuti Details of allied / other activities (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Semi-Intensive pisciculture Hec 314000 0.65 2.04 0 0.00 0 0.00 0 0.00 0 0.00 0.65 2.04 Goatery No. 69000 2 1.38 0 0.00 0 0.00 1 0.69 1 0.69 0 0.00 Name of Micro Watershed Naldoba MWS Name of Village Naldoba Details of allied / other activities (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 69000 2 1.38 0 0.00 0 0.00 1 0.69 1 0.69 0 0.00 Name of Micro Watershed Naldoba MWS Name of Village Sikibiki Details of allied / other activities (Rs. In Lakh) (Rs. In Lakh)
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 69000 2 1.38 0 0.00 1 0.69 0 0.00 1 0.69 0 0.00 Dairy NO 135000 1 1.35 0 0.00 0 0.00 0 0.00 0 0.00 1 1.35
81
Village Wise Interventions (Livelihood for Assetless Persons) TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Name of Micro Watershed Bagulamari MWS Name of Village Bagulamari
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 5th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 25000 4 1.00 0 0.00 1 0.25 1 0.25 1 0.25 1 0.25 Poultry (Commercial Broiler Unit) No. 25000 3 0.75 0 0.00 0 0.00 1 0.25 1 0.25 1 0.25 Name of Micro Watershed Bagulamari MWS Name of Village Pachim Bhadra
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 25000 4 1.00 0 0.00 0 0.00 1 0.25 2 0.50 1 0.25 Poultry (Commercial Broiler Unit) No. 25000 3 0.75 0 0.00 0 0.00 1 0.25 1 0.25 1 0.25 Name of Micro Watershed Bagulamari MWS Name of Village Pub-Bhadra
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 25000 4 1.00 0 0.00 1 0.25 1 0.25 1 0.25 1 0.25 Poultry (Commercial Broiler Unit) No. 25000 3 0.75 0 0.00 0 0.00 1 0.25 1 0.25 1 0.25 Name of Micro Watershed Bagulamari MWS Name of Village Pub-Bhadra No.1
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 25000 4 1.00 0 0.00 1 0.25 1 0.25 1 0.25 1 0.25 Poultry (Commercial Broiler Unit) No. 25000 4 1.00 0 0.00 0 0.00 2 0.50 1 0.25 1 0.25 Name of Micro Watershed Bagulamari MWS Name of Village Pub-Bhadra No.2
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
82
Goatery No. 25000 4 1.00 0 0.00 1 0.25 1 0.25 1 0.25 1 0.25 Poultry (Commercial Broiler Unit) No. 25000 3 0.75 0 0.00 0 0.00 2 0.50 1 0.25 0 0.00 Name of Micro Watershed Bagulamari MWS Name of Village Rabhapara
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 25000 4 1.00 0 0.00 1 0.25 1 0.25 1 0.25 1 0.25 Poultry (Commercial Broiler Unit) No. 25000 3 0.75 0 0.00 0 0.00 1 0.25 1 0.25 1 0.25 Name of Micro Watershed Bagulamari MWS Name of Village Saraikhoshra
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 25000 4 1.00 0 0.00 1 0.25 1 0.25 1 0.25 1 0.25 Poultry (Commercial Broiler Unit) No. 25000 4 1.00 0 0.00 0 0.00 2 0.50 1 0.25 1 0.25 Name of Micro Watershed Bagulamari MWS Name of Village Tokeamari
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 25000 4 1.00 0 0.00 1 0.25 1 0.25 1 0.25 1 0.25 Poultry (Commercial Broiler Unit) No. 25000 3 0.75 0 0.00 0 0.00 1 0.25 1 0.25 1 0.25 Name of Micro Watershed Kakragaon MWS Name of Village Bhumeswar Hill N.C
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Name of Micro Watershed Kakragaon MWS Name of Village Dabli
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 25000 4 1.00 0 0.00 1 0.25 1 0.25 1 0.25 1 0.25 Poultry (Commercial Broiler Unit) No. 25000 3 0.75 0 0.00 0 0.00 1 0.25 1 0.25 1 0.25 Name of Micro Watershed Kakragaon MWS Name of Village Kakragaon
83
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 25000 4 1.00 0 0.00 0 0.00 1 0.25 2 0.50 1 0.25 Poultry (Commercial Broiler Unit) No. 25000 3 0.75 0 0.00 0 0.00 2 0.50 1 0.25 0 0.00 Name of Micro Watershed Kakragaon MWS Name of Village Kashugaon
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 25000 4 1.00 0 0.00 1 0.25 1 0.25 1 0.25 1 0.25 Poultry (Commercial Broiler Unit) No. 25000 3 0.75 0 0.00 0 0.00 2 0.50 1 0.25 0 0.00 Name of Micro Watershed Kakragaon MWS Name of Village Tangaigon
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 25000 4 1.00 0 0.00 1 0.25 1 0.25 1 0.25 1 0.25 Poultry (Commercial Broiler Unit) No. 25000 3 0.75 0 0.00 0 0.00 1 0.25 1 0.25 1 0.25 Name of Micro Watershed Kakragaon MWS Name of Village Tilpukhuri
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 25000 4 1.00 0 0.00 1 0.25 1 0.25 1 0.25 1 0.25 Poultry (Commercial Broiler Unit) No. 25000 3 0.75 0 0.00 0 0.00 1 0.25 1 0.25 1 0.25 Name of Micro Watershed Naitamara MWS Name of Village Barchara
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 25000 4 1.00 0 0.00 1 0.25 1 0.25 1 0.25 1 0.25 Poultry (Commercial Broiler Unit) No. 25000 4 1.00 0 0.00 0 0.00 2 0.50 2 0.50 0 0.00 Name of Micro Watershed Naitamara MWS Name of Village Didari
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
84
Goatery No. 25000 4 1.00 0 0.00 1 0.25 1 0.25 1 0.25 1 0.25 Poultry (Commercial Broiler Unit) No. 25000 3 0.75 0 0.00 0 0.00 1 0.25 1 0.25 1 0.25 Name of Micro Watershed Naitamara MWS Name of Village Ghilaguri
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 25000 4 1.00 0 0.00 1 0.25 1 0.25 1 0.25 1 0.25 Poultry (Commercial Broiler Unit) No. 25000 3 0.75 0 0.00 0 0.00 2 0.50 1 0.25 0 0.00 Name of Micro Watershed Naitamara MWS Name of Village Naitamara
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 25000 4 1.00 0 0.00 0 0.00 1 0.25 2 0.50 1 0.25 Poultry (Commercial Broiler Unit) No. 25000 3 0.75 0 0.00 0 0.00 1 0.25 2 0.50 0 0.00 Name of Micro Watershed Naitamara MWS Name of Village Tilakgaon
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 25000 4 1.00 0 0.00 1 0.25 1 0.25 1 0.25 1 0.25 Poultry (Commercial Broiler Unit) No. 25000 3 0.75 0 0.00 0 0.00 1 0.25 1 0.25 1 0.25 Name of Micro Watershed Naldoba MWS Name of Village Bhandarani
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 25000 4 1.00 0 0.00 1 0.25 1 0.25 1 0.25 1 0.25 Poultry (Commercial Broiler Unit) No. 25000 4 1.00 0 0.00 0 0.00 2 0.50 2 0.50 0 0.00 Name of Micro Watershed Naldoba MWS Name of Village Durgamari
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 25000 4 1.00 0 0.00 1 0.25 1 0.25 1 0.25 1 0.25 Poultry (Commercial Broiler Unit) No. 25000 3 0.75 0 0.00 0 0.00 1 0.25 1 0.25 1 0.25
85
Name of Micro Watershed Naldoba MWS Name of Village Hallahguri
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 25000 4 1.00 0 0.00 0 0.00 1 0.25 2 0.50 1 0.25 Poultry (Commercial Broiler Unit) No. 25000 3 0.75 0 0.00 0 0.00 1 0.25 2 0.50 0 0.00 Name of Micro Watershed Naldoba MWS Name of Village Nachankhuti
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 25000 4 1.00 0 0.00 1 0.25 1 0.25 1 0.25 1 0.25 Poultry (Commercial Broiler Unit) No. 25000 4 1.00 0 0.00 0 0.00 2 0.50 1 0.25 1 0.25 Name of Micro Watershed Naldoba MWS Name of Village Naldoba
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 25000 4 1.00 0 0.00 0 0.00 1 0.25 2 0.50 1 0.25 Poultry (Commercial Broiler Unit) No. 25000 3 0.75 0 0.00 0 0.00 1 0.25 2 0.50 0 0.00 Name of Micro Watershed Naldoba MWS Name of Village Sikibiki
Name of Intervention Unit Rate (in INR)
TOTAL 1st Year 2nd Year 3rd Year 4th Year 4th Year Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Goatery No. 25000 4 1.00 0 0.00 1 0.25 1 0.25 1 0.25 1 0.25 Poultry (Commercial Broiler Unit) No. 25000 3 0.75 0 0.00 0 0.00 1 0.25 1 0.25 1 0.25