DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed Management Agency District Watershed Development Unit District Vadodara
Transcript
Page 1: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

 

 

 

 

 

 

 

 

 

 

DETAIL PROJECT REPORT                       ( IWMP‐5  CHHOTAUDEPUR‐ 2P)   

 

Gujarat State Watershed Management AgencyDistrict Watershed Development Unit District Vadodara 

Page 2: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 2 

 

 Contents Project Background ............................................................................................................................................................................................................................................................... 8 Table no.2: Weightage of the project .......................................................................................................................................................................................................................... 10 Table no. 2.1 Criteria and weightage for selection of watershed ................................................................................................................................................................... 10 Table no.3: Watershed information ............................................................................................................................................................................................................................ 11 Table no.4: Developmental programmers running in the project area: ...................................................................................................................................................... 12 Table no. 5: Previous Watershed programmes in the project area: .............................................................................................................................................................. 12 2.1. Project Implementing Agency ............................................................................................................................................................................................................................... 13 Table no. 6: PIA: ................................................................................................................................................................................................................................................................... 15 Table no. 7: Staff at PIA level: ......................................................................................................................................................................................................................................... 15 CHAPTER – 3 ......................................................................................................................................................................................................................................................................... 16 BASIC INFORMATION OF THE PROJECT AREA ...................................................................................................................................................................................................... 16 Geography and Geo‐hydrology ...................................................................................................................................................................................................................................... 17 Table no. 8: Land use pattern: ........................................................................................................................................................................................................................................ 17 Soil and topography: .......................................................................................................................................................................................................................................................... 18 Table no. 11.1: Soil Erosion ............................................................................................................................................................................................................................................. 19 Table no. 11.2: Soil Salinity/Alkalinity (Salinity ingress) .................................................................................................................................................................................. 19 Table no. 11.3: Water logging Conditions ................................................................................................................................................................................................................. 20 Table no.12: Climatic conditions................................................................................................................................................................................................................................... 21 Table no. 13: Physiographic and relief ....................................................................................................................................................................................................................... 22 Land and Agriculture: ........................................................................................................................................................................................................................................................ 22 Table no. 14: Land ownership details ......................................................................................................................................................................................................................... 22 Table no. 15: Agriculture .................................................................................................................................................................................................................................................. 23 Table no. 16: Irrigation ..................................................................................................................................................................................................................................................... 23 Table no. 18: Livestock ...................................................................................................................................................................................................................................................... 26 Table no. 19:Drinking water ........................................................................................................................................................................................................................................... 27 Socio‐Economic Profile ..................................................................................................................................................................................................................................................... 33 Table no. 22: Literacy rate ............................................................................................................................................................................................................................................... 34 Migration Pattern: ............................................................................................................................................................................................................................................................... 35 Table no. 23: Migration details ...................................................................................................................................................................................................................................... 35 

 

Page 3: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 3 

 

Table no. 24: Poverty ......................................................................................................................................................................................................................................................... 36 Table no. 25: Village infrastructure ............................................................................................................................................................................................................................. 37 Table no. 26 : Facilities / HH assets ............................................................................................................................................................................................................................. 38 Livelihood pattern: ............................................................................................................................................................................................................................................................. 38 Table no. 27: Income .......................................................................................................................................................................................................................................................... 39 Dependence on Common Property Resource ......................................................................................................................................................................................................... 39 Table no. 29: Livelihood pattern (Occupational distribution) ......................................................................................................................................................................... 40 CHAPTER – 4 ......................................................................................................................................................................................................................................................................... 46 WATERSHED ACTIVITIES ................................................................................................................................................................................................................................................ 46 Scientific Planning: .............................................................................................................................................................................................................................................................. 47 Table no. 30: Details of Scientific Planning and Inputs in IWMP projects .................................................................................................................................................. 49 Watershed Committee ....................................................................................................................................................................................................................................................... 51 Table no. 31: Watershed Committee details ............................................................................................................................................................................................................ 51 (ii ) Self Help Group ............................................................................................................................................................................................................................................................ 55 User Group: ............................................................................................................................................................................................................................................................................ 58 Table no. 33: UG detail ...................................................................................................................................................................................................................................................... 58 4.3.1 Entry Point activity (EPA) .................................................................................................................................................................................................................................... 61 Table no.36: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.) ................................................................... 65 Table no 36.1   Technical Details of Earthen Bund: .............................................................................................................................................................................................. 71 Table no. 36.2   Technical Details of Farm Pond .................................................................................................................................................................................................... 72 Table no . 36. 3 Technical Details of Feild/Farm Bund ....................................................................................................................................................................................... 72 Table no. 38: Activities related to livelihoods by Self Help Groups (SHGs) in the project areas ...................................................................................................... 73 Sr No. ......................................................................................................................................................................................................................................................................................... 73 Name of Village ..................................................................................................................................................................................................................................................................... 73 Major Activities of the SHGs ............................................................................................................................................................................................................................................ 73 Name of Activity ................................................................................................................................................................................................................................................................... 73 No of SHGs involved ........................................................................................................................................................................................................................................................... 73 Average annual income from activity per SHG ....................................................................................................................................................................................................... 73 1. .................................................................................................................................................................................................................................................................................................. 73 Mandlva ................................................................................................................................................................................................................................................................................... 73 2. .................................................................................................................................................................................................................................................................................................. 73 

Page 4: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 4 

 

Ranikheda ............................................................................................................................................................................................................................................................................... 73 3. .................................................................................................................................................................................................................................................................................................. 73 Limbani .................................................................................................................................................................................................................................................................................... 73 4. .................................................................................................................................................................................................................................................................................................. 73 Bandibhit ................................................................................................................................................................................................................................................................................. 73 5. .................................................................................................................................................................................................................................................................................................. 73 Dholisimel ............................................................................................................................................................................................................................................................................... 73 6. .................................................................................................................................................................................................................................................................................................. 73 Dungarbhit.............................................................................................................................................................................................................................................................................. 73 7. .................................................................................................................................................................................................................................................................................................. 73 Dobachapra ............................................................................................................................................................................................................................................................................ 73 8. .................................................................................................................................................................................................................................................................................................. 73 Kevdi ......................................................................................................................................................................................................................................................................................... 73 9. .................................................................................................................................................................................................................................................................................................. 73 Mithibor ................................................................................................................................................................................................................................................................................... 73 10. ............................................................................................................................................................................................................................................................................................... 73 Kakadkund .............................................................................................................................................................................................................................................................................. 73 11. ............................................................................................................................................................................................................................................................................................... 73 Marchipani .............................................................................................................................................................................................................................................................................. 73 12. ............................................................................................................................................................................................................................................................................................... 73 Rinchhvel ................................................................................................................................................................................................................................................................................. 73 13. ............................................................................................................................................................................................................................................................................................... 73 Gadola ....................................................................................................................................................................................................................................................................................... 73 14. ............................................................................................................................................................................................................................................................................................... 73 Kothara ..................................................................................................................................................................................................................................................................................... 73 15. ............................................................................................................................................................................................................................................................................................... 73 Dhorkuva ................................................................................................................................................................................................................................................................................. 73 Table no. 39.1 Soil and water conservation activities of watershed works phase – Proposed Target .......................................................................................... 74 Table no 39.2 Agriculture and Aforestation related activites of watershed works phase – Proposed Target ........................................................................... 74 Table no.40: Details of engineering structures in watershed works* .......................................................................................................................................................... 75 Table no.41: Details of activities connected with vegetative cover in watershed works .................................................................................................................... 79 

Page 5: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 5 

 

Table no 40.2.Techincal Specification Graded Bunding ..................................................................................................................................................................................... 83 Table no 40.3.Techincal Specification  Farm Bund ............................................................................................................................................................................................... 83 Table 40.4.Techincal specification Masonary Checkwall ................................................................................................................................................................................... 83 Table no 40.5.Techincal Specification Masonary Checkdam ............................................................................................................................................................................ 85 Table no.41.1: Details of activities connected with vegetative cover in watershed works ................................................................................................................. 87 Table no .41.1 Technical Details of Aforestation Activities/Plantation/Grass seeding: ...................................................................................................................... 92 Table No. 41.1.1 Cost Estimation For Afforestation Activity (For 1000 Plants) ...................................................................................................................................... 92 Table no.42: Details of allied / other activities ....................................................................................................................................................................................................... 93 Production System –I ...................................................................................................................................................................................................................................................... 101 Production System‐II ...................................................................................................................................................................................................................................................... 103 Production System‐III: ................................................................................................................................................................................................................................................... 106 Production System‐IV ..................................................................................................................................................................................................................................................... 108 Production System – V ................................................................................................................................................................................................................................................... 111 Production System: VI .................................................................................................................................................................................................................................................... 112 Production System VII : ................................................................................................................................................................................................................................................. 114 4.4. Capacity Building: ..................................................................................................................................................................................................................................................... 115 Table no. 44: Capacity Building Institution: ........................................................................................................................................................................................................... 116 Table no. 44: Capacity Building Institution: .......................................................................................................................................................................................................... 116 Table no. 45: Capacity Building plan:........................................................................................................................................................................................................................ 117 Table no.46: Information, education and Communication Activities: ........................................................................................................................................................ 117 Budgeting .............................................................................................................................................................................................................................................................................. 119 Table no. 47: Budget at a glance for the project ................................................................................................................................................................................................... 119 Table no. 48: Village wise‐ component wise budget available under IWMP ........................................................................................................................................... 119 Table no.50: Details of Convergence of IWMP with other Schemes ........................................................................................................................................................... 121 CHAPTER – 6 ....................................................................................................................................................................................................................................................................... 124 EXPECTED OUTCOMES ................................................................................................................................................................................................................................................... 124 Expected Outcomes ......................................................................................................................................................................................................................................................... 125 Employment ......................................................................................................................................................................................................................................................................... 125 Table no. 52: Employment in Project area: ............................................................................................................................................................................................................ 125 Migration ............................................................................................................................................................................................................................................................................... 126 Table no. 53: Details of seasonal migration from Project area ...................................................................................................................................................................... 126 

Page 6: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 6 

 

Table no. 54: Details of average ground water table depth in the project areas (in meters) ........................................................................................................... 127 Drinking water .................................................................................................................................................................................................................................................................... 128 Table no. 55: Status of Drinking water ..................................................................................................................................................................................................................... 128 Table no. 56: Details of Kharif crop area and yield in the project areas .................................................................................................................................................... 129 Table no. 57: Area under horticulture ...................................................................................................................................................................................................................... 137 Vegetative cover ................................................................................................................................................................................................................................................................. 138 Table no. 58:  Forest/vegetative cover .................................................................................................................................................................................................................... 138 Table no. 59: Details of livestock in the project areas  (for fluids please mention in litres, for solids please mention in kgs. and income in Rs.) .. 139 Linkages ................................................................................................................................................................................................................................................................................. 141 Table no. 60: Backward‐Forward linkages ............................................................................................................................................................................................................ 141 CHAPTER ‐7 ......................................................................................................................................................................................................................................................................... 146 QUALITY AND SUSTAINABILITY ISSUES ................................................................................................................................................................................................................ 146 Table no 60. Details of Monitoring system proposed for the project IWMP‐5 ...................................................................................................................................... 147 MAPS ....................................................................................................................................................................................................................................................................................... 151                                                   

Page 7: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 7 

 

             

CHAPTER ­1   PROJECT BACKGROUND 

 

 

 

 

      

Page 8: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 8 

 

Project Background Chottaudepur 2‐P project villages of  (IWMP‐5) are  located  in chottaudepur Taluka (N‐220 18’ – 31.25 & E‐ 740 00 – 47.46”) Vadodara District of Gujarat state. IWMP‐5 consists of 15 villages  and  an  area  around  3988.60  ha  is  taken  into  the  project  as  per  the  priority  for treatment.  15  villages  fall  under  3  gram  panchayats.  All  the  villages  are  separated  by  a distance of 25‐55 kms from chottaudepur taluka. 3 Watershed committees are constituted for  these  15  villages.  This  project  is  expected  to  cover  9  micro  watersheds  with  codes 5E1B8f1a, 5E1B8f2a, 5E1B8f1k, 5E1B8f1g, 5E1B8c3a, 5E1B8f1h, 5E1B8f1d, 5E1B8f1j, 5E1B8f1e    The  total  project  area  proposed  to  be  treated  under  Integrated  Watershed Management Programme  (IWMP) of  the watershed  is  taken by excluding  area  covered  in DPAP (Drought Prone Area Program) and EAS (Employment Assurance Scheme) project.  The  nearest  town  is  chottaudepur  taluka  place  which  is  approximately  about  25‐55 Km from almost all the villages  and most of the villages are well connected by pucca  tar road and  few  still  have  kutcha  roads  and  it  becomes  very  difficult  in  rainy  season  for transportation.  Trasnportation  is  provided  by  private  transportation  facilities  as  well  as State  Transport  Bus.    Most  of  the  land  is  dry  with  no  land  scrub  and  true  example  arid region  for  agriculture.  Nayaka,  Rathwa,  koli  and  Harijan  communities  are  the  major inhabitants of  the project area. The  livelihood of  these people  is primarily based on rainfed agriculture, wage  labour, depends on  local based natural resources, sheep and goat rearing is also prevalent however not in a large scale. The watershed falls under the government designated tribal area.  The water level is almost 140 feet deep further, structure of the soil is very shallow with undulated topography, and part of forest land is also encroached by residents of these villages. Land is productive but, acute shortage of irrigation sources and irrigation  facilities and least water holding capacity  is one of  the geographical disadvantages of  this project area. Considerably a slope of more than 25‐33 can be seen. Close green forests as well as dence forest can be seen in this area. 

Table no.1: Basic project information 

Sl No. 

Name of the project 

Villages Gram 

Panchayats  Taluka  District Area of the 

project 

Area proposed to be treated 

Total project cost 

PIA Name  Census code 

1 I.W.M.P ‐5 

Mandalva  190050139280000Mandalva Gram 

Panchayats  Chotaudepur Vadodara

764.3  264.3  31.71 DCF Forest 

Department,Chhotaudepur 2  Ranikhada  190050139180000 Dholisamal Gram 

Panchayats 

464.5 264.5 31.74

3  Limbani  190050139170000 380.3  180.3  21.63 

Page 9: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 9 

 

4  Bandibhint  190050139300000Mandalva Gram 

Panchayats 316.3  316.6  37.99 

5  Dholisimel  190050139150000Dholisamal Gram 

Panchayats 

278.4  78.4  9.4 6  Dungarbhint  190050139160000 649.2  649.2  77.9 7  Dobachapura  190050139140000 394  194  23.28 8  Kevdi  190050139050000 1083.8  583.8  70 9  Mithibor  190050139130000

Mithibor Gram 

Panchayats 

846.5  446.5  53.58 10  Kakadkund  190050139080000 217.3  97.3  11.67 11  Marchipani  190050139060000 434.5  235.5  28.14 12  Rinchhvel  190050139090000 286  186  22.32 13  Gadola  190050139110000 541.1  241.1  28.93 14  Kothara  190050139120000 127  77  9.24 15  Dhorkuva  190050139100000 375.1  175.1  21.01 Area proposed to be treated 1.2 Need of Watershed Development Programme Watershed  Development  Programme  is  prioritised  on  the  basis  of thirteen  parameters  namely  Poverty  Index,  Percentage  of  SC/ST, Actual wages, Percentage of small and marginal farmers, Ground water status, Moisture Index, Area under rainfed agriculture, Drinking water situation  in  the  area,  Percentage  of  the  degraded  land,  Productivity potential of the land, Continuity of another watershed that has already developed/treated,  Cluster  approach  for  plain  or  for  hilly  terrain. Based on these thirteen parameters a composite ranking was given to Chottaudepur (IWMP­5) Watershed project as given in table no. 2. The  total  number  of  families  under  BPL  is  2321,  which  is  equal  to 83.15 per cent of the total households of the project. Hence a score of 10  is allotted. The percentage of  schedule  tribe  in  the project  is 90% percent  to  the  total  population;  hence  a  score  of  10  was  allotted. Rainfed  agriculture  forms  the  primary  occupation  of  the  village 

Page 10: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 10 

 

majority of the persons. More than 80 per cent of the farmers are small and marginal by nature  and the average land holdings of  farmers in around 2‐3 ha and the actual wages earned by the  labour  is  less than the minimum wages hence a composite rank of 5, 5 and 5 are allotted respectively. Since this area is prone to frequent drought land is and due to the low moisture index the area is classified under IWMP block. Drinking water is a major problem in this project area. In a broader view the soil of this region is suitable for agriculture crops and cash crops but due to lack of water  harvesting  structures  and  irrigation water,  agriculture  itself  has become  a  constraint  and  the  productivity potential  has  considerable gone low. The soil is very shallow and hence rate of infiltration is more however production of the land can be significantly  brought up with the help of better management practices and availability of timely  irrigation and use of organic and inorganic fertilizer. Chottaudepur watershed falls  under  second  priority  and  it  is  an  individual  cluster.  Cluster  approach  was  followed  taking  into  consideration  11  micro‐watersheds covering a total area of 3988.60 Ha.   All the parameters taken together and a cumulative score of 73 are given to the watershed (reference Table 2.1 below). Table no.2: Weightage of the project Project name  Project type  Weight age  TOTAL

CHHOTAUDEPUR2

‐G 

HILLY/DESERT/OTHER 

i  ii iii iv v vi vii viii  ix x xi xii xiii

10  10  5  5  3  10  5  5  5  5  5  5  0  73

Table no. 2.1 Criteria and weightage for selection of watershed  S. No.  Criteria  Maximum 

score  Ranges & scores 

i  Poverty index (% of poor to population) 

10 Above 80 % (10) 80 to 50 % (7.5) 50 to 20 % (5) Below 20 % (2.5) 

ii  % of SC/ ST population  10 More than 40 % (10) 20 to 40 % (5) Less than 20 % (3)iii  Actual wages  5 Actual wages are significantly 

lower than minimum wages (5) 

Actual wages are equal to or higher  than minimum wages (0) 

iv  % of small and marginal farmers 

10 More than 80 % (10) 50 to 80 % (5) Less than 50 % (3)

v  Ground water status  5 Over exploited (5) Critical (3)  Sub critical (2) Safe (0)vi  Moisture index/  

DPAP/ DDP Block 15 ‐66.7 & below (15)

DDP Block ‐33.3 to ‐66.6 (10)DPAP Block 

0 to ‐33.2 (0)Non DPAP/ DDP Block 

vii  Area under rain‐fed agriculture   15 More than 90 % (15) 80 to 90 % (10) 70  to 80% (5) Above 70 % 

Page 11: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 11 

 

(Reject)viii  Drinking water  10 No source (10) Problematic village (7.5) Partially covered (5) Fully 

covered (0) ix  Degraded land   15 High – above 20 % (15) Medium – 10 to 20 % (10) Low‐ less than 10 % of 

TGA (5) x  Productivity potential of the 

land  15 Lands with low production & 

where productivity can be significantly enhanced with reasonable efforts (15) 

Lands with moderate production & where productivity can be enhanced with reasonable efforts (10) 

Lands with high production & where productivity can be marginally enhanced with reasonable efforts (5) 

xi  Contiguity to another watershed that has already been developed/ treated 

10 Contiguous to previously treated watershed & contiguity within the microwatersheds in the project (10) 

Contiguity within the microwatersheds in the project but non contiguous to previously treated watershed (5) 

Neither contiguous to previously treated watershed nor contiguity within the microwatersheds in the project (0) 

xii  Cluster approach in the plains (more than one contiguous micro‐watersheds in the project) 

15 Above 6 micro‐watersheds in cluster (15) 

4 to 6 microwatersheds in cluster (10) 

2 to 4 microwatersheds in cluster (5) 

xiii  Cluster approach in the hills (more than one contiguous micro‐watersheds in the project) 

15 Above 5 micro‐watersheds in cluster (15) 

3 to 5 micro watersheds in cluster (10) 

2 to 3 microwatersheds in cluster (5) 

  Total  150  150  90  41  2.5 Project type: Hilly/desert/Other Table no.3: Watershed information 

Name of the project  No. Of watersheds to be treated Watershed code Watershed regime/type/order

I.W.M.P ‐5  9 

5E1B8f1a, 5E1B8f2a, 5E1B8f1k, 5E1B8f1g, 5E1B8c3a,  5E1B8f1h, 

5E1B8f1d, 5E1B8f1j, 5E1B8f1e, 

Micro Watershed 

 

Page 12: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 12 

 

1.3 Other developmental projects/schemes running in the chottaudepur­2P village This village is very back ward in various issues and falls under tribal area, still some of the villages fails to draw the limelight of schemes and developmental projects. Although NREGS (National Rural Employment Scheme) and Indira Awas Yojana (IAY), Sardar Awas Yojana, SGSY, Sakhi Mandal.  i. NREGS:   Construction of Wells, kutcha Road constructions works, pond depending, check walls, bori bunds and other labour intensive 

activity has been taken‐up under NREGA. Construction of boundary trenching, boundary walls, nursery and terrace ponds on hill tops is also taken up through forest department.  

ii. Indira Awas Yojana: Total houses constructed in this project are 83 and all the villages of this project have Indra Awas Yojana except for on village Bhindol. 

iii. Sardar Awas :  houses were built under this shemes and work is still in progess in some of the villages. iv. SGSY:  Total groups under this scheme are 32 and are currently active and some of the groups are under grading process. v. Sakhi Mandal: Sakhi Mandal schemes comprise of several groups which are sustainable from long time. vi. TASP: This is a designated as tribal area hence different activities are taken up by for welfare  of people these tribal villages. Table no.4: Developmental programmers running in the project area: Sl no 

Name of the programme/scheme 

Sponsoring agency Objectives of the programme/scheme 

Year of commencement

Villages covered 

Estimated number of beneficiaries 

 1  NREGS  Rural Development Dept. Employment 2009 3 598 2  IAY  Rural Development Dept. Housing 2005 13 274 3  SGSY  Rural Development Dept. Women Welfare 2005 10 180 4  Sakhi Mandal  Rural Development Dept. Women Welfare 2006 14 154 5  SHG’s of Haryali  Rural Development Dept. Women and Men Welfare 2003 ‐ ‐6   Sadar Awas Yojana  Rural Development Dept. Housing 2003 11 169

Table no. 5: Previous Watershed programmes in the project area: Sl no 

Project name 

Year started 

Name of villages 

No. Of micro 

watershed

Watershed codes 

Area under 

treatment

Funding source 

Nodal agency 

PIA Total cost 

Expenditure incurred up to start of IWMP 

% financial completion

% physical completion 

1  I.W.M.P ‐5 

   Mandalva 9 

5E1B8f1d Govt. DRDA  ANA2  Ranikheda  5E1B8f1e 500.15 1200000 1200000 100 1003  Limbani  5E1B8f2a 510 1319000 1319000 100 100

Page 13: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 13 

 

4  Bandibhint  5E1B8f1a 217.565  Dholisimel  5E1B8f2a 109.43 1200000 1200000 100 1006  Dungarbhint  5E1B8c3a7  Dobachapura  5E1B8f1g 146 956000 965302 100 1008  Kevdi  5E1B8f1d 330 832000 843798 100 1009  Mithibor  5E1B8f1j 500 1144000 1166874 100 10010  Kakadkund  5E1B8f1h11  Marchipani  5E1B8f1h 607 600000 615323 100 10012  Rinchhvel  5E1B8f1k 462.14 1107000 1130843 100 10013  Gadola  5E1B8f1k 156.04 850000 867163 100 10014  Kothara  5E1B8f1j 425.13 1275000 1329991 100 10015  Dhorkuva  5E1B8f1k 205.06 1100000 1129296 100 1002.1. Project Implementing Agency The Project Implementing Agencies (PIA) is selected by an appropriate mechanism by Gujarat State Watershed Management Agency (GSWMA), the  State  Level  Nodal  Agency  (SLNA)  for  Integrated Watershed Management  Programme  (IWMP)  in  Gujarat.  The  PIAs  are  responsible  for implementation of watershed project. In district Vadodara Forest Department is being selected as the Project Implementing Agency. The main office of PIA is located in Chottaudepur taluka place. Deputy conservator of Forest is bestowed the responsibity for all the projects, henceforth he is the PIA of all projects . There are 7 projects in different taluka of Vadodara and each project is assigned to a Nodal officer (Range forest officer). Four different offices are setup in 4 different talukas for smooth functioning and overseasing of project work.  About District Watershed Development Unit (DWDU), Vadodara  The organization and its objectives: The District Watershed Development Unit (DWDU), Vadodara is a district level nodal agency and was established on 12 May 2009 in a separate office to oversee the smooth implementation of watershed projects in the district. The District Development Officer (DDO) is the chairman of the DWDU.    The  DWDU  has  dedicated  and  experienced  staff  comprising  one  Project Manager  (deputation  from  Gujarat  Forest  Department),  a Technical expert and a multidisciplinary team of agriculture expert, community mobilization expert and Data Entry Operator, civil engineer, MIS coordinator,  system  analyst,  surveyor,  and  accountant.  The  objectives  of  the  DWDU,  Vadodara  are  supervising,  planning,  implementing, documenting and promoting watershed development projects and related developmental activities in the district as per guidelines.   Programmes/projects of DWDU, Vadodara: At present 7 IWMP projects have been sanctioned by Government of India for Vadodara district. The entry point activities of all the seven IWMP projects have been identified by the respective PIAs in the district.  Vadodara Forest Division is PIA for 7 projects (IWMP‐1, 2, 3, 4, 5, 6 & 7). 

Page 14: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 14 

 

Apart from the 7 IWMP projects, DWDU Vadodara is involved in a total of 303 pre‐Hariyali & Hariyali projects (DPAP & IWMP); 93 projects are completed and 210 projects are still running in the district and are expected to complete within two years of time.  The DWDU, Vadodara is also monitoring a central government sponsored scheme on “Artificial Recharge of Groundwater through Dug wells” in the district.   SWOT Analysis of the DWDU: Strength:  (1) Dedicated and experienced staff and a multidisciplinary team.  (2) Independent District Level Nodal Agency.  (3) Strong linkages with national and state level institutions, agricultural universities and training institutes for capacity building and technical guidance.  (4) Scientific planning in watershed projects with the help of BISAG, Gandhi agar,  (5) District level advisory committee for monitoring, coordination & Co‐operation. (6)  Prior acquaintance of nodal officers with the villagers of selected project area, hence ease in implementation of project. Weakness: (1) No permanent office building at project level. (2) Most of the project area is hilly and distance of project area from DWDU is almost 2‐3 hours. (3) Project area inhabitants mainly composed of schedule tribe class hence, ignorance about developmental projects. Opportunities:  (1) A number of different other development schemes of the government are running; so, there can be horizontal integration and convergence of programmes. (2) Better financial provision under IWMP better quality of work can be expected (3) Usage of new ICT tools like GIS, GPS and MIS integration of the project with the State Level Data Cell for online monitoring and evaluation. (4)  Reputed  training  centres  for  capacity  building  at  all  level  of  stakeholders  viz,,  district,  block  and  village  level  to  ensure  the  proper implementation of the project Threats:  

(1) Rainfall being very scarce and unreliable in the project area, the activities planned to be taken up may yield limited impact. (2) Options in production system are limited due to the lack of sufficient natural resources and due to limited resource base.  (3) Irregularities in fund flow can derail the smooth functioning. (4) Lack of awareness of the watershed programme and its objectives. (5) Low literacy rate in the project area. 

Page 15: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 15 

 

Table no. 6: PIA: Sl. No.  Names of project  Details of PIA 

1  I.W.M.P‐5 

(i) Type of organization  Project Implementing Agency  (ii) Name of organization  PIA, Chottaudepur (iii) Designation & Address Nodal Officer, Range Forest Office,  Chottaudepur(iv) Telephone 02669‐232302(v) Fax(vi) E‐mail [email protected]

Table no. 7: Staff at PIA level: Sl no  Name  Age  Sex  Designation  Qualification  Experience Job assigned  Monthly 

remuneration 1  P.S.Rathod  51  Male Range Forest Officer M.sc 23 Nodal officer 40498/‐2  Vinodbhai M. Nisarata    Male WDT(Agriculture) M.S.W 6  YEAR Agriculture 8000/‐

3  Rekhaben P. Damor  30  FEMALE WDT (Community Mob.)  M.S.W.  2  Year  Community Mobilizes  8000/‐ 

4  Vandanaben I. Patel  31  Female WDT(Accountant) M.com, B.ed  5 Year Accountant 7000/‐5  Rathwa suresh .m.  25  Male WDT (Data Entry Operator) B.B.A 2 Year Data Entry Operator 5000/‐6  Bharatkumar K. Bariya  25  Male  Messenger  12TH PASS    0 year  Messenger  3000/‐  

  

    

Page 16: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 16 

 

 

 

 

 

CHAPTER – 3 BASIC INFORMATION OF THE PROJECT AREA 

               

     

Page 17: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 17 

 

Geography and Geo­hydrology Land use pattern: The net geographical area of Chottaudepur watershed is about 3988.60 ha out of which 29% is forest area. The forest area is nearly covers one third of the project area. Forest areas in this region are dense to moderate. Most of the villages in this area are surrounded by hilly and rocky mountains. About 51% of land is under agriculture which is completely rain‐fed; mainly a Kharif crop is taken. About 14% of the total land is classified under wasteland of which 41% percent is cultivable and rest is not fit for agriculture. The watershed area consist mostly consist of Mahuda trees, chalori (Buchanania lanzan), teak, Ber, wild blackberry, custard apple, acacia Arabica, kusum trees, ficus and plam tress. These trees are encouraged and grown by the villager since they generated income for the villagers from the produce obtained through these trees. Table no. 8: Land use pattern: 

Sr. No.  Names of villages 

Geographical Area of the village  Forest Area Land under 

agricultural use Rain fed area 

Perm‐anent pastu‐res 

Wasteland 

Cultivable  Non‐cultivable 

1  Mandalva  764.30  309.69  268.2  155.80  0.00  177.1  9.30 2  Ranikhada  464.50  308.60  69.4  65.40  0.00  79.10  7.40 3  Limbani  380.30  307.20  57.10  42.10  0.00  16.00  0.00 4  Bandibhint  316.60  98.30  107.6  86.10  0.00  68.90  41.80 5  Dholisimel  278.40  119.10  70.8  34.80  0.00  86.40  2.40 6  Dungarbhint  649.20  388.10  172.10  92.10  0.00  89.00  0.00 7  Dobachapura  394.00  339.00  52.3  46.30  0.00  2.70  0.00 8  Kevdi  1083.80 799.40 212.4 202.40 0.00 47.80 24.209  Mithibor  846.50  384.20  386.40  376.40  0.00  5.5  70.40 10  Kakadkund  217.30  0.00  83.9  68.90  0.00  88.40  45.00 11  Marchipani  434.50  398.7  18.3  18.3  0.00  17.5  7.5 12  Rinchhvel  286.00  185.80  55.70  52.70  0.00  26.00  18.50 13  Gadola  541.10  409.90  61.8  56.80  0.00  21.1  48.30 14  Kothara  127.00  32.90  73.0  70.00  0.00  0.90  20.20 15  Dhorkuva  375.10  226.80  79.5  71.50  0.00  18.1  50.70 

Total  7158.6  4307.69  1768.5  1439.6  0.0  744.5  345.7 

Page 18: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 18 

 

Soil and topography: Chottaudepur watershed project falls under Middle Gujarat Agro Climatic Zone. The soil is mainly sandy silt to loamy in some places. The soil is reddish brown to greyish black. The depth of soil is shallow to moderate about 25 to 80 cm. The predominant texture of soil is sandy silty  and moderately coarse texture to fine texture in some villages. The soil  fertility is very poor with  low nitrogen, phosphorus and potash. Status of organic carbon is very poor and depleting in this region due to lack of sufficient organic resources and also largely due to the ignorance of the farmers. Due to the low moisture index of this region organic fertilizer efficiency is not noteworthy.    The topography of the area is moderate ranging from 5‐30% slope with undulating topography and hills surround the most of the project area. There is close similarity between the adjacent project areas. Table no. 9: Soil type and topography: 

S. No.  Name of the Agro‐climatic zone covers project area  Area in ha 

Names of thevillages 

 

Major soil typesTopo‐graphy a)Type  b) Area in ha 

Central Gujarat  3988.60 

Bandibhint

Rocky strata & Sandy loam type 

soil 3988.60  Medium to High 

Slope 

2  Dholisimel3  Dhorkuwa4  Dobachapura5  Dugarbhit6  Gadoal7  Kakadkund8  kevdi9  Kothara10  Limbani11  Mandalva12  Marchipani13  Mithibor14  Ranikheda15  Rinchhvel

# Flat, undulating, moderate slope, Steep slope 

Page 19: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 19 

 

Table no. 10: Flood and drought condition: Sr. no  Village Flood (Incidence) Drought (Incidence) 1 

        

 

Chhotaudepur I.W.MP‐5  NIL  Once in three year 

11. Edaphic Factors Table no. 11.1: Soil Erosion 

Cause  Type of erosion  Area affected  (ha)  Run off(mm/ year) 

Average soil loss (Tonnes/ ha/ year) 

Water erosiona  Sheet 827.1603

25‐35%   b  Rill 937.6260c  Gully 1367.3525d  Ravenous

Sub‐Total Wind erosion  668.1823 NA

Total  3988.6Table no. 11.2: Soil Salinity/Alkalinity (Salinity ingress)  

Name of the Village  Survey Number  Soil pH Type of Salinity 

(Inherent/Ingress) Mandalva  32/3 7.5  InherentRanikhada  4,26 7.4  InherentLimbani  18,27 7.8  Inherent

Bandibhint  65,57 6.9  InherentDholisimel  22/2,103 7.6  InherentDungarbhint  126 7.5  InherentDobachapura  19,53 7.1  Inherent

Kevdi  117 7.9  Inherent

Page 20: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 20 

 

Mithibor  8,148 6.8  InherentKakadkund  10 7.3  InherentMarchipani  7,18 7.0  InherentRinchhvel  251,44 7.00,6.6 InherentGadola  8,30 7.4,6.8 InherentKothara  32 7.1  InherentDhorkuva  74,19 6.6,7.2 Inherent

Table no. 11.3: Water logging Conditions Name of the Village  Survey Number  Reasons 

IMWP‐5 

N/A  N/A 

Ranikhada Limbani Bandibhint Dholisimel Dungarbhint Dobachapura 

Kevdi Mithibor Kakadkund Marchipani Rinchhvel Gadola Kothara Dhorkuva 

 

Page 21: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 21 

 

Table no.12: Climatic conditions   

 

Name of project  Average rainfall‐ last 5 years Rainfall (in 

mm) Average temperature Highest intensity of 

Rainfall (mm in a day) 

SummerMax Min

1  2004 1383 42.3 9.9 3142  2005 853 42.3 9.7 3053  2006 1623 42.4 8.1 3014  2007 856 42.9 8.2 3025  2008 364 42.8 7.9 3126  2009 503 42.9 7.9 329

The project area has an optimum to good rainfall over the years however due to various reasons like, changing weather parameters and global climate has changed drastically. The details of the rainfall from 2004‐2009 are given above the of rainfall and temperature trends considerably changed. Hence, rainfall sanctity is growing problem in this area and also due to the low water holding capacity, high infiltration, less land scrub, degrading forests, lack of moisture conservation structure and undulated topography leads to drainage of water. The top fertile soils accounts for major loss. The average rainfall of this area is about 930.3 mm (from past six year data) with a highest intensity of 320 mm within span of a day. This uneven distribution of rainfall is leading to surface runoff of soil causing ravine and gully erosion as per the details given in table no 11. The rainfall  of  this  area has  considerable gone down  from  the past  three consecutive years and  there  is decresing  trend  in  rainfall with increasing trend in temperature from past 6 years data. This is glimpse of detoriating conditions of this project area. 

Page 22: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 22 

 

Table no. 13: Physiographic and relief Project name  Elevation Slope range (%) Major streamsI.W.M.P‐5  472 Meters 25‐33% NA

Land and Agriculture: Surface water sources and limited ground water table makes farming a difficult task and scarcity of drinking water  in this area  is among the major problems in almost all the villages of chottaudepur IWMP‐5 project area.  The average land holding is about 1.0 ha ranging from 1 to 5 ha. Crop failure is common problem due to insufficient and untimely rains hence, agriculture become a risky. Only kharif season crop is taken in this area. The major crops cultivated by the farmers are Maize, cotton, paddy and pulses like Redgram and black gram in this area. 95% of the total agriculture is rainfed and based monsoon of that particular year. Rabi season only 5‐10% of the land is under cultivation in places where the  irrigation sources are available. Modern agriculture practise are prevalent  in these areas, use of  fertilizers and agricultural pesticides for better crop production for increased yields. However, farmers often get cheated in hands of local vendor and obtain second grade products. Table no. 14: Land ownership details Sl no  Village  Total owned land

Gen OBC  SC ST1  Mandalva  ‐ ‐  ‐ 265.192  Ranikhada  ‐ ‐  ‐ 70.543  Limbani  ‐ ‐  ‐ 48.574  Bandibhint  ‐ ‐  0.22 0.225  Dholisimel  ‐ ‐  ‐ 77.096  Dungarbhint  ‐ ‐  ‐ 196.17  Dobachapura  ‐ ‐  ‐ 59.718  Kevdi  ‐ ‐  ‐ 168.849  Mithibor  ‐ 16.85  ‐ 363.4310  Kakadkund  ‐ ‐  ‐ 61.1211  Marchipani  ‐ ‐  ‐ 21.4712  Rinchhvel  0.59 ‐  ‐ 51.1613  Gadola  ‐ ‐  ‐ 76.3514  Kothara  ‐ ‐  ‐ 68.3215  Dhorkuva  ‐ ‐  ‐ 78.08

Page 23: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 23 

 

Table no. 15: Agriculture Sl no  Village  Net sown area (Ha)    One time Two times Three times1  Mandalva  164.40 26.99 ‐2  Ranikhada  637.65 2.96 ‐3  Limbani  63.78 12.24 ‐4  Bandibhint  179.77 47.04 ‐5  Dholisimel  449 18.2 ‐6  Dungarbhint  351.24 59.12 ‐7  Dobachapura  58.72 4.88 ‐8  Kevdi  215.38 1.6 ‐9  Mithibor  267.64 7.72 ‐10  Kakadkund  73.25 4.4 ‐11  Marchipani  24.87 0 ‐12  Rinchhvel  67.66 1.2 ‐13  Gadola  134.94 0 ‐14  Kothara  243.05 13.30 ‐15  Dhorkuva  53.40 0.2 ‐

Table no. 16: Irrigation 

Sl no  Village 

Source 1 : Canal Source 2 : Check dam / Pond  Source 3 : WellAvailability months  Net area  Gross area  Availability 

months Net area 

Gross area 

Availability months  Net area  Gross area 

1  Mandalva  ‐  ‐ ‐ 5 14.6 764.3  7 27.25 764.32  Ranikhada  ‐  ‐ ‐ ‐ ‐ 464.5  7 17.75 464.53  Limbani  ‐  ‐ ‐ ‐ ‐ 380.3  8 14.62 380.34  Bandibhint  ‐  ‐ ‐ ‐ ‐ 316.3  8 20.00 316.35  Dholisimel  ‐  ‐ ‐ 5 9.5 278.4  7 21.25 278.46  Dungarbhint  ‐  ‐ ‐ 4 12.4 649.2  7 18.80 649.27  Dobachapura  ‐  ‐ ‐ ‐ ‐ 394.0  8 10.11 394.08  Kevdi  ‐  ‐ ‐ 5 15.5 1083.8  8 25.70 1083.89  Mithibor  ‐  ‐ ‐ 4 10.00 846.5  7 18.25 846.5

Page 24: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 24 

 

10  Kakadkund  ‐  ‐ ‐ 4 3.5 217.3  7 7.60 217.311  Marchipani  ‐  ‐ ‐ ‐ ‐ 434.5  6 7.25 434.512  Rinchhvel  ‐  ‐ ‐ ‐ ‐ 286.0  7 8.05 286.013  Gadola  ‐  ‐ ‐ ‐ ‐ 541.1  6 ‐ 541.114  Kothara  ‐  ‐ ‐ ‐ ‐ 127.0  7 ‐ 127.015  Dhorkuva  ‐  ‐ ‐ ‐ ‐ 375.1  7 ‐ 375.1Table no. 17: Crop details:  Sl no   

Village   

Kharif (Monsoon) Maize  Tur  Paddy 

Area(ha)  Production(Kg) Productivity(kg/ha) 

Area(ha) Production(Kg) Productivity(kg/ha) Area(ha) Production(Kg) Productivity(kg/ha) 

1  Mandalva  65.42  92896.4 1420 8.20 4920  600 68.80 66736.0 970 2  Ranikhada  110.68  157719.0 1425 90.84 47691  525 365.17 337782.3 925 3  Limbani  16.17  22638.0 1400 13.04 6650.4  510 25.94 24643.0 950 4  Bandibhint  47.91  69469.5 1450 61.48 34121.4  555 52.29 42354.9 810 5  Dholisimel  146.24  215704.0 1475 83.22 46603.2  560 142.52 149646.0 1050 6  Dungarbhint  141.18  202593.3 1435 51.06 26040.6  510 103.74 103740.0 1000 7  Dobachapura  28.92  38319.0 1325 6.42 3338.4  520 17.58 14591.4 830 8  Kevdi  88.48  122544.8 1385 53.76 27686.4  515 52.09 44797.4 860 9  Mithibor  117.28  143081.6 1220 61.82 33073.7  535 34.74 28313.1 815 10  Kakadkund  28.89  34523.6 1195 15.12 6652.8  440 17.48 14368.6 822 11  Marchipani  11.38  13030.1 1145 6.40 3008  470 4.20 3477.6 828 12  Rinchhvel  31.56  40459.9 1282 16.30 7824  480 5.18 4206.2 812 13  Gadola  24.54  28589.1 1165 49.33 22889.1  464 61.08 48253.2 790 14  Kothara  57.36  68832.0 1200 99.19 43842  442 47.40 36877.2 778 15  Dhorkuva  29.04  36590.4 1260 12.40 5952  480 0.20 156.6 783 Sl no   

Village   

Kharif (Monsoon)Black Gram Cottons(UI)

Area(ha)  Production(Kg) Productivity(kg/ha) 

Area(ha) Production(Kg) Productivity(kg/ha)

Page 25: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 25 

 

1  Mandalva  6.90  4312.5 625 17.8 9980  560.72  Ranikhada  70.82  43341.8 612 0 0  03  Limbani  6.96  4468.3 642 4.2 2838.36  675.84  Bandibhint  15.10  10192.5 675 7.5 5907  787.65  Dholisimel  76.80  47692.8 621 0 0  06  Dungarbhint  32.96  21358.1 648 55.8 38496.4  689.97  Dobachapura  5.80  3567.0 615 0 0  08  Kevdi  20.76  13660.1 658 1.0 0  09  Mithibor  53.80  33248.4 618 0 0  010  Kakadkund  9.73  7054.3 725 0 0  011  Marchipani  2.90  2088.0 720 0 0  012  Rinchhvel  14.62  10760.3 736 0 0  013  Gadola  0.00  0.0 0 0 0  014  Kothara  39.10  30576.2 782 0 0  015  Dhorkuva  11.80  6549.0 555 0 0  0

 

Sr.no  Village 

Rabi (Winter) Maize Tur Paddy

Area  Production(kg)  Productivity(Kg per Ha)  Area  Production(kg)  Productivity(Kg 

per Ha)  Area Production(kg)  Productivity(Kg per Ha) 

1  Mandalva  26.55  34522.8  1300 0 0 0 0 0 02  Ranikhada  2.16  3240  1500 0 0 0 0 0 03  Limbani  12.11  18537.48  1530 0 0 0 0 0 04  Bandibhint  26.38  41561.1  1575 6.256 6881.6 1100 0 0 05  Dholisimel  16.00  25840  1615 0 0 0 0 0 06  Dungarbhint  57.52  93182.4  1620 0 0 0 0 0 07  Dobachapura  4.4  6314  1435 0 0 0 0 0 08  Kevdi  1.76  2833.6  1610 0 0 0 0 0 09  Mithibor  7.04  9961.60  1415 0 0 0 0 0 010  Kakadkund  4.00  5600  1400 0 0 0 0 0 011  Marchipani  ‐  ‐  ‐ 0 0 0 0 0 012  Rinchhvel  0.8  1053.8  1317 0 0 0 0 0 0

Page 26: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 26 

 

13  Gadola  0  0  0 0 0 0 0 0 014  Kothara  1.4  1859.2  1328 0 0 0 0 0 015  Dhorkuva  0.2  270  1350 0 0 0 0 0 0 Sl no  Village  Zaid (Summer) 

Crop 1 Crop 2 Crop 3

1    Area  Production(kg)  Productivity(Kg per Ha)  Area Production(kg) Productivity(Kg per Ha)  Area Production(kg) Productivity(Kg 

per Ha)     ‐  ‐  ‐ ‐ ‐ ‐ ‐ ‐ ‐Livestock: The villages have 1281 cows, 1735 buffaloes, 2250 bullocks, 6242 goats, Hens 6213 and no sheeps. Livestock  is owned by all almost all  the farmer  for  drought  and  agriculture  purposes.  Partly  some  people  in  the  community  depend  on  goat  rearing  for  their  livelihood.  Cows  and buffaloes are of local breed. Mehsani buffalo and Gir cow are common in this area and the survival and production parameters are suitable to this region and climatic condition. Hence there is wider scope for improvement of dairy in this cluster of villages of chottaudepur IWMP‐5. Lack of  rain  and  surface water  has  reduced  the  fodder  and pasture  availability  for  their  animals. Milk  production  is  so  low however  this  can  be improved by fodder production in the wasteland in these areas. Although green fodder is only available in kharif season, excess fodder can be dried and stored for use in off season. Country chicken has great demand as it’s a part of daily food and also a source of income. Table no. 18: Livestock Sr. no  Village  Buffalo  Cow Total Milk 

(Buffalo Cow) 

Goat  Sheep Bullock Hen Others0 

No  milk No Milk 0 No Milk1  Mandalva  665  478800 500 210000 688800 950 21375 0 300 720 02  Ranikhada  50  36000 40 16800 52800 250 5625 0 105 314 03  Limbani  25  18000 60 25200 43200 178 4005 0 80 200 04  Bandibhint  150  108000 35 14700 255700 300 6750 0 103 370 05  Dholisimel  200  144000 50 21000 165000 800 18000 0 289 385 06  Dungarbhint  200  144000 63 45360 59760 600 13500 0 358 689 07  Dobachapura  25  18000 30 12600 30600 200 4500 0 89 225 08  Kevdi  80  57600 50 21000 78600 280 6300 0 178 368 0

Page 27: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 27 

 

9  Mithibor  150  108000 200 84000 192000 970 21825 0 377 1150 010  Kakadkund  50  3600 100 42000 45600 300 6750 0 38 290 011  Marchipani  20  14400 18 7560 21960 194 4365 0 19 175 012  Rinchhvel  15  10800 30 12600 23400 300 6750 0 98 317 013  Gadola  30  21600 20 8400 30000 350 7875 0 60 290 014  Kothara  47  33840 60 25200 59040 420 9450 0 80 415 015  Dhorkuva  28  20160 25 10500 30660 150 3375 0 76 305 0

Table no. 19:Drinking water Sr. no  Village  Ground water table (m) Source of drinking 

water Availability in months Quality

1  Mandalva  15 Hand pump,      Well      8 Month             4 month Medium2  Ranikhada  16.04 Hand pump,      Well      8 Month             4 month Medium3  Limbani  17.5 Hand pump,      Well      8 Month             4 month Medium4  Bandibhint  15.4 Hand pump,      Well      8 Month             4 month Medium5  Dholisimel  20.35 Handpump,      Well       8 Month             4 month Medium6  Dungarbhint  16.42 Handpump,      Well       8 Month             4 month Medium7  Dobachapura  19.02 Hand pump,      Well      8 Month             4 month Medium8  Kevdi  18.15 Handpump,      Well       8 Month             4 month Medium9  Mithibor  15 Handpump,      Well       8 Month             4 month Medium10  Kakadkund  17.1 Handpump,      Well       8 Month             4 month Medium11  Marchipani  20.15 Handpump,      Well       8 Month             4 month Medium12  Rinchhvel  12.3 Handpump,      Well       8 Month             4 month Medium13  Gadola  14.5 Handpump,      Well       8 Month             4 month Medium14  Kothara  13.4 Handpump,      Well       8 Month             4 month Medium15  Dhorkuva  14 Handpump,      Well       8 Month             4 month Medium

Table no. 20: Details of Common Property Resources S. No.  Names of 

project CPR Total Area (ha)  Area available for treatment (ha)

Particulars Area owned/ In possession of   Pvt.  Govt. PRI Any other  Pvt.  Govt. PRI Any other 

Page 28: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 28 

 

persons (Specify dept.) 

(Pl. Specify) 

persons (Specify dept.) 

(Pl. Specify) 

1  Mandalva  Wasteland/ degraded land 1.53 123.29 0.8094     1.53 123.29 0.809 ‐Pastures  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Orchards  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Village Woodlot  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Forest  309.07    309.07 ‐Village Ponds/ Tanks    ‐Community Buildings 0.4    ‐Weekly Markets  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Permanent markets ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Temples/ Places of worship ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Others (Pl. specify) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐

2  Ranikheda  Wasteland/ degraded land 79.458 0.8    79.45 0.8 ‐Pastures  79.1    ‐Orchards     ‐Village Woodlot     ‐Forest  308.06    308.06 ‐Village Ponds/ Tanks ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Community Buildings ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Weekly Markets  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Permanent markets ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Temples/ Places of worship ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Others (Pl. specify) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐

3  Libani  Wasteland/ degraded land ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Pastures  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Orchards  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Village Woodlot  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Forest  307.03    307.03 ‐Village Ponds/ Tanks ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐

Page 29: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 29 

 

Community Buildings ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Weekly Markets  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Permanent markets ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Temples/ Places of worship ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Others (Pl. specify) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐

4  Bandibhit  Wasteland/ degraded land 0.2125 98.369    0.2125 98.369 ‐Pastures  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Orchards  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Village Woodlot     ‐Forest  98.32    98.32 ‐Village Ponds/ Tanks    ‐Community Buildings 1500 

squre ft    ‐

Weekly Markets  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Permanent markets ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Temples/ Places of worship ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Others (Pl. specify) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐

5  Dholishamel  Wasteland/ degraded land 1.13 29.34    1.13 29.34 ‐Pastures     ‐Orchards     ‐Village Woodlot     ‐Forest  119.01    119.01 ‐Village Ponds/ Tanks ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Community Buildings ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Weekly Markets  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Permanent markets ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Temples/ Places of worship ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Others (Pl. specify) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐

6  Dugarbhit  Wasteland/ degraded land 0.0607 32.01 57.806     0.0607 32.01 57.806 ‐Pastures     ‐

Page 30: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 30 

 

Orchards     ‐Village Woodlot     ‐Forest  388.02    388.02 ‐Village Ponds/ Tanks ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Community Buildings ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Weekly Markets  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Permanent markets ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Temples/ Places of worship ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Others (Pl. specify) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐

7  Dobachapara  Wasteland/ degraded land 4.0166    4.0166 ‐Pastures     ‐Orchards     ‐Village Woodlot     ‐Forest  339    339 ‐Village Ponds/ Tanks ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Community Buildings ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Weekly Markets     ‐Permanent markets ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Temples/ Places of worship ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Others (Pl. specify) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐

8  Kevadi  Wasteland/ degraded land ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Pastures  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Orchards  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Village Woodlot     ‐Forest  799.04    ‐‐Village Ponds/ Tanks ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Community Buildings ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Weekly Markets  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Permanent markets ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Temples/ Places of worship ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐

Page 31: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 31 

 

Others (Pl. specify) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐9  Mithibor  Wasteland/ degraded land 1.3709 32.031    1.3709 32.031 ‐

Pastures     ‐Orchards     ‐Village Woodlot     ‐Forest     ‐Village Ponds/ Tanks 384.2    384.2 ‐Community Buildings ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Weekly Markets  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Permanent markets ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Temples/ Places of worship ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Others (Pl. specify)    ‐

10  Kakadkund  Wasteland/ degraded land 1.01 173.04    1.01 173.04 ‐Pastures  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Orchards  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Village Woodlot  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Forest  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Village Ponds/ Tanks ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Community Buildings ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Weekly Markets  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Permanent markets ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Temples/ Places of worship ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Others (Pl. specify) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐

11  Marchipani  Wasteland/ degraded land 2.9476 0.4047     2.9476 0.4047 ‐Pastures  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Orchards  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Village Woodlot     ‐Forest  398.7    398.7 ‐Village Ponds/ Tanks ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Community Buildings ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐

Page 32: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 32 

 

Weekly Markets  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Permanent markets ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Temples/ Places of worship ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Others (Pl. specify)    ‐

12  Richvel  Wasteland/ degraded land 196.28    196.28 ‐Pastures     ‐Orchards     ‐‐Village Woodlot     ‐Forest  185.8    185.8 ‐Village Ponds/ Tanks ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Community Buildings ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Weekly Markets  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Permanent markets ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Temples/ Places of worship ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Others (Pl. specify) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐

13  Gadola  Wasteland/ degraded land 51.102    51.102 ‐Pastures  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Orchards  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Village Woodlot  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Forest  409.9    409.9 ‐Village Ponds/ Tanks ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Community Buildings ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Weekly Markets  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Permanent markets ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Temples/ Places of worship ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Others (Pl. specify) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐

14  Kothara  Wasteland/ degraded land 17.655 0.4047     17.655 0.4047 ‐Pastures  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Orchards  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐

Page 33: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 33 

 

Village Woodlot  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Forest  32.9    32.9 ‐Village Ponds/ Tanks ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Community Buildings ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Weekly Markets  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Permanent markets ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Temples/ Places of worship ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Others (Pl. specify) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐

15  Dhorkuwa  Wasteland/ degraded land 0.2024 261.62    0.2024 261.62 ‐Pastures  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Orchards  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Village Woodlot  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Forest  226.8    226.8 ‐Village Ponds/ Tanks ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Community Buildings ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Weekly Markets  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Permanent markets ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Temples/ Places of worship ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Others (Pl. specify) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐

Socio­Economic Profile Demographic Status: Chottaudepur watershed project has a total of 1401 households with a population of 11797 (as per base­line survey) out of which 5890 are male and 5907  female .The sex ratio is 1002 female to 1000 male. There are 2321 BPL families. The average family size is 5. The literacy rate is very low i.e. 7.1 percent male literacy rate is 70 per cent (of total male population) and female literacy rate is 30 per cent (of total female population). People in this area are more inclined towards education as it is the best option for finding a employment , as the opportunities in other sectors are  limited.  The major  castes  in  the  village  are  rathwa, bariya, nayaka and all are  Schedule  tribe.  Majority  of  population  is  involved  in agriculture and animal husbandry.  

  

 

Page 34: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 34 

 

Table no. 21: Demographic information Sl no  Village  Population SC ST

Total  Male Female Total Male  Female Total Total Male Female 1  Mandalva  2416  1195 1221 2416 5 7 12 2404 1185 12192  Ranikhada  526  256 270 526 0 0 0 526 256 2703  Limbani  362  182 180 362 0 0 0 362 182 1804  Bandibhint  906  469 437 906 24  20 44 862 445 4175  Dholisimel  956  477 479 956 1 1 2 954 474 4806  Dungarbhint  1326  671 655 1326 38  38 76 1250 635 6157  Dobachapura  332  177 155 332 0 0 0 332 177 1558  Kevdi  1136  573 563 1136 1 0 1 1115 560 5559  Mithibor  1613  788 825 1613 14  8 22 781 810 159110  Kakadkund  343  165 178 343 0 0 0 162 176 33811  Marchipani  120  59 61 120 0 0 0 59 61 12012  Rinchhvel  332  168 164 332 0 0 0 166 163 32913  Gadola  423  220 203 423 0 0 0 219 203 42214  Kothara  568  278 290 568 0 0 0 276 287 56315  Dhorkuva  438  212 226 438 0 0 0 210 225 435    11797  5890 5907 11797

Table no. 22: Literacy rate Sl no  Village  Literacy 

Total % Male % Female %1  Mandalva  718 29.82 371 15.4 347 14.422  Ranikhada  109 20.76 66 12.05 43 8.263  Limbani  71  19.08 39 10.5 34 9.34  Bandibhint  159 17.52 82 9.1 76 8.425  Dholisimel  269 28.15 118 12.36 151 166  Dungarbhint  224 16.94 120 9.03 101 7.647  Dobachapura  33  10.08 20 6.03 13 4.58  Kevdi  274 24.15 142 12.05 132 11.65

Page 35: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 35 

 

9  Mithibor  626 26.03 336 14 296 12.0310  Kakadkund  92  27.31 48 14.1 45 13.2111  Marchipani  3  3.6 2 2.4 1 1.212  Rinchhvel  90  27.37 50 15.17 40 12.213  Gadola  65  15.35 39 9.25 26 6.114  Kothara  93  16.45 54 9.45 38 6.7215  Dhorkuva  84  19.2 44 10 40 9.2

Total    Migration Pattern:  Migration  is  a major  problem of  these  areas. Money  is  the major motivation  and hence people migrate  during Rabi  and  summer  season  to different parts of the state like Surat, Ahmedabad ,  Vadodara,  bhuj,  Ankelshwar  and  Suarashtra  as  daily  wagers,  agricultural  labours  and construction workers. As soon as kharif season ends most of people tend to migrated to different places in search of employment. People with little  irrigation  souces  and  livestock  stay  in  the village,  futher during drought  season most  of  the villagers  choose  to migrate.  Chottaudepur taluka  is  also  known  for  its  migration.  Several  studies  were  taken  up  from  different  institution  for  analysising  the  reason  for  migration. Regularly they migrate to same places and work as agriculture labour and wage labour. Childern are most affected as parents migrate, children are taken along them and their education is effected. Table no. 23: Migration details Sl no 

Village  Total population 

Migration Migration by months Main reason for migration Income during migration / month 

Total  Male Female Up to 3 months 

3‐6 months 

More than 6 months 

1  Mandalva  2416  846  507 339 310 315 221

Low Income, Due to low Crop Production and Lack of Employment 

4500/‐2  Ranikhada  526  210  126 84 94 70 46 3500/‐

3  Limbani  362  109  65 44 46 35 28 3200/‐

4  Bandibhint  906  317  190 127 210 67 40 4700/‐

5  Dholisimel  956  315  190 115 140 102 73 2800/‐

6  Dungarbhint 

1326  464  278 186 186 189 89 5200/‐

Page 36: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 36 

 

7  Dobachapura 

332  100  60 40 45 45 10 3800/‐

8  Kevdi  1136  454  272 181 195 150 109 2500/‐

9  Mithibor  1613  564  338 226 208 186 170 3000/‐

10  Kakadkund 

343  102  60 42 45 35 10 4800/‐

11  Marchipani 

120  36  26 10 15 14 7 4500/‐

12  Rinchhvel  332  100  60 40 40 30 30 3200/‐

13  Gadola  423  169  100 69 74 64 31 3800/‐

14  Kothara  568  227  127 100 97 76 54 5000/‐

15  Dhorkuva  438  153  103 50 85 46 22 4100/‐

Table no. 24: Poverty  Sr.no  Village  Total Household BPL

0‐16  17‐20 Total1  Mandalva  308 117  228 3452  Ranikhada  107 33  49 823  Limbani  64 103  2 1054  Bandibhint  112 109  59 1685  Dholisimel  178 133  32 1656  Dungarbhint  220 238  68 3067  Dobachapura  95 63  34 978  Kevdi  209 222  26 2489  Mithibor  240 325  2 32710  Kakadkund  60 77  3 8011  Marchipani  23 37  1 38

Page 37: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 37 

 

12  Rinchhvel  51 71  1 7213  Gadola  69 78  24 10214  Kothara  137 79  29 10815  Dhorkuva  57 77  1 78    1930 1762  559 2321

Infrastructure facilities:  The village has electricity connectivity under  Jyotigram Yojana of the State Government. Nearly 79 per cent of households  in the village have their personal electric meters. Almost all of the villages in this cluster have primary schools. For middle and higher secondary education, the students have to go to chottaudepur a taluka place and a mini town (Zoz) which is about 25‐55 and 10‐25 kilometres respectively  from the almost all  the villages  this particular cluster. However, most  of  the youngster  travel  this distance on daily basis  to obtain  a better education facilities. Most of these do not have any primary health care centre for which villagers have to go to chottaudepur taluka place which is 25 and 55 Kms. Some of the villages come under a Group Panchayat with Panchayat as mentioned in Table no 1 of basic project information.  Table no. 25: Village infrastructure Sl no 

Village  Pucca road to the village (Y/N) 

Schools  Colleges (Number)

Post Office 

(Distance)

Banks (Number)

Distance from nearest market yard 

Milk collection centre 

(Number)

Milk cooperative (Number) 

Other cooperatives 

/ CBIs (Number) 

Any other institution LP  UP  HS

1  Mandalva  yes  1  0  0 0 0 0 17  0 1 1 02  Ranikhada  yes  1  0  0 0 4 0 20  0 0 1 03  Limbani  yes  1  0  0  0  7  0  20  0  0  1  0 4  Bandibhint  yes  1  0  0 0 4 0 21  0 0 1 05  Dholisimel  yes  1  1  0 0 3 0 22  0 1 1 16  Dungarbhint  yes  1  0  0 0 5 0 25  0 0 1 07  Dobachapura  no  1  0  0 0 4 0 24  0 0 1 18  Kevdi  yes  1  0  0  0  6  0  25  0  0  1  0 9  Mithibor  yes  Yes  Yes  Yes 0 0 0 38  0 0 2 210  Kakadkund  Yes  Yes  Yes  No 0 3 0 33  0 0 1 011  Marchipani  No  No  No  No 0 5 0 35  0 0 1 012  Rinchhvel  No  Yes  No  No 0 2 0 34  0 0 1 0

Page 38: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 38 

 

13  Gadola  Yes  Yes  No  No  0  2  0  41  0  0  1  1 14  Kothara  Yes  Yes  No  No  0  3  0  45  0  0  1  1 15  Dhorkuva  yes  Yes  no  no 0 2 0 43  0 0 1 0Table no. 26 : Facilities / HH assets Sl no  Village  HHs with 

electricity HHs with safety latrines 

HHs with phones HHs with vehicle HHs with TV set 

HHs with cooking gas 

HHs with Drinking water 

HHs with 

freedge Land line 

Mobile 2‐wheeler 

4‐wheeler

1  Mandalva  166  29 3 68 20 1  5 3 6 22  Ranikhada  70  26 4 76 16 3  5 2 0 03  Limbani  40  10 No 15 2 No 1 No 1 14  Bandibhint  115  16 No 60 10 1  No No 0 35  Dholisimel  112  15 No 42 21 5  6 No 5 36  Dungarbhint  160  20 No 38 14 1  2 No 1 27  Dobachapura  33  12 No 15 4 1  1 No 0 08  Kevdi  123  32 No 35 5 3  1 No 2 19  Mithibor  144  4 4 48 15 6  3 2 0 210  Kakadkund  52  No 0 23 2 1  1 0 0 011  Marchipani  3  No 1 8 2 0  0 0 0 012  Rinchhvel  4  No 0 4 1 0  0 0 0 013  Gadola  11  No 1 25 5 2  1 0 0 014  Kothara  41  No 1 8 4 1  4 0 0 115  Dhorkuva  45  No 1 15 3 0  1 0 0 0   Total  1119  164  15  480  124  25  31  7  15  15 

Livelihood pattern:  The villagers  earn  their  livelihood  from agriculture  and animal husbandry and during  lean  seasons  they migrate  as daily wage  labourers  in Surat and surastra and as agriculture labour in other parts of the state. As this area is abundant with local palm trees, in off‐season women tend to  sell  the extract  from  these  trees  locally known as nira a  semi alcoholic natural drink consumed by  the  localities  to  sustain  from  the heat waves  of  summer.  This  is  also  one  of  the  subsidiary  income  sources  for  the  villager  especially  in  summer  season.  Income  is  irregular  and absolutely no scope for saving for future use. This leads to lending from local sources. Things get wrost when barrowed amount is not paid on time. 

Page 39: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 39 

 

Table no. 27: Income Sl no  Village  Agriculture Animal husbandry  Casual labour Others Total1  Mandalva  1201 119 1272 2217 48102  Ranikhada  1452 13 1017 197 26783  Limbani  561 5 898 997 24614  Bandibhint  818 26 375 151 13705  Dholisimel  1764 437 1893 813 49076  Dungarbhint  2891 8 190 163 32517  Dobachapura  1830 0 202 973 30058  Kevdi  1943 124 312 824 32049  Mithibor  1728 85 176 949 293810  Kakadkund  1895 420 1380 58 375411  Marchipani  1305 108 1260 2233 490712  Rinchhvel  1865 0 0 2808 467313  Gadola  1251 0 1557 45 285314  Kothara  446 34 1771 540 279115  Dhorkuva  628 381 1036 508 2554

 Dependence on Common Property Resource The majority  of  the  people  of  this  region depend on  Common property  resources. Most  of  them  continue  to  live  a  virtually  hand‐to‐mouth existence. Based upon the rainfall data of past few years the rainfall of this area is increasingly decreasing due to which agriculture is become a major constraint. Availability of  little moisture  is also  insufficient  for  the development of pasture  lands this  trend seems to continue year by year making the natural resources in this depleting at a faster rate. Drinking water is also scarce in this region and water table in most of the wells going deeper day by day. One of the prominent features of all these villages in this cluster is dependence on common property resources. Trees of mahuda, medicinal plants, wild herbs and spices are abundant in this area and yearly people tend to year Rs.3000‐3500 per family in summer  season. Two main products are mahuda  flowers and mahuda  (Dodi)  seeds. First  is Mahuda  flowers when  fermented  releases great amounts of alcohol hence, flowers are sold in the near markets which are exported to different states. Secondly seed cotyledons of mahuda have a good amount of fatty acids which turns into oil after it is allowed from oil extraction process.This extracted oil is used for household purposes which is a good source of nutrition.  

Page 40: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 40 

 

Table no.28: Dependence on Forest/CPR 

Sr. no  Village Mahuda Ful Doli  Timru Pan

% sells Income % sells Income % sells Income1  Mandalva  50.4  616500 45.3 554850 0 02  Ranikhada  9.1  28500 18.4 57750 72.5 2268913  Limbani  52.6  194500 47.4 175050 0 04  Bandibhint  52.6  71000 47.4 63900 0 05  Dholisimel  46.8  490500 42.1 441450 9.3 973506  Dungarbhint  41.5  350500 37.3 315450 21.2 1787507  Dobachapura  11.9  30000 10.8 27000 77.3 1941508  Kevdi  50.0  1291000 45.0 1161900 2.1 534609  Mithibor  47.1  560000 42.4 504000 10.5 12490510  Kakadkund  52.6  120000 47.4 108000 0 011  Marchipani  52.6  82500 47.4 74250 0 012  Rinchhvel  52.6  140500 47.4 126450 0 013  Gadola  52.6  155000 47.4 139500 0 014  Kothara  41.4  150000 37.3 135000 21.3 7711015  Dhorkuva  42.3  133500 38.1 120150 19.6 61710

This shows the livelihood pattern of these particular villagers about 40% are solely engaged in agriculture activities, 37% agriculture plus animal husbandry, 16% causal cum agri labour, 3 % in animal husbandry exclusively, 1% in services,1% in handy crafts works and 1% in others. As shown in this figure it can be understood that primary occupation of this cluster is agriculture and followed by casual labour, which is why most of the people migrate to distant parts of Gujarat in search of labour works during off season. Animal husbandry comes next to casual labour, which is not much improved due to lack of fodder and improved breeds hence, based upon the available resources from locally and from common property resources the livelihood activities were planned keeping 

Page 41: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 41 

 

in view the pro and cons this clusters.  Table no. 29: Livelihood pattern (Occupational distribution) 

Sl no  Village  Agriculture 

Animal husbandry 

(AH) 

Agriculture + AH  Casual labour Services  Handicraft  Others 

1  Mandalva  1201  119 1082 672  38 ‐ 222  Ranikhada  1452  13 1439 517  8 ‐ 193  Limbani  561  5 556 298  4 ‐ 994  Bandibhint  818  26 792 375  8 ‐ 155  Dholisimel  1764  437 1327 793  16 ‐ 816  Dungarbhint  2891  8 2883 467  9 ‐ 167  Dobachapura  1430  45 1385 202  5 ‐ 638  Kevdi  1943  124 1819 312  5 ‐ 249  Mithibor  1728  85 1643 376  31 ‐ 4910  Kakadkund  1895  420 1475 480  2 ‐ 5811  Marchipani  1305  108 1197 260  0 ‐ 3312  Rinchhvel  1865  45 1820 0  2 ‐ 0813  Gadola  1251  95 1156 1557  2 ‐ 4514  Kothara  446  344 412 1771  3 ‐ 4015  Dhorkuva  20550 1874 18986 8080  133 572Comparative data of the crop productivity of the area: project area vs. District vs. State vs. Country vs. World:  “The term productivity in general means the total output per unit of factor input. For example land productivity means output per hectare of land. Productivity is an average and is calculated by dividing the total output of a particular crop by the total cultivated area under that crop.”  In order to asses the status of agricultural crops of the project area it is very crucial to have data of that particular geography and its agriculture profile  to  make  a  comparative  analysis.  Hence  different  sources  of  data  like  Baseline  survey  (for  Chottaudepur  villages),  Handbook  of Agriculture, ICAR publication 2006(For Gujarat and India), and Final district plan (DAP) of Dept. of Agriculture (Vadodara) on production and productivity are obtained. Based upon the production and productivity data the gap can be understood  in comparision with project villages, taluka place, district, state, country and world. The projections on the graphs is relative comparision of productivity of different places this is in order to understand the gaps in the productivity and to find the plausible solution for increasing the potential to an extend possible.  

Page 42: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 42 

 

  Crop Details of Project area: Crop 1:  Maize Tribal belt of chottaudepur taluka has a good potential for agriculture, the productivity of maize is one among high in chottaudepur taluka in comparsion to entire state and its leading in term of productivity. Maize is one of the major cereals crops grown in this project area and taluka place of chottaudepur. Mazie staple food crop in this region and15 villages of project area are designated as tribal villages and their majority of people  depend  upon mazie  as  food  crop. Maize  crop  is also  encouraged  by many private agri­business  companies  like Monsanto, Pineor and dhanuka. NGO’s like shrrof Foudation is also involved in project named “SUNSHINE” which involves distribution of seeds. During migration people tend to carry foods grains from their own field. Fig.1 Comparative data of project, Block, District, State and country of Maize and Redgram 

The world productivity of Maize is 4182 kg/ha.  In India, it is grown in about 6290 lakh hectares with a production of 10303 lakh tonnes and productivity of 2024 kg/ha. Gujarat is one of the lowest producing states in India with a 1481 kg/ha productivity, Vadodara district productivity being 1100. Chottaudepur block has very good productivity of 3000 kg/ha. The productivity of the project area is 1318.8 kg/ha which is less in comparsion to the   district. Hence, with proper solution the gaps can be minimized through modern agriculture practises. 

Page 43: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 43 

 

  Crop 2: Redgram: Pigeonpea is grown on an area of about 3.25 million hectares with the production of 2.23 million tonnes in the country.The world productivity of red is 780 kg/ha, India productivity 685 kg/ha. It is second most important crop after chickpea among different pulse crops in the country. Intresting Gujarat state have maximum productivity of with 989 kg/ha and one of the noteworthy facts is chottaudepur has 1500 kg/ha twice the productivity of redgram and even the project area 507.6 kg/ha productivity is higher than the world. However, gap between project area and chottaudepur,  can be minimized by modern agricultural practices. 

Figure 2 . Comparative data of project, Block, District, State and country of Paddy and Cotton              Crop 3: Paddy  

In India, rice  accounts  for  22  per  cent  of  the  total  cropped  area  under cereals.The most significant achievement of the post independent era is the transformation from chronic deficit to self‐sufficiency. The per  capita  net  availability  of  rice  (provisional)  has  increased  from  about  150  g  in  1950  to  225  g  in  1990,  in  spite  of  growing population.The rice area has shrunk from 2.52 million hectares in 1960 to about 2.20 million hectares in 1998‐99, but the production has increased  from 3.5 million  tonnes  to  about 8.2 million  tonnes  in 1998‐99  and  ranked  first  in national  productivity with 2278 kg/ha. World  is  kg/ha  3033,  Gujarat  1699  kg/ha,  district  Vadodara  1125  kg/ha,  chottaudepur  1000  kg/ha  and  project  area  is  868  kg/ha respectively. We  can  see  the  gap  in  the  productivity  of  project  area.  This  is mainly  due  to  the  lack  of  irrigation  facilities,  traditional 

Page 44: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 44 

 

varities pest and disease  incidence. The differenc can be elimated by different  innovative  techniques of  crop demonstration  to create awareness of fertilizer use, pesticides and different tillage practices for increasing productivity of paddy.   Crop 4: Cotton Cotton often referred as "White gold" has been  in cultivation  in  India  for more  than  five  thousand  years. He cotton required  for  the purpose of manufacturing yarn is cultivated in about 9 million hectares of land in India and thus India ranks first in the world. In India, cotton is grown over an area of about 9 million hectares and provides livelihood for over 4 million farming families. The productivity of cotton is very low in India but still it stands first in production of cotton after china and USA. The productivity of cotton is comparatively good in the project area and chottaudepur block has highest productivity with 1500 kg/ha . . The productivity of cotton is 1103 kg/ha. In this block .Hence this difference has be improved with innovative agricultural practices to an extend. Productivity details of project area of  cotton  is 685 kg/ha, 950 kg/ha, 534 kg/ha, 774 kg/ha, 488 kg/ha, 690 kg/ha  in  comparision  to  taluka, district,  state,  country and world respectivel It is observed that in recent years their is raise in net cropping area under cotton crop, this is mainly due to the innovate seed technology such as BT cotton (Bacillus turengenises) which has considerable decresed the use of pesticide by 50%. Cotton being a cash crops fetchs more  returns  and more and more  farmers  are  inclined  towards  cotton  crops. Agriculture department  also  involved  in  increasing  the yields Black Gram Productivity:                             

Blackgram  is  famously  known  as  Udad Dal  in  India  and India  is one  the major producer of  this pulse crop. This  is a  rich source  of  protein  and  greatly  used  in  making  of  many  bakery products.  The  average  productivity  of  the  India  is  around  450 kg/ha.  The  project  area  is  good  in  terms  of  productivity  due  to favourable  climatic  conditions  and  suitable  soils.  However  the productivity  can  be  still  increased  by  introducing  the  better management  practices  and  by  adopting  “Integrated  Nutrient Management “and by  introducing high yielding varities  into  the project area. 

     

Page 45: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 45 

 

  The productivity of Project area is low due to following reasons: i) Full dependence on monsoon:    Project  villages  village  is  dependent  on  monsoon.  Water  is  essential  input  in  agriculture.  Due  to  the  absence  of  proper  irrigation facility,100%  of  the  total  cultivated  area  depends  on  the  uncertain  monsoon.  Therefore,  the  suceess  or  failure  of  the  monsoon determines the success or failure of agriculture production.The rainfall is unreliable due to two factors: untimely and inadequate. ii) Low use of fertilizer per unit cropped area:  Farmers do not use sufficient fertilizer due to lack of water, scarcity of fertilizer in market and insufficient money for fertilizer. Many a times they don’t get fertilizer at the right time.    iii)  Traditional farming methods:  This also leads to low productivity. There is a lot of ignorance about the use of new farming methods and technologies such as multiple cropping. They don’t use FYM and other input in a proper way; that is why they don’t get 100% output. So these factors contribute to low productivity. iv)  Lack of adequate farm machinery:  Even today a large number of farmers in chottaudepur project use wooden ploughs and bullocks. They don’t have adequate machinery like seed drill. So, old machineries take more time in tillage practices.  v) Lack of finances for farmers:  In chottaudepur most of the farmers are marginal and small. They do not have enough money to buy good quality seeds, machinery and other inputs.   vi) Lack of good quality seeds and fertilizers: Good quality seed, fertilizer and pesticide are important factor in agriculture productivity. The use of good quality leads to higher land productivity.  In  project,  however,  there  are  two  limitations  in  the  use  of  fertilizer.  First  these  fertilizers  are most  useful  in  irrigated condition. But in project 100 per cent of land depend on rainfall. In chottaudepur mostly farmers use nitrogenous fertilizers especially urea. This has resulted in disproportionate use of fertilizer depleting the quality of land.  vii) Lack of other facilities such as storage and marketing:  5‐10% of agriculture product damage after harvesting due to scarcity of proper storage and proper market for sale. So he sells to local traders at  the  low prices. Farmers mainly  face proper means of  transportation and roads. And second problem  is  farmers don’t have proper storage facilities. 

Page 46: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 46 

 

       

 

CHAPTER – 4 WATERSHED ACTIVITIES 

 

Page 47: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 47 

 

Watershed Activities  Watershed management as a strategy has been adopted by Government of India especially in the rain‐fed regions of semi‐arid tropics. 

These  regions  are  characterized  by  low  and  undependable  rain,  low  soil  fertility,  poor  infrastructure  development,  low  literacy  and  high incidence of migration. Several studies have identified that there is a dire need of a systematic and scientific approach to deal with watershed development. The common guidelines generate a fresh and flexible framework for the next generation watershed development.  Scientific Planning: 

i) Cluster Approach , This envisages a broader vision of Geo‐hydrological unit which involves treating a cluster of micro‐watershed. The Chottaudepur 

IWMP‐5  Project  consists  of  eleven  micro‐  watersheds  namely  5E1B8f1a,  5E1B8f2a,  5E1B8f1k,  5E1B8f1g,  5E1B8c3a,    5E1B8f1h, 5E1B8f1d, 5E1B8f1j, 5E1B8f2a,  5E1B8f1e, 5E1B8f1k   as their respective codes. Further chottaudepur IWMP‐5  watershed project is in continuation with  other  watershed  projects  namely  Lunaja,  Muthai,  Ambakuth,  Ghata,  Chetapur,  Kundal    Projects  which  is  taken  as IWMP‐3 as third priority area    this gives an element of continuation of  the programme and suits with  features of cluster approach as holistic development. ii) Base line Survey 

To  access  the  impact  of  any watershed  development  programme  a  detailed  baseline  survey  has  to  be  conducted.  This  acts  a benchmark  for  any  intervention  during  and  post  implementation  of  any  development  programme.  A  detailed  baseline  survey  was undertaken which  involved household census survey, Bio­physical survey  and Village  level data collection  from Talati –cum mantri. Household census survey  includes a detailed questionnaire which was been filled by visiting each and every household  in  the village. This gave in the details of the demographic profile of the village, the literacy percentage, SC/ST population, number of BPL household, cattle  population,  net  consumption  rate  in  the  village,  average milk  production  of  the  cattle  and  various  schemes  running  and  their benefits. Bio‐physical survey was undertaken to identify various natural resources available in the village. It included the soil typology, well in the area, crop taken in the field, Cropping pattern, fertilizer used and various sources of irrigation in the field.  

iii) Participatory Rural Appraisal (PRA) The past  experience  of watershed has  given  tremendous  input  to  focus  on  creating accountability  of  the  stakeholders  towards  the  programme.  This  has  created  an emphasis  to  include all  the stakeholder communities and their  local and  indigenous Technological  Knowledge  (ITK)  while  planning  for  any  activity.  Participatory approach provides a new path for planning, implementing, and monitoring and post‐ withdrawal activities with a complete accountability of the stakeholders. Various PRA 

Page 48: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 48 

 

techniques like resource mapping, social mapping, and season calendars were used to understand the physical and social orientation of the village in general and watershed in specific. These tools put the villagers in ease than the complicated questionnaires. Various tools like  Matrix  ranking,  Venn  Diagram  were  used  to  identify  various  local  vegetations  (apt  for  afforestation)  ,  Fodders  crops  ,  various institution and   their significance in the life of the farmers. Focus Group Discussion with women: Community mobilization expert has carried out the FGD with women in order to understand various issues related to their day to day life. PRA tools such as time line, daily activity chart, details of SHG’s, details of common property resources, seasonal health problems, girl child education, problems of agriculture and seasonal charts were discussed.  In this discussion women were encouraged to  speak about their problem. The women who drew these charts described the differences between the rainy and dry season patterns. In the dry season, it took longer to get water from the well and collecting firewood to stockpile for the rainy season. When the rains come, things are much busier and the women's days are much longer because of all the work to be done in the fields. Focus Group Discussion with Women  

   

Page 49: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 49 

 

iv) Use of GIS and Remote sensing for planning   Use of various high science tools has been promoted at various stages of watershed development. a) Prioritization 

Geographical  Information  System(GIS)  has  been  used  for  prioritization  process.  Various  layer  maps  were  created  like  Geo‐morphological,  Soil,  BPL  Population,  SC/ST  population,  Ground water  Status,  Drinking water  situation  Slope  percent.  These were  all given proper weightage according to the DoLR specification. This helped in prioritization of various watershed areas. b) Planning A action plan matrix was formulated by State Level Nodal Agency (SLNA) taking into account various features like the slope percent, soil Depth, Soil Texture, Soil erosion in the area for wasteland, forest land and agricultural land. Contour Map of vertical interval of 1 meter at a  scale of 1:8000 was used  for  identifying various  locations  for  soil  and water  conservation  structures.  Land parcel number of  those particular villages is provided in order to understand the drainage, slope and stream in that area. Selection of site can be marked on the maps with help of survey number of that village map.  Hydrological modelling Hydrology  modelling  technique  was  used  for  locating  drainage,  stream  length,  flow  direction,  sink,  Flow  accumulation.  This  model overlaid over cadastral map to calculate  the catchment area of  each structures  like  the check dam etc. This has helped to remove  the human error which generally occurs while calculating the catchment area of a check dam. 

Table no. 30: Details of Scientific Planning and Inputs in IWMP projects 

S. No.  Scientific criteria/ inputs used Whether scientific criteria was 

used 

 

(A) Planning Cluster approach  YesWhether  technical back‐stopping  for  the project has been arranged?  If yes, mention  the name of the Institute   

Baseline survey  YesHydro‐geological survey  YesContour mapping  YesParticipatory Net Planning (PNP) YesRemote sensing data‐especially soil/ crop/            run‐off coverRidge to Valley treatment Online IT connectivity between 

Page 50: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 50 

 

(1) Project and DRDA cell/ZP  Yes (2) DRDA and SLNA  Yes  (3) SLNA and DoLR  Yes Availability of GIS layers   1. Cadastral map  Yes2. Village boundaries  Yes3. Drainage  Yes4. Soil (Soil nutrient status)  Yes5. Land use  Yes6. Ground water status  Yes7. Watershed boundaries  Yes8. Activity  YesCrop simulation models#  NoIntegrated coupled analyzer/ near  infrared visible  spectroscopy/ medium spectroscopy  for high speed soil nutrient analysis  No 

Normalized difference vegetation index (NDVI)# NoWeather Station (B) Inputs  No1. Bio‐pesticides  No2. Organic manures  Yes3. Vermicompost  Yes4. Bio‐fertilizer  No5. Water saving devices  Yes6. Mechanized tools/ implements Yes7. Bio‐fencing  Yes8. Nutrient budgeting  No9. Automatic water level recorders & sediment samplers NoAny other (please specify) 

 #NDVI  ‐ Ratio of the differences of the response of vegetation in the near infrared & red regions of the electromagnetic spectrum 

Page 51: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 51 

 

Institution building: The watershed development project has great potential and scope to empower socially disadvantage sections of the community. Considering the  needs  and  priorities  of  these  sections,  special  activities  can  be  designed  to  reduce  their  drudgery.  The  can  be  involved  in  a  skills  up gradation programme. People's organizations hold the key in ensuring the right integration between sustainable development and social equity. Such organizations must have  representations  from representations  from  socially  backward  communities  and women with  separate  special interest groups. Within group interactions across group interactions and representation in village level institutions provide a platform for the disadvantaged groups to become a part of mainstream development. It is also important to ensure that these groups obtain equal opportunities to access the resources developed at the community level.  Watershed Committee  It  is  a  committee  that  is  constituted by Gram Sabha  to  implement  the watershed project with  technical  support  of WDT  in  the  village.  This committee is registered under society Registration Act 1860. The Gram Sabha of the village selects the chairman of the watershed committee with the secretary who will be a paid functionary. A watershed Committee was formed accordingly in all the  villages of IWMP‐5chottaudepur 2P project area. The IWMP‐5 Chottaudepur is a cluster of 15 villages with 3 Gram panchayats. Hence 7 main Watershed Committees and 3 sub‐watershed  committees  are  formed  at  village  keeping  all  parameter  of  watershed  committee  keeping  the  gender  sensitive  issues  intact. Watershed committee member are briefed about the project objectives and a workshop is also conducted a in this regard at every village. The watershed committee has a pivotal role to play during and after the project implementation period. Table no. 31: Watershed Committee details Sl. No. 

Names of WCs 

Date of Registration  as a Society  

Name  Designation  M/F  SC  ST  SF  MF  LF  Land­less 

UG  SHG  GP  Any other 

Educa­tional qualifi­cation 

Function/s assigned# 

1  Mandalva   30/7/2010  Rathwa Ramsingbhai Darshanbhai 

Presidant M ST M    6th  PASS

2   30/7/2010  Rathwa Bachubhai Abhabhai 

vice‐Precident M ST L     Illiterate

3   30/7/2010  Rathod Pramosinh s. 

Member M ST   

4   30/7/2010  Rathwa Sanjaybhai Manshukhbhai  

Member M ST M    12th   PASS

5   30/7/2010  Nayaka Burabhai Khaparbhai  

Member M ST S    5th    PASS     

6   30/7/2010  Rathwa Avsingbhai Chuniyabhai  

Member M ST  L  10th PASS

Page 52: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 52 

 

7   30/7/2010  Rathwa Savitaben Rajubhai 

Member F ST M    S  Illiterate

8   30/7/2010  Rathwa Soramabhai Maniyabhai  

Member M ST  L  U  Illiterate

9   30/7/2010  Rathwa Ditaliben Buchabhai  

Member F ST  L  S  Illiterate

10   30/7/2010  Harijanbhai Ravindrabhai Mansingbhai  

Member M SC     10th PASS

11   30/7/2010  Vinodbhai M.Nisarata 

WDT M ST    M.S.W

 Sl. No. 

Names of WCs 

Date of Registration  as a Society  

Name  Designation M/F SC ST SF MF LF  Land‐less 

UG SHG GP Any other 

Educa‐tional qualifi‐cation 

Function/s assigned# 

1  Dhorisimel   30/7/2010  Rathwa Mavsingbhai Bhangadabhai 

Presidant M ST M      12 th pass

2   30/7/2010  Rathwa Kanubhai Chisalabhai 

vice‐Precident M ST S      10 pass

3   30/7/2010  Rathod Pramodsinh S. 

Member M ST     

4   30/7/2010  Rathwa Shantaben Kanubhai 

Member F ST S      SY

5   30/7/2010  Rathwa Jetiben Sakabhai 

Member F ST S       Illiterate

6   30/7/2010  Rathwa Ganpatbhai Chandubhai 

Member M ST S      9 TH PASS

7   30/7/2010  Rathwa Ratanbhai Kulsingbhai  

Member M ST M       Illiterate

8   30/7/2010  Nayaka Dineshbhai  Gemabhai 

Member M ST S      10 TH PASS

9   30/7/2010  Rathwa Natvarbhai Hamirbhai 

Member M ST S      10 TH PASS

Page 53: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 53 

 

10   30/7/2010  Rathwa Sankarbhai Maganbhai 

Member M ST M      UGS 10 TH PASS

11   30/7/2010  Rathwa Ditiyabhai Jemabhai  

Presidant M ST L     10 TH PASS

12   30/7/2010  Rathwa Sankuntalaben Ranjitbhai 

vice‐Precident F ST S      SHGS 10 TH PASS

13   30/7/2010  Rathwa Geetaben Rajubhai 

Member F ST M      SHGS 10 TH PASS

14   30/7/2010  Rathwa Pravinbhai Gemabhai 

Member M ST S      UG 12 TH PASS

15   30/7/2010  Rathwa Sumutraben Rameshbhai 

Member F ST S      SHG 10 TH PASS

16   30/7/2010  Harijan Bhotubhai Minkabhai 

Member M SC    LL  Illiterate

17   30/7/2010  Nayaka Chimabhai Ditiyabhai 

Member M ST     LL  Illiterate

18   30/7/2010  Vinodbhai M. Nisarata 

WDT M ST      W.D.T M.S.W

                                 

      

         

         

               

Page 54: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 54 

 

Sl. No. 

Names of WCs 

Date of Registration  as a Society  

Name  Designation M/F SC ST SF MF LF  Land‐less 

UG SHG GP Any other 

Educa‐tional qualifi‐cation 

Function/s assigned# 

1  Mithibor   30/7/2010  Nayaka Dursingbhai Saburbhai 

Presidant M ST S      8th Pass

2   30/7/2010  Nayaka Bhanabhai Kanjibhai 

vice‐Precident M ST M      10th Pass

3   30/7/2010  Rathwa Keshubhai B.(R.F.O) 

Member M ST     

4   30/7/2010  shri Nayaka Himatbhai Jangabhai 

Member M ST M        Illiterate

5   30/7/2010  Nayaka Divabhai Hemabhai  

Member M ST S      7th Pass

6   30/7/2010  Vinubhai Dalabhai Member M ST M      6th Pass7   30/7/2010  Vishalbhai 

Vechalabhai Member M ST M     

8   30/7/2010  Chokhaliben Narsingbhai 

Member F ST S      Illiterate

9   30/7/2010  Rangaliben Temalabhai 

Member F ST L     Illiterate

10   30/7/2010  Shri Nadubhai Segalabhai 

Member M ST S      USG Illiterate

11   30/7/2010  Rathwa Somabhai Ramabhai 

Member M ST S      USG 10th Pass

12   30/7/2010  Nayaka Galiben Kanubhai  

Member F ST L     SHG  Illiterate

13   30/7/2010  Rathwa Manguben Bhagabhai 

Member F ST S      SHG 9th Pass

14   30/7/2010  Nayaka Narsingbhai Kagadabhai 

Member M ST M      USG 4TH

15   30/7/2010  Nayaka Kanubhai Dilabhai  

Member M ST M        Illiterate

16   30/7/2010  VAnkarHimatbhai Kabhaibhai 

Member M SC     LL 12th Pass

Page 55: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 55 

 

17   30/7/2010  Nayaka Maliyabhai Devabhai 

Member M ST    LL    Illiterate

18   30/7/2010  Dipak Prajapati WDT M GN      WDT

 District: Vadodara                                                          Taluka: Chhotaudaipur  

Sr. No.   Name Of Institute  Registration 

Date  AD 1860, Registration Summittee, 

Section 21 

AD 1950, Mumbai Public Trust, Under Section 29 (Registration 

No. Of Public Trust)  

1  Mandalva Groups Gram Panchayat Main Watershed Committee  30/7/2010  Gujarat/2886/Vadodara  F/2569/Vadodara 

2  Dhorisimel Groups Gram Panchayat Main Watershed Committee  30/7/2010  Gujarat/2888/Vadodara  F/2571/Vadodara 

3  Mithibor Groups Gram Panchayat Main Watershed Committee  30/7/2010  Gujarat/2889/Vadodara  F/2572/Vadodara 

(ii ) Self Help Group Self Help Groups are motivated, small homogenous groups organized together through credit and thrift activities. Self help group initiative especially for women help uplift their livelihood. Generally self help groups include landless and poor women. Men can also be member in SHG if it serves the common objective of the group. Before formation of the SHGs, during PRA activities, Focussed Group Discussions (FGDs) were held with the women, which came up with the following observations: a) Lack of proper credit facilities due to low intervention of formal financial credit institution. b) Schemes like Sakhi mandal and SGSY are already operation at the village level but not to full extend. c) Excessive exploitation of weaker section by money lenders d) Lack of attitude for saving among poor people e) Lack of knowledge on credit and thrift activity and banking. 

After a discussion through PRA and other foucus groupd discussion with villagers and local authorities of  taluka panchayat and other developmental department, it was known that lack of awareness to villagers regarding such facilities and also due to the lengthy procedure of financial institutions has also become a major constraint. 

  

Page 56: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 56 

 

Table no. 32: SHG details Village  Name  Total no. of registered SHGs No. of members  No. of SC/ST in each 

category No. of BPL in each 

category With 

only Men With only Women 

With both 

Total  Categories M F Total M F Total M F Total

RANIKHEDA  0  3  0 3 (i) Landless 1 1 1 1 1 1(ii) SF 12  12 12 12 8 8(iii) MF 17  17 17 17 6 6(iv) LF 4 4 4 4 2 2

Total  0  3  0  3        34  34     34  34     17  17 DHORKUVA     2  2 (i) Landless

(ii) SF 8 8 8 8 6 6(iii) MF 12  12 12 12 10 10(iv) LF 2 2 2 2 2 2

Total     2     2        22  22     22  22     18  18 LIMBANI     1  1 (i) Landless

(ii) SF 6 6 6 6 6 6(iii) MF 5 5 5 5 3 3(iv) LF

Total     1     1        11  11     11  11     9  9 DUNGARBHIT     2  2 (i) Landless 1 1 1 1 1 1

(ii) SF 4 4 4 4 4 4(iii) MF 17  17 17 17 13 13(iv) LF

Total     2     2        22  22     22  22     18  18 KOTHARA     2  2 (i) Landless 2 2 2 2 2 2

(ii) SF 6 6 6 6 6 6(iii) MF 14  14 14 14 11 11(iv) LF

Total     2     2        22  22     22  22     19  19 

Page 57: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 57 

 

MANDALVA     2  2 (i) Landless 2 2 2 2 2 2(ii) SF 7 7 7 7 1 1(iii) MF 13  13 13 13 11 11(iv) LF

Total     2     2        22  22     22  22     14  14 MITHIBOR     2  2 (i) Landless 3 3 3 3 3 3

(ii) SF 10  10 10 10 7 7(iii) MF 10  10 10 10 6 6(iv) LF

Total     2     2        23  23     23  23     16  16 DHOLISAMEL     2  2 (i) Landless

(ii) SF(iii) MF 22  22 22 22 15 15(iv) LF

Total     2     2        22  22     22  22     15  15 RICHHAVEL  1  2  3 (i) Landless 1 1 1 1 1 1

(ii) SF 3 9 12 3 9 12 2 6 8(iii) MF 8 9 17 8 9 17 4 7 11(iv) LF 4 4 4 4 4 4

Total  1  2     3     12  22  34  12  22  34  7  17  24 KAKADKUND     2  2 (i) Landless

(ii) SF 7 7 7 7 5 5(iii) MF 15  15 15 15 12 12(iv) LF 1 1 1 1 ‐ ‐

Total     2     2        23  23     23  23     17  17 BANDIBHIT     2  2 (i) Landless

(ii) SF 8 8 8 8 8 8(iii) MF 14  14 14 14 11 11(iv) LF

Total     2     2        22  22     22  22     19  19 

Page 58: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 58 

 

DOBACHAPRA     2  2 (i) Landless(ii) SF 4 4 4 4 2 2(iii) MF 19  19 19 19 13 13(iv) LF

Total     2     2        23  23     23  23     15  15 KEVDI     2  2 (i) Landless

(ii) SF 6 6 6 6 4 4(iii) MF 14  14 14 14 9 9(iv) LF 3 3 3 3 2 2

Total     2     2        23  23     23  23     15  15 GADOLA     2  2 (i) Landless 2 2 2 2 2 2

(ii) SF 6 6 6 6 6 6(iii) MF 14  14 14 14 11 11(iv) LF

Total     2     2        22  22     22  22     19  19  

User Group: User Groups are normally formed to manage an activity or asset created under the programme on a long term basis. The user group collect user charges from their members, oversee the works and manage the benefits.  It was decided that each group would formulate certain internal rules and have a feeling of ownership with community spirit. Table no. 33: UG detail Village name  Total no. of UGs  No. of members No. of SC/ST in each 

category No. of BPL in each 

category Men  Women  Both  Total Categories M F Total  M F Total M F Total

Mandalva  1  0   2  3 (i)Landless   (ii) SF 16 2 18  16 2 18 8 1 9(iii) MF 6 6  6 6 2 2(iv) LF   

Total  1   0  2   3 22 2 24  22 2 24 10 1 11Ranikhada   0  0   1  1 (i)Landless   

(ii) SF 4 2 6   4 2 6 2 1 3

Page 59: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 59 

 

(iii) MF 2  2  2 2 1 1(iv) LF   

Total   0  0   1   1 6 2  8  6 2 8 3 1 4Limbani  1   0  1  2 (i)Landless   

(ii) SF 7 2 9  7 2 9 6 1 7(iii) MF 6 6  6 6 3 3(iv) LF   

Total   1  0  1  2 13 2 15  13 2 15 9 1 10Bandibhint  1   0  2  1 (i)Landless   

(ii) SF 17 1 18  17 1 18 7 1 8(iii) MF 4 1 5  4 1 5 2 1 3(iv) LF   

Total  1   0   2  1 21 2 23  21 2 23 9 2 11Dholisimel        2   2 (i)Landless   

(ii) SF 5 2 7  5 2 7 2 1 3(iii) MF 2 2  2 2 1 1(iv) LF   

Total  0   0  2  2 7 2 9  7 2 9 3 1 4Dungarbhint      2     2 (i)Landless   

(ii) SF 20 1 21  20 1 21 8 1 9(iii) MF 11 1 12  11 1 12 4 1 5(iv) LF 10 10  10 10 3 3

Total   0  2  0  2 41 2 43  41 2 43 15 2 17Dobachapura     3     3 (i)Landless   

(ii) SF 13 2 15  13 2 15 6 2 8(iii) MF 6 6  6 6 2 2(iv) LF 3 3  3 3 1 1

Total   0  3  0  3 22 2 24  22 2 24 9 2 11Kevdi  2  0  4  6 (i)Landless   

(ii) SF 25 1 26  25 1 26 13 1 14

Page 60: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 60 

 

(iii) MF 11 1 12  11 1 12 8 8(iv) LF 7 7  7 7 3 3

Total   2  0  4  6 43 2 45  43 2 45 24 1 25Mithibor   0  2   0  2 (i)Landless   

(ii) SF 6 5 11   6 5 11 2 2 4(iii) MF 2 1  3  2 1 3 1 1(iv) LF   

Total  0   2  0  2 8 6  14  8 6 14 3 2 5Kakadkund           (i)Landless

(ii) SF(iii) MF Forest area  (iv) LF

Total           0   Marchipani           0 (i)Landless

(ii) SF(iii) MF Forest area   (iv) LF

Total           0   Rinchhvel  1       1  2 (i)Landless   

(ii) SF 4 3  7  4 3 7 2 1 3(iii) MF 2 1  3  2 1 3 1 1(iv) LF   

Total  1      1   2 6 4 10   6 4 10 3 1 4Gadola           (i)Landless

(ii) SF(iii) MF Forest area  (iv) LF

Total           0   

Page 61: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 61 

 

Kothara           1 (i)Landless   (ii) SF 3 2 5  3 2 5 3 2 5(iii) MF 2 2  2 2 2 2(iv) LF   

Total           1 5 2 7  5 2 7 5 2 7Dhorkuva  2   0   0   2 (i)Landless   

(ii) SF 7  7  7 7 5 5(iii) MF 3  3  3 3 2 2(iv) LF   

Total  2    0  0   2 10  10  10 10 7 74.3.1 Entry Point activity (EPA) EPA activities are taken up under watershed projects to build a rapport with the village community to make them to feel the presence at the beginning  of  the  project;  generally,  certain  important  works  which  are  in  urgent  demand  of  the  local  community  are  taken  up.  A  group Discussion was  conducted with watershed Development Committee  regarding  the EPA activity,  It was  conveyed  to  the WC  that  a particular amount was allotted for EPA activity for each of their villages, which was 4 per cent of total allocated budget. The villagers discussed various activities which they felt is important but after a brief discussion it was conveyed to them that only those activities can be taken, which revive the  common  natural  resources.    It  was  also  taken  into  priority  that  there  should  be  an  instrument  of  convergence  which  will  result  in sustainability of activities.  Table no.34: Entry point activities (EPA) (All financial figures in lakh Rs.) 

Sl No 

Names of Villages Amount 

earmarked (in Lakhs) 

Entry Point Activities planned  No Estimated cost (in Lakhs) 

1  Mandalva  1.268 Water trough for animals( Hawada) 1 0.484Hand pump repairing with recharge structure 3 0.300New hand pump with recharge structure  1 0.484

   Total  1.268 

2  Ranikheda  1.269 Water trough for animals( Hawada) 1 0.505Hand pump repairing with recharge structure 3 0.260New hand pump with recharge structure  1  0.504 

   Total     1.269 

Page 62: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 62 

 

3  Limbani  0.865  New hand pump with recharge structure  2 0.865   Total  0.865 

4  Bandibhit  1.519 

Water trough for animals( Hawada) 1 0.500Hand pump repairing with recharge structure 2 0.200New hand pump with recharge structure  1 0.519Repair of community well with recharge recharge structure 1 0.200Water filter in anganwadi /school 1 0.100

   Total  1.519 

5  Dholisimel  0.376  New hand pump with recharge structure  1  0.376    Total  0.376 

6  Dungarbhint  3.116 

Hand pump repairing with recharge structure 5 0.508Sintex tank for drinking water(25000 Ltr.)  1 1.000Water trough for animals( Hawada) 2 1.000New hand pump with recharge structure  1  0.508 Water filter in anganwadi /school  1  0.100 

   Total  3.116 

7  Dobachapura  0.931  Hand pump repairing with recharge structure 4 0.415New hand pump with recharge structure  1 0.516

   Total     0.931 

8  Kevdi  2.802 Water trough for animals( Hawada) 2 1.167New hand pump with recharge structure  2 1.167Hand pump repairing with recharge structure  3  0.468 

   Total  2.802 

9  Mithibor  2.143 Water trough for animals( Hawada) 2 0.981New hand pump with recharge structure  2 0.981Hand pump repairing with recharge structure 2 0.181

   Total  2.143 

10  Kakadkund  0.467  New hand pump with recharge structure  1  0.467    Total     0.467 

Page 63: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 63 

 

11  Marchipani  1.125 Water trough for animals( Hawada)  1  0.505 New hand pump with recharge structure  1 0.505Hand pump repairing with recharge structure 1 0.115

   Total  1.125 

12  Rinchhvel  0.892  New hand pump with recharge structure  1 0.446Water trough for animals( Hawada) 1 0.446

   Total  0.892 

13  Gadola  1.157  New hand pump with recharge structure  2 1.038Hand pump repairing with recharge structure 1 0.119

   Total  1.157 

14  Kothara  0.369  New hand pump with recharge structure  1  0.369    Total  0.369 

15  Dhorkuva 0.840 

New hand pump with recharge structure  1 0.520Community well recharge  1 0.210Hand pump repairing with recharge structure 1 0.110

   Total     0.840 Grand Total  19.139        19.139 

Watershed Development Works: Watershed work phase  is  the  core  component  of  the project.  Creating permanent  structures  as  required  the  slope,  geology  and  topography starting from ridge to valley to conserve rain water at point of its incidence with ground. Trapping the water resources at right place at right time  can  great  increase  the  effectiveness  of  this  project.  The  objective  being  reclamation  of  natural  resources  and  creating  sustainability  to assets created under this project.  A multi‐tier ridge to valley sequence approach should be approached towards implementation of watershed development projects. A net budget of 50 percent is allotted for this work.  Ridge Area Treatment Plans: It  is  very  important  to  treat  the  ridge  as  this  is where  the major water  resources  originate.  This  involves mainly  hilly  and  forest  region  in Chottaudepur  IWMP‐5watershed.  For  the  ridge  area  treatment  of  Chottaudepur  IWMP‐5watersheds  following  structure  are  been  Proposed after interaction between the watershed committee, Range Forest Officer (RFO) and other field staff of forest and MDT and WDT engineer. 

a. Graded Bunding b. Gully Plung 

Page 64: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 64 

 

a. Graded Bunding: “Graded bunds or graded terraces or channel terraces are the bunds or terraces laid along a pre‐determined longitudinal grade very near the contour but not exactly along contour”. Suitability: The graded bunds, commonly used are comparable to the narrow base terraces. They are used for the safe, disposal of excess runoff high rainfall areas and rigious where the [Clay] soil is relatively impervious. Farming operations are not done on bunds or bund channels. Function: 

1. These terraces act primarily as drainage channel to regulate and conduct runoff at non erosive velocity. 2. To make the runoff water to trickle rather than to rush out. b. Gully Plunge:  

The portion where the stream begins, the structure is construted with arraging loose boulder perpendicular to the flow of water is called gully plunge. Benefits:  A. Prevents soil erosion of land and reduces the flow of water and further prevents the formation of new strems. B. Very useful in moisture conservation and reduces the scroucing and delsilation of the streams. Land Development  The  second  tier  treatment  is  the  slope  treatment.  This  is  generally  done  on  agricultural  land  or waste  land.  This  generally  includes water conservation  or  surface  water  storage  structures.  This  being  highly  labour  intensive,  will  involve  more  of  manual  labour;  so,  funds  from National Rural Employment Guarantee Scheme (NREGS) can be taken.Following structures are been proposed in these areas  Farm Bunds: Bunding, also called a bund wall, is the area within a structure designed to prevent inundation or breaches of various types. Feild bunding is one of the important structures which check the runoff of water from the Farm level. Often Farm are left without proper bunding, water freely flows out of the Farm and scope for percolation is almost negligible. Hence Farm bunding plays a important role in conservation of moisture at Farm level.  As the multi‐tier approach ridge to valley, drainage line treatment and land development Farm bund fall in the third agenda. Table no.35:  Details of activities of preparatory phase (All financial figures in lakh Rs.) 

Name Of the Village 

Institution & Capacity Building 5%  DPR 1%    

Institution 0.5% 

Capacity 3.0% 

IEC 1.5% Base Line Survey 0.50% 

Hydro­Geological Survey 0.25% 

Technical Support Agencies 

Printing Of DPR & Mapping Of Project Area 

0.25% 

Estimated Cost (Rs. In Lakh) 

Mandlva  15858  95148  47574  15858  7929  ‐  7929  190296 

Page 65: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 65 

 

Bandibhit  18996  113976  56988 18996 9498 ‐ 9498 227952Dhorisimel  4704  28224  14112  4704  2352  ‐  2352  56448 Limbani  10818  64908  32454  10818  5409  ‐  5409  129816 Kevdi  35028  210168  105084  35028  17514  ‐  17514  420336 Dobachapra  11640  69840  34920  11640  5820  ‐  5820  139680 Ranikheda  15870  95220  47610  15870  7935  ‐  7935  190440 Dungarbhit  38952  233712  116856  38952  19476  ‐  19476  467424 Mithibor  26790  160740  80370  26790  13395  ‐  13395  321480 Kakadkund  5838  35028  17514  5838  2919  ‐  2919  70056 Dhorkuva  10506  63036  31518  10506  5253  ‐  5253  126072 Rinchvel  11160  66960  33480  11160  5580  ‐  5580  133920 Gadola  14466  86796  43398 14466 7233 ‐ 7233 173592Kothara  4620  27720  13860  4620  2310  ‐  2310  55440 Marchipani  14070  84420  42210 14070 7035 ‐ 7035 168840

   239316  1435896  717948  239316  119658  ­  119658  2871792 Table no.36: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.) 

Sr. NO. 

Village name 

Type of structures 

Proposed target  Remarks Augmentation/ repair of existing 

structures Construction of new structures  Total target 

   

No. 

Area to be 

irrigated (ha) 

Storage capacit

Estimated  cost 

No. 

Area to be 

irrigated (ha) 

Storage capacity 

Estimated  cost 

Area to be 

irrigated (ha) 

Storage capacity 

Estimated  cost   

1  Limbani 

Checkdam          2  21.00  1000.00  8.00  21.00  1000.00  8.00 Irrigation departmen

Checkwall          3  6.00  2400.00  0.60  6.00  2400.00  0.60 MGNREGA  panchayt dep. 

well          4  14.00    7.00  14.00  0.00  7.00  MGNREGA   Irrigat dep. 

Terrece Talavdi  2  0.38  0.00  0.00  0.38  Forest dep. 

Page 66: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 66 

 

Checkdam  2  30.00  9250.00  3.98  30.00  9250.00  3.98 Checkwall  7  21.00  7000.00  4.30  21.00  7000.00  4.30 

Total  0  0  0  0  20  92.00 19650.0

0 24.26  92.00  19650.0

0  24.26  

2  Bandibhit 

Checkdam  4  6  900  1.5          6.00  900.00  1.50 Irrigation departmen

t Percolation 

Tank          2  5.00  500.00  0.50  5.00  500.00  0.50  Forest dep. 

Checkwall          2  2.30  1600.00  0.40  2.30  1600.00  0.40 MGNREGA  panchayt dep. 

well          2  15.00    15.00  15.00  0.00  15.00  MGNREGA   Irrigat dep. 

Terrece Talavdi  2  0.38  0.00  0.00  0.38  Forest dep. 

Checkdam          3  45.00  10300.00  5.97  45.00  10300.00  5.97   

Checkwall          17  51.00  17000.00  10.68  51.00  17000.00  10.68   

Total  4  6  900  1.5  28  118.30 29400.0

0  32.93  124.30  30300.00  34.43   

3  Dholisimel 

Checkdam  1  2  250  0.4          2.00  250.00  0.40 irrigation departmen

t Percolation 

Tank          3  1.50  300.00  0.30  1.50  300.00  0.30  Forest dep. 

Checkwall          2  2.00  1800.00  0.40  2.00  1800.00  0.40 MGNREGA  panchayt dep. 

well          2  5.00    6.00  5.00  0.00  6.00  MGNREGA   Irrigat dep. 

Terrece Talavdi  3  0.57  0.00  0.00  0.57  Forest dep. Checkdam  1  9.00  5600.00  1.99  9.00  5600.00  1.99 Checkwall  6  18.00  6000.00  2.48  18.00  6000.00  2.48 Total  1  2  250  0.4  17  35.50  13700.0  11.74  37.50  13950.0  12.14 

 

Page 67: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 67 

 

4  Dungarbhit 

Percolation Tank  0        3  5.00  500.00  0.70  5.00  500.00  0.70  Forest dep. 

Checkwall          7  8.00  6100.00  0.80  8.00  6100.00  0.80 MGNREGA  panchayt dep. 

well          5  20.00    15.00  20.00  0.00  15.00  MGNREGA   Irrigat dep. 

Terrece Talavdi  3  0.57  0.00  0.00  0.57  Forest dep. 

Checkdam          6  48.00  19500.00  11.93  48.00  19500.00  11.93   

Checkwall          28  51.80  28000.00  21.62  51.80  28000.00  21.62   

Total  0  0  0  0  52  132.80  54100.00 

50.62  132.80  54100.00  50.62 

 

5  Dobachapra 

Checkdam  0        2  36.00  1200.00  9.50  36.00  1200.00  9.50 Irrigation departmen

t Percolation 

Tank          3  5.00  300.00  0.30  5.00  300.00  0.30  Forest dep. 

Checkwall          3  4.00  2700.00  1.20  4.00  2700.00  1.20 MGNREGA  panchayt dep. 

well          7  41.00    13.00  41.00  0.00  13.00  MGNREGA   Irrigat dep. 

Terrece Talavdi  2  0.38  0.00  0.00  0.38  Forest dep. Checkdam  3  24.00  8600.00  5.93  24.00  8600.00  5.93 Checkwall  5  16.00  5300.00  3.13  16.00  5300.00  3.13 

Total  0  0  0  0  25  126.00 18100.0

0 33.44  126.00  18100.0

0  33.44  

6  Kevdi 

Checkdam  0        5  37.00  1200.00  15.00  37.00  1200.00  15.00 irrigation departmen

Checkwall          3  6.00  2850.00  0.60  6.00  2850.00  0.60 MGNREGA  panchayt dep. 

Page 68: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 68 

 

well          4  27.00    9.00  27.00  0.00  9.00  MGNREGA   Irrigat dep. 

Terrece Talavdi  4  0.76  0.00  0.00  0.76  Forest dep. 

Checkdam          6  48.00  19500.00  13.93  48.00  19500.00  13.93   

Checkwall          20  50.00  15600.00  13.40  50.00  15600.00  13.40   

Total  0  0  0  0  42  168.00 39150.0

0  52.69  168.00  39150.00  52.69   

7  Kakad Kund 

Checkdam  0        1  21.00  700.00  4.00  21.00  700.00  4.00 Irrigation departmen

t Percolation 

Tank          6  13.00  600.00  0.60  13.00  600.00  0.60  Forest dep. 

Checkwall          3  6.00  2750.00  1.20  6.00  2750.00  1.20 MGNREGA  panchayt dep. 

well          7  41.00    13.00  41.00  0.00  13.00  MGNREGA   irrigat dep. 

Terrece Talavdi  3  0.57  0.00  0.00  0.57  Forest dep. Checkdam  2  14.00  7500.00  3.98  14.00  7500.00  3.98 Checkwall  4  12.00  4800.00  1.30  12.00  4800.00  1.30 

Total  0  0  0  0  26  107.00 16350.0

0 24.65  107.00  16350.0

0  24.65  

8  Marchipani 

Checkdam  1  2  250  0.4          2.00  250.00  0.40 Irrigation departmen

t Percolation 

Tank          3  1.50  300.00  0.30  1.50  300.00  0.30  Forest dep. 

Checkwall          2  2.00  1800.00  0.40  2.00  1800.00  0.40 MGNREGA  panchayt dep. 

well          2  5.00    6.00  5.00  0.00  6.00  MGNREGA   Irrigat dep. 

Terrece Talavdi  2  0.38  0.00  0.00  0.38  Forest dep. 

Page 69: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 69 

 

Checkdam          3  36.00  12300.00  5.97  36.00  12300.00  5.97   

Checkwall          16  48.00  11200.00  6.00  48.00  11200.00  6.00   

Total  1  2  250  0.4  7  8.50  2100.00  6.70  10.50  2350.00  7.10  

9  Gadola 

Percolation Tank  0        2  5.00  500.00  0.50  5.00  500.00  0.50  Forest dep. 

Checkwall          2  2.30  1600.00  0.40  2.30  1600.00  0.40 MGNREGA  panchayt dep. 

well          5  20.00    15.00  20.00  0.00  15.00  MGNREGA   irrigat dep. 

Terrece Talavdi  4  0.76  0.00  0.00  0.76  Forest dep. 

Checkdam          2  24.00  11200.00  3.98  24.00  11200.00  3.98   

Checkwall  8  32.00  6800.00  6.38  32.00  6800.00  6.38 

Total  0  0  0  0  23  83.30 20100.0

0 27.02  83.30  20100.0

0  27.02  

10  Kothara 

Percolation Tank  0        3  1.50  300.00  0.30  1.50  300.00  0.30  Forest dep. 

Checkwall          10  20.00  8500.00  3.50  20.00  8500.00  3.50 MGNREGA  panchayt dep. 

well          5  10.00  250.00  9.00  10.00  250.00  9.00  MGNREGA   irrigat dep. 

Terrece Talavdi  4  0.76  0.00  0.00  0.76  Forest dep. Checkdam  1  9.00  5650.00  1.99  9.00  5650.00  1.99 Checkwall  5  15.00  4250.00  2.40  15.00  4250.00  2.40 

Total  0  0  0  0  28  55.50  18950.00 

17.95  55.50  18950.00  17.95 

 

11  Mandalva Checkdam  0        1  17.00  1200.00  4.50  17.00  1200.00  4.50 

irrigation departmen

Well          4  27.00    9.00  27.00  0.00  9.00  MGNREGA   irrigat dep. 

Page 70: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 70 

 

Checkdam          3  18.00  14800.00  5.02  18.00  14800.00  5.02   

Checkwall  8  24.00  6400.00  8.05  24.00  6400.00  8.05 

Total  0  0  0  0  16  86.00 22400.0

0 26.57  86.00  22400.0

0  26.57  

12  Ranikheda 

tank  0        2  5.00  500.00  0.50  5.00  500.00  0.50  Forest dep. 

(a) Check wall          2  2.30  1800.00  0.40  2.30  1800.00  0.40 MGNREGA  panchayt dep. 

(b) well          5  20.00    15.00  20.00  0.00  15.00  MGNREGA   irrigat dep. 

Checkdam          3  21.00  12900.00  5.97  21.00  12900.00  5.97   

Checkwall  8  20.00  7100.00  6.51  20.00  7100.00  6.51 

Total  0  0  0  0  20  68.30 22300.0

0 28.38  68.30  22300.0

0  28.38  

13  Mithibor 

Checkdam  1  2  250  0.4          2.00  250.00  0.40 irrigation departmen

t Percolation 

Tank          3  1.50  300.00  0.30  1.50  300.00  0.30  Forest dep. 

Checkwall          2  2.00  1600.00  0.40  2.00  1600.00  0.40 NRGA  

panchayt dep. 

well          2  5.00    6.00  5.00  0.00  6.00  NRGA   irrigat dep. 

Checkdam          5  15.00  22200.00  9.95  15.00  22200.00  9.95   

Checkwall          13  26.00  12100.00  9.20  26.00  12100.00  9.20   

Total  1  2  250  0.4  25  49.50 36200.0

0  25.85  51.50  36450.00  26.25   

14  Rinchhvel  Checkdam          1  13.00  1000.00  4.00  13.00  1000.00  4.00 irrigation departmen

Page 71: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 71 

 

Checkwall          3  6.00  2700.00  0.60  6.00  2700.00  0.60 NRGA  

panchayt dep. 

well          4  14.00    7.00  14.00  0.00  7.00  NRGA   irrigat dep. 

Checkdam          2  12.00  10200.00  3.98  12.00  10200.00  3.98   

Checkwall  5  25.00  4200.00  3.72  25.00  4200.00  3.72 

Total  0  0  0  0  15  70.00 18100.0

0 19.30  70.00  18100.0

0  19.30  

15  Dhorkuva 

(iv)check dam  4  6  900  1.5          6.00  900.00  1.50 irrigation departmen

t tank  2  5.00  500.00  0.50  5.00  500.00  0.50  Forest dep. 

(a) Check wall          2  2.30  1700.00  0.40  2.30  1700.00  0.40 NRGA  

panchayt dep. 

(b) well          5  20.00    15.00  20.00  0.00  15.00  NRGA   irrigat dep. 

Checkdam          4  24.00  22500.00  7.96  24.00  22500.00  7.96   

Checkwall  3  6.80  3100.00  1.72  6.80  3100.00  1.72 

Total  4  6  900  1.5  16  58.10 27800.0

0 25.58  64.10  28700.0

0  27.08  

Total  4.2      

407.647    

411.847  

Net Convergence = 411.847 ‐ 193.415 = 218.432 Lakhs Table no 36.1   Technical Details of Earthen Bund: 

Particulars  Value  Units Structure Length  680 mt.Structure Height  1  mt. Upstream Slope  02:01 ‐Downstream Slope  01:01 ‐Bund Top Width  1  mt. Structure Base Width  4  mt. Structure Cross Section  2.5  sqm 

Page 72: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 72 

 

Table no. 36.2   Technical Details of Farm Pond Particulars  Value  Unit 

Pond Length  10  mt. Pond Width  10 mt.Pond Depth  2.5 mt.Side Slope  02:01Table no . 36. 3 Technical Details of Feild/Farm Bund 

Particulars  Value  Units Bund Length Per Ha.  400 mt.Proposed Area(area of farm)  1 Ha.Total Bund Length For Proposed Area  400 mt.Top Width  0.5 mt.Side Slope  01:01Height  0.5 mt.Base Width  1.5 mt.Cross‐Section of Farm bund  0.5 SqM.

Page 73: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 73 

 

Table no. 38: Activities related to livelihoods by Self Help Groups (SHGs) in the project areas  Sr No.  Name of Village  Major Activities of the SHGs 

Name of Activity  No of SHGs involved  Average annual income from activity per SHG 

1.  Mandlva  Fodder Plot 1 Ha. 2 7000Animal helth Camp 4 10000

2.  Ranikheda  Fodder Plot 1 Ha. 3 7000Animal health Camp 4 10000

3.  Limbani  Fodder Plot 1 Ha. 2 7000Animal health Camp 4 10000

4.  Bandibhit  Fodder Plot 1 Ha. 3 7000Animal health Camp 4 10000

5.  Dholisimel  Animal helth Camp 4 10000Foddar Plote 1 Ha. 2 7000

6.  Dungarbhit  Foddar Plote 1 Ha. 3 7000Animal helth Camp 6 10000

7.  Dobachapra  Foddar Plote 1 Ha. 5 7000Animal helth Camp 4 10000

8.  Kevdi  Animal helth Camp 6 10000Foddar Plote 1 Ha. 8 7000

9.  Mithibor  Animal helth Camp 6 10000Foddar Plote 1 Ha. 7 7000

10.  Kakadkund  Animal helth Camp 2 10000Foddar Plote 1 Ha. 3 7000

11.  Marchipani  Animal helth Camp 4 10000Foddar Plote 1 Ha. 2 7000

12.  Rinchhvel  Animal helth Camp 6 10000Fodder Plot 1 Ha. 4 7000

13.  Gadola  Animal helth Camp 4 10000Foddar Plote 1 Ha. 3 7000

14.  Kothara  Animal helth Camp 2 10000Foddar Plote 1 Ha. 1 7000

15.  Dhorkuva  Foddar Plote 1 Ha. 2 7000Animal helth Camp 6 10000

Page 74: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 74 

 

Table no. 39.1 Soil and water conservation activities of watershed works phase – Proposed Target  

S. No. Name of villages 

Gully pluge(R) 

contour bund 

Masonary check wall(D) 

Masonary check dam(D) 

Gabian Structure 

Afforestation 75% 

Live  fencing 25%  Total 

Estimated cost (Rs. In lakhs) (in 

Cmt) (in lakh) 

(in Cmt) 

(in lakh) 

No.of units 

(in lakh) 

No.of units 

(in lakh) 

No.of units 

(in lakh) 

Ha Rs. In Lakh 

Rmt Rs. In Lakh 

1  Mandalva  2000  2.00  0 0.00 8 8.05 3 5.02 0  0.00 3.11 0.59 985.00 0.20 15.8582  Ranikheda  1160  1.16  0 0.00 8 6.51 3 5.97 1200  1.44 3.12 0.59 987.50 0.20 15.8703  Limbani  2000  2.00  0 0.00 7 4.30 2 3.98 0  0.00 2.12 0.40 672.50 0.13 10.8184  Bandibhit  650  0.65  1200 0.75 17 10.68 3 5.97 0  0.00 3.73 0.71 1182.50 0.24 18.9965  Dhorisimal  0  0.00  0 0.00 6 2.48 1 1.99 0  0.00 0.92 0.18 292.50 0.06 4.7046  Dungrabhit  2000  2.00  1200 1.20 28 21.52 6 11.93 300  0.35 7.71 1.46 2440.00 0.49 38.9527  Dobachopra  2000  2.00  0 0.00 5 3.13 3 5.93 0  0.00 2.29 0.44 725.00 0.15 11.6408  Kevadi  3800  3.80  2500 1.70 20 13.40 6 13.93 400  0.45 6.90 1.31 2185.00 0.44 35.0289  Mithibor  2700  2.70  0 0.00 13 9.20 5 9.95 3000  3.60 5.29 1.01 1675.00 0.34 26.79010  Kakadkund  280  0.28  0 0.00 4 1.30 2 3.98 0  0.00 1.14 0.22 360.00 0.07 5.84811  Mirchipani  1400  1.40  0 0.00 16 6.00 3 5.97 0  0.00 2.76 0.53 875.00 0.18 14.07012  Rinchwell  2000  2.00  900 0.90 2 3.72 2 3.98 0  0.00 2.21 0.42 700.00 0.14 11.16013  Gadola  1800  1.80  1200 1.20 8 6.38 2 3.98 300  0.38 2.87 0.54 907.50 0.18 14.46614  Kothara  0  0.00  0 0.00 5 2.40 1 1.99 0  0.00 0.91 0.17 287.50 0.06 4.62015  Dhorkuva  300  0.30  0 0.00 3 1.72 4 7.96 0  0.00 2.08 0.39 657.50 0.13 10.506

Total  22090  22.09  7000  5.75  150  100.79  46  92.53  5200  6.22  47.16  8.96  14932.50  2.99  239.33 Table no 39.2 Agriculture and Aforestation related activites of watershed works phase – Proposed Target 

S.No Name of  Villages 

Nursery Raising 

Vegetable Nursery 

Crop Demonstation 

Plot 

Horticulture Plot 

Fodder/Pasture Development 

Meditation Plot 

Total 

Ha In 

Lakh No 

In Lakh 

No In 

Lakh Ha 

In Lakh 

Ha  In Lakh  Ha In 

Lakh 1   Mandalva  0  0  1 0.6 7 0.87 4 1.25 2 0.14 0.4 0.370 3.2302  Ranikheda  0  0  1 0.6 10 1.25 4 1.25 3 0.21 0.8 0.750 4.0603  Limbani  0  0  1  0.6  8  1  3.2  1  3  0.21  0.8  0.750  3.560 

Page 75: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 75 

 

4  Bandibhit  0  0  1 0.6 5 0.62 2.8 0.87 2 0.14 0 0.000 2.2305  Dhorisimal  0  0  0 0 2 0.25 0.8 0.25 2 0.14 0 0.000 0.6406  Dungrabhit  0.07  1.5  2 1.2 18 2.25 8 2.5 3 0.21 2 1.188 8.8487  Dobachopra  0  0  1 0.6 7 0.87 2.8 0.87 5 0.35 0 0.000 2.6908  Kevadi  0.07  1.5  2 1.2 16 2 8 2.5 8 0.56 1.6 1.500 9.2609  Mithibor  0.07  1.5  2 1.2 14 1.75 6 1.87 7 0.49 0.4 0.375 7.18510  Kakadkund  0  0  0 0 3 0.37 1.6 0.5 3 0.21 0 0.000 1.08011  Mirchipani  0  0  1  0.6  8  1  3.2  1  2  0.14  0  0.000  2.740 12  Rinchwell  0  0  1  0.6  6  0.75  2.4  0.75  4  0.28  0  0.000  2.380 13  Gadola  0  0  1 0.6 8 1 4 1.25 3 0.21 0.4 0.375 3.43514  Kothara  0  0  0 0 4 0.5 1.6 0.5 1 0.07 0 0.000 1.07015  Dhorkuva  0  0  1 0.6 6 0.75 2.4 0.75 2 0.14 0 0.000 2.240

   Total  0.21  4.5  15  9  122  15.2  54.8  17.11  50  3.5  6.4  5.308  54.648 Table no.40: Details of engineering structures in watershed works* S.  No. 

Village name 

Name of structures 

Type of treatment Type of land Executing agency 

Target

(i) Ridge area  (R) 

(ii) Drainage line(D) 

(iii)Land dev. (L) 

(i)Pri‐vate 

(ii) Community 

(iii) Others (pl. 

specify) 

(i) UG (ii)SHG(iii) Others (pl. specify) 

No. of units (No./ cu.m./ rmt) 

Estimated cost (Rs. in lakh) 

Expected month & year of 

completion (mm/yyyy) 

M W O T

1  Mandalva  Gully plug  R  P UG, WC, WDT 

2000CMT 1.2 0.8 2 2013           

check dam     D P C UG, WC, WDT 

3 3.01 2.01 5.02

check wall     D P C UG, WC, WDT 

8 4.83 3.22 8.05

Total     9.04 6.03 15.072  Ranikheda  Gully plug  R  P UG, WC, 

WDT 1160CMT 0.7 0.46 1.16

Gabion structures  R  P UG, WC, WDT 

1200CMT 0.86 0.58 1.44

Page 76: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 76 

 

check dam     D P C UG, WC, WDT 

3 3.58 2.39 5.97 

check wall     D P C UG, WC, WDT 

8 9.91 2.6 6.51

Total     15.05 6.03 15.083  Limbani  Gully plug  R  P UG, WC, 

WDT 2000CMT 1.2 0.8 2

check dam     D C UG, WC, WDT 

2 2.39 1.59 3.98

check wall     D P UG, WC, WDT 

7 2.58 1.72 4.3

Total     6.17 4.11 10.284  Bandibhit  Contour bunding  R  C UG, WC, 

WDT 1200CMT 0.45 0.3 0.75

2013 

Gully plug  R  C UG, WC, WDT 

650CMT 0.36 0.29 0.65

check dam     D P C UG, WC, WDT 

3 3.58 2.39 5.97

check wall     D P C UG, WC, WDT 

17 6.4 4.28 10.68

Total     10.79 7.26 18.055  Dholisimel  check dam     D P UG, WC, 

WDT 1 1.19 0.8 1.99

check wall     D P UG, WC, WDT 

6 1.49 0.99 2.48

Total     2.68 1.79 4.476  Dungarbhit  Contour bunding  R  C UG, WC, 

WDT 1200CMT 0.72 0.48 1.2

Gully plug  R  C UG, WC, WDT 

2000CMT 1.2 0.8 2

Gabion structures  R  C UG, WC, WDT 

300CMT 0.21 0.14 0.35

check dam     D P C UG, WC, WDT 

6 7.16 4.77 11.93

Page 77: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 77 

 

check wall     D P C UG, WC, WDT 

28 12.9 8.62 21.52

Total     22.19 14.81 377  Dobachapra  Gully plug  R  C UG, WC, 

WDT 2000CMT 1.2 0.8 2

                     

2013 

check dam     D P C UG, WC, WDT 

3 3.56 2.37 5.93

check wall     D P C UG, WC, WDT 

5 1.88 1.25 3.13

Total     6.64 4.42 11.068  K  Contour bunding  R  C UG, WC, 

WDT 2500CMT 1.02 0.68 1.7

Gully plug  R  C UG, WC, WDT 

3800cmt 2.28 1.52 3.8

Gabion structures  R  C UG, WC, WDT 

1 0.27 0.18 0.45

check dam     D P C UG, WC, WDT 

6 8.36 5.57 13.93

check wall     D P C UG, WC, WDT 

20 8.04 5.36 13.4

Total     19.97 13.31 33.289  Mithibor  Gully plug     R C UG, WC, 

WDT 2700CMT 1.62 1.08 2.7

Gabion structures     D C UG, WC, WDT 

3000cmt 2.16 1.44 3.6

check dam     D P C UG, WC, WDT 

5 5.97 3.98 9.95

check wall     D P C UG, WC, WDT 

13 5.52 3.68 9.2

Total     15.27 10.18 25.4510  Kakadkund  Gully plug  R  P UG, WC, 

WDT 280CMT 0.17 0.11 0.28

Page 78: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 78 

 

check dam     D P UG, WC, WDT 

2 2.39 1.59 3.98

check wall     D P UG, WC, WDT 

4 0.78 0.52 1.3

Total     3.33 2.22 5.5511  Marchipani  Gully plug  R  P UG, WC, 

WDT 1400CMT 0.84 0.56 1.4

check dame     D C UG, WC, WDT 

3 3.58 2.39 5.97

check wall     D P UG, WC, WDT 

16 3.6 2.4 6

Total     8.02 5.35 13.3712  Rinchhvel  Contour bunding     R C 900cmt 0.54 0.36 0.9

Gully plug  R  C UG, WC, WDT 

2000CMT 1.2 0.8 2

2012 

check dam     D P C UG, WC, WDT 

2 2.38 1.6 3.98

check wall     D P C UG, WC, WDT 

5 2.23 1.49 3.72

Total     6.35 4.25 10.613  Gadola  Contour bunding  R  C UG, WC, 

WDT 1200cmt 0.72 0.48 1.2

Gully plug  R  C UG, WC, WDT 

1800cmt 1.08 0.72 1.8

Gabion structures  R  C UG, WC, WDT 

300CMT 0.23 0.15 0.38

check dam     D C UG, WC, WDT 

2 2.39 1.59 3.98

check wall     D P UG, WC, WDT 

8 3.83 2.55 6.38

Total     8.25 5.49 13.7414  Kothara  check dam     D P UG, WC, 

WDT 1 1.19 0.8 1.99

Page 79: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 79 

 

check wall     D P C UG, WC, WDT 

5 1.44 0.96 2.4

Total     2.63 1.76 4.3915  Dhorkuva  Gully plug     R C UG, WC, 

WDT 300CMT 0.18 0.12 0.3

check dam     D P C UG, WC, WDT 

4 4.78 3.18 7.96

check wall     D P C UG, WC, WDT 

3 1.03 0.69 1.72

Total     5.99 3.99 9.98   Total    216.3

Table no.41: Details of activities connected with vegetative cover in watershed works 

S. No. 

Name of village 

Name of structure/ work 

Type of treatment  Type of land  Executing agency  Target 

(i) Ridge area (R) 

(ii) Drainage line 

(iii) Land dev. (L) 

(i) Private 

(ii) Community 

(iii) Others (pl. 

specify) 

(i) UG,SHG,WC(Pl.specify 

Area (ha)/No. 

No. of plants / rmt 

Estimated cost in lakhs 

Expected month & year of 

completion (mm/ yyyy) 

1  Mandalva 

Afforestation  R     L        F  WC  3.11  1943.75  0.591  Jun/13 Live Fencing     L C F UG, WC 0 985 0.197 Jun/13Fodder/pasture development        L     C     SHG/UG  2  0  0.140  Jun/13 

Nursery raising        L     C     SHG  0  0  0.000  Jun/13 Crop Demonstration plot        L  P        UG  7  0  0.870  Jun/13 Medictional Plot        L  P        UG  0.4  0  0.370  Jun/13 Horticuluture Plant     L C F UG 4 0 1.250 Jun/13

   Total                                3.418    

2  Ranikheda 

Afforestation  R  L F WC 3.73 2331.25 0.591 Jun/13Live Fencing     L C F UG, WC 0 1182.5 0.198 Jun/13Fodder/pasture development        L     C     SHG/UG  2  0  0.140  Jun/13 

Nursery raising     L C SHG 0 0 0.000 Jun/13Crop Demonstration plot     L P UG 10 0 1.250 Jun/13Meditation Plot        L  P        UG  0.8  0  0.750  Jun/13 Horticuluture Plant        L     C  F  UG  4  0  1.250  Jun/13 

   Total                                4.179    

Page 80: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 80 

 

3  Limbani 

Afforestation  R  L F WC 3.12 1950 0.400 Jun/13Live Fencing     L C F UG, WC 987.5 250 0.130 Jun/13Fodder/pasture development        L     C     SHG/UG  2  0  0.140  Jun/13 

Nursery raising     L C SHG 0 0 0.000 Jun/13Crop Demonstration plot     L P UG 8 0 1.000 Jun/13Meditation Plot     L P 0.8 0 0.750 Jun/13Horticuluture Plant     L C F 3.20 0 1.000 Jun/13

   Total                                3.420    

4  Bandibhit 

Afforestation  R     L        F  WC  2.12  1325  0.710  Jun/13 Live Fencing        L     C  F  UG, WC  0  672.5  0.240  Jun/13 Fodder/pasture development        L     C     SHG/UG  1     0.070  Jun/13 

Nursery raising        L     C     SHG  0  0  0.000  Jun/13 Crop Demonstration plot        L  P        UG  5     0.620  Jun/13 Meditation Plot        L  P        UG  0  0  0.000  Jun/13 Horticuluture Plant        L     C  F  UG  2.8  0  0.870  Jun/13 

   Total                                2.510    

5  Dholisimel 

Afforestation  R     L        F  WC  0.92  575  0.176  Jun/13 Live Fencing     L C F UG, WC 0 292.5 0.059 Jun/13Fodder/pasture development        L     C     SHG/UG  0  0  0.000  Jun/13 

Nursery raising        L     C     SHG  0  0  0.000  Jun/13 Crop Demonstration plot        L  P        UG  2     0.250  Jun/13 Meditation Plot     L P UG 0 0 0.000 Jun/13Horticuluture Plant     L C F UG 0.8 0 0.250 Jun/13

   Total                                0.734    

6  Dungarbhit 

Afforestation  R  L F WC 7.71 4818.75 1.464 Jun/13Live Fencing        L     C  F  UG, WC  0  2440  0.488  Jun/13 Fodder/pasture development        L     C     SHG/UG  3     0.210  Jun/13 

Nursery raising     L C SHG 0.07 0 1.500 Jun/13Crop Demonstration plot     L P UG 18 0 2.250 Jun/13Meditation Plot        L  P        UG  2  0  1.188  Jun/13 Horticuluture Plant        L     C  F  UG  8  0  2.500  Jun/13 

   Total                                9.600    

7  Dobachopra 

Afforestation  R     L        F  WC  2.29  1431.25  0.435  Jun/13 Live Fencing        L     C  F  UG, WC  0  725  0.145  Jun/13 Fodder/pasture development        L     C     SHG/UG  2     0.140  Jun/13 

Page 81: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 81 

 

Nursery raising     L C SHG 0 0 0.000 Jun/13Crop Demonstration plot     L P UG 7 0.870 Jun/13Meditation Plot     L P UG 0 0 0.000 Jun/13Horticuluture Plant        L     C  F  UG  2.8  0  0.870  Jun/13 

   Total                                2.460    

8  Kevdi 

Afforestation  R     L        F  WC  6.9  4312.5  1.311  Jun/13 Live Fencing        L     C  F  UG, WC  0  2185  0.437  Jun/13 Fodder/pasture development        L     C     SHG/UG  3     0.210  Jun/13 

Nursery raising        L     C     SHG  0.07  0  1.500  Jun/13 Crop Demonstration plot        L  P        UG  16     2.000  Jun/13 Meditation Plot        L  P        UG  1.6     1.500  Jun/13 Horticuluture Plant        L     C  F  UG  8  0  2.500  Jun/13 

   Total                                9.458    

9  Mithibor 

Afforestation  R  L F WC 5.29 3306.25 1.005 Jun/13Live Fencing     L C F UG, WC 0 1675 0.335 Jun/13Fodder/pasture development        L     C     SHG/UG  2  0  0.140  Jun/13 

Nursery raising        L     C     SHG  0.07  0  1.500  Jun/13 Crop Demonstration plot     L P UG 14 1.750 Jun/13Meditation Plot     L P UG 0.4 0.375 Jun/13Horticuluture Plant     L C F UG 6 0 1.870 Jun/13

   Total                                6.975    

10  Kakadkund 

Afforestation  R     L        F  WC  1.14  712.5  0.216  Jun/13 Live Fencing        L     C  F  UG, WC  0  360  0.072  Jun/13 Fodder/pasture development        L     C     SHG/UG  0     0.000  Jun/13 

Nursery raising     L C SHG 0 0 0.000 Jun/13Crop Demonstration plot        L  P        UG  3     0.370  Jun/13 Meditation Plot        L  P        UG           Jun/13 Horticuluture Plant        L     C  F  UG  1.6  0  0.500  Jun/13 

   Total                                1.158    

11  Mirchipani 

Afforestation  R     L        F  WC  2.76  1725  0.525  Jun/13 Live Fencing        L     C  F  UG, WC  875  0.175  Jun/13 Fodder/pasture development        L     C     SHG/UG  1     0.070  Jun/13 

Nursery raising        L     C     SHG  0  0  0.000  Jun/13 Crop Demonstration plot        L  P        UG  8     1.000  Jun/13 Meditation Plot     L P UG 0.4 0.375 Jun/13Horticuluture Plant     L C F UG 3.2 0 1.000 Jun/13

Page 82: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 82 

 

   Total                                3.145    

12  Rinchwell 

Afforestation  R  L F WC 2.21 1381.25 0.420 Jun/13Live Fencing     L C F UG, WC 700 0.140 Jun/13Fodder/pasture development        L     C     SHG/UG  1     0.070  Jun/13 

Nursery raising     L C SHG 0 0 0.000 Jun/13Crop Demonstration plot     L P UG 6 0.750 Jun/13Meditation Plot        L  P        UG           Jun/13 Horticuluture Plant        L     C  F  UG  2.4  0  0.750  Jun/13 

   Total                                2.130    

13  Gadola 

Afforestation  R     L        F  WC  2.87  1793.75  0.545  Jun/13 Live Fencing        L     C  F  UG, WC  0  907.5  0.182  Jun/13 Fodder/pasture development        L     C     SHG/UG  1     0.070  Jun/13 

Nursery raising        L     C     SHG  0  0  0.000  Jun/13 Crop Demonstration plot        L  P        UG  8     1.000  Jun/13 Meditation Plot     L P UG 0.4 0.375 Jun/13Horticuluture Plant     L C F UG 4 0 1.250 Jun/13

   Total                                3.421    

14  Kothara 

Afforestation  R  L F WC 0.91 568.75 0.173 Jun/13Live Fencing        L     C  F  UG, WC  0  287.5  0.058  Jun/13 Fodder/pasture development        L     C     SHG/UG  1     0.070  Jun/13 

Nursery raising     L C SHG 0 0 0.000 Jun/13Crop Demonstration plot     L P UG 4 0.500 Jun/13Meditation Plot        L  P        UG  0  0  0.000  Jun/13 Horticuluture Plant        L     C  F  UG  1.6  0  0.500  Jun/13 

   Total                                1.300    

15  Dhorkuva 

Afforestation  R     L        F  WC  2.08  1300  0.395  Jun/13 Live Fencing        L     C  F  UG, WC  0  657.5  0.132  Jun/13 Fodder/pasture development        L     C     SHG/UG  1     0.070  Jun/13 

Nursery raising        L     C     SHG  0  0  0.000  Jun/13 Crop Demonstration plot        L  P        UG  6     0.750  Jun/13 Meditation Plot        L  P        UG  0  0  0.000  Jun/13 Horticuluture Plant        L     C  F  UG  2.4  0  0.750  Jun/13 

   Total                                2.096    

 

Page 83: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 83 

 

Table no 40.2.Techincal Specification Graded Bunding Particulars Value Units

Top width of bund  1 mt.Bottom width of Bund  1 mt.Depth above ground level  1 mt.Depth of Foundation  0.2 mt.Cross section of bund  1 sq. mProposed Area  750 ha.Table no 40.3.Techincal Specification  Farm Bund 

Particulars Value UnitsBund Length Per Ha.  400 mt.Proposed Area(area of farm)  1 Ha.Total Bund Length For Proposed Area  400 mt.Top Width  0.5 mt.Side Slope  01:01Height  0.5 mt.Base Width  1.5 mt.Cross‐Section of Farm bund  0.5 SqM.Table 40.4.Techincal specification Masonary Checkwall S.no  Particular  No. Length Width H/D/T Quantity Unit Rate Amount1  Excavation       Body wall  1 16 1.5 1  24   Key wall  2 2 0.6 1  2.4         26.4 Cmt. 55.64 1468.9 2  C. C.  In Foundation and Plinth (B) 1 16 1.5 0.3  7.2      (K) 2 2 0.6 0.3  0.72            7.92 Cmt. 1586.5 12565.1 3  UCR Masonary in Foundation and 

Plinth (B) 1 16 1.5 0.7  16.8   

   (K) 2 2 0.6 0.7  1.68   

Page 84: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 84 

 

   Super Structure (B)  1 16 1.5+0.60/2 1  16.8      (K) 2 2 0.6 1  2.4            37.68 Cmt. 1509.9 56893 4  Coping for CC (1:2:4)                     (B) 1 16 0.6 0.1  0.96      (K) 2 2 0.6 0.1  0.24            1.2 Cmt. 2363.7 2836.44 5  Cement Pointing                              (B) 1 16 1  16      (K) 2 2 0.6  2.4            18.4 Sq. mt. 41.3 784.7          Total 74548.2          Add 2% W.C. 1490.96          76039.1          Say  76000/‐

40.4.1.Corss –Section of Check wall with its side wall Dimensions: 

 

Page 85: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 85 

 

Table no 40.5.Techincal Specification Masonary Checkdam S.no  Particular  No.  Length  Width  H/D/T  Quantity  Unit  Rate  Amount 1  Excavation  Mt. Mt. Mt.    Main Body  1  17  1.5  0.9  22.95             Side Wall  2  6.5  0.6  0.45  3.51             Bucket  1  17  5  0.45  38.25             Key Wall  1  4  0.6  0.45  1.08                1  2  0.6  0.45  0.54                   66.33 Cmt. 68.4 4536.972  Excavation in Soft rock       Main Body  1  17  1.5  0.3  7.65             Side Wall  2  6.5  0.6  0.3  2.34             Bucket  1  17  4  0.25  17             Key Wall  1  4  0.6  0.15  0.36                1 2 0.6 0.15  0.18         27.53 Cmt. 177.2 4878.323  Filling the Foundation       Main Body  1  17  1.5  0.15  3.825             Side Wall  2  6.5  0.6  0.15  1.17             Bucket  1  17  5  0.15  12.75             Key Wall  1  4  0.6  0.15  0.36                1  2  0.6  0.15  0.18                   18.29 Cmt. 1403.4 25661.24  UCR Masonary in  (1) Foundatlion       Main Body  1  17  1.5  0.55  14.025             Side Wall  2  6.5  0.6  0.55  4.29             Bucket  1  17  5  0.3  25.5             Key Wall  1  4  0.6  0.6  1.44                1 2 0.6 0.6  0.72 45.98

Page 86: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 86 

 

         46 Cmt. 1516 69736   (2) Superstructure                            Main Body  1  17  1.05  1.4  24.99             Side Wall  2  2  0.6  0.6  1.44                2  5  0.6  1.05  6.3             Key Wall  2  4  0.6  0.6  2.88                2  2  0.6  0.6  1.44             Toe Wall  1  17  0.6  0.6  6.12  43.17                         44  Cmt.  1516  66704 5  Coping                             Top of the main bodywall  1  17  0.6  0.1  1.02             Toe Wall  1  17  0.6  0.1  1.02             Bucket flooring  1  17  4  0.1  6.8  8.84                         9  Cmt.  1934.4  17409.6 6  Plaster in (1:3)                            Main Body  1  17  1.25     21.25             Body wall slop  1  17  1.74     29.58  50.83                         51  Sq. mt.  70.2  3580.2 7  Cement Pointing (1:3)                            Side wall  4  4  1.05     16.8             Key Wall  1  4  0.6     2.4                1  2  0.6     1.2  20.4                         21  Sq. mt.  40.5  850.5 8  Name Plate (30cm * 30cm)  1           1  No.  434.9  434.9                         Total  193792                         3% Conti.  5813.75                            199605                            199600/‐ 

Page 87: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 87 

 

Table no.41.1: Details of activities connected with vegetative cover in watershed works 

S. No. 

Name of village 

Name of structure/ work 

Type of treatment Type of land Executing agency Target

(i) Ridge area (R) 

(ii) Drainage line 

(iii) Land dev. (L) 

(i) Private

(ii) Community 

(iii) Others (pl. 

specify)

(i) UG,SHG,WC(Pl.specify 

Area (ha)/No.

No. of plants / rmt 

Estimated cost in lakhs 

Expected month & year of 

completion (mm/ yyyy) 

1  Mandalva 

Afforestation  R  L F WC 3.11 1943.75 0.591 Jun/12Live Fencing        L C F UG, WC 0 985 0.197 Jun/12Fodder/pasture development 

   L C SHG/UG 2 0 0.140 Jun/12

Nursery raising     L C SHG 0 0 0.000 Jun/12Crop Demonstration plot 

      L P UG 7 0 0.870 Jun/12

Medictional Plot 

      L P UG 0.4 0 0.370 Jun/12

Horticuluture Plant 

      L C F UG 4 0 1.250 Jun/12

   Total                                3.418    

2  Ranikheda 

Afforestation  R  L F WC 3.73 2331.25 0.710 Jun/12Live Fencing        L C F UG, WC 0 1182.5 0.237 Jun/12Fodder/pasture development 

   L C SHG/UG 2 0 0.140 Jun/12

Nursery raising     L C SHG 0 0 0.000 Jun/12Crop Demonstration plot 

      L P UG 10 0 1.250 Jun/12

Meditation Plot        L P UG 0.8 0 0.750 Jun/12Horticuluture Plant 

      L C F UG 4 0 1.250 Jun/12

   Total                                4.336    

3  Limbani  Afforestation  R  L F WC 3.12 1950 0.593 Jun/12Live Fencing        L C F UG, WC 987.5 250 0.198 Jun/12

Page 88: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 88 

 

Fodder/pasture development 

   L C SHG/UG 2 0 0.140 Jun/12

Nursery raising     L C SHG 0 0 0.000 Jun/12Crop Demonstration plot 

      L P UG 8 0 1.000 Jun/12

Meditation Plot        L P 0.8 0 0.750 Jun/12Horticuluture Plant 

      L C F 3.20 0 1.000 Jun/12

   Total                                3.680    

4  Bandibhit 

Afforestation  R  L F WC 2.12 1325 0.404 Jun/12Live Fencing        L C F UG, WC 0 672.5 0.135 Jun/12Fodder/pasture development 

   L C SHG/UG 1 0.070 Jun/12

Nursery raising     L C SHG 0 0 0.000 Jun/12Crop Demonstration plot 

      L P UG 5 0.620 Jun/12

Meditation Plot        L P UG 0 0 0.000 Jun/12Horticuluture Plant 

      L C F UG 2.8 0 0.870 Jun/12

   Total                                2.098    

5  Dholisimel 

Afforestation  R  L F WC 0.92 575 0.176 Jun/12Live Fencing        L C F UG, WC 0 292.5 0.059 Jun/12Fodder/pasture development 

   L C SHG/UG 0 0 0.000 Jun/12

Nursery raising     L C SHG 0 0 0.000 Jun/12Crop Demonstration plot 

      L P UG 2 0.250 Jun/12

Meditation Plot        L P UG 0 0 0.000 Jun/12Horticuluture Plant 

      L C F UG 0.8 0 0.250 Jun/12

   Total                                0.734    

6  Dungarbhit  Afforestation  R  L F WC 7.71 4818.75 1.464 Jun/12Live Fencing        L C F UG, WC 0 2440 0.488 Jun/12

Page 89: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 89 

 

Fodder/pasture development 

   L C SHG/UG 3 0.210 Jun/12

Nursery raising     L C SHG 0.07 0 1.500 Jun/12Crop Demonstration plot 

      L P UG 18 0 2.250 Jun/12

Meditation Plot        L P UG 2 0 1.188 Jun/12Horticuluture Plant 

      L C F UG 8 0 2.500 Jun/12

   Total                                9.600    

7  Dobachopra 

Afforestation  R  L F WC 2.29 1431.25 0.435 Jun/12Live Fencing        L C F UG, WC 0 725 0.145 Jun/12Fodder/pasture development 

   L C SHG/UG 2 0.140 Jun/12

Nursery raising     L C SHG 0 0 0.000 Jun/12Crop Demonstration plot 

      L P UG 7 0.870 Jun/12

Meditation Plot        L P UG 0 0 0.000 Jun/12Horticuluture Plant 

      L C F UG 2.8 0 0.870 Jun/12

   Total                                2.460    

8  Kevdi 

Afforestation  R  L F WC 6.9 4312.5 1.311 Jun/12Live Fencing        L C F UG, WC 0 2185 0.437 Jun/12Fodder/pasture development 

   L C SHG/UG 3 0.210 Jun/12

Nursery raising     L C SHG 0.07 0 1.500 Jun/12Crop Demonstration plot 

      L P UG 16 2.000 Jun/12

Meditation Plot        L P UG 1.6 1.500 Jun/12Horticuluture Plant 

      L C F UG 8 0 2.500 Jun/12

   Total                                9.458    

9  Mithibor  Afforestation  R  L F WC 5.29 3306.25 1.005 Jun/12Live Fencing        L C F UG, WC 0 1675 0.335 Jun/12

Page 90: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 90 

 

Fodder/pasture development 

   L C SHG/UG 2 0 0.140 Jun/12

Nursery raising     L C SHG 0.07 0 1.500 Jun/12Crop Demonstration plot 

      L P UG 14 1.750 Jun/12

Meditation Plot        L P UG 0.4 0.375 Jun/12Horticuluture Plant 

      L C F UG 6 0 1.870 Jun/12

   Total                                6.975    

10  Kakadkund 

Afforestation  R  L F WC 1.14 712.5 0.216 Jun/12Live Fencing        L C F UG, WC 0 360 0.072 Jun/12Fodder/pasture development 

   L C SHG/UG 0 0.000 Jun/12

Nursery raising     L C SHG 0 0 0.000 Jun/12Crop Demonstration plot 

      L P UG 3 0.370 Jun/12

Meditation Plot        L P UGHorticuluture Plant 

      L C F UG 1.6 0 0.500 Jun/12

   Total                                1.158    

11  Mirchipani 

Afforestation  R  L F WC 2.76 1725 0.525 Jun/12Live Fencing        L C F UG, WC 875 0.175 Jun/12Fodder/pasture development 

   L C SHG/UG 1 0.070 Jun/12

Nursery raising     L C SHG 0 0 0.000 Jun/12Crop Demonstration plot 

      L P UG 8 1.000 Jun/12

Meditation Plot        L P UG 0.4 0.375 Jun/12Horticuluture Plant 

      L C F UG 3.2 0 1.000 Jun/12

   Total                                3.145    

12  Rinchwell  Afforestation  R  L F WC 2.21 1381.25 0.420 Jun/12Live Fencing        L C F UG, WC 700 0.140 Jun/12

Page 91: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 91 

 

Fodder/pasture development 

   L C SHG/UG 1 0.070 Jun/12

Nursery raising     L C SHG 0 0 0.000 Jun/12Crop Demonstration plot 

      L P UG 6 0.750 Jun/12

Meditation Plot        L P UGHorticuluture Plant 

      L C F UG 2.4 0 0.750 Jun/12

   Total                                2.130    

13  Gadola 

Afforestation  R  L F WC 2.87 1793.75 0.545 Jun/12Live Fencing        L C F UG, WC 0 907.5 0.182 Jun/12Fodder/pasture development 

   L C SHG/UG 1 0.070 Jun/12

Nursery raising     L C SHG 0 0 0.000 Jun/12Crop Demonstration plot 

      L P UG 8 1.000 Jun/12

Meditation Plot        L P UG 0.4 0.375 Jun/12Horticuluture Plant 

      L C F UG 4 0 1.250 Jun/12

   Total                                3.421    

14  Kothara 

Afforestation  R  L F WC 0.91 568.75 0.173 Jun/12Live Fencing        L C F UG, WC 0 287.5 0.058 Jun/12Fodder/pasture development 

   L C SHG/UG 1 0.070 Jun/12

Nursery raising     L C SHG 0 0 0.000 Jun/12Crop Demonstration plot 

      L P UG 4 0.500 Jun/12

Meditation Plot        L P UG 0 0 0.000 Jun/12Horticuluture Plant 

      L C F UG 1.6 0 0.500 Jun/12

   Total                                1.300    

15  Dhorkuva  Afforestation  R  L F WC 2.08 1300 0.395 Jun/12Live Fencing        L C F UG, WC 0 657.5 0.132 Jun/12

Page 92: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 92 

 

Fodder/pasture development 

   L C SHG/UG 1 0.070 Jun/12

Nursery raising     L C SHG 0 0 0.000 Jun/12Crop Demonstration plot 

      L P UG 6 0.750 Jun/12

Meditation Plot        L P UG 0 0 0.000 Jun/12Horticuluture Plant 

      L C F UG 2.4 0 0.750 Jun/12

   Total                                2.096    

Table no .41.1 Technical Details of Aforestation Activities/Plantation/Grass seeding: Particulars  Value   Unit 

Crop Name  Plant To Plant Spacing  3 mtRow To Row Spacing  3 mtPit Length  1.5 ftPit Width  1.5 ftPit Depth  1.5 ftNo. of Plants  1111Plantation Area  1 1 HaNo. of Plants Per Ha.  1111 1 HaGap Filling   20% 225Table No. 41.1.1 Cost Estimation For Afforestation Activity (For 1000 Plants) Sr. No. 

Description   No.   Length Width (m.) 

Depth (m.) 

Unit  Quantity  Rate  Amount 

1  Digging of pits for plants in ordinary murum 1000 1.5 ft 1.5 ft 1.5 ft ­  1000 2.00 2000

2  Plants sampling for plantation In Govt. pasture area, sampling not less than 30cm. Height  ­  ­  ­  ­  ­  1000  2  2000 

3  Transportation of plants from nursery to camp site up to 5km 1000 ­  ­  ­  ­  1000 1 10004  Loding and unloding plants   ­  ­  ­  ­  ­  1000 ­  1000

5  Rehandling of plants from camp site up to actual planting site upto 200m.  ­  ­  ­  ­  ­  1000  ­  500 

Page 93: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 93 

 

6  Cost of fertiliser & insecticides incl. application ­  ­  ­  ­  ­  ­  ­  12007  Weeding and Hoeing two times (Twice in year) 1000 ­  ­  ­  ­  1000 3 3000

Table no.42: Details of allied / other activities S. No. 

Name of village 

Name of activity  Type of land  Executing agency 

Target 

(i) Private 

(ii) Community 

(iii) Others (pl. 

specify) 

(i) UG(ii)SHG(iii) Others (pl. specify) 

Estimated cost(Rs. in lakh) 

Expected month & year of completion (mm/yyyy) 

1  Mandalwa 

Production Systems    

      

2013     

(A) Agri­Horticulture    Vegetable  nursery with net house P    UG 0.60Horticulture plot (vadi) ‐1 acre P   UG 1.25Medicinal Plot(Allovera )‐1 acre P   UG 0.375Drip irrigation for 1 vigha land(Vegetable) P   UG 0.52Crop Demonstration/acre P   UG 0.875(B) Dairy Development   Fodder Plot 1 Ha.  P C   UG 0.14Animal health Camp  P   UG 0.40Total    4.160 Micro Enterprise for Assestless   Vermicumpost Unit  P   SHG 2.50Farm implements kits  P   UG 0.60Total    3.100 Grand Total    7.260 

  2  

Ranikheda 

Production Systems          

2013 

(A) Agri­Horticulture   Vegetable  nursery with net house P   UG 0.60Horticulture plot (vadi) ‐1 acre P   UG 1.000Medicinal Plot(Allovera )‐1 acre P   UG 0.75Drip irrigation for 1 vigha land(Vegetable) P   UG 0.26Crop Demonstration/acre P   UG 1.00

Page 94: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 94 

 

(B) Dairy Development      

  

Fodder Plot 1 Ha.  P C   UG 0.21Animal health Camp  P   UG 0.40Total  P   4.220 Micro Enterprise for Assestless   Vermicompost Unit  P   SHG 2.250cattle Feed store/stall  P   SHG 0.50Farm implements kits  P   UG 0.30Total    3.05 Grand Total    7.270 

3  

Limbani  

Production Systems   

2013  

(A) Agri­Horticulture   Vegetable  nursery with net house P   UG 0.60Horticulture plot (vadi) ‐1 acre P   UG 0.875Drip irrigation for 1 vigha land(Vegetable) P   UG 0.26Crop Demonstration/acre P   UG 0.625 (B) Dairy Development   Fodder Plot 1 Ha.  P C   UG 0.14Animal health Camp  P   UG 0.40Total  P   2.900 Micro Enterprise for Assestless     Vermicompost Unit  P   SHG 1.250cattle Feed store/stall  P   SHG 0.50Farm implements kits  P   UG 0.30Total    2.05 

    Grand Total    4.950 

4  

Bandibhit  

Production Systems   

2013   

(A) Agri­Horticulture   Vegetable  nursery with net house P   UG 0.60Horticulture plot (vadi) ‐1 acre P   UG 1.250Medicinal Plot(Allovera )‐1 acre P   UG 0.75Drip irrigation for 1 vigha land(Vegetable) P   UG 0.52

Page 95: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 95 

 

Crop Demonstration/acre P   UG 1.250(B) Dairy Development  P  Fodder Plot 1 Ha.  P C   UG 0.21 Animal health Camp  P   UG 0.40Total    4.98 Micro Enterprise for Assestless   Vermicompost Unit  P   SHG 2.00cattle Feed store/stall  P   SHG 0.50Farm implements kits  P   UG 0.51floor ‐cum‐  Rice Mill  P   SHG 0.75Total    3.760 Grand Total    8.740 

5  

Dholishamel  

Production Systems   

   

2013  

  

(A) Agri­Horticulture   Horticulture plot (vadi) ‐1 acre P   UG 0.25Drip irrigation for 1 vigha land(Vegetable) P   UG 0.26 Crop Demonstration/acre P   UG 0.25(B) Dairy Development   Animal helth Camp  P   UG 0.40Foddar Plote 1 Ha.  P   UG 0.14Total    1.30 Micro Enterprise for Assestless   Vermicompost Unit  P   SHG 0.875Total    0.875 Grand Total    2.175 

6  Dugarbhint 

Production Systems   

2013 

(A) Agri­Horticulture   Vegetable  nursery with net house P   UG 0.120Horticulture plot (vadi) ‐1 acre P   UG 2.500Medicinal Plot(Allovera )‐1 acre P   UG 1.875Drip irrigation for 1 vigha land(Vegetable) P   UG 1.560Crop Demonstration/acre P   UG 2.250(B) Dairy Development   

Page 96: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 96 

 

Foddar Plote 1 Ha.  P C   UG 0.21Animal health Camp  P   UG 0.60Total    10.19  Micro Enterprise for Assestless   Nursery raishing for foresty plant(50000 plants) P   SHG 1.50Vermicompost Unit  P   SHG 3.125Bamboo works(for one SHG) P   SHG 0.71 Flour ‐cum‐ rice mill  P   SHG 0.75Cattle Feed store /stall  P   SHG 1.00Farm implements kits  P   UG 0.60

      Total    7.685     Grand Total    17.880 

7  

Dobachapur   

Production Systems   

2013  

(A) Agri­Horticulture   Vegetable  nursery with net house P   UG 0.60Crop Demonstration/acre P   UG 0.875Horticulture plot (vadi) ‐1 acre P   UG 0.875(B) Dairy Development   Foddar Plote 1 Ha.  P C   UG 0.350 Animal helth Camp  P   UG 0.40Total  P   3.10  Micro Enterprise for Assestless   Flour ‐cum‐ rice mill  P   SHG 0.75Cattle Feed store /stall  P   SHG 0.50Vermicompost Unit  P   SHG 1.00

    Total    2.250     Grand Total    5.350 8  Kevadi  Production Systems   

2013 

(A) Agri­Horticulture   Vegetable  nursery with net house P   UG 1.20Horticulture plot (vadi) ‐1 acre P   UG 2.50Medicinal Plot(Allovera )‐1 acre P   UG 1.50Drip irrigation for 1 vigha land(Vegetable) P   UG 0.78

Page 97: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 97 

 

Crop Demonstration/acre P   UG 2.00(B) Dairy Development   Animal helth Camp  P   UG 0.60Foddar Plote 1 Ha.  P C   UG 0.56Total    9.14 Micro Enterprise for Assestless   Mahuda (doli) processing centre P   SHG 1.250Nursery raishing for foresty plant(50000 plants) P   SHG 1.500Vermicompost Unit  P   SHG 2.500Flour ‐cum‐ rice mill  P   SHG 0.75Cattle Feed store /stall  P   SHG 0.50Farm implements kits  P   UG 0.45

      Total    6.95     Grand Total    16.09 9  Mithibor  Production Systems   

 2013 

(A) Agri­Horticulture   Vegetable  nursery with net house P   UG 1.20Medicinal Plot(Allovera )‐1 acre P   UG 0.375Crop Demonstration/acre P   UG 1.750Drip Irrigation for 1 Vingha Land(Vegetable) P   UG 0.78Horticulture plot (vadi) ‐1 acre P   UG 1.875(B) Dairy Development   Animal helth Camp  P   UG 0.60Foddar Plote 1 Ha.  P C   UG 0.49Total    7.07 Micro Enterprise for Assestless   Nursery raishing for foresty plant(50000 plants) P   SHG 1.500Vermicompost Unit  P   SHG 2.500Flour ‐cum‐ rice mill  P   SHG 0.75Cattle Feed store /stall  P   SHG 0.500Total    SHG 5.250 

      Grand Total    12.320  2013 10  Kakadkund  Production Systems  P  

Page 98: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 98 

 

    (A) Agri­Horticulture  P  Crop Demonstration/acre P   UG 0.375Drip irrigation for 1 vigha land(Vegetable) P   UG 0.26Horticulture plot (vadi) ‐1 acre P   UG 0.50(B) Dairy Development  P  Animal health Camp  P   UG 0.20Foddar Plote 1 Ha.  P C   UG 0.21Total    1.545 Micro Enterprise for Assestless     Vermicompost Unit  P   1.125

    Total    SHG 1.125     Grand Total    2.670 

11  

Marchipani  

Production Systems  P  

      

2013 

(A) Agri­Horticulture  P  Vegetable  nursery with net house P   UG 0.60Crop Demonstration/acre P   UG 1.00Horticulture plot (vadi) ‐1 acre P   UG 1.00Drip irrigation for 1 vigha land(Vegetable) P   UG 0.52 (B) Dairy Development   Animal health Camp  P   UG 0.40Foddar Plote 1 Ha.  P C   UG 0.14Total    3.66 Micro Enterprise for Assestless     Vermicompost Unit  P   SHG 1.250Cattle Feed store /stall  P   SHG 0.50Farm implements kits  P   UG 0.30Flour ‐cum‐ rice mill  P   SHG 0.75

    Total    2.80     Grand Total    6.46 

12  Rinchhvel 

Production Systems   

2013 (A) Agri­Horticulture   Crop Demonstration/acre P   UG 0.75Vegetable  nursery with net house P   UG 0.60

Page 99: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 99 

 

Horticulture plot (vadi) ‐1 acre P   UG 0.75(B) Dairy Development   Animal health Camp  P   UG 0.60Fodder Plot 1 Ha.  P C   UG 0.28Total    2.98 Micro Enterprise for Assestless   Vermicompost Unit  P   SHG 1.375Honey collection and Processing P   SHG 0.767Total    2.142 

      Grand Total    5.122 

13   

Gadola   

Production Systems   

2013  

(A) Agri­Horticulture   Medicinal Plot(Allovera )‐1 acre P   UG 0.375Vegetable  nursery with net house P   UG 0.60Crop Demonstration/acre P   UG 1.00Horticulture plot (vadi) ‐1 acre P   UG 1.250(B) Dairy Development   Animal health Camp  P   UG 0.40Foddar Plote 1 Ha.  P C   UG 0.21Total    3.835 Micro Enterprise for Assestless   Vermicompost Unit  P   SHG 1.750Honey collection and Processing P   SHG 0.767Farm implements kits  P   UG 0.30

    Total    2.187     Grand Total    6.652 

14  Kothara  

Production Systems   

2013 

(A) Agri­Horticulture   Crop Demonstration/acre P   UG 0.50Horticulture plot (vadi) ‐1 acre P   UG 0.50(B) Dairy Development   Animal haelth Camp  P   UG 0.20Foddar Plote 1 Ha.  P C   UG 0.07

Page 100: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 100 

 

Total    1.270 Micro Enterprise for Assestless     Vermicompost Unit  P   SHG 0.875

    Total    8.75     Grand Total    2.145 15   

Dhorkuwa   

Production Systems   

2013   

(A) Agri­Horticulture   Vegetable  nursery with net house P    SHG 0.60Crop Demonstration/acre P    SHG 0.75Horticulture plot (vadi) ‐1 acre P    SHG 0.75(B) Dairy Development    Foddar Plote 1 Ha.  P C    UG 0.14Animal heath Camp  P    UG 0.60Total     2.84 Micro Enterprise for Assestless   Vermicompost Unit  P    SHG 1.250Honey collection and Processing P    SHG 0.767

    Total    2.01     Grand Total    4.857  

 

   No. of adult animals           No. of calves 

TotalNo. of Cattle to be catered by one fodder bank. 

   236                                  27                                     263 

Fodder requirement per day (10kg dry fodder for adult and 5 kg for calf).  3540 Kg 

Fodder requirement for 180 days.  6372 quintal 

 Fodder available from lands/farms/pasture land (60%) 

 3823 quintal 

Page 101: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 101 

 

Production System –I Vermicompost Unit: Wastes  are  nothing  but misplaced  resources.  A  large  volume  of  organic matter  is  generated  from  agricultural  activities,  in  dairy  farms  and animal wastes which are usually dumped in corners where it putrefies, usually emanating foul smell. This valuable resource can be utilised by properly composting it into a value‐added end product called manure. The chief objective is to compost organic wastes not for the disposal of solid organic wastes but also to produce superior quality manure to feed our “nutrient/organic matter hungry” soils. Organic wastes can be broken down and fragmented rapidly by earthworms within short period of time. Vermicompost considerable enhances the soil fertility of and N,P,K are totally available to the plants. The water holding capacity of the soil  is increased and also help in binding the soil particles together. It should be realized that vermicomposting can be a useful cottage industry for the underprivileged and the economically weak  as  it  can  provide  them  with  a  supplementary  income.  If  every  village  can  formulate  a  cooperative  society  or  SHG’s  of  unemployed youth/women group,  it could be a wise venture  for  them to produce vermicompost and sell  it back to the village or  firm at a recommended price. The youth will not only earn money, but also aid society by providing excellent quality organic manure for sustainable agro‐practices. This is one of the simplest process where 5 mt.(length) * 1.5 mt (width) beds with 0.5 depth are made on the ground and in the backyard and is filled by 3 month old manure and worms are introduced @ 1/2 kg/ sq.ft. These worms voraciously feed on the manure turning it to granulated compost with 45 day period of time.  Hence yearly 8 cycles can be taken within 1 year of time. The proposed model is ideally suitably for the individual beneficiary.  Components of Vermicompost Unit:  About Worm Species: Non­Borrowing Eisenia fetida, Eudrilus eugeniae is the scientific name of the worms commonly found in Indian soil. They are non‐ borrowing and surface feeders and go maximum up to a depth of 1‐ 1.5 mts. Feeds on decomposing organic matter and well decomposed manure. They are voracious feeders and survive in most of the stressed conditions. Shade Net/ Green Net: A net with 90% shade with steel pipes of 72 running ft for supporting the shade net is recommended and suitable for the construction of a ideal vermicompost unit. The main purpose of shade net is to minimize the sunlight to maximum possible extend and allow only that amount which is essential for keeping worm alive and maintaining a warmer vicinity. Tools and Implements:  Some tools and  implements are required a crowbar,  spade,  rose can  for watering and sieve  for sieving  the vermicompost  for separating  the compost without injury to the earth worms when the compost is ready for packing and storing. Vermi­Composting Beds: 

Page 102: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 102 

 

Customized beds were prepared based upon areas requirement and availability of the manure and raw material. The dimension of bed for this specific  area  are  as  follows 5mt  length  *1.5 width  * 0.5 mt depth.  These  types  of  beds  are  feasible  and  require  less  space  and  are  good example of the small scale commercial unit for a individual beneficiary at village level Land and worms requirement:  Area of 502 meter is need to cover two bed of above mentioned dimensions. The beds are made up of bricks at sides and bottom to maintain the proper  structure  and  depth  to  ensure  viable  structure  for  long  period  of  time. Worms  are  introduced @  250 worms  for meter  2.  This  the optimum population for this bed of this dimension to ensure proper multiplication of worms and composting in desired period of time.. Proposed Model of 2 bed Dimension (5mt *1.5mt*0.5mt): A. Intial Investment for Vermi­compost Unit: S.no  Particulars Units Unit Price Amount1  Vermiculture (Eisenia fetida)  15 kg Rs. 300/kg 45002  Shade net/ Green net of 90 % shade 54 sq.mt Rs. 30/mt 16203  Steel pipes galvanized for supporting the shed 100 ft Rs. 25/sq.ft 25004  Fencing   18 mts Rs. 50/mt 9005  Labour charges of installation of shed and shade net ‐  ‐ 5006  Labour charges for preparation of vermin‐beds ‐  ‐ 4007  Expenditure for the transport of material ‐  ‐ 4008  Expenditure of bricks for construction of vermi‐beds 200  Rs 3.00 6009  Spade and  basket   ‐  ‐ 20010  Nuts bolts and other accessories for fixing the shed ‐  ‐ 30011  Rose can for water the vermin‐beds ‐  ‐ 25012  Sieve with wooden frame  ‐  ‐ 250  Total    12420 

B. Returns from Vermicompost Unit: 1. One cycle production per cycle(45 days) is 650 kg * Rs. 3/kg = Rs.1950 8 cycles/Year 156002. Sale of worms 1 kg /cycle  * 8 cycle Rs. 50/kg 4003. Gross profit    16000 4. Net profit ( Gross profit 16000 –12420 vermicompost Unit cost)    3580 

Break Even Point= Total Fixed Cost (or, Investment) / Unit Margin =12420/  

Page 103: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 103 

 

Production System­II Introduction: Rural economy  is mainly based upon the agriculture, agriculture growth on  the other hand  is decelerated at macro  level with un‐ profitable remuneration, crop failure with adverse climatic condition coupled with falling real prices of farm products, and contributing population from agriculture  to  non­agricultural  sector.  Added  to  these  problems  is  the  problem  of  depleting  and  degrading  natural  base  for  farming, threatening the very livelihood security of a majority of subsistence farmers. The farming industry is getting un‐remunerative, the failures of identifying  right growth priorities within  farming  sector, have  culminated  in  farmer’s distress. At  this  juncture horticultural crops  are new hope in providing economic security and further growth.  The production and consumption of horticultural products could play a key role in providing nutrition and health security to  the people and especially  on  the  income  of  farmers.  Further,  given  the  high  degree  of  agricultural  development  segmentation  with  a  small  percentage  of commercial  farmers  and  a  great  majority  of  subsistence  farmers,  horticultural  development  could  provide  an  opportunity  to  bring  the subsistence and bypass  farmers  into  the development orbit;  if  the appropriate  technologies are  identified and  implemented. Horticultural crops  can  augment  employment‐income  generation  to  ensure  livelihood  security  of  the  subsistence  farmers without  further  depleting  and degrading the natural resource base for achieving livelihood security and increased economic growth,  Production Details of Fruit Crops:  Table­1 S.no  Name of Fruit Crop  Plants 

per acre Specing  Production details every years (plants / kg) 

1  2  3  4  5  6  7  8  9  10 

1 Kesar Mango  40 10 X 10 MT. ‐ ‐ ‐ 5  15 15 25 40 60 95Rajapuri Mango  40 10 X 10 MT. ‐ ‐ ‐ 15  20 25 35 60 80 120Langdo Mango  40 10 X 10 MT. ‐ ‐ ‐ 7  15 30 35 45 75 100

2  Sapota (Kalipati)  40 10 X 10 MT. ‐ ‐ ‐ 20  35 45 75 100 120 1403  Guava  110 6 x 6 MT. ‐ ‐ 10 25  45 80 110 125 135 1504  Custard Apple (Balanagari)  80 5 X 5 MT. ‐ ‐ ‐ 5  7 11 13 15 18 205  Ber (Gola / Umaran)  110 6 X 6 MT. ‐ 2 8 35  55 75 100 125 150 1756  Kagadi Lemon  110 6 X 6 MT. ‐ ‐ 10 20  35 45 60 85 120 150

     

Page 104: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 104 

 

Details of Expenditure for Mango plantation: Table­2 Sr No  Particulars  Expenditure in. Rs. 1  40 pits of 3 x 3 x 5 fect  500 2  Grafted mango plants (40) / 70 Rs. Plants 2800 3  Transportation  1200 4  Thorry fencing  800 5  Fertilizer / Insecticides in pits (40) 1500 6  Plantation & after care expenditure 2200 7  Irrigation to plants  3500 

   Total  12500 Production Parameters: Kesar variety of mango yields 15kg per plant of 5 years of times and keeps on increasing as growth proceeds.   

Particulars Year Increase in production 

in Qtl In Rs. 

A  Initial Investment  Rs. 12,000B  Production /year(15kg/40 Plants) 6   C  Gross income/ Year for 600kg @( Rs.3500/100kg) 6*3500 21000

Net Income/ Year* (C­A) 5th Year 9000Net Income/ Year* 6th Year =(20*40) 8*3500 28000Net Income/ Year* 7th Year=(25*40) 10*3850 38500Net Income/ Year* 8th Year=(40*40) 16*4235 67760Net Income/ Year* 9th Year=(60*40) 24*4658 111792Net Income/ Year* 10th Year=(95*40) 38*5123 194674

      

Page 105: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 105 

 

Sr. No.   Cost Head   Unit   Unit cost   Total  I   Fixed Cost  a   Digging of pits (3*3*5 ft)  40 Rs. 12.50 Rs. 500b   Granfted Mango Plants  40 Rs. 70 Rs. 2,800c   Transportation cost  40 Rs. 30.00 Rs. 1,200.00d  Throny Fencing  Rs. 800.00e  Fertilizer/ Insecticides in pits  Rs. 1,500.00f  Plantation & after care expenditure 40 Rs. 55.00 Rs. 2,200.00g  Irrigation to plants  Rs. 3,500.00   Total: Fixed Cost   Rs. 12,500 II   Variable Cost (One production cycle)           a   Labour   2000b   Fertilizer/ Insecticides in pits  2000c   Transportation cost  1000d   Packing  500e   Miscellaneous   2500   Total Variable Cost   8000 

Sr. No.   Heads   Unit   Amount / Quantity  1  Total Variable Cost (TVC)   Rs. 80002  Total Production (Q)   Kgs 10003  Average Variable Cost : AVC= (TVC/Q)  8000/1000 84  Average Revenue (AR=Price)   1 kg 38.55  Total Revenue: Total Market Value of the produce (P*Q)  38.5*1000 385006  Unit Margin (P‐AVC)   38.5‐8 30.57  Net profit per cycle (TR‐TVC)   38500‐8000 30500

Break Even Point = Fixed cost  (or, Investment) / Unit Margin           = 12500/30.5=409.5 

Benefit cost ratio (BCR) = Net Benefit/Net cost                = 30500/8000                = 3.8 ((should be greater than 1) 

Page 106: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 106 

 

Production System­III:  Raising of Poultry Birds Poultry  is one of  the  fastest growing segments of  the agricultural  sector  in  India  today. While  the production of agricultural  crops has been rising at a rate of 1.5 to 2 percent per annum, that of eggs and broilers has been rising at a rate of 8 to 10 percent per annum. As a result, India is now the world's fifth largest egg producer and the eighteenth largest producer of broilers. Driving this expansion are a combination of factors ‐ growth in per capita income, a growing urban population and falling real poultry prices. The poultry sector in India has undergone a paradigm shift in structure and operation. A significant feature of India's poultry industry has been its transformation from a mere backyard activity into a major commercial activity in just about four decades. This transformation has involved sizeable  investments  in  breeding,  hatching,  rearing  and  processing.  Farmers  in  India  have moved  from  rearing  non‐descript  birds  to  today rearing hybrids such as is Hyaline, lt is Shaver, ll and in Babcock, lt which ensure faster growth, good livability, excellent feed conversion and high profits  to  the rearers. The  industry has grown  largely due  to  the  initiative of private enterprise, minimal government  intervention, and considerable  indigenous  poultry  genetics  capabilities,  and  considerable  support  from  the  complementary  veterinary  health,  poultry  feed, poultry equipment, and poultry processing sectors.  India  is one of the few countries  in the world that has put  into place a sustained Specific Pathogen Free (SPF) egg production project. Why the term “Home Based Business Opportunity” is the most used term on the Internet today. Because today most people doesn’t want to work for other people anymore, and wanted to have their own home based business instead. Sr. No.   Cost Head   Unit   Unit cost   Total  I   Fixed Cost           

a   Construction of poultry shed (10mt*10mt) 1 13000 13000b   Feeder  2 350 700c   Drinker  2 200 400e   Sub feeders  2 200 400   Total Fixed Cost  14500 

       

Page 107: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 107 

 

 

 

 1.8 kg body weight * 2.0 F.C.R. (Feed convertion ratio) 3.6 kg feed require for 1.8 kg body wright at 40 ­ 42 day period * 15 Rs feed. Cost 55/­ Rs Total Feed Cost  Benefit cost ratio (BCR) = Net Benefit/Net cost                = 14000/10600                = 1.3 ((should be greater than 1)     

II   Variable Cost (One production cycle)           a   Purchase of birds  100 25 2500b   Feed purchase  100 55 5500c   Transportation during procurement 700 700d   Transportation during selling  1000 1000e   Vaccination & Medication (Twice in cycle) 400 400f  Electricity charges  500 500   Total Variable Cost   10600 

Sr. No.   Heads   Unit   Amount / Quantity  1  Total Variable Cost (TVC)   Rs  106002  Total Production (Q)   Kgs  1403  Average Variable Cost : AVC= (TVC/Q)     68.54  Average Revenue (AR=Price)  1 kg  1005  Total Revenue: Total Market Value of the produce (P*Q)  (100*140) 140006  Unit Margin (P‐AVC)   (100‐68.5) 31.57  Net profit per cycle (TR‐TVC)  (14000‐10600) 3400

Page 108: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 108 

 

Production System­IV Introduction: Jetpurpavi villages of (IWMP‐1) are located in jetpurpavi Taluka Vadodara District of Gujarat state. IWMP‐1 consists of 10 villages and a area around 4353.8 ha is taken into the project as per the priority  for treatment. These clusters of village consist of forest area from thin to thick cover. 98% of the population in this area is tribal and hence agriculture, animal husbandry and other allied activities are still carried in very traditional manner. There  is huge gap between average and actual yield  in this area. Hence, Natural resources based livelihood activities are planned by including modern techniques for enhancing productivity this areas. Selected Activity:  Dairy Improvement (Jetpupavi‐1) Livelihood  improvement through dairying seems to be a promising option  in this area as the  livestock population  is  in optimum number for generating good income and forming potential sub‐sector in these villages. Check list: 

1. There is huge number of livestock population in this cluster of villages however; the average productivity potential is very low as per the details given in table 1. Hence after a close study it was decided that by suitable intervention and required support, productivity can be maximized in this area, thereby increasing the average income of the stake holder. 

Table: 1  S.No   Livestock (Cow, buffalo, etc)  No. of cattle  No. of productive cattle  Milk productivity (liters/cattle/day) 1  Buffalo   2360 486  3.52  Cow   2230 545  2.53  Bullock   2408  275  ‐  4  Goat   2476 20  0.55  Sheep   ‐ 3  06  Hen   1706  ‐   ‐  

 i. Increasing the productivity: 

Due  to  continuous  inbreeding  the  progeny  produced  is  of  same  indigenous  breed  which  leads  to  low milk  productivity.  However,  to  counter act this issues a tie‐up with local NGO(JK Trust) and District Milk Union working towards dairy development which provides services  such  as  “Artificial  insemination”  and  animal  health  care    are  being  linked  up  to  villages  of  watershed  for  replacement  of indigenous breeds. With the time, improved breeds will ensure the higher productivity of milk in the project area.  

Page 109: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 109 

 

ii. Reduce Cost of Production: Cost of production is mainly increased due to fodder and concentrates which are partially available from forest area and farmers own field which is  insufficient for entire year. To reduce the cost of production, concentrates along with fodder plots are provided to users group for growing of fodder in their own field which will be sufficient for whole year. 

iii. Price realization will be improved by setting up milk collection cum milk grading centre for remuneration as per the fat percentage of milk. Grading centre equipment – 1Computer, 1 Dot‐ Matrix printer, Centrifugal machine for  fat testing. 

iv. Reducing production Risk: Continuous  support  for  breeding  from NGO  (JK  trust) and District Milk Union/Govt bodies  for Artificial  Insemination will  ensure improved breeds. Feeding risk is being covered by providing fodder plots and concentrates to the user groups ensuring fodder security. Health risk is covered by regular animal health camps‐ de‐worming and preventive health care is provided.  Production risk is minimized by above intervention and marketing risk is minimized by linking to District milk collection center. In all the cases agreements are being made between the primary producers and procuring agency. 

V.  Peoples Institutions Primary level co‐operatives/ Users groups are formed at village level for carrying these activities in collective manner.  

Vi.  Capacity building requirements Training of farmer/Individual creating awareness regarding preventive health care and animal management through various institutes like KVK, Animal husbandry department and sadguru foundation. 

Vii  Credit Linkage: Credit linkages with Bank and Gujarat State Tribal Development Corporation through TASP. 

Viii  Convergence with other programmes: Convergence with District Milk Union, JK trust Program, Animal husbandry department for required technical support and Agriculture department for latest fodder varieties.        

Page 110: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 110 

 

S.N.  Fodder Name   Variety  Seed Rate (Kg/Ha.)  Torduction (Qtl/Ha.) 

1  Jowar  S‐1049(Sundhiya), C‐10.2(Chasatiyo), GFS‐3/4/5  For Improved 60 & For Hybrid 30 

350‐400

2  Maize  Africal Tall, Ganga Safed‐2, Ganga‐5, Vikram Farm Sameri, GM‐1/2/3 

60  In Monsoon 300‐400, In Winter & Summer 400‐500 

3  Gajraj Grass  NB‐21, CO‐1, APBN‐1 27777, 12345, 10000 Cuttings First Year: 1500‐2000, Second Year: 1500, Third Year: 1000 

4  Anjan/Dhaman Grass 

IGFRI‐1, Pusailo Anjan, Co‐1 2 to 3  In Gauchar 150‐200, In case of Irrigated 400‐500 

IX  Natural Resource Requirement: Particulars  Private Panchayat Government

Land  Private  Water   Private  Biomass  Private   ForestX. Total Beneficiaries under dairy development program.   

Sr No.  Village Marginal and small Farmer 

Total  %of marginal Farmers Fodder Plots  Health Camps 1  Amabazati  3 75 78 11.62  Bhindol  8 75 83 7.23  Bandli  5 75 80 13.14  Bortha  2 75 77 5.55  Degla  2 80 82 17.86  Naniamrol  10 75 85 13.87  Karsan  20 75 95 4.88  Rajpur(k)  10 90 100 8.59  Saloj  15 75 90 6.910  Zab(Sajva)  15 75 90 7.4

   Total  90  770  860  9.7 On an average 9.7 % marginal and small farmers will be covered of the total cluster. 

*Note: Beneficiaries % is calculated against total demographic population of each village. 

Page 111: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 111 

 

Production System – V Project title:   Cultivation of alovera plants in 1 acre of land as part of production system in selected villages. This idea is mainly borrowed from Van Bandhu  Kalyan Yojana of Chief Minister’s Ten Point Programme. Objectives: The major objective of the above project is as under. 

1.  To identify the lands of Tribal/B.P.L Farmer. 2. To prepare a site map of individual plots. 3. To generate and interest among the local population to cultivate herbs of medicinal important in those fileds. 4. To extend necessary technical‐know how for growing medicinal herbs in a cost effective manners. 5. To find out the suitable buyers for the produce and act as a liaison body between the seller and the buyer, protecting interest of the 

seller. Criteria for Crop demonstration in production systems: a. Owned land minimum 1 acre. b. Irrigation facility in summer c. Farmer should be progressive and willingness to adapt new technology. d. Self motivated and interested in the field activity. Methodology Each of the individual plots will be assigned a particular WDT agriculture member agro climatic condition of each plot will be recorded and necessary measures will be taken to maintain the optimum level of soil condition suitable for the growth of the herbs.  Technical assistance from the expert will be taken to choose the plant species to be grown inn a particular field depending upon the agro climatic condition of that particular field.  Arrangement for the supply of seeds/saplings etc will be made and all effort will be made to keep the herbs free from infection.    After  harvest  herbs will  be  sold  at  the  prevailing  market  price  and  hers  benefits will  be  passed  on  to  cultivators.    The most important aspect of this project will be that for the growth of the plants no chemical fertilizer will be used rather plants will be grown under the strict principle of “ORGANIC FARMING” so as maintain the best quality of the crude drugs. NOTE: This project  is purely based on backward and forward linkages  for procurement of raw material  till selling and all other technical guidance will be provided through the  Navjeevan Trust. This trust is having M.O.U with Nutan Ayurvedic Research Center for purchase all Aloe Vera plants cultivated by trust in Gujarat. (A) COST BENEFIT ANALYSIS:       For one acre of land one type of crop with probable variation of 10 % when The crop is changed. S.no  Particulars for one year of cultivation  Cost in Rs. 1  Preparation of Land (Ploughing, weeding composting etc.)  10000 

Page 112: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 112 

 

2  Seeds/sapling of  alovara plants and related.  17500 3  Misc  1000 4  Water  1500 5  Consultation Fee  2500 6  Transportation Expenses  5000 7  Total (Per acre per crop)  37500 

(B) PROFIT :  (Calculated for one crop per acre) S.no  Particulars  In Rs. 

1   5000 baby plants planted in a acre of land will produce about 20,000 sapling. Each sapling will be sell @ Rs. 1  so the net profit from the sell sapling will be   20000 

2  Fully mature plants will be purchased @ Rs. 1/kg. Estimated biomass of Aloe Vera in a acre  of land will be 15 kg ( individual wt) X 5000  75000 

3  Gross profit  950004  Net profit (A­B)  57500 

*Note: Good treatment can give one plant weight up to 35 to 40 kgs. Production System: VI Mahua (doli) processing centre: Madhuca longifolia, commonly known as mahwa or mahua, is an Indian tropical tree found largely in the central and north Indian plains and forests. It is a fast‐growing tree that grows to approximately 20 meters in height, possesses evergreen or semi‐evergreen foliage, and belongs to the family Sapotaceae. It is cultivated in warm and humid regions for its oleaginous seeds (producing between 20 and 200 kg of seeds annually per tree, depending on maturity), flowers and wood. The fat (solid at ambient temperature) is used for the care of the skin, to manufacture soap or detergents, and as a vegetable butter.  It can also be used as a fuel oil. The seed cakes obtained after extraction of oil constitute very good fertilizer. It is considered holy by many tribal communities because of its usefulness. Sr. No.   Cost Head   Unit   Unit cost   Total  

I   Fixed Cost           a   Mahuda oil extraction machine   1  60,000 60,000b   Machine motor   1  25,000 25,000c   Three phase light connection      25,000   Total: Fixed Cost         1,10,000 II   Variable Cost (One production cycle)          

Page 113: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 113 

 

a   Light bill   4 month  10000b   Oil expenditure   4 month 2500c   Miscellaneous      2,500   Total Variable Cost      15,000

 Sr. No.   Heads   Unit   Amount / Quantity  

1  Total Variable Cost (TVC)   4 month  15,000

2  Total Production (Q)   4 month  40,000 Kg 

3  Average Variable Cost : AVC= (TVC/Q)  2.6 rs/kg 

4  Average Revenue (AR=Price)   5 Rs./Kg 

5  Total Revenue: Total Market Value of the produce (P*Q)  Rs 20,0000 

6  Unit Margin (P‐AVC)   2.4

7  Net profit per cycle (TR‐TVC)   185000

 • Break Even Point=  45833.3Total Fixed Cost (or, Investment) / Unit Margin 

• Benefit Cost Ratio (BCR)= Net Benefit / Net Cost  = 185000/125000= 1.4  

– should be greater than 1  

 

 

 

 

 

 

Page 114: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 114 

 

Production System VII :  Net House Famring: Net Houses cultivation has been experiencing accelerated growth in recent years. Because of the substantial financial investment involved in the building and maintenance of Net Houses’, they are largely used for high added value crops. Net Houses development is particularly suited to the small family farm where there are constraints on available land and water. An average of 300 tons of tomatoes is grown per hectare per season, four times that harvested  in open fields.  In addition, plastic Net Houses structures have recently come into use  for housing  livestock, mainly chicken and fish.Net houses are mainly used  for growing flowers, vegetables, ornamental plants and spices. Recently experiments have been conducted to investigate the feasibility of Net Houses‐grown fruit trees such as nectarines, peaches, loquats, grapes and bananas for commercial purposes, mainly for export. In  our  project  villages  there  is  vast  potential  for  growing  horticulture  and  floriculture  crops which  have  high  commercial  value  and  profit margins are equally with short term returns on investments. A model  of  capsicum  farming  in  net  house  is  designed  in  small  area  to  reap  the  benefits  to  the  best  from  improvised  farming techniques.  

S.no   Cost Head   Unit   Unit Quanity  Unit cost   Total  

I   Fixed Cost               i  Civil Works                Excavation for net‐house coloumn (1:2:4) ordinary Cement 

Concrere of curing etc. Size: 9''*9''*1'‐6''  No.  17  225.00  3825.00 

ii  STRUCTURE WORK  0   G.I.ISI ''B'' CLASS PIPE 32 mm  Rmt.  102 225.00 22950.00   G.I.ISI ''B'' CLASS PIPE 25 mm  Rmt.  54 168.00 9072.00   G.I.ISI ''B'' CLASS PIPE 20 mm  Rmt.  30 118.00 3540.00   90 % Shade Agro net  Sq. Mt.  300 32.00 9600.00   Ropes  Rmt.  200 2.50 500.00iii  Fitting Charges  L/S  1 6849.3 6849.30   Misting System for net house without Ele. motor Nos.  ‐ ‐ 0   Plumbing Materials for connecting motor to irrigation system Nos.  ‐ ‐ 0iv  Taxes @ 5%  L/S  1 2816.82 2816.82   Total           59153.12 

Page 115: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 115 

 

  II   Variable Cost (One production cycle)  

Units  Unit cost  Total 

a   Seedlings  400.No 5 2000b   Land preparation  108.Sqmt 200c   Feritlizer & Pesticide  2000d   Packing Material  500e   Transportation  2500   Total Variable Cost         7200 

 Sr. No.   Heads   Unit   Amount / Quantity  1  Total Variable Cost (TVC)      72002  Total Production (Q)   kgs 10803  Average Variable Cost : AVC= (TVC/Q)     6.64  Average Revenue (AR=Price)     255  Total Revenue: Total Market Value of the produce (P*Q)     270006  Unit Margin (P‐AVC)      18.47  Net profit per cycle (TR‐TVC)     19800 

Break Even Point= Total Fixed Cost (or, Investment) / Unit Margin    =59153/18.4=3214.8 Benefit Cost Ratio (BCR)= Net Benefit / Net Cost   = 19800/7200= 2.75 4.4. Capacity Building: 

Capacity Building is the process of assisting the group or individuals to identify and address  issues and gain the insights, knowledge and experience needed to solve problems and implement change. There is a realization in the development sector that there is a need to appraise the success of development interventions by going beyond the conventional development targets and measures of success (e.g.  in the form of commodities, goods and services) to take into account improvements to human potential. Capacity building of stakeholders  is also  increasingly viewed as an  important factor  in developmental projects that involve participation of stakeholders at all levels for effective implementation of projects. Scope of capacity building at ProjectVillage(Chottaudepur 1­G) 

• Alternative Land Use Plan 

Page 116: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 116 

 

• Scientific technique of Soil and Moisture conservation  • Improved and Scientific agriculture practices • Fodder development and Management • Afforestation  • Organic Farming • Meteorological Information • Dairy Development and Management • Income Generation Activities 

o Stiching Machines o  Making leaf plates o Flour Mills o Centering material o Tent House o Vermicomposting 

Table no. 44: Capacity Building Institution:  #  Central govt. Dept./ State govt. Dept./ Autonomous Body/ Research Institutes/ Universities/ Others (pl. specify) $    Capacity  Building/  Agriculture/  Horticulture/  Animal  Husbandry/  Pisciculture/  Remote  Sensing/  Water  conservation/  Ground  water/ 

Forestry/ livelihoods/ entrepreneurship development/ others (pl. specify) Table no. 44: Capacity Building Institution: S.No  Organisation 

 Training Modules 

 1  Krishi Vigyan Kendra,  At: Gola Gamadi ,Taluko:Sankheda ,Vadodara Training in modern and scientific agriculture practices2  Anand agriculture University, Anand  Training in modern and better agriculture practices3  Sadguru Foundation, Dahod  Community Mobilization, Geology  and Engg structures details 4  BAIF foundation vadodara  SMC works, Livelihood activities and Animal Husbandry development 

Programmes, SHG and federation level training and accounting 

5  ITI Jambugoda,  Microenterprise development activities6  District industrial center,  Mechanical training and support training to stakeholders7  Forest research center, vadodara  Afforestation and Vermicomposting and agro forestry8  SPIPA, Ahmedabad  Participatory approach and Engineering  aspects in watershed9  BISAG  Space application and Different maps preparation

Page 117: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 117 

 

Table no. 45: Capacity Building plan: 

S. No.  State  Project Stakeholders  Total no. of persons 

No. of persons to be trained 

No. of training programmes  Estimated cost 

1  Gujarat 

PIA  4WDTs  5UGs  232SHGs  308WCs  47

Table no.46: Information, education and Communication Activities: 

S. No. 

Particulars  Number/Year Cost per unit 

Executing agency Estimated expenditure 

(Rs.) Outcomes 

1  Street play  20  4500 

PIA and DWDU, Vadodara 

90000 Awareness for the importance of watershed 

project 

2 Campaigning for community mobilisation  4  2500  10000 

3  Pamphlets and posters  20000 3 600004  Banners, Hoardings  20 600 120005  Wall Painting at 3 community places 20 2500 50000

 

Page 118: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 118 

 

      

   CHAPTER – 5 BUDGETING 

    

Page 119: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 119 

 

Budgeting The  first  step  in  budgeting  is  dividing  the  cost  of  the  project  into  various  component  s  as  detailed  in  the  common  guidelines  and  done accordingly in table no. 47. It helps us in further identifying activities under different components and allocate appropriate funds. Table no. 47: Budget at a glance for the project  Budget component  Cost requirement Administrative costs  47.9 Monitoring  4.8 Evaluation  4.8 Entry Point activity  19.1 Institution and Capacity Building  23.9 Detailed Project Report  4.8 Watershed Development Works  239.3 Livelihood activities for asset less  47.9 Production systems and micro‐enterprises  6.2 Consolidation phase  23.9 TOTAL  422.6 Table no. 48: Village wise­ component wise budget available under IWMP Sr.no  Village  Activity     EPA  Institution 

and CB DPR  Watershed 

development Work 

Livelihood for asset less 

Production system and 

Microenterprises 

Consolidation  Total 

1  Mandalva  126864  158580 31716 1585800 9317160  412308 158580 117910082  Ranikhada  126960  158700 31740 1587000 317400  412620 158700 27931203  Limbani  86544  108180 21636 1081800 216360  281268 108180 19039684  Bandibhint  151968  189960 37992 1899600 379920  493896 189960 33432965  Dholisimel  37632  47040 9408 470400 94080  122304 47040 8279046  Dungarbhint  311616  389520 77904 3895200 779040  1012752 389520 68555527  Dobachapura  93120  116400 23280 1164333 232800  302640 116400 20489738  Kevdi  280224  350280 70056 3502800 700560  910728 350280 6164928

Page 120: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 120 

 

9  Mithibor  214320  267900 53580 2679000 535800  696540 267900 471504010  Kakadkund  46704  58380 11676 583800 116760  151788 58380 102748811  Marchipani  112560  140700 28140 1407000 281400  365820 140700 247632012  Rinchhvel  89280  111600 22320 1116000 223200  290160 111600 196416013  Gadola  115728  144660 28932 1446600 289320  376116 144660 254601614  Kothara  36260  46200 9240 462000 92400  120120 46200 81242015  Dhorkuva  84048  105060 21012 1050600 210120  273156 105060 1849056  Total  1914528  2393160  478632  23931600  4786320  6222216  2393160  42119616 Table no. 49: Village wise gap in funds requirement S.no  Village 

Total cost requirement  Total funds available under IWMP Gap in funds requirement 

1  Mandalva  45.22  31.716  13.52  Ranikhada  47.64  31.74  15.93  Limbani  37.62 21.636  15.984  Bandibhint  55.77  37.992  17.785  Dholisimel  17.08 9.408  7.676  Dungarbhint  94.97  77.904  17.077  Dobachapura  47.66  23.28  24.388  Kevdi  95.42  70.056  25.369  Mithibor  60.68  53.58  7.110  Kakadkund  31.05  11.676  19.3711  Marchipani  35.62  28.14  7.4812  Rinchhvel  33.92  22.32  11.613  Gadola  45.59  28.932  16.6614  Kothara  22.80  9.24  13.5615  Dhorkuva  38.41  21.012  17.4 

   Total  709.44  478.632  230.81    

Page 121: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 121 

 

 Table no.50: Details of Convergence of IWMP with other Schemes  

S. No.  Village  Activity to be carried out 

Fund made available to IWMP due to 

convergence (Rs. in lakh) 

Scheme with which convergence took place 

Reference no. of activity/ task/ 

structure in DPR 

Level at which decision for convergence was 

taken 

1  Mandalva Checkdam  4.5 Irrigation department Block LevelWell  9 MGNREGA   irrigat dep. Block LevelTotal  13.5    

2  Ranikhada 

tank  0.5 Forest dep. Block Level(a) Check wall  0.4 MGNREGA  panchayt dep. Block Level(b) well  15 MGNREGA   irrigat dep. Block LevelTotal  15.9    

3  Limbani 

Checkdam  8 Irrigation department Block LevelCheckwall  0.6 MGNREGA  panchayt dep. Block Levelwell  7 MGNREGA   irrigat dep. Block LevelTerrece Talavdi  0.38 Forest dep. Block LevelTotal  15.98    

4  Bandibhint 

Checkdam  1.5 Irrigation department Block LevelPercolation Tank  0.5 Forest dep. Block LevelCheckwall  0.4 MGNREGA  panchayt dep. Block Levelwell  15 MGNREGA   irrigat dep. Block LevelTerrece Talavdi  0.38 Forest dep. Block LevelTotal  17.78    

5  Dholisimel 

Checkdam  0.4 Irrigation department Block LevelPercolation Tank  0.3 Forest dep. Block LevelCheckwall  0.4 MGNREGA  panchayt dep. Block Levelwell  6 MGNREGA   irrigat dep. Block LevelTerrece Talavdi  0.57 Forest dep. Block LevelTotal  7.67    

6  Dungarbhint  Percolation Tank  0.7 Forest dep. Block LevelCheckwall  0.8 MGNREGA  panchayt dep. Block Level

Page 122: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 122 

 

well  15 MGNREGA   irrigat dep. Block LevelTerrece Talavdi  0.57 Forest dep. Block LevelTotal  17.07    

7  Dobachapura 

Checkdam  9.5 Irrigation department Block LevelPercolation Tank  0.3 Forest dep. Block LevelCheckwall  1.2 MGNREGA  panchayt dep. Block Levelwell  13 MGNREGA   irrigat dep. Block LevelTerrece Talavdi  0.38 Forest dep. Block LevelTotal  24.38    

8  Kevdi 

Checkdam  15 Irrigation department Block LevelCheckwall  0.6 MGNREGA  panchayt dep. Block Levelwell  9 MGNREGA   irrigat dep. Block LevelTerrece Talavdi  0.76 Forest dep. Block LevelTotal  25.36    

9  Mithibor 

Checkdam  0.4 Irrigation department Block LevelPercolation Tank  0.3 Forest dep. Block LevelCheckwall  0.4 NRGA  panchayt dep. Block Levelwell  6 NRGA   irrigat dep. Block LevelTotal  7.1    

10  Kakadkund 

Checkdam  4 Irrigation department Block LevelPercolation Tank  0.6 Forest dep. Block LevelCheckwall  1.2 MGNREGA  panchayt dep. Block Levelwell  13 MGNREGA   irrigat dep. Block LevelTerrece Talavdi  0.57 Forest dep. Block LevelTotal  19.37    

11  Marchipani 

Checkdam  0.4 Irrigation department Block LevelPercolation Tank  0.3 Forest dep. Block LevelCheckwall  0.4 MGNREGA  panchayt dep. Block Levelwell  6 MGNREGA   irrigat dep. Block LevelTerrece Talavdi  0.38 Forest dep. Block LevelTotal  7.48    

12  Rinchhvel  Checkdam  4 Irrigation department Block LevelCheckwall  0.6 NRGA  panchayt dep. Block Level

Page 123: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 123 

 

well  7 NRGA   irrigat dep. Block LevelTotal  11.6    

13  Gadola 

Percolation Tank  0.5 Forest dep. Block LevelCheckwall  0.4 MGNREGA  panchayt dep. Block Levelwell  15 MGNREGA   irrigat dep. Block LevelTerrece Talavdi  0.76 Forest dep. Block LevelTotal  16.66    

14  Kothara 

Percolation Tank  0.3 Forest dep. Block LevelCheckwall  3.5 MGNREGA  panchayt dep. Block Levelwell  9 MGNREGA   irrigat dep. Block LevelTerrece Talavdi  0.76 Forest dep. Block LevelTotal  13.56    

15  Dhorkuva 

(iv)check dam  1.5 Irrigation department Block Leveltank  0.5 Forest dep. Block Level(a) Check wall  0.4 NRGA  panchayt dep. Block Level(b) well  15 NRGA   irrigat dep. Block Level

   Total  17.4      

         

Page 124: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 124 

 

     

CHAPTER – 6 EXPECTED OUTCOMES 

Page 125: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 125 

 

Expected Outcomes   Employment One  of  the  prominent  features  of  watershed  program  is  to  create  self  sustainace  to  stake  holder  in  terms  of  livelihood  and  increase  in employment  opprutunities  is  one  of  the  benchmark  that  can  unravel  the  effect  of watershed. Watershed  creates  employment  oppurtunites during  the  work  phase  for  labour  intensive  activities  like  construction  of  gully  plug,  earthen  dam,  Farm  bund,  check  dam,  check wall  and through the assest created under watershed program have a direct impact on agiculuture and natural resource development.  Livelihood for self employed, wage lobour and income generating activities where there is a ample scope for employment. As the net employement increases the percapita income of agriculture, animal husbandry and other allied activites are also sure to increase. Table no. 52: Employment in Project area: 

Sr. NO. 

Names of Villages 

Wage employment Self employmentNo. of mandays No. of beneficiaries No. of beneficiaries

SC  ST  Others Women Total SC ST Others  Women Total SC ST Others Women Total 1  Mandalva  892  25467  0  7640  33999 12  2380 0  1221  3613  4  714  0  566  1084 2  Ranikhada  0  5628  0  1688  7316  0  526  0  270  796  0  157  0  81  238 3  Limbani  0  3873  0 1161 5034 0 362 0 180 543 0 108 0 54 162 4  Bandibhint  478  9224  0 2767 12469 44 862 0 437 1343 14 258 0 131 403 5  Dholisimel  66  10090  0 3027 13183 2 943 0 479 1424 2 282 0 143 427 6  Dungarbhint  791  13108  0 3932 17831 74 1225 0 655 1954 22 367 0 196 585 7  Dobachapura  0  3541  0  1062 4603 0 331 0 155 486 0 99 0 46 145 8  Kevdi  100  11931  0 3579 15610 1 1115 0 563 1679 1 334 0 168 503 9  Mithibor  1133  15740  0 4722 21595 22 1471 0 825 2318 7 441 0 247 695 10  Kakadkund  0  3616  0 778 4394 0 338 0 178 516 0 101 0 53 154 11  Marchipani  0  1284  0 385 1669 0 120 0 61 181 0 36 0 19 55 12  Rinchhvel  0  1754  0 526 2280 0 329 0 164 493 0 98 0 49 147 13  Gadola  0  4515  0 1355 5870 0 422 0 203 625 0 126 0 60 186 14  Kothara  0  6024  0  1807  7831  0  563  0  290  853  0  168  0  87  255 15  Dhorkuva  0  4654  0  1396  6050  0  435  0  226  661  0  130  0  67  197  

Page 126: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 126 

 

Migration Main reason for migration is in search of employment oppurtunities for generating income for oneself and family. These clusters of villages have employment oppurtunities only during kharif season and which leaves them unemployed for both rabi and summer season.  Implementation of watershed activities in these villages will open new avenues for employment in both kharif and Rabi seasons. Water stored in the water harvesting structures will be utilized in the offseason for agriculture purpose and also new technologies like drip irrigation, crop demonstration,  animal  camps,  and  farmers meeting  for  improved  crop  production  practices will  alter  the  farming  pattern  and  create  huge employment oppurtunites in the rural areas. Water stored through the structures will give opportunity for cultivation of farm lands which were left barren past years. Hence the overall impact is there will be decrease in the rate of migration Table no. 53: Details of seasonal migration from Project area  

Sr. No.  Names of villages  No. of persons migrating No. of days per year of migration

    Pre‐project Expected post   Pre‐project Expected post project 

1  Mandalva  846 677 282 2122  Ranikhada  210 168 70 533  Limbani  109 87 36 274  Bandibhint  317 254 106 795  Dholisimel  315 252 105 796  Dungarbhint  464 377 155 1167  Dobachapura  100 80 33 258  Kevdi  454 363 151 1149  Mithibor  564 451 188 14110  Kakadkund  102 82 34 2611  Marchipani  36 29 12 912  Rinchhvel  100 80 33 2513  Gadola  169 135 56 4214  Kothara  227 182 76 5715  Dhorkuva  153 122 51 38

Ground water table: The ground water table of this cluster of villages is appromately 15mt and futher goes down in summer and drought seasons. The single biggest source of  groundwater depletion and  lowering of  the water  table  is  over‐pumping and unchecked ground water utilization. Due  to growing 

Page 127: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 127 

 

population the demand for water for daily acitivies and agriculute has increased. This posses a major pressure on the water table.  The water travels  slowly  through  layers  of soil and  rock  before  finally  reaching  the  water  table.  Several  water  harvesting  structure  are  created  like percolation tanks, roof water harvesting structures, bore well and dug well recharge for recharge of ground water. Hence a strong effort is taken to maintain a balance between usage and recharging of the ground water. Table no. 54: Details of average ground water table depth in the project areas (in meters) 

Sr. No.  Names of Villages  Sources  Pre‐Project level  Expected Increase/decrease(Post‐ Project) 

1  Mandalva  

Open wells  15.00  13.05 Bore wells 15.00  13.05

Others (specify) ‐ ‐

2  Ranikhada  

Open wells 18.04  16.24Bore wells 18.04  16.24

Others (specify) ‐ ‐

3  Limbani  

Open wells 17.50  15.75Bore wells 17.50  15.75

Others (specify) ‐ ‐

4 Bandibhint 

Open wells 15.40  13.86Bore wells 15.40  13.86

Others (specify) ‐ ‐

5  Dholisimel  

Open wells 20.35  18.32Bore wells 20.35  18.32

Others (specify) ‐ ‐

6  Dungarbhint  

Open wells 16.42  14.78Bore wells 16.42  14.78

Others (specify)  ‐  ‐ 

7  Dobachapura Open wells 19.02  17.12Bore wells 19.02  17.12

Others (specify) ‐ ‐

8  Kevdi  

Open wells 18.15  16.34Bore wells 18.15  16.34

Page 128: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 128 

 

Others (specify) ‐ ‐

9  Mithibor  

Open wells 15.00  13.05Bore wells 15.00  13.05

Others (specify) ‐ ‐

10  Kakadkund Open wells 17.10  15.39Bore wells 17.10  15.39

Others (specify) ‐ ‐

11  Marchipani  

Open wells 20.15  18.14Bore wells 20.15  18.14

Others (specify) ‐ ‐

12  Rinchhvel  

Open wells 12.30  11.07Bore wells 12.30  11.07

Others (specify) ‐ ‐

13  Gadola Open wells 14.50  13.05Bore wells 14.50  13.05

Others (specify) ‐ ‐

14  Kothara  

Open wells 14.50  13.05Bore wells 14.50  13.05

Others (specify) ‐ ‐

15  Dhorkuva Open wells 16.25  14.63Bore wells 16.25  14.63

Others (specify) ‐ ‐Drinking water Drinking water is major problem in these villages. People depend upon hand pump and open well for drinking water and travel at 50 ft distance on average to fetch the water. There is no much problem of inherent or ingress salanity in this area. Drinking water is only available for 8 months and only few well in this village are live. The demand for drinking water changes from season to season gets worse in summer. However through intregration of watershed program with other schemes like WASSMO and Mechnical wing for water supply department Vadodara, has been done under the convergence.  Drinkin water problem is likely to slove by this initiative.  Table no. 55: Status of Drinking water  

S. No.  Names of  Availability of drinking water Quality of drinking water

Page 129: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 129 

 

Villages  (no. of months in a year)Pre‐project Expected Post project  Pre‐project Expected Post‐project

1  Mandalva  8 Month             4 month 11 Month 6 month  Medium Good2  Ranikhada  8 Month             4 month 11 Month 6 month  Medium Good3  Limbani  8 Month             4 month 11 Month 6 month  Medium Good4  Bandibhint  8 Month             4 month 11 Month 6 month  Medium Good5  Dholisimel  8 Month             4 month 11 Month 6 month  Medium Good6  Dungarbhint  8 Month             4 month 11 Month 6 month  Medium Good7  Dobachapura  8 Month             4 month 11 Month 6 month  Medium Good8  Kevdi  8 Month             4 month 11 Month 6 month  Medium Good9  Mithibor  8 Month             4 month 11 Month 6 month  Medium Good10  Kakadkund  8 Month             4 month 11 Month 6 month  Medium Good11  Marchipani  8 Month             4 month 11 Month 6 month  Medium Good12  Rinchhvel  8 Month             4 month 11 Month 6 month  Medium Good13  Gadola  8 Month             4 month 11 Month 6 month  Medium Good14  Kothara  8 Month             4 month 11 Month 6 month  Medium Good15  Dhorkuva  8 Month             4 month 11 Month 6 month  Medium Good

Table no. 56: Details of Kharif crop area and yield in the project areas  Sr. no  Name of Village  Name of crops Pre‐project  Expected Post‐project

Area(ha) Average Yield (Qtl) per ha. 

Area(ha) Average Yield per ha (qtl) 

1  Mandalva  Kharif    Maize 65.42 14.2 71.96 17.04Tur 8.2 6  9.02 10.22

Paddy(UI) 68.8 9.7  75.68 77.62Black gram 6.9 6.25 7.59 8.84Ground nut 0 0   0 0Cotton 17.8 11.86 19.58 21.952Rabi  0 0   0 0Maize 26.55 13  29.2 31.8

Page 130: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 130 

 

Tur 0 0   0 0Zaid  0 0   0 0

2  Ranikheda  Name of crops Pre‐project  Expected Post‐projectArea(ha) Average Yield (Qtl) 

per ha. Area(ha) Average Yield per ha 

(qtl) Kharif    Maize 110.68 14.25 121.75 17.1Tur 90.84 5.25 99.92 6.3

Paddy(UI) 365.17 9.25 401.69 11.1Black gram 70.82 6.12 77.9 7.344Ground nut 0 0  0 0Cotton 0 0  0 0Rabi  0 0   0 0Maize 0 0   0 0Zaid  0 0   0 0

3  Limbani  Name of crops Pre‐project  Expected Post‐projectArea(ha) Average Yield (Qtl) 

per ha. Area(ha) Average Yield per ha 

(qtl) Kharif    Maize 16.17 14  17.79 16.8Tur 13.04 5.1  14.34 6.12

Paddy(UI) 25.94 9.5  28.53 11.4Black gram 6.96 6.42 7.66 7.704Ground nut 0 0   0 0Cotton 4.02 11  4.42 13.2Rabi  0 0   0 0Maize 12.11 15.3 13.32 18.36Tur 0 0   0 0Zaid  0 0   0 0

Page 131: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 131 

 

4  Bandibhit  Name of crops Pre‐project  Expected Post‐projectArea(ha) Average Yield (Qtl) 

per ha. Area(ha) Average Yield per ha 

(qtl) Kharif    Maize 47.91 14.2 52.7 17.04Tur 61.48 6  67.63 7.2

Paddy(UI) 52.29 9.7  57.52 11.64Black gram 15.1 6.75 16.61 8.1Ground nut 0 0   0 0Cotton 7.5 10.4 8.25 12.48Rabi  0 0   0 0Maize 26.38 15.75 29.02 18.9Tur 6.26 11  6.88 13.2Zaid  0 0   0 0

5  Dholisamel  Name of crops Pre‐project  Expected Post‐projectArea(ha) Average Yield (Qtl) 

per ha. Area(ha) Average Yield per ha 

(qtl) Kharif    Maize 146.24 14.7 160.86 17.64Tur 83.22 5.6  91.54 6.72

Paddy(UI) 142.52 10.5 156.77 12.6Black gram 76.8 6.21 84.48 7.452Ground nut 0 0   0 0Cotton 0 0   0 0Rabi  0 0   0 0Maize 16 16.15 17.6 19.38Tur 0 0   0 0

Page 132: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 132 

 

Zaid  0 0   0 06  Dungarbhit  Name of crops Pre‐project  Expected Post‐project

Area(ha) Average Yield (Qtl) per ha. 

Area(ha) Average Yield per ha (qtl) 

Kharif    Maize 141.18 14.35 155.3 17.22Tur 51.06 5.1  51.06 5.1

Paddy(UI) 103.74 10  103.74 10Black gram 32.96 6.48 32.96 6.48Ground nut 0 0   0 0Cotton 55.8 11.5 55.8 11.5Rabi     0 0Maize 57.52 16.2 57.52 16.2Tur 0 0   0 0Zaid  

  

7  Dobachapura  Name of crops Pre‐project  Expected Post‐projectArea(ha) Average Yield (Qtl) 

per ha. Area(ha) Average Yield per ha 

(qtl) Kharif    Maize 28.92 13.25 31.81 15.9Tur 6.42 5.2  6.42 5.2

Paddy(UI) 17.58 8.3  17.58 8.3Black gram 5.8 6.15 5.8 6.15Ground nut 0 0   0 0Cotton 0 0   0 0Rabi  0 0   0 0Maize 4.4 14.35 4.4 14.35

Page 133: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 133 

 

Tur 0 0   0 0Zaid    

8  Kevadi  Name of crops Pre‐project  Expected Post‐projectArea(ha) Average Yield (Qtl) 

per ha. Area(ha) Average Yield per ha 

(qtl) Kharif    Maize 88.48 13.85 97.33 16.62Tur 53.76 5.15 59.14 6.18

Paddy(UI) 52.09 8.6  57.3 10.32Black gram 20.76 6.58 22.84 7.896Ground nut 0 0   0 0Cotton 1 10.4 1.1 12.48Rabi  0 0   0 0Maize 1.76 16.1 1.94 19.32Tur 0 0   0 0Zaid    

9  Mithibor  Name of crops Pre‐project  Expected Post‐projectArea(ha) Average Yield (Qtl) 

per ha. Area(ha) Average Yield per ha 

(qtl) Kharif    Maize 117.28 12.2 129.01 14.64Tur 61.82 5.35 68 6.42

Paddy(UI) 34.74 8.15 38.21 9.78Black gram 53.8 6.18 59.18 7.416Ground nut 0 0   0 0Cotton 0 0   0 0Rabi     0 0Maize 7.04 14.15 7.74 16.98

Page 134: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 134 

 

Tur 0 0   0 0Zaid    

10  Kakadkund  Name of crops Pre‐project  Expected Post‐projectArea(ha) Average Yield (Qtl) 

per ha. Area(ha) Average Yield per ha 

(qtl) Kharif    Maize 28.89 11.95 31.78 14.34Tur 15.12 4.4  16.63 5.28

Paddy(UI) 17.48 8.22 19.23 9.864Black gram 9.73 7.25 10.7 8.7Ground nut 0 0   0 0Cotton 0 0   0 0Rabi    Maize 4 14  4.4 16.8Tur 0 0   0 0Zaid    

11  Marchipani  Name of crops Pre‐project  Expected Post‐projectArea(ha) Average Yield (Qtl) 

per ha. Area(ha) Average Yield per ha 

(qtl) Kharif    Maize 11.38 11.45 12.52 13.74Tur 6.4 4.7  7.04 5.64

Paddy(UI) 4.2 8.28 4.62 9.936Black gram 2.9 7.2  3.19 8.64Ground nut 0 0   0 0Cotton 0 0   0 0Rabi    Maize 0 0   0 0

Page 135: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 135 

 

Tur 0 0   0 0Zaid    

12  Rinchhvel  Name of crops Pre‐project  Expected Post‐projectArea(ha) Average Yield (Qtl) 

per ha. Area(ha) Average Yield per ha 

(qtl) Kharif    Maize 31.56 12.82 34.72 15.384Tur 16.3 4.8  17.93 5.76

Paddy(UI) 5.18 8.12 5.7 9.744Black gram 14.62 7.36 16.08 8.832Ground nut 0 0   0 0Cotton 0 0   0 0Rabi     0 0Maize 0.8 13.17 0.88 15.804Tur 0 0   0 0Zaid    

13  Gadola  Name of crops Pre‐project  Expected Post‐project      Area(ha) Average Yield (Qtl) 

per ha. Area(ha) Average Yield per ha 

(qtl)            Kharif          Maize 24.56 11.65 27.02 13.98      Tur 49.33 4.64 54.26 5.568      Paddy(UI) 61.08 7.9  67.19 9.48      Black gram 0 0   0 0      Ground nut 0 0   0 0      Cotton 0 0   0 0      Rabi          Maize 0 0   0 0

Page 136: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 136 

 

      Tur 0 0   0 0      Zaid            14  Kothara  Name of crops Pre‐project  Expected Post‐project

Area(ha) Average Yield (Qtl) per ha. 

Area(ha) Average Yield per ha (qtl) 

Kharif    Maize 57.36 12  63.1 14.4Tur 99.19 4.42 99.19 4.42

Paddy(UI) 47.4 7.78 47.4 7.78Black gram 39.1 7.82 39.1 7.82Ground nut 0 0   0 0Cotton 0 0   0 0Rabi     0 0Maize 1.4 13.28 1.4 13.28Tur 0 0   0 0Zaid    

15  Dhorkuwa  Name of crops Pre‐project  Expected Post‐projectArea(ha) Average Yield (Qtl) 

per ha. Area(ha) Average Yield per ha 

(qtl) Kharif    Maize 29.04 12.6 31.94 15.12Tur 12.4 4.8  12.4 4.8

Paddy(UI) 0.2 7.83 0.2 7.83Black gram 11.8 5.55 11.8 5.55Ground nut 0 0   0 0Cotton 0 0   0 0Rabi     0 0

Page 137: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 137 

 

Maize 0.2 13.5 0.2 13.5Tur 0 0   0 0Zaid    

Agriculture  is being one the most  important component and main occupation of  the people  living  in  these rural areas.   Crop production and agiculture itself  is constraint due to  lack of  irrigation facilities and total dependence of rain has  limited the scope for agriculture. Only kharif season crops are taken in one year. However structures created under watershed opens avenue to take up cropping in rabi season by utilizing the  water stored through check dam, check wall, farm ponds. Feilds bunds are also created to check the run‐off and to promote percolation of rain water. *Note the present data is taken based upon base‐line survey.  The above yield is increased by certain percentage keeping in view the assumption that after  the  intervention of watershed, production and net area under agriculture will  increase. Although the actual condition  is subject  to change based upon rainfall and climatic condition of that current year. Horticulture Table no. 57: Area under horticulture 

Sr. No.  Name of Village  Existing area under horticulture (ha)  Area under horticulture proposed to be covered through IWMP 

1  Mandalva  10.0 22.52  Ranikhada  3.8 15.03  Limbani  3.0 15.64  Bandibhint  3.5 15.45  Dholisimel  8.0 17.26  Dungarbhint  4.0 16.27  Dobachapura  8.0 20.08  Kevdi  10.5 25.49  Mithibor  11.2 25.010  Kakadkund  2.7 12.311  Marchipani  4.0  16.0 12  Rinchhvel  3.7 15.213  Gadola  2.5 11.014  Kothara  3.6 12.015  Dhorkuva  3.0 10.0

Page 138: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 138 

 

Vegetative cover There is negligible area under tree cover. The village has a forest area of 524ha which consists of only Juliflora Prosopis (ganda babool). Trees like Neem and _Alianthus_are seen just here and there, not concentrated in any area.  It is planned that 15 ha land to be covered under new plantation.  Table no. 58:  Forest/vegetative cover S. No.  Name of Village  Existing area under tree cover (ha)  Area under tree cover proposed 1  Mandalva  286.17 1052  Ranikhada  308.77 953  Limbani  345.31 654  Bandibhint  68.60 355  Dholisimel  123.13 706  Dungarbhint  345.31 1157  Dobachapura  322.18 158  Kevdi  848.06 1329  Mithibor  399.87 6210  Kakadkund  90.44 5011  Marchipani  403.23 6812  Rinchhvel  211.75 17013  Gadola  409.93 9014  Kothara  32.88 3015  Dhorkuva  245.33 50

Livestock The village has quite a good of  livestock population. These  include cows, bullocks, buffaloes, goats,  sheep and camels. The  interventions  like provision of  good quality  cows  and buffaloes,  the  establishment of  a  fodder bank and other  such  related activities would  spur  up  the dairy development in the village. It is expected that the post project period would see a substantial increase in livestock population and yield from them. 

  

 

Page 139: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 139 

 

Table no. 59: Details of livestock in the project areas  (for fluids please mention in litres, for solids please mention in kgs. and income in Rs.) 

S. No.  Name of Village  Type of Animal Pre‐Project  Expected Post‐project

No. Yield Income No. Yield Income

1 Mandalwa 

Milch‐animals 3165 733800 12726000 3798 880560 15271200Draught Purpose animals ‐ ‐ ‐ ‐ ‐ ‐Animals for other purpose ‐ ‐ ‐ ‐ ‐ ‐

      Total  3165 733800 12726000 3798 880560 15271200

Ranikheda 

Milch‐animals 340 58425 972000 408 70110 1166400Draught Purpose animals ‐ ‐ ‐ ‐ ‐ ‐Animals for other purpose ‐ ‐ ‐ ‐ ‐ ‐Total  340 58425 972000 408 70110 1166400

3 Libani 

Milch‐animals 263 47205 738000 315.4 56646 885600Draught Purpose animals ‐ ‐ ‐ ‐ ‐ ‐Animals for other purpose ‐ ‐ ‐ ‐ ‐ ‐

      Total  263 47205 738000 315.4 56646 885600

4 Bandibhit 

Milch‐animals 485 262450 2380500 582 314940 2856600Draught Purpose animals ‐ ‐ ‐ ‐ ‐ ‐Animals for other purpose ‐ ‐ ‐ ‐ ‐ ‐

      Total  485 262450 2380500 582 314940 2856600

5 Dhodisamel 

Milch‐animals 2250 210000 3195000 2700 252000 3834000Draught Purpose animals ‐ ‐ ‐ ‐ ‐ ‐Animals for other purpose ‐ ‐ ‐ ‐ ‐ ‐

      Total  2250 210000 3195000 2700 252000 3834000

6 Dugarbhit 

Milch‐animals 863 73260 3560400 1035.6 87912 4272480Draught Purpose animals ‐ ‐ ‐ ‐ ‐ ‐Animals for other purpose ‐ ‐ ‐ ‐ ‐ ‐

      Total  863 73260 3560400 1035.6 87912 4272480

7  Dobachapara  Milch‐animals 255 35100 549000 306 42120 658800Draught Purpose animals ‐ ‐ ‐ ‐ ‐ ‐

Page 140: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 140 

 

Animals for other purpose ‐ ‐ ‐ ‐ ‐ ‐      Total  255 35100 549000 306 42120 658800

8 kewadi 

Milch‐animals 210 80400 1467000 252 96480 1760400Draught Purpose animals ‐ ‐ ‐ ‐ ‐ ‐Animals for other purpose ‐ ‐ ‐ ‐ ‐ ‐

      Total  210  80400  1467000  252  96480  1760400 

9 Mithibor 

Milch‐animals 1850 225750 3420000 2220 2709000 4104000Draught Purpose animals ‐ ‐ ‐ ‐ ‐ ‐Animals for other purpose ‐ ‐ ‐ ‐ ‐ ‐

      Total  1850 225750 3420000 2220 2709000 4104000

10 Kakund 

Milch‐animals 450 52350 702000 540 62820 842400Draught Purpose animals ‐ ‐ ‐ ‐ ‐ ‐Animals for other purpose ‐ ‐ ‐ ‐ ‐ ‐

450 52350 702000 540 62820 842400

11 Marchipani 

Milch‐animals 232 26325 401400 278.4 31590 481680Draught Purpose animals ‐ ‐ ‐ ‐ ‐ ‐Animals for other purpose ‐ ‐ ‐ ‐ ‐ ‐

      Total  232 26325 401400 278.4 31590 481680

12 Richavel 

Milch‐animals 345 30150 405000 414 36180 486000Draught Purpose animals ‐ ‐ ‐ ‐ ‐ ‐Animals for other purpose ‐ ‐ ‐ ‐ ‐ ‐

      Total  345 30150 405000 414 36180 486000

13 Gadola 

Milch‐animals 800 46875 558000 960 56250 669600Draught Purpose animals ‐ ‐ ‐ ‐ ‐ ‐Animals for other purpose ‐ ‐ ‐ ‐ ‐ ‐Total  800 46875 558000 960 56250 669600

14 Kothara 

Milch‐animals 1007 79290 1054800 1208.4 95148 1265760Draught Purpose animals ‐ ‐ ‐ ‐ ‐ ‐Animals for other purpose ‐ ‐ ‐ ‐ ‐ ‐

      Total  1007  79290  1054800  1208.4  95148  1265760 

Page 141: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 141 

 

15 

Dhorkuwa 

Milch‐animals 203 34035 560700 243.6 40842 672840Draught Purpose animals ‐ ‐ ‐ ‐ ‐ ‐Animals for other purpose ‐ ‐ ‐ ‐ ‐ ‐Total  203 34035 560700 243.6 40842 672840

      G.Total  12718 1995415 32689800 15261.4 4832598 39227760Linkages The direct livelihood activities need good forward and backward support. Without such support system the activities may fail to deliver the desired results. These linkages would involve credit, machinery, input supply, marketing, etc. Table no. 60: Backward­Forward linkages   S. No.  Project  Type of Marketing Facility Pre‐project (no.)  During the project (no.) Post‐project (no.)      Backward linkages 

Seed certification  1 3Seed supply systemFertilizer supply systemPesticide supply systemCredit institutions Water supply  1 2Extension services  1 2Nurseries  1 2Tools/machinery suppliers 1 1Price Support systemLabour Any other (please specify)Forward linkages Vermicomposting  1 3Paper Plate Making  1 4Road network  1 2Transport facilities Markets / Mandis Agro and other IndustriesMilk and other collection centres 1 4Labour Any other (please specify)

Page 142: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 142 

 

Logical Framework Analysis 

PROJECT STRUCTURE  EXPECTED RESULT PERFORMANCE VARIABLE 

INDICATOR MEANS OF 

VERIFICATION RISK/ ASSUMPTIONS 

GOAL:  IMPACT:    

To conserve the soil and moisture and enhance the income of the people of the 

project area through watershed activities 

* The income of families will increased 

*Purchase power of villagers will increase 

* Impact assessment study   

* Living standard will improve 

* Annual expenditure and saving of households.  * Evaluation report  Natural disaster 

(Drought) 

*  * Household assests * Compare between baseline survey and evaluation report 

Political Intervention 

Increase of ground water table 

* Number of people migrating for employment 

opportunity * Physical observation   

* Irrigation during off‐season  * Cropping pattern  * Physical Varification and 

FGD with farmers   OBJECTIVE­1:  OUTCOMES: 

To minimize the degradation of land and to conserve the natural resources of the project 

and area. 

* Agriculture income will increase 

*Net area under agriculture will increases. 

* Impact assessment study   

* Total agriculture production will increase    * Evaluation report 

 

Soil moisture content will increase 

* Presence of vegetation cover in the project area. 

* Discussion with Villagers/Farmers 

Maintenance of the Structure after the project completion 

 * Percentage of farmers 

cultivating the crops in Rabi. * Trend analysis of crop 

cultivation   

Page 143: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 143 

 

Activity for Objective­1:  Outputs:     

1. Soil and moisture conservation works 

* Completion of soil moisture works. 

* Number of watershed physical structure presents 

in the project area * Physical verification 

 

*Diversified farming  * Discussion with Villagers/Farmers   

2. Use of advance water conservation techniques. 

* Optimum utilization of available available water 

* Number of households having drip irrigation system of their houses 

 

* Physical verification  

3. Modern agriculture techniques for enhancing of agriculture productivity 

through crop demonstration plot. 

*Change in the cultivation pattern and adoption of new techniques in 

agriculture to realize the maximum potential of the 

land  

* Number of people migrating for employment 

opportunity * Observations 

 

OBJECTIVE­2: OUTCOMES 

     

 

To increase the per capita income of BPL and marginal farmer through 

various livelihood activities. 

* Reduction of migrating families from the project 

area. 

* Number of people migrating for employment 

opportunity  

* Impact assessment study 

* Availbility of  employment within the 

project area. 

* Number of people engaged in poultry farming and other 

livelihood activities.  

* Physical verification/ Photographs 

* Unemployment will decrease 

* Number of people involved in self employment activities 

 * FGDs and PRA 

Page 144: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 144 

 

Activity for Objective­2:  Outputs:   1. Promotion of livelihood 

activities like dairy unit,vermicompost, 

nursery raising, fodder production, garment stiching and flour mill. 

* People will set‐up their micro‐enterprise on 

demand based activties. 

* Number of people showing their interest to set‐up micro 

industry * Observations 

 

2. Capacity building activities for improvement entrepreneurial skill. 

* Improved knowledge and enhancement of skills for 

self development 

* Number of small enterprise set‐up 

* Impact assessment study   

OBJECTIVE­3:  OUTCOMES:    

To strengthen the local institution 

* Presence of strong and dynamic local governance 

* Number of meetings initiated by the local leaders. 

* Impact assessment study  * Interest of the People. 

* People participation and representation will 

increase 

* Number of peoples’ organization present in the 

grass root level 

* Evaluation report, FGD, Observations   

Activity for Objective­3:  Outputs:  

1. Organise training and awareness programme for 

Village institutions 

* Quality of local leaders will improve and use of more democratic method 

of decision making. 

* Number of case resolved within the locality.  * Observations 

 

2.Capacity building workshops and exposure visits User Group and Watershed Committee 

* Local leaders will take interest to understand the programmes and schemes and utilize for the benefit 

of the village. 

* Number of schemes utilize for the benefit of the villages.  * FGDs and PRA 

 

Page 145: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 145 

 

3. Formation of peoples organization in the grass 

root level 

* There will be proper management of available resources by the people's 

organisation 

* Activities of the watershed is implementing smoothly without any hindrance     

 

* There will be proper implementation of the 

projects       

 * Participation of deprived 

section will increase 

* Number of  deprived/ poor people participated in the meeting of Gram Sabha     

 * Representation of local people will increase 

* Number of participants represent in the project 

meeting.     

      

   

Page 146: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 146 

 

 

 

 

 

   

CHAPTER ­7 QUALITY AND SUSTAINABILITY ISSUES 

 

Page 147: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 147 

 

 Introduction: Chapter‐7 deals with the plan in which the activities of watershed IWMP‐5 Project of Vadodara maintain the quality and renders the project sustainable. In details the chapter describes that the proper and regular monitoring and evaluation of the project can trimming down the improper implementation of activities so that the quality can be controlled at the right time. The chapter extends with the appropriate post‐project techniques for project sustainability and research and documentation for maintaining the records, locate the loop falls in implementing and follow up the project with a new and suitable adaptation for the area development.   7.1 Plans for Monitoring and Evaluation:  

To control the activities at the stage of implementing proper plans has formed for monitoring and Evaluation. Project monitoring is one of the important components in watershed development programmes. The broad objectives of a watershed project demand good monitoring framework. A monitoring framework is suggested which within the capacity of watershed development teams and watershed committees. No great deal of training, human resources or instruments are expected to be employed. The monitoring should actually assist the project team to provide  a  guideline  for  improvement  in  the  activities  and  output  the  project.  Selection  of  an  appropriate  measure  for  the  given  area  and ensuring the quality of project measures to be given great attention at the time of monitoring.  Three Ties of Monitoring: Three tiers of monitoring are planned –  

1. First  Tire  (Monitoring  of  activities):  This  is  carried  out  by  the  head  of  local  PO’s  along  with  part  time  workers  to  monitor  the implementation  of  all  activities  as  per  the  action  plan.  The monitoring  also  aims  at  ensuring  that  the  quality  of  work  is  as  per  the guidelines prescribed for each activity. 

2. Second Tire (Monitoring of outputs): To check  the outputs of  the activities, project  coordinators along with  the part  time workers monitors as per  the  logical  frame work. The  indicators are selected considering  the broad objectives of  the project. One can adopt or modify  these as per  requirement at  the  time of  implementation.  The output  level  indicators needs  to be devised by  the project  team based on the outcome level indicators on. Outputs need to be monitored frequently, may be once in a quarter/ six months. 

3. Third  Tire  (Monitoring  of Outcomes):  Project  reviewing  committee  along  with  the  project  co‐ordinator  will  monitor  the  overall outcomes of the objectives as per the log frame. The outcomes level monitoring may start in the second year and continue on an annual basis. Most of the information can be available from the sets of output level indicators. Participatory methods should be used at the time of monitoring the activities. The methods of collecting samples data for the monitoring activities should be clearly documented in the monitoring report. The detail of 

the monitoring system is presented in the table as under. Table no 60. Details of Monitoring system proposed for the project IWMP­5 Tiers of Monitoring  Basis of monitoring Frequency of monitoring Orientation of the Indicator Monitoring by

First tier  Immediate result basis 

Regular Monthly Monitoring 

Activity oriented  Local People organizations

Page 148: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 148 

 

Second Tier  Monitoring of Outputs Regular monitoring (Quarterly, half yearly and 

annually ) 

Objective oriented Internal project team (WDT, PIA,  MDT, Experts and PM) 

Third Tier  Monitoring of Outcomes 

Annually but monitoring start from second year 

onwards? 

Goal Oriented 1. Specified monitoring team formed by DWDU,  

2. External Monitoring team by GSWMA 

Apart from the above mentioned monitoring system, there are a Web‐based GIS System is being developed for monitoring and evaluating the  project  in  its  planning  &  implementation  phases.  The  system  would  be  available  on  a  public  domain  and  can  be  accessed  by  all  the stakeholders of the project. The system shows the entire state of Gujarat and all of those areas selected over the next 18 years. Filtering allows the user to zoom onto one particular project. Details related to soil type, Land‐use classification, inhabitation etc., can be obtained village‐wise. Furthermore, survey‐number wise details related to ownership,  irrigation source, yield etc., can also be accessed by  the users of  the system. This system is being used for pooling up the details obtained from the DPR. In other words, the DPR is made available online in the form of a database which will help the stakeholders know areas of importance viz., already treated areas/historical works in the area, proposed areas for treatment  etc.,  for  further  treatment  and  planning.  The  system  would  also  show  the  satellite  imageries  of  various  years  from  the  project inception  stage  to  the project  closing  stages. This allows  the  user  to evaluate  the effectiveness of  the  treatment and  thereby plan  corrective measures for the project area. The system would serve as an aiding tool to the planners and evaluators for judging the efficacy of the project. 

Yet another component of the Web‐based GIS system is the Mobile based Monitoring & Evaluation System, which will help the ground staff  alias WDTs  (Watershed  Development  Team)  to  transmit  information  from  the  ground  level  to  the  central  server.  Also,  any  higher‐up official in charge of the project can obtain information regarding the project area on their mobile phone by means of an SMS. The system works in the following manner. The WDT equipped with a GPS instrument marks the latitude‐longitude information of various treatment areas during the  DPR.  The  probable  sites  are  then  transferred  onto  the  central  server.  During  the works  phase,  any  progress  in  the  treatment  areas  is reported to the server by means of an SMS by the WDT. Similarly, any nodal officer or higher‐up official can view the progress in a project by means of summarized reports generated over frequent periods of time. Evaluation: The project will be evaluated by the external agency after the project completion to see the impact of the project in the area. The external agency should use the monitoring tool specified in the DPR of the project and should consider the assumptions and risk mentioned in the DPR because these are the factors which may be an obstacle  in the implementation of the project. The agency will be decided by the State Nodal Agency (GSWMA) at the time of the evaluation. The evaluation will be evaluate that the goal is achieved or not after the implementation of the project.    

Page 149: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 149 

 

7.2 Plans for Post­Project Management/Sustainability Approach:   Watershed development project can be rendered sustainable through an appropriate combination of environmental balance, community participation and institutionalization of process. So the detail plans for the post project management are described as under: 7.2.1 Adopting Environment friendly conservation measures   The measures taken up will be long lasting. Along with engineering measures, efforts will also be made to establish forest cover in the upper catchment areas and on the slopes. The downstream area will have prolonged stream flows. The stream banks should also be vegetated to create a buffer between land and water bodies. Such vegetation helps in stabilizing streams, enhancing recharge and improving the riparian habitat.   An  including species of  trees and grasses will be selected  for developing a vegetative cover at  the  time of  implementation of  IWMP‐5 project of Vadodara. The diversity of vegetative measures is the key to sustainability. Combination of shallow and deep‐rooted plants, fast and slow growing plants, productive and medical plants and herbs will be encouraged. The vegetation created will ultimately help to recharge the rainwater, use the soil moisture optimally and provide direct and indirect benefits to the community and environment as a whole.   Land use pattern will  go hand  in hand with  carrying  capacity  of  the watershed. Optimum use  of water  and  increased use  of  organic fertilizers is the key to conserve the precious land source. Water overuse and excessive fertilization leads to permanent damage of lands and groundwater.   It  is important to maintain soil quality through crop management. Crop diversity and crop rotation helps in improving the micro flora and fauna present in the soil and maintaining the healthy symbiotic subsystems relationship. 7.2.2 Participation of local community in development and management 

During the planning phase the local people’s participation were involved and it is planned that the involvement during implementation and post project maintenance will enhance the  impact of project and maintain the structures. However, participation without empowerment does not help  in achieving sustainable development. So People will be made aware of different concepts and options for  their  livelihood and natural  resource  management.  Local  wisdom  is  important  in  understanding  rural  dynamics  that  includes  the  interface  between  human behaviour and its economic / ecological implications. The interests of a community will be created and maintained by adopting the measures in such a manner that they provide immediate, medium term and long term benefits to the community. 7.2.3 Institutionalization for post project management 

A  dynamic  institutional  arrangement  is  necessary  for  project  management,  facilitation  of  benefit  sharing  and  maintenance  of  the resources. This usually  includes  small user groups  for different  resources / assets as well as village  level organizations.  In‐built  system and mechanisms will be developed for qualitative growth and dynamisms of the organizations. The community organizations should be  linked to other Government  and Non Government  institutes  of  interest. The potential people’s  organizations were  formed  in  the project  area  include Watershed level Organization and Users Groups. 

 

Page 150: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 150 

 

Watershed level Committee   Watershed level organization is established right from the beginning of the project. The overall planning, coordination, management and maintenance  are  possible  through  this  representative  body.  This  clearly  implies  representation  from different  sections  of  the  community  – landholders and landless, upper reach and lower reach, men and women, lower and upper castes, Gram Panchayat and other existing political or non political organizations User Groups   The other categories of institutions are formed of various groups with common areas of interest in the project area named user groups. These  include,  depending  upon  necessity,  Self  Help  Groups  of  women  and  men,  User  Groups  for  common  assets,  Natural  Clubs,  etc.  The capacities of different groups will be developed time to time for effective functioning of these groups. A mechanism will be developed to ensure continuity, both in learning, functioning and actions that from responsibilities of such groups during the implementation project activities.  

        

Page 151: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 151 

 

 

 

 

 

 

 

 

MAPS           

Page 152: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 152 

 

 

Page 153: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 153 

 

Page 154: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 154 

 

 

Page 155: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 155 

 

Page 156: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 156 

 

Page 157: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 157 

 

 

Page 158: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 158 

 

Page 159: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 159 

 

 

Page 160: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 160 

 

Page 161: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 161 

 

 

Page 162: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 162 

 

 

Page 163: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 163 

 

Page 164: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 164 

 

Page 165: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 165 

 

 

Page 166: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 166 

 

 

Page 167: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 167 

 

Page 168: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 168 

 

 

Page 169: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 169 

 

Page 170: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 170 

 

 

Page 171: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 171 

 

Page 172: PROJECT REPORT IWMP‐5 CHHOTAUDEPUR 2P)gswma.gujarat.gov.in/pfile/DPR/2009-10/vadodara/Vad_IWMP_5.pdf · DETAIL PROJECT REPORT ( IWMP‐5 CHHOTAUDEPUR‐ 2P) Gujarat State Watershed

District Watershed Development Unit, Vadodara  Page 172 

 

 