    Principles of Lean ManufacturingAnd Total Quality Management

    (including ISO 9001)

    Prof. Dr. Vincent Gaspersz,

    CFPIM, Six Sigma Black Belt

    Delivered at an Indonesian Production and Operations

    Management Society (IPOMS) Seminar in Bogor.

    http://www.ipoms.or.id/mambo

    Please ask your friend to learn this subject by sending an email to

    [email protected]

  • 7/30/2019 Jit Tqm Iso9001

    2/28

    What is Lean Enterprise?

    Principles Practices

    For Design, Operation,Management planning and

    control, and continuousimprovement of enterprise

    systems

  • 7/30/2019 Jit Tqm Iso9001

    3/28

  • 7/30/2019 Jit Tqm Iso9001

    4/28

  • 7/30/2019 Jit Tqm Iso9001

    5/28

    WORKER

    Respect for

    human dignity

    The Three Objectives of Lean Manufacturing

    CUSTOMER

    Highest

    satisfaction

    of needs

    Machine

    1

    Machine

    2

    Machine

    3

    Machine

    4

    PROCESS

    Total elimination of

    muda or waste

  • 7/30/2019 Jit Tqm Iso9001

    6/28

    Traditional Manufacturing

    Finished Goods

    Warehouse

    Machine Group 1

    Machine Group 3

    Machine Group 2

    Machine Group 4

    Internal

    Warehouse

    Functional layout

    Product routing

    Large batch

    manufacturing

    MRP

  • 7/30/2019 Jit Tqm Iso9001

    7/28

    Lean Manufacturng

    Machine

    1

    Machine

    2

    Machine

    3

    Machine

    4

    Process layout

    Single piece flow

    Lot size of 1

    Pull productioncontrol

    Machine

    1

    Machine

    2

    Machine

    3

    Machine

    4

  • 7/30/2019 Jit Tqm Iso9001

    8/28

    The overall structure

    of lean manufacturing

  • 7/30/2019 Jit Tqm Iso9001

    9/28

    The 5 InterdependentLean Principles

  • 7/30/2019 Jit Tqm Iso9001

    10/28

    1. Value Definition

    Define customer needs

    Use as metric

  • 7/30/2019 Jit Tqm Iso9001

    11/28

    2. Value Stream Analysis

    Map the value stream

    Critically assess value-addat each

    step

    Eliminate/minimize non-value-addedactivity

  • 7/30/2019 Jit Tqm Iso9001

    12/28

    3. Flow Continuous flow through value stream

    Make each product, each day, in directproportion to demand.

  • 7/30/2019 Jit Tqm Iso9001

    13/28

    4. J IT/Pull

    Pull the product through the value

    stream

    Authorize production

    Capture WIP

  • 7/30/2019 Jit Tqm Iso9001

    14/28

    Pull System Function

    Final

    Work-

    station

    Material Flow

    Replenishment

    Signal

    Customer

    Work Authorizations

  • 7/30/2019 Jit Tqm Iso9001

    15/28

  • 7/30/2019 Jit Tqm Iso9001

    16/28

    5. Perfection Create a clear vision ofperfection

    production ideals

    customer value

    Make waste visible and evident

    Problem solving.

  • 7/30/2019 Jit Tqm Iso9001

    17/28

    Lean J ourney

    In order to become a world-classmanufacturing company through leanphilosophy and lean thinking, a

    systematic approach must be applied andrigorously followed.

  • 7/30/2019 Jit Tqm Iso9001

    18/28

    Three Key Stages of Lean J ourney

    ImplementInitiate Sustain

    Strategy & Planning Lean ToolsContinuous

    Improvement

  • 7/30/2019 Jit Tqm Iso9001

    19/28

    Phase I: Initiate Phase

    Establish Culture

    Strategy

    Assessment

    Initiate Phase

    Key Steps

    Deliverable:

    Clear strategy & roadmap

    Key Projects & Topics

    Lean Diagnostic Assessment Current State Mapping

    SWOT Analysis Strategic Planning Implementation Planning Change Management Planning Lean Philosophy and mindset

  • 7/30/2019 Jit Tqm Iso9001

    20/28

    Phase II: Implementation Phase

    Value Stream

    Mapping

    5S & Kaizen Blitz

    Training

    Implementation Phase

    Key Steps

    Deliverable:

    Organized environment with

    faster, more efficient value

    stream; reduced waste

    Key Projects & Topics

    Introduction to Lean Tools 5S Blitz throughout the plant Topic-specific Kaizen Blitz

    Value stream mapping of a product family Mistake reduction Project Lead time reduction Project Total Preventative Maintenance ProjectCycle time improvement Project Application of Lean tools to enterprise

  • 7/30/2019 Jit Tqm Iso9001

    21/28

    Industry

    Cross-sharing

    Phase III: Sustain Phase

    Balanced

    Scorecard/Metrics

    Team Building

    & Recognition

    Continuous

    Improvement

    Sustain Phase

    Key Steps

    Deliverable:

    Continuous Improvement

    Environment & empowered

    teams

    Key Projects & Topics

    Team Building Tools Kaizen Teams Development Train-the-trainer Programs

    Reward & Recognition Programs Balanced Scorecard Project Visual Performance Metrics Performance-based Compensation Customer value-enhancing Programs Industry cross-sharing and networking

  • 7/30/2019 Jit Tqm Iso9001

    22/28

    SISTEM KUALITAS (ISO 9001:2000, MBNQA)

    MANAJEMEN

    KUALITAS TOTAL

    (Total Quality Management = TQM)

    TIMPENINGKATAN

    KUALITAS(Quality Improvement

    Teams = QIT)

    PENINGKATAN KUALITAS

    TERUS-MENERUS

    (Continuous Quality

    Improvement =CQI)

    KUALITAS

    DALAM AKTIVITAS

    HARIAN

    Gambar: Struktur Peningkatan Sistem Kualitas Terus-Menerus

  • 7/30/2019 Jit Tqm Iso9001

    23/28

    QUALITY MANAGEMENT SYSTEM (QMS)

    CONTINUAL IMPROVEMENT

    C

    U

    S

    T

    O

    M

    ER

    R

    e

    q

    ui

    r

    e

    m

    e

    nt

    s

    C

    U

    S

    T

    O

    M

    ER

    S

    a

    t

    i

    s

    f

    a

    c

    t

    io

    n

    Management

    Responsibility

    Measurement,

    Analysis,

    Improvement

    Resource

    Management

    Input Product

    RealizationOutput

  • 7/30/2019 Jit Tqm Iso9001

    24/28

    5 Management Responsibility

    5.1 Management commitment (4.1/ 4.1.2.2/4.2.1)

    5.2 Customer focus

    5.3 Quality policy (4.1.1)5.4 Planning (4.1.1/ 4.2.1/4.2.3)

    5.5 Responsibility, authority and communication(4.1.2/4.1.2.1/ 4.1.2.3/4.2.1/4.5/4.16)

    6 Resource management

    6.1 Provision of resources (4.1.2.2)

    6.2 Human resources (4.1.2.1/4.18)

    6.3 Infrastructure (4.9)

    6.4 Work environment (4.9)

    7 Product realization

    7.1 Planning of product realization

    (4.2.3/4.9/4.10/4.15/4.19)

    7.2 Customer-related processes (4.3/4.7)

    7.3 Design and development (4.4)

    7.4 Purchasing (4.6)

    7.5 Production & service provision(4.7/4.8/4.9/4.15/4.19)

    8 Measurement, Analysis & Improvement

    8.1 General (4.10/4.20)

    8.2 Monitoring and measurement

    (4.10/4.17/4.20)

    8.3 Control of nonconforming product (4.13)

    8.4 Analysis of data (4.14/4.20)

    8.5 Improvement (4.1.3/4.9/4.14)

  • 7/30/2019 Jit Tqm Iso9001

    25/28

    DELAPAN PRINSIP TQMBERDASARKAN ISO 9001:2000

    1. FOKUS PELANGGAN2. KEPEMIMPINAN

    3. KETERLIBATAN ORANG-ORANG

    4. PENDEKATAN PROSES

    5. PENDEKATAN SISTEM TERHADAP MANAJEMEN

    6. PENINGKATAN TERUS-MENERUS

    7. PENDEKATAN FAKTUAL DALAM PEMBUATAN

    KEPUTUSAN8. HUBUNGAN PEMASOK YANG SALING

    MENGUNTUNGKAN

  • 7/30/2019 Jit Tqm Iso9001

    26/28

    Tindakan Korektif:

    Dokumentasi Proses

    Yang Sedang

    Berlangsung

    KONFORMANS

    DOKUMENTASI

    NON

    KONFORMANS

    TIDAK

    DOKU-

    MENTASIISO 9001

    Tindakan Korektif:

    1. Menulis Prosedur

    2. Sesuaikan ProsedurDengan Sistem ISO

    9001: 2000

    Tindakan Korektif:

    Sesuaikan Prosedur

    Dengan Persyaratan

    Sistem ISO 9001:2000

    ISO 9001

    OK

    ISO 9001

    SISTEM

    PR

    O

    S

    E

    DU

    R

  • 7/30/2019 Jit Tqm Iso9001

    27/28

    Tujuan Kualitas dari Perusahaan (Terukur)

    Rencana Strategik Membangun Sistem Kualitas (ISO 9001 atau MBNQA)

    1.Pelatihan Sistem Kualitas (ISO 9001,

    MBNQA)

    2. Pembentukan Team Peningkatan Kualitas

    3. Sistem Penilaian Kepuasan PelangganEksternal

    4. Sistem Penilaian Karyawan

    5. Sistem Penghargaan dan Pengakuan

    6. Dan Lain-Lain

    Visi dari Perusahaan

    Diakui sebagai perusahaan berkualitas yang selalu

    berusaha giat untuk memenuhi kebutuhan pelanggan

    Apa (What) Penanggung Jawab (Who) Waktu (When)1.

    2.

    3.

    4.

    Apa (What)Alasan

    (Why)Penanggung

    Jawab (Who)

    Di mana

    (Where)

    Bilamana

    (When)Bagaimana

    (How)

    Komite Pengarah Kualitas PERUSAHAAN

    1.

    2.

    3.

    4.

    5.

  • 7/30/2019 Jit Tqm Iso9001

    28/28

    TAHUN 1 TAHUN 2

    HASIL-HASIL BISNIS

    MANAJEMEN SISTEMKUALITAS

    MANAJEMEN SUMBER DAYA

    MANAJEMEN

    PROSES

    BISNIS

    FOKUSPASAR &

    PELANGGAN

    PENGGUNAANINFORMASI &

    ALAT KUALITAS

    HASIL-HASIL BISNIS

    MANAJEMEN SISTEMKUALITAS

    MANAJEMEN SUMBER DAYA

    MANAJ EMEN

    PROSES

    BISNIS

    FOKUSPASAR &

    PELANGGAN

    PENGGUNAANINFORMASI &

    ALAT KUALITAS

    RENCANA AKTUAL

    HASIL

    DIAGNOSIS

    PERNYATAAN

    MASALAH

    GAP

    AKARPENYEBAB

    PENINGKATAN PROSES

    (Process Improvement)

    GAP


Recommended