+ All Categories
Home > Documents > John McNeill ece.wpi/analog

John McNeill ece.wpi/analog

Date post: 15-Jan-2016
Category:
Upload: wallis
View: 71 times
Download: 0 times
Share this document with a friend
Description:
Opportunities for Analog / Mixed Signal / RF MQPs: The NECAMSID Center for Analog and Mixed Signal Design at WPI. John McNeill http://ece.wpi.edu/analog. Center Overview. Project Topics Proposed by Industry Sponsors Analog Devices, Allegro Microsystems, Skyworks Solutions - PowerPoint PPT Presentation
6
Opportunities for Analog / Mixed Signal / RF MQPs: The NECAMSID Center for Analog and Mixed Signal Design at WPI John McNeill http://ece.wpi.edu/analog
Transcript
Page 1: John McNeill ece.wpi/analog

Opportunities for Analog / Mixed Signal / RF MQPs:

The NECAMSID Center for Analog and Mixed Signal Design at WPI

John McNeill

http://ece.wpi.edu/analog

Page 2: John McNeill ece.wpi/analog

NECAMSID MQPs: ece.wpi.edu/analog 2

Center Overview

• Project Topics Proposed by Industry Sponsors– Analog Devices, Allegro Microsystems,

Skyworks Solutions

• Meet with sponsor representatives at start, finish of MQP

Page 3: John McNeill ece.wpi/analog

NECAMSID MQPs: ece.wpi.edu/analog 3

Autonomous Bioinstrumentation Card

• Dan Moyer, Tuan Vu• Noninvasive measurement of biosignal (pulse rate)• Autonomously powered (60µA 5V solar cell)

Page 4: John McNeill ece.wpi/analog

NECAMSID MQPs: ece.wpi.edu/analog 4

LEDs as Feedback Sensors for Displays

• Cianfrocco , Lee, Renzulli

• Application: Use inactiveLEDs as sensors forfeedback calibration

• Closed loop PWM control of display intensity; compensate for aging effects

Page 5: John McNeill ece.wpi/analog

NECAMSID MQPs: ece.wpi.edu/analog 5

Trimmable Bandgap Voltage Reference in CMOS

• Foreman, Solitro, Wolfertz

• Bipolar devices in CMOS for bandgap reference function

• Implemented link fuses for bandgap voltage adjustment

Page 6: John McNeill ece.wpi/analog

NECAMSID MQPs: ece.wpi.edu/analog 6

Recruiting Process

• http://ece.wpi.edu/analog link to:– Sign up for interview time– Indicate project preference

• November 2013– Interview

• January 2014– Result of interview process– Decision timetable same as off-campus MQPs


Recommended