+ All Categories
Home > Documents > June 22, 2018 ADDENDUM No. 1 Beachland Avenue...1\01_20180621_Addendum No. 1_Cover Letter.Docx ....

June 22, 2018 ADDENDUM No. 1 Beachland Avenue...1\01_20180621_Addendum No. 1_Cover Letter.Docx ....

Date post: 26-Jul-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
23
146 Hartford Road Manchester, CT 06040 t 860.646.2469 800.286.2469 f 860.533.5143 www.fando.com California Connecticut Maine Massachusetts New Hampshire Rhode Island Vermont \\Private\Dfs\Projectdata\P2014\0303\A15\Deliverables\Bid & Construction Documents\Project Manual\Addendum 1\01_20180621_Addendum No. 1_Cover Letter.Docx June 22, 2018 ADDENDUM No. 1 RE: Beachland Avenue Flood Mitigation Project Beachland Avenue Milford, Connecticut TO ALL PROSPECTIVE BIDDERS: Enclosed is a copy of Addendum No. 1 for the referenced project. Please retain this with your Project Manual. Information provided herein shall be considered part of the Project Manual. This Addendum forms a part of the Project Manual and modifies the original Bidding Documents dated June 13, 2018. Acknowledge receipt of this Addendum in the space provided on page 2 of this Addendum and include Acknowledgement with Bid Form submission. Failure to do so may subject Bidder to disqualification. Bid Form – Schedule of Payment Items – Base Bid: Clarified that new catch basin grates are to be galvanized Deleted remove and dispose of wood fence Added remove, protect and replace vinyl fence Added bid item for raise new gas valve box to match new grade Added a bid item to raise cleanout box to match new grade As a result of lengthening the project limit northerly by approximately 65 feet, adjusted Bid Quantities associated with roadway reclamation and new construction. Indicated that Roadway Asphalt and base are to be reclaimed to a total depth of 12 inches, that the Contractor shall regrade and compact reclaimed materials to form a base for geotextile and subbase materials, and remove and dispose of excess reclaimed materials off site. [Note: driveways are not to be reclaimed] Add/Deduct Unit Prices: Added Add Unit Price item for a new catch basin with 4 foot sump in the event that existing basins are determined by the City of Milford to be in need of removal and replacement.
Transcript
Page 1: June 22, 2018 ADDENDUM No. 1 Beachland Avenue...1\01_20180621_Addendum No. 1_Cover Letter.Docx . June 22, 2018 . ADDENDUM No. 1 . RE: Beachland Avenue Flood Mitigation Project . Beachland

146 Hartford Road Manchester, CT

06040 t 860.646.2469

800.286.2469 f 860.533.5143

www.fando.com

California

Connecticut

Maine

Massachusetts

New Hampshire

Rhode Island

Vermont

\\Private\Dfs\Projectdata\P2014\0303\A15\Deliverables\Bid & Construction Documents\Project Manual\Addendum 1\01_20180621_Addendum No. 1_Cover Letter.Docx

June 22, 2018 ADDENDUM No. 1 RE: Beachland Avenue Flood Mitigation Project Beachland Avenue Milford, Connecticut TO ALL PROSPECTIVE BIDDERS: Enclosed is a copy of Addendum No. 1 for the referenced project. Please retain this with your Project Manual. Information provided herein shall be considered part of the Project Manual. This Addendum forms a part of the Project Manual and modifies the original Bidding Documents dated June 13, 2018. Acknowledge receipt of this Addendum in the space provided on page 2 of this Addendum and include Acknowledgement with Bid Form submission. Failure to do so may subject Bidder to disqualification. Bid Form – Schedule of Payment Items – Base Bid:

• Clarified that new catch basin grates are to be galvanized • Deleted remove and dispose of wood fence • Added remove, protect and replace vinyl fence • Added bid item for raise new gas valve box to match new grade • Added a bid item to raise cleanout box to match new grade • As a result of lengthening the project limit northerly by approximately 65 feet, adjusted Bid

Quantities associated with roadway reclamation and new construction. • Indicated that Roadway Asphalt and base are to be reclaimed to a total depth of 12 inches,

that the Contractor shall regrade and compact reclaimed materials to form a base for geotextile and subbase materials, and remove and dispose of excess reclaimed materials off site. [Note: driveways are not to be reclaimed]

Add/Deduct Unit Prices:

• Added Add Unit Price item for a new catch basin with 4 foot sump in the event that existing basins are determined by the City of Milford to be in need of removal and replacement.

Page 2: June 22, 2018 ADDENDUM No. 1 Beachland Avenue...1\01_20180621_Addendum No. 1_Cover Letter.Docx . June 22, 2018 . ADDENDUM No. 1 . RE: Beachland Avenue Flood Mitigation Project . Beachland

ADDENDUM NO. 1 BEACHLAND AVENUE FLOOD MITIGATION PROJECT MILFORD, CONNECTICUT JUNE 22, 2018 PAGE 2

\\Private\Dfs\Projectdata\P2014\0303\A15\Deliverables\Bid & Construction Documents\Project Manual\Addendum 1\01_20180621_Addendum No. 1_Cover Letter.Docx

Plan Revisions: • Lengthened the project limit northerly by approximately 65 feet • Reflect changes in existing site conditions:

o Wood fencing has been replaced with vinyl fencing o House and improvements at #35 Beachland Avenue had been removed

• Clarifies that all lawns, driveways and walks within the project area are to drain to

Beachland Avenue on Sheets CN-001 and CS-103. Sincerely, Philip E. Forzley, P.E. Vice President Enclosures:

1. Technical specification for Asphalt Reclamation and Paving (02741) revised June 22, 2018. Replaces technical specification for Asphalt Paving (02741).

2. Bid Documents Bid Form revised June 22, 2018. Replaces Bid Form provided in advertisement for bids. Changes are generally indicated in bold italics for convenience, however Bidders are responsible for understanding and addressing all items in the revised Bid Form.

3. Drawings are revised June 22, 2018. Revisions are bubbled and labeled . However, Bidders are responsible for understanding and addressing all items in the Drawings.

BIDDER’S ACKNOWLEDGEMENT OF ADDENDUM 1

Include in Bid Submission

Bidder’s Name Address:

Bidder’s Representative Print Name: Sign:

Date

Page 3: June 22, 2018 ADDENDUM No. 1 Beachland Avenue...1\01_20180621_Addendum No. 1_Cover Letter.Docx . June 22, 2018 . ADDENDUM No. 1 . RE: Beachland Avenue Flood Mitigation Project . Beachland

BID FORM (Revised June 22, 2018)  BF‐1

CITY OF MILFORD, CONNECTICUT  

ITB FORM   

BEACHLAND AVENUE FLOOD MITIGATION PROJECT Beachland Avenue 

 ITB # 1682 

 PROPOSER'S FULL LEGAL NAME:           PROPOSER'S CONTACT NAME:           PROPOSER'S CONTACT PHONE:           PROPOSER'S CONTACT E‐MAIL:            Pursuant  to and  in  full  compliance with  the  ITB,  the undersigned proposer, having visited  the  site or property  if applicable, and having thoroughly examined each and every document comprising the  ITB, including any addenda, hereby offers and agrees as follows:  To provide the products and/or services specified herein, and upon the terms and conditions of the ITB for the following Schedule of Items.  SCHEDULE OF PAYMENT ITEMS – BASE BID 

 Item No. 

Item Name  Lump Sum Bid Price in Words Lump Sum 

Bid Price in Figures 

1  Mobilization and Demobilization 

The lump sum price of: 

______               __________________dollars 

and____________________cents [in words] 

( $__________________ ) 

 [in figures] 

2  Sedimentation and Erosion Controls: Straw Wattle (700 LF), Catch Basins (4) 

The lump sum price of: 

______               __________________dollars 

and____________________cents [in words] 

( $__________________ )  

[in figures] 

3  Clearing, Grubbing and Additional Demolition 

The lump sum price of: 

______               __________________dollars 

and____________________cents [in words] 

( $__________________ )  

[in figures] 

4  Traffic Control  The lump sum price of: 

______               __________________dollars 

and____________________cents [in words] 

( $__________________ )  

[in figures] 

5  Vegetation Protection The lump sum price of: 

_______               __________________dollars 

and____________________cents [in words] 

 

( $__________________ )  

[in figures] 

 

Page 4: June 22, 2018 ADDENDUM No. 1 Beachland Avenue...1\01_20180621_Addendum No. 1_Cover Letter.Docx . June 22, 2018 . ADDENDUM No. 1 . RE: Beachland Avenue Flood Mitigation Project . Beachland

BID FORM (Revised June 22, 2018)  BF‐2

Item No. 

Item Name  Lump Sum Bid Price in Words Lump Sum 

Bid Price in Figures 

6  Remove, Protect and Reset Stone Curb and Slate Stones, and Replace Landscaping In‐Kind 

The lump sum price of: 

_______________________dollars 

and_____________cents [in words] 

( $__________________ )  

[in figures] 

7  Closeout and Record Documents 

The lump sum price of: 

_______________________dollars 

and_____________cents [in words] 

( $__________________ )  

[in figures] 

8  Insurance and Bonds The lump sum price of: 

________________________dollars 

and_____________cents [in words] 

$__________________ )  

[in figures] 

  

Unit price  items shall  include all materials, equipment,  labor, testing, reporting, coordination, etc. as required to furnish and install each item in accordance with the Contract Drawings and Technical Specifications.   Item No. 

Item Name Unit Price Bid Price in Words 

Estimate of 

Quantity Unit Price Computed Total 

Bid Price in Figures 

9  Full Depth Bituminous Sawcut 

The price per linear foot of: 

_______________________dollars     and____________cents [in words] 

71 

( $__________________ ) 

[in figures] 

10  Reclaim Roadway Asphalt and Base to 12‐inch Depth 

The price per square yard of: 

_______________________dollars     and____________cents [in words] 

2400 

( $__________________ ) 

[in figures] 

11  General Fill and Rough Grading (for lawn areas) 

The price per cubic yard of: 

_______________________dollars     and____________cents [in words] 

150 

( $__________________ ) 

[in figures] 

12  Roadway Blended Processed Aggregate and Subbase and Rough Grading 

The price per cubic yard of: 

_______________________dollars     and____________cents [in words]  705 

( $__________________ ) 

[in figures] 

13  Roadway Fine Grading and Compacting  

The price per square yard of: 

_______________________dollars     and____________cents [in words] 

2110 

( $__________________ ) 

[in figures] 

14  Roadway Asphalt Superpave  (3/8” Stone) 

The price per ton of: 

_______________________dollars     and_____________cents [in words] 

220 

 

( $__________________ ) 

[in figures] 

 

Page 5: June 22, 2018 ADDENDUM No. 1 Beachland Avenue...1\01_20180621_Addendum No. 1_Cover Letter.Docx . June 22, 2018 . ADDENDUM No. 1 . RE: Beachland Avenue Flood Mitigation Project . Beachland

BID FORM (Revised June 22, 2018)  BF‐3

Item No. 

Item Name Unit Price Bid Price in Words 

Estimate of 

Quantity Unit Price Computed Total 

Bid Price in Figures 

15  Roadway Asphalt Superpave (1/2” Stone) 

 

The price per ton of: 

_______________________dollars     and_____________cents [in words] 

237  ( $__________________ ) 

[in figures] 

16  Remove and Dispose Bituminous Curb 

The price per linear foot of: 

_______________________dollars     and_____________cents [in words] 

155 

( $__________________ ) 

[in figures] 

17  Remove and Dispose Existing Roadway Bituminous Pavement and Base Including Reclaimed Materials 

The price per cubic yard of: 

_______________________dollars     and_____________cents [in words] 

30 

( $__________________ ) 

[in figures] 

18  Bituminous Curbing  The price per linear foot of: 

_______________________dollars     and_____________cents [in words] 

260 

( $__________________ ) 

[in figures] 

19  Separation Geotextile  (Roadway) 

The price per square yard of: 

_______________________dollars     and_____________cents [in words] 

2135 

( $__________________ ) 

[in figures] 

20  Raise New Water Valve Box to Grade  

The price per each of: 

_______________________dollars     and_____________cents [in words] 

 

( $__________________ ) 

[in figures] 

21  Raise New Gas Valve Box to Grade 

The price per each of: 

_______________________dollars     and_____________cents [in words] 

( $__________________ ) 

[in figures] 

22  Raise Cleanout Box to Grade 

The price per each of: 

_______________________dollars     and_____________cents [in words] 

( $__________________ ) 

[in figures] 

23  New Sanitary MH Top, Frame and Cover, Adjust to Grade 

The price per each of: 

_______________________dollars     and_____________cents [in words] 

( $__________________ ) 

[in figures] 

 

 

 

24  New Catch Basin Top, Frame and Galvanized Grate,  Adjust to Grade 

 

The price per each of: 

_______________________dollars     and_____________cents [in words] 

( $__________________ ) 

[in figures] 

Page 6: June 22, 2018 ADDENDUM No. 1 Beachland Avenue...1\01_20180621_Addendum No. 1_Cover Letter.Docx . June 22, 2018 . ADDENDUM No. 1 . RE: Beachland Avenue Flood Mitigation Project . Beachland

BID FORM (Revised June 22, 2018)  BF‐4

Item No. 

Item Name Unit Price Bid Price in Words 

Estimate of 

Quantity Unit Price Computed Total 

Bid Price in Figures 

25  Remove Existing Concrete Retaining Wall, Construct New Segmental Retaining Wall 

The price per linear foot of: 

_______________________dollars     and_____________cents [in words]  25 

( $__________________ ) 

[in figures] 

26  Remove, Protect and Replace Vinyl Fence 

 

 

The price per linear foot of: 

_______________________dollars     and_____________cents [in words] 

130 ( $__________________ ) 

[in figures] 

27  Support and Maintain Wood Fence 

The price per linear foot of: 

_______________________dollars     and_____________cents [in words] 

110 

( $__________________ ) 

[in figures] 

28  Protect and Support Utility Poles 

The price per each of: 

_______________________dollars     and_____________cents [in words] 

( $__________________ ) 

[in figures] 

29  Remove, Protect and Reset Signs 

The price per each of: 

_______________________dollars     and_____________cents [in words] 

( $__________________ ) 

[in figures] 

30  Reset Water Hydrant  The price per each of 

_______________________dollars     and_____________cents [in words] 

( $__________________ ) 

[in figures] 

31  Remove, Protect and Reset Mailbox 

The price per each of: 

_______________________dollars     and_____________cents [in words] 

( $__________________ ) 

[in figures] 

32  Remove and Reconstruct Gravel Drive 

The price per square yard of: 

_______________________dollars     and_____________cents [in words] 

277 

( $__________________ ) 

[in figures] 

33  Remove and Dispose Existing Bituminous Concrete Driveway and Base, Construct New Driveway and Base 

The price per square yard of: 

_______________________dollars     and_____________cents [in words] 

681 

( $__________________ ) 

[in figures] 

 

 

 

 

34  Remove, Protect, and Reconstruct Driveway Edging  

The price per linear foot of: 

_______________________dollars     and_____________cents [in words] 

 63 

( $__________________ ) 

[in figures] 

Page 7: June 22, 2018 ADDENDUM No. 1 Beachland Avenue...1\01_20180621_Addendum No. 1_Cover Letter.Docx . June 22, 2018 . ADDENDUM No. 1 . RE: Beachland Avenue Flood Mitigation Project . Beachland

BID FORM (Revised June 22, 2018)  BF‐5

Item No. 

Item Name Unit Price Bid Price in Words 

Estimate of 

Quantity Unit Price Computed Total 

Bid Price in Figures 

35  Reconstruct Paver Stone Driveway 

The price per square yard of: 

_______________________dollars     and_____________cents [in words] 

93 

( $__________________ ) 

[in figures] 

36  Remove, Protect, Reset Sign 

The price per each of: 

_______________________dollars     and_____________cents [in words] 

( $__________________ ) 

[in figures] 

37  Reset Hydrant As Required 

 

 

The price per each of: 

_______________________dollars     and_____________cents [in words] 

1 ( $__________________ ) 

[in figures] 

38  Remove, Protect and Reset Railroad Ties 

The price per linear foot of: 

_______________________dollars     and_____________cents [in words] 

103 

( $__________________ ) 

[in figures] 

39  Protect Concrete Stairs and Aprons 

The price per each of: 

_______________________dollars     and_____________cents [in words] 

( $__________________ ) 

[in figures] 

40  Protect Guy Wire  The price per each of: 

_______________________dollars     and_____________cents [in words] 

( $__________________ ) 

[in figures] 

41  Sawcut, remove and Dispose Concrete Driveway Apron/ Sidewalk 

The price per square yard of: 

_______________________dollars     and_____________cents [in words]  34 

( $__________________ ) 

[in figures] 

42  Concrete Driveway Apron 

The price per square yard of: 

_______________________dollars     and_____________cents [in words] 

34 

( $__________________ ) 

[in figures] 

43  Concrete Sidewalk  The price per square yard of: 

_______________________dollars     and_____________cents [in words] 

14 

( $__________________ ) 

[in figures] 

44  High Performance Anchored Turf Reinforcement Matting with Anchor Reinforced Vegetation  

The price per square yard of: 

_______________________dollars     and_____________cents [in words] 

15 

( $__________________ ) 

[in figures] 

45  Strip , Stockpile and Re‐Use Topsoil 

The price per square yard of: 

_______________________dollars     and_____________cents [in words] 

1,130 

( $__________________ ) 

[in figures] 

Page 8: June 22, 2018 ADDENDUM No. 1 Beachland Avenue...1\01_20180621_Addendum No. 1_Cover Letter.Docx . June 22, 2018 . ADDENDUM No. 1 . RE: Beachland Avenue Flood Mitigation Project . Beachland

BID FORM (Revised June 22, 2018)  BF‐6

Item No. 

Item Name Unit Price Bid Price in Words 

Estimate of 

Quantity Unit Price Computed Total 

Bid Price in Figures 

46  Loam  The price per square yard of: 

_______________________dollars     and_____________cents [in words] 

10 

( $__________________ ) 

[in figures] 

47  Lawn Grass Seed  The price per square yard of: 

_______________________dollars     and_____________cents [in words] 

1,130 

( $__________________ ) 

[in figures] 

48  New England Salt Tolerant Grass Mix 

The price per square yard of: 

_______________________dollars     and_____________cents [in words] 

70 

( $__________________ ) 

[in figures] 

 Add/ Deduct Unit Prices:  The undersigned agrees that the following supplemental Unit Prices shall be the basis of compensation for the addition in the work.  These Unit Prices shall include all overhead and profit.  (Note: bidder shall fill in.)  

Unit Prices  Unit  Add  

1. Rock Excavation  per cubic yard  $_________ 2. Remove existing catch basin, provide new catch basin with 4‐foot sump   per each  $_________ 

  SCHEDULE OF PAYMENT ITEMS – BID SUMMARY   

Bid Name  Total Price in Words  Total Price in Figures 

 

Total Base Bid Price  

 

________________________________________dollars 

and____________________cents [in words] 

 

( $__________________ ) 

[in figures] 

 

  

The Total Base Bid Price (sum of all lump sum and unit prices, excluding add/deduct items) equals:  ______________________________________________________________________________dollars  and________________________________cents [in words]  ($_____________________________) [in figures]  

Page 9: June 22, 2018 ADDENDUM No. 1 Beachland Avenue...1\01_20180621_Addendum No. 1_Cover Letter.Docx . June 22, 2018 . ADDENDUM No. 1 . RE: Beachland Avenue Flood Mitigation Project . Beachland

BID FORM (Revised June 22, 2018)  BF‐7

In the event of discrepancies between bid prices (in words) and (in figures) of  individual  items totals, the mathematically  correct  amount  using  sum  bid  prices  (in words)  shall  govern  in  determining  the  TOTAL LUMP SUM BID PRICE.  All work for this project shall be performed under the above Schedule of Value Items.  These Bid Items shall become the basis of payment of work performed.  The value of each Schedule of Value Item when added together shall equal the Total Base Bid amount. Should the Bidder have any questions regarding the specific elements of work to be  included within each Item, said question shall be directed  in writing sufficiently  in advance of the bid date in order to allow for a proper response. The cost for other items of work included in the Contract Documents and/or on the Contract Documents and not listed in the Bid Items shall be included in the cost of the various Items bid. All items shall include all costs necessary to perform the work and the costs for all materials, equipment, tools, labor and work incidental thereto, including overhead and profit. 

 Variation  in Estimated Quantity:  If  the quantity of a unit‐priced  item  in  this Contract  is an estimated quantity and the actual quantity of the unit‐priced item varies more than twenty (20) percent above or below  the  estimated  quantity,  an  equitable  adjustment  in  the  contract  price  shall  be  made  upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due  solely  to  the  variation  above 120 percent or below 80 percent of  the  estimated quantity.  If  the quantity variation  is such as to cause an  increase  in the time necessary for completion, the Contractor may  request,  in writing,  an  extension  of  time,  to  be  received  by  the  City within  10  days  from  the beginning of the delay, or within such further period as may be granted by the City. Upon the receipt of a  written  request  for  an  extension,  the  City  shall  ascertain  the  facts  and make  an  adjustment  for extending  the  completion  date  as,  in  the  judgment  of  the  City,  is  justified.  Any  adjustment  to  the Contract  price  or  time  due  to  a  variation  in  estimated  quantities  in  response  to  a  request  from  the Contractor shall be the sole and exclusive remedy available to the Contractor due to such variation and payment to the Contractor for such variation shall constitute an accord and satisfaction regarding any claims related to the variation. 

 ACKNOWLEDGEMENT  In submitting this Bid Form, the undersigned proposer acknowledges that the price(s) include all  labor, materials,  transportation,  hauling,  overhead,  fees  and  insurances,  bonds  or  letters  of  credit,  profit, security, permits and  licenses, and all other  costs  to  cover  the  completed work  called  for  in  the  ITB.  Except as otherwise expressly stated in the ITB, no additional payment of any kind will be made for work accomplished under the price(s) as proposed. 

 CONTRACT SCHEDULE AND LIQUIDATED DAMAGES  All work under this contract will be completed within 90 calendar days after Notice to Proceed. If project completion is delayed, liquidated damages will be assessed at the rate of 500 dollars ($500) per calendar day thereafter.  

   

Page 10: June 22, 2018 ADDENDUM No. 1 Beachland Avenue...1\01_20180621_Addendum No. 1_Cover Letter.Docx . June 22, 2018 . ADDENDUM No. 1 . RE: Beachland Avenue Flood Mitigation Project . Beachland

BID FORM (Revised June 22, 2018)  BF‐8

REQUIRED DISCLOSURES  1.  Exceptions to the ITB    

______ This bid does not take exception to any requirement of the ITB, including but not  only  any  of  the  Contract  Terms  set  forth  in  Section  26  of  the  Standard Instructions to Proposers. 

       OR  

______ This bid takes exception(s) to certain of the  ITB requirements,  including but not  only  the  following  Contract  Terms  set  forth  in  Section  26  of  the  Standard Instructions to Proposers.  Attached is a sheet fully describing each such exception.  

2. State Debarment List                Is the proposer on the State of Connecticut's Debarment List? 

   ______ Yes    ______ No 

 3. Occupational Safety and Health Law Violations  

Has the proposer or any firm, corporation, partnership or association in which it has an  interest  (1) been  cited  for  three  (3) or more willful or  serious violations of any occupational  safety  and  health  act  or  of  any  standard,  order  or  regulation promulgated pursuant  to  such act, during  the  three‐year period preceding  the bid (provided such violations were cited  in accordance with the provisions of any state occupational  safety  and  health  act  or  the  Occupational  Safety  and  Health  Act  of 1970, and not abated within the time fixed by the citation and such citation has not been  set  aside  following  appeal  to  the  appropriate  agency  or  court  having jurisdiction) or (2) received one or more criminal convictions related to the injury or death of any employee in the three‐year period preceding the bid?      ______ Yes    ______ No  If "yes," attach a sheet fully describing each such matter.  

4. Arbitration/Litigation  

Has either the proposer or any of  its principals (regardless of place of employment) been  involved  for  the  most  recent  ten  (10)  years  in  any  resolved  or  pending arbitration or litigation?     ______ Yes    ______ No  If "yes," attach a sheet fully describing each such matter.   

Page 11: June 22, 2018 ADDENDUM No. 1 Beachland Avenue...1\01_20180621_Addendum No. 1_Cover Letter.Docx . June 22, 2018 . ADDENDUM No. 1 . RE: Beachland Avenue Flood Mitigation Project . Beachland

BID FORM (Revised June 22, 2018)  BF‐9

5. Criminal Proceedings  

Has  the proposer or any of  its principals  (regardless of place of employment) ever been the subject of any criminal proceedings?     ______ Yes    ______ No If "yes," attach a sheet fully describing each such matter. 

6. Ethics and Offenses in Public Projects or Contracts  

Has either the proposer or any of  its principals (regardless of place of employment) ever been found to have violated any state or local ethics law, regulation, ordinance, code, policy or standard, or to have committed any other offense arising out of the submission of bids or bids or  the performance of work on public works projects or contracts?       ______ Yes      ______ No  If "yes," attach a sheet fully describing each such matter. 

 BID SECURITY   I/we have included herein the required bid (bid) bond in the amount of 5% of the bid amount.  NOTE: THIS DOCUMENT, IN ORDER TO BE CONSIDERED A VALID BID, MUST BE SIGNED BY A PRINCIPAL OFFICER  OR  OWNER  OF  THE  BUSINESS  ENTITY  THAT  IS  SUBMITTING  THE  BID.  SUCH  SIGNATURE CONSTITUTES  THE  PROPOSER'S  REPRESENTATIONS  THAT  IT  HAS  READ,  UNDERSTOOD  AND  FULLY ACCEPTED  EACH AND  EVERY PROVISION OF  EACH DOCUMENT COMPROMISING  THE  ITB, UNLESS AN EXCEPTION IS DESCRIBED ABOVE.     BY ___________________________     TITLE:_____________________________  (PRINT NAME)    ______________________________     DATE:_____________________________ (SIGNATURE)    

END OF BID FORM 

   

Page 12: June 22, 2018 ADDENDUM No. 1 Beachland Avenue...1\01_20180621_Addendum No. 1_Cover Letter.Docx . June 22, 2018 . ADDENDUM No. 1 . RE: Beachland Avenue Flood Mitigation Project . Beachland

BID FORM (Revised June 22, 2018)  BF‐10

THIS PAGE IS INTENTIALLY BLANK  

Page 13: June 22, 2018 ADDENDUM No. 1 Beachland Avenue...1\01_20180621_Addendum No. 1_Cover Letter.Docx . June 22, 2018 . ADDENDUM No. 1 . RE: Beachland Avenue Flood Mitigation Project . Beachland

FUSS & O’NEILL, INC. BEACHLAND AVENUE FLOOD

PROJECT NO. 20140303.A15 MITIGATION PROJECT

ASPHALT RECLAMATION AND PAVING (Revised June 22, 2018) 02741 - 1

SECTION 02741 – ASPHALT RECLAMATION AND PAVING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes the following for asphaltic roadways and driveways:

1. Reclamation of existing pavement and base to 12” depth

2. Hot-mix asphalt paving.

3. Bituminous concrete curbing.

B. Related Sections:

1. Division 2 Section "Earthwork".

1.3 DEFINITION

A. Hot-Mix Asphalt Paving Terminology: Refer to ASTM D 8 for definitions of terms.

1.4 SUBMITTALS

A. Product Data: For each type of product indicated including all pavement mixes. Include technical data and tested physical and performance properties.

1.5 PROJECT CONDITIONS

A. Environmental Limitations: Do not apply asphalt materials if subgrade is wet or excessively damp, if rain is imminent or expected before time required for adequate cure, or if the following conditions are not met:

1. Tack Coat: Minimum surface temperature of 50 deg F.

2. Asphalt Base Course: Minimum surface temperature of 40 deg F and rising at time of placement.

3. Asphalt Surface Course: Minimum surface temperature of 50 deg F at time of placement.

Page 14: June 22, 2018 ADDENDUM No. 1 Beachland Avenue...1\01_20180621_Addendum No. 1_Cover Letter.Docx . June 22, 2018 . ADDENDUM No. 1 . RE: Beachland Avenue Flood Mitigation Project . Beachland

FUSS & O’NEILL, INC. BEACHLAND AVENUE FLOOD

PROJECT NO. 20140303.A15 MITIGATION PROJECT

ASPHALT RECLAMATION AND PAVING (Revised June 22, 2018) 02741 - 2

PART 2 - PRODUCTS

2.1 Products shall be in conformance with Form 816.

2.2 MIXES

A. Mixes shall be in conformance with the plans and Form 816.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that subgrade is dry and in suitable condition to begin paving.

B. Proof-roll subgrade below pavements with heavy pneumatic-tired equipment to identify soft pockets and areas of excess yielding. Do not proof-roll wet or saturated subgrades.

1. Completely proof-roll subgrade in one direction. Limit vehicle speed to 3 mph.

2. Proof roll with a loaded 10-wheel, tandem-axle dump truck weighing not less than 15 tons.

3. Excavate soft spots, unsatisfactory soils, and areas of excessive pumping or rutting, as determined by Engineer, and replace with compacted backfill or fill as directed.

C. Proceed with paving only after unsatisfactory conditions have been corrected.

D. Verify that utility adjustments requiring installation below the asphalt surface have been made prior to paving.

3.2 RECLAMATION

A. Cold reclaim asphalt pavement in conformance with the plans and Form 816 to a depth of 12 inches below the finished pavement. The Contractor shall grade and compact the reclaimed material as necessary to obtain the required base for geotextile and 12-inches of imported processed gravel and subbase, as specified in these Specifications. Any surplus or unutilized reclaimed or partially reclaimed material shall be removed and disposed of off-site by the Contractor.

3.3 SUBBASE PREPARATION

A. The Contractor will excavate and dispose off-site the current existing pavement and base materials to a depth of 16 inches below the proposed finished pavement grade.

B. The Contractor shall establish a firm subgrade as discussed in Division 2 Section “Earthwork.” Prior to placing separation geotextile.

Page 15: June 22, 2018 ADDENDUM No. 1 Beachland Avenue...1\01_20180621_Addendum No. 1_Cover Letter.Docx . June 22, 2018 . ADDENDUM No. 1 . RE: Beachland Avenue Flood Mitigation Project . Beachland

FUSS & O’NEILL, INC. BEACHLAND AVENUE FLOOD

PROJECT NO. 20140303.A15 MITIGATION PROJECT

ASPHALT RECLAMATION AND PAVING (Revised June 22, 2018) 02741 - 3

3.4 BITUMINOUS CONCRETE CURBING

A. Construct bituminous concrete curbs over compacted pavement surfaces as shown on Drawings. Apply a light tack coat unless pavement surface is stilly tacky and free from dust. Spread mix at a minimum temperature of 250 deg F.

B. Place bituminous concrete curb cross section indicated by the Drawings by machine or by hand in wood or metal forms. Tamp hand placed materials and screen to smooth finish. Remove forms after bituminous concrete has cooled.

C. Protect curbing for a minimum of 24 hours and until mixture has cooled so as not to become marked.

D. Installation shall be in conformance with Form 816 Section 8.15.

3.5 FIELD QUALITY CONTROL

A. Testing Agency: Contractor shall employ a qualified testing agency to perform tests and inspections.

B. Thickness: In-place compacted thickness of hot-mix asphalt courses will be determined according to ASTM D 3549.

C. Surface Smoothness: Finished surface of each hot-mix asphalt course will be tested for compliance with smoothness tolerances.

D. In-Place Density: In conformance with Form 816.

3.6 DISPOSAL

A. Remove excavated materials from Project site and legally dispose of them off-site in an EPA-approved landfill.

END OF SECTION

Page 16: June 22, 2018 ADDENDUM No. 1 Beachland Avenue...1\01_20180621_Addendum No. 1_Cover Letter.Docx . June 22, 2018 . ADDENDUM No. 1 . RE: Beachland Avenue Flood Mitigation Project . Beachland

FUSS & O’NEILL, INC. BEACHLAND AVENUE FLOOD

PROJECT NO. 20140303.A15 MITIGATION PROJECT

ASPHALT RECLAMATION AND PAVING (Revised June 22, 2018) 02741 - 4

PAGE LEFT INTENTIONALLY BLANK

Page 17: June 22, 2018 ADDENDUM No. 1 Beachland Avenue...1\01_20180621_Addendum No. 1_Cover Letter.Docx . June 22, 2018 . ADDENDUM No. 1 . RE: Beachland Avenue Flood Mitigation Project . Beachland

WELCHES

BAYVIEWBEACH

LONG ISLAND SOUND

SITELOCATION

POIN

TRD

.

BUCKINGHAM AVE.

PROJ. No.:

DATE:

File

P

ath

: J:\D

WG

\P

20

14

\0

30

3\A

15

\C

ivil\P

la

n\2

01

40

30

3A

15

_C

OV

01

.d

wg

, L

ayo

ut: G

I-0

01

, P

lo

tte

d: T

hu

rsd

ay, Ju

ne

2

1, 2

01

8, U

se

r: w

dyla

g P

lo

tte

r: D

WG

T

O P

DF

.P

C3

C

TB

F

ile

: F

O.S

TB

20140303.A15

MAY 18, 2018

PREPARED BY

SHEET INDEXSHEET No. SHEET TITLEGI-001 COVER SHEETCN-001 GENERAL NOTES & LEGEND

CS-101 EXISTING CONDITIONS PLAN

CS-102 DEMOLITION AND EROSION &SEDIMENTATION CONTROL PLAN

CS-103 PROPOSED CONDITIONS PLAN

CD-501 - CD-502 DETAILS

LOCATION MAPSCALE: 1" = 2000'

PREPARED FOR

CITY OF MILFORD70 WEST RIVER STREET

MILFORD, CT. 06460

BEACHLAND AVENUE FLOOD MITIGATIONPROJECT

BEACHLAND AVENUE · MILFORD · CONNECTICUTREVISED JUNE 22, 2018

146 HARTFORD ROADMANCHESTER, CONNECTICUT 06040860.646.2469www.fando.com

Page 18: June 22, 2018 ADDENDUM No. 1 Beachland Avenue...1\01_20180621_Addendum No. 1_Cover Letter.Docx . June 22, 2018 . ADDENDUM No. 1 . RE: Beachland Avenue Flood Mitigation Project . Beachland

20140303.A15

MAY 18, 2018

CITY OF MILFORD

BEACHLAND AVENUE FLOOD MITIGATION PROJECT

BEACHLAND AVENUE MILFORD, CONNECTICUT

146 HARTFORD ROADMANCHESTER, CONNECTICUT 06040860.646.2469www.fando.com

SEALSEAL

SCALE:

DATUM:

VERT.:

HORZ.:

VERT.:

HORZ.:

PROJ. No.:

DATE:

MS

V

IE

W:

LA

YE

R S

TA

TE

:

DATENo.DESCRIPTION

DESIGNER REVIEWER

File

P

ath

: J:\D

WG

\P

20

14

\0

30

3\A

15

\C

ivil\P

la

n\2

01

40

30

3A

15

_G

EN

01

.d

wg

L

ayo

ut: C

N-0

01

P

lo

tte

d: T

hu

, Ju

ne

2

1, 2

01

8 - 3

:5

0 P

M U

se

r: w

dyla

g

Plo

tte

r: D

WG

T

O P

DF

.P

C3

C

TB

F

ile

: F

O.S

TB

GENERAL NOTES & LEGEND

NOT TO SCALE

Page 19: June 22, 2018 ADDENDUM No. 1 Beachland Avenue...1\01_20180621_Addendum No. 1_Cover Letter.Docx . June 22, 2018 . ADDENDUM No. 1 . RE: Beachland Avenue Flood Mitigation Project . Beachland

20140303.A15

MAY 18, 2018

CITY OF MILFORD

BEACHLAND AVENUE FLOOD MITIGATION PROJECT

BEACHLAND AVENUE MILFORD, CONNECTICUT

146 HARTFORD ROADMANCHESTER, CONNECTICUT 06040860.646.2469www.fando.com

SEALSEAL

SCALE:

DATUM:

VERT.:

HORZ.:

VERT.:

HORZ.:

PROJ. No.:

DATE:

MS

V

IE

W:

LA

YE

R S

TA

TE

:

DATENo.DESCRIPTION

DESIGNER REVIEWER

File

P

ath

: J:\D

WG

\P

20

14

\0

30

3\A

15

\C

ivil\P

la

n\2

01

40

30

3A

15

_E

XC

01

_C

on

stru

ctio

n.d

wg

L

ayo

ut: C

S-1

01

P

lo

tte

d: T

hu

, Ju

ne

2

1, 2

01

8 - 3

:5

1 P

M U

se

r: w

dyla

g

Plo

tte

r: D

WG

T

O P

DF

.P

C3

C

TB

F

ile

: F

O.S

TB

EXISTING CONDITIONS PLAN

1" = 20'

NAD83

NAVD88

Page 20: June 22, 2018 ADDENDUM No. 1 Beachland Avenue...1\01_20180621_Addendum No. 1_Cover Letter.Docx . June 22, 2018 . ADDENDUM No. 1 . RE: Beachland Avenue Flood Mitigation Project . Beachland

20140303.A15

MAY 18, 2018

CITY OF MILFORD

BEACHLAND AVENUE FLOOD MITIGATION PROJECT

BEACHLAND AVENUE MILFORD, CONNECTICUT

146 HARTFORD ROADMANCHESTER, CONNECTICUT 06040860.646.2469www.fando.com

SEALSEAL

SCALE:

DATUM:

VERT.:

HORZ.:

VERT.:

HORZ.:

PROJ. No.:

DATE:

MS

V

IE

W:

LA

YE

R S

TA

TE

:

DATENo.DESCRIPTION

DESIGNER REVIEWER

File

P

ath

: J:\D

WG

\P

20

14

\0

30

3\A

15

\C

ivil\P

la

n\2

01

40

30

3A

15

_S

TP

01

_C

on

stru

ctio

n.d

wg

L

ayo

ut: C

S-1

02

P

lo

tte

d: T

hu

, Ju

ne

2

1, 2

01

8 - 3

:5

1 P

M U

se

r: w

dyla

g

Plo

tte

r: D

WG

T

O P

DF

.P

C3

C

TB

F

ile

: F

O.S

TB

DEMOLITION AND EROSION & SEDIMENTATIONCONTROL PLAN

1" = 20'

NAD83

NAVD88

Page 21: June 22, 2018 ADDENDUM No. 1 Beachland Avenue...1\01_20180621_Addendum No. 1_Cover Letter.Docx . June 22, 2018 . ADDENDUM No. 1 . RE: Beachland Avenue Flood Mitigation Project . Beachland

20140303.A15

MAY 18, 2018

CITY OF MILFORD

BEACHLAND AVENUE FLOOD MITIGATION PROJECT

BEACHLAND AVENUE MILFORD, CONNECTICUT

146 HARTFORD ROADMANCHESTER, CONNECTICUT 06040860.646.2469www.fando.com

SEALSEAL

SCALE:

DATUM:

VERT.:

HORZ.:

VERT.:

HORZ.:

PROJ. No.:

DATE:

MS

V

IE

W:

LA

YE

R S

TA

TE

:

DATENo.DESCRIPTION

DESIGNER REVIEWER

File

P

ath

: J:\D

WG

\P

20

14

\0

30

3\A

15

\C

ivil\P

la

n\2

01

40

30

3A

15

_S

TP

01

_C

on

stru

ctio

n.d

wg

L

ayo

ut: C

S-1

03

P

lo

tte

d: T

hu

, Ju

ne

2

1, 2

01

8 - 3

:5

1 P

M U

se

r: w

dyla

g

Plo

tte

r: D

WG

T

O P

DF

.P

C3

C

TB

F

ile

: F

O.S

TB

PROPOSED CONDITIONS PLAN

1" = 20'

NAD83

NAVD88

Page 22: June 22, 2018 ADDENDUM No. 1 Beachland Avenue...1\01_20180621_Addendum No. 1_Cover Letter.Docx . June 22, 2018 . ADDENDUM No. 1 . RE: Beachland Avenue Flood Mitigation Project . Beachland

20140303.A15

MAY 18, 2018

CITY OF MILFORD

BEACHLAND AVENUE FLOOD MITIGATION PROJECT

BEACHLAND AVENUE MILFORD, CONNECTICUT

146 HARTFORD ROADMANCHESTER, CONNECTICUT 06040860.646.2469www.fando.com

SEALSEAL

SCALE:

DATUM:

VERT.:

HORZ.:

VERT.:

HORZ.:

PROJ. No.:

DATE:

MS

V

IE

W:

LA

YE

R S

TA

TE

:

DATENo.DESCRIPTION

DESIGNER REVIEWER

File

P

ath

: J:\D

WG

\P

20

14

\0

30

3\A

15

\C

ivil\P

la

n\2

01

40

30

3A

15

_D

ET

01

.d

wg

L

ayo

ut: C

D-5

01

P

lo

tte

d: T

hu

, Ju

ne

2

1, 2

01

8 - 3

:5

1 P

M U

se

r: w

dyla

g

Plo

tte

r: D

WG

T

O P

DF

.P

C3

C

TB

F

ile

: F

O.S

TB

DETAILS

AS NOTED

-INCH

SIDE VIEW

TOP VIEW

SIDE VIEW

TOP VIEW

®

Page 23: June 22, 2018 ADDENDUM No. 1 Beachland Avenue...1\01_20180621_Addendum No. 1_Cover Letter.Docx . June 22, 2018 . ADDENDUM No. 1 . RE: Beachland Avenue Flood Mitigation Project . Beachland

20140303.A15

MAY 18, 2018

CITY OF MILFORD

BEACHLAND AVENUE FLOOD MITIGATION PROJECT

BEACHLAND AVENUE MILFORD, CONNECTICUT

146 HARTFORD ROADMANCHESTER, CONNECTICUT 06040860.646.2469www.fando.com

SEALSEAL

SCALE:

DATUM:

VERT.:

HORZ.:

VERT.:

HORZ.:

PROJ. No.:

DATE:

MS

V

IE

W:

LA

YE

R S

TA

TE

:

DATENo.DESCRIPTION

DESIGNER REVIEWER

File

P

ath

: J:\D

WG

\P

20

14

\0

30

3\A

15

\C

ivil\P

la

n\2

01

40

30

3A

15

_D

ET

01

.d

wg

L

ayo

ut: C

D-5

02

P

lo

tte

d: T

hu

, Ju

ne

2

1, 2

01

8 - 3

:5

1 P

M U

se

r: w

dyla

g

Plo

tte

r: D

WG

T

O P

DF

.P

C3

C

TB

F

ile

: F

O.S

TB

DETAILS

AS NOTED


Recommended