17
Enhancing Digital Transformation in Manufacturing SMEs 22nd of May Brussels 201 5 1
Transcript

1

Enhancing Digital Transformation in Manufacturing SMEs

22nd of MayBrussels

2015

2

Dr Kenneth Burnham

Integrated Environmental Solutions

Experiment 6: Cloud-based HPC tools for Urban Planning

3

INDEX1. WHAT WE ACHIEVED

2. HOW WE DID IT

3. HOW I4MS HELPED

4. HOW WE WILL TAKE IT FORWARD

4

Meeting the Challenge

I4MS 2015: Enhancing Digital Transformation in Manufacturing SMEs · 22nd of May · Brussels

IES intends to expand current capabilities and move from an approach of single building simulation, to multi-building city-scale simulations

Moving to City-Scale Simulations

5

WHAT WE ACHIEVED

Primary Achievement

Moving our SunCast module

onto a cloud based platform

for faster simulations

I4MS 2015: Enhancing Digital Transformation in Manufacturing SMEs · 22nd of May · Brussels

6

WHY WE DID IT

I4MS 2015: Enhancing Digital Transformation in Manufacturing SMEs · 22nd of May · Brussels

6

There is a growing need for IES to increase the speed of our simulations. This is both at individual building level, and more recently for city-scale level

Open new markets for us where we move from early stage master planning to detailed design, to the development of smart cities

7

HOW I4MS HELPED

I4MS 2015: Enhancing Digital Transformation in Manufacturing SMEs · 22nd of May · Brussels

• Provided suitable testing platform to experiment with cloud computing in a low risk setting

• Has enabled IES to perform intricate simulations via a web based platform as opposed to running on a desktop solution

• Has allowed IES to create a new market for the company– Blue Ocean Strategy i.e. creating a

new market instead of competing in an existing red ocean

8

Project Example - Masterplanning

I4MS 2015: Enhancing Digital Transformation in Manufacturing SMEs · 22nd of May · Brussels

9

Project Example - Masterplanning

I4MS 2015: Enhancing Digital Transformation in Manufacturing SMEs · 22nd of May · Brussels

• Northside Coalition, Pittsburgh, USA• Main Features of project:– 3D Model Creation of existing buildings in

Northside Coalition area– Building Energy Simulation– Photo Voltaics (PV) & Solar Thermal Potential– Wind Potential– Overall Energy Masterplanning

10

Project Example - Masterplanning

I4MS 2015: Enhancing Digital Transformation in Manufacturing SMEs · 22nd of May · Brussels

• Use of Cloud Services– Our SunCast Module was

used to provide an analysis of solar radiation falling on buildings -> useful to show potential for PV

– In this case it ranged from 72.25 kWh/m2 (blue) to 1377.25 kWh/m2 (red)

– Dependent on orientation of buildings, and overshadowing of other buildings

11

Project Example – In-depth Simulation

I4MS 2015: Enhancing Digital Transformation in Manufacturing SMEs · 22nd of May · Brussels

12

Project Example – In-depth Simulation

I4MS 2015: Enhancing Digital Transformation in Manufacturing SMEs · 22nd of May · Brussels

• Hotel Project, Middle East• Main Features of project:– 3D Model Creation of the hotel– 7 story building, 250 guest rooms– Large organic shaped wrap-around for shading– 35,626 surfaces in the model, 5,538 windows

13

Project Example – In-depth Simulation

I4MS 2015: Enhancing Digital Transformation in Manufacturing SMEs · 22nd of May · Brussels

• Use of Cloud Services– Our SunCast Module was used to

provide an analysis of solar radiation penetrating all the rooms of the building

– Resulted in greater understanding of passive heating of the buildings and explicit need for shading

– More detailed analysis than Pittsburgh example

14

Project Example – Benefits

I4MS 2015: Enhancing Digital Transformation in Manufacturing SMEs · 22nd of May · Brussels

• Speed• Prior to obtaining cloud services, a simulation like that run

in for Pittsburgh could have taken 3 hours. This simulation was run in 10 minutes

• In the Middle East Example, the simulation would have taken 2 weeks to run, this was done in 2 days with through the use of cloud capabilities

• Reduced human resource

• Data Capacity• Prior to obtaining cloud services, simulations taken at this

scale would be far more susceptible to crashing• Increased efficiency and reliability

15

HOW WE WILL TAKE IT FORWARD

I4MS 2015: Enhancing Digital Transformation in Manufacturing SMEs · 22nd of May · Brussels

• Increase our modules on the cloud• SunCast completed, Radiance will be next

16

HOW WE WILL TAKE IT FORWARD

I4MS 2015: Enhancing Digital Transformation in Manufacturing SMEs · 22nd of May · Brussels

• Market evolution

• Faster, more comprehensive simulations

• Marketing approach/channels

• Target our existing worldwide customer base which include: AECOM, Gensler, HoK, ARUP, and WSP

• Over 1000 clients in 140 countries

• Use our existing connections with city authorities such as San Francisco, Hong Kong, Dubai, London Organisation Affiliations

17

THANK YOUFOR YOUR ATTENTION


Recommended