Salient Features Northern Regional Power System Welcome. Reforms Within The State, Trading And Other Issues by ALOK ROY General Manager (NRLDC) POWERGRID, New Delhi. Largest sized hydro unit (180 MW at Chamera) in the country. CS - 2. CS - 1. MPP. Regional Grid. RLDC - PowerPoint PPT Presentation
Popular Tags:
21
Largest sized hydro unit (180 MW at Chamera) in the country Salient Features Northern Regional Power System Welcome Reforms Within The State, Trading And Other Issues by ALOK ROY General Manager (NRLDC) POWERGRID, New Delhi
Transcript
Page 1: Largest sized hydro unit (180 MW at Chamera) in the country

Largest sized hydro unit (180 MW at Chamera) in the country

Salient FeaturesNorthern Regional Power System

Welcome

Reforms Within The State, Trading And Other Issues

by

ALOK ROY

General Manager (NRLDC)

POWERGRID, New Delhi

Page 2: Largest sized hydro unit (180 MW at Chamera) in the country
Page 3: Largest sized hydro unit (180 MW at Chamera) in the country

Regional Grid

State - A

State - B

State - C

CS - 1 MPPCS - 2

RLDCCoordinates

Control Areas

Page 4: Largest sized hydro unit (180 MW at Chamera) in the country

SEB’s Grid

Discom - A

Discom - B

Discom - C

STATE IPP

CENTRALSHARE

STATE GENR.

SLDCCoordinatesDirects

Control Areas

TRADE

Trading

Consumer

Trading

Page 5: Largest sized hydro unit (180 MW at Chamera) in the country

G1 G2

SERCSERC

SLDC

SEB/STU

State Govt.

RLDC

RPC

CTU

CERCCERC

Central Govt. CEA

ISTS

ISGS

Load

L1 L2

Intra State System

IEGC to Operate on the periphery

X= - GL G

I E G C

Page 6: Largest sized hydro unit (180 MW at Chamera) in the country
Page 7: Largest sized hydro unit (180 MW at Chamera) in the country
Page 8: Largest sized hydro unit (180 MW at Chamera) in the country

Orissa Model

BC

G

G

G

G

G

D

RC

T

G : Genco BC : Bulk Consumer T : Transco RC : Retail Consumer D : Discom

Page 9: Largest sized hydro unit (180 MW at Chamera) in the country

BC

Recommended Model

D

NG

NG

OG

OG

OG

RC

OG : Old Genco BC : Bulk Consumer NG : New Genco RC : Retail Consumer D : Discom

Page 10: Largest sized hydro unit (180 MW at Chamera) in the country
Page 11: Largest sized hydro unit (180 MW at Chamera) in the country

How do you buy or sell a commodity

which can not be seen, counted in numbers, or measured in kg, litres or metres,

which can not be put in a container with a forwarding address, on a particular truck taking a particular route, but flows as per laws of physics,

which can not be stored, and whose availability and cost keep changing widely,

Page 12: Largest sized hydro unit (180 MW at Chamera) in the country

which intermingles with all other supplies in an inevitable pool, and can not have an owner’s name tag ?

There is another peculiarity: the buyer has no control over what the seller supplies, and the seller has no control over what the buyer draws from the pool, and the two may not match !

It is crucial to have mechanism for commercial handling of mismatches

 

Page 13: Largest sized hydro unit (180 MW at Chamera) in the country

1) Power trading has to be notional :

buyer to pay the agreed amount to the supplier for scheduled quantum of power.

2) Payment for variations from the schedule through a common mechanism, e.g. U.I.

TO AVOID DISPUTES

Page 14: Largest sized hydro unit (180 MW at Chamera) in the country

TRADER

GRID

10 MW 10 MW

8 MW

A B@ Rs. 2.00/ u @ Rs. 2.20/ u

AGREEMENTS

ACTUAL FLOW

12 MW

A B

Page 15: Largest sized hydro unit (180 MW at Chamera) in the country

TRADER

UI POOL A/C

UI for 2 MW

A B

Rs. 2.00/ u for 10 MW

Rs. 2.20/ u for 10 MW

PAYMENTS

UI for 2 MW

Page 16: Largest sized hydro unit (180 MW at Chamera) in the country

• An Example:Suppose TATA POWER want to sell 100 MW to Discom- A in Andhra Pradesh

STEPS :

1) TPC and Discom-A to agree on terms and conditions of sale

2) TPC to get the consent of MSEB and “no-objection” of MSERC

3) Discom-A to get the consent of APTransco and “no- objection” of APSERC

Page 17: Largest sized hydro unit (180 MW at Chamera) in the country

4) MSLDC and APSLDC to ascertain transmission adequacy, and agree to arrange necessary metering, scheduling, energy accounting and UI settlement

5) WRLDC and SRLDC to ascertain transmission adequacy in their regional transmission systems

6) All concerned to have a common understanding about treatment / sharing of transmission losses, and levy of transmission/ wheeling charges for the use of intra-State and inter-State systems

Page 18: Largest sized hydro unit (180 MW at Chamera) in the country
Page 19: Largest sized hydro unit (180 MW at Chamera) in the country

SCHEDULING,

METERING,

UI SETTLEMENT

AGREEMENT & PAYMENT FOR SCHEDULED QUANTUM

WRLDC

SRLDC

AP TRANSCO/APLDC

TATA POWER

DISCOM-A

MSEB /MSLDC

Page 20: Largest sized hydro unit (180 MW at Chamera) in the country

Nondiscriminatory provision for use of transmission line or distribution system or associated facilities with such line or system by any licensee or consumer or a person engaged in generation in accordance with the regulations specified by the Appropriate Commission.

Under sub-section (2) of Section 38, CTU is obliged to provide nondiscriminatory open access to its transmission system for use by

(i) any licensee or generating company on payment of transmission charges; or

(ii) any consumer as and when such open access is provided by the State Commission under sub-section (2) of Section 42, on payment of transmission charges and a surcharge thereon as may be specified by the Central Commission

“Open Access’ means

Page 21: Largest sized hydro unit (180 MW at Chamera) in the country

A MORE GENERAL DEFINITION OF “OPEN ACCESS”

“Enabling of non-discriminatory sale/ purchase of electric power/energy between two parties utilizing the system of an in- between (third party), and not blocking it on unreasonable grounds”