+ All Categories
Home > Documents > LECC 2002 - Colmar Monday 9 September PLENARY SESSION P1 14:30 LHC Physics Goals explained for...

LECC 2002 - Colmar Monday 9 September PLENARY SESSION P1 14:30 LHC Physics Goals explained for...

Date post: 17-Jan-2016
Category:
Upload: elisabeth-wiggins
View: 217 times
Download: 0 times
Share this document with a friend
Popular Tags:
23
LECC 2002 - Colmar Monday 9 September Monday 9 September PLENARY SESSION P1 PLENARY SESSION P1 14:30 14:30 LHC Physics Goals explained for Engineers LHC Physics Goals explained for Engineers P11 P11 P. Sphicas P. Sphicas (CERN) (CERN) 15:15 15:15 LHC Beam Instrumentation Detectors and LHC Beam Instrumentation Detectors and P12 P12 Acquisition Systems Acquisition Systems R. Jones R. Jones (CERN) (CERN) 16:00 16:00 Coffee break Coffee break 16:30 16:30 Trends in microelectrics and nanoelectronics Trends in microelectrics and nanoelectronics P13 P13 and their impact on HEP instrumentation and their impact on HEP instrumentation P. Jarron P. Jarron (CERN) (CERN) 17:15 17:15 Managing for Quality in the Electronics Industry Managing for Quality in the Electronics Industry P14 P14 S. Kelly S. Kelly (Motorola) (Motorola)
Transcript
Page 1: LECC 2002 - Colmar Monday 9 September PLENARY SESSION P1  14:30 LHC Physics Goals explained for Engineers P11P. Sphicas (CERN)  15:15 LHC Beam Instrumentation.

LECC 2002 - Colmar

Monday 9 SeptemberMonday 9 SeptemberPLENARY SESSION P1PLENARY SESSION P1

14:30 14:30 LHC Physics Goals explained for EngineersLHC Physics Goals explained for Engineers P11P11 P. Sphicas P. Sphicas (CERN)(CERN)

15:15 15:15 LHC Beam Instrumentation Detectors andLHC Beam Instrumentation Detectors and

P12P12 Acquisition SystemsAcquisition Systems   R. JonesR. Jones (CERN) (CERN)

16:0016:00 Coffee breakCoffee break

16:3016:30 Trends in microelectrics and nanoelectronics Trends in microelectrics and nanoelectronics

P13P13 and their impact on HEP instrumentationand their impact on HEP instrumentationP. JarronP. Jarron (CERN) (CERN)

17:1517:15 Managing for Quality in the Electronics IndustryManaging for Quality in the Electronics Industry P14P14 S. KellyS. Kelly (Motorola) (Motorola)

Page 2: LECC 2002 - Colmar Monday 9 September PLENARY SESSION P1  14:30 LHC Physics Goals explained for Engineers P11P. Sphicas (CERN)  15:15 LHC Beam Instrumentation.

LECC 2002 - Colmar

Tuesday 10 SeptemberTuesday 10 SeptemberPLENARY SESSIONPLENARY SESSION P2P2

09:00 09:00 LHC DAQ SystemsLHC DAQ Systems P21P21 S. CittolinS. Cittolin (CERN) (CERN)

09:4509:45 First-level trigger systems at LHCFirst-level trigger systems at LHC P22P22 N. EllisN. Ellis (CERN) (CERN)

10:3010:30 Coffee breakCoffee break

Page 3: LECC 2002 - Colmar Monday 9 September PLENARY SESSION P1  14:30 LHC Physics Goals explained for Engineers P11P. Sphicas (CERN)  15:15 LHC Beam Instrumentation.

LECC 2002 - Colmar

Tuesday 10 SeptemberTuesday 10 SeptemberParallel Session Parallel Session A1A1

Electronics for TrackerElectronics for Tracker 11:0011:00 Realization and test of a 0.25um Rad-Hard chip for Realization and test of a 0.25um Rad-Hard chip for A11A11

ALICE ITS data acquisition chain ALICE ITS data acquisition chain A.  GabrielliA.  Gabrielli (Bologna University) (Bologna University)

11:3011:30 Fast CMOS Transimpedance Amplifier and Fast CMOS Transimpedance Amplifier and A12A12 Comparator circuit for readout of silicon strip Comparator circuit for readout of silicon strip

detectors at LHC experimentsdetectors at LHC experimentsJ. KaplonJ. Kaplon (CERN) (CERN)

12:0012:00 OTIS - A TDC for the LHCb Outer TrackerOTIS - A TDC for the LHCb Outer Tracker A13A13 U. StangeU. Stange ( (Heidelberg University)Heidelberg University)

Page 4: LECC 2002 - Colmar Monday 9 September PLENARY SESSION P1  14:30 LHC Physics Goals explained for Engineers P11P. Sphicas (CERN)  15:15 LHC Beam Instrumentation.

LECC 2002 - Colmar

Tuesday 10 SeptemberTuesday 10 SeptemberParallel Session Parallel Session B1B1

TRIGGER ELECTRONICSTRIGGER ELECTRONICS

11:0011:00 The ATLAS Level-1 Muon to Central Trigger Processor The ATLAS Level-1 Muon to Central Trigger Processor B11B11 Interface (MUCTPI)Interface (MUCTPI)

K. NaganoK. Nagano (CERN) (CERN)

11:3011:30 Tests of CMS regional calorimeter Trigger prototypesTests of CMS regional calorimeter Trigger prototypesB12B12 W.H. SmithW.H. Smith ( (University of Wisconsin)University of Wisconsin)

12:0012:00 An Implementation of the Sector Logic for the Endcap An Implementation of the Sector Logic for the Endcap B13B13Level-1 Muon Trigger of the ATLAS ExperimentLevel-1 Muon Trigger of the ATLAS ExperimentR. IchimiyaR. Ichimiya ( (Kobe University)Kobe University)

Page 5: LECC 2002 - Colmar Monday 9 September PLENARY SESSION P1  14:30 LHC Physics Goals explained for Engineers P11P. Sphicas (CERN)  15:15 LHC Beam Instrumentation.

LECC 2002 - Colmar

Tuesday 10 SeptemberTuesday 10 SeptemberParallel Session Parallel Session A2A2

Electronics for TrackerElectronics for Tracker 14:0014:00 The ATLAS Pixelchip FEI in Deepsubmicron TechnologyThe ATLAS Pixelchip FEI in Deepsubmicron Technology

A21A21 Ivan PericIvan Peric ( (Bonn University)Bonn University)

14:3014:30 DTMROC-S : Deep submicron version of the readout chip forDTMROC-S : Deep submicron version of the readout chip for

A22 A22 the TRT detector in ATLASthe TRT detector in ATLASV. RyjovV. Ryjov ( (JINR, Moscow  and Lund UniversityJINR, Moscow  and Lund University) )

15:0015:00 System Performance of ATLAS SCT Detector ModulesSystem Performance of ATLAS SCT Detector Modules  A23A23 P. W. PhillipsP. W. Phillips ( (Rutherford Appleton Laboratory)Rutherford Appleton Laboratory)

15:3015:30 Development of the Inner Tracker Detector Electronics for Development of the Inner Tracker Detector Electronics for

A24 A24 LHCbLHCbA. VollhardtA. Vollhardt (Zurich University) (Zurich University)

16:0016:00 Coffee breakCoffee break

Page 6: LECC 2002 - Colmar Monday 9 September PLENARY SESSION P1  14:30 LHC Physics Goals explained for Engineers P11P. Sphicas (CERN)  15:15 LHC Beam Instrumentation.

LECC 2002 - Colmar

Tuesday 10 SeptemberTuesday 10 SeptemberParallel Session Parallel Session A2A2

Electronics for TrackerElectronics for Tracker 16:3016:30 Digital optical links for control of the CMS TrackerDigital optical links for control of the CMS Tracker

A25A25 A-M SandvikA-M Sandvik (CERN) (CERN)

17:0017:00 Results of early phase of series production of ATLAS SCT Results of early phase of series production of ATLAS SCT A26A26barrel hybrids and modulesbarrel hybrids and modulesY.IkegamiY.Ikegami ( (KEK)KEK)

17:3017:30 Performance of the Beetle Readout Chip for LHCbPerformance of the Beetle Readout Chip for LHCb A27A27 S. LoechnerS. Loechner (Max-Planck Institute, Heidelberg) (Max-Planck Institute, Heidelberg)

18:0018:00 Design and Performance of the CMS Pixel Readout Chip Design and Performance of the CMS Pixel Readout Chip  A28A28 H-C KaestliH-C Kaestli ( (Paul Scherrer Institut, Villigen)Paul Scherrer Institut, Villigen)

18:3018:30 Results from the first CMS Tracker System TestResults from the first CMS Tracker System Test A29A29 N.  MarinelliN.  Marinelli (Imperial College, London) (Imperial College, London)

Page 7: LECC 2002 - Colmar Monday 9 September PLENARY SESSION P1  14:30 LHC Physics Goals explained for Engineers P11P. Sphicas (CERN)  15:15 LHC Beam Instrumentation.

LECC 2002 - Colmar

Tuesday 10 SeptemberTuesday 10 SeptemberParallel Session Parallel Session B2B2

Trigger electronics and Detector Control Systems Trigger electronics and Detector Control Systems

and Data Acquisitionand Data Acquisition 14:0014:00 Results of a Sliced System Test for the ATLAS End-cap Results of a Sliced System Test for the ATLAS End-cap

B21B21 Muon Level-1 TriggerMuon Level-1 TriggerH. KanoH. Kano (ICEPP, (ICEPP, University of Tokyo)University of Tokyo)

14:3014:30 Level 0 trigger decision unit for the LHCb experimentLevel 0 trigger decision unit for the LHCb experiment B22B22 R. CornatR. Cornat (LPC Clermont-Ferrand (IN2P3/CNRS) (LPC Clermont-Ferrand (IN2P3/CNRS)

15:0015:00 Pile-Up Veto L0 Trigger System for LHCb using large FPGA'sPile-Up Veto L0 Trigger System for LHCb using large FPGA's B23B23 L..W. WiggersL..W. Wiggers (NIKHEF Amsterdam) (NIKHEF Amsterdam)

16:0016:00 Coffee breakCoffee break

Page 8: LECC 2002 - Colmar Monday 9 September PLENARY SESSION P1  14:30 LHC Physics Goals explained for Engineers P11P. Sphicas (CERN)  15:15 LHC Beam Instrumentation.

LECC 2002 - Colmar

Tuesday 10 SeptemberTuesday 10 SeptemberParallel Session Parallel Session B2B2

Trigger electronics and Detector Control Systems Trigger electronics and Detector Control Systems

and Data Acquisitionand Data Acquisition

16:3016:30 Prototype Cluster Processor Module for the ATLAS Level-1 Prototype Cluster Processor Module for the ATLAS Level-1 B25B25Calorimeter TriggerCalorimeter TriggerG. MahoutG. Mahout ( (University of Birmingham)University of Birmingham)

17:0017:00 The Design of the Coincidence Matrix ASIC of the ATLAS The Design of the Coincidence Matrix ASIC of the ATLAS B26B26Barrel Level-1 Muon TriggerBarrel Level-1 Muon TriggerR. VariR. Vari ( (INFN Roma)INFN Roma)

17:3017:30 The ATLAS readout system of the Liquid Argon CalorimeterThe ATLAS readout system of the Liquid Argon CalorimeterB27B27 I. RiuI. Riu (University of Geneva) (University of Geneva)

Page 9: LECC 2002 - Colmar Monday 9 September PLENARY SESSION P1  14:30 LHC Physics Goals explained for Engineers P11P. Sphicas (CERN)  15:15 LHC Beam Instrumentation.

LECC 2002 - Colmar

Wednesday 11 SeptemberWednesday 11 SeptemberPLENARY SESSIONPLENARY SESSION P3P3

09:0009:00 Summary of the JCOP Workshop IIISummary of the JCOP Workshop IIIP31P31 W. SalterW. Salter (CERN) (CERN)

09:4509:45 Radiation Assurance of LHC Radiation Assurance of LHC electronicselectronicsP32P32 P. FarthouatP. Farthouat (CERN) (CERN)

10:3010:30 Coffee breakCoffee break

Page 10: LECC 2002 - Colmar Monday 9 September PLENARY SESSION P1  14:30 LHC Physics Goals explained for Engineers P11P. Sphicas (CERN)  15:15 LHC Beam Instrumentation.

LECC 2002 - Colmar

Wednesday 11 SeptemberWednesday 11 SeptemberParallel Session Parallel Session A3A3

Electronics for TrackerElectronics for Tracker 11:0011:00 Test and Evaluation of HAL25 : the ALICE SSD Test and Evaluation of HAL25 : the ALICE SSD 

A31A31 Front-End Chip Front-End Chip C. HUC. HU (IreS Strasbourg) (IreS Strasbourg)

11:3011:30 Status Report of the ATLAS SCT Optical LinksStatus Report of the ATLAS SCT Optical LinksA32A32 J.  MathesonJ.  Matheson (Rutherford Appleton Laboratory) (Rutherford Appleton Laboratory)

12:0012:00 Radiation-Hard ASICs for Optical Data Radiation-Hard ASICs for Optical Data A33A33

Transmission in theTransmission in the ATLAS Pixel DetectorATLAS Pixel DetectorM. ZoellerM. Zoeller ( (The Ohio State University, The Ohio State University, Columbus)Columbus)

Page 11: LECC 2002 - Colmar Monday 9 September PLENARY SESSION P1  14:30 LHC Physics Goals explained for Engineers P11P. Sphicas (CERN)  15:15 LHC Beam Instrumentation.

LECC 2002 - Colmar

Wednesday 11 SeptemberWednesday 11 SeptemberParallel Session Parallel Session B3B3

DAQDAQ 11:0011:00 ATLAS Tile Calorimeter Digitizer-to-Slink ATLAS Tile Calorimeter Digitizer-to-Slink B31B31

InterfaceInterfaceF. TangF. Tang (The University of Chicago) (The University of Chicago)

11:3011:30 FED-kit design for CMS DAQ systemFED-kit design for CMS DAQ system B32B32 D. GigiD. Gigi (CERN) (CERN)

12:0012:00 A Gigabit Ethernet Link Source CardA Gigabit Ethernet Link Source Card B33B33 J. W. DawsonJ. W. Dawson ( (Argonne National Laboratory)Argonne National Laboratory)

Page 12: LECC 2002 - Colmar Monday 9 September PLENARY SESSION P1  14:30 LHC Physics Goals explained for Engineers P11P. Sphicas (CERN)  15:15 LHC Beam Instrumentation.

LECC 2002 - Colmar

Wednesday 12 SeptemberWednesday 12 SeptemberParallel Session Parallel Session A4A4

Electronics for TrackerElectronics for Tracker

14:0014:00 Aluminium microcable technology for the Alice silicon strip Aluminium microcable technology for the Alice silicon strip A41A41detector : a status reportdetector : a status reportA.P. de HaasA.P. de Haas ( (NIKHEF, Utrecht/Amsterdam)NIKHEF, Utrecht/Amsterdam)

14:3014:30 High Rate Photon Irradiation Test of an 8-Plane TRT Endcap High Rate Photon Irradiation Test of an 8-Plane TRT Endcap A42A42Sector PrototypeSector PrototypeJ. VallsJ. Valls (CERN) (CERN)

15:0015:00 The Effect of Highly Ionising Events on the APV25 Readout The Effect of Highly Ionising Events on the APV25 Readout A43A43ChipChipR. BainbridgeR. Bainbridge (Imperial College, London) (Imperial College, London)

15:3015:30 Readout Control Unit of the Front End Electronics of the Readout Control Unit of the Front End Electronics of the

A44A44 Time Projection Chamber in ALICETime Projection Chamber in ALICEJ. LienJ. Lien (CERN) (CERN)

16:0016:00 Coffee breakCoffee break

Page 13: LECC 2002 - Colmar Monday 9 September PLENARY SESSION P1  14:30 LHC Physics Goals explained for Engineers P11P. Sphicas (CERN)  15:15 LHC Beam Instrumentation.

LECC 2002 - Colmar

Wednesday 12 SeptemberWednesday 12 SeptemberParallel Session Parallel Session A4A4

Electronics for TrackerElectronics for Tracker16:3016:30 The Alice Silicon Pixel Detector Readout System – Moving The Alice Silicon Pixel Detector Readout System – Moving A45 A45 Towards System IntegrationTowards System Integration

R. DinapoliR. Dinapoli (CERN) (CERN)

17:0017:00 Front-End Hybrid for the CMS Silicon Tracker Front-End Hybrid for the CMS Silicon Tracker  A46 A46 U.GoerlachU.Goerlach (IreS Strasbourg) (IreS Strasbourg)

17:3017:30 Reliability prediction for TFBGA AssembliesReliability prediction for TFBGA Assemblies A47 A47 Z. RadivojevicZ. Radivojevic (NOKIA Research Center) (NOKIA Research Center)

18:0018:00 The CCU25: a network oriented Communication and Control The CCU25: a network oriented Communication and Control A48 A48 Unit integrated circuit in a 0.25 um CMOS technologyUnit integrated circuit in a 0.25 um CMOS technology

C. PaillardC. Paillard (CERN) (CERN)

Page 14: LECC 2002 - Colmar Monday 9 September PLENARY SESSION P1  14:30 LHC Physics Goals explained for Engineers P11P. Sphicas (CERN)  15:15 LHC Beam Instrumentation.

LECC 2002 - Colmar

Wednesday 11 SeptemberWednesday 11 SeptemberParallel Session Parallel Session B4B4

DAQDAQ 14:0014:00 PCI-based Readout Receiver Card in the ALICE DAQ PCI-based Readout Receiver Card in the ALICE DAQ B41B41

SystemSystemC. SoosC. Soos (CERN) (CERN)

14:3014:30 CMS Data to surface transportation architectureCMS Data to surface transportation architectureB42B42 A. RaczA. Racz (CERN) (CERN)

15:0015:00 TAGnet, a high rate eventbuilder protocol TAGnet, a high rate eventbuilder protocol B43B43 H. MullerH. Muller (CERN) (CERN)

15:3015:30 MROD, the MDT Read Out DriverMROD, the MDT Read Out DriverB44B44 A.KonigA.Konig (Nijmegen University) (Nijmegen University)

16:0016:00 Coffee breakCoffee break

Page 15: LECC 2002 - Colmar Monday 9 September PLENARY SESSION P1  14:30 LHC Physics Goals explained for Engineers P11P. Sphicas (CERN)  15:15 LHC Beam Instrumentation.

LECC 2002 - Colmar

Wednesday 11 SeptemberWednesday 11 SeptemberParallel Session Parallel Session B4B4

DAQDAQ16:3016:30 The implementation of the production version of the Front-End The implementation of the production version of the Front-End

Driver card for the CMS silicon tracker readoutDriver card for the CMS silicon tracker readout B45B45 J.A. CoughlanJ.A. Coughlan ( (CLRC Rutherford Appleton Laboratory)CLRC Rutherford Appleton Laboratory)

17:0017:00 ROD General Requirements and Present Hardware Solution for ROD General Requirements and Present Hardware Solution for the ATLAS TileCalorimeterthe ATLAS TileCalorimeter

B46B46 J. Torres PaísJ. Torres País (Valencia University) (Valencia University)

17:3017:30 Evolution of S-Link to PCI interfacesEvolution of S-Link to PCI interfaces B47B47 W. IwanskiW. Iwanski ( (Henryk Niewodniczanski Institute of Nuclear Physics)Henryk Niewodniczanski Institute of Nuclear Physics)

18:0018:00 The Read Out Driver for the ATLAS Muon Endcap trigger and its The Read Out Driver for the ATLAS Muon Endcap trigger and its architectural and design language techniquesarchitectural and design language techniques

B48B48 L. LevinsonL. Levinson (Weizmann Institute of Science, Rehovot) (Weizmann Institute of Science, Rehovot)

Page 16: LECC 2002 - Colmar Monday 9 September PLENARY SESSION P1  14:30 LHC Physics Goals explained for Engineers P11P. Sphicas (CERN)  15:15 LHC Beam Instrumentation.

LECC 2002 - Colmar

Thursday 12 SeptemberThursday 12 SeptemberPLENARY SESSION PLENARY SESSION P4P4

09:0009:00 LHC Machine and Experiment Interface IssuesLHC Machine and Experiment Interface Issues

P41P41 E. TsesmelisE. Tsesmelis (CERN) (CERN)

09:4509:45 Grounding and Shielding Techniques Grounding and Shielding Techniques

P42P42 for Large Scale Experimentsfor Large Scale ExperimentsM. JohnsonM. Johnson (Fermilab) (Fermilab)

11:0011:00 Coffee breakCoffee break

Page 17: LECC 2002 - Colmar Monday 9 September PLENARY SESSION P1  14:30 LHC Physics Goals explained for Engineers P11P. Sphicas (CERN)  15:15 LHC Beam Instrumentation.

LECC 2002 - Colmar

Thursday 12 SeptemberThursday 12 SeptemberParallel Session Parallel Session A5A5

Links, Power Systems, Grounding and Links, Power Systems, Grounding and

Shielding, Testing and Quality AssuranceShielding, Testing and Quality Assurance

11:0011:00 Embedding deserialisation of LHC experimental data Embedding deserialisation of LHC experimental data A51A51inside Field Programmable Gates Arraysinside Field Programmable Gates Arrays

T. RomanteauT. Romanteau (Laboratoire Leprince-Ringuet) (Laboratoire Leprince-Ringuet) 11:3011:30 High Voltage Power Supply Module Operating in High Voltage Power Supply Module Operating in

A52A52 Magnetic FieldMagnetic FieldM. ImoriM. Imori (ICEPP, Tokyo University) (ICEPP, Tokyo University)

12:0012:00 Electromagnetic Compatibility Test for CMS Electromagnetic Compatibility Test for CMS

A53A53 experimentexperimentF. ArtecheF. Arteche (CERN) (CERN)

Page 18: LECC 2002 - Colmar Monday 9 September PLENARY SESSION P1  14:30 LHC Physics Goals explained for Engineers P11P. Sphicas (CERN)  15:15 LHC Beam Instrumentation.

LECC 2002 - Colmar

Thursday 12 SeptemberThursday 12 SeptemberParallel Session Parallel Session B5B5

Electronics for Calorimeters Electronics for Calorimeters

11:0011:00 A Configurable Radiation Tolerant Dual-Ported A Configurable Radiation Tolerant Dual-Ported

B51B51 Static RAM macro, designed in a 0.25 μm CMOSStatic RAM macro, designed in a 0.25 μm CMOStechnology for applications in the LHC technology for applications in the LHC

environment.environment.K. KloukinasK. Kloukinas (CERN) (CERN)

11:3011:30 Overview of the new CMS electromagnetic Overview of the new CMS electromagnetic

B52B52 calorimeter electronicscalorimeter electronicsP. BussonP. Busson ( (Laboratoire Leprince-Ringuet, Laboratoire Leprince-Ringuet,

Palaiseau)Palaiseau) 12:0012:00 Front-end Electronics for the LHCb preshowerFront-end Electronics for the LHCb preshower

B53B53 R. CornatR. Cornat (LPC Clermont-Ferrand (IN2P3/CNRS) (LPC Clermont-Ferrand (IN2P3/CNRS)

Page 19: LECC 2002 - Colmar Monday 9 September PLENARY SESSION P1  14:30 LHC Physics Goals explained for Engineers P11P. Sphicas (CERN)  15:15 LHC Beam Instrumentation.

LECC 2002 - Colmar

Thursday 12 SeptemberThursday 12 SeptemberParallel Session Parallel Session A6A6

Power Systems, Grounding and Shielding, Testing and Power Systems, Grounding and Shielding, Testing and

Quality AssuranceQuality Assurance 14:0014:00 Progress in Radiation and Magnetic Field tests of Progress in Radiation and Magnetic Field tests of

A61A61 CAEN HV and LV CAEN HV and LV N. PaoliN. Paoli (Caen, SpA) (Caen, SpA)

14:3014:30 Noise immunity analysis of the Forward Hadron Calorimeter Noise immunity analysis of the Forward Hadron Calorimeter A62A62Front-end electronicsFront-end electronics

C. RivettaC. Rivetta (Fermilab, Batavia) (Fermilab, Batavia) 15:0015:00 A Common 400Hz AC power supply distribution system for A Common 400Hz AC power supply distribution system for A63A63

CMS front-end electronicsCMS front-end electronicsC. RivettaC. Rivetta (Fermilab, Batavia) (Fermilab, Batavia)

15:3015:30 A flexible stand-alone testbench for characterizing the front-A flexible stand-alone testbench for characterizing the front-A64A64end electronics for the CMS Preshowerend electronics for the CMS Preshower

detector under LHC-like timing conditionsdetector under LHC-like timing conditionsD. BarneyD. Barney (CERN) (CERN)

16:0016:00 Coffee breakCoffee break   

Page 20: LECC 2002 - Colmar Monday 9 September PLENARY SESSION P1  14:30 LHC Physics Goals explained for Engineers P11P. Sphicas (CERN)  15:15 LHC Beam Instrumentation.

LECC 2002 - Colmar

Thursday 12 SeptemberThursday 12 SeptemberParallel Session Parallel Session B6B6

Electronics for Calorimeters /Electronics for Calorimeters /Electronics for MuonsElectronics for Muons

14:0014:00 A BiCMOS synchronous pulse discriminator for the LHCb A BiCMOS synchronous pulse discriminator for the LHCb

B61B61 calorimeter systemcalorimeter systemD. GascónD. Gascón (Barcelona University) (Barcelona University)    

14:3014:30 Channel Control ASIC for the CMS Hadron Calorimetry Front Channel Control ASIC for the CMS Hadron Calorimetry Front B62B62End Readout ModuleEnd Readout Module

R. YaremaR. Yarema (Fermilab, Batavia) (Fermilab, Batavia) 15:0015:00 A low-power high dynamic range front-end ASIC for imaging A low-power high dynamic range front-end ASIC for imaging B63B63

calorimeterscalorimetersM. Grazia BagliesiM. Grazia Bagliesi (University and INFN,  Siena) (University and INFN,  Siena)

15:3015:30 ATLAS/LAR Calibration systemATLAS/LAR Calibration system   B64B64 N. Seguin-MoreauN. Seguin-Moreau (Laboratoire de l’Accélérateur (Laboratoire de l’Accélérateur

Linéaire,Linéaire,Université Paris-SudUniversité Paris-Sud

16:0016:00 Coffee breakCoffee break

Page 21: LECC 2002 - Colmar Monday 9 September PLENARY SESSION P1  14:30 LHC Physics Goals explained for Engineers P11P. Sphicas (CERN)  15:15 LHC Beam Instrumentation.

LECC 2002 - Colmar

16:3016:30 Mass production testing of the anode front-end electronics Mass production testing of the anode front-end electronics A65A65for the CMS endcap muon cathode strip chambersfor the CMS endcap muon cathode strip chambersA. GolyashA. Golyash ( ( Petersburg Nuclear Physics Institute, Petersburg Nuclear Physics Institute,

Gatchina)Gatchina)

17:0017:00 APV25 production testing and quality assuranceAPV25 production testing and quality assuranceA66A66 M. RaymondM. Raymond ( (Blackett Laboratory, Imperial College, Blackett Laboratory, Imperial College,

London)London)

Thursday 12 SeptemberThursday 12 SeptemberParallel Session Parallel Session A6A6

Power Systems, Grounding and Shielding, Testing and Power Systems, Grounding and Shielding, Testing and Quality Assurance Quality Assurance

Page 22: LECC 2002 - Colmar Monday 9 September PLENARY SESSION P1  14:30 LHC Physics Goals explained for Engineers P11P. Sphicas (CERN)  15:15 LHC Beam Instrumentation.

LECC 2002 - Colmar

16:3016:30 Chamber Service Module (CSM1) for MDTChamber Service Module (CSM1) for MDTB65B65 Pietro BinchiPietro Binchi (University of Michigan) (University of Michigan)

17:0017:00 Frontend Electronics for the CMS Barrel Muon ChambersFrontend Electronics for the CMS Barrel Muon Chambers B66B66 F. GonellaF. Gonella ( (University and INFN, Padova)University and INFN, Padova)

Thursday 12 SeptemberThursday 12 SeptemberParallel Session Parallel Session B6B6

Electronics for Calorimeters /Electronics for Calorimeters /Electronics for MuonsElectronics for Muons

Page 23: LECC 2002 - Colmar Monday 9 September PLENARY SESSION P1  14:30 LHC Physics Goals explained for Engineers P11P. Sphicas (CERN)  15:15 LHC Beam Instrumentation.

LECC 2002 - Colmar

Friday 13 SeptemberFriday 13 SeptemberPLENARY SESSIONPLENARY SESSION P5P5

09:0009:00 Trends in high speed, low power Analog to Digital Trends in high speed, low power Analog to Digital

P51P51 convertersconvertersL. DugoujonL. Dugoujon (STMicroelectronics, Grenoble) (STMicroelectronics, Grenoble)

09:4509:45 Distributed Processors allow revolutionary Hardware / Distributed Processors allow revolutionary Hardware / P52P52 Software Software partitioningpartitioning

J-LJ-L.. Brelet Brelet ( (Xilinx Inc,  Xilinx Inc,  Sophia Antipolis) Sophia Antipolis)

10:1510:15 Coffee breakCoffee break

10:3010:30 Technology TransferTechnology TransferP53P53 R. AmendoliaR. Amendolia (CERN) (CERN)

11:1511:15 Timing Distribution at the LHCTiming Distribution at the LHC

P54P54 B. TaylorB. Taylor (CERN) (CERN)


Recommended