LSTS LOTTE Steel Tracking Management System
PC User's Guide
Contents
Getting Start .......................................................................................................................................... 1
Hardware Specification for LSTS .......................................................................................................... 1
Install Program ............................................................................................................................................. 1
Execute Program ......................................................................................................................................... 2
Delete Program ............................................................................................................................................ 3
Install Direct X .............................................................................................................................................. 4
Main Window and Main Menu .................................................................................................... 6
Main Window ............................................................................................................................................. 6
Main Menu ..................................................................................................................................................... 6
Toolbar ............................................................................................................................................................. 8
work Window ................................................................................................................................................ 8
File Menu ................................................................................................................................................ 9
Login & Logout ........................................................................................................................................... 9
Import Tekla Structures Report File ................................................................................................. 11
1. Copy Template File .............................................................................................................. 11
2. Generate Tekla Structures Report File ........................................................................ 11
3. Generate LSTS Member .................................................................................................... 13
Manage Tekla Structures BM Revision ........................................................................................... 15
Input BM file into Excel file ................................................................................................................. 17
Work Process Finish File (based on Individual ID) ................................................................... 18
1. Complete base on member workprocess ................................................................. 19
2. Complete 'Packing' workprocess .................................................................................. 20
3. Complete 'Delivery(Arrival)' workprocess. ................................................................. 21
Management Menu ........................................................................................................................ 23
Edit Member............................................................................................................................................... 23
Actual work--Check Actual Process ................................................................................................. 26
General Notice .......................................................................................................................................... 28
Emergency work order and check ................................................................................................... 29
Sync Mobile Eqipment and Work Data ......................................................................................... 31
Production Menu ............................................................................................................................. 33
Input Production data--Setup Work Plan and Completion ................................................. 33
Input Loose part ....................................................................................................................................... 36
Input Bolt Box Data ................................................................................................................................ 39
Packing Menu .................................................................................................................................... 43
Packing Environment--Setup Shipping/Job ................................................................................. 43
Input Packing Data .................................................................................................................................. 44
Input Delivery Data--Setup Sent work plan and completion ............................................. 46
Construction Menu ......................................................................................................................... 48
Setup work plan and completion of Construction Process ................................................. 48
1. Input Construction Data (Arrival) .................................................................................. 48
2. Input Construction Data (Arrival etc.) ......................................................................... 50
Search&Report Menu .................................................................................................................... 53
Packing List ................................................................................................................................................. 53
Warehouse Summary Report--Management Stock and Shipping & Receiving in
Laydown ....................................................................................................................................................... 55
Revision History of BM --BM Revision Record .......................................................................... 56
Process Status Report for Member ................................................................................................. 56
1. Day .............................................................................................................................................. 57
2. Period-Day ............................................................................................................................... 58
3. Period-Week ........................................................................................................................... 59
4. Period-Month ......................................................................................................................... 60
5. Current....................................................................................................................................... 61
Progress Status .......................................................................................................................................... 63
Process Status Report for Loosepart .............................................................................................. 64
1. Period-Day ............................................................................................................................... 64
2. Period-Week ........................................................................................................................... 65
3. Detail .......................................................................................................................................... 65
4. Current....................................................................................................................................... 66
Process Status Report for Bolt ........................................................................................................... 67
1. Detail .......................................................................................................................................... 67
2. Current....................................................................................................................................... 68
Structure Process Report ...................................................................................................................... 69
1. Summary .................................................................................................................................. 69
2. Total ............................................................................................................................................ 70
3. Process Detail ......................................................................................................................... 70
Material Status Report ........................................................................................................................... 71
1. Material Status ....................................................................................................................... 71
2. Material Status Detail ......................................................................................................... 72
Storage Map--Search the Laydown ................................................................................................ 73
1. Search ........................................................................................................................................ 73
2. Map ............................................................................................................................................. 74
Track Map .................................................................................................................................................... 77
Display Tekla Structure .......................................................................................................................... 79
Setup Menu ........................................................................................................................................ 85
Project & PBS ............................................................................................................................................ 85
1. PBS ................................................................................................................................................... 85
2. Tekla Structure ...................................................................................................................................... 89
Assign the User block ............................................................................................................................ 91
Setup the Member type ....................................................................................................................... 92
Setup the Structure Type ...................................................................................................................... 93
Setup the Laydown Map ...................................................................................................................... 95
Setup the User Account........................................................................................................................ 97
Assign Work Manager and Publisher ............................................................................................. 99
Setup the Company .............................................................................................................................. 100
Ressign the Member index number ............................................................................................. 101
Setup Option............................................................................................................................................ 102
1. Graphic View ........................................................................................................................ 102
2. Barcode ................................................................................................................................... 103
3. Sync........................................................................................................................................... 105
4. Printer ...................................................................................................................................... 106
5. Data .......................................................................................................................................... 107
6. DisplayData ........................................................................................................................... 108
Setup Database (Select DB Server) ............................................................................................... 108
LSTS USER MANUAL
1
Getting Start
Hardware Specification for LSTS
To excute LSTS program, you need a personal computer satisfied the
below hardware specifications.
1. CPU Pentium or over
2. Operating System Window 7
3. Hard Disc 1GB or over
4. RAM 1GB or over
5. Graphic Card Supporting Direct X 9.0
Install Program
To install the program, you follow the below steps.
1. Download LSTS Program in the URL.
2. Click the Setup.exe File
3. When program install window come up, click [Next] button.
4. After step 3, you make “C:\Program Files (X86)\EverHitIT\LSTS\”
folder and install the program into the folder. If you want to install
시
스
템
사
양
LSTS USER MANUAL
2
the program the different folder, just click [Browse] button and select
new folder and click [OK] button.
5. If you click [Next] button on install window, all the files of the
program will be installed automatically.
Execute Program
After the program install has been done, you can execute the
program on your PC. You can execute the program with LSTS icon on
Starting menu or Desktop window.
LSTS USER MANUAL
3
Delete Program
To delete LSTS Program from the PC, you can delete by the following
steps.
1. Go Start> Setting> Control Pannel menu and click ‘Add and Delete
icon.
2. Select“LSTS”in the list on the appeared window.
3. Click [Delete] button.
4. LSTS Program will be deleted.
LSTS USER MANUAL
4
Install Direct X
You must install 'Direct X'. If your PC was uninstalled 'Direct X', you
can't check chart and map at 'Seach&Report' of mainmenu
1. You generate a new folder to unzip a setup direct x file ( you
have to generate the folder a location to exclude wallpaper)
2. If you double click the direct x setup file, you can check a
window as follows. Click the [Browse] button, Select the folder
generated at no.1, Click the [OK] button, Click the [OK] button at
first window. You can unzip the directx setup file.
LSTS USER MANUAL
5
3. If you double-click the [DXSETUP.exe] file at the folder to unzip
setup file, you can install 'Direct X'
LSTS USER MANUAL
6
Main Window and Main Menu
Main Window
Work screen of LSTS and menu system are as following.
Main Menu
It contains all the commands to operating LSTS.
File You can login and logout, import the ‘BM’ (Bill of
Material) file and chat with other user.
Management You can perform the following works: steel members,
Revision, deleted members, alarm, print barcodes and
Sync barcode hand terminal etc
Production You can input the plan of production members and
the production completion. You can
add/modify/delete the ‘Bolt’ box and the ‘Loose Part’
Toolbar Main Menu Work Window
LSTS USER MANUAL
7
box and print the barcode etc
Packing You can perform the Shipping/Job management, the
plan of packing and input completion work and print
the barcode etc.
Construction You can perform arrangement, installation,
examination, the plan of work and input of
completion of the steel member in laydown. and
print the barcode etc. in other word, you can
perform the work of construction space management.
Report You can check statistical work status from the project
process status and the 4D, the packing list and the
shipping & receving Laydown history etc
Setup You can setup the project, PBS and user account
Window You can arrange/select windows on Work Window
LSTS USER MANUAL
8
Toolbar
This provides several main functions by toolboxes.
Y
o
u
work Window
You can perform all the works of LSTS program.
Login You can login LSTS program.
Logout You can logout LSTS program.
Select PBS You can select PBS.
Display Structure You can check progress status through 4D
Storage Map You can manage administration of Laydown
Track Map You can check the location of members base
on the google map
Progress Status
Report
You can check progress status on daily,
monthly, yearly
Structure
Progress Report
You can check project progress rate
Option You can setup options
LSTS USER MANUAL
9
File Menu
Login & Logout
You can Log in or log out LSTS program.
.
At ‘File>Login’ menu, you can login LSTS program. Also, you can log
out at ‘File>Logout’ menu.
If you input the wrong password 5times, you have to unlock to log-in.
LSTS USER MANUAL
10
If you want to change password, you click the [Change Password] and
then input the information to ‘Change Password’ window.
If you don’t change password for 3 months, you check the window as
above.
You should change password every 3 months.
LSTS USER MANUAL
11
Import Tekla Structures Report File
1. Copy Template File
To generate the ‘BM Report File’ (ex: BPCM_v9.xsr) of Tekla Strcutures,
at first, you have to copy ‘Report Template File’ (ex: BPCM_v9.rpt) to
‘Tekla Structures’ folder or copy ‘Report Template File’ to by model
folder.
Folder for copy:
c:\ProgramData\Tekla Structures\18.0\environments\korea\template
2. Generate Tekla Structures Report File
You can generate a ‘BM Report File’ to import in LSTS program.
Tekla Structures open window
LSTS USER MANUAL
12
After you execute ‘Tekla Structures’ program, at ‘File>Open’, import
the file to perform modeling in ‘Tekla Structures’. At ‘File>Report’, if
you select a ‘BM Report File’ (ex: BPCM_v9) for LSTS at the ‘Report
Generate Use’ window. and then click the [Create from all] button, you
can generate a ‘Report File’(‘BPCM_v9.xsr’).
LSTS USER MANUAL
13
3. Generate LSTS Member
You can generate member information of the structure to use the ‘BM
Report File’ to be imported from the ‘Tekla Structure’ program.
At ‘File>Import>New Tekla BM on Client’ menu, you can import a
report file of ‘Tekla Structure’ program.
⚫ Select a ‘Tekla Structure’ and then select the options of
'Previous Data and Dummy Pieces.
⚫ Click the [Read] button.
You can import the BM report file. if you want to import the report
file after deleting existing files, you have to select the 'Delete' option.
and if you want to perserve existing files and import the report file,
you have to select the 'Preserve' option. If you want to read members
of Dummy type, you have to select 'Yes Read' option and if not, you
have to select 'No Read' option.
LSTS USER MANUAL
14
If you want to realize Tekal Structure models as LSTS member, you
have to set up 'Name' property of member property to 'Dummy'.
<Tekla Structures property>
'Name' propery is member's 'Name' of LSTS.
You can check that Structure to manage seperately 'Loose Part
Mebmer' is output at Separte Loose Part from Member. In the case of
opposition, the Structure is output at Connect Loose Part to Member.
⚫ Select the [Read] button to appear the below window
⚫ Select a BM report file
⚫ You can import the BM report file.
LSTS USER MANUAL
15
Manage Tekla Structures BM Revision
You can apply the changed data of Tekla Sturctures Modeling to
existing data.
At ‘File>Import>Revision Tekla Structures BM File’, After select the
'Dummy Pieces' option, if you click the [Read Revision TS BM File]
button, you can import the revisioned BM report file of Tekla Structure
After importing the BM report file, if you want to check the detailed
information about 'Modify Member', you have to click the [Write
Detail] button.
If the main properties change, Make Latest column is ‘o’. also, you can
check the changed items in the Detail column.
LSTS USER MANUAL
16
You click the [Write Excel] button, you can save the outputed
information at datagrid as an Excel file.
If you click the [Read Revision TS BM File] button, you can see the
window as below. If you click the [Ok] button, you can import the
data.
If you import the Revisioned Tekla Structure report file, you can see
the added/modified/deleted data compared to existing data at
datagrid. You can check the date, file name to be Revision or
imported at Revision History window on the lower left hand.
If you check the invalid Revisoned data, you can delete the data to
click the [Skip] button. on the top of datagrid. After completing
control works, click the [Apply Revision button, you can replect the
Revisioned data.
If you think invalid file during Revision replecting, you can stop the
Revision to click the [Apply Revision] button. If Revision is finish, you
cannot cancel the Revison
LSTS USER MANUAL
17
Input BM file into Excel file
You can input 'BM' file as an Excel file.
The members of input 'BM FILE' cannot perform 'Revision'.
At File>Import>New Excel BM File menu, If you click the button
at the right bottom, you can output a excel file of form as below.
After making BM FILE,
⚫ Select the 'Tekla Sturcture'
⚫ Select the 'Preserve' or the Delete' at the 'Previous Data
groupbox
If you click [Read] button, you can import the 'BM' file to the selected
'Tekla Structure' and then you can check the data at the selected
'Tekla Sturcture'.
MemberNo Member Name
RevNo Revision No.
LSTS USER MANUAL
18
Size Size
Material Material
Qnty Quantity of Member
Length Length of Member(Meter)
Weight Weight of Member(Kg)
Type Type of Member
Grid Arraged Grid of Member
Elevation Arraged height of Member
Work Process Finish File (based on Individual ID)
You can complete workprocess as reading excel file.
At File>Import>Work Process Finish File (based on Individual ID), you
can input completed workprocess member- information as Excel file.
LSTS USER MANUAL
19
1. Complete base on member workprocess
At 'Make Template File for Actual Work' groupbox,
⚫ Select workprocess base on member at 'Work Process'
combobox
⚫ Select 'Tekla Structure' at 'Tekla Structure' groupbox
If you click the [Make Template] button, you can check a file as
follows.
The workprocess base on member is workprocess except for 'Packing,
Delivery, Arrival, and Release’.
As above, you can check memberlists of selected 'Tekla Structure'
⚫ Input '*' at the 'Update' column and 'Actual Date(YYYY-MM-
DD)' at the ' Actual Date' column.
⚫ Save the excel file. and click the [Read] button at the 'Update
Template File for Actual Work' group box.
⚫ Import the saved excel file.
LSTS USER MANUAL
20
You can complete production workprocess.
※ You must only input information at the yellow shading.
2. Complete 'Packing' workprocess
At 'Make Template File for Actual Work' groupbox,
⚫ Select 'Packing' workproces at 'Work Process' combobox
⚫ Select 'Tekal Structure' at 'Tekla Structure' groupbox
If you click the [Make Template] button, you can check a file as
follows.
You can check memberlist of selected 'Tekla Structure'.
⚫ Input '*' at the 'Update' column and 'Actual Date(YYYY-MM-DD)'
at the ' Actual Date' column and 'Package No.' at the 'Package
No.' column. If you input wrong 'Package No.' information you
can't update the line.
⚫ Save the excel file. and click the [Read] button at the 'Update
Template File for Actual Work' group box.
⚫ Import the saved excel file.
You can update workprocess- completion.
LSTS USER MANUAL
21
3. Complete 'Delivery(Arrival)' workprocess.
At 'Make Template File for Actual Work' groupbox,
⚫ Select 'Delivery ' or 'Arrival' workproces at 'Work Process'
combobox
⚫ Select 'Tekla Structure' at 'Packing Owner' groupbox
If you click the [Make Template] button, you can check a file as
follows.
You can check Package list of 'Package Owner'.
⚫ Input '*' at the 'Update' column and 'Actual Date(YYYY-MM-DD)'
at the ' Actual Date' column.
⚫ Save the excel file. and click the [Read] button at the 'Update
LSTS USER MANUAL
22
Template File for Actual Work' group box.
⚫ Import the saved excel file.
You can update workprocess- completion.
LSTS USER MANUAL
23
Management Menu
Edit Member
You can manage about member information.
At ‘Management>Edit Member’ menu, you can add/modify/delete the
member information. In addition, you can add/modify/delete the Bolt
is included within the member.
At ‘Search’ groupbox
⚫ Select ‘Tekla Structure’ to want search
⚫ Input member name to be searched in 'Name' window
If you do not want to search to use member ’s name, you can leave
the member 'Name' box. If you click the [Search] button, you can
check information of members to meet the conditions.
The total number, length and weight of members to be searched are
output in ‘Members’ datagrid. If you select the members in datagrid
LSTS USER MANUAL
24
and then click the [Print] button in ‘Print Barcode Label’ groupbox,
you can output the barcodes.
If you select a member in ‘Members’ datagrid and click the [View
Detail] button, you can see Bolts belong to the member at ‘Bolt’
datagrid. You can add/modify/delete it. ‘Revision Information’ At
‘Revision Information’ datagrid, you can check the ‘Revision’
information of the member. At ‘Shpae’ and ‘Plate’ datagrid, you can
check the small members of the beams and plates to constitute the
member.
If you select the menu at the ‘Export BM List’ groupbox and then click
the [Write Excel] button, you can output the searched member as an
Excel file.
In case of adding/modifying the member, click the [Add]/ [Modify]
button you can add/modify the member in the appered window, if
you click the [Delete] button, you can delete the selected member.
If you click the [Exchange Barcode&Work Process Data] button, you
can exchange barcode and process information at the same member.
This is used if there is the same member about performing revision
members of the deliveried members
LSTS USER MANUAL
25
Properties of members input window are as follows.
Member groupbox Properties
Tekla Structure: Tekla Structure of Member
Member No.: Member Name
Length(mm): Length
Weight(kg): Weight
Paint Area(m2): Paint Area
Material: Material
Section: Section
Type: Type of Member
StartX: Start X coordinate of Member
StartY: Start Y coordinate of Member
StartZ: Start Z coordinate of Member
EndX: End X coordinate of Member
EndY: End Y coordinate of Member
EndZ: End Z coordinate of Member
In case of adding or modifying the bolt belong to the member, Click
the [Add]/[Modify] button in the ‘Bolt’ groupbox, you can add/modify
it.
LSTS USER MANUAL
26
Properties of Bolt are as follows.
Name: Bolt Name
Diameter: Diameter
Length: Length
Weight: Weight
Quantity: Quantity
Actual work--Check Actual Process
You can check the status of the process progress by members or
make a production plan.
At ‘Management>Actual Work’ menu you can check the process
LSTS USER MANUAL
27
progress information.
At ‘Search’ groupbox, if you select the target Tekla Structure and then
input the member name or leave the entry box and then click the
[Search] button, you can see the member information on the screen.
You can check a basic-information, Package and date of process
proceed and print them, in case of the ‘Latest Member ’ information, it
is displayed in the ‘Revision Member’.
If you select the member and then the Subcon to produce a member
at ‘Fab Plan’ groupbox on the right and then select a date, you can
assign the production plan.
At ‘Work’ groupbox, select the Work Process, Subcon and work date
and then click the [Actual] button, you can perform the process with
the manual.
At ‘Repair & Rework for Fabrication’ groupbox, select the treatment of
target member and then select the Subcon and then click the [Assign]
button, you can assign it.
In case of unrevision members, you can hold it at ‘Fix Status of
Member’
LSTS USER MANUAL
28
General Notice
You can manage Notice.
At ‘Management>General Notice’ menu you can check or manage the
notice and see a pop-up window when you log in out of
administrator. if it is the important notice, you can see '!' beside it.
Date: Notice Date
Priority: Prority
Title: Title
Contents: Contents
LSTS USER MANUAL
29
Emergency work order and check
You can give an emergency work order to the steel member publisher
or check the contents.
You can give an emergency work order to the steel member publisher
as follows.
⚫ Stop: Temporarily stop work of the target steel member
⚫ Release: Operations resumed of the target steel member
⚫ Reject: Full stop of the target steel member
This can be performed in the ‘Management>Edit Member’ menu or
‘Production>Input Production Data’ menu or Construction>Input
Construction Data menu. After you select the member at target
window with the mouse, if you click the right mouse button, you can
see the pop-up menu. At pop-up menu, select [Add Notice] item and
then input the emergency instruction contents. They are given to the
publisher of the member as alarm window when he loges in LSTS.
LSTS USER MANUAL
30
The information in the ‘Target Member’ groupbox is the basic
information about the steel member. The work order item is selected
in the ‘Notice Type’ of the ‘Notice’ groupbox, and then the work order
date. ‘Memo’ is saved the existing work order contents as historical
format. If you have additional contents to deliver, you can add the
contents in the ‘Memo’ box.
When you logged in as a normal user at LSTS, you can see ‘Notice
Summary’ window. You can see the emergency order contents of steel
members of ‘Tekla Structure’ in connection with login user at ‘Notice
Summary’ window. If you click the [Go Notice Window] window to
apper the window, you can check the steel member is gived to the
current work order.
At ‘Management>Notice’ menu, you can open the same window
You can check the work order ststus and contents of each steel
member by Tekla Structure in this window. In case of checking the
work instructions, you have to input the contents about checking facts.
Select the target member and then click the [Check] button. You have
to input the Check facts.
LSTS USER MANUAL
31
Sync Mobile Eqipment and Work Data
You can transmit the work data to perform the production completion,
packing, installation completion to the central database with the Hand
Terminal or PDA.
After you equip a data device on the cradle, you can setup the
transmission status at the data device menu. At ‘Management>Sync
Data with Mobile Equipment’ window, if you click the [Sync. Data with
PDA] button, you can get transmitted the data of the data device. You
can check transmitted work data by process in the datagrid on the
right. If you select a data to be error in the received data and then
click the [Delete] button, you can delete it. If all transmission data is
correct, click the [Upload Data into Database] button, you can save
the received data in the database.
If the data synchronized with data device is incorrect, you edit the
Sync files on the Sync folder is located in the installation folder of
LSTS and then click [Read Sync Data] button, you can import back.
If you select the ‘Sync Data File’ (input.sdf…) and then click the [Ok]
LSTS USER MANUAL
32
button, you can import the work data.
If you synchronize with data device, you can see the [*] on the
Barcode Scan field of each process.
LSTS USER MANUAL
33
Production Menu
Input Production data--Setup Work Plan and Completion
You can perform the plan or completed work to each worker about
the operation of the production process.
At ‘Production>Input Production Data’ menu, if you select or Input
several options (Tekla Structure, Name, State, Type, Memo) and then
you click the [Search] button, you can check the production work
status of members by production process.
Option function
Tekla Structure You can select Tekla Structure
Name You can input M.Punch No. (If you input *B*,
you can check all members included 'B' of M
Punch No.)
State You can select State
LSTS USER MANUAL
34
Type You can select Type
Memo You can input Memo
Include revise mem You can check memebers inclued Revisioned.
Include deleted mem You can check members include Delete
View only repair &
rework members
You can check members repaired
View weight excluded
loosepart
You can check the row output weight excluded
loosepart.
At ‘Filter’ group box
⚫ Check the checkbox and select ‘Actual Date Period’ or ‘Plan
Date Perod’
⚫ Input period and click the [Filter] button
You can filter the production work status of members.
⚫ Check the View weight excluded loosepart.
LSTS USER MANUAL
35
⚫ At datagrid, click the right button of mouse to appear window.
⚫ Select the Cloumn Change and then check the L/Weight(kg)
⚫ Click the [Save] button
You can check member’s weight excluded loosepart weight at the
'L/Weight' row
You can input the general work plan of 'Welding' and 'Inspection'. In
case of the others, you can't click the [Plan] button. If the 'Plan Date'
item is blank, work plan of the member is not set. To set work plan of
the member, you select a plan date and then click the [Plan] button.
the ‘Plan Date’ item is got the date to be planned.
If you click the [Delete Plan] button, you can cancel the work plan of
the member and the ‘Plan Date’ item change blank. You can set the
batch production plan by selecting a plurality of members.
To setup completed work of the member,
⚫ Select the completed Date and Subcon to work
⚫ Click the [Actual] button
If you click the [Delete Actual] button, you can cancel the completed
work.
If you manually want to change the current process state, any data is
not input in the ‘Barcode Scan’ field.
LSTS USER MANUAL
36
Input Loose part
You can manage the ‘Loose Part’ information.
At ‘Production>Input Loose Part Data’ menu, you can
input/modify/delete the informations of the ‘Loose Part and perform
or cancel the packing the ‘Loose Part Bundle in Loosepart Box’ to the
‘Loose Part Box’.
At 'Loose Part' groupbox, if you select the Structure and then click the
[Search] button, you can check the ‘Loose Part’ is connected to the
Structure. If you input part or all of the 'Loose Part Name' in the
'Name' box, you can sort Loose Part.
Kind S - Loose part of Plate, M - Loose part of Shape
At the top of Gernerate Loose Part BM from DB group box, if you
check the Include revised mem or Include deleted mem and then click
the [Generate] button, you can check the members included
revisioned or deleted.
LSTS USER MANUAL
37
You can see the bolt and bolt box generated by the logined user at
the ‘Loose Part Bundle’ and ‘Loose Part Box’ groupbox.
When you perform the packing the Loose Part Bundle into Loose Part
Box, you have to select the ‘Loose Part Box’ at the ‘Loose Part Box’
groupbox and then select the Loose Part Bundle to pack at ‘Loose
Part Bundle’ groupbox and then click the [▶] button then you can
perform the packing. When you cancel the packing bolt, you have to
select the Loose Part Bundle in the ‘Loose Part Bundle in Loosepart
Box’ groupbox and then click the [◀] button then you cancel the
packing.
If you click [Write Loose Part Box List] button on the top, you can
print out the ‘Loose Part’ list.
If you want to add Loose Part Bundle,
⚫ Select Loose Part in the 'Loose Part BM' groupbox.
⚫ Input infomation of Loose Part Bundle in the 'Make Loose Part
Bundle' groupbox.
⚫ Click the [Add] button.
You can check 'Bundle Qnty' at the datagrid of Loose Part BM
groupbox.
Name: Loose Part name
Q’nty.: quantity
Date: add date
Memo: Uniqueness
LSTS USER MANUAL
38
If you want to add the Loose Part Box,
⚫ Click the [Add] button to appear the ‘Add Loosepart Box’
window
⚫ Input a ‘Loose Part Box’ information
⚫ Click the [Add] button
You can save the ‘Loose Part Box’ information.
Name: Box Name
Barcode: Automatic Generation
Subcon: Worker
Memo: Uniqueness
LSTS USER MANUAL
39
Input Bolt Box Data
You can manage bolt (nut, washer) and the bolt box infomation.
At ‘Production>Input Bolt Data’ menu, you can input/modify/delete
the bolt box information and perform the packing bolt bundle in the
boltbox or cancel.
At ‘Bolt BM from Tekla for Reference’ groupbox, if you click the
[Gernerate Bolt BM from Tekla] button, you can gernerate 'Bolt BM'
for BPCM-LT from bolt info. of members for 'Tekla BM'(If you
imported the new 'Tekla BM' or 'Revision BM', you have to click the
[Generate Bolt BM from Tekla] to generate the new 'Bolt BM' If you
select 'Tekla Structure' and then click the [Search] button, you can
check the all bolt is connect to the ‘Tekla Structure’. If you want to
sort bolt, you have to input '*' and bolt full name or part name in the
'Name' box and then click the [Search] button.
Empty Show all the Bolt BM
LSTS USER MANUAL
40
HS* Show all Bolt BM beginning HS.
*HS Show all Bolt BM ending HS
*HS* Show all Bolt BM in the middle of the name to the
HS
'Bolt Overage(%) is overage at the 'Gross total Qnty' column of
datagrid.(ex, 20 'Gross total Qnty. = Net total Qnty. 120%)
You can setup 'Bolt Overage(%) at the Setup > Option > Data tap of
Main Menu.
You can check the Bolt Bundle and Bolt Box depending on authority
of loggined user
If you want to add the Bolt Bundle,
⚫ Input the information in the 'Make Bundle' groupbox.
⚫ Click the [Add] button.
Name: Bolt, Nut, Washer name
Q’nty.: Quantity
U.Weight: Unit Weight
Date: date
Subcon: Subcon
Structure: Connected Structure
Memo: Uniqueness
You can input 'Bolt Bundle' to import an 'Excel' file
LSTS USER MANUAL
41
At the [Import Excel] button, if you click the button, you can
output a document as below.
⚫ Input exact information and then save it
⚫ Click the [Import Excel] button and then input the information
to appear window
⚫ Click the [Read] button and then import the excel file saved.
You can check the 'Bolt Bundle BM' in the datagrid of 'Bolt Bundle'
groupbox.
If you want to add the 'Bolt Box',
⚫ Click the [Add] button to appear the ‘Add Bolt Box’ window.
⚫ Input the 'Bolt Box' information in the ‘Add Bolt Box’ window
⚫ Click the [Add] button.
You can add the boltbox information in the DB.
LSTS USER MANUAL
42
Name: Box Name
Barcode: Automatic Generation
Subcon: Worker
Memo: Uniqueness
When you perform the packing Bolt Bundle to the BoltBox,
⚫ Select a Bolt Box in the ‘Bolt Box’ groupbox
⚫ Select the Bolt Bundle in ‘Bolt & Nut & Washer Bundle’
groupbox on the right
⚫ Click the [▶] button.
If you want to cancel the packing Bolt Bundle,
⚫ Select the Bolt Bundle in the ‘Bundles in Bolt Box’ groupbox.
⚫ Click the [◀]button.
If you click the [Write Bolt List] button at the bottom rigth, you can
output 'Bolt & Nut & Washer List' showed to the datagrid. If you click
the [Write Bolt Box List]] button, you can output the 'Bolt Box List'
packed to bolt & nut & washer bundle as a 'Excel' file.
LSTS USER MANUAL
43
Packing Menu
Packing Environment--Setup Shipping/Job
You can setup the Shipping/Job and package information for packing
works.
To generate about the Shipping/Job is performed per project.
At ‘Packing>Packing Environment’ menu, you can manage the
Shipping/Job information.
If you click the [View Shipment] button, you can check the
Shipping/Job information. If you input the Shipping/Job information
and then click the [Find] button, you can check it.
If you want to generate a new Shipping/Job information,
⚫ Input a Subcon, a number Shipping/Job less than 20 characters
and Delivery Actual Date.
⚫ Click the [Add] button, you can generate a new Shipping/Job.
LSTS USER MANUAL
44
⚫ Click the [Write Packing List] button, you can make a ‘Packing
List’.
⚫ Click the [View Shipment/Job Weight] button, you can check
total weight of Shipment.
At ‘Packing/Truck’ groupbox, you can generate a package
(Package/Truck) is assigned to the Shipping/Job.
If you automatically want to generate package, you check the 'Auto
Apply' and input the 'Start No', 'Prefix', 'Digit No.' of package and
then click the [Apply] button, you can gradually generate package. If
you uncheck the 'Auto Apply', you can make a package as inputing
information 'Packing/Truck No.' textbox.
If you click the [Print] button, you can print out selected package label
to use barcode printer.
Input Packing Data
You can setup the packing information of members in the package.
LSTS USER MANUAL
45
At ‘Packing>Input Packing Data’, if you select a package and then
click the [Search] button at the 'Packed Material' group box, you can
check the member and box to be include in the selected package. If
you select a member and then click the [View] button at the 'Revision
History' on bottom, you can check Revision History of selected
member.
If you setup the packing date and 'Subcon' and then select members,
loosepartboxes, boltboxes and then click the [Packing]/[Delete Packing]
button, you can input/cancel the selected members, loosepartboxes,
boltboxes of the package.
At ‘Memo’ box, you can write uniqueness about the packed members
and boxes.
If you click the [Print] button in ‘Print Packing/Truck Barcode’
groupbox, you can print out the barcode labels of package If you click
the [Print] button in ''Print Packed Member Barcode', you can print
out the barcode label of members, loosepartboxes, boltboxes.
You click the [Write Packing List] button, you can print out the
‘Packing List’ as an Excel file.
At 'Move Materials to Other Packing/Truck'
⚫ Select members or boxes and Package at the left tree menu.
⚫ Click the [Move] button
You can move members or boxes to selected package.
If you want to manually changes the current process state, any data is
LSTS USER MANUAL
46
not input in the ‘Barcode Scan’ field
Input Delivery Data--Setup Sent work plan and completion
You can assign or complete the shipping management work to each
team.
At ‘Packing>Input Delivery Data’ menu, if you click the [Search] button,
you can check the shipping work status of each package.
At ‘Filter’ group box,
⚫ Check the check box and input period
⚫ Click the [Filter] button
You can Filter the data
If the ‘Plan Date’ item is blank, shipping plan of the package is not set.
If the ‘Actual State’ item is blank, shipping plan of the package is not
setup. To setup the shpping plan of the package, you select a work
and date and then click the [Plan] button then you can setup the
shipping plan of the selected package. If the shipping plan is set, the
LSTS USER MANUAL
47
‘Plan Date’ item is got the date to be planned. If the setting the
shipping plan is incorrect, you can click the [Delete Plan] button to
cancle the shipping plan. If the shipping plan is canceled, the ‘Plan
State’ item is changed the blank.
If you select the package and then click the [Actual] button, you can
setup that the shipping work of the selected package is completed. If
you click the [Delete Actual] button, you can cancel the shipping work
completion status.
If you manually want to change the current process state, any data is
not input in the ‘Barcode Scan’ field.
LSTS USER MANUAL
48
Construction Menu
Setup work plan and completion of Construction Process
You can assign or completion the work about the construction
process to each team.
1. Input Construction Data (Arrival)
‘Construction>Input Construction Data (Arrival)’
If you setup the’Fabricator’, ‘Shipment/Job’, ‘State’, ‘Actual Date’ and
then click the [Search] button, you can check whether the packages
are arrived or not at the datagrid.
At ‘Filter’ group box
⚫ Check the checkbox and select ‘Actual Date Period’ or ‘Plan
Date Perod’
⚫ Input period and click the [Filter] button
You can filter the production work status of members.
LSTS USER MANUAL
49
If the ‘Actual Date’ item is blank, the package is not delivered. If the
package is delivered in the laydown, you have to setup a subcon and
date and then click the [Actual] button to set completion of arrival
work of the package. In this case, the ‘Actual Date’ item is got the
date to be acted If the setting the arrival completion status is
incorrect, you click [Delete Actual] button to cancel arrival completion
status. At ‘Member or Box List’ groupbox, if you click the [View]
button, you can check the member and box list is connect to the
selected package. When it sync. between PC and PDA, if you click the
[Sync Packing List to PDA] button at the right down, you can transfer
packing data not to actual to PDA and perform 'PACKING LIST' fuction
in 'Arrive' work process.
At 'Manual Laydown' in the bottom right-hand corner, you can assign
manually 'Laydown' location of 'Package'.
At 'Packing/Truck' datagrid,
⚫ Select the Package(s) in the 'Packing/Truck' datagrid.
⚫ Select 'Site' and 'Area' in the 'Manual Laydown' groupbox.
⚫ Select 'Site' and 'Area' and then click the [Assign] button,
You can assign the package(s) manually. Also, if you click the [Cancel]
button, you can cancel the assignment. If you can't select a 'Area',
'Area' is assigned to 'Site'. You can 'Area' at 'Setup>Laydown menu.
LSTS USER MANUAL
50
2. Input Construction Data (Arrival etc.)
If you set the scope to the ‘Tekla Structure’, the work completion
status (State), the member type (Type) of the combobox and then
click the [Search] button, you can check the member states by the
construction process.
At ‘Filter’ group box
⚫ Check the checkbox and select ‘Actual Date Period’ or ‘Plan
Date Perod’
⚫ Input period and click the [Filter] button
You can filter the production work status of members.
if you check the Include revised mem or Include deleted mem and
then click the [Search] button, you can check the members included
revisioned or deleted.
If you check the 'View weight excluded loosepart', You can check the
row output weight excluded loosepart.
LSTS USER MANUAL
51
⚫ Check the View weight excluded loosepart.
⚫ At datagrid, click the right button of mouse to appear window.
⚫ Select the Cloumn Change and then check the L/Weight(kg)
⚫ Click the [Save] button
You can check members weight excluded loosepart weight at the
'L/Weight' row.
in case of 'Erection' process, if the ‘Plan Date’ item is the blank, the
process planning work of the members is not set. To setup the
construction process planning work of these members, you have to
select a worker and planned date and then click the [Plan] button
then you can setup work plan of the selected member.
If you set it, the ‘Plan Date’ item is got the date to be planned. If the
setting plan work is incorrect, you can click the [Delete Plan] button
to cancle the plan work. If the plan work is canceled, the ‘Plan Date’ is
blank.
If you click the [Actual] button, you can setup the completed
construction work of the members. If you click the [Delete Actual]
button, you can cancel the construction work completion status of the
members.
If you manually want to change the current process state, any data is
not input in the ‘Barcode Scan’ field.
At 'Arrival Inspection' tap, you can assign manually the location of
each members at 'Laydown'.
LSTS USER MANUAL
52
⚫ Select the member(s) in the datagrid.
⚫ Select 'Site' and 'Area' and then click the [Assign] button.
You can assign the member(s). Also, if you click the [Cancel] button,
you can cancel the assignment. If you can't select a 'Area', 'Area' is
assigned to 'Site'. You can 'Area' at 'Setup>Laydown menu.
At the others tap, 'Manual Laydown' groupbox is deactivated.
LSTS USER MANUAL
53
Search&Report Menu
Packing List
You can print out the ‘Packing List.
At 'Search&Report>Packing List' menu, you can print out the Packing
List.
If you log in to ‘Subcon Fabricator’, you can only use that property of
the user’s ‘Type Delivery’ match up the Ship and Truck radio button.
1. Write Packing List for Truck
At ‘Shipment/Job List’ menu, if you check the ‘Truck’ and select pack
picture you can check [Write Packing List for Truck] button. If you click
the [Write Packing List for Truck] button, you can output the excel file
for packing list.
2. Write Packing List
At ‘Shipment/Job List’ menu, If you check the item to be output to
the 'Packing List' and then click the [▶] button, you can send the item
to the right ‘Target Shipment & Packing List for Report’.
LSTS USER MANUAL
54
If you select the ‘Ship’ radio button in the upper left corner, you can
add a box weight of the ‘Package’ to the ‘Package’.
To add the weight of ‘Packing Box’,
After you send the package to the right ‘Target Shipment & Packing
List for Report’,
⚫ Select the package and then input the weight at 'Adding
Weight (Box Weight)' groupbox.
⚫ Click the [Assign only Selected Packing] button
You can add the weight of 'Packing Box'.
⚫ Select the Shipment and then input the Weight.
⚫ Click the [Assign All of Selected Shipment] button
You can add the weight of Packing Box is included in the Shipment.
If you click the [Write Packing List] button, you can output the
packing list as below.
Packing List Output Format.
LSTS USER MANUAL
55
When you select a Truck, the red shaded area will no be printed.
Warehouse Summary Report--Management Stock and
Shipping & Receiving in Laydown
You can check the member quantity and the management history of
Shipping & Receiving in Laydown.
At ‘Search&Report>Warehouse Summary Report’ menu, you can
check the management status of ‘Warehouse’.
If you input the ‘Tekla Structure’ of ‘Search’ groupbox, member type
and member name and then click the [Search] button, you can check
the Shipping & Receiving member status.
LSTS USER MANUAL
56
If you click the [Write Excel] button, you can output the information is
displayed on the screen as an Excel file
Revision History of BM --BM Revision Record
At Search&Report>Revision History of BM, you can check the
‘Revision Record’ by each Structure.
You can check the quantity of added/modified/deleted member step-
by-step Revision.
Process Status Report for Member
You can check the process status up to now for day, week, month,
years by each process.
Also, you can check the comparison chart between the plan and the
result about the major planning processes.
At ‘Search&Report>Progress Status Report for Member’ menu, you
can import the information. If you click the [Save Graph] button on
each tap, you can save the output graph as a JPG file. If you click the
[Write Excel] button, you can save the output as an Excel file.
LSTS USER MANUAL
57
1. Day
At ‘Day’ tap menu,
⚫ Select a ‘Tekla Structure’.
⚫ Select a date in the ‘Target Day’
You can print out work status of the selected date by each process
and member type base on the member number and weight.
LSTS USER MANUAL
58
2. Period-Day
At ‘Date Period’ groupbox of ‘Period’ tap, select the period and output
format to want to be checked. This screen is to select the Day.
At Display Type groupbox, if you select the ‘Daily’ or ‘Accumlation’,
you can check the production status by process or date base on the
number of member and weight. At the bottom, you can see the
production status graph.
LSTS USER MANUAL
59
3. Period-Week
At ‘Date Period’ groupbox of Period tap, select the period and output
way to want to be checked. This screen is to select the Week
At ‘Display Type’ groupbox, select the ‘Daily’ or the ‘Acccumulation’,
you can check the production status per 7 days by the production
process base on the number of member and weight. At the bottom,
you can see the production status graph.
LSTS USER MANUAL
60
4. Period-Month
At ‘Date Period’ groupbox of ‘Period’ tap, select the period and output
format to want to be check. This screen is to select the Month.
At ‘Display Type’ group box, select ‘Daily’ or ‘Accumulation’, you can
check the production status per 1month base on the number of
member and weight. At the bottom, you can see the production
status graph.
LSTS USER MANUAL
61
5. Current
- Sort by Tekla Structure
- Sort by Unit
LSTS USER MANUAL
62
- Sort by Area
At Current tap, you can check the process status up to now in entire
project.
You can see the process status is sorted to the PBS Tekla Structure
and process base on the number of members and weight.
LSTS USER MANUAL
63
Progress Status
You can check the process status up to now by member type.
At ‘Search&Report>Progress Status’ menu,
⚫ Click the [Member type Filter] button
⚫ Check the member type and then click the [Apply] button
You can check the progress status up to now by selected member
type.
If you click the [Write Excel] button, you can save the out as an Excel
file
LSTS USER MANUAL
64
Process Status Report for Loosepart
You can check the process status up to now by the production and
the package unit process for week, month, year.
At ‘Search & Report>Progress Status Report’ menu, you can read the
information. If you click the [Save Graph] button for each tap, you can
save the output the graph as a JPG file. If you click [Write Excel]
button, you can save the out as an Excel file.
1. Period-Day
At ‘Date Period’ groupbox of ‘Period’ tap, select the period and output
format to want to be checked. This screen is to select the Day.
At ‘Display Type’ groupbox, if you select the ‘Daily’ or ‘Accumulation’,
you can check the work status by the process and the day base on
the number of member and the weight. At the bottom, you can see
the production status graph.
LSTS USER MANUAL
65
2. Period-Week
At ‘Date Period’ of ‘Period’ tap, select the period and output format to
want to be check. This screen is to select the Week.
At ‘Display Type’ groupbox, select the ‘Daily’ or the ‘Accumulation’,
you can check the production status per 1week base on the number
of member and the weight
3. Detail
At ‘Detail’ tap, you can check each ‘LoosePart’ by the quantity and the
work status.
LSTS USER MANUAL
66
4. Current
At ‘Current’ tap, you can check the quantity of ‘LoosePart’ by Tekla
Structure and the work status
LSTS USER MANUAL
67
Process Status Report for Bolt
You can check the Bolt information and work process record by the
Subcon.
At ‘Search&Report>Progress Status Report’ menu, you can read the
information. If you click the [Write Excel] button each tap, you can
save the output as an Excel file.
1. Detail
At ‘Detail’ tap, you can check the detailed information of Bolt.
LSTS USER MANUAL
68
2. Current
At ‘Current’ tap, you can check the ‘Bolt’ work status by the ‘Subcon’.
LSTS USER MANUAL
69
Structure Process Report
You can check the process status about the entire project
At ‘Search>Structure Process Report’ menu, you can import the
information. If you click the [Save Graph] button of ‘Summary’, ‘Total’
and ‘Process Detail’ tap, you can save the displayed graph on the
screen as a JPG file. Also, if you click the [Write Excel] button of each
tap, you can save the output data as an Excel file.
1. Summary
At ‘Summary’ tap, you can check the process progress status from
table and graph by PBS in the entire project. You can see the current
process progress status base on the installation process of the
member.
LSTS USER MANUAL
70
2. Total
At ‘Total’ tap, select the individual ‘Tekla Structure’, you can check the
process status up to now. The process status is rate of entire process,
weight basis and number basis of member.
3. Process Detail
This is the screen to display the process status of the member basis as
one table. At ‘Process Detail’ tap menu, if you select the ‘Tekla
Structure’, you can check the process status of each member.
LSTS USER MANUAL
71
Material Status Report
At Search&Report>Material Status Report, you can check the process
status by weight and type of the production quantity
1. Material Status
You can check the process status by weight distinction of the process
base on the PBS structure of the entire project. This data can be used
as the ready-made data. At ‘Material Status’ tap, select the process
and then setup the target period. You can see the sum of the weight
by Structure based on pre-defined weight stars. You can see the sum
of separately calculating the weight of members like 'Handrail, Ladder,
Grating and Stair'.
You can see method of calculating the weight of the sum of the flow
section steel members plus the ‘Plate’ weight on the upper table and
method of calculating the ‘Plate’ weight subtracted from the weight of
the sum of the flow section steel members on the bottom of the table.
LSTS USER MANUAL
72
At ‘Select Detailed Search Condition of Actual Members’ groupbox, if
you select the process and period and then click the [Search] button,
you can only see the data of member coming into the rage.
If you click the [Write Excel] button on the upper right corner, you can
save the data is displayed the screen as an Excel file.
If the value is not output on below, at ‘Setup>Option>Data’ tap, you
have to select a ‘Member and Linear Sub Members’ item or a
‘Members, All Sub Member and Bolts’
2. Material Status Detail
At ‘Material Status Detail’ tap, you can check the detailed information
about the data expressed in the ‘Material Status’. If you select the
‘Structure’, you basically can check the sum of weight of members by
the weight stars and the list of members used to the sum of weight.
At ‘Select Detailed Search Condition of Actual Members’ groupbox, if
you select the process and period and then click the [Search] button,
you can see the data of member coming into rage.
LSTS USER MANUAL
73
If you click the [Write Excel] button on the upper right corner, you can
save the data to the tab by each items as an Excel file.
If the value is not output, at ‘Setup>Option>Data’ tap, you have to
select the ‘Member and Linear Sub Members’ item or ‘Members, All
Sub Member and Bolts’.
Storage Map--Search the Laydown
You can check the Package in Laydown and arrangement status of the
members.
At ‘Search&Report>Storage Map’, you can check the package and the
location of the members to search and you can sync the PDA device.
1. Search
At ‘Search’ tap,
⚫ Select the Structure and the process.
⚫ Input the package or member name to search in the ‘Text Box’
of ‘Search’ groupbox
LSTS USER MANUAL
74
⚫ Click the [Search] button.
You can track the package and location of the member.
If you don’t input the package and member name, you can see all
package and member of the range. In case of clicking 'Only members
including manual laydown data', you can check only the members to
have location information of 'Laydown'. you can trace them to use
PDA at 'Laydown'.
2. Map
LSTS USER MANUAL
75
At ‘Map’ tap,
⚫ Select the ‘Structure’ and the process.
⚫ Click the [Search] button on the upper right corner
⚫ Select the Site of the Filter groupbox and then click the [View]
button.
You can see the members are placed in the selected ‘Site’ of the
searched members in the ‘Member List’ on the right. If you select the
install date on ‘Erection Plan’ and then input the member name to
search on ‘Member No’ and then click the [Search] button, you can
check the member on the right of the datagrid.
If you select the searched members on the ‘Member List’ datagrid and
then click the right mouse button and click the [Add Member into
Target List] button, you can send them ‘Target Tracking List’ datagrid.
If you click the [Print] button, you can print the members are marked
on ‘Target Tracking List’. Also, click the [Sync PDA] button, you can
send the data to PDA device.
To make the site map, you must manually perform the operation on
the database for BPCM-LT. For this work, please ask the BPCM-LT crew.
LSTS USER MANUAL
76
Click the [Print] button you can see this screen.
To trace members in 'Laydown',
⚫ Select members to have location information.
⚫ Click the right button of mouse to appear 'Add Members into
Target List' button
⚫ Click the button to move members to 'Member List for Tracking
(Manual Laydown) groupbox.
⚫ Click the [Sync PDA] button when PDA connect PC.
You can check the member's data in PDA and you can check location
of member at 'TRACK MATERIAL' menu of PDA.
LSTS USER MANUAL
77
Click the [Sync PDA] button, the screen is to transfer a data to a PDA
device.
Track Map
You can check the member to input the Laydown Area and GPS
Position Using the Google map.
At Search&Report>Track Map, If you select 'Tekla Structure' and then
click the [Search] button, you can check members at datagrid on
bottom left. If you select the member at datagrid on the bottom left
and if you input the information of member to search in the 'M.Punch
LSTS USER MANUAL
78
No.' box and click the [Search] button, you can check the member to
find. If you select 'All' at the 'Tekla Structure' and 'M.Punch No.' is
empty, you can't check members at the datagrid.
At datagrid of the bottom right, if you select members to check and
then click the [ > ] button, you can check selected members on the
map and datagrid. If selected members don't have GPS infomation,
you can't check location of members on the map.
The fuction 'M.Punch No.' is as follows.
On Mouse
Over
When mouse cusur is on the member location, you
can check the information of member on the map.
Always You can check always the infomation of members on
the map.
Naver You can't the information of members on the map.
If you select member at the datagrid on the bottom right and then
click the [Track History] button, you can check the location of member
and work time by workprocess.
LSTS USER MANUAL
79
If you click the [Save Map] button, you can save the map screen and
if you click the [Write Excel] button, you can save member-list of the
datagrid on the bottom right as excel file.
* You can check the serveral visual point by Mouse
Mouse Right Button Move
Mouse Wheel Zoom In, Zoom Out
Display Tekla Structure
You can check the work status by hour with Three-dimensional
structures geometric graphic.
At ‘Search&Report>Display Structure' menu, If you select the target
‘Tekla Structure’, you can check the shape of the model of the
structure.
LSTS USER MANUAL
80
If you click the [View Current Status] button, you can check the final
process completion status of each member
⚫ Click the [4D & Search] button
⚫ Select workprocess, type and date
⚫ Click the [Search] button.
you can check members on the 4D
New members - Sky blue color
Revision members(change important info) - Red color
Revision members(change normal info) - blue color
No change infor - green color
LSTS USER MANUAL
81
At [Search Member] tab, if you input information on the 'Member No.'
textbox and click the [Search] button, you can check the members 4D
⚫ Click the [Fabrication Plan] button to appear the window
⚫ Select the member to establish a work plan
⚫ Input the ‘Subcon’, .work completion date and alarm.
If you click the [Plan] button, you can establish a work plan.
If you click the [Delete] button, you can cancel a work plan.
LSTS USER MANUAL
82
⚫ Click the [General Plan] button
⚫ Select 'Target Work Process' and 'Target Date'
If you click the [Plan] button, you can establish a work plan by
workprcess.
If you click the [Delete] button, you can cancel a work plan.
⚫ Click the [Input Actual Work] button to appear the window
⚫ Select 'Target Work Process' and then select the member at 4D
screen.
⚫ select 'Target Date' and then click the [Actual] button
You can actual selected members at 4D screen.
If you click the [Member Type Filter] button, you can select the type
LSTS USER MANUAL
83
to want and click the [Apply] button and then you can output it.
If you click the [Elevation Filter] button, you can select the type to
want and click the [Apply] button and then you can output it.
If you click the [Grid Filter] button, you can select the type to want
and click the [Apply] button and then you can output it.
Also, if you click the [Save Image] button, you can save the screen
structure image as an image file.
You can check the serveral visual point by toolbar
Default
3D View
Top View
LSTS USER MANUAL
84
Front View
Side View
Mouse Wheel Zoom In, Zoom Out
Mouse Wheel
button
Move
Ctrl + Mouse Wheel
Button
Rotation across rows or down columns
LSTS USER MANUAL
85
Setup Menu
Project & PBS
1. PBS
At ‘Setup>Project & PBS’ menu, you can modify ‘Project’ and setup
‘Revision Tolerance’. Also, you can add/modify/delete the ‘Area’, ‘Unit’,
‘Discipline’ and Activity. PBS hierarchy Tekla Structure is as follows.
[Project -> Area -> Unit -> Activity]
Also, each ‘Tekla Structure’ can be assigned one by one the ‘Discipline’.
If you click the [Modify] button on the right, you can bring the
following window
LSTS USER MANUAL
86
You can modify ‘Name’, ‘Start Date’, ‘End Date’, ‘Memo’ property.
At ‘Revision Tolerance’ group box, if you setup ‘Length’, ‘Location’,
‘Weight’, ‘Paint Area’, you can check that values smaller than the
corresponding value are not recognized as changed values when
excuting ‘Revision’.
If you add/modify the Area,
⚫ Click the [Add] / [Modify] button in the ‘Area’ groupbox.
⚫ Modify the ‘Area’ information.
⚫ Click the [Add] / [Modify] button.
You can save the ‘Area’ information.
Properties in the Area are as follows.
Name: Area Name
Code: Area code
Start Date: Area Work Start Date
End Date: Area Work End Date
Remark: Memo
If you add/modify the ‘Unit’,
LSTS USER MANUAL
87
⚫ Click the [Add] / [Modify] button in the ‘Unit’ groupbox
⚫ Modify the ‘Unit’ information
⚫ Click the [Add] / [Modify] button
You can save the ‘Unit’ information.
Properties in the Unit are as follows.
Name Unit Name
Code Unit code
Start Date Unit Work Start Date
End Date Unit Work End Date
Remark Memo
If you add/modify the ‘Discipline’,
⚫ Click the [Add] / [Modify] button in the ‘Discipline’ groupbox.
⚫ Modify the ‘Discipline’ information.
⚫ Click the [Add] / [Modify] button
You can save the ‘Discipline’ information
LSTS USER MANUAL
88
Properties in the Discipline are as follows.
Name: Discipline Name
Code: Discipline code
Remark: Memo
If you add/modify the ‘Activity’,
⚫ Click the [Add] / [Modify] button in the ‘Activity’ groupbox.
⚫ Modify the ‘Activity’ information.
⚫ Click the [Add] / [Modify] button
You can save the ‘Activity’ information
Properties in the Activity are as follows.
Name: Activity Name
Code: Activity code
Remark: Memo
LSTS USER MANUAL
89
2. Tekla Structure
At ‘Tekla Structure’ tap, you can check the ‘Tekla Structure’
synchronize with ‘Area’, ‘Unit’,‘Discipline’ and ‘Activity’.
If you separately manage the ‘Loose Part’, at ‘Loose Part Type’
groupbox, you can setup the ‘Loose Part’ for each ‘Tekla Structure’.
Click the [Add] button, you have to input a character to enter a name
in common of the ‘Loose Part’ to be managed.
If you add/modify the ‘Tekla Structure’,
⚫ Click the [Add] / [Modify] button in the ‘Tekla Structure’
groupbox.
⚫ Modify the ‘Tekla Structure’ information.
⚫ Click the [Add] / [Modify] button
You can save the ‘Tekla Structure’ information
‘Tekla Structure’ is one of ‘Zone’ in a certain amount buliding or a unit
of ‘Tekla Structure’.
LSTS USER MANUAL
90
Properties in the ‘Structure’ are as follows.
Connect Loose Part to Member If you uncheck, manage ‘Loose Part’
separately
Name Structure Name
Prifix for Punch No Used in all the members data'Prifix' of ‘Punch No’
In 'Structure'
Serial Code(3) Tekla Structure code(3)
Subcon Tekla Structure belong Subcon
Vendor Tekla Structure belong Vendor
Area Tekla Structure belong Area
Unit Tekla Structure belong Unit
Discipline Tekla Structure belong Discipline
Activity Activity
Structure Type Structure Type of Structure
The member mark is indicated on the barcode label using two data
would be written as follows.
The current member mark has the same data of the punch mark of
the member
Prifix for Punch No of Structure + Member No. of the member
LSTS USER MANUAL
91
Assign the User block
You can add/delete authority to access the ‘Tekla Structure’ by
‘Subcon’
At ‘Setup> Assign Tekla Structure to Subcon’ of main menu, you can
assign the Tekla Structure to access by ‘Subcon’.
⚫ Select a worker in the ‘Subcon’ datagrid.
⚫ Check or uncheck the subject to assign in the ‘Tekla Structure
List’.
⚫ Click the [Apply] button on the top.
You can assign or not the ‘Tekla Structure’ into selected worker.
The worker can add/modify the assigned ‘Tekla Structure’.
LSTS USER MANUAL
92
Setup the Member type
At ‘Setup>Member Type’, you can setup the member type (Column,
Beam etc.).
When you import ‘Tekla Structrues BOM File’, the member type is
generated and registered automatically.
⚫ Click the [Add] button and then input the member type and
index
⚫ Click the [Add] button to add the member type
⚫ The index range is from 1 to 100
⚫ You can check members in small order
⚫ Click the [Modify] button and modify the member type and
index
LSTS USER MANUAL
93
⚫ Click the [Modify] button to modify the member type and index
⚫ Click the [Delete] button to appear the window.
⚫ Select the member type replace the member type to delete
⚫ Click the [OK] button.
The member type of the members are connected to the deleted is
changed to the selected member type automatically.
Setup the Structure Type
At ‘Setup>Tekla Structure Type’ menu, you can setup the Tekla
Structure Type.
The Tekla Structure Type is assigned to each ‘Tekla Structure’. The steel
members constituting a Tekla Structure by Tekla Structure Type
classified by weight and Classified material is used as a ready-made
application source. You can check the ready-made application source
on the ‘Material Status’ tap of ‘Search&Report>Structure Progress
Report’ of main menu.
The ‘Tekla Structure Type’ is the rage by member weight and the unit
cost data to be used in ‘Search>Tekla Structure Progress’ of ‘Material
LSTS USER MANUAL
94
Status’ and ‘Material Status Detail’.
⚫ Click the [Add] button to apear the window
⚫ Input the name of the ‘Tekla Structure Type’ and value by
weight rage.
⚫ Click the [OK] button.
⚫ Click the [Delete] button to appear the window
⚫ Select the ‘Tekla Structure Type’ to replace the deleted ‘Tekla
Structure Type’.
⚫ Click the [OK] button.
You can check that ‘Tekla Structure Type’ of ‘Tekla Structure’ is
associated with the deleted ‘Tekla Structure Type’ is automatically
assigned to the newly selected ‘Tekla Structure Type’
LSTS USER MANUAL
95
Setup the Laydown Map
At ‘Setup>Laydown’ menu, you can setup the ‘Laydown Map’ data.
The ‘Laydown Map’ consists of a ‘Site’ and ‘Area’ information. The Site
is the information of the Laydown outside and the ‘Area’ is the
individual information to split into the ‘Site’ to a lattice form.
You can add/modify/delete the ‘Site’ and ‘Area’.
If you want to add the data,
⚫ First, add the ‘Site’ and then generate the ‘Area’ in the ‘Site’.
⚫ Input the name and then click the [OK] button.
To input the coordinate, you have to survey the Latitude and
longitude on the spot using the PDA device of LSTS.
⚫ Input the surveyed ‘Site’ and ‘Area’ of latitude and longitude,
latitude and longitude of the direction value.
You have to input the latitude and longitude in the clockwise
direction.
LSTS USER MANUAL
96
LSTS USER MANUAL
97
Setup the User Account
At ‘Setup>User Account’ menu, you can add/modify/delete the User
Account. You can appoint the user accout authority using the ‘Level’
properties. The accout authority features are as follows. You can give
one ‘Subcon’ to one User Account. Multiple users can simultaneously
access one accout available.
If the user accout authority is ‘Subcon Fabrication’, you can setup the
‘Type Delivery’ (Ship, Truck). The other accout is setup to the Common.
Supervisor: Full administrator Level
Viewer: View the progress of the project Level
Subcon Fabrication: Production and packing process of the
assigned Structure
Subcon Warehouse: Mangement the Warehouse of the assigned
LSTS USER MANUAL
98
Structure
Subcon Erection: Installation process of the assigned Structure
Manager: Assigned Subcon Manager
The user barcode automatically is generated and you can select the
user and then click the [Print Barcode Label] button to output the
user barcode. You can use it during work
Properties of User Accout are as follows:
ID: User Account
Password: Password
Barcode: User Barcode, Auto-generated
Name: User Real Name
Level: User Authority
Phone: Phone Number
Mobile Phone: Moblie Phone Number
Email: Email
Department: Department
Type Delivery: Type Delivery
LSTS USER MANUAL
99
Assign Work Manager and Publisher
You can add/delete the authority to check the work status of worker
by Work Manager.
Main Menu at ‘Setup> Assign Subcon to Manager’ of main menu, you
can assign the ‘Subcon’ to access by Work Manager.
⚫ Select a work manager in the ‘Manager’ datagrid.
⚫ Check or uncheck the subject to be assigned in the ‘Subcon List’.
⚫ Click the [Apply] button on the top
You can assign or cancel the ‘Subcon’ to the selected work manager.
LSTS USER MANUAL
100
Setup the Company
At ‘Setup>Company’ of main menu, you can setup the properties of
company using the BPCM.
Properties of Company are as follows.
Name: Company Name
Phone: Phone Number
Mobile Phone: Mobile Phone Number
Department: Department
Email: Email
Agent: Agent
LSTS USER MANUAL
101
Ressign the Member index number
At ‘Setup>Renumbering’ of main menu, you can newly assign the
index number of the member by the Structure.
The index is a serial number for the members of the same member
name. In case of continued revision, the index number of the same
member name may be changed and you need to regrant index
number of the member to manage the consistent member number.
Using this fuction, you can give a new index number of members.
The index number of the members is output to the member barcode
label, it is output to the number of the same form as follows
Current member index number / the total number of the same member name
The index numbering function of members run when you add a
member in the ‘File>Import>New Tekla Structure BM File’ of main
menu and ‘Management>Edit Member’. You can assign the correct
the index number to recognize automatically the index number of the
existing members in this menu. However, if you perform the
‘File>Import>Revision Tekla Structure BOM File’ of main menu or
delete the member in the ‘Edit Membe’r window, after carrying out
the work, you have to regrant the member index number because you
can not check the consistent index number.
LSTS USER MANUAL
102
Select the Structure to regrant the index number and then click the
[Execute] button. You can regrant the index number.
Setup Option
In case of output the Tekla Structural shape, you can setup the output
option, barcode label title and port when you sync with a
handterminal.
1. Graphic View
You can setup the output options of the Structural shape at ‘Graphic
View’ tap.
To output the name of Structure members, you have to select the
radio button in the ‘View Text’ groupbox.
The output of the radio button is as follows:
None: Do not Show
Member No.: Member Name
Member Type Name: Member Type
Member Punch No.: Punch Number
Barcode: Barcode Number
LSTS USER MANUAL
103
Fab. Subcon: Publisher ID
At ‘Display Type’ groupbox, you can setup the output format of the
structure member to ‘Solid’ or ‘Frame’ format.
At ‘Laydown Map View’ groupbox, you can setup the ‘Member Display
Size’. At ‘Etc’ groupbox, you can setup the ‘Member Font Size’. This is
the size of the member in the Laydown.
2. Barcode
You can setup the properties of the barcode label at the ‘Barcode’ tap.
After selecting the ‘Barcode’ tap,
The string is input at the ‘Customer/Fabricator’ textbox of ‘Label Text’
groupbox is output in the ‘Member & Package’ barcode label on the
bottom left.
The string is input at the ‘From/To’ textbox of ‘Location’ groupbox is
output in the Package barcode label on the right.
'Label Type of Member' and 'Label Type of Package' perform functions
as follows.
LSTS USER MANUAL
104
* Label Type of Member
Type1 Default
Type2 Exclusive of index code
Type3 Exclusive of index, revision number, EL and location.
* Label Type of Package
Type1 Default
Type2 Exclusive of 'Shipment No.'
Type3 Include weight of Type1
LSTS USER MANUAL
105
3. Sync.
You can setup the sync type at the Sync. tap.
1. Cradle - You can trans data to cradle.
2. WIFI - You can trans data to wifi.
* Transfer data to wifi
If you connect to wifi, you can check the ip at the sync window for
PDA.
At Setup>Option>Sync tap on client program, If you input ip on the
LSTS USER MANUAL
106
PDA IP, you can transfer data to wifi.
If you cllick the [Sync] button and transfer to DB on the client
program, you can transfer to useraccout and Laydown map data to
pda.
4. Printer
You can setup the properties of the ‘Printer’ at the ‘Printer’ tap.
Printer Type
Paraller Type Printer (LPT1): only Connect with Paraller Port(fast)
Select Other Printer: Local printer.
You can setup the ‘Print’ speed of the barcode at the ‘Printer Speed’
groupbox.
At 'Print Current User Barcode Label' groupbox, you can print out user
bacode.
LSTS USER MANUAL
107
5. Data
You can setup the format which the data is load on Search at the
‘Data’ tap.
Only Members:
-. This does not load the ‘Sub Member’ and ‘Bolt Data’ contained in
the member so it is fast but you cannot calculate the correct data.
Member and Linear Sub Members:
-.This load the linear ‘Sub Member’ contained in the member so
speed is a little slow and you cannot calculate the correct data.
Members, All Sub Member and Bolts:
-.This load the ‘Sub Member ’ and ‘Bolt Data’ contained in the
member so speed is slow but you can calculate the correct data.
When you modify the value of Overage (%) of ‘Bolt Overage’
groupbox and then output the ‘Bolt Data’, this is represented
LSTS USER MANUAL
108
6. DisplayData
At ‘Display’ tap, you can setup reading type data on Search.
Actual Color: Actualed color of member At ‘Production’
window or ‘Construction’.
Notice Text Color: in case of entering string on memo, this is
the text color.
Setup Database (Select DB Server)
If you intall the LSTS client program and then excute LSTS first, you
can check Open window as below. At Setup>Connect Project DB, you
can connect Project Database. To connect DB, click the [Read ServeList]
button and then you can check Open window as below.
LSTS USER MANUAL
109
Select ‘serverlist_soil.xml’ and then click the [Open] button.
As above window, click the [Connect DB] button
Image signed to depend on Database connect status are as follows.
Successful connection
Failed connection
LSTS USER MANUAL
110
Signature: LSTS Client User ’s Guide