L-MT-14-075 ENCLOSURE 5 WESTINGHOUSE LETTER REPORT, LTR-BWR-ENG-14-034-NP NON-PROPRIETARY INVESTIGATION INTO THE CAUSE OF EXCEEDING THE LEVEL 1 (L1) AND LEVEL 2 (L2) LIMIT CURVES GENERATED BASED ON 2011 MONTICELLO MAIN STEAM LINE STRAIN GAUGE DATA 51 pages follow
Transcript
Page 1: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

L-MT-14-075

ENCLOSURE 5

WESTINGHOUSE LETTER REPORT, LTR-BWR-ENG-14-034-NPNON-PROPRIETARY

INVESTIGATION INTO THE CAUSE OF EXCEEDINGTHE LEVEL 1 (L1) AND LEVEL 2 (L2) LIMIT CURVES GENERATED

BASED ON 2011 MONTICELLO MAIN STEAM LINE STRAIN GAUGE DATA

51 pages follow

Page 2: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3

LTR-BWR-ENG- 14-034-NP

Investigation into the Cause of Exceeding the

Level 1 (LI) and Level 2 (L2) Limit Curves

Generated Based on 2011 Monticello Main

Steam Line Strain Gauge Data

September 5, 2014

Westinghouse Electric Company LLC1000 Westinghouse Drive

Cranberry Township, PA 16066 USA

© 2014 Westinghouse Electric Company LLCAll Rights Reserved

Page 3: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-14-034-NP, Revision 1

1

 

Background In early 2014, during power ascension activities (at 1864 MWt) for the extended power uprate (EPU) license amendment, the United States Nuclear Regulatory Commission (U.S. NRC) questioned the accuracy of certain steam dryer data that had been provided as information by Monticello Nuclear Generating Plant (MNGP). After investigation, Northern States Power Minnesota (NSPM) discovered that data errors existed in the replacement steam dryer (RSD) analyses. The errors consisted of 1) a strain gauge (SG) adjustment factor in the data acquisition system (DAS) that was set to a value that reduced the amplitude of the data acquired by a constant factor and; 2) an inadvertent reversal of main steam line (MSL) strain gauge signals, on MSL C, [ ]a,c In Reference 1, the NRC requested additional information (RAIs) related to this issue. NSPM/Westinghouse Electric Company reanalyzed the steam dryer performance using corrected information without changing the benchmark methodology and provided this analysis in response to the RAI request (Reference 2). The minimum alternating stress ratio (MASR) for operation at 2004 MWt that was used to derive the benchmark limit curves in References 2 and 3 [ ]a,c These limit curves were generated based on the 2011 MSL pressure power spectral densities (PSDs) to be consistent for comparison with past work.

Following this submittal, the NRC informally requested that pressure PSDs calculated based on 2014 data, recorded at 1775 MWt, be plotted against the new limit curves provided as part of Reference 2. On August 6, 2014, Xcel Energy recorded a MSL strain gauge dataset at the 1775 MWt thermal power level. Westinghouse has evaluated this dataset and plotted the MSL pressure PSDs against the limit curves derived based on corrected 2011 SG data. [ ]a,c Operability analyses existed and were enhanced to verify that the steam dryer was operable at 1775 MWt and at previous operation that included short periods at power levels up to 1864 MWt.

[ ]a,c A new set of limit curves, developed based on August 6, 2011 data, is also provided. A separate document will be provided to the NRC that describes the alternate power ascension process that NSPM/Westinghouse Electric Company will use to perform the remainder of EPU power ascension testing.

Page 4: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 14-034-NP

References

1. Email from T Beltz (NRC) to J Fields (NSPM), "Monticello Nuclear Generating Plant -Draft Request for Additional Information (EMCB) in Support of EPU Power Ascension(TAC No. MF3330)," dated May 15, 2014. (Attached in EDMS)

2. Letter from K Fili (NSPM), "Monticello Extended Power Uprate: Replacement SteamDryer - Response to NRC Requests for Additional Information, Revised Limit Curvesand Supporting Information (TAC No. MF3330)," July 22, 2014. (Attached in EDMS)

3. Westinghouse Letter LTR-BWR-ENG-14-010, Revision 1, "Responses to the US NRCRequest for Additional Information Relative to the Monticello Replacement Steam DryerAcoustic/Structural Analyses Set #7," July 18, 2014.

4. Xcel Energy Design Information Transmittal (DIT) 1353, "EPU Data Acquisition System(DAS) Main Steam Line (MSL) Data," August 6, 2014.

5. Xcel Energy Design Information Transmittal (DIT) EC-13638, "Transmittal of SIA LetterAMK-1 1-001, Revision 1 confirming that the pressure conversion factors remainunchanged and strain gage data taken during power ascension following the spring 2011refuel outage," June 2011.

6. Structural Integrity Associates Report 1301246.406.R2, "Investigation of SignalDiscrepancies in Extended Power Uprate Strain Gage Data," April 10, 2014.

7. Structural Integrity Associates Report 1301246.407.RO, "Review of Strain Gage SignalPerformance over Extended Time Periods," August 14, 2014.

8. Westinghouse Letter LTR-BSA-14-9, Revision 0, "Monticello Power AscensionAssessment of 105% of CLTP Power Level Data," May 17, 2014.

9. Westinghouse Letter LTR-BWR-ENG-14-031, Revision 0, "Monticello Steam DryerStructural Integrity," August 14, 2014.

10. Structural Integrity Associates Report 1301246.408.RO, "Summary of Onsite DASFunctionality Verification," August 26, 2014.

2

Page 5: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG-14-034-NP

Evaluation

Westinghouse has evaluated the 1775 MWt dataset, transmitted from Xcel Energy toWestinghouse on August 6, 2014 in Reference 4.

a,c

]a,c

The LI and L2 curves in Figures 1A through 8C are based on the MASR consistent with the2011 MSL SG data projected to 2004 MWt in Reference 3.

[

Table 2Recirculation Pump Speeds for 2011 and 2014

]a,c

a,b,c

3

Page 6: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG-14-034-NP

Ii

Ia,c

3.SvrlcanlIaecage

lgtyfo

01t 04

Ia,c

3. Several channels have changed slightly from 2011 to 2014. []a,c The changes include:

0 [

Ia,c

0 [

]a,c

I

Ia,c

From the SIA study, [

Ia,c

4

Page 7: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 14-034-NP

II

]a,c

a I

Ia,c

I

Ia,c

I

I a,c

The changes to the MASR for MSL SG datasets taken at different times are summarized inTable 2.

Table 2I I a,c

a,b,c

5

Page 8: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 14-034-NP

Conclusion

Ia,c

6

Page 9: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG-14-034-NP

a,b,c

Figure 1-A MSL A Upstream0-250 Hz

7

Page 10: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG-14-034-NP

a,b,c

Figure 1-B MSL A Upstream0-100 Hz

8

Page 11: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 14-034-NP

a,b,c

Figure 1-C MSL A Upstream100-250 Hz

9

Page 12: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 1 4-034-NP

a,b,c

Figure 2-A MSL A Downstream0-250 Hz

10

Page 13: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- I 4-034-NP

a,b,c

Figure 2-B MSL A Downstream0-100 Hz

11

Page 14: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 14-034-NP

a,b,c

Figure 2-C MSL A Downstream100-250 Hz

12

Page 15: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 1 4-034-NP

a,b,c

Figure 3-A MSL B Upstream0-250 Hz

13

Page 16: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 14-034-NP

a,b,c

Figure 3-B MSL B Upstream0-100 Hz

14

Page 17: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG-14-034-NP

a,b,c

Figure 3-C MSL B Upstream100-250 Hz

15

Page 18: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- I 4-034-NP

a,b,c

Figure 4-A MSL B Downstream0-250 Hz

16

Page 19: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG-14-034-NP

a,b,c

Figure 4-B MSL B Downstream0-100 Hz

17

Page 20: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 14-034-NP

a,b,c

Figure 4-C MSL B Downstream100-250 Hz

18

Page 21: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG-14-034-NP

a,b,c

Figure 5-A MSL C Upstream0-250 Hz

19

Page 22: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- I 4-034-NP

a,b,c

Figure 5-B MSL C Upstream0-100 Hz

20

Page 23: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG-1 4-034-NP

a,b,c

Figure 5-C MSL C Upstream100-250 Hz

21

Page 24: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 1 4-034-NP

7 a,b,c

Figure 6-A MSL C Downstream0-250 Hz

22

Page 25: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 1 4-034-NP

a,b,c

Figure 6-B MSL C Downstream0-100 Hz

23

Page 26: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 14-034-NP

a,b,c

Figure 6-C MSL C Downstream100-250 Hz

24

Page 27: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 14-034-NP

a,b,c

Figure 7-A MSL D Upstream0-250 Hz

25

Page 28: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 14-034-NP

a,b,c

Figure 7-B MSL D Upstream0-100 Hz

26

Page 29: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 14-034-NP

a,b,c

Figure 7-C MSL D Upstream100-250 Hz

27

Page 30: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 14-034-NP

a,b,c

Figure 8-A MSL D Downstream0-250 Hz

28

Page 31: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG-14-034-NP

a,b,c

Figure 8-B MSL D Downstream0-100 Hz

29

Page 32: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG-14-034-NP

a,b,c

Figure 8-C MSL D Downstream100-250 Hz

30

Page 33: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 14-034-NP

a,b,c

Figure 9 [Ia,c

31

Page 34: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 14-034-NP

a,b,c

Figure 10 [Ia,c

32

Page 35: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- I 4-034-NP

a,b,c

Figure 11 [Ia,c

33

Page 36: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- I 4-034-NP

a,b,c

Figure 12 [Ia,c

34

Page 37: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 14-034-NP

I a,b,c

Figure 13 [Ia,c

35

Page 38: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 14-034-NP

7a,b,c

Figure 14 [Iaxc

36

Page 39: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 14-034-NP

2 a,b,c

Figure 15 [I aC

37

Page 40: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 14-034-NP

- a,b,c

Figure 16 [I a,c

38

Page 41: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- I 4-034-NP

Figure 17 Sample Plant 2, MSL A Upper

a,b,c

39

Page 42: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- I 4-034-NP

a,b,c

Figure 18 Sample Plant 2, MSL A Lower

40

Page 43: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 14-034-NP

a,b,c

Figure 19 Sample Plant 2, MSL D Upper

41

Page 44: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 14-034-NP

a,b,c

Figure 20 Sample Plant 2, D Lower

42

Page 45: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 14-034-NP

a,b,c

Figure 21 MSL A Upstream

43

Page 46: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- I 4-034-NP

a,b,c

Figure 22 MSL A Downstream

44

Page 47: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 14-034-NP

a,b,c

Figure 23 MSL B Upstream

45

Page 48: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 14-034-NP

a,b,c

Figure 24 MSL B Downstream

46

Page 49: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 14-034-NP

a,b,c

Figure 25 MSL C Upstream

47

Page 50: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 14-034-NP

a,b,c

Figure 26 MSL C Downstream

48

Page 51: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-BWR-ENG- 14-034-NP

a,b,c

Figure 27 MSL D Upstream

49

Page 52: LTR-BWR-ENG-14-034-NP, 'Investigation into the Cause of … · 2014-10-14 · LTR-BWR-ENG-14-034-NP, Revision 1 1 Background In early 2014, during power ascension activities (at 1864

Westinghouse Non-Proprietary Class 3LTR-B WR-ENG- I 4-034-NP

a,b,c

Figure 28 MSL D Downstream

50