41
South River View Park Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM www.karvakko. com Presented By: Keith Kinnen, PLA, ASLA Landscape Architect
Transcript
Page 1: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

South River View Park

Master PlanPublic Input Meeting

April 23rd 2015Open House: 4:30 – 5:30 PM

Presentation: 5:30 – 6:00 PM

Open Forum: 6:00 – 7:00 PM

www.karvakko.com

Presented By:Keith Kinnen, PLA, ASLALandscape Architect

Page 2: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Wel

com

e

Keith Kinnen, PLA, ASLALandscape ArchitectKarvakko Engineering

Introductions

Page 3: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Back

grou

nd

• Bemidji, MN• Civil Engineering, Planning & Surveying• Regional• Small firm • High priority on customer satisfaction and interaction with the

community

Karvakko Engineering

Page 4: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Back

grou

nd

• South River View Park• Previous public pool location• In need of updates• North River View Park recently updated

Project

Page 5: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Back

grou

nd

• Gather public input• You will be who uses the park• It’s your community, your money and your park!

Why are we here today?

Page 6: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Proc

ess

• City of Roseau has acquired Karvakko Engineering• We met internally to discuss some ideas and develop an

initial plan.• Developed a list of anticipated priorities• Developed some “schematic” layouts• Refined them• Developed “Preliminary Master Plan”

What’s happened so far?

Page 7: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Proc

ess

• Splash Pad• Warming/Changing House• Skate Park• Outdoor Fire Place• Small Public Ice Rink• Other Suggestions?

• We will discuss after and please fill out the Public Survey!

Step 1: List of priorities

* This is only our preliminary order. We are here today to finalize the order and to add any additional suggestions to the list.

Page 8: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Existi

ng L

ayou

tInitial thoughts:• Nice Parking Area• Trail Access• Existing Structures• Nearby Sledding Hill• Good Visibility • Nice Location by

River

Page 9: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Sche

mati

c La

yout Pros:

• This layout groups the summer activities and winter activities to similar locations.

• It allows the existing structures to be salvaged and would likely save money.

Cons:• The skate park and ice skating rink would not be very

visible from Center Street.

Option #1

Page 10: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Sche

mati

c La

yout Pros:

• The splash pad and ice skate rink will be easily visible from the street.

• The warming/changing shelter can be used in summer and winter.

• The skate park is easily accessible next to the new parking and somewhat separated from the new splash pad.

Cons:• The warming shelter is not close to the sledding

area.

Option #2

Page 11: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Sche

mati

c La

yout Pros:

• This layout groups the ice skating rink and splash pad areas, which may tend to be more family-type groups and it groups the skate park and basketball court, which may tend to be more teenager-type groups.

Cons:• The splash pad becomes almost a secondary feature

in the park with the ice skating rink so close to the road.

• There is minimal buffer between the ice rink and the street. This leaves minimal open, recreational space.

Option #3

Page 12: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Sche

mati

c La

yout

Pros:• The picnic shelter is located in a central location

which will allow it to be used by people using any of the surrounding amenities.

• The ice rink is located somewhat close to the sledding area and the warming shelter is accessible by both.

Cons:• Not much open space for general recreation.

Option #4

Page 13: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Sche

mati

c La

yout We analyzed the options… Weighed pros and cons… and refined a single schematic layout.

Page 14: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Sche

mati

c La

yout

Pros:• This layout allow a nice open green space for

recreation in the front of the park, but still will have a nice open visibility to the splash pad.

• The layout will allow the existing pump house and picnic shelter to be salvaged until now ones can be phased into the overall park.

• The skate park will be easily accessible from the new parking area.

• The outdoor fireplace is located where a fire can be going near the ice skate rink in the winter to warm up.

• The picnic shelter and changing house are centrally located to accommodate all of the amenities in the park.

• The basketball court will remain in the same location.

• The park sign will be easily visible from the street and parking lot.

• The ice skate rink and warming shelter are located close to the sledding hill.

• This layout groups the teenage-group activities together and the family-group activities together. It allows the different groups to have their own spaces.

Cons:• None!

Final Option

Page 15: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Mas

ter P

lan

Preliminary

Page 16: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Mas

ter P

lan

Preliminary

Page 17: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Mas

ter P

lan

Preliminary

Page 18: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Mas

ter P

lan

Preliminary

Page 19: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Mas

ter P

lan

Preliminary

Page 20: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Mas

ter P

lan

Preliminary

Page 21: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Mas

ter P

lan

Preliminary

Page 22: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Mas

ter P

lan

Preliminary

Page 23: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Mas

ter P

lan

Preliminary

Page 24: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Mas

ter P

lan

Preliminary

Page 25: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Mas

ter P

lan

Preliminary

Page 26: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Mas

ter P

lan

Preliminary

Page 27: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Mas

ter P

lan

Preliminary

Page 28: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Mas

ter P

lan

Preliminary

Page 29: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Mas

ter P

lan

Preliminary

Page 30: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Mas

ter P

lan

Preliminary

Page 31: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Mas

ter P

lan

Preliminary

Page 32: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Mas

ter P

lan

Preliminary

Page 33: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Mas

ter P

lan

Preliminary

Page 34: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Mas

ter P

lan

Preliminary

Page 35: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Mas

ter P

lan

Rendering

Page 36: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Estim

ated

Cos

ts

Page 37: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Conc

lusi

on

• Existing Park Conditions• List of Priorities• Schematic Design• Preliminary Master Plan

So it’s all coming together

Page 38: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Mov

ing

Forw

ard

• Gather feedback today• Refine and develop Master Plan• Fund Raise, Apply for grants• Once funds become available

• Determine size of phases• Develop construction plans• Construction

• Enjoy your new park!

What’s Next?

Page 39: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Befo

re y

ou g

o • Place a sticker next to the park amenity which you would MOST like to see included in this park.

• If you have additional suggestions, please write them in the additional rows provided.

• The totals will be tallied and considered for the final master plan.

Please fill out the survey board!

Page 40: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Befo

re y

ou g

o • Additional suggestions?• Comments?• Considerations?

Questions?

Page 41: Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM  Presented.

www.karvakko.com

Ope

n fo

rum

• Feel free to stick around.• I will be around to discuss with

anyone interested until 7:00.

Thank you for ALL your feedback!

6:00-7:00 pm

Presented By:Keith Kinnen, PLA, ASLALandscape Architect