1 Executive Committee Meeting #3/13 Chair: Gerri Lynn O'Connor Vice Chair: Maria Augimeri Members: Ben Cachola Ronald Chopowick Glenn De Baeremaeker Michael Di Biase Jack Heath Colleen Jordan Gloria Lindsay Luby Mike Mattos Jim Tovey Richard Whitehead May 10, 2013 9:30 A.M. WESTON ROOM B, BLACK CREEK PIONEER VILLAGE AGENDA Pages EX1. MINUTES OF MEETING #2/13, HELD ON APRIL 12, 2013 Minutes Summary Enclosed Herewith on PINK EX2. BUSINESS ARISING FROM THE MINUTES EX3. DISCLOSURE OF PECUNIARY INTEREST AND THE GENERAL NATURE THEREOF EX4. DELEGATIONS EX4.1 A delegation by Mr. Dinesh Bilimoria of 146 Robirwin Street, Whitchurch-Stouffville, speaking in regard to item EX7.1 - Request for Disposal of Toronto and Region Conservation Authority-owned Land. EX4.2 A delegation by Mr. Mitch Abrahams of 19 Strathearn Road, Toronto, in regard to item EX10.23 - 19 Strathearn Road.
Transcript
Page 1: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

1

Executive Committee Meeting #3/13

Chair: Gerri Lynn O'ConnorVice Chair: Maria AugimeriMembers: Ben Cachola

Ronald ChopowickGlenn De BaeremaekerMichael Di BiaseJack HeathColleen JordanGloria Lindsay LubyMike MattosJim ToveyRichard Whitehead

May 10, 2013

9:30 A.M.WESTON ROOM B, BLACK CREEK PIONEER VILLAGE

AGENDAPages

EX1. MINUTES OF MEETING #2/13, HELD ON APRIL 12, 2013Minutes Summary Enclosed Herewith on PINK

EX2. BUSINESS ARISING FROM THE MINUTES

EX3. DISCLOSURE OF PECUNIARY INTEREST AND THE GENERAL NATURE THEREOF

EX4. DELEGATIONS

EX4.1 A delegation by Mr. Dinesh Bilimoria of 146 Robirwin Street, Whitchurch-Stouffville, speaking in regard to item EX7.1 - Request for Disposal of Toronto and Region Conservation Authority-owned Land.

EX4.2 A delegation by Mr. Mitch Abrahams of 19 Strathearn Road, Toronto, in regard to item EX10.23 - 19 Strathearn Road.

Page 2: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

2

EX5. PRESENTATIONS

EX6. CORRESPONDENCE

EX7. SECTION I - ITEMS FOR AUTHORITY ACTION

EX7.1 REQUEST FOR DISPOSAL OF TORONTO AND REGION CONSERVATION AUTHORITY-OWNED LANDRear of 146 Robirwin Street, Town of Whitchurch-StouffvilleCFN 48039 34

EX/7.2 REQUEST FOR REMOVAL OF CONSERVATION EASEMENT11220 Regional Road 271321362 Ontario Inc.CFN 37324 39

EX8. SECTION II - ITEMS FOR EXECUTIVE ACTION

EX8.1 ENFORCEMENT AND COMPLIANCE 42

EX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTINGAward of Sole Source Contract for HVAC Retrofits and Air Quality Testing, 5 Shoreham Drive, Downsview 44

EX8.3 220 GREYABBEY TRAIL & SCARBOROUGH WATERFRONT ACCESS PLANReport to Follow

EX9. SECTION IV - ITEMS FOR THE INFORMATION OF THE BOARD

EX10 ONTARIO REGULATION 166/06

PERMIT APPLICATIONS EX10.1 - EX10.3 ARE MAJOR APPLICATIONS

Applications that involved a more complex suite of technical studies to demonstrate consistency with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater management ponds), extensive modifications to the landscape, major infrastructure projects, emergency works, resolution of violations/after the fact permits, trail construction

Page 3: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

3

CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA]

EX10.1 CITY OF TORONTOTo site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere, at Budapest Park near Parkside Drive and Lake Shore Boulevard West, in the City of Toronto (Etobicoke York Community Council Area), Waterfront Watershed, as located on property owned by the City of Toronto. The purpose is to construct a temporary containment swale. Works involved site grading and modifications to the combined sewer system. No in-water works were within the scope of this project. 46

CITY OF VAUGHAN

EX10.2 LONGYARD PROPERTIES INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere, interfere with a wetland and alter a watercourse on Part Lots 21, 22, Concession 2, (Northwest of Major Mackenzie Drive and Bathurst Street, Block 12), in the City of Vaughan, Don River Watershed as located on the property owned by Longyard Properties Inc. The purpose is to allow development, interference with a wetland and alteration of a watercourse within a Regulated Area of the Don River Watershed to facilitate topsoil stripping and the installation of sediment and erosion control measures, including multiple temporary sediment control ponds, for a draft approved plan of subdivision (19T-03V13) within Block 12, northwest of Major Mackenzie Drive and Bathurst Street, in the City of Vaughan. 48

EX10.3 NASHVILLE DEVELOPMENTS INC.To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Part Lots 22, 23, Concession 9, (northeast of Major Mackenzie Drive and Huntington Road, Block 61W), in the City of Vaughan, Humber River Watershed as located on the property owned by Nashville Developments Inc. The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed to facilitate topsoil stripping and the installation of sediment and erosion control measures in Phase 3 of a draft approved plan of subdivision (19T-10V004) within Block 61 West, northeast of Major Mackenzie Drive and Huntington Road, in the City of Vaughan. 51

Page 4: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

4

PERMIT APPLICATIONS EX10.4 - EX10.12 ARE MAJOR APPLICATIONS - ERRATA

Staff's recommendation for approval is based upon the review and acceptance of additional information from the applicant. The applicant has been informed that the information outstanding must be reviewed and accepted by staff prior to the Executive Committee Meeting. Staff will advise that this application be withdrawn from the Executive Committee Agenda should this information remain outstanding.

CITY OF VAUGHAN

EX10.4 LONGYARD PROPERTIES INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Part Lots 21, 22, Concession 2, (Northwest of Major Mackenzie Drive and Bathurst Street, Block 12), in the City of Vaughan, Don River Watershed as located on the property owned by Longyard Properties Inc. The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Don River Watershed to facilitate the construction of a stormwater management facility (SWM Pond 7) and associated outfall to service a draft approved plan of subdivision (19T-03V13) within Block 12, northwest of Major Mackenzie Drive and Bathurst Street, in the City of Vaughan

53

EX10.5 LONGYARD PROPERTIES INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere, interfere with a wetland and alter a watercourse on Part Lots 21, 22, Concession 2, (Northwest of Major Mackenzie Drive and Bathurst Street, Block 12), in the City of Vaughan, Don River Watershed as located on the property owned by Longyard Properties Inc. The purpose is to allow development, interference with a wetland and alteration of a watercourse within a Regulated Area of the Don River Watershed to facilitate the construction of a stormwater management facility (SWM Pond 8) and associated outfall to service a draft approved plan of subdivision (19T-03V13) within Block 12, northwest of Major Mackenzie Drive and Bathurst Street, in the City of Vaughan. 56

Page 5: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

5

EX10.6 TOWNWOOD HOMES INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Part Lot 20, Concession 2, Major Mackenzie Drive and Dufferin Street, in the City of Vaughan, Don River Watershed as located on the property owned by Townwood Homes Inc. The purpose is to conduct site grading works in order to construct a stormwater management pond and associated outfall which will facilitate the servicing and development of the Mackenzie Ridge townhome subdivision, in Planning Block 11, in the City of Vaughan. 58

EX10.7 TOWNWOOD HOMES INC.To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 20, Concession 2, Major Mackenzie Drive and Dufferin Street, in the City of Vaughan, Don River Watershed as located on the property owned by Townwood Homes Inc. The purpose is to conduct topsoil stripping works in order facilitate the servicing, development and final grading works for the Mackenzie Ridge townhome subdivision, in Planning Block 11, in the City of Vaughan. 60

EX10.8 TOWNWOOD HOMES INC.To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 20, Concession 2, Major Mackenzie Drive and Dufferin Street, in the City of Vaughan, Don River Watershed as located on the property owned by Townwood Homes Inc. The purpose is to conduct final grading/development works in order facilitate the construction and development of the Mackenzie Ridge townhome subdivision, in Planning Block 11, in the City of Vaughan. 62

TOWN OF CALEDON

EX10.9 GRECFAM HOLDINGS INC.To construct, reconstruct, erect or place a building or structure, site grade on Part Lot 7, Concession 6, (13303 Coleraine Drive), in the Town of Caledon, Humber River Watershed as located on the property owned by Grecfam Holdings Incorporated. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the realignment of a tributary of the Humber River Watershed and develop the industrial lot with open storage and an equipment storage building associated with a municipal site plan application. 64

Page 6: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

6

TOWN OF RICHMOND HILL

EX10.10 DDR MAJOR MAC RICHMOND GP INC.To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 19, 20, Concession 3, (1577 - 1621 Major MacKenzie Drive East), in the Town of Richmond Hill, Rouge River Watershed as located on the property owned by DDR Major Mac Richmond Gp Inc.. The purpose is to facilitate earthworks, pre-grading, temporary stormwater management, and initial site preparation works associated with a draft approved commercial subdivision. 66

EX10.11 SANMIKE CONSTRUCTION LIMITEDTo construct, reconstruct, erect or place a building or structure and site grade on Part Lot 25, EYS Block 24, Plan 65M-3230, (10665 Bayview Avenue), in the Town of Richmond Hill, Rouge River Watershed as located on the property owned by Sanmike Construction Limited. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate grading and servicing associated with an approved Draft Plan of Subdivision consisting of 67 residential townhouse units in the Town of Richmond Hill. 68

EX10.12 SANMIKE CONSTRUCTION LIMITEDTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 25, EYS Block 24, Plan 65M-3230, (10665 Bayview Avenue), in the Town of Richmond Hill, Rouge River Watershed as located on the property owned by Sanmike Construction Limited. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order facilitate the construction of an outfall structure associated with a townhouse development in the Town of Richmond Hill. 70

CITY OF BRAMPTON

EX10.13 LOT 6, GOREWAY DRIVE - NEAR CYNTHIA CRESCENTTo construct, reconstruct, erect or place a building or structure and site grade on Lot 6, Plan 43M-580, (Lot 6, Goreway Drive - near Cynthia Crescent), in the City of Brampton, Humber River Watershed. The purpose is to undertake works within the TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a single family dwelling, associated with a municipal building permit. 72

Page 7: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

7

EX10.14 IBRANS DEVELOPMENTS LTD.To site grade on Part Lot 11, Concession 7, N.D.S., in the City of Brampton, Humber River Watershed as located on the property owned by Ibrans Developments Ltd.. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate grading works related to a residential draft plan of subdivision application. 73

EX10.15 72 BROOKLAND DRIVETo construct, reconstruct, erect or place a building or structure on Lot 222, Plan 688, (72 Brookland Drive), in the City of Brampton, Etobicoke Creek Watershed. The purpose is to undertake works within the TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of a proposed below grade entrance to an existing single family dwelling, associated with a municipal building permit. 76

EX10.16 ONTARIO CONFERENCE SEVENTH DAY ADVENTIST CHURCHTo construct, reconstruct, erect or place a building or structure on Part 2, 3, 4, 5, 6 Plan 43R-24714, (10747 Heart Lake Road), in the City of Brampton, Etobicoke Creek Watershed as located on the property owned by Ontario Conference Seventh Day Adventist Church. The purpose is to undertake works within the TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of an outdoor playground and garden shed associated with a municipal building permit. 78

CITY OF MARKHAM

EX10.17 CITY OF MARKHAMTo temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Raymerville Drive between Hickory Drive and Norwich Drive; Raymerville Drive between Bendamere Crescent and Wooden Mill Road in the City of Markham, Rouge River Watershed as located on the property owned by City of Markham. The purpose is to undertake rehabilitation of two culverts located on Raymerville Drive, one between Hickory Drive and Norwich Drive and the other between Bendamere Crescent and Wooden Mill Road in the City of Markham. The Redside Dace fisheries timing window will apply to this project unless otherwise specified in writing by Ministry of Natural Resources (MNR). A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). 79

Page 8: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

8

CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA]

EX10.18 49 CORNELIUS PARKWAYTo construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 148, Plan 3244, (49 Cornelius Parkway), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to construct a new two-storey single family detached dwelling and an inground pool with associated hardscaping at 49 Cornelius Parkway in the City of Toronto (Etobicoke York). The existing dwelling will be demolished. 82

EX10.19 CITY OF TORONTOTo construct, reconstruct, erect or place a building or structure, site grade, and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere, at Chris Tonks Arena (2801 Eglinton Avenue West), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed, as located on property owned by the City of Toronto. The purpose is to carry out exterior upgrades at Chris Tonks Arena. Works will involve rehabilitation of the existing parking lot, upgrades to the drainage system, and landscaping. No in-water works are within the scope of this project. 84

EX10.20 DELMANOR DUNDAS INC.To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 10, Concession C, (4180 - 4190 Dundas Street West), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on the property owned by Delmanor Dundas Inc.. The purpose is to construct an underground parking garage and the above-grade portion of an multi-storey retirement apartment building, remove an existing asphalt parking lot, and install associated landscaping. 87

EX10.21 68 HAYMARKET ROADTo construct, reconstruct, erect or place a building or structure and site grade on Lot 81, Plan 3855, (68 Haymarket Road), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to construct a one-storey detached garage in the rear yard of the single family detached dwelling at 68 Haymarket Road in the City of Toronto (Etobicoke York). 89

Page 9: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

9

CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA]

EX10.22 CITY OF TORONTOTo construct, reconstruct, erect or place a building or structure, and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere, at 777 Lawrence Avenue East near Leslie Street, in the City of Toronto (North York Community Council Area), Don River Watershed, as located on property owned by the City of Toronto. The purpose is to install a pre-engineered garage structure. Works will involve placement of the new structure on new concrete foundations. No in-water works are within the scope of this project. 91

CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA]

EX10.23 19 STRATHEARN ROADTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part 276 Plan , Part Lot 285, 286, Plan M-378, (19 Strathearn Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to construct a retaining wall, relocate soil, and construct a terrace, planting beds and a swimming pool. 94

CITY OF VAUGHAN

EX10.24 107 TREELAWN BOULEVARDTo construct, reconstruct, erect or place a building or structure on , (107 Treelawn Boulevard), in the City of Vaughan, Humber River Watershed. The purpose is to construct an accessory shed within a Regulated Area of the Humber River watershed at 107 Treelawn Boulevard in the City of Vaughan. 96

Page 10: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

10

EX10.25 REGIONAL MUNICIPALITY OF YORKTo construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere, and alter a watercourse on Yonge Street, 0.52 km north of 71 John Street, in the City of Vaughan, Don River Watershed as located on the property owned by the Regional Municipality of York. The purpose is to undertake maintenance works on a concrete arch culvert and replace a failed gabion wall. Maintenance works on the culvert and wing walls include drip edges at the storm inlet pipes, crack injection, new hand rail, new chain link fence, concrete curb reconstruction, the removal of trees from around the wing walls, and the realignment of the low flow channel. Works are subject to the coldwater timing window, unless otherwise specified in writing by the Ministry of Natural Resources (MNR). A Letter of Advice (LOA) will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). 98

EX10.26 140 CENTRE STREETTo construct, reconstruct, erect or place a building or structure and site grade on Lot 7, Plan 3270, (140 Centre Street), in the City of Vaughan, Don River Watershed. The purpose is to construct a replacement dwelling within a Regulated Area of the Don River watershed at 140 Centre Street in the City of Vaughan. 100

EX10.27 11801 KEELE STREETTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on , (11801 Keele Street), in the City of Vaughan, Humber River Watershed. The purpose is to construct a replacement dwelling within a Regulated Area of the Humber River watershed at 11801 Keele Street in the City of Vaughan. 102

EX10.28 21 PARK DRIVETo construct, reconstruct, erect or place a building or structure on Part Lot 7, Concession 7 Part Lot 6, Plan 449, (21 Park Drive), in the City of Vaughan, Humber River Watershed. The purpose is to construct an above-ground pool within a Regulated Area of the Humber River watershed at 21 Park Drive in the City of Vaughan.

104TOWN OF CALEDON

EX10.29 140 VICTORIA STREETTo construct, reconstruct, erect or place a building or structure on Lot 96, Plan BOL-7, (140 Victoria Street), in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within the TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a two storey addition at the rear of the existing residential dwelling, associated with a municipal building permit.105

Page 11: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

11

EX10.30 REGIONAL MUNICIPALITY OF PEELTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere along a tributary of Lindsay Creek on King Street, 1000 m west of The Gore Road, in the Town of Caledon, Humber River Watershed, as located on the property owned by Regional Municipality of Peel. The purpose is to replace an existing culvert over a tributary of Lindsay Creek on King Street, approximately 1000 m west of The Gore Road, in the Town of Caledon. The redside dace timing window will be applied to this project unless otherwise specified in writing by the Ministry of Natural Resources (MNR). A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). 108

EX10.31 REGIONAL MUNICIPALITY OF PEELTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere along a tributary of the Humber River on King Street, approximately 280 m east of Innis Lake Road, in the Town of Caledon, Humber River Watershed, as located on the property owned by Regional Municipality of Peel. The purpose is to replace an existing concrete box culvert along a tributary of the Humber River on King Street, approximately 280 m east of Innis Lake Road, in the Town of Caledon. The redside dace fisheries timing window will be applied to this project unless otherwise specified in writing by the Ministry of Natural Resources (MNR). A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). 109

EX10.32 REGIONAL MUNICIPALITY OF PEELTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere along a tributary of the Humber River at 4700 King Street, approximately 00 m east of Dixie Road, in the Town of Caledon, Humber River Watershed, as located on the property owned by Regional Municipality of Peel. The purpose is to replace an existing corrugated steel pipe culvert with an open footed concrete culvert along a tributary of the Humber River on King Street, approximately 500 m east of Dixie Road, in the Town of Caledon. The Redside Dace fisheries timing window will be applied to this project, unless otherwise specified in writing by the Ministry of Natural Resources (MNR). A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). 111

Page 12: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

12

TOWN OF RICHMOND HILL

EX10.33 22 FERGUS AVENUETo construct, reconstruct, erect or place a building or structure and site grade on Part Lot 19, Plan 194, (22 Fergus Avenue), in the Town of Richmond Hill, Humber River Watershed. The purpose is to demolish an existing one-storey single family dwelling and construct a 208.71m² two-storey single detached dwelling associated with a municipal building permit. The municipal roadway and a portion of the subject property are located in the Regional Floodplain associated with Lake Wilcox. However, the proposed replacement dwelling is located outside of the Floodplain and appropriately set back. In addition, the site is located away from Lake Wilcox and contains no ecologically significant features. As such, there are no flooding, geotechnical or ecology related concerns with this application. 113

EX10.34 209 OXFORD STREETTo construct, reconstruct, erect or place a building or structure and site grade on Lot 88, Plan 1999, (209 Oxford Street), in the Town of Richmond Hill, Don River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a two-storey addition to an existing two-storey single family dwelling associated with a municipal building permit. 115

ITEMS EX10.35 - EX10.49 ARE ERRATA ITEMS:

CITY OF MARKHAM

EX10.35 MILL POND INV. INC.To construct, reconstruct, erect or place a building or structure at 16 Moore's Court, in the City of Markham, Rouge River Watershed as located on the property owned by Mill Pond Inv. Inc.. The purpose is to undertake works within a TRCA regulated area of the Rouge River Watershed in order to facilitate the construction of a paved driveway and two storey frame addition with an enclosed garage to the rear of an existing two storey "heritage" dwelling associated with a municipal building permit. 117

Page 13: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

13

CITY OF MISSISSAUGA

EX10.36 PCM BRAMALEA ROAD INC.To construct, reconstruct, erect or place a building or structure and site grade on Part Lot 12, Concession 5 Part Lot 1, 2, Plan 43R-32904, (7381 Bramalea Road), in the City of Mississauga, Etobicoke Creek Watershed as located on the property owned by PCM Bramalea Road Incorporated. The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of an addition to an existing industrial building associated with a site plan application.

119

CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA]

EX10.37 303 LAKE PROMENADETo construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 40, Plan 2180, (303 Lake Promenade), in the City of Toronto (Etobicoke York Community Council Area), Waterfront Watershed. The purpose is to construct a three storey replacement dwelling with terrace, and covered and enclosed swimming pool with hot tub at 303 Lake Promenade in the City of Toronto (Etobicoke York Community Council Area). 120

CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA]

EX10.38 CITY OF TORONTOTo construct, reconstruct, erect or place a building or structure, site grade, and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere, on Donwoods Drive (from Ivor Road to Donino Avenue); Plymbridge Road (from Donwoods Drive to the West Don River); Donwwods Drive (from Donino Avenue to Knightswood Road); Donwwods Grove; and Winton Road, in the City of Toronto (North York Community Council Area), Don River Watershed, as located on property owned by the City of Toronto. The purpose is to undertake road and sewer improvements within the Hoggs Hollow Neighbourhood. Works will include the construction of a new storm sewer system, replacement of watermains and reconstruction of roadways. No in-water works are associated with this project. 122

Page 14: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

14

CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA]

EX10.39 108 FERRIS ROADTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 11, Plan M-630, (108 Ferris Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to construct a in-ground swimming pool, cabana and associated landscaping at 108 Ferris Road in the City of Toronto (Toronto and East York Community Council Area). 124

CITY OF VAUGHAN

EX10.40 16 JAYLYNN COURTTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 10, Plan 65M-3474, (16 Jaylynn Court), in the City of Vaughan, Humber River Watershed. The purpose is to construct an inground pool within a Regulated Area of the Humber River watershed at 16 Jaylynn Court in the City of Vaughan. 126

EX10.41 209 GLENFOREST DRIVETo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 5, Plan 65M-3447, (209 Glenforest Drive), in the City of Vaughan, Don River Watershed. The purpose is to construct an inground pool, retaining wall and conduct minor grading works within a Regulated Area of the Don River watershed at 209 Glenforest Drive in the City of Vaughan. 128

TOWN OF CALEDON

EX10.42 HALCO HOLDINGS LTD.To construct, reconstruct, erect or place a building or structure and site grade on Lot 1, 2, Plan 959, (195 Healey Road), in the Town of Caledon, Humber River Watershed as located on the property owned by Halco Holdings Limited. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of an addition to an existing industrial warehouse facility associated with a municipal site plan application.

129

Page 15: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

15

EX10.43 KING MASONRYTo construct, reconstruct, erect or place a building or structure and site grade on Lot 11, Concession 5, (14025 Humber Station Road), in the Town of Caledon, Humber River Watershed as located on the property owned by King Masonry. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new office building, storage building and to permit the existing courier service use and to include permission for the lands to be used for a masonry sales establishment, which displays and warehouses masonry products for sale to the public, associated with municipal planning approvals.131

EX10.44 MILL LANETo construct, reconstruct, erect or place a building or structure on Part Lot 22, Concession 4, (Mill Lane), in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within the TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a single family home, driveway, septic system, geothermal system, deck and solar panel associated with a municipal building permit. 133

TOWN OF RICHMOND HILL

EX10.45 TOWN OF RICHMOND HILLTo construct, reconstruct, erect or place a building or structure, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse in Wood's Park in the Town of Richmond Hill, Don River Watershed as located on the property owned by Town of Richmond Hill. The purpose is to undertake construction of a pedestrian bridge to replace an existing bridge located over a tributary of the East Don River within Wood's Park approximately 55m downstream of Castle Rock Drive in the Town of Richmond Hill, Don River Watershed as located on the property owned by the Town of Richmond Hill. The Redside Dace fisheries timing window will apply to this project unless otherwise specified in writing by Ministry of Natural Resources (MNR). A letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). 135

EX10.46 ZAVALA DEVELOPMENTS INC.To temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 60, Concession 1 WYS, (Drynnoch Estates Phase 3 West, north of Jefferson Sideroad), in the Town of Richmond Hill, Rouge River Watershed as located on the property owned by Zavala Developments Incorporated. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the cleanout of an existing stormwater management pond in the Town of Richmond Hill.

136

Page 16: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

16

TOWNSHIP OF KING

EX10.47 12800 8TH CONCESSIONTo construct, reconstruct, erect or place a building or structure and change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 3 - 5, Concession 8, (12800 8th Concession), in the Township of King, Humber River Watershed. The purpose is to construct an addition to an existing dwelling within a Regulated Area of the Humber River watershed at 12800 8th Concession in the Township of King. 138

EX10.48 55 KINGSWORTH ROADTo construct, reconstruct, erect or place a building or structure and site grade on Lot 13, Plan 473, (55 Kingsworth Road), in the Township of King, Humber River Watershed. The purpose is to construct a replacement dwelling, replacement septic system, cabana, inground pool and detached garage within a Regulated Area of the Humber River watershed at 55 Kingsworth Road in the Township of King. 140

EX10.49 13195 CALEDON-KING TOWNLINE SOUTHTo construct, reconstruct, erect or place a building or structure on , (13195 Caledon-King Townline South), in the Township of King, Humber River Watershed. The purpose is to recognize a concrete pad and cabana constructed within a Regulated Area of the Humber River watershed at 13195 Caledon-King Townline South in the Township of King. 142

PERMIT APPLICATIONS EX10.50 - EX10.69 ARE PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS

Permission for Routine Infrastructure Works Letter of Approval are implemented by Planning and Development Division staff and are received monthly by the Executive Committee. The permission of routine infrastructure works is subject to authorization by the Director, Planning and Development and signed by an appointed enforcement officer. All routine infrastructure works are located within a Regulated Area, generally within or adjacent to the hazard or natural feature and in the opinion of staff do not affect the control of flooding, erosion, dynamic beaches, pollution or the conservation of land.

Page 17: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

17

CITY OF BRAMPTON

EX10.50 BELL CANADATo undertake sewer and watermain or utility watercourse crossing by trenchless technology above an existing culvert at a tributary of Etobicoke Creek on Countryside Drive, west of Naperton Drive and near Dixie Road, in the City of Brampton, Etobicoke Creek Watershed, as located on the property owned by the City of Brampton. The purpose is to install a communication cable conduit above an existing culvert at a tributary of Etobicoke Creek on Countryside Drive, west of Naperton Drive and near Dixie Road, in the City of Brampton. The warmwater fisheries timing window will be applied to this project, unless otherwise specified in writing by the Ministry of Natural Resources (MNR). A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO).

CFN: 48902 - Application #: 0156/13/BRAMReport Prepared by: Shirin Varzgani, extension 5785For information contact: Shirin Varzgani, extension 5785Date: April 29, 2013

EX10.51 REGIONAL MUNICIPALITY OF PEELTo undertake sewer and watermain or utility installation or maintenance within an existing roadway on John Street, near Queen Street East and Centre Street, in the City of Brampton, Etobicoke Creek Watershed, as located on the property owned by Regional Municipality of Peel. The purpose is to replace an existing sanitary sewer on John Street, near Queen Street East and Centre Street, in the City of Brampton. The warmwater fisheries timing window will be applied to the project, unless otherwise specified in writing by the Ministry of Natural Resources (MNR). A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO).

CFN: 48975 - Application #: 0230/13/BRAMReport Prepared by: Shirin Varzgani, extension 5785For information contact: Shirin Varzgani, extension 5785Date: April 29, 2013

Page 18: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

18

CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA]

EX10.52 CITY OF TORONTOTo undertake road/pathway resurfacing or reconstruction on Canerouth Drive from Rathburn Road to south of Rathburn Road, and on Ivybridge Drive from Rathburn Road to Canerouth Drive, in the City of Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed, as located on property owned by the City of Toronto. The purpose is to resurface existing roadway. Works involved removal and replacement of the existing asphalt road surface, as well as concrete sidewalks and curbs, catch basins and gutters. No in-water works were within the scope of this project. Construction has occurred.

CFN: 45463 - Application #: 0273/11/TORReport Prepared by: Daniel Brent, extension 5774For information contact: Jonathan Pounder, extension 5304Date: April 16, 2013

EX10.53 CITY OF TORONTOTo undertake sewer and watermain or utility installation or maintenance within an existing roadway on Gunns Road from Glen Scarlett Road to Weston Road; Symes Road from Terry Drive to Glen Scarlett Road; and Castleton Avenue from Corbett Avenue to St. Clair Avenue West, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed, as located on property owned by the City of Toronto. The purpose is to install new watermain within the road right of way and boulevard. No in-water works are within the scope of this project.

CFN: 48400 - Application #: 0051/13/TORReport Prepared by: Daniel Brent, extension 5774For information contact: Daniel Brent, extension 5774Date: April 3, 2013

EX10.54 CITY OF TORONTOTo undertake road/pathway resurfacing or reconstruction at 2125 Hickory Tree Road, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed, as located on property owned by the City of Toronto. The purpose is to resurface a parking lot and two tennis courts. Works will involve removal and replacement of existing asphalt surfaces, as well as landscaping. No in-water works are within the scope of this project.

Page 19: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

19

CFN: 48377 - Application #: 0124/13/TORReport Prepared by: Daniel Brent, extension 5774For information contact: Daniel Brent, extension 5774Date: April 9, 2013

EX10.55 COGECO DATA SERVICESTo undertake sewer and watermain or utility installation or maintenance within an existing roadway on Jane Street between Highway 401 and Falstaff Avenue, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed, as located on property owned by the City of Toronto. The purpose is to install fiber optic cable conduit. Works will involve installation of conduit to the east of the roadway. No in-water works are within the scope of this project.

CFN: 48120 - Application #: 0796/12/TORReport Prepared by: Daniel Brent, extension 5774For information contact: Daniel Brent, extension 5774Date: April 4, 2013

CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA]

EX10.56 CITY OF TORONTOTo undertake sewer and watermain or utility installation by trenchless technology between Sheppard Avenue East and Glentworth Road near Don Mills Road, in the City of Toronto (North York Community Council Area), Don River Watershed, as located on property owned by the City of Toronto. The purpose is to install park pathway lighting. Works will involve installation of an electrical conduit and lighting poles. No in-water works are within the scope of this project.

CFN: 48845 - Application #: 0150/13/TORReport Prepared by: Daniel Brent, extension 5774For information contact: Daniel Brent, extension 5774Date: April 26, 2013

EX10.57 CITY OF TORONTOTo undertake borehole investigations near Donwoods Drive and Plymbridge Road; near Mill Street and Brookfield Road; and at 1901 Mount Pleasant Road, in the City of Toronto (North York Community Council Area), Don River Watershed, as located on the property owned by the City of Toronto, TRCA, and the Rosedale Golf Club. The purpose is to undertake a geotechnical investigation as part of the Hoggs Hollow road and stormwater improvement study. Works will involve drilling nine (9) boreholes. No in-water works are within the scope of this project.

Page 20: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

20

CFN: 48904 - Application #: 0164/13/TORReport Prepared by: Daniel Brent, extension 5774For information contact: Daniel Brent, extension 5774Date: April 26, 2013

EX10.58 ENBRIDGE GAS DISTRIBUTION INC.To undertake sewer, watermain or utility installation or maintenance within an existing roadway on the west side of Bayview Avenue and north side of York Mills Road, in the City of Toronto (North York Community Council Area), Don River Watershed as located on property owned by City of Toronto under franchise agreement with Enbridge Gas Distribution Inc.. The purpose is to replace 509 m of NPS 12 ST FBE HP gas pipeline on the west side of Bayview Avenue and the north side of York Mills Road in the City of Toronto - North York. The existing NPS 12 ST HP gas main is to be abandoned. The gas main will be installed by the method of open cut trenching. The majority of the installation will occur in the road right of way. No in-water works will take place.

CFN: 48980 - Application #: 0236/13/TORReport Prepared by: Caroline Mugo, extension 5689For information contact: Caroline Mugo, extension 5689Date: April 23, 2013

EX10.59 TORONTO HYDRO ELECTRIC SYSTEMTo undertake sewer and watermain or utility installation or maintenance within an existing roadway on Donino Avenue (from the West Don River to Donwoods Drive); Donwoods Drive; Knightswood Road; St. Margarets Drive; Plymbridge Road (from the West Don River to Donwoods Drive); Winton Road; and Donwoods Grove, in the City of Toronto (North York Community Council Area), Don River Watershed, as located on property owned by the City of Toronto. The purpose is to replace buried electrical utility cables. Works will involve installation of the new electrical infrastructure in the roadway and boulevard. No in-water works are within the scope of this project.

CFN: 48913 - Application #: 0176/13/TORReport Prepared by: Daniel Brent, extension 5774For information contact: Daniel Brent, extension 5774Date: April 8, 2013

Page 21: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

21

CITY OF TORONTO [SCARBOROUGH COMMUNITY COUNCIL AREA]

EX10.60 CITY OF TORONTOTo undertake road/pathway resurfacing or reconstruction on Kennedy Road between Finch Avenue East and south of Passmore Avenue, in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed, as located on property owned by the City of Toronto. The purpose is to resurface Kennedy Road. Works will involve removal and replacement of the existing asphalt road surface. No in-water works are within the scope of this project.

CFN: 48848 - Application #: 0149/13/TORReport Prepared by: Daniel Brent, extension 5774For information contact: Daniel Brent, extension 5774Date: April 16, 2013

CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA]

EX10.61 CITY OF TORONTOTo undertake utility pole installation at 550 Broadview Avenue, in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed, as located on property owned by the City of Toronto. The purpose is to install pedestrian scale lighting along an existing unpaved pathway within Riverdale Park. Works involved installation of 20 lighting fixtures and a PVC conduit along the length of the path. No in-water works were within the scope of this project. Construction has occurred.

CFN: 45442 - Application #: 0123/11/TORReport Prepared by: Daniel Brent, extension 5774For information contact: Jonathan Pounder, extension 5304Date: April 16, 2013

EX10.62 CITY OF TORONTOTo undertake road/pathway resurfacing or reconstruction on Kingston Road between Waverley Road and Victoria Park Avenue, in the City of Toronto (Toronto and East York Community Council Area), Waterfront Watershed, as located on property owned by the City of Toronto. The purpose is to reconstruct Kingston Road between Waverley Road and Victoria Park Avenue. Works will involve the reconstruction of the existing TTC streetcar tracks and resurfacing of roadway as well as replacement of sidewalk and installation of new fire hydrants within the City of Toronto right of way.

Page 22: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

22

CFN: 48968 - Application #: 0194/13/TORReport Prepared by: Caroline Mugo, extension 5689For information contact: Caroline Mugo, extension 5689Date: April 23, 2013

EX10.63 TORONTO HYDRO ELECTRIC SYSTEM LTD.To undertake structure maintenance and sewer, watermain or utility installation or maintenance within an existing right of way on Lake Shore Boulevard at Don Roadway, in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed, as located on property owned by, and with permission obtained from, the Toronto Port Lands Company. The purpose is to install a new hydro duct structure over the Lower Don River north of the Keating Channel rail bridge. Works will involve installation of the new duct structure on the north abutments and piers of the existing railway bridge. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO) for this project.

CFN: 48901 - Application #: 0161/13/TORReport Prepared by: Daniel Brent, extension 5774For information contact: Steve Heuchert, extension 5311Date: April 9, 2013

CITY OF VAUGHAN

EX10.64 CITY OF VAUGHANTo undertake structure maintenance on Huntington Road - approx. 300m north of Kirby Road, in the City of Vaughan, Humber River Watershed as located on the property owned by City of Vaughan. The purpose is to undertake the rehabilitation of Dick Bridge which conveys Huntington Road over the Humber River approximately 300m North of Kirby Road. The rehabilitation works include removing and reconstructing new curbs, repairing deteriorated concrete on the deck, soffit, abutments, wingwalls and retaining walls, removing and replacing the existing guiderail system and placing riverstone protection in front of the south abutment. Works will proceed under the Ontario Operation Statement for bridge maintenance. The Ministry of Natural Resources redside dace fisheries timing window will apply to this proposal unless otherwise specified in writing by MNR.

CFN: 48528 - Application #: 0023/13/VAUGReport Prepared by: Manirul Islam, extension 5715For information contact: Leah Chishimba, extension 5744Date: April 23, 2013

Page 23: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

23

TOWN OF CALEDON

EX10.65 REGIONAL MUNICIPALITY OF PEELTo undertake sewer and watermain or utility installation or maintenance within an existing roadway on Plan 43R - 30748 AND 43R - 33015, Queen Street - Highway 50 and King Street, in the Town of Caledon, Humber River Watershed as located on the property owned by Regional Municipality of Peel. The purpose is to construct a 400 mm diametre watermain in downtown Bolton. There will be no inwater work as part of the proposal therefore no fisheries timing window will be applied.

CFN: 48468 - Application #: 0205/13/CALReport Prepared by: Ben Krul, extension 5769For information contact: Ben Krul, extension 5769Date: April 30, 2013

TOWN OF RICHMOND HILL

EX10.66 BELL CANADATo undertake installation of anchors on existing poles and installation of conduits on Olde Bayview Avenue and Sunset Beach Road respectively in the Town of Richmond Hill, Humber River Watershed as located on the property owned by the Town of Richmond Hill. The purpose is to install anchors on existing Bell Canada poles on Olde Bayview Avenue and installation of conduits under two culverts on Sunset Beach Road at Bethesda Sideroad in the Town of Richmond Hill. The warm water fisheries timing window will apply to this proposal unless otherwise specified in writing by Ministry of Natural Resources.

CFN: 48189 - Application #: 0014/13/RHReport Prepared by: Leah Chishimba, extension 5744For information contact: Leah Chishimba, extension 5744Date: April 19, 2013

EX10.67 ENBRIDGE GAS DISTRIBUTION INC.To undertake sewer, watermain or utility watercourse crossing by trenchless technology on the south side of Sunset Beach Road, in the Town of Richmond Hill, Humber River Watershed as located on property owned by the Town of Richmond Hill under franchise agreement with Enbridge Gas Distribution Inc. The purpose is to install a gas pipeline crossing two points under the watercourse on the south side of Sunset Beach Road. The first one is west of Vanek Road and the second is east of Vanek Road in the Town of Richmond Hill, by method of Horizontal Directional Drill.

Page 24: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

24

CFN: 48535 - Application #: 0053/13/RHReport Prepared by: Caroline Mugo, extension 5689For information contact: Caroline Mugo, extension 5689Date: April 10, 2013

EX10.68 POWERSTREAM INC.To undertake hydro pole removal and relocation on Olde Bayview Avenue, Sunset Beach Road and Bayview Park Lane in the Town of Richmond Hill, Humber River Watershed as located on the property owned by the Town of Richmond Hill. The purpose is to undertake removal of existing hydro poles and overhead wires and installation of new hydro poles along Olde Bayview Avenue, on Sunset Beach Road and Bayview Park Lane in the Town of Richmond Hill. The warm water fisheries timing window will apply to this proposal unless otherwise specified in writing by Ministry of Natural Resources.

CFN: 48526 - Application #: 0020/13/RHReport Prepared by: Leah Chishimba, extension 5744For information contact: Leah Chishimba, extension 5744Date: April 12, 2013

EX10.69 ROGERS COMMUNICATIONS INC.To undertake installation of two new conduits within an existing roadway on Sunset Beach Road in the Town of Richmond Hill, Humber River Watershed as located on the property owned by the Town of Richmond Hill. The purpose is to undertake installation of two new 100mm conduit underneath Sunset Beach Road in the Town of Richmond Hill. The warm water fisheries timing window will apply to this proposal unless otherwise specified in writing by Ministry of Natural Resources.

CFN: 48467 - Application #: 0997/12/RHReport Prepared by: Leah Chishimba, extension 5744For information contact: Leah Chishimba, extension 5744Date: April 12, 2013

PERMIT APPLICATIONS EX10.70 - EX10.100 ARE MINOR WORKS LETTER OF APPROVAL

Permission for Minor Works Letter of Approval are implemented by Planning and Development Division staff and are received monthly by the Executive Committee. The permission of minor works is subject to authorization by the Director, Planning and Development and signed by an appointed enforcement officer. All minor works are located within a Regulated Area, outside of the floodplain and in the opinion of staff do not affect the control of flooding, erosion, dynamic beaches, pollution or the conservation of land.

Page 25: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

25

CITY OF BRAMPTON

EX10.70 113 CEDARBROOK ROADTo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 14, Concession 5 EHS, (113 Cedarbrook Road), in the City of Brampton, Humber River Watershed.

CFN: 49037 - Application #: 0241/13/BRAMReport Prepared by: Anant Patel, extension 5618For information contact: Anant Patel, extension 5618Date: April 18, 2013

EX10.71 4 ADRIATIC CRESCENTTo install a swimming pool on Lot 94, Plan 43M-1632, (4 Adriatic Crescent), in the City of Brampton, Humber River Watershed.

CFN: 49055 - Application #: 0249/13/BRAMReport Prepared by: Anant Patel, extension 5618For information contact: Anant Patel, extension 5618Date: April 24, 2013

EX10.72 36 MARTINEAU ROADTo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 140, Plan M-1445, (36 Martineau Road), in the City of Brampton, Humber River Watershed.

CFN: 49043 - Application #: 0247/13/BRAMReport Prepared by: Anant Patel, extension 5618For information contact: Anant Patel, extension 5618Date: April 18, 2013

CITY OF MARKHAM

EX10.73 21 ROUGE RIVER CIRCLETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Block A, Plan 6230, (21 Rouge River Circle), in the City of Markham, Rouge River Watershed.

CFN: 49069 - Application #: 0260/13/MARKReport Prepared by: Jeffrey Thompson, extension 5386For information contact: Doris Cheng, extension 5306Date: April 17, 2013

Page 26: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

26

EX10.74 59 HEATHERWOOD CRESCENTTo install a swimming pool on Lot 119, Plan 65M-2557, (59 Heatherwood Crescent), in the City of Markham, Rouge River Watershed.

CFN: 49072 - Application #: 0263/13/MARKReport Prepared by: Jeffrey Thompson, extension 5386For information contact: Doris Cheng, extension 5306Date: April 17, 2013

EX10.75 11 CHRISTMAN COURTTo undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads), construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) and construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 6, Plan RP 7426, (11 Christman Court), in the City of Markham, Rouge River Watershed.

CFN: 49026 - Application #: 0221/13/MARKReport Prepared by: Jeffrey Thompson, extension 5386For information contact: Doris Cheng, extension 5306Date: April 22, 2013

EX10.76 52 PAGNELLO COURTTo install a swimming pool and construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 20E, Plan 65M-4180, (52 Pagnello Court), in the City of Markham, Rouge River Watershed.

CFN: 49070 - Application #: 0261/13/MARKReport Prepared by: Jeffrey Thompson, extension 5386For information contact: Doris Cheng, extension 5306Date: April 16, 2013

EX10.77 40 HICKORY DRIVETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 39L, Plan 65M-2225, (40 Hickory Drive), in the City of Markham, Rouge River Watershed.

CFN: 49028 - Application #: 0234/13/MARKReport Prepared by: Jason Wagler, extension 5743For information contact: Jason Wagler, extension 5743Date: April 9, 2013

Page 27: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

27

CITY OF PICKERING

EX10.78 2287 CANTERBURY CRESCENTTo install a swimming pool and construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 20, Plan 40M-2344, (2287 Canterbury Crescent), in the City of Pickering, Duffins Creek Watershed.

CFN: 48953 - Application #: 0182/13/PICKReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Chris Jones, extension 5718Date: April 11, 2013

EX10.79 926 VISTULA DRIVETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 873, Plan M17, (926 Vistula Drive), in the City of Pickering, Waterfront Watershed.

CFN: 48456 - Application #: 0981/12/PICKReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Chris Jones, extension 5718Date: April 11, 2013

CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA]

EX10.80 33 WARREN CRESCENTTo change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 44, Plan 1915, (33 Warren Crescent), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed.

CFN: 48748 - Application #: 0090/13/TORReport Prepared by: Tara Jahanarai, extension 5284For information contact: Steve Heuchert, extension 5311Date: April 5, 2013

EX10.81 21 NORSEMAN STREETTo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 10, Plan 5580, (21 Norseman Street), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed.

Page 28: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

28

CFN: 48869 - Application #: 0128/13/TORReport Prepared by: Tara Jahanarai, extension 5284For information contact: Mark Rapus, extension 5259Date: April 19, 2013

CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA]

EX10.82 CITY OF TORONTOTo undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) at 3 Gwendolen Crescent), in the City of Toronto (North York Community Council Area), Don River Watershed, as located on property owned by the City of Toronto.

CFN: 48250 - Application #: 0846/12/TORReport Prepared by: Daniel Brent, extension 5774For information contact: Beth Williston, extension 5217Date: April 15, 2013

EX10.83 11 ANEWEN DRIVETo construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 710, Plan M-762, (11 Anewen Drive), in the City of Toronto (North York Community Council Area), Don River Watershed.

CFN: 48935 - Application #: 0177/13/TORReport Prepared by: Tara Jahanarai, extension 5284For information contact: Steve Heuchert, extension 5311Date: April 19, 2013

EX10.84 400 KEEWATIN AVENUETo construct a ground floor addition up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Part Lot 38, Plan M.146, (400 Keewatin Avenue), in the City of Toronto (North York Community Council Area), Don River Watershed.

CFN: 48312 - Application #: 0206/13/TORReport Prepared by: Tara Jahanarai, extension 5284For information contact: Mark Rapus, extension 5259Date: April 30, 2013

Page 29: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

29

EX10.85 107 ALAMOSA DRIVETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lot 18, Concession 2 EYS Part Lot 1, Plan M-786, (107 Alamosa Drive), in the City of Toronto (North York Community Council Area), Don River Watershed.

CFN: 48128 - Application #: 0776/12/TORReport Prepared by: Tara Jahanarai, extension 5284For information contact: Mark Rapus, extension 5259Date: April 19, 2013

EX10.86 287 NEWTON DRIVETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) and construct a ground floor addition up to 50 sq. m (538 sq. ft) on , (287 Newton Drive), in the City of Toronto (North York Community Council Area), Don River Watershed.

CFN: 48706 - Application #: 0030/13/TORReport Prepared by: Tara Jahanarai, extension 5284For information contact: Mark Rapus, extension 5259Date: April 4, 2013

CITY OF TORONTO [SCARBOROUGH COMMUNITY COUNCIL AREA]

EX10.87 35 LAKESIDE AVENUETo change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on 24 Plan 1538, (35 Lakeside Avenue), in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed.

CFN: 49061 - Application #: 0269/13/TORReport Prepared by: Tara Jahanarai, extension 5284For information contact: Mark Rapus, extension 5259Date: April 30, 2013

EX10.88 99 SYLVAN AVENUETo undertake minor landscaping involving the placement - removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads); construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft); change the use - size - or number of dwelling units of a structure - or undertake work that does not change the footprint of the existing structure, or undertake work that does not change the footprint of the existing structure on Lot 61, Plan 4351, 99 Sylvan Avenue, in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed.

Page 30: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

30

CFN: 49011 - Application #: 0208/13/TORReport Prepared by: Tara Jahanarai, extension 5284For information contact: Mark Rapus, extension 5259Date: April 9, 2013

CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA]

EX10.89 605 RUSHTON ROADTo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) and construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 1, Plan 1741, (605 Rushton Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed.

CFN: 49056 - Application #: 0253/13/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Mark Rapus, extension 5259Date: April 11, 2013

CITY OF VAUGHAN

EX10.90 35 COLONY COURTTo install a swimming pool and undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 26, Plan 65M-3738, (35 Colony Court), in the City of Vaughan, Humber River Watershed.

CFN: 49132 - Application #: 0306/13/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: June Little, extension 5756Date: May 1, 2013

EX10.91 90 UPPER POST ROADTo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on , (90 Upper Post Road), in the City of Vaughan, Don River Watershed.

CFN: 49091 - Application #: 0283/13/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: June Little, extension 5756Date: April 26, 2013

Page 31: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

31

EX10.92 163 LUCA AVENUETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on , (163 Luca Avenue), in the City of Vaughan, Don River Watershed.

CFN: 49089 - Application #: 0281/13/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: June Little, extension 5756Date: April 26, 2013

EX10.93 63 WIGSTON PLACETo install a swimming pool and undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Part Lot 34, Concession 1 Plan 65R-33481, PART 2, (63 Wigston Place), in the City of Vaughan, Don River Watershed.

CFN: 48960 - Application #: 0211/13/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: June Little, extension 5756Date: April 9, 2013

EX10.94 67 WIGSTON PLACETo undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Part Lot 34, Concession 1 Plan 65R-33481, PART 1, (67 Wigston Place), in the City of Vaughan, Don River Watershed.

CFN: 49029 - Application #: 0238/13/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: June Little, extension 5756Date: April 9, 2013

EX10.95 167 LUCA AVENUETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on , (167 Luca Avenue), in the City of Vaughan, Don River Watershed.

CFN: 49086 - Application #: 0278/13/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: June Little, extension 5756Date: April 26, 2013

Page 32: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

32

EX10.96 43 WOODCHUCK COURTTo install a swimming pool and undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 13, Plan 65M-4089, (43 Woodchuck Court), in the City of Vaughan, Don River Watershed.

CFN: 49131 - Application #: 0305/13/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: June Little, extension 5756Date: May 1, 2013

TOWN OF CALEDON

EX10.97 ARLINGTON HOMESTo construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 13, Plan 43M1787, (Lot 13 Diamondwood Drive), in the Town of Caledon, Humber River Watershed as located on the property owned by Arlington Homes.

CFN: 48808 - Application #: 0083/13/CALReport Prepared by: Anant Patel, extension 5618For information contact: Anant Patel, extension 5618Date: April 18, 2013

EX10.98 DIAMONDWOOD PROPERTIES LIMITEDTo construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 7, Plan 43M1787, (Lot 7 Diamondwood Drive), in the Town of Caledon, Humber River Watershed as located on the property owned by Diamondwood Properties Limited.

CFN: 48807 - Application #: 0082/13/CALReport Prepared by: Anant Patel, extension 5618For information contact: Anant Patel, extension 5618Date: April 18, 2013

TOWN OF RICHMOND HILL

EX10.99 31 SHOSHANA DRIVETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 56, Plan 65M-3508, (31 Shoshana Drive), in the Town of Richmond Hill, Rouge River Watershed.

Page 33: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

33

CFN: 49027 - Application #: 0229/13/RHReport Prepared by: Jeffrey Thompson, extension 5386For information contact: Jeffrey Thompson, extension 5386Date: April 9, 2013

TOWN OF WHITCHURCH-STOUFFVILLE

EX10.100 44 JAMES RATCLIFF AVENUETo install a swimming pool and construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on Block 77, Plan 65M-3734, Part Block 27, Plan 65M-3735, (44 James Ratcliff Avenue), in the Town of Whitchurch-Stouffville, Rouge River Watershed.

CFN: 49066 - Application #: 0252/13/WSReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Mark Rapus, extension 5259Date: April 11, 2013

EX11. NEW BUSINESS

NEXT MEETING OF THE EXECUTIVE COMMITTEE #4/13, TO BE HELD ON JUNE 7, 2013 AT 9:30 A.M. IN WESTON ROOM B, BLACK CREEK PIONEER VILLAGE

Brian DenneyChief Administrative Officer

/ks

Page 34: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

34

Item EX7.1TO: Chair and Members of the Executive Committee

Meeting #3/13, May 10, 2013

FROM: Mike Fenning, Senior Manager, Property Services

RE: REQUEST FOR DISPOSAL OF TORONTO AND REGION CONSERVATION AUTHORITY-OWNED LANDRear of 146 Robirwin Street, Town of Whitchurch-StouffvilleCFN 48039

______________________________________________________________________________KEY ISSUERecommends that the TRCA-owned property located at the rear of 146 Robirwin Street, Town of Whitchurch-Stouffville, Rouge River watershed be retained for conservation purposes.

RECOMMENDATION

THE EXECUTIVE COMMITTEE RECOMMENDS THAT the Toronto and Region Conservation Authority (TRCA)-owned property located at the rear of 146 Robirwin Street, Town of Whitchurch-Stouffville, be retained for conservation purposes.

BACKGROUNDCorrespondence via electronic mail (E-mail) has been received from Mr. Dinesh Bilimoria who wishes to purchase a fragment of TRCA-owned property located at the rear of 146 Robirwin Street in the hamlet of Stouffville. A copy of the E-mail and a plan from Mr. Bilimoria is outlined in Attachment 1. TRCA lands at this location are part of a larger parcel acquired from Mattamy (Little Rouge Creek) Limited on March 8, 2011, under the Greenlands Acquisition Project for 2011-2015, Flood Plain and Conservation Component, Rouge River watershed.

At Executive Committee Meeting #7/12, held on September 7, 2012, Resolution #B119/12 was approved as follows:

THAT the potential disposal of a fragment of Toronto and Region Conservation Authority (TRCA)-owned property located at the rear of 146 Robirwin Street, Town of Whitchurch-Stouffville, be referred to TRCA staff for review and discussion in accordance with established TRCA policies;

AND FURTHER THAT a report be brought forward to the Executive Committee at a future date recommending further action.

This request was circulated to staff of the Town of Whitchurch-Stouffville, the Regional Municipality of York and TRCA for review and comment. The following comments have been received:

Page 35: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

35

TRCA Staff Comments The subject residential lot at 146 Robirwin Street was created as part of draft plan of subdivision 19T-04005 developed by Mattamy (Little Rouge Creek) Limited. The analysis which defined the boundary between the developed lands and the adjacent Greenlands System (now under TRCA ownership) was presented in a report titled: "Mattamy Stouffville / Maio Environmental Impact Study", prepared by LGL Environmental Research Associates, dated April 2005 ("LGL Report").

The rear lot line of the subject lot was established as the "10m offset from Regional Flood Line" constraint. In addition to the adjacent Natural Hazard in the form of the Regional Flood Line associated with the Little Rouge Creek Tributary, the lands behind 146 Robirwin Street form part of the Town and Regional Greenland system and are designated as "Oak Ridges Moraine Plan Area Key Natural Heritage and Hydrologically Sensitive Features", as identified on Schedule H of the Town of Whitchurch-Stouffville Official Plan.

Furthermore, the LGL Report identifies the TRCA lands at the rear of 146 Robirwin Street as a Dry-Moist Old Field Meadow and are approximately 20 metres north of a White Cedar Mineral Thicket Swamp. The creek itself is located roughly 50 metres south of the rear lot line.

Planning and Development staff is of the opinion that the portion of TRCA lands requested for disposal should be retained in TRCA ownership to protect the adjacent private residential lands from riverine flood hazards as well as for Oak Ridges Moraine natural heritage conservation and protection, as required in the Oak Ridges Moraine Conservation Plan, the Regional Official Plan and the Town's Official Plan and Zoning By-law.

Town of Whitchurch-Stouffville Staff CommentsTown staff concur with TRCA's Planning and Development staff comments and recommendation to retain ownership of the subject TRCA-owned land.

Regional Municipality of York Staff CommentsYork Region staff agree with TRCA's Planning and Development staff comments and recommendation to retain ownership of the subject TRCA-owned land.

CONCLUSIONFor the reasons noted in the above comments, staff is recommending that the subject parcel be retained by TRCA for conservation purposes.

A plan illustrating the location of the subject lands is outlined in Attachment 2.

Report prepared by: George Leja, extension 5342Emails: [email protected] Information contact: George Leja, extension 5342, Mike Fenning, extension 5223Emails: [email protected], [email protected]: March 26, 2013Attachments: 2

Page 36: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

36

Attachment 1Dinesh Bilimoria <>

08/13/2012 10:38 PMPlease respond to

Dinesh Bilimoria <>

To "[email protected]" <[email protected]>

cc

Subject Lot 55 - Wheller's Mill - Stouffville - Health and Safety Concerns

Hi Mike, We had discussed about our home backyard design over the phone. We would like to inform you that the current backyard design has Health and Safety concern issues. The pointing fence inside has been affecting us whenever we use the backyard. It is not a recommended design since it causes harm and injury. We would like to have this corrected as shown in the attached document. Thanks,Dinesh Bilimoria

Page 37: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

37

Page 38: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

38

Attachment 2

Page 39: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

39

Item EX7.2TO: Chair and Members of the Executive Committee

Meeting #3/13, May 10, 2013

FROM: Mike Fenning, Senior Manager, Property Services

RE: REQUEST FOR REMOVAL OF CONSERVATION EASEMENT11220 Regional Road 271321362 Ontario Inc.CFN 37324

______________________________________________________________________________KEY ISSUEReceipt of a request from 1321362 Ontario Inc. for Toronto and Region Conservation Authority to remove a conservation easement from a 0.85 hectares (2.10 acres) parcel of land, in the City of Vaughan, Regional Municipality of York, Humber River watershed.

RECOMMENDATION

THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS Toronto and Region Conservation Authority (TRCA) is in receipt of a request from 1321362 Ontario Inc. to remove a conservation easement in favour of TRCA affecting land owned by 1321362 Ontario Inc. in the City of Vaughan;

AND WHEREAS it is in the best interests of TRCA in furthering its objectives, as set out in Section 20 of the Conservation Authorities Act to cooperate with the 1321362 Ontario Inc. in this instance;

THEREFORE LET IT BE RESOLVED THAT TRCA release the conservation easement affecting a parcel of valley and valley buffer lands containing 0.85 hectares (2.10 acres), more or less, said land being Part of Lot 29, Concession 9, City of Vaughan, Regional Municipality of York;

THAT consideration for the removal of the conservation easement be a nominal sum of $2.00 plus legal, survey and other costs incurred by TRCA;

THAT completion of the transaction be subject to the approval of the Minister of Natural Resources in accordance with Section 2(4.3) of the Conservation Land Act, R.S.O. 1990, Chapter C.28, as amended;

AND FURTHER THAT authorized TRCA officials be directed to take the necessary action to finalize the transaction including obtaining needed approvals and signing and execution of documents.

BACKGROUND131362 Ontario Inc. has requested the removal of a conservation easement (ie. restrictive covenants registered as Instrument No. YR929579 and transfer easement registered as Instrument No. YR929652).

Page 40: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

40

The conservation easement was a requirement for a severance application approval at the time for then owner, Argot Developments Inc. There was an understanding that the conservation easement would be a temporary measure to protect the valleylands until a subdivision application was made and the development limits were established.

The subject property plus additional lands were sold to 1321362 Ontario Inc. 1321362 Ontario Inc. applied to develop a residential subdivision on the property. Through review of the residential subdivision 19T-03V02, TRCA staff established the limits of the valley and valley buffer lands. TRCA acquired these lands from 1321362 Ontario Inc. on February 15, 2013.

Attached is a plan showing the location of the subject lands.

RATIONALEThe limits valley and valley buffer lands have been established by registration of subdivision 19T-03V002 and these lands have been conveyed to TRCA. Therefore, it is appropriate to remove the current conservation easement as 1321362 Ontario Inc. has requested.

FINANCIAL DETAILS1321362 Ontario Inc. will be responsible for all of TRCA costs incurred from removing the conservation easement (ie. legal, survey, etc.).

Report prepared by: Edlyn Wong, extension 5711Emails: [email protected] Information contact: Edlyn Wong, extension 5711, Mike Fenning, extension 5223Emails: [email protected], [email protected]: April 22, 2013Attachments: 1

Page 41: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

41

Attachment 1

Page 42: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

42

Item EX8.1TO: Chair and Members of the Executive Committee

Meeting #3/13, May 10, 2013

FROM: Carolyn Woodland, Director, Planning and Development

RE: ENFORCEMENT AND COMPLIANCE______________________________________________________________________________KEY ISSUEAppointment of Enforcement Officer and designation as Provincial Offences Officer.

RECOMMENDATION

THAT the appointment of Coreena Smith as an Officer under the Conservation Authorities Act, as per Section 28(1)(d)(e), and as a Provincial Offences Officer be approved for the purposes of Enforcing the Development, Interference with Wetlands and Alterations to Shorelines and Watercourses Regulation (Ontario Regulation 166/06) pursuant to Section 28 of the Conservation Authorities Act.

BACKGROUNDThe Conservation Authorities Act provides for a conservation authority to appoint officers to enforce its regulations. Furthermore, the Minister of Natural Resources has implemented, under the authority of Subsection 1(3) of the Provincial Offences Act R.S.O. 1990, a class designation process for all conservation authorities whereby any conservation authority officer appointed under Section 28 (1)(d)(e) of the Conservation Authorities Act shall be designated by the Minister simultaneously as a Provincial Offences Officer.

The prerequisite to the Minister’s Provincial Offences Officer appointment is that all candidate officers:

i) be adequately trained in the legislation to be enforced, including the Provincial Offences Act;

ii) have proof of a clean criminal record check, and;iii) be appointed as an officer to enforce conservation authority legislation at an official

board meeting.

Pursuant to the approval of the above-noted appointment, the Minister’s requirements will have been addressed.

Page 43: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

43

RATIONALEMs. Coreena Smith is a Planner II with TRCA’s Planning and Development Division, and provides ongoing support to the Enforcement and Compliance Section. She has successfully completed the Basic Law Enforcement – Conservation Authority Compliance Training (Level 1) through Conservation Ontario. Her appointment as an Enforcement Officer will enable her to authorize the issuance of approvals and will allow her to assist with the enforcement of the regulation.

Report prepared by: Brian Moyle, extension 5229Email: [email protected] Information contact: Brian Moyle, extension 5229Email: [email protected]: April 23, 2013

Page 44: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

44

Item EX8.2TO: Chair and Members of the Executive Committee

Meeting #3/13, May 10, 2013

FROM: Mike Fenning, Senior Manager, Property Services

RE: HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTINGAward of Sole Source Contract for HVAC Retrofits and Air Quality Testing, 5 Shoreham Drive, Downsview

______________________________________________________________________________KEY ISSUEAward of sole source contract for HVAC retrofit, duct cleaning and air quality testing at 5 Shoreham Drive, Downsview.

RECOMMENDATION

THAT the contract for the HVAC Retrofit, Duct Cleaning and Air Quality Testing for the heating system at 5 Shoreham Drive, be awarded to Modern Niagara HVAC Services Inc. at a cost not to exceed $49,890.00, plus a 10% contingency, plus HST;

THAT the contract be on terms and conditions satisfactory to Toronto and Region Conservation Authority (TRCA) staff including performance by the contractor satisfactory to TRCA at its sole discretion;

AND FURTHER THAT authorized TRCA officials be directed to take the action necessary to implement the contract including signing and execution of documents.

BACKGROUNDDuring the past few months staff at TRCA expressed concerns regarding small particles being emitted from some of the heating diffusers located within the building located at 5 Shoreham Drive. Requests were made by staff to undertake the cleaning of the duct work. TRCA consulted with Modern Niagara, the service provider for the heating system at this location. Modern Niagara undertook an intense investigation of the duct system and reported back that the insulation in some of the diffuser boxes has deteriorated and is in need of replacement. The black particles being emitted from diffusers is in fact the insulation.

In addition to the diffuser replacement, Modern Niagara recommended the following:that the duct system be cleaned, inspected and potentially sealed;

that a thorough inspection of the entire system be undertaken to ensure maximum air

distribution efficiency;that air quality testing be undertaken before the work begins and upon completion of all

construction for comparative results.

Page 45: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

45

RATIONALEModern Niagara has worked closely with TRCA over these last 10 years. In 2002, TRCA undertook the replacement of the heating/cooling system at 5 Shoreham Drive. At this time only the mechanical equipment was replaced and not the duct work and/or diffusers. Modern Niagara was the contractor who was awarded the contract to complete this work. Since the replacement of the heating/cooling system, Modern Niagara HVAC Services was retained as the HVAC service provider for this system.

Modern Niagara has extensive knowledge of TRCA's HVAC system at 5 Shoreham Drive and demonstrated ability to produce high quality work, within tight timelines and the approved budget. Based on Modern Niagara's previous involvement; knowledge of the system, design of the building and local site conditions; and provision of quick and efficient service during these last 10 years, TRCA staff recommends that their services be retained.

Staff therefore recommends award of the contract on a sole source basis as per Section 1.14.5 of TRCA's Purchasing Policy as follows:

The required goods and services are to be supplied by a particular vendor or supplier having special knowledge, skills, expertise or experience that cannot be provided by any other supplier.

FINANCIAL DETAILSThe upset limit for this project is $49,890, plus 10% contingency, plus HST. Funds are identified in TRCA's 2013 Major Facilities Retrofit budget 006-01.

Report prepared by: Lori Colussi, extension 5303Emails: [email protected] Information contact: Lori Colussi, extension 5303Emails: [email protected]: April 26, 2013

Page 46: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

46

Item EX10.1

TO: Chair and Members of the Executive CommitteeMeeting #3/13, May 10, 2013

FROM: Carolyn Woodland, Director, Planning and Development

RE: APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06Development, Interference with Wetlands and Alterations to Shorelines and Watercourses

______________________________________________________________________________KEY ISSUEPursuant to Ontario Regulation 166/06, written permission from the Authority is required for:

a) straightening, changing, diverting or interfering in any way with the existing channel of a river, creek, stream or watercourse, or for changing or interfering in any way with a wetland;

b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic beaches or pollution or the conservation of land may be affected by the development.

A permit may be refused through a Hearing Process, if in the opinion of the Authority, the control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected.

RECOMMENDATION

THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications which are listed below:

PERMIT APPLICATIONS EX10.1 - EX10.3 ARE MAJOR APPLICATIONS

Applications that involved a more complex suite of technical studies to demonstrate consistency with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater management ponds), extensive modifications to the landscape, major infrastructure projects, emergency works, resolution of violations/after the fact permits, trail construction

CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA]

EX10.1 CITY OF TORONTOTo site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere, at Budapest Park near Parkside Drive and Lake Shore Boulevard West, in the City of Toronto (Etobicoke York Community Council Area), Waterfront Watershed, as located on property owned by the City of Toronto. The purpose is to construct a temporary containment swale. Works involved site grading and modifications to the combined sewer system. No in-water works were within the scope of this project.

Page 47: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

47

The permit will be issued for the period of May 10, 2013 to May 9, 2015 in accordance with the following documents and plans which form part of this permit:

Drawing unnumbered; Budapest Park CSO Modification Floodproofing Plan; prepared

by Toronto Water; dated March 2012; received by TRCA on March 18, 2013;Budapest Park CSO Modifications Summary Technical Memorandum; prepared by

Wardrop on behalf of the City of Toronto; dated November 2011; received by TRCA on March 18, 2013.

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The City of Toronto has constructed a temporary containment swale in Budapest Park, located near Lake Shore Boulevard West and Parkside Drive. This swale was necessary to control surcharge from the sewer system during heavy rain events and direct it to the lake, away from more sensitive areas of the park. Works involved regrading a portion of the park south of an existing maintenance chamber, in order to create a swale. Modifications were also carried out to this chamber so that flows are now directed to the swale and conveyed to the lake. The implementation of this temporary measure will allow Toronto Water to study options for a more permanent solution to flooding in the park. Construction has occurred.

Fee and Permit Timing:Works were completed prior to the issuance of a permit under Ontario Regulation 166/06. A permit is now being sought for TRCA's retroactive approval, in conjunction with approval from the Ontario Ministry of Environment. The schedule for this permit has been adjusted to reflect that the works have been completed.

Control of Flooding:The proposed works did not impact flooding, flood storage or conveyance of flood waters.

Page 48: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

48

Pollution:The site has been stabilized since the completion of works.

Dynamic Beaches:The proposal did not have any implications to dynamic beaches.

Erosion:There were no impacts identified to slope stability or erosion as a result of these works.

Conservation of Land:No in-water works were within the scope of this project.

PlantingsAll disturbed areas were restored to pre-construction conditions or better, upon completion of work.

Policy Guidelines:This proposal complied with Section 4.3, Infrastructure and Servicing, of the TRCA’s Valley and Stream Corridor Management Program.

CFN: 48981 - Application #: 0251/13/TORReport Prepared by: Daniel Brent, extension 5774For information contact: Jonathan Pounder, extension 5304Date: April 30, 2013

CITY OF VAUGHAN

EX10.2 LONGYARD PROPERTIES INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere, interfere with a wetland and alter a watercourse on Part Lots 21, 22, Concession 2, (Northwest of Major Mackenzie Drive and Bathurst Street, Block 12), in the City of Vaughan, Don River Watershed as located on the property owned by Longyard Properties Inc. The purpose is to allow development, interference with a wetland and alteration of a watercourse within a Regulated Area of the Don River Watershed to facilitate topsoil stripping and the installation of sediment and erosion control measures, including multiple temporary sediment control ponds, for a draft approved plan of subdivision (19T-03V13) within Block 12, northwest of Major Mackenzie Drive and Bathurst Street, in the City of Vaughan.

Page 49: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

49

The permit will be issued for the period of May 10, 2013 to May 9, 2015 in accordance with the following documents and plans which form part of this permit:

Letter of Undertaking dated April 16, 2013 prepared by Metrus Development Inc.,

indicating the applicant agrees to provide any and all minor revisions to the plans and documents to the satisfaction of TRCA prior to the release of the permit, received by TRCA on April 19, 2013.

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The purpose is to allow development, interference with a wetland and alteration of a watercourse within a Regulated Area of the Don River Watershed to facilitate topsoil stripping and the installation of sediment and erosion control measures, including multiple temporary sediment control ponds, for a draft approved plan of subdivision (19T-03V13) within Block 12 in the City of Vaughan.

The Longyard Properties Inc. draft approved plan of subdivision is situated north of Major Mackenzie Drive and west of Bathurst Street in the City of Vaughan. There are two tributaries of the Don River in the area of the proposed development: one along the western portion of the site (Tributary A) and a second along the eastern portion of the property (McNair/Patterson Creek). There are small wetland pockets associated with these valley corridors.

This permit will facilitate topsoil stripping and the installation of various erosion and sediment control measures for the entire draft approved plan of subdivision. Temporary sediment control ponds will be constructed to capture storm run-off associated with the topsoil stripping. These temporary sediment control ponds will outlet to the adjacent watercourses and wetlands. Other sediment and erosion control measures will also be employed including, but not limited to, sediment control fencing, temporary swales, rock check dams and erosion control blankets.

Page 50: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

50

It should also be noted that only a portion of the topsoil stripping activity is regulated by the TRCA. The applicant requires approval from the City of Vaughan for those portions of the site not within the TRCA's Regulated Area.

Control of Flooding:A portion of the topsoil stripping activities, in the area of the southeastern sediment control pond, will be within the limits of the Regional Storm Floodplain. This sediment control pond will become one of two ultimate stormwater management ponds for this development. The location of this pond was approved at the Master Environmental Servicing Plan and draft plan of subdivision application stages. The southeastern sediment control pond will be built close to final design specifications at the topsoil stripping stage to avoid prolonged disturbance along the valley slope and flood plain area. The final pond design will be subject to separate permit approval from the TRCA. Staff have reviewed the design of the interim pond condition and are satisfied that there will be no impact on the storage or conveyance of floodwaters.

Pollution:Sediment and erosion control measures will be installed and maintained throughout construction to prevent sediment from entering the adjacent natural features.

Dynamic Beaches:Not applicable.

Erosion:There are no geotechnical/slope stability issues associated with the proposed development. In addition, the implementation of the aforementioned sediment and erosion control measures will minimize erosion on the site.

Conservation of Land:This project does not constitute a Harmful Alteration, Destruction, or Disruption of fish habitat and, therefore, an Authorization from Fisheries and Oceans Canada (DFO) is not required. Staff will issue a Letter of Advice to the proponent on behalf of DFO. The Ministry of Natural Resources (MNR) fisheries timing window of July 1 to September 15 will apply to this proposal unless otherwise specified in writing by the MNR. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project.

PlantingsA planting plan has not been submitted with the current proposal, but the applicant is required to provide extensive plantings to satisfy the TRCA's conditions of draft plan approval. Some of these plantings will be provided with future TRCA permit applications on this site (e.g., final stormwater management ponds, trails).

As part of the current proposal, seeding of the disturbed areas will be utilized as a means of erosion control.

Policy Guidelines:This proposal is consistent with Section 4.1 (New Development) and Section 4.3 (Infrastructure and Servicing) of the TRCA's Valley and Stream Corridor Management Program.

Page 51: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

51

CFN: 48883 - Application #: 0151/13/VAUGReport Prepared by: Coreena Smith, extension 5269For information contact: Coreena Smith, extension 5269Date: April 29, 2013

EX10.3 NASHVILLE DEVELOPMENTS INC.To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Part Lots 22, 23, Concession 9, (northeast of Major Mackenzie Drive and Huntington Road, Block 61W), in the City of Vaughan, Humber River Watershed as located on the property owned by Nashville Developments Inc. The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed to facilitate topsoil stripping and the installation of sediment and erosion control measures in Phase 3 of a draft approved plan of subdivision (19T-10V004) within Block 61 West, northeast of Major Mackenzie Drive and Huntington Road, in the City of Vaughan.

The permit will be issued for the period of May 10, 2013 to May 9, 2015 in accordance with the following documents and plans which form part of this permit:

Letter of Undertaking dated April 19, 2013 prepared by Schaeffers Consulting

Engineers, indicating the applicant will undertake to work with TRCA to resolve any outstanding issues to the satisfaction of TRCA prior to the release of the permit, received by TRCA on April 22, 2013.

RATIONALEThe application was reviewed by staff on the basis of the following information:

Page 52: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

52

Proposal:The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed to facilitate topsoil stripping and the installation of sediment and erosion control measures in Phase 3 of a draft approved plan of subdivision (19T-10V004) within Block 61 West, northeast of Major Mackenzie Drive and Huntington Road, in the City of Vaughan.

Phase 3 of the draft approved plan of subdivision is owned by Nashville Developments Inc., operating in conjunction with a larger landowners' group which own the remaining lands in the draft approved plan of subdivision. There are two watercourses on the Phase 3 lands: one which traverses the central portion of the site (Tributary 'A') and a second in the northeast corner of the property (Tributary 'C').

This permit will facilitate topsoil stripping and the installation of various erosion and sediment control measures in Phase 3. The watercourses will be isolated from the topsoil stripping activities by a double row of siltation control fencing. Other sediment and erosion control measures will also be employed including, but not limited to, temporary swales, rock check dams, sediment traps and erosion control blankets.

It should also be noted that only a portion of the topsoil stripping activity is regulated by the TRCA. The applicant requires approval from the City of Vaughan for those portions of the site not within the TRCA's Regulated Area.

Control of Flooding:There will be no impact on the storage or conveyance of floodwaters.

Pollution:Sediment and erosion control measures will be installed and maintained throughout construction to prevent sediment from entering the adjacent natural features.

Dynamic Beaches:Not applicable.

Erosion:There are no geotechnical/slope stability issues associated with the proposed development. In addition, the implementation of the aforementioned sediment and erosion control measures will minimize erosion on the site.

Conservation of Land:This project does not constitute a Harmful Alteration, Destruction, or Disruption of fish habitat and, therefore, an Authorization from Fisheries and Oceans Canada (DFO) is not required. Staff will issue a Letter of Advice to the proponent on behalf of DFO. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project.

Page 53: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

53

PlantingsA planting plan has not been submitted with the current proposal, but the applicant is required to provide extensive plantings to satisfy the TRCA's conditions of draft plan approval. Some of these plantings will be provided with future TRCA permit applications on this site (e.g., final Tributary 'A' alignment and enhancement).

As part of the current proposal, seeding of the disturbed areas will be utilized as a means of erosion control.

Policy Guidelines:This proposal is consistent with Section 4.1 (New Development) and Section 4.3 (Infrastructure and Servicing) of the TRCA's Valley and Stream Corridor Management Program.

CFN: 48192 - Application #: 0815/12/VAUGReport Prepared by: Coreena Smith, extension 5269For information contact: Coreena Smith, extension 5269Date: April 29, 2013

PERMIT APPLICATIONS EX10.4 - EX10.12 ARE MAJOR APPLICATIONS - ERRATA

Staff's recommendation for approval is based upon the review and acceptance of additional information from the applicant. The applicant has been informed that the information outstanding must be reviewed and accepted by staff prior to the Executive Committee Meeting. Staff will advise that this application be withdrawn from the Executive Committee Agenda should this information remain outstanding.

CITY OF VAUGHAN

EX10.4 LONGYARD PROPERTIES INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Part Lots 21, 22, Concession 2, (Northwest of Major Mackenzie Drive and Bathurst Street, Block 12), in the City of Vaughan, Don River Watershed as located on the property owned by Longyard Properties Inc. The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Don River Watershed to facilitate the construction of a stormwater management facility (SWM Pond 7) and associated outfall to service a draft approved plan of subdivision (19T-03V13) within Block 12, northwest of Major Mackenzie Drive and Bathurst Street, in the City of Vaughan.

Page 54: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

54

The permit will be issued for the period of May 10, 2013 to May 9, 2015.

The documents and plans which form part of this permit will be listed in a separate report

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Don River Watershed to facilitate the construction of a stormwater management facility (SWM Pond 7) and associated outfall to service a draft approved plan of subdivision (19T-03V13) within Block 12 in the City of Vaughan.

The Longyard Properties Inc. draft approved plan of subdivision is situated north of Major Mackenzie Drive and west of Bathurst Street in the City of Vaughan. There are two tributaries of the Don River in the area of the proposed development: one along the western portion of the site (Tributary A) and a second along the eastern portion of the property (McNair/Patterson Creek). There are small wetland pockets associated with these valley corridors.

SWM Pond 7 will be constructed on the northeast side of Tributary A, in an existing draw feature. The proposed stormwater management facility will be designed to utilize the existing contours of this natural landform and will be enclosed on the southern end by an earthen berm. The facility will outlet to the south, toward an existing on-line pond along Tributary A.

All disturbed areas will be restored with trees, shrubs, aquatic species, seed and sod upon completion of the works.

Control of Flooding:There will be no impact on the storage or conveyance of floodwaters.

Page 55: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

55

Pollution:Sediment and erosion control measures will be installed and maintained throughout construction to prevent sediment from entering the adjacent natural features.

Dynamic Beaches:Not applicable.

Erosion:There are no geotechnical/slope stability issues associated with the proposed works. In addition, the implementation of the aforementioned sediment and erosion control measures will minimize erosion on the site.

Conservation of Land:The proposed stormwater management facility will be designed to utilize the existing contours of a natural draw feature and will be enclosed on the southern end by an earthen berm. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project.

This project does not constitute a Harmful Alteration, Destruction, or Disruption of fish habitat and, therefore, an Authorization from Fisheries and Oceans Canada (DFO) is not required. Staff will issue a Letter of Advice to the proponent on behalf of DFO. The Ministry of Natural Resources (MNR) fisheries timing window of July 1 to September 15 will apply to this proposal unless otherwise specified in writing by the MNR.

PlantingsAn extensive restoration plan has been prepared for the stormwater management facility to the satisfaction of TRCA staff.

Policy Guidelines:This proposal is consistent with Section 4.3 - Infrastructure and Servicing - of the TRCA’s Valley and Stream Corridor Management Program.

CFN: 49134 - Application #: 0315/13/VAUGReport Prepared by: Coreena Smith, extension 5269For information contact: Coreena Smith, extension 5269Date: April 30, 2013

Page 56: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

56

EX10.5 LONGYARD PROPERTIES INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere, interfere with a wetland and alter a watercourse on Part Lots 21, 22, Concession 2, (Northwest of Major Mackenzie Drive and Bathurst Street, Block 12), in the City of Vaughan, Don River Watershed as located on the property owned by Longyard Properties Inc. The purpose is to allow development, interference with a wetland and alteration of a watercourse within a Regulated Area of the Don River Watershed to facilitate the construction of a stormwater management facility (SWM Pond 8) and associated outfall to service a draft approved plan of subdivision (19T-03V13) within Block 12, northwest of Major Mackenzie Drive and Bathurst Street, in the City of Vaughan.

The permit will be issued for the period of May 10, 2013 to May 9, 2015.

The documents and plans which form part of this permit will be listed in a separate report

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The purpose is to allow development, interference with a wetland and alteration of a watercourse within a Regulated Area of the Don River Watershed to facilitate the construction of a stormwater management facility (SWM Pond 8) and associated outfall to service a draft approved plan of subdivision (19T-03V13) within Block 12 in the City of Vaughan.

The Longyard Properties Inc. draft approved plan of subdivision is situated north of Major Mackenzie Drive and west of Bathurst Street in the City of Vaughan. There are two tributaries of the Don River in the area of the proposed development: one along the western portion of the site (Tributary A) and a second along the eastern portion of the property (McNair/Patterson Creek). There are small wetland pockets associated with these valley corridors.

Page 57: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

57

SWM Pond 8 will be constructed on the west side of McNair/Patterson Creek, in an area previously used primarily for agricultural purposes. The proposed stormwater management facility will be located below the top of bank and within the Regional Storm Floodplain. The facility will outlet to the east, toward McNair/Patterson Creek.

All disturbed areas will be restored with trees, shrubs, aquatic species, seed and sod upon completion of the works.

Control of Flooding:As noted above, SWM Pond 8 will be located below the top of bank and within the Regional Storm Floodplain. The location of this pond was approved at the Master Environmental Servicing Plan and draft plan of subdivision application stages. Staff have reviewed the design of the stormwater management facility and are satisfied that there will be minimal impact on the storage or conveyance of floodwaters.

Pollution:Sediment and erosion control measures will be installed and maintained throughout construction to prevent sediment from entering the adjacent natural features.

Dynamic Beaches:Not applicable.

Erosion:There are no geotechnical/slope stability issues associated with the proposed development. In addition, the implementation of the aforementioned sediment and erosion control measures will minimize erosion on the site.

Conservation of Land:The stormwater management facility will be located within the valley corridor, but has been designed to integrate into the existing valley slope and flood plain area, within minimal disturbance to the seepage areas within the adjacent low lying wetland. Plantings in and around the facility will complement the existing valley vegetation.

This project does not constitute a Harmful Alteration, Destruction, or Disruption of fish habitat and, therefore, an Authorization from Fisheries and Oceans Canada (DFO) is not required. Staff will issue a Letter of Advice to the proponent on behalf of DFO. The Ministry of Natural Resources (MNR) fisheries timing window of July 1 to September 15 will apply to this proposal unless otherwise specified in writing by the MNR.

PlantingsAn extensive restoration plan has been prepared for the stormwater management facility to the satisfaction of TRCA staff.

Policy Guidelines:This proposal is consistent with Section 4.3 - Infrastructure and Servicing - of the TRCA’s Valley and Stream Corridor Management Program.

Page 58: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

58

CFN: 49135 - Application #: 0317/13/VAUGReport Prepared by: Coreena Smith, extension 5269For information contact: Coreena Smith, extension 5269Date: April 30, 2013

EX10.6 TOWNWOOD HOMES INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Part Lot 20, Concession 2, Major Mackenzie Drive and Dufferin Street, in the City of Vaughan, Don River Watershed as located on the property owned by Townwood Homes Inc. The purpose is to conduct site grading works in order to construct a stormwater management pond and associated outfall which will facilitate the servicing and development of the Mackenzie Ridge townhome subdivision, in Planning Block 11, in the City of Vaughan.

The permit will be issued for the period of May 10, 2013 to May 9, 2015.

The documents and plans which form part of this permit will be listed in a separate report

RATIONALEThe application was reviewed by staff on the basis of the following information:

Page 59: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

59

Proposal:The proposal is to conduct site grading works in order to construct a stormwater management pond and associated outfall which will facilitate the servicing and development of townhouses on the Mackenzie Ridge site (also known as King-Jane Developments), in Planning Block 11, in the City of Vaughan. The subject site is located east of Dufferin Street and immediately south of Major Mackenzie Drive. The proposed development includes 136 townhome units with 6 semi-detached units. The subject property is approximately 3.07 ha in size and is bounded by open space valleylands on the west, south and eastern flankages while Major Mackenzie Drive is located to the north. The subject lands are located within Planning Block 11 where there is an approved Master Environmental Servicing Plan (MESP) in place. However, these lands were not part of the MESP process and as such, stormwater will be managed on site and will not be feeding into the existing stormwater pond facilities located in Block 11.

As part of the planning process for the subject site, the limits of the natural features including the dripline of significant vegetation and physical top of bank was identified and established. A 10 m ecological buffer has been applied which is consistent with new development in Block 11.

Control of Flooding:The proposed works are located outside of the Regional Storm Flood Plain of the Humber River. As such, the storage and conveyance of flood waters will not be negatively impacted by the proposal.

Pollution:Erosion and sediment control measures including silt fencing will be erected around the work site in an effort to ensure that sediment does not migrate into the nearby watercourse and open space valleylands. These measures will be monitored and maintained for the duration of the construction works.

Dynamic Beaches:Not applicable.

Erosion:Erosion will be minimized through the implementation of the aforementioned erosion and sediment control measures.

Conservation of Land:A geotechnical/slope stability technical study was submitted. The TRCA's Geotechnical Engineering is satisfied that there are no geotechnical/slope stability issues associated with the proposed works. There will be no in-water works and as such, the nearby watercourse and fish habitat will not be impacted.

PlantingsPlantings of native, non-invasive material around the pond and outfall area will be conducted in accordance with TRCA's Planting Plan Guidelines.

Policy Guidelines:This proposal complies with Section 4.3 - Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program.

Page 60: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

60

CFN: 48716 - Application #: 0033/13/VAUGReport Prepared by: Kevin Huang, extension 5307For information contact: Kevin Huang, extension 5307Date: April 29, 2013

EX10.7 TOWNWOOD HOMES INC.To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 20, Concession 2, Major Mackenzie Drive and Dufferin Street, in the City of Vaughan, Don River Watershed as located on the property owned by Townwood Homes Inc. The purpose is to conduct topsoil stripping works in order facilitate the servicing, development and final grading works for the Mackenzie Ridge townhome subdivision, in Planning Block 11, in the City of Vaughan.

The permit will be issued for the period of May 10, 2013 to May 9, 2015.

The documents and plans which form part of this permit will be listed in a separate report

RATIONALEThe application was reviewed by staff on the basis of the following information:

Page 61: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

61

Proposal:The proposal is to conduct topsoil stripping and preliminary grading works in order to facilitate the servicing and development of townhouses on the Mackenzie Ridge site (also known as King-Jane Developments), in Planning Block 11, in the City of Vaughan. The subject site is located east of Dufferin Street and immediately south of Major Mackenzie Drive. The proposed development includes 136 townhome units with 6 semi-detached units. The subject property is approximately 3.07 ha in size and is bounded by open space valleylands on the west, south and eastern flankages while Major Mackenzie Drive is located to the north. The subject lands are located within Planning Block 11 where there is an approved Master Environmental Servicing Plan (MESP) in place. However, these lands were not part of the MESP process and as such, stormwater will be managed on site and will not be feeding into the existing stormwater pond facilities located in Block 11.

As part of the planning process for the subject site, the limits of the natural features including the dripline of significant vegetation and physical top of bank was identified and established. A 10 m ecological buffer has been applied which is consistent with new development in Block 11.

Control of Flooding:The proposed works are located outside of the Regional Storm Flood Plain of the Humber River. As such, the storage and conveyance of flood waters will not be negatively impacted by the proposal.

Pollution:Erosion and sediment control measures including silt fencing will be erected around the work site in an effort to ensure that sediment does not migrate into the nearby watercourse and open space valleylands. These measures will be monitored and maintained for the duration of the construction works.

Dynamic Beaches:Not applicable.

Erosion:Erosion will be minimized through the implementation of the aforementioned erosion and sediment control measures.

Conservation of Land:A geotechnical/slope stability technical study was submitted. The TRCA's Geotechnical Engineering is satisfied that there are no geotechnical/slope stability issues associated with the proposed works. There will be no in-water works and as such, the nearby watercourse and fish habitat will not be impacted.

PlantingsPlantings of native, non-invasive species will be conducted in the ecological buffer and open space valleylands as part of the associated permit for final grading and development on the subject site.

Policy Guidelines:This proposal complies with Section 4.3 - Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program.

Page 62: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

62

CFN: 48717 - Application #: 0036/13/VAUGReport Prepared by: Kevin Huang, extension 5307For information contact: Kevin Huang, extension 5307Date: April 29, 2013

EX10.8 TOWNWOOD HOMES INC.To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 20, Concession 2, Major Mackenzie Drive and Dufferin Street, in the City of Vaughan, Don River Watershed as located on the property owned by Townwood Homes Inc. The purpose is to conduct final grading/development works in order facilitate the construction and development of the Mackenzie Ridge townhome subdivision, in Planning Block 11, in the City of Vaughan.

The permit will be issued for the period of May 10, 2013 to May 9, 2015.

The documents and plans which form part of this permit will be listed in a separate report

RATIONALEThe application was reviewed by staff on the basis of the following information:

Page 63: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

63

Proposal:The proposal is to conduct final grading/development works in order facilitate the construction and development of the Mackenzie Ridge townhome subdivision (also known as King-Jane Developments), in Planning Block 11, in the City of Vaughan. The subject site is located east of Dufferin Street and immediately south of Major Mackenzie Drive. The proposed development includes 136 townhome units with 6 semi-detached units. The subject property is approximately 3.07 ha in size and is bounded by open space valleylands on the west, south and eastern flankages while Major Mackenzie Drive is located to the north. The subject lands are located within Planning Block 11 where there is an approved Master Environmental Servicing Plan (MESP) in place. However, these lands were not part of the MESP process and as such, stormwater will be managed on site and will not be feeding into the existing stormwater pond facilities located in Block 11.

As part of the planning process for the subject site, the limits of the natural features including the dripline of significant vegetation and physical top of bank was identified and established. A 10 m ecological buffer has been applied which is consistent with new development in Block 11.

Control of Flooding:The proposed works are located outside of the Regional Storm Flood Plain of the Humber River. As such, the storage and conveyance of flood waters will not be negatively impacted by the proposal.

Pollution:Erosion and sediment control measures including silt fencing will be erected around the work site in an effort to ensure that sediment does not migrate into the nearby watercourse and open space valleylands. These measures will be monitored and maintained for the duration of the construction works.

Dynamic Beaches:Not applicable.

Erosion:Erosion will be minimized through the implementation of the aforementioned erosion and sediment control measures.

Conservation of Land:A geotechnical/slope stability technical study was submitted. The TRCA's Geotechnical Engineering is satisfied that there are no geotechnical/slope stability issues associated with the proposed works. There will be no in-water works and as such, the nearby watercourse and fish habitat will not be impacted.

PlantingsPlantings of native, non-invasive species will take place within the ecological buffer area and in the open space valleyland block. These restoration plantings along with edge management efforts will be conducted in accordance with TRCA's Planting Plan Guidelines.

Page 64: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

64

Policy Guidelines:This proposal complies with Section 4.3 - Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program.

CFN: 48718 - Application #: 0037/13/VAUGReport Prepared by: Kevin Huang, extension 5307For information contact: Kevin Huang, extension 5307Date: April 29, 2013

TOWN OF CALEDON

EX10.9 GRECFAM HOLDINGS INC.To construct, reconstruct, erect or place a building or structure, site grade on Part Lot 7, Concession 6, (13303 Coleraine Drive), in the Town of Caledon, Humber River Watershed as located on the property owned by Grecfam Holdings Incorporated. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the realignment of a tributary of the Humber River Watershed and develop the industrial lot with open storage and an equipment storage building associated with a municipal site plan application.

The permit will be issued for the period of May 10, 2013 to May 9, 2015.

The documents and plans which form part of this permit will be listed in a separate report

RATIONALEThe application was reviewed by staff on the basis of the following information:

Page 65: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

65

Proposal:The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the realignment of a tributary of the Humber River Watershed and develop the industrial lot with open storage and an equipment storage building (approximately 650 sq. m) at 13303 Coleraine Drive, in the Town of Caledon associated with a municipal site plan application (Town File No. SPA 13-09). The 4.05 ha lot is located east of Coleraine Drive, south of Holland Drive, in the industrial area of the Village of Bolton. The site contains a seasonal watercourse feature that is approximately 10 m in width that indirectly contributes to downstream fish habitat. The proposal involves the realignment of this channel into a new 200 m long channel that will tie into the existing channel approximately 80 m south of Holland Drive and will proceed for 200 m southwesterly into the roadside ditch. The new channel will be contained within a 6 to 10 m wide drainage channel with a 6 m wide landscape strip on the south side of the proposed realigned channel. The planting plan for the realigned channel will consist of native trees and shrubs consisting of red maple, gray dogwood, red-osier dogwood and staghorn sumac and improve the ecological form and function for this reach. These species are tolerant to salt spray and are well suited to the urban conditions which will persist on this property. The proposed stormwater management scheme includes the construction of a stormwater management facility at the southwest portion of the site to achieve TRCA stormwater management criteria (i.e., quantity, quality and erosion control). The stormwater management scheme also includes the design of an infiltration gallery to achieve TRCA water balance requirements.

Control of Flooding:The subject property is located outside of the Regional Floodplain. As such, no impacts to the storage and/or conveyance of flood waters are anticipated.

Pollution:Appropriate erosion and sediment controls will be installed and maintained throughout all phases of construction.

Dynamic Beaches:Not applicable.

Erosion:There are no geotechnical and/or slope stability concerns associated with this project.

Conservation of Land:The proposed tributary realignment will improve the ecological condition for this reach of the Humber River Watershed and demonstrates an ecological net gain. No significant vegetation will be removed as a result of construction. An extensive enhancement planting plan incorporating natural channel design principles has been submitted with this application. A Letter of Advice (LOA) on behalf of Fisheries and Oceans Canada (DFO) will be issued with this permit.

PlantingsAll proposed plant species will be native and non-invasive consistent with TRCA's guidelines.

Page 66: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

66

Policy Guidelines:The proposed works are consistent with Section 3.3 - Policies and Procedures for Identifying Watercourses and Alterations and Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP).

CFN: 48872 - Application #: 0136/13/CALReport Prepared by: Adam Miller, extension 5244For information contact: Adam Miller, extension 5244Date: April 29, 2013

TOWN OF RICHMOND HILL

EX10.10 DDR MAJOR MAC RICHMOND GP INC.To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 19, 20, Concession 3, (1577 - 1621 Major MacKenzie Drive East), in the Town of Richmond Hill, Rouge River Watershed as located on the property owned by DDR Major Mac Richmond Gp Inc.. The purpose is to facilitate earthworks, pre-grading, temporary stormwater management, and initial site preparation works associated with a draft approved commercial subdivision.

The permit will be issued for the period of May 10, 2013 to October 4, 2015.

The documents and plans which form part of this permit will be listed in a separate report

RATIONALEThe application was reviewed by staff on the basis of the following information:

Page 67: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

67

Proposal:This permit application is to facilitate the initial phase of site preparation works associated with the proposed Mackenzie Commons (Rice Commercial) commercial subdivision, located in the Headford Business Park, between Highway 404 and Leslie Street, south of Major Mackenzie Drive, in the Town of Richmond Hill. A TRCA permit was previously issued (approved by the Executive Committee on July 7, 2006) to the previous owner of the lands for initial site works, and a TRCA permit was issued to the current landowner (Permit Number C-110934, approved by the Executive Committee on October 13, 2011) for the removal of barn structures within the valley corridor. The subject lands are within a plan of subdivision that was recently draft approved by the Ontario Municipal Board, for which TRCA staff provided conditions of approval. The owner is now proceeding through the site plan approval process, through the review of which, TRCA staff are reviewing the stormwater management and other technical details.

Works within the Regulated areas on the subject property will be completed in two phases - the first of which will include initial site preparation and servicing works, and the second of which will include permanent grading and servicing as well as permanent stormwater management measures and development. This permit application is to facilitate the first phase of work, including initial site preparation works.

The works to be completed under this permit will occur outside of the Regulatory floodplain, and no in-stream works are proposed with this application. Erosion and sediment control measures will be integral to the current phase, and will be implemented to the satisfaction of the TRCA. As part of the associated subdivision planning process, the valleylands on the subject property will be conveyed into public ownership, and a comprehensive valleyland enhancement planting plan will be implemented through a future TRCA permit application.

Control of Flooding:The proposed works are located outside of the Regional Storm Floodplain. All temporary stormwater management measures on this site will comply with TRCA stormwater management criteria and guidelines.

Pollution:Appropriate erosion and sediment control measures have been proposed with this application, and will be maintained throughout all phases of construction.

Dynamic Beaches:Not applicable

Erosion:There are no geotechnical concerns with this application.

Conservation of Land:Limits of development were established through the subdivision planning process, with the provision of adequate buffers.

Page 68: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

68

PlantingsAll proposed plantings and seed mixes used to stabilize the disturbed areas will be consistent with TRCA's planting guidelines. An extensive valleyland enhancement planting plan will be brought forward as part of the future Phase 2 permit application.

Policy Guidelines:This proposal is consistent with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP).

CFN: 49075 - Application #: 0272/13/RHReport Prepared by: Quentin Hanchard, extension 5324For information contact: Quentin Hanchard, extension 5324Date: April 30, 2013

EX10.11 SANMIKE CONSTRUCTION LIMITEDTo construct, reconstruct, erect or place a building or structure and site grade on Part Lot 25, EYS Block 24, Plan 65M-3230, (10665 Bayview Avenue), in the Town of Richmond Hill, Rouge River Watershed as located on the property owned by Sanmike Construction Limited. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate grading and servicing associated with an approved Draft Plan of Subdivision consisting of 67 residential townhouse units in the Town of Richmond Hill.

The permit will be issued for the period of May 10, 2013 to May 9, 2015.

The documents and plans which form part of this permit will be listed in a separate report

RATIONALEThe application was reviewed by staff on the basis of the following information:

Page 69: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

69

Proposal:The purpose of this application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the grading, servicing, and development of an approved Draft Plan of Subdivision consisting of 67 residential townhouse units in the Town of Richmond Hill. This application serves to implement a recent Ontario Municipal Board (OMB) decision approving an Official Plan Amendment (Town File D01-08008), Draft Plan of Subdivision (Town File No. D03-06003) and a Zoning By-law Amendment (Town File No. D02-08031) to permit the proposed development on the subject lands. The 2.08 hectare site is traversed by two tributaries of the Rouge River Watershed, which abut the north and south sides of the proposed development before converging further downstream. TRCA staff previously staked the crest of slope and contiguous significant valley vegetation to mark the limit of the aforementioned tributaries. An appropriate buffer has been provided from the limit of these features to the rear lot lines associated with the townhouses. The proposed development is sufficiently setback from the valley corridors and is located outside of the Regional Storm Floodplain. Stormwater will be managed on site through a variety of measures (i.e., bioswales, stormwater chambers, oil-grit separator, etc.) in order to achieve TRCA's stormwater management criteria. The proposal also includes an extensive planting restoration plan for the buffer and valley corridor, providing a net ecological gain associated with this application. As such, there are no geotechnical, ecology, or flooding concerns with this application.

Control of Flooding:The proposed development is located outside of the Regional Floodplain. As such, no impacts to the storage and/or conveyance of flood waters are anticipated.

Pollution:Appropriate erosion and sediment controls will be installed and maintained throughout all phases of construction.

Dynamic Beaches:Not applicable.

Erosion:There are no geotechnical and/or slope stability concerns anticipated with this application.

Conservation of Land:No significant vegetation will be removed as a result of construction. However, an extensive planting plan has been submitted with this application to improve the ecological condition of the adjacent natural area.

PlantingsAll plant species are native and non-invasive consistent with TRCA's guidelines.

Policy Guidelines:The proposal is in conformity with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP).

Page 70: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

70

CFN: 48802 - Application #: 0077/13/RHReport Prepared by: Jason Wagler, extension 5743For information contact: Jason Wagler, extension 5743Date: April 30, 2013

EX10.12 SANMIKE CONSTRUCTION LIMITEDTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 25, EYS Block 24, Plan 65M-3230, (10665 Bayview Avenue), in the Town of Richmond Hill, Rouge River Watershed as located on the property owned by Sanmike Construction Limited. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order facilitate the construction of an outfall structure associated with a townhouse development in the Town of Richmond Hill.

The permit will be issued for the period of May 10, 2013 to May 9, 2015.

The documents and plans which form part of this permit will be listed in a separate report

RATIONALEThe application was reviewed by staff on the basis of the following information:

Page 71: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

71

Proposal:The purpose of this application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order facilitate the construction of an outfall structure associated with a 67-unit townhouse development in the Town of Richmond Hill. Please note that the associated grading and servicing application for the townhouse development is also before the Executive Committee (CFN 48802). The outfall is located in the southeast portion of the site and will drain to a tributary of the Rouge River Watershed. The proposed outfall has been designed in accordance with TRCA's guidelines. The outfall is located outside of the Regional Storm Floodplain associated with the tributary and is located on a tableland portion of the site void of any significant natural vegetation. As such, there are no ecology, flooding, or geotechnical concerns with this application. In order to satisfy MNR concerns with respect to the Endangered Species Act (ESA, 2007), all near water works will be conducted within the Redside dace fisheries timing window of July 1 to September 15 of any given year. Although there are no fisheries related concerns associated with the outfall construction, a Letter of Advice (LOA) on behalf of Fisheries and Oceans Canada (DFO) will be issued with this permit. An appropriate planting plan for the area surrounding the outfall and naturalized swale will be approved as part of this application in order to provide a net ecological gain with this application.

Control of Flooding:The proposed development is located outside of the Regional Floodplain. As such, no impacts to the storage and/or conveyance of flood waters are anticipated.

Pollution:Appropriate erosion and sediment controls will be installed and maintained throughout all phases of construction.

Dynamic Beaches:Not applicable.

Erosion:There are no geotechnical and/or slope stability concerns anticipated with this application.

Conservation of Land:No significant vegetation will be removed as a result of construction. However, an extensive planting plan has been submitted with this application to improve the ecological condition of the adjacent natural area.

PlantingsAll plant species are native and non-invasive consistent with TRCA's guidelines.

Policy Guidelines:This proposal is in conformity with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Plan (VSCMP).

CFN: 48804 - Application #: 0079/13/RHReport Prepared by: Jason Wagler, extension 5743For information contact: Jason Wagler, extension 5743Date: April 30, 2013

Page 72: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

72

CITY OF BRAMPTON

EX10.13 LOT 6, GOREWAY DRIVE - NEAR CYNTHIA CRESCENTTo construct, reconstruct, erect or place a building or structure and site grade on Lot 6, Plan 43M-580, (Lot 6, Goreway Drive - near Cynthia Crescent), in the City of Brampton, Humber River Watershed. The purpose is to undertake works within the TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a single family dwelling, associated with a municipal building permit.

The permit will be issued for the period of May 10, 2013 to May 9, 2015 in accordance with the following documents and plans which form part of this permit:

Drawing No. 12-2859-GR1, Lot Grading and Sediment Control Plan, prepared by Urban

Watershed Group Ltd. dated April 22, 2013, stamped received by TRCA Planning & Development on April 22, 2013.

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a proposed a 4,000 sq. ft. (371.6 sq. m) two-storey single family dwelling, attached garage, driveway and deck associated with a municipal building permit. The subject property is located adjacent to tributary of the Salt Creek, which is also a tributary of the West Humber River valley corridor of the Humber River Watershed. The proposed development is located on the tableland portion of the subject property, and is located outside of the Regional Storm Floodplain. Additionally, the area to where development is proposed does not contain any significant natural features. There are no geotechnical or ecology related concerns related to this development.

Page 73: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

73

Control of Flooding:The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and/or conveyance of flood waters are anticipated.

Pollution:Appropriate sediment and erosion controls (i.e., silt fence and sediment trap) have been proposed with this application, and will be installed and maintained throughout all phases of construction.

Dynamic Beaches:Not applicable

Erosion:There are no geotechnical and/or slope stability concerns anticipated with this project.

Conservation of Land:No significant vegetation will be removed as a result of this project. Additionally, there are no fisheries concerns related with these works.

PlantingsAs no vegetation is being removed as result of this proposal, no additional plantings are required.

Policy Guidelines:This proposal is in conformity with Section 4.1.1 – New Urban Development, of the Authority’s Valley and Stream Corridor Management Program (VSCMP).

CFN: 46491 - Application #: 0858/11/BRAMReport Prepared by: Anant Patel, extension 5618For information contact: Leilani Lee-Yates, extension 5370Date: April 30, 2013

EX10.14 IBRANS DEVELOPMENTS LTD.To site grade on Part Lot 11, Concession 7, N.D.S., in the City of Brampton, Humber River Watershed as located on the property owned by Ibrans Developments Ltd.. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate grading works related to a residential draft plan of subdivision application.

Page 74: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

74

The permit will be issued for the period of May 10, 2013 to May 9, 2015 in accordance with the following documents and plans which form part of this permit:

General Plan: Generic Regulation Line, Sheet No. FRP-1, prepared by D. Horgan,

Candevcon Limited, dated March 19, 2013, last revised March 22, 2013, stamped received by TRCA Planning and Development March 27, 2013;Grading Plan, Sheet No. G3, prepared by D. Horgan, Candevcon Limited, dated May

18, 2012, last revised March 22, 2013, stamped received by TRCA Planning and Development March 27, 2013;Grading Plan, Sheet No. G3A, prepared by D. Horgan, Candevcon Limited, dated May

18, 2012, last revised March 22, 2013, stamped received by TRCA Planning and Development March 27, 2013;Erosion & Sediment Control Plan, Sheet No. M2, prepared by D. Horgan, Candevcon

Limited, dated May 18, 2012, last revised March 22, 2013, stamped received by TRCA Planning and Development March 27, 2013.

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate grading works related to a proposed residential draft plan of subdivision (City File No. 21T-07008B), located east of Airport Road and north of Castlemore Road, in the City of Brampton. The draft plan was approved by City of Brampton Council on July 28, 2011 and the conditions of draft approval were subsequently issued on August 3, 2011. A condition of draft approval is attaining a permit from TRCA. The Main Branch of the West Humber River runs through the valley lands located east of the site, and Tributary A of the West Humber River (West Branch) runs through the valley lands located west of the site. The subject property is located entirely on tablelands. The total area of the property is 4.045 ha within the planning boundaries of the Vales of Castlemore Secondary Plan area, which was supported by a Master Environmental Servicing Plan (MESP) reviewed and approved by TRCA staff.

Page 75: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

75

The proposed development will be serviced by a stormwater management pond located on the lands to the west of this site. The stormwater management facility was approved by the TRCA Executive Committee at the May 4, 2012 TRCA Executive Committee meeting (Permit No. C-120839). Through the draft plan review, a Functional Servicing Report (FSR) was completed and reviewed/approved by TRCA staff. In order to achieve TRCA's water balance requirements, measures are to be implemented to ensure that at minimum pre-to-post infiltration is attained through on-site storage, and infiltration of runoff from the rear lots and roof areas in an infiltration trench across the rear of the development area.

An erosion and sediment control plan has been provided in support of this application. The proposed erosion and sediment control scheme is consistent with the requirements and recommendations approved in the FSR report, as well as TRCA's erosion and sedimentation control guidelines.

Control of Flooding:The proposed works are located entirely outside of the Regional Floodplain. As such, no impacts to the storage and/or conveyance of flood waters are anticipated.

Pollution:Appropriate erosion and sediment controls will be installed and maintained throughout all phases of construction.

Dynamic Beaches:Not applicable.

Erosion:There are no geotechnical and/or slope stability concerns associated with this project.

Conservation of Land:No significant vegetation will be removed as a result of construction. As such, no additional plantings are required. Through the broader Secondary Plan/MESP review, target areas were identified for restoration and enhancement planting. This work is being implemented through other TRCA permit applications within the Vales of Castlemore Secondary Plan area.

PlantingsNo plantings are required.

Policy Guidelines:The proposed development is consistent with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP).

CFN: 49034 - Application #: 0232/13/BRAMReport Prepared by: Adam Miller, extension 5244For information contact: Adam Miller, extension 5244Date: April 29, 2013

Page 76: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

76

EX10.15 72 BROOKLAND DRIVETo construct, reconstruct, erect or place a building or structure on Lot 222, Plan 688, (72 Brookland Drive), in the City of Brampton, Etobicoke Creek Watershed. The purpose is to undertake works within the TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of a proposed below grade entrance to an existing single family dwelling, associated with a municipal building permit.

The permit will be issued for the period of May 10, 2013 to May 9, 2015 in accordance with the following documents and plans which form part of this permit:

Drawing No. 1153-1, Site Plan, prepared by Alfa Engineering Solutions Inc. dated

March 23, 2013, stamped received by TRCA Planning & Development on March 27, 2013;Drawing No. 1153-02, Basement Below Grade Entrance Plan, prepared by Alfa

Engineering Solutions Inc. dated March 23, 2013, stamped received by TRCA Planning & Development on March 27, 2013;Drawing No. 1153-03, Basement Below Grade Entrance Plan, prepared by Alfa

Engineering Solutions Inc. dated March 23, 2013, stamped received by TRCA Planning & Development on March 27, 2013;Drawing No. 1153-04, Basement Below Grade Entrance Plan, prepared by Alfa

Engineering Solutions Inc. dated March 23, 2013, stamped received by TRCA Planning & Development on March 27, 2013.

RATIONALEThe application was reviewed by staff on the basis of the following information:

Page 77: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

77

Proposal:The purpose of this application is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of a 4.3 feet x 12.6 feet x 6.5 feet (1.3 metre x 3.8 metre x 2.0 metre) proposed below grade entrance and stairway at rear of an existing residential dwelling associated with a municipal building permit. The rear of the subject property is located adjacent to a valley corridor of the Etobicoke Creek Watershed. The proposed works are sufficiently setback from the edge of the valley corridor. The subject property and proposed works are located outside of the Regional Storm Floodplain. There are no geotechnical or ecological concerns associated with this project.

Control of Flooding:The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and/or conveyance of flood waters are anticipated.

Pollution:Sediment and erosion control fencing is not required as the proposed works are far removed from the watercourse.

Dynamic Beaches:Not applicable

Erosion:There are no geotechnical and/or slope stability concerns anticipated with this project.

Conservation of Land:No significant vegetation will be removed as a result of this project. Additionally, there are no fisheries concerns related with these works.

PlantingsAs no vegetation is being removed as result of this proposal, no additional plantings are required.

Policy Guidelines:The proposal is in conformity with Section 4.2.2(C) – Minor Additions and Section 4.2.2(E) Property Improvements and Ancillary Structure, of TRCA’s Valley and Stream Corridor Management Program (VSCMP).

CFN: 49039 - Application #: 0243/13/BRAMReport Prepared by: Anant Patel, extension 5618For information contact: Leilani Lee-Yates, extension 5370Date: April 29, 2013

Page 78: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

78

EX10.16 ONTARIO CONFERENCE SEVENTH DAY ADVENTIST CHURCHTo construct, reconstruct, erect or place a building or structure on Part 2, 3, 4, 5, 6 Plan 43R-24714, (10747 Heart Lake Road), in the City of Brampton, Etobicoke Creek Watershed as located on the property owned by Ontario Conference Seventh Day Adventist Church. The purpose is to undertake works within the TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of an outdoor playground and garden shed associated with a municipal building permit.

The permit will be issued for the period of May 10, 2013 to May 9, 2015 in accordance with the following documents and plans which form part of this permit:

Drawing No.A-01, Site Plan, prepared by Marcos Ltd. B.D.C., dated January 15, 2013,

stamped received by TRCA Planning & Development on March 26, 2013.

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The purpose of this application is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of a 115 square metres (1,237.85 square feet) outdoor playground and a 3.65 metre x 4.57 metre (12 feet x 15 feet) garden shed located at 10747 Heart Lake Road, in the City of Brampton. The property is located in the nearby vicinity of wetlands associated with the Heart Lake Provincially Significant Wetland Complex. The proposed outdoor playground and garden shed is located approximately 35 metres from the edge of the Provincially Significant Wetland (PSW) features. Based on the distance between development and the PSW features, no significant impacts are anticipated to the wetlands. Additionally, there are no flooding, hydrological, geotechnical or ecology related concerns associated with this application.

Control of Flooding:The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and/or conveyance of flood waters are anticipated.

Page 79: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

79

Pollution:Sediment and erosion control fencing is not required as the proposed works are far removed from the watercourse.

Dynamic Beaches:Not applicable

Erosion:There are no geotechnical and/or slope stability concerns anticipated with this project.

Conservation of Land:No significant vegetation will be removed as a result of this project. Additionally, there are no fisheries concerns related with these works.

PlantingsAs no vegetation is being removed as result of this proposal, no additional plantings are required.

Policy Guidelines:The proposal is in conformity with Section 4.2.2(C) – Minor Additions and Section 4.2.2(E) Property Improvements and Ancillary Structure, of TRCA’s Valley and Stream Corridor Management Program (VSCMP).

CFN: 49020 - Application #: 0228/13/BRAMReport Prepared by: Anant Patel, extension 5618For information contact: Leilani Lee-Yates, extension 5370Date: April 29, 2013

CITY OF MARKHAM

EX10.17 CITY OF MARKHAMTo temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Raymerville Drive between Hickory Drive and Norwich Drive; Raymerville Drive between Bendamere Crescent and Wooden Mill Road in the City of Markham, Rouge River Watershed as located on the property owned by City of Markham. The purpose is to undertake rehabilitation of two culverts located on Raymerville Drive, one between Hickory Drive and Norwich Drive and the other between Bendamere Crescent and Wooden Mill Road in the City of Markham. The Redside Dace fisheries timing window will apply to this project unless otherwise specified in writing by Ministry of Natural Resources (MNR). A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO).

Page 80: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

80

The permit will be issued for the period of May 10, 2013 to May 9, 2015 in accordance with the following documents and plans which form part of this permit:

Drawing # C11-1; General Arrangement; prepared by G.D. Jewell Engineering Inc. on

behalf of City of Markham; dated December 2011; received by TRCA on March 08, 2013;Drawing # C11-2; Stream Protection-1 and Sediment Control; prepared by G.D. Jewell

Engineering Inc. prepared on behalf of City of Markham; dated December 2011; received by TRCA on March 08, 2013;Drawing # C11-3; Stream Protection and Sediment Control-2; Traffic Control Plan;

prepared by G.D. Jewell Engineering Inc. on behalf of City of Markham; dated December 2011; received by TRCA on March 08, 2013;Drawing # C11-4; Pedestrian Railing and Typical Rehabilitation Details; prepared by

G.D. Jewell Engineering Inc. on behalf of City of Markham; dated December 2011; received by TRCA on March 08, 2013;Drawing # C11-5; Restoration Plan; prepared by G.D. Jewell Engineering Inc. on

behalf of City of Markham; dated December 2012; received by TRCA on March 08, 2013;Drawing # C11-6; Staging & Removals; prepared by G.D. Jewell Engineering Inc. on

behalf of City of Markham; dated December 2011; received by TRCA on March 08, 2013;Drawing # C73-1; General Arrangement; prepared by G.D. Jewell Engineering Inc. on

behalf of City of Markham; dated January 2012; received by TRCA on March 08, 2013;Drawing # C73-2; Stream Protection and Sediment Control-1; prepared by G.D. Jewell

Engineering Inc. on behalf of City of Markham; dated December 2011; received by TRCA on March 08, 2013;Drawing # C73-3, Stream Protection and Sediment Control-2 and Traffic Control Plan;

prepared by G.D. Jewell Engineering Inc. on behalf of City of Markham; dated December 2011; received by TRCA on March 08, 2013;Drawing # C73-4; Typical Rehabilitation Details; prepared by G.D. Jewell Engineering

Inc. on behalf of City of Markham; dated January 2012; received by TRCA on March 08, 2013;

Page 81: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

81

Drawing # C73-5, Restoration Plan; prepared by G.D. Jewell Engineering Inc. on

behalf of City of Markham; dated December 2012; received by TRCA on March 08, 2013;Drawing # C73-6; Staging & Removals; prepared by G.D. Jewell Engineering Inc. on

behalf of City of Markham; dated December 2011; received by TRCA on March 08, 2013.

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The proposal involves rehabilitation of two culverts located on Raymerville Drive, between Hickory Drive and Norwich Drive (Culvert # C11) and Bendamere Crescent and Wooden Mill Road (Culvert # C73), north of Highway 7 and east of Markham Road in the City of Markham, Rouge River Watershed, Regional Municipality of York. The works will include removal of deteriorated concrete and patch repair on concrete barrels, concrete headwalls and wingwalls; reconstruction of the deteriorated areas of gabion walls and also the installation of new pedestrian railing.

Control of Flooding:The proposed project is not anticipated to have significant impacts on the storage or conveyance of floodwaters.

Pollution:Standard erosion and sediment control measures, including (heavy duty silt fence, Filtrexx Siltsoxx, erosion control blanket, pea gravel barrier, filter bag or sediment trap with splash pad) will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediments from entering any watercourse. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction.

Dynamic Beaches:Not applicable

Erosion:No geotechnical/ slope stability issues have been identified for the proposed project.

Conservation of Land:With erosion and sediment control measures in effect, the potential for Harmful, Alteration Disruption or Destruction (HADD) to fish habitat will be mitigated. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). The Redside Dace fisheries timing window of July 1 to September 15 will apply to this proposal unless otherwise specified in writing by MNR.

PlantingsAll disturbed areas will be stabilized and restored immediately following construction using native and non-invasive species.

Page 82: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

82

Policy Guidelines:This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Toronto and Region Conservation Authority's Valley and Stream Corridor Management Program.

CFN: 47944 - Application #: 0749/12/MARKReport Prepared by: Leah Chishimba, extension 5744For information contact: Leah Chishimba, extension 5744Date: April 30, 2013

CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA]

EX10.18 49 CORNELIUS PARKWAYTo construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 148, Plan 3244, (49 Cornelius Parkway), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to construct a new two-storey single family detached dwelling and an inground pool with associated hardscaping at 49 Cornelius Parkway in the City of Toronto (Etobicoke York). The existing dwelling will be demolished.

The permit will be issued for the period of May 10, 2013 to May 9, 2015 in accordance with the following documents and plans which form part of this permit:

Drawing No. L-1, Landscape Plan, prepared by The MBTW Group, dated March 22,

2013, received on March 22, 2013;Drawing, North Elevation, prepared by Graziani and Corazza Architects Inc., dated

February 11, 2013, received on February 15, 2013;Drawing, South Elevation, prepared by Graziani and Corazza Architects Inc., dated

February 11, 2013, received on February 15, 2013;

Page 83: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

83

Drawing, West Elevation, prepared by Graziani and Corazza Architects Inc., dated

February 11, 2013, received on February 15, 2013;Drawing, East Elevation, prepared by Graziani and Corazza Architects Inc., dated

February 11, 2013, received on February 15, 2013.

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The purpose of this application is to develop within the TRCA Regulated Area of the Humber River watershed in order to construct a new two-storey single family detached dwelling and inground pool with associated hardscaping at 49 Cornelius Parkway. The existing dwelling will be demolished. The subject site is located east of Keele Street and north of Lawrence Avenue in the City of Toronto (Etobicoke Community Council Area).

Control of Flooding:The site is not located within a regional storm flood plain and the proposal will have no impact on the storage and/or conveyance of floodwaters.

Pollution:Appropriate erosion and sediment controls will be installed and maintained throughout all phases of construction to prevent debris from entering the adjacent ravine.

Dynamic Beaches:Not applicable

Erosion:There are no slope stability/geotechnical concerns associated with this application.

Conservation of Land:The proposed works are located no further than the existing limit of development and are adequately set back from the top of bank. The appropriate tree protection fencing will be installed.

PlantingsNative plantings will be provided as per City of Toronto Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented.

Policy Guidelines:This proposal is consistent with Section 4.2.2.(D) and (E) - Development Guidelines for Replacement Structures, Property Improvements and Ancillary Structures within Non-Established/Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program

Page 84: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

84

CFN: 48866 - Application #: 0116/13/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Mark Rapus, extension 5259Date: April 30, 2013

EX10.19 CITY OF TORONTOTo construct, reconstruct, erect or place a building or structure, site grade, and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere, at Chris Tonks Arena (2801 Eglinton Avenue West), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed, as located on property owned by the City of Toronto. The purpose is to carry out exterior upgrades at Chris Tonks Arena. Works will involve rehabilitation of the existing parking lot, upgrades to the drainage system, and landscaping. No in-water works are within the scope of this project.

The permit will be issued for the period of May 10, 2013 to May 9, 2015 in accordance with the following documents and plans which form part of this permit:

Drawing no. CS1; State of Good Repair (SGR) Work at Chris Tonks Arena, 2801

Eglinton Avenue West, City of Toronto: Civil/Structural Overall Site Plan; prepared by Peter T. Mitches & Associates Limited on behalf of City of Toronto Parks, Forestry and Recreation; dated October 31, 2012; revised April 1, 2013; received by TRCA on April 8, 2013;Drawing no. CS2; State of Good Repair (SGR) Work at Chris Tonks Arena, 2801

Eglinton Avenue West, City of Toronto: Civil/Structural Partial Site, Demolition & Erosion Control Plan; prepared by Peter T. Mitches & Associates Limited on behalf of City of Toronto Parks, Forestry and Recreation; dated October 31, 2012; revised April 1, 2013; received by TRCA on April 8, 2013;

Page 85: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

85

Drawing no. CS3; State of Good Repair (SGR) Work at Chris Tonks Arena, 2801

Eglinton Avenue West, City of Toronto: Civil/Structural Partial Site Plan, New Work; prepared by Peter T. Mitches & Associates Limited on behalf of City of Toronto Parks, Forestry and Recreation; dated October 31, 2012; revised April 1, 2013; received by TRCA on April 8, 2013;Drawing no. CS4; State of Good Repair (SGR) Work at Chris Tonks Arena, 2801

Eglinton Avenue West, City of Toronto: Civil/Structural Retaining Wall Details; prepared by Peter T. Mitches & Associates Limited on behalf of City of Toronto Parks, Forestry and Recreation; dated October 31, 2012; revised April 1, 2013; received by TRCA on April 8, 2013;Drawing no. CS5; State of Good Repair (SGR) Work at Chris Tonks Arena, 2801

Eglinton Avenue West, City of Toronto: Civil/Structural Retaining Wall Details; prepared by Peter T. Mitches & Associates Limited on behalf of City of Toronto Parks, Forestry and Recreation; dated October 31, 2012; revised April 1, 2013; received by TRCA on April 8, 2013;Drawing no. CS6; State of Good Repair (SGR) Work at Chris Tonks Arena, 2801

Eglinton Avenue West, City of Toronto: Plan/Profile, New Storm Sewers, East Side of Building; prepared by Peter T. Mitches & Associates Limited on behalf of City of Toronto Parks, Forestry and Recreation; dated October 31, 2012; revised April 1, 2013; received by TRCA on April 8, 2013;Drawing no. CS7; State of Good Repair (SGR) Work at Chris Tonks Arena, 2801

Eglinton Avenue West, City of Toronto: Plan/Profile, New Storm Sewers, West Side of Building; prepared by Peter T. Mitches & Associates Limited on behalf of City of Toronto Parks, Forestry and Recreation; dated October 31, 2012; revised April 1, 2013; received by TRCA on April 8, 2013;Drawing no. CS8; State of Good Repair (SGR) Work at Chris Tonks Arena, 2801

Eglinton Avenue West, City of Toronto: Civil/Structural Grading Plan; prepared by Peter T. Mitches & Associates Limited on behalf of City of Toronto Parks, Forestry and Recreation; dated October 31, 2012; revised April 1, 2013; received by TRCA on April 8, 2013;Drawing no. CS9; State of Good Repair (SGR) Work at Chris Tonks Arena, 2801

Eglinton Avenue West, City of Toronto: Civil/Structural Restoration Plan; prepared by Peter T. Mitches & Associates Limited on behalf of City of Toronto Parks, Forestry and Recreation; dated October 31, 2012; revised April 1, 2013; received by TRCA on April 8, 2013.

RATIONALEThe application was reviewed by staff on the basis of the following information:

Page 86: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

86

Proposal:The City of Toronto is proposing various state-of-good-repair upgrades to the exterior of the Chris Tonks Arena, located at 2801 Eglinton Avenue West near Black Creek Drive. Works will involve replacing the existing wood retaining wall along the east side of the property with a new retaining wall system. The existing drainage system is to be upgraded with new storm sewers, catch basins and manholes. Roof water leaders will be redirected from the sanitary sewer to the storm sewer to alleviate flooding within the arena building. A portion of the parking lot is also to be repaved on the west side of the building, where new concrete curbs will be incorporated, while new turf stone will be added between the east side of the building and the new retaining wall. Silt fencing will isolate two working areas in the soccer field, while tree protection hoarding will be established on the east side of the arena building. Once construction is complete, trees and shrubs will be planted and the surrounding lawn restored. Construction is anticipated to occur in 2013.

Control of Flooding:The proposed works are not anticipated to impact flooding, flood storage or conveyance of flood waters. All grades will be maintained or matched.

Pollution:Erosion and sediment control measures (silt fence) will be installed prior to construction and maintained for its duration. These measures are being implemented to prevent the release of construction generated sediment into Black Creek, a tributary of the Humber River. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction (2006).

Dynamic Beaches:The proposal will not have any implications to dynamic beaches.

Erosion:There are no impacts identified to slope stability or erosion as a result of these works.

Conservation of Land:No in-water works are within the scope of this project.

PlantingsTwenty-one tree removals are associated with this project. These will be compensated through the planting of 84 new trees. Disturbed ground surfaces will be restored with native seed mix. Removals have been approved by City of Toronto Urban Forestry staff, with compensation to be sought in accordance with City standards. All disturbed areas will be restored with non-invasive species to pre-construction conditions or better, upon completion of work.

Policy Guidelines:This proposal complies with Section 4.2.2, Existing Resource-based Uses, of the TRCA’s Valley and Stream Corridor Management Program.

Page 87: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

87

CFN: 48466 - Application #: 0015/13/TORReport Prepared by: Daniel Brent, extension 5774For information contact: Daniel Brent, extension 5774Date: April 19, 2013

EX10.20 DELMANOR DUNDAS INC.To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 10, Concession C, (4180 - 4190 Dundas Street West), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on the property owned by Delmanor Dundas Inc.. The purpose is to construct an underground parking garage and the above-grade portion of an multi-storey retirement apartment building, remove an existing asphalt parking lot, and install associated landscaping.

The permit will be issued for the period of May 10, 2013 to May 9, 2015 in accordance with the following documents and plans which form part of this permit:

Drawing No. A101, Site Plan & Statistics, prepared by Burka Architects Inc., Revision

No. 16, revised March 08, 2013, received April 25, 2013;Drawing No. A201, Underground Parking plan- P1, prepared by Burka Architects Inc.,

Revision No. 18, revised February 12, 2013, received April 25, 2013;Drawing No. A401, South and East Elevations, prepared by Burka Architects Inc.,

Revision No. 18, revised April 30, 2013, received April 25, 2013;Drawing No. A402, North Elevation – Ravine and West Elevation, prepared by Burka

Architects Inc., Revision No. 17, revised March 08, 2013, received April 25, 2013;Drawing No. A403, South Elevation – Motor Court & North Elevation – Motor Court,

prepared by Burka Architects Inc., Revision No. 18, revised April 30, 2013, received April 25, 2013;Drawing No. EC1, Erosion & Sediment Control Plan, prepared by R. V. Anderson

Associates Limited, Revision No. 2, revised August 02, 2012, received January 22, 2013;

Page 88: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

88

Drawing No. L100, Ground Floor Landscape Key Plan, prepared by Terraplan

Landscape Architects, Revision No. 9, revised January 17, 2013, received January 22, 2013;Drawing No. L100TGS, TGS Ground Floor Landscape Plan, prepared by Terraplan

Landscape Architects, Revision No. 3, revised January 17, 2013, received January 22, 2013;Drawing No. L102, Ground Floor Planting Plan, prepared by Terraplan Landscape

Architects, Revision No. 8, revised January 17, 2013, received January 22, 2013;Drawing No. L103, Ground Floor Grading Plan, prepared by Terraplan Landscape

Architects, Revision No. 9, revised January 17, 2013, received January 22, 2013;Drawing No. L109, Landscape Key Plan Enlargement-3, prepared by Terraplan

Landscape Architects, Revision No. 8, revised January 17, 2013, received January 22, 2013;Drawing No. L110, Landscape Dimension Plan-3, prepared by Terraplan Landscape

Architects, Revision No. 8, revised January 17, 2013, received January 22, 2013;Drawing No. L300, Planting Details, prepared by Terraplan Landscape Architects,

Revision No. 7, revised November 30, 2012, received January 22, 2013.

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The proposal is to develop an underground parking garage and multi-storey retirement apartment building at 4180 and 4190 Dundas Street West in the City of Toronto (Etobicoke York Community Council Area). The works also include removing an large area of existing asphalt parking located on the top of the valley and restoring with landscaping. The subject property is located on the south side of the main Humber River, north of Dundas Street West near Prince Edward Drive.

The retirement apartment building development is subject to City of Toronto and TRCA review and approvals, now finalized. The subject property is appropriately zoned for the use and is currently developed with an office building and surface parking. The existing surface parking is located well into the slope hazard limit and up to the physical top of bank, and the resulting storm flows are actively eroding the slope on the north west corner of the site. This erosion scar requires remediation and replanting. The zoning approval was based upon securing a comprehensive plan for the slope remediation, valley renaturalization and conveyance of the restored valley lands to TRCA ownership.

The proposed slope remediation and replanting plans need to be secured prior to moving forward with the permit for the new building. The owner, Tridel, has agreed in principal to retaining TRCA Restoration Services staff to design and construct the required slope remediation works given their expertise in such matters. An agreement must be put in place prior to the issuance of this permit in order to guarantee that the slope remediation works will take place. This could take the form of a secured contract or financial securities.

Conditional Permit:This permit will not be issued until TRCA staff is satisfied that an agreement is in place to guarantee that the slope remediation works will take place.

Page 89: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

89

Control of Flooding:The proposed works will take place outside of the regulatory floodplain and the proposal will have no impact on the storage and/or conveyance of floodwaters. The development is setback well in excess of 10 metres from the floodplain.

Pollution:Temporary sediment control has been provided per the Greater Golden Horseshoe Area Conservation Authorities, Erosion and Sediment Control Guideline for Urban Construction.

Dynamic Beaches:Not applicable.

Erosion:Temporary erosion control has been provided per the Greater Golden Horseshoe Area Conservation Authorities, Erosion and Sediment Control Guideline for Urban Construction. The flow of stormwater will be carefully controlled and monitored so as not to exacerbate slope erosion.

Conservation of Land:The subject property was, until recently, fully developed with an office building and surface parking in an urban context. The proposal will have no impact on the conservation of land. Ultimately, the development will result in renaturalization of the former parking area, and the hazard lands will be conveyed to public ownership, for a net gain to the natural heritage system.

PlantingsA comprehensive renaturalization of the existing parking area with native trees, shrubs and seed mix is included. Renaturalization of the slope remediation works will be secured prior to the issuance of the permit.

Policy Guidelines:The proposal is consistent with Section 4.2.2., Development within Non-Established/Highly Urbanized Areas, of the TRCA's Valley and Stream Corridor Management Program.

CFN: 48800 - Application #: 0073/13/TORReport Prepared by: Steve Heuchert, extension 5311For information contact: Steve Heuchert, extension 5311Date: April 25, 2013

EX10.21 68 HAYMARKET ROADTo construct, reconstruct, erect or place a building or structure and site grade on Lot 81, Plan 3855, (68 Haymarket Road), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to construct a one-storey detached garage in the rear yard of the single family detached dwelling at 68 Haymarket Road in the City of Toronto (Etobicoke York).

Page 90: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

90

The permit will be issued for the period of May 10, 2013 to May 9, 2015 in accordance with the following documents and plans which form part of this permit:

Structural Letter, Re: 68 Haymarket Road, prepared by Leonard Kalishenko, P. Eng.,

Licensed Professional Engineer, dated March 21, 2013, received March 26, 2013;Drawing No. 1 of 4, Site Plan, prepared by Mastech Design Inc., dated August 2012,

Revision No. 3, revised March 21, 2013, received March 26, 2013;Drawing No. 3 of 4, Elevations, prepared by Mastech Design Inc., dated August 2012,

Revision No. 3, revised March 21, 2013, received March 26, 2013;Drawing No. 4 of 4, Cross Section, prepared by Mastech Design Inc., dated August

2012, Revision No. 3, revised March 21, 2013, received March 26, 2013.

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The purpose of this application is to develop within a TRCA Regulated Area of the Humber River watershed in order to facilitate the construction of a one-storey detached garage in the rear yard of the existing single family detached dwelling at 68 Haymarket Road. The subject site is located west of Jane Street and north of Wilson Avenue in the City of Toronto (Etobicoke York Community Council Area).

Control of Flooding:The subject property is located within a Regulatory Floodplain of the Humber River watershed and is subject to a Regional Storm flood elevations of 130.74 MASL (meters above sea level) and flooding velocities of 0.14 m/s. In light of this, TRCA has received a letter that has been signed and stamped by a professional engineer confirming the detached garage can withstand these Regional Floodplain elevations and velocities. TRCA staff have determined the proposed garage is adequately flood proofed and that the proposed works will not adversely impact the storage and/or conveyance of floodwaters.

Page 91: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

91

Pollution:The proposed construction is well removed from the Humber River. The proponent is required to abide by the municipal sewer use by-law so that sediment will not enter the storm sewer system.

Dynamic Beaches:Not applicable

Erosion:There are no slope stability/geotechnical concerns associated with this application.

Conservation of Land:No significant vegetation will be removed as a result of construction. There are no other significant natural features on, or adjacent to, the site that would be negatively impacted by the project.

PlantingsNo plantings are required as part of this project.

Policy Guidelines:The proposal is consistent with Section 4.2.2.(E) - Development Guidelines for Property Improvements and Ancillary Structures within Non-Established/Highly Urbanized Areas of the TRCA’s Valley and Stream Corridor Management Program.

CFN: 49019 - Application #: 0227/13/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Mark Rapus, extension 5259Date: April 30, 2013

CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA]\

EX10.22 CITY OF TORONTOTo construct, reconstruct, erect or place a building or structure, and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere, at 777 Lawrence Avenue East near Leslie Street, in the City of Toronto (North York Community Council Area), Don River Watershed, as located on property owned by the City of Toronto. The purpose is to install a pre-engineered garage structure. Works will involve placement of the new structure on new concrete foundations. No in-water works are within the scope of this project.

Page 92: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

92

The permit will be issued for the period of May 10, 2013 to May 9, 2015 in accordance with the following documents and plans which form part of this permit:

Drawing no. 1; New Garage/Storage Building at Edwards Gardens, 777 Lawrence

Avenue East, City of Toronto: Site Plan; prepared by Peter T. Mitches and Associates Limited on behalf of City of Toronto Parks, Forestry and Recreation; dated November 23, 2012; revised April 1, 2013; received by TRCA on April 8, 2013;Drawing no. 2; New Garage/Storage Building at Edwards Gardens, 777 Lawrence

Avenue East, City of Toronto: Site Plan, New Work; prepared by Peter T. Mitches and Associates Limited on behalf of City of Toronto Parks, Forestry and Recreation; dated November 23, 2012; revised April 1, 2013; received by TRCA on April 8, 2013;Drawing no. 3; New Garage/Storage Building at Edwards Gardens, 777 Lawrence

Avenue East, City of Toronto: Floor Plan, Door Schedule; prepared by Peter T. Mitches and Associates Limited on behalf of City of Toronto Parks, Forestry and Recreation; dated November 23, 2012; revised February 20, 2013; received by TRCA on February 28, 2013;Drawing no. 4; New Garage/Storage Building at Edwards Gardens, 777 Lawrence

Avenue East, City of Toronto: Typical Section & Pre-engineered Building Details; prepared by Peter T. Mitches and Associates Limited on behalf of City of Toronto Parks, Forestry and Recreation; dated November 23, 2012; revised February 20, 2013; received by TRCA on February 28, 2013.

RATIONALEThe application was reviewed by staff on the basis of the following information:

Page 93: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

93

Proposal:The City of Toronto is proposing to construct a storage garage in an existing works yard in Edwards Gardens, southwest of Lawrence Avenue East and Leslie Street. Works will involve removal of the existing concrete pad, on which no structure currently sits, followed by placement of a new pre-engineered garage structure on new concrete foundations. Silt fencing will be used to isolate the work and stockpile areas during construction. No vegetation removals are associated with this project. Once the structure has been installed, the area around it will be restored with gravel. Construction is anticipated to occur in 2013 and be completed within one month’s time.

Control of Flooding:The proposed works are not located within the Regional Storm Flood Plain and are not anticipated to impact flooding, flood storage or conveyance of flood waters.

Pollution:Erosion and sediment control measures (silt fence) will be installed prior to construction and maintained for its duration. These measures are being implemented to prevent the release of construction generated sediment into Wilket Creek, a tributary of the East Don River. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction (2006).

Dynamic Beaches:The proposal will not have any implications to dynamic beaches.

Erosion:There are no impacts identified to slope stability or erosion as a result of these works.

Conservation of Land:No in-water works are within the scope of this project.

PlantingsNo tree removals are associated with this project. All disturbed areas will be restored to pre-construction conditions or better, upon completion of work.

Policy Guidelines:This proposal complies with Section 4.1.2, New Resource-based Uses, of the TRCA’s Valley and Stream Corridor Management Program.

CFN: 48847 - Application #: 0157/13/TORReport Prepared by: Daniel Brent, extension 5774For information contact: Daniel Brent, extension 5774Date: April 17, 2013

Page 94: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

94

CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA]

EX10.23 19 STRATHEARN ROADTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part 276 Plan , Part Lot 285, 286, Plan M-378, (19 Strathearn Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to construct a retaining wall, relocate soil, and construct a terrace, planting beds and a swimming pool.

The permit will be issued for the period of May 10, 2013 to May 9, 2015 in accordance with the following documents and plans which form part of this permit:

Drawing No. 1, Landscape and Sediment Control Plan, prepared by John Lloyd &

Associates, Revision 1, revised October 11, 2012, received October 12, 2012;Drawing No. 1, Ravine Planting Plan, prepared by John Lloyd & Associates, Revision

3, revised April 25, 2013, received April 25, 2013;Drawing No. LD-1, Retaining Walls to be Rebuilt, unknown author, Revision No. 1,

revised July 9, 2012, received October 12, 2012;Drawing No. LD-2, Retaining Wall Sections, stamped by J. J. Yee, P. Eng., Revision

No. 1, revised July 9, 2012, received October 12, 2012;Drawing No. LD-3, Retaining Wall Sections, stamped by J. J. Yee, P. Eng., Revision

No. 1, revised July 9, 2012, received October 12, 2012.

RATIONALEThe application was reviewed by staff on the basis of the following information:

Page 95: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

95

Proposal:The proposal is to construct a concrete retaining wall, relocate soil in the rear yard within the confines of the retaining wall, and construct a terrace, planting beds and a swimming pool all in the rear yard of 19 Strathearn Road in the City of Toronto (Toronto and East York Community Council Area). The single family residential property located west of Bathurst Street and south of Eglinton Avenue includes a deep rear yard which is terraced towards a well defined top of bank of the Cedarvale Park ravine. Properties along the Cedarvale Park ravine are for the most part extensively developed with retaining walls, pool houses, swimming pools and other landscaping treatments. The rear yard included turf, some stone terraced retaining walls and staircases in the range of 1 to 2 metres high, a child's playhouse, a large wooden retaining wall at top of bank with a staircase extending from the wooden retaining wall down the slope. The proposal is to replace the 1 to 2 metre high stone terraced retaining walls and staircases with a more substantial concrete retaining wall and place fill behind the retaining wall to level out the terraced rear yard. The existing child's playhouse and large wooden retaining wall is located on the valley side of the proposed development and will remain.

The retaining wall is located 14 metres from the top of the bank at the south end of the property, and 3 metres from the side property line at the west end of the property. The maximum height of the wall is 4.52 metres in the centre of the property and 3.83 metres at the southwest corner abutting the neighbouring property. The side property line abuts a very mild 2.45H to 1V slope on the neighbouring property to the west. The slope on the south end of the property is much steeper at 1.75H to 1V and represents the principal erosion hazard along this valley reach. The wall is located 7 metres back from the erosion hazard limit on the south side, and 5 metres back from the top of the mild slope on the west side.

Permit After the Fact:The applicant completed construction without the benefit of a TRCA permit. The applicant was issued a violation notice. As a result, the applicant has paid the application fee plus 100% as required for a permit "after the fact".

The proposal is subject to a neighbour dispute. It is understood that the nature of the dispute generally revolves around the esthetics and height of the concrete retaining wall and the amount of fill relocated on site. TRCA planning and development and geotechnical engineering staff have reviewed the proposal in light of its location adjacent to the top of bank of the valley and the erosion hazard limit. Staff concur that the proposal represents a substantial transformation of the rear yard, albeit no permits or other approvals were required by the City of Toronto. A rigorous technical review concludes that the proposed development will have no impact on the relevant tests of the regulation, in this case being the conservation of land and the control of erosion. The walls are adequately set back from the erosion hazard limit and will have no impact on the slopes on or off the property.

Control of Flooding:The site is not located within a Regional Storm Floodplain and will have no impact on the control of flooding.

Pollution:The proposal is already built. There was no impact on pollution during the construction.

Page 96: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

96

Dynamic Beaches:Not applicable.

Erosion:TRCA Geotechnical Engineering staff reviewed a Slope Stability Study prepared by a Professional Engineer and concur with the conclusions. The proposal is adequately set back from the erosion hazard limit and will have no impact on the slopes on or off the property. No erosion is evident due to the construction.

Conservation of Land:The proposal is located within 10 metres of the top of bank and construction resulted in some tree loss and injury generally in the area along the east side property line. The neighbouring property to the east is developed with a large pool house or accessory unit and retaining walls that extend a similar distance towards the valley than the proposed. In addition, the property is already developed with a large wooden retaining wall and stairs further down into the valley. TRCA's policies for development within 10 metres of the top of bank of the valley does allow for ancillary structures provided they are adequately set back from the erosion hazard limit and they do not extend further into the valley than other such existing development along the valley reach. As such, the proposal will not have an impact on the conservation of land.

PlantingsThe applicant is planting four black cherry and three red oak trees on the valley slope to compensate for tree impacts during construction, per City of Toronto Urban Forestry requirements. In addition, the applicant is planting the 14 metre buffer zone between the top of the bank and the retaining wall with native shrubs while still allowing for access to the existing staircase and child's playhouse.

Policy Guidelines:The proposal is consistent with Section 4.2.2.(E), Development Guidelines for Property Improvements and Ancillary Structures within Non-Established/Highly Urbanized Areas of the TRCA’s Valley and Stream Corridor Management Program.

CFN: 48309 - Application #: 0872/12/TORReport Prepared by: Steve Heuchert, extension 5311For information contact: Steve Heuchert, extension 5311Date: April 29, 2013

CITY OF VAUGHAN

EX10.24 107 TREELAWN BOULEVARDTo construct, reconstruct, erect or place a building or structure on , (107 Treelawn Boulevard), in the City of Vaughan, Humber River Watershed. The purpose is to construct an accessory shed within a Regulated Area of the Humber River watershed at 107 Treelawn Boulevard in the City of Vaughan.

Page 97: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

97

The permit will be issued for the period of May 10, 2013 to May 9, 2015 in accordance with the following documents and plans which form part of this permit:

Site Plan, drawing no. 1, prepared by the applicant, dated March 23, 2013, received by

the TRCA March 26, 2013 redline revised to indicate the removal of excess fill material

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The purpose is to construct an accessory shed within a Regulated Area of the Humber River watershed. The subject property is adjacent to the Main Humber River valley corridor. Based upon a site visit conducted by TRCA staff, a steep, well vegetated slope (with a configuration of approximately 1.7 horizontal : 1 vertical) is located roughly 1 metre away from the rear property line.

The proposed shed is located within an already disturbed sodded area approximately 10 metres from the top-of-slope. TRCA Geotechnical Engineering staff are satisfied that the proposed works are adequately setback from the valley wall and will have no impacts on the slope.

Control of Flooding:The subject property is not located within the Regional Storm Flood Plain. There will be no impacts on the storage and conveyance of flood waters.

Pollution:There are no pollution related issues associated with this application.

Dynamic Beaches:Not applicable.

Page 98: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

98

Erosion:TRCA Geotechnical Engineering staff are satisfied that the proposed works are adequately setback from the top-of-slope.

Conservation of Land:As a watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project.

PlantingsAll disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features.

Policy Guidelines:The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program.

CFN: 49031 - Application #: 0240/13/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: June Little, extension 5756Date: April 23, 2013

EX10.25 REGIONAL MUNICIPALITY OF YORKTo construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere, and alter a watercourse on Yonge Street, 0.52 km north of 71 John Street, in the City of Vaughan, Don River Watershed as located on the property owned by the Regional Municipality of York. The purpose is to undertake maintenance works on a concrete arch culvert and replace a failed gabion wall. Maintenance works on the culvert and wing walls include drip edges at the storm inlet pipes, crack injection, new hand rail, new chain link fence, concrete curb reconstruction, the removal of trees from around the wing walls, and the realignment of the low flow channel. Works are subject to the coldwater timing window, unless otherwise specified in writing by the Ministry of Natural Resources (MNR). A Letter of Advice (LOA) will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO).

Page 99: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

99

The permit will be issued for the period of May 10, 2013 to May 9, 2015 in accordance with the following documents and plans which form part of this permit:

Letter of Undertaking from York Region for revisions to the engineering drawings to

the satisfaction of TRCA staff, dated April 25, 2013, received by TRCA staff of April 29, 2013.

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The proposal is to undertake maintenance works on a concrete arch culvert and wing walls, and to replace a failed gabion wall. Maintenance works on the culvert and wing walls include drip edges at the storm inlet pipes, crack injection, new hand rail, concrete curb reconstruction, the removal of trees from around the wing walls, and the realignment of the low flow channel.

Control of Flooding:Existing grades within the Regional Storm Flood Plain will be maintained.

Pollution:Standard erosion and sediment control measures, including silt fencing and cofferdam will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediments from entering any watercourse or wetland. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction.

Dynamic Beaches:Not applicable

Page 100: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

100

Erosion:Part of this application is to address existing slope stability issues through replacing the existing failed gabion wall.

Conservation of Land:With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration Disruption or Destruction (HADD) of fish habitat will be mitigated. A Letter of Advice (LOA) will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). The Ministry of Natural Resources coldwater fisheries timing window of July 1 to September 15 will apply to this proposal unless otherwise specified in writing by MNR.

PlantingsNative, non-invasive tree and shrub plantings are proposed.

Policy Guidelines:This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Toronto and Region Conservation Authority's Valley and Stream Corridor Management Program.

CFN: 48476 - Application #: 1028/12/VAUGReport Prepared by: Scott Smith, extension 5758For information contact: Scott Smith, extension 5758Date: April 29, 2013

EX10.26 140 CENTRE STREETTo construct, reconstruct, erect or place a building or structure and site grade on Lot 7, Plan 3270, (140 Centre Street), in the City of Vaughan, Don River Watershed. The purpose is to construct a replacement dwelling within a Regulated Area of the Don River watershed at 140 Centre Street in the City of Vaughan.

The permit will be issued for the period of May 10, 2013 to May 9, 2015 in accordance with the following documents and plans which form part of this permit:

Page 101: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

101

Lot Drainage & House Siting Control Plan, prepared by R.G. McKibbon Limited, revise

dated February 26, 2013, received by the TRCA April 5, 2013, redline revised to indicate removal of excess fill material;Elevations, drawing no. A-8, prepared by Georgio Lolos Design, revise dated January

17, 2013, received by the TRCA April 5, 2013; Elevations, drawing no. A-9, prepared by Georgio Lolos Design, revise dated January

17, 2013, received by the TRCA April 5, 2013.

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The purpose is to construct a replacement dwelling within a Regulated Area of the Don River watershed. A drainage channel which is subject to flooding is located along the north side of Centre Street and traverses the front of the subject property. Based upon a Flood Study prepared by Genivar, dated August 5, 2009, a portion of the subject property is subject to shallow flooding during a Regional Storm Event. The Regional Storm Flood Elevation has been determined to be 175.60 metres above sea level (m.a.s.l.).

The footprint of the proposed dwelling is generally over the footprint of the existing dwelling and has been located outside of the flood prone portion of the property. The proposed dwelling is approximately 6 metres away from the flood plain at its closest point. No significant vegetation will be removed to accommodate the new dwelling.

TRCA water resources staff are satisfied that the proposed dwelling has been adequately setback from the flood plain and the proposed works will have no adverse impacts on the storage and conveyance of flood waters.

Control of Flooding:The proposed works are located outside of the Regional Storm Flood Plain. There will be no impacts on the storage or conveyance of flood waters.

Pollution:Sediment control fencing will be erected and maintained for the duration of construction to prevent the transport of sediment off the property.

Dynamic Beaches:Not applicable.

Erosion:There are no geotechnical issues associated with this application.

Conservation of Land:As a watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project.

Page 102: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

102

PlantingsAll disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features.

Policy Guidelines:The proposal is consistent with Section 4.2 - Existing Development - of the Authority's Valley and Stream Corridor Management Program.

CFN: 49024 - Application #: 0219/13/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: June Little, extension 5756Date: April 23, 2013

EX10.27 11801 KEELE STREETTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on , (11801 Keele Street), in the City of Vaughan, Humber River Watershed. The purpose is to construct a replacement dwelling within a Regulated Area of the Humber River watershed at 11801 Keele Street in the City of Vaughan.

The permit will be issued for the period of May 10, 2013 to May 9, 2015 in accordance with the following documents and plans which form part of this permit:

Site Plan, drawing no. SP-1, prepared by Landscape Planning Limited, revise dated

March 19, 2013, received by the TRCA March 28, 2013.

RATIONALEThe application was reviewed by staff on the basis of the following information:

Page 103: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

103

Proposal:The purpose is to construct a replacement dwelling within a Regulated Area of the Humber River. The subject property contains a number of Provincially Significant Wetlands (PSW) as well as some well vegetated areas. TRCA previously issued a permit to construct a replacement home on the subject property (Permit No. C-10867, issued October 1, 2010); however, this permit has since expired and the applicant has proposed to locate the replacement home elsewhere on the property.

The proposed dwelling is located along an existing driveway which lead to the original dwelling on the property and is within an already disturbed, flat area devoid of any significant vegetation. Although the location is surrounded by actively farmed fields, it remains within the 120 metre Wetland Area of Interference of two PSWs. However, given the separation distance from the vegetation contiguous with the wetland and the proposed works (a minimum of approximately 100 metres), TRCA staff are satisfied that there would be no impacts on the wetlands as a result of the proposed works.

We note that the proposed dwelling has now been located in an area less ecologically sensitive than the previously proposed location.

Control of Flooding:The proposed works are not located within the Regional Storm Flood Plain. There will be no impacts on the storage or conveyance of flood waters.

Pollution:There are no pollution related issues associated with this application.

Dynamic Beaches:Not applicable.

Erosion:There are no geotechnical issues associated with this application.

Conservation of Land:As a watercourse will not impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project.

PlantingsAll disturbed areas will be restored to a sodded condition and will not affect any significant natural features.

Policy Guidelines:The proposal is consistent with Section 4.2.2 D) - Replacement Structures - of the Authority's Valley and Stream Corridor Management Program

CFN: 49032 - Application #: 0250/13/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: June Little, extension 5756Date: April 23, 2013

Page 104: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

104

EX10.28 21 PARK DRIVETo construct, reconstruct, erect or place a building or structure on Part Lot 7, Concession 7 Part Lot 6, Plan 449, (21 Park Drive), in the City of Vaughan, Humber River Watershed. The purpose is to construct an above-ground pool within a Regulated Area of the Humber River watershed at 21 Park Drive in the City of Vaughan.

The permit will be issued for the period of May 10, 2013 to May 9, 2015 in accordance with the following documents and plans which form part of this permit:

Sketch, prepared by the applicant, received by the TRCA March 14, 2013.

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The purpose is to construct an above-ground pool within a Regulated Area of the Humber River watershed. The subject property is located within the Woodbridge Special Policy Area (SPA). The proposed works are located over 130 metres away from the actual watercourse but are still located within the Regional Storm Flood Plain of the Main Humber River.

As the proposed works are minor in nature and the property is located outside of the 350-year flood plain, TRCA Water Resources staff are satisfied that the proposed works will not have a significant impact on the storage and conveyance of flood water.

The proposed works are located within an already disturbed sodded area and will not impact any significant natural features. No significant vegetation removals are required.

Control of Flooding:TRCA Water Resources Engineering staff are satisfied that the proposal will not have a significant impact on the storage and conveyance of flood waters.

Page 105: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

105

Pollution:There are no pollution related issues associated with this application

Dynamic Beaches:Not applicable

Erosion:There are no erosion issues associated with this application.

Conservation of Land:As a watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project.

PlantingsAll disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features.

Policy Guidelines:The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program.

CFN: 48954 - Application #: 0190/13/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: June Little, extension 5756Date: April 29, 2013

TOWN OF CALEDON

EX10.29 140 VICTORIA STREETTo construct, reconstruct, erect or place a building or structure on Lot 96, Plan BOL-7, (140 Victoria Street), in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within the TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a two storey addition at the rear of the existing residential dwelling, associated with a municipal building permit.

Page 106: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

106

The permit will be issued for the period of May 10, 2013 to May 9, 2015 in accordance with the following documents and plans which form part of this permit:

Drawing No. Site-1, Site Plan, prepared by Egberts Engineering Limited dated April

2011, stamped received by TRCA Planning & Development on March 21, 2013;Drawing No. OBC1, dated January 23, 2013, stamped received by TRCA Planning &

Development on March 21, 2013;Drawing No. A-01, Demolition View, prepared by C.F., stamped received by TRCA

Planning & Development on March 21, 2013;Drawing No. A-02, Existing & New Basement Foundation Plan and Existing & New

Ground Flood Plan, prepared by C.F., dated January 23, 2013, stamped received by TRCA Planning & Development on March 21, 2013;Drawing No. A-03, New Second Floor and Porch Roof Plan and New Roof Plan,

prepared by C.F., dated January 23, 2013, stamped received by TRCA Planning & Development on March 21, 2013;Drawing No. A-04, TACBOC Detail – F01a and TACBOC Detail – F01B, prepared by

C.F., dated January 23, 2013, stamped received by TRCA Planning & Development on March 21, 2013;Drawing No. A-05, Section Detail – North Wall and Elevation Detail – North, prepared

by C.F., dated January 23, 2013, stamped received by TRCA Planning & Development on March 21, 2013;Drawing No. A-06, Section Detail – South Wall and Elevation Detail – South, prepared

by C.F., dated January 23, 2013, stamped received by TRCA Planning & Development on March 21, 2013;Drawing No. A-07, Section Detail – East Wall and Elevation Detail – East, prepared by

C.F., dated January 23, 2013, stamped received by TRCA Planning & Development on March 21, 2013;Drawing No. A-08, Section Detail – East Wall and Elevation Detail – West, prepared by

C.F., dated January 23, 2013, stamped received by TRCA Planning & Development on March 21, 2013.

Page 107: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

107

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a 732 square feet (68.0 square metre) first floor addition and a 895 square feet (83.1 square metre) second floor addition at the rear of an existing residential dwelling associated with a municipal building permit. The subject property and proposed two storey addition are located within the Village of Bolton and within the bottom of the larger valley associated with the Humber River. The property is located outside of the Bolton Special Policy Area (SPA). As such, no flooding, hydrological, geotechnical or ecology related concerns with this application.

Control of Flooding:The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and/or conveyance of flood waters are anticipated.

Pollution:Sediment and erosion control fencing is not required as the proposed works are far removed from the watercourse.

Dynamic Beaches:Not applicable

Erosion:There are no geotechnical and/or slope stability concerns anticipated with this project.

Conservation of Land:No significant vegetation will be removed as a result of this project. Additionally, there are no fisheries concerns related with these works.

PlantingsAs no vegetation is being removed as result of this proposal, no additional plantings are required.

Policy Guidelines:The proposal is in conformity with Section 4.2.2(C) – Minor Additions and Section 4.2.2(E) Property Improvements and Ancillary Structure, of TRCA’s Valley and Stream Corridor Management Program (VSCMP).

CFN: 49017 - Application #: 0225/13/CALReport Prepared by: Anant Patel, extension 5618For information contact: Leilani Lee-Yates, extension 5370Date: April 29, 2013

Page 108: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

108

EX10.30 REGIONAL MUNICIPALITY OF PEELTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere along a tributary of Lindsay Creek on King Street, 1000 m west of The Gore Road, in the Town of Caledon, Humber River Watershed, as located on the property owned by Regional Municipality of Peel. The purpose is to replace an existing culvert over a tributary of Lindsay Creek on King Street, approximately 1000 m west of The Gore Road, in the Town of Caledon. The redside dace timing window will be applied to this project unless otherwise specified in writing by the Ministry of Natural Resources (MNR). A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO).

The permit will be issued for the period of May 10, 2013 to May 9, 2015 in accordance with the following documents and plans which form part of this permit:

Letter of Undertaking to provide revisions to the engineering and landscape drawings

to the satisfaction of TRCA staff; prepared by Region of Peel; dated April 16, 2013; received April 16, 2013.

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The Region of Peel has proposed to replace an existing culvert along a tributary of Lindsay Creek on King Street, approximately 1000 m west of The Gore Road, in the Town of Caledon. The proposed works involve the removal of an existing 2.9 m by 25 m concrete open footed culvert including the roadway above the deck. A new precast concrete open footed culvert will be constructed with a new road surface above. The proposed culvert will be 3.66 m in width, 1.8 m in height and 25 m in length.

Control of Flooding:Works within this area are not anticipated to affect the conveyance or storage of flood waters.

Page 109: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

109

Pollution:Standard erosion and sediment control measures (silt soxx, cofferdam, double row heavy duty silt fence) will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediments from entering any watercourse or wetland. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction.

Dynamic Beaches:Not applicable

Erosion:No geotechnical/slope stability issues are anticipated for the proposal.

Conservation of Land:All works will be conducted in the dry. With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). The Ministry of Natural Resources (MNR) redside dace fisheries timing window of July 1 to September 15 will apply to this proposal, unless otherwise specified in writing by MNR.

PlantingsAll works will take place within the road right of way. All disturbed areas will be stabilized with a native non-invasive seed mix and restored upon completion of work.

Policy Guidelines:The proposal complies with Section 4.3 - Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program.

CFN: 48265 - Application #: 0889/12/CALReport Prepared by: Shirin Varzgani, extension 5785For information contact: Shirin Varzgani, extension 5785Date: April 29, 2013

EX10.31 REGIONAL MUNICIPALITY OF PEELTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere along a tributary of the Humber River on King Street, approximately 280 m east of Innis Lake Road, in the Town of Caledon, Humber River Watershed, as located on the property owned by Regional Municipality of Peel. The purpose is to replace an existing concrete box culvert along a tributary of the Humber River on King Street, approximately 280 m east of Innis Lake Road, in the Town of Caledon. The redside dace fisheries timing window will be applied to this project unless otherwise specified in writing by the Ministry of Natural Resources (MNR). A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO).

Page 110: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

110

The permit will be issued for the period of May 10, 2013 to May 9, 2015 in accordance with the following documents and plans which form part of this permit:

Letter of Undertaking to provide revisions to the engineering and landscape drawings

to the satisfaction of TRCA staff; prepared by Region of Peel; dated April 16, 2013; received April 16, 2013.

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The Region of Peel has proposed to replace an existing concrete box culvert along a tributary of the Humber River on King Street, approximately 280 m east of Innis Lake Road, in the Town of Caledon. The proposed construction activities involve the removal of an existing 2 m by 17 m concrete box culvert including the road above the deck. A new precast concrete open footed culvert will be constructed with a new road surface above. The new culvert will be 3.66 m in width, 1.8 m in height and 20 m in length.

Control of Flooding:The proposed project is not anticipated to impact flooding, conveyance or storage of floodwaters.

Pollution:Standard erosion and sediment control measures (double row heavy duty silt fence, coffer dam, silt soxx) will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediments from entering any watercourse or wetland. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction.

Page 111: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

111

Dynamic Beaches:Not applicable

Erosion:No geotechnical/slope stability issues have been identified.

Conservation of Land:All works will be conducted in the dry. With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration Disruption or Destruction (HADD) of fish habitat will be mitigated. A Letter of Advice (LOA) will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). The Ministry of Natural Resources (MNR) redside dace fisheries timing window of July 1 to September 15 will apply to this proposal, unless otherwise specified in writing by MNR.

PlantingsAll works will take place within the road right of way. All disturbed areas will be stabilized with a native non-invasive seed mix and restored upon completion of work.

Policy Guidelines:The proposal complies with Section 4.3 - Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program.

CFN: 48266 - Application #: 0890/12/CALReport Prepared by: Shirin Varzgani, extension 5785For information contact: Shirin Varzgani, extension 5785Date: April 29, 2013

EX10.32 REGIONAL MUNICIPALITY OF PEELTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere along a tributary of the Humber River at 4700 King Street, approximately 00 m east of Dixie Road, in the Town of Caledon, Humber River Watershed, as located on the property owned by Regional Municipality of Peel. The purpose is to replace an existing corrugated steel pipe culvert with an open footed concrete culvert along a tributary of the Humber River on King Street, approximately 500 m east of Dixie Road, in the Town of Caledon. The Redside Dace fisheries timing window will be applied to this project, unless otherwise specified in writing by the Ministry of Natural Resources (MNR). A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO).

Page 112: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

112

The permit will be issued for the period of May 10, 2013 to May 9, 2015 in accordance with the following documents and plans which form part of this permit:

Letter of Undertaking to provide revisions to the engineering and landscape drawings

to the satisfaction of TRCA staff; prepared by Region of Peel; dated April 16, 2013; received April 16, 2013.

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The Region of Peel has proposed to replace an existing culvert along a tributary of the Humber River on King Street, approximately 500 m east of Dixie Road, in the Town of Caledon. The proposed works involve the removal of an existing 650 mm diameter corrugated steel pipe (CSP) culvert including the road above the deck and construct a new precast concrete open footed culvert with a new road surface above. The proposed culvert will be 3.66 m in width, 1.8 m in height and 20 m in length.

Control of Flooding:The proposed project is not anticipated to impact flooding, conveyance or storage of floodwaters.

Pollution:Standard erosion and sediment control measures (double row heavy duty silt fence, coffer dam, silt soxx) will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediments from entering any watercourse or wetland. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction.

Page 113: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

113

Dynamic Beaches:Not applicable

Erosion:No geotechnical/slope stability issues have been identified.

Conservation of Land:With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration Disruption or Destruction (HADD) of fish habitat will be mitigated. A Letter of Advice (LOA) will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). The Ministry of Natural Resources (MNR) Redside Dace fisheries timing window of July 1 to September 15 will apply to this proposal, unless otherwise specified in writing by MNR.

PlantingsAll works will take place within the road right of way. All disturbed areas will be stabilized with a native non-invasive seed mix and restored upon completion of work.

Policy Guidelines:The proposal complies with Section 4.3 - Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program.

CFN: 48267 - Application #: 0893/12/CALReport Prepared by: Shirin Varzgani, extension 5785For information contact: Shirin Varzgani, extension 5785Date: April 29, 2013

TOWN OF RICHMOND HILL

EX10.33 22 FERGUS AVENUETo construct, reconstruct, erect or place a building or structure and site grade on Part Lot 19, Plan 194, (22 Fergus Avenue), in the Town of Richmond Hill, Humber River Watershed. The purpose is to demolish an existing one-storey single family dwelling and construct a 208.71m² two-storey single detached dwelling associated with a municipal building permit. The municipal roadway and a portion of the subject property are located in the Regional Floodplain associated with Lake Wilcox. However, the proposed replacement dwelling is located outside of the Floodplain and appropriately set back. In addition, the site is located away from Lake Wilcox and contains no ecologically significant features. As such, there are no flooding, geotechnical or ecology related concerns with this application..

Page 114: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

114

The permit will be issued for the period of May 10, 2013 to May 9, 2015 in accordance with the following documents and plans which form part of this permit:

Drawing No. A1A, Landscape Plan, prepared by Lemcad Consultants, dated January

30, 2013, received by TRCA on February 25, 2013;Drawing No. A1, Site Plan, prepared by Lemcad Consultants, dated January 30, 2013,

received by TRCA on February 25, 2013;Drawing No. A2, Basement Floor Plan, prepared by Lemcad Consultants, dated

January 30, 2013, received by TRCA on February 25, 2013;Drawing No. A3, Ground Floor Plan, prepared by Lemcad Consultants, dated January

30, 2013, received by TRCA on February 25, 2013;Drawing No. A4, Second Floor Plan, prepared by Lemcad Consultants, dated January

30, 2013, received by TRCA on February 25, 2013;Drawing No. A5, Roof Plan, prepared by Lemcad Consultants, dated January 30, 2013,

received by TRCA on February 25, 2013;Drawing No. A6, Front (East) Elevation, prepared by Lemcad Consultants, dated

January 30, 2013, received by TRCA on February 25, 2013;Drawing No. A7, Side (South) Elevation, prepared by Lemcad Consultants, dated

January 30, 2013, received by TRCA on February 25, 2013;Drawing No. A8, Side (North) Elevation, prepared by Lemcad Consultants, dated

January 30, 2013, received by TRCA on February 25, 2013.

RATIONALEThe application was reviewed by staff on the basis of the following information:

Page 115: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

115

Proposal:The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the demolition of an existing one-storey single family dwelling and construct a new 208.71m² two-storey single detached dwelling associated with a municipal building permit. The municipal roadway and a portion of the subject property are located in the Regional Floodplain associated with Lake Wilcox. However, the proposed replacement dwelling is located outside of the Floodplain and appropriately set back. In addition, the site is located away from Lake Wilcox and contains no ecologically significant features. As such, there are no flooding, geotechnical or ecology related concerns with this application.

Control of Flooding:TRCA water Resources engineering staff has confirmed that there are no impacts to the storage and/or conveyance of floodwaters are anticipated.

Pollution:Appropriate erosion and sediment controls are proposed with this application.

Dynamic Beaches:Not applicable.

Erosion:There are no geotechnical and/or slope stability concerns anticipated with this project.

Conservation of Land:The proposed location of the new two-storey single detached dwelling is void of any significant vegetation. In addition, there are no fisheries related concerns associated with this project.

PlantingsGiven that no significant vegetation is to be removed with this application, no plantings have been required at this time.

Policy Guidelines:The proposal is in conformity with Section 4.2.2 (D) - Replacement Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP).

CFN: 48916 - Application #: 0185/13/RHReport Prepared by: Jeffrey Thompson, extension 5386For information contact: Quentin Hanchard, extension 5324Date: April 25, 2013

EX10.34 209 OXFORD STREETTo construct, reconstruct, erect or place a building or structure and site grade on Lot 88, Plan 1999, (209 Oxford Street), in the Town of Richmond Hill, Don River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a two-storey addition to an existing two-storey single family dwelling associated with a municipal building permit.

Page 116: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

116

The permit will be issued for the period of May 10, 2013 to May 9, 2015 in accordance with the following documents and plans which form part of this permit:

Drawing No. "209 Oxford - SP", Site Plan, prepared by Daniel Walden (D.W), dated

December 3, 2012, revised April 12, 2013, received by TRCA April 16, 2013.

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:to undertake works within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a two-storey addition to an existing two-storey single family dwelling associated with a municipal building permit. The existing dwelling is located adjacent to a valley slope which is located on the front of the property. The proposed addition is located on tableland void of significant vegetation at the rear of the existing dwelling and is appropriately set back from the valley slope. As such, there are no geotechnical concerns with this application. In addition, there are no ecological or flooding related concerns with this application.

Control of Flooding:The proposed works are located outside of the Regional Storm Floodplain. As such, there are no anticipated impacts to the storage and/or conveyance of flood waters.

Pollution:Appropriate erosion and sediment controls are proposed with this application.

Dynamic Beaches:Not applicable.

Erosion:There are no geotechnical and/or slope stability concerns anticipated with this project.

Page 117: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

117

Conservation of Land:The proposed location of the new two-storey addition is void of any significant vegetation. In addition, there are no fisheries related concerns associated with this project.

PlantingsGiven that no significant vegetation is to be removed with this application, no plantings have been required at this time.

Policy Guidelines:This proposal is in conformity with Section 4.2.2 (C) - Minor Additions - of the Authority's Valley and Stream Corridor Management Program (VSCMP).

CFN: 48917 - Application #: 0186/13/RHReport Prepared by: Jeffrey Thompson, extension 5386For information contact: Jason Wagler, extension 5743Date: April 29, 2013

ITEMS EX10.35 - EX10.49 ARE ERRATA ITEMS:

CITY OF MARKHAM

EX10.35 MILL POND INV. INC.To construct, reconstruct, erect or place a building or structure at 16 Moore's Court, in the City of Markham, Rouge River Watershed as located on the property owned by Mill Pond Inv. Inc.. The purpose is to undertake works within a TRCA regulated area of the Rouge River Watershed in order to facilitate the construction of a paved driveway and two storey frame addition with an enclosed garage to the rear of an existing two storey "heritage" dwelling associated with a municipal building permit.

The permit will be issued for the period of May 10, 2013 to May 9, 2015.

Page 118: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

118

The documents and plans which form part of this permit will be listed in a separate report

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The purpose of this application is to undertake works within a TRCA regulated area of the Rouge River Watershed in order to facilitate the construction of a two storey frame addition with an enclosed garage to the rear of an existing two storey "heritage" dwelling. The subject property is located adjacent to a tributary of the Rouge River Watershed. The rear of the subject property is located within the Regional Floodplain, however, the proposed works are located outside of the Regional Floodplain and appropriately set back. As such, there are no flooding concerns with this proposal. In addition, there are no geotechnical or ecological concerns are anticipated with this proposal. Although there are no ecology related concerns with this proposal, a planting plan will be provided in order to achieve a net ecological gain with this application.

Control of Flooding:The proposed works are located outside of the Regional Storm Floodplain. As such, there are no anticipated impacts to the storage and/or conveyance of flood waters.

Pollution:Appropriate erosion and sediment controls are proposed with this application.

Dynamic Beaches:Not applicable

Erosion:There are no geotechnical and/or slope stability concerns anticipated with this project.

Conservation of Land:The proposed location of the new two-storey addition and paved driveway are void of any significant vegetation, however a planting plan will be provided in order to achieve a net ecological gain with this application. In addition, there are no fisheries related concerns associated with this project.

PlantingsAll proposed plant species will be native and non-invasive in accordance with TRCA's planting guidelines.

Policy Guidelines:This proposal is in conformity with Section 4.2.2 (C) - Minor Additions - of the Authority's Valley and Stream Corridor Management Program (VSCMP).

CFN: 49170 - Application #: 0324/13/MARKReport Prepared by: Jeffrey Thompson, extension 5386For information contact: Doris Cheng, extension 5306Date: May 1, 2013

Page 119: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

119

CITY OF MISSISSAUGA

EX10.36 PCM BRAMALEA ROAD INC.To construct, reconstruct, erect or place a building or structure and site grade on Part Lot 12, Concession 5 Part Lot 1, 2, Plan 43R-32904, (7381 Bramalea Road), in the City of Mississauga, Etobicoke Creek Watershed as located on the property owned by PCM Bramalea Road Incorporated. The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of an addition to an existing industrial building associated with a site plan application.

The permit will be issued for the period of May 10, 2013 to May 9, 2015.

The documents and plans which form part of this permit will be listed in a separate report

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The purpose of this application is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of a 6,548 sq. m addition to the existing industrial warehouse facility at 7381 Bramalea Road, in the City of MIssissauga associated with a municipal site plan application (City File No. SP 13-061). The western property boundary is located immediately adjacent to the Little Etobicoke Creek valley corridor. The proposed works are sufficiently setback from the top of bank associated with the valley corridor and are located entirely on the tableland portion of the subject property. An extensive enhancement planting plan has been submitted with this application for the buffer area to improve the ecological condition of the valley corridor. The proposed development is located entirely outside of the Regional Floodplain.

Page 120: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

120

Control of Flooding:The subject property is located outside of the Regional Floodplain. As such, no impacts to the storage and/or conveyance of flood waters are anticipated.

Pollution:Appropriate erosion and sediment controls will be installed and maintained throughout all phases of construction.

Dynamic Beaches:Not applicable.

Erosion:There are no geotechnical and/or slope stability concerns associated with this project.

Conservation of Land:No significant vegetation will be removed as a result of construction. However, an extensive enhancement planting plan has been submitted with this application for the buffer area in order to improve the ecological condition of the adjacent valley corridor.

PlantingsAll proposed plant species will be native and non-invasive consistent with TRCA's guidelines.

Policy Guidelines:The proposed works are consistent with Section 4.2.2 (C) - Minor Additions - of the Authority's Valley and Stream Corridor Management Program (VSCMP).

CFN: 49035 - Application #: 0235/13/MISSReport Prepared by: Adam Miller, extension 5244For information contact: Adam Miller, extension 5244Date: April 29, 2013

CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA]

EX10.37 303 LAKE PROMENADETo construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 40, Plan 2180, (303 Lake Promenade), in the City of Toronto (Etobicoke York Community Council Area), Waterfront Watershed. The purpose is to construct a three storey replacement dwelling with terrace, and covered and enclosed swimming pool with hot tub at 303 Lake Promenade in the City of Toronto (Etobicoke York Community Council Area).

Page 121: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

121

The permit will be issued for the period of May 10, 2013 to May 9, 2015.

The documents and plans which form part of this permit will be listed in a separate report

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The applicant seeks permission to develop within a TRCA Regulated Area of the Lake Ontario Waterfront in order to facilitate the construction of a three storey replacement dwelling with terrace and covered and enclosed swimming pool with hot tub at 303 Lake Promenade. The existing dwelling is to be demolished. The subject site is located east of Browns Line and south of Lake Shore Boulevard West in the City of Toronto (Etobicoke York Community Council Area).

Control of Flooding:The proposed works are located well above the Lake Ontario flood level and wave up rush allowance. The proposal will have no impact on the storage and/or conveyance of floodwaters.

Pollution:Appropriate erosion and sediment controls will be installed and maintained throughout all phases of construction in order to prevent construction debris from entering Lake Ontario.

Dynamic Beaches:Not applicable

Erosion:There are no slope stability/geotechnical concerns associated with this application.

Page 122: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

122

Conservation of Land:The proposed dwelling including swimming pool and hot tub are adequately setback from the existing shoreline. The entire property is located within a developed community along this portion of the lakefront. There will be no impact to significant natural features, riparian vegetation or fisheries.

PlantingsNative plantings will be provided as per City of Toronto Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented.

Policy Guidelines:This proposal is consistent with Section 3.1 of the Provincial Policy Statement which addresses the management of natural hazards and the need to direct development outside of hazardous areas. This proposal was also evaluated using MNR's Technical Guide for Great Lakes - St. Lawrence River Shorelines.

CFN: 45827 - Application #: 0345/11/TORReport Prepared by: Jessica Bester, extension 5250For information contact: Steve Heuchert, extension 5311Date: April 29, 2013

CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA]

EX10.38 CITY OF TORONTOTo construct, reconstruct, erect or place a building or structure, site grade, and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere, on Donwoods Drive (from Ivor Road to Donino Avenue); Plymbridge Road (from Donwoods Drive to the West Don River); Donwwods Drive (from Donino Avenue to Knightswood Road); Donwwods Grove; and Winton Road, in the City of Toronto (North York Community Council Area), Don River Watershed, as located on property owned by the City of Toronto. The purpose is to undertake road and sewer improvements within the Hoggs Hollow Neighbourhood. Works will include the construction of a new storm sewer system, replacement of watermains and reconstruction of roadways. No in-water works are associated with this project.

Page 123: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

123

The permit will be issued for the period of May 10, 2013 to May 9, 2015.

The documents and plans which form part of this permit will be listed in a separate report

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The City of Toronto is proposing to install a new storm sewer system and reconstruct the majority of roads within the Hoggs Hollow neighbourhood south of the West Don River. Specifically works will be completed on Donwoods Drive from Ivor Road to Donino Avenue, Plymbridge Road from Donwoods Drive to the West Don River, Donwoods Drive from Donino Avenue to Knightswood Road, Donwoods Grove and Winton Road. These works comprise phase III of the recommendations of the Hoggs Hollow Stormwater and Road Improvements Study Environmental Assessment. The purpose of Storm sewer installation will consists of two separate systems. The first will drain into an existing sewer along Donino Drive. This system will service Plymbridge Road from the West Don River to Donwoods Drive, Donwoods Grove and Donwoods Drive from Plymbridge Road to immediately east of Donwoods Groove. The second system will service Donwoods Drive east of Donwoods Grove and Winton Road. Two 200mm exfiltration pipes will be installed along Donwoods Drive and Winton Road. Road side swales will also be constructed along Donwoods Grove and Winton Road. The existing road will be reconstructed with curbs and gutters. Curb cuts are proposed at several locations to direct flows to existing and proposed drainage swales adjacent to the road surface. The existing 150mm watermains on Winton Road will also be removed and replaced. This phase of works is anticipated to be completed in 2013.

Control of Flooding:The proposed works have been designed to improve the existing storm run-off conditions within the area and are anticipated to reduce storm sewer discharge the exfiltration and infiltration. Impacts to flooding, flood storage or conveyance of floodwaters are not anticipated as a result of the proposed.

Page 124: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

124

Pollution:Standard erosion and sediment control measures, including [silt/sediment fencing, catchbasin filters] will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediments from entering the West Don River. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction (2006).

Dynamic Beaches:Not applicable

Erosion:No geotechnical/slope stability issues have been identified.

Conservation of Land:No in-water works are associated with this project.

PlantingsAll disturbed areas will be restored to pre-construction conditions or better upon the completion of works with top soil and sod.

Policy Guidelines:This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Toronto and Region Conservation Authority's Valley and Stream Corridor Management Program.

CFN: 48460 - Application #: 0983/12/TORReport Prepared by: Jonathan Pounder, extension 5304For information contact: Jonathan Pounder, extension 5304Date: April 30, 2013

CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA]

EX10.39 108 FERRIS ROADTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 11, Plan M-630, (108 Ferris Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to construct a in-ground swimming pool, cabana and associated landscaping at 108 Ferris Road in the City of Toronto (Toronto and East York Community Council Area).

Page 125: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

125

The permit will be issued for the period of May 10, 2013 to May 9, 2015.

The documents and plans which form part of this permit will be listed in a separate report

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The applicant seeks permission to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of an in-ground swimming pool, cabana and associated landscaping at 108 Ferris Road. The subject site is located west of Victoria Park Avenue and south of St. Clair Avenue East in the City of Toronto (Toronto and East York Community Council Area). The property is regulated as it is located within the valley corridor and contains the top of valley slope.

Control of Flooding:The site is not located within a regional storm flood plain and the proposal will have no impact on the storage and/or conveyance of floodwaters.

Pollution:Appropriate erosion and sediment controls will be installed and maintained throughout all phases of construction.

Dynamic Beaches:Not applicable

Erosion:A geotechnical slope stability report has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report.

Page 126: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

126

Conservation of Land:TRCA staff are satisfied that there will be no geotechnical/slope stability issues associated with the completed works.

PlantingsNative plantings will be provided as per City of Toronto Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented.

Policy Guidelines:The proposal is consistent with Section 4.2.2.(E) - Development Guidelines for Property Improvements and Ancillary Structures within Non-Established/Highly Urbanized Areas of the TRCA’s Valley and Stream Corridor Management Program.

CFN: 48281 - Application #: 0865/12/TORReport Prepared by: Jessica Bester, extension 5250For information contact: Steve Heuchert, extension 5311Date: April 29, 2013

CITY OF VAUGHAN

EX10.40 16 JAYLYNN COURTTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 10, Plan 65M-3474, (16 Jaylynn Court), in the City of Vaughan, Humber River Watershed. The purpose is to construct an inground pool within a Regulated Area of the Humber River watershed at 16 Jaylynn Court in the City of Vaughan.

The permit will be issued for the period of May 10, 2013 to May 9, 2015.

The documents and plans which form part of this permit will be listed in a separate report

Page 127: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

127

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The purpose is to construct an inground pool within a Regulated Area of the Humber River watershed. The subject property is located along the edge of the valley wall of a draw feature associated with the Main Humber River valley. Based upon a site visit conducted by TRCA staff, the main top-of-slope of the draw feature is located approximately 1 metre from the side property boundary. The slope is relatively steep (approximately 2 horizontal : 1 vertical) and surface runoff has caused minor erosion near the top-of-slope. TRCA Geotechnical Staff are satisfied that the proposed works are located far enough away from the slope (approximately 7 metres) and will not negatively impact the slope or cause further erosion.

The proposed works are located within an already disturbed sodded area, there will be no removal of significant vegetation.

Control of Flooding:The subject property is not located within the Regional Storm Flood Plain, there will be no impacts on the storage or conveyance of flood waters.

Pollution:Erosion and sediment control fencing will be erected and maintained for the duration of construction to prevent the transport of sediment into the adjacent draw feature.

Dynamic Beaches:Not applicable.

Erosion:TRCA Geotechnical Staff are satisfied that the proposed works have been adequately setback from the slope feature and will not adversely impact the stability of the valley wall.

Conservation of Land:As a watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project.

PlantingsAll disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features.

Policy Guidelines:The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program.

CFN: 48957 - Application #: 0207/13/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: June Little, extension 5756Date: April 23, 2013

Page 128: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

128

EX10.41 209 GLENFOREST DRIVETo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 5, Plan 65M-3447, (209 Glenforest Drive), in the City of Vaughan, Don River Watershed. The purpose is to construct an inground pool, retaining wall and conduct minor grading works within a Regulated Area of the Don River watershed at 209 Glenforest Drive in the City of Vaughan.

The permit will be issued for the period of May 10, 2013 to May 9, 2015.

The documents and plans which form part of this permit will be listed in a separate report

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The purpose is to construct an inground pool, retaining wall and conduct minor grading works within a Regulated Area of the Don River watershed. The subject property is located along the valley wall of a tributary of the East Don River but well away from the watercourse (approximately 30 metres).

Based upon a Site Visit conducted by TRCA staff, the property contains a slope approximately 3 metres from the rear of the existing dwelling. The proposed works are located within a generally flat, already disturbed area between the bottom of the slope feature and the rear property line. In order to provide sufficient amenity space to accommodate the proposed pool, a retaining wall is required along the slope, which is also in an already disturbed state devoid of significant vegetation. The retaining wall has been engineer designed and will have a height of approximately 2.4 metres. TRCA geotechnical staff are satisfied that the proposed wall will not have an adverse impact on the stability of the surrounding slope feature / valley wall.

Page 129: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

129

Control of Flooding:The subject property is not located within the Regional Storm Flood Plain. There will be no impacts on the storage or conveyance of flood waters.

Pollution:Sediment control fencing will be erected and maintained for the duration of construction to prevent the transport of sediment off of the subject property into the adjacent valley system.

Dynamic Beaches:Not applicable.

Erosion:TRCA Geotechnical Staff are satisfied that the proposed grading works and retaining wall have been adequately designed and will not result in an adverse impacts on the stability of the slope / valley wall.

Conservation of Land:As a watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project.

PlantingsAll disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features.

Policy Guidelines:The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program.

CFN: 48326 - Application #: 0877/12/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: June Little, extension 5756Date: April 23, 2013

TOWN OF CALEDON

EX10.42 HALCO HOLDINGS LTD.To construct, reconstruct, erect or place a building or structure and site grade on Lot 1, 2, Plan 959, (195 Healey Road), in the Town of Caledon, Humber River Watershed as located on the property owned by Halco Holdings Limited. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of an addition to an existing industrial warehouse facility associated with a municipal site plan application.

Page 130: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

130

The permit will be issued for the period of May 10, 2013 to May 9, 2015.

The documents and plans which form part of this permit will be listed in a separate report

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a 10,000 sq. ft. addition to the existing industrial warehouse facility and parking lot expansion at 195 Healey Road, in the Town of Caledon associated with a municipal site plan application (Town File No. SPA 12-116). The 0.78 ha lot was created through the registration of an industrial draft plan of subdivision application (Plan 43M-418 and 43M-419). A stream corridor of the Humber River Watershed traverses the northwest portion of the subject property. The proposed works are sufficiently setback from the edge of the stream corridor and are located entirely on the tableland portion of the subject property. An extensive enhancement planting plan has been submitted with this application to improve the ecological condition of the stream corridor. The proposed development is located entirely outside of the Regional Floodplain.

Control of Flooding:The proponent has confirmed that the upstream drainage area for this site is approximately 6 ha. Given that the upstream drainage area is relatively small (i.e., less than 50 ha), TRCA Water Resources staff do not anticipate flooding on the property and no impacts to the storage and/or conveyance of flood waters are anticipated.

Pollution:Appropriate erosion and sediment controls will be installed and maintained throughout all phases of construction.

Dynamic Beaches:Not applicable.

Page 131: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

131

Erosion:There are no geotechnical and/or slope stability concerns associated with this project.

Conservation of Land:No significant vegetation will be removed as a result of construction. However, an extensive enhancement planting plan has been submitted with this application in order to improve the ecological condition of the adjacent stream corridor.

PlantingsAll proposed plant species will be native and non-invasive consistent with TRCA's guidelines.

Policy Guidelines:The proposed works are consistent with Section 4.2.2 (C) - Minor Additions - of the Authority's Valley and Stream Corridor Management Program (VSCMP).

CFN: 49041 - Application #: 0245/13/CALReport Prepared by: Adam Miller, extension 5244For information contact: Adam Miller, extension 5244Date: April 29, 2013

EX10.43 KING MASONRYTo construct, reconstruct, erect or place a building or structure and site grade on Lot 11, Concession 5, (14025 Humber Station Road), in the Town of Caledon, Humber River Watershed as located on the property owned by King Masonry. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new office building, storage building and to permit the existing courier service use and to include permission for the lands to be used for a masonry sales establishment, which displays and warehouses masonry products for sale to the public, associated with municipal planning approvals.

Page 132: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

132

The permit will be issued for the period of May 10, 2013 to May 9, 2015.

The documents and plans which form part of this permit will be listed in a separate report

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new office building (approximately 500 sq. m), storage building (approximately 950 sq. m) and to permit the lands to be used for a masonry sales establishment, which displays and warehouses masonry products for sale to the public at 14025 Humber Station Road, in the Town of Caledon, associated with an official plan amendment (Town File No. POPA 12-02), zoning by-law amendment (Town File No. RZ 12-04) and site plan application (Town File No. SPA 13-31). The subject property is located east of Humber Station Road, north of King Street West, in the Village of Bolton. A tributary of the Humber River Watershed traverses the eastern portion of the subject property. The proposed works are sufficiently setback from the edge of the stream corridor and are located entirely on the tableland portion of the subject property. The implementing zoning by-law has accurately rezoned the stream corridor and buffer area in a suitable zoning category (i.e., EPA1) to prohibit development and structural encroachment and ensure the long-term preservation of the lands in perpetuity. An extensive enhancement planting plan has been submitted with this application to improve the ecological condition of the stream corridor. The proposed development is located entirely outside of the Regional Floodplain.

Control of Flooding:Through the official plan and zoning by-law amendment application review, the proponent completed and submitted a flood analysis for the stream corridor traversing the subject property. The report concludes that the Regional flows will be contained within the embankments of the stream corridor channel during a Regional Storm event. As such, the proposed works are located outside of the Regional Floodplain and no impacts to the storage and/or conveyance of flood waters are anticipated.

Pollution:Appropriate erosion and sediment controls will be installed and maintained throughout all phases of construction.

Dynamic Beaches:Not applicable.

Erosion:There are no geotechnical and/or slope stability concerns associated with this project.

Conservation of Land:No significant vegetation will be removed as a result of construction. However, an extensive enhancement planting plan has been submitted with this application in order to improve the ecological condition of the stream corridor traversing the subject property.

Page 133: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

133

PlantingsAll proposed plant species will be native and non-invasive consistent with TRCA's guidelines.

Policy Guidelines:The proposed works are consistent with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP).

CFN: 49038 - Application #: 0242/13/CALReport Prepared by: Adam Miller, extension 5244For information contact: Adam Miller, extension 5244Date: April 29, 2013

EX10.44 MILL LANETo construct, reconstruct, erect or place a building or structure on Part Lot 22, Concession 4, (Mill Lane), in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within the TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a single family home, driveway, septic system, geothermal system, deck and solar panel associated with a municipal building permit.

The permit will be issued for the period of May 10, 2013 to May 9, 2015.

The documents and plans which form part of this permit will be listed in a separate report

RATIONALEThe application was reviewed by staff on the basis of the following information:

Page 134: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

134

Proposal:The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a single family home, driveway, septic system, geothermal system, deck and solar panel associated with a municipal building permit. The subject property is located on the Oak Ridges Moraine within the Countryside Area and Natural Core land use designations of the Oak Ridges Moraine Conservation Plan (ORMCP) and is within the TRCA's 120 metre Regulatory allowance of a wetland, which is located on the south portion of the property. The proposed development is located on the tableland portion of the subject property, and is located outside of the Regional Storm Floodplain. Additionally, the area where development is proposed does not contain any significant natural features. There are no geotechnical or ecology related concerns related to this development.

Control of Flooding:The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and/or conveyance of flood waters are anticipated.

Pollution:Appropriate sediment and erosion controls (i.e., sediment control fence) have been proposed with this application, and will be installed and maintained throughout all phases of construction.

Dynamic Beaches:Not applicable

Erosion:There are no geotechnical and/or slope stability concerns anticipated with this project.

Conservation of Land:No significant vegetation will be removed as a result of this project. Additionally, there are no fisheries concerns related with these works.

PlantingsTRCA Restoration Services are undertaking the proposed planting project as part of their 2013 Planting Projects. All proposed plantings are native and non-invasive consistent with TRCA's guidelines.

Policy Guidelines:This proposal is in conformity with Section 4.1.1 – New Urban Development, of the Authority’s Valley and Stream Corridor Management Program (VSCMP).

CFN: 49104 - Application #: 0301/13/CALReport Prepared by: Anant Patel, extension 5618For information contact: Leilani Lee-Yates, extension 5370Date: April 30, 2013

Page 135: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

135

TOWN OF RICHMOND HILL

EX10.45 TOWN OF RICHMOND HILLTo construct, reconstruct, erect or place a building or structure, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse in Wood's Park in the Town of Richmond Hill, Don River Watershed as located on the property owned by Town of Richmond Hill. The purpose is to undertake construction of a pedestrian bridge to replace an existing bridge located over a tributary of the East Don River within Wood's Park approximately 55m downstream of Castle Rock Drive in the Town of Richmond Hill, Don River Watershed as located on the property owned by the Town of Richmond Hill. The Redside Dace fisheries timing window will apply to this project unless otherwise specified in writing by Ministry of Natural Resources (MNR). A letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO).

The permit will be issued for the period of May 10, 2013 to May 9, 2015.

The documents and plans which form part of this permit will be listed in a separate report

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The proposal involves the construction of a pedestrian bridge to replace an existing bridge which was removed due to safety concerns. Creek and bank restoration works are proposed to address abutment removal and erosion issues at the existing bridge site. The bridge is located over a tributary of the East Don River within Wood's Park in the Town of Richmond Hill, Don River Watershed, Regional Municipality of York. The proposal is to locate the new bridge across a straighter, more stable section approximately 20m downstream of the existing abutments.

Page 136: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

136

Control of Flooding:The proposed project is not anticipated to impact flooding, conveyance or storage of floodwaters.

Pollution:Standard erosion and sediment control measures, including (coffer dams, Filtrexx Siltsoxx, filter bag or sediment trap with splash pad) will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediments from entering any watercourse. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction.

Dynamic Beaches:Not applicable

Erosion:Slope stability issues will be addressed with the implementation of the proposed bank restoration works.

Conservation of Land:With erosion and sediment control measures in effect, the potential for Harmful, Alteration Disruption or Destruction (HADD) to fish habitat will be mitigated. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). The Redside Dace fisheries timing window of July 1 to September 15 will apply to this proposal unless otherwise specified in writing by MNR.

PlantingsAll disturbed areas will be stabilized and restored immediately following construction using native and non-invasive species.

Policy Guidelines:This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Toronto and Region Conservation Authority's Valley and Stream Corridor Management Program.

CFN: 48472 - Application #: 1002/12/RHReport Prepared by: Leah Chishimba, extension 5744For information contact: Leah Chishimba, extension 5744Date: April 30, 2013

EX10.46 ZAVALA DEVELOPMENTS INC.To temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 60, Concession 1 WYS, (Drynnoch Estates Phase 3 West, north of Jefferson Sideroad), in the Town of Richmond Hill, Rouge River Watershed as located on the property owned by Zavala Developments Incorporated. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the cleanout of an existing stormwater management pond in the Town of Richmond Hill.

Page 137: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

137

The permit will be issued for the period of May 10, 2013 to May 9, 2015.

The documents and plans which form part of this permit will be listed in a separate report

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The purpose of this application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the cleanout of an existing stormwater management pond associated with a residential plan of subdivision in the Town of Richmond Hill. The existing stormwater management pond, located west of Yonge Street and immediately north of Jefferson Sideroad, treats stormwater from the adjacent Drynoch Estates Phase 3 West residential subdivision. The pond outlets to a tributary of the Rouge River Watershed immediately south of Jefferson Sideroad. Appropriate erosion and sediment controls will be in place during construction to minimize impacts to the downstream tributary. In addition, the works are located on tableland and are outside of the Regional Floodplain. There are no ecology, geotechnical, or flooding related concerns with this proposal.

Control of Flooding:The proposed works are located outside of the Regional Storm Floodplain. As such, there are no anticipated impacts to the storage and/or conveyance of flood waters.

Pollution:Appropriate erosion and sediment controls are proposed with this application.

Dynamic Beaches:Not applicable.

Erosion:There are no geotechnical and/or slope stability concerns anticipated with this project.

Page 138: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

138

Conservation of Land:The pond location is void of any significant vegetation. In addition, there are no fisheries related concerns associated with this project.

PlantingsGiven that no significant vegetation is to be removed with this application, no plantings have been required at this time.

Policy Guidelines:This proposal is in conformity with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Plan (VSCMP).

CFN: 49073 - Application #: 0264/13/RHReport Prepared by: Jason Wagler, extension 5743For information contact: Jason Wagler, extension 5743Date: April 30, 2013

TOWNSHIP OF KING

EX10.47 12800 8TH CONCESSIONTo construct, reconstruct, erect or place a building or structure and change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 3 - 5, Concession 8, (12800 8th Concession), in the Township of King, Humber River Watershed. The purpose is to construct an addition to an existing dwelling within a Regulated Area of the Humber River watershed at 12800 8th Concession in the Township of King.

The permit will be issued for the period of May 10, 2013 to May 9, 2015.

The documents and plans which form part of this permit will be listed in a separate report

Page 139: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

139

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The purpose is to construct an addition to an existing dwelling within a Regulated Area of the Humber River watershed. The majority of the subject property is located within the valley corridor of the East Humber River. The existing dwelling is located in close proximity to the valley wall and near well vegetated areas that are contiguous with the valley system. The proposed addition is located within an already disturbed sodded area and would not require the removal of any significant vegetation.

Based upon a site visit conducted by TRCA staff on January 9, 2013, TRCA Geotechnical staff are satisfied that the proposed addition is adequately setback from the top-of-slope (approximately 10 metres). TRCA staff note that the addition is located within an area identified by TRCA as being an Environmentally Significant Area (ESA); however, as there are no other feasible alternatives for the location of the addition and the works are located within an already disturbed area and will not result in the removal of any significant vegetation, TRCA Ecology staff are satisfied that the proposal will not have an adverse impact on the integrity of the natural feature. Furthermore, a restoration planting plan has been provided as part of this application to provide an ecological buffer between the residential use and the natural feature.

Control of Flooding:The proposed works are not located within the Regional Storm Flood Plain. There will be no impacts on the storage and conveyance of flood waters.

Pollution:Sediment control fencing will be erected and maintained for the duration of construction to prevent the transport of sediment into the natural feature and valley system.

Dynamic Beaches:Not applicable.

Erosion:TRCA Geotechnical staff are satisfied that the proposed works are adequately setback from the top-of-slope and will not have an adverse impact on the valley wall.

Conservation of Land:As a watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project.

PlantingsA restoration planting plan included as part of this permit application, composed of native, non-invasive plantings will provide an ecological buffer between the residential uses and the natural feature.

Policy Guidelines:The proposal is consistent with Section 4.2.2 C) - Minor Additions - of the Authority's Valley and Stream Corridor Management Program.

Page 140: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

140

CFN: 49092 - Application #: 0284/13/KINGReport Prepared by: Anthony Sun, extension 5724For information contact: June Little, extension 5756Date: April 29, 2013

EX10.48 55 KINGSWORTH ROADTo construct, reconstruct, erect or place a building or structure and site grade on Lot 13, Plan 473, (55 Kingsworth Road), in the Township of King, Humber River Watershed. The purpose is to construct a replacement dwelling, replacement septic system, cabana, inground pool and detached garage within a Regulated Area of the Humber River watershed at 55 Kingsworth Road in the Township of King.

The permit will be issued for the period of May 10, 2013 to May 9, 2015.

The documents and plans which form part of this permit will be listed in a separate report

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The purpose is to construct a replacement dwelling and associated replacement septic system within a Regulated Area of the Humber River watershed. The subject property is almost entirely within a Wetland Area of Interference and a portion of the property is located within the Regional Storm Flood Plain of a tributary of the East Humber River which is directly adjacent to the property. The Estimated Regional Storm Flood Elevation for the property is 285.74 metres above sea level (m.a.s.l.).

Page 141: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

141

The previously existing dwelling (which was destroyed by fire) was located approximately 6 metres away from the Estimated Flood Plain. As the replacement dwelling will maintain this setback from the flood plain, there will be no increase in the risk to life and property resulting from this re-development proposal. The proposed dwelling is the closest structure to the flood plain, all other proposed works are located further away from the flood plain.

All of the proposed works are located within already disturbed sodded areas or over the footprint of the previous existing dwelling and will not result in the removal of any significant vegetation.

Control of Flooding:The proposed works are not located within the Regional Storm Flood Plain. There will be no impacts on the storage or conveyance of flood waters.

Pollution:Sediment control fencing will be erected and maintained for the duration of construction to prevent the transport of sediment into the wetland and stream corridor located adjacent to the property.

Dynamic Beaches:Not applicable.

Erosion:There are no geotechnical issues associated with this application.

Conservation of Land:As a watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project.

PlantingsAll disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features.

Policy Guidelines:The proposal is consistent with Section 4.2.2 D) - Replacement Structures and 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program.

CFN: 49087 - Application #: 0279/13/KINGReport Prepared by: Anthony Sun, extension 5724For information contact: June Little, extension 5756Date: April 29, 2013

Page 142: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

142

EX10.49 13195 CALEDON-KING TOWNLINE SOUTHTo construct, reconstruct, erect or place a building or structure on , (13195 Caledon-King Townline South), in the Township of King, Humber River Watershed. The purpose is to recognize a concrete pad and cabana constructed within a Regulated Area of the Humber River watershed at 13195 Caledon-King Townline South in the Township of King.

The permit will be issued for the period of May 10, 2013 to May 9, 2015.

The documents and plans which form part of this permit will be listed in a separate report

RATIONALEThe application was reviewed by staff on the basis of the following information:

Proposal:The purpose is to recognize an existing concrete pad and cabana constructed within a Regulated Area of the Humber River watershed. The subject property is located on a peninsula which extends into the Main Humber River valley corridor. Based upon a site visit conducted by TRCA staff, the existing dwelling is located near the tip of the peninsula and is surround by relatively steep slopes. The newly constructed concrete pad and cabana are located between an existing inground pool and a detached garage. The existing inground pool was constructed prior to the TRCA regulation of the property and the existing detached garage had previously been approved by the TRCA (Permit No. C-09330, issued June 12, 2009).

The concrete pad and cabana subject of this permit application are located approximately 1.5 metres away from the top-of-slope of the valley wall which at this location has an approximately 2.5 horizontal : 1 vertical configuration and is generally well vegetated. Based upon the site visit, TRCA Geotechnical Staff are satisfied that these works will not have an adverse impact on the stability of the slope.

Fee:As the works were conducted prior to the issuance of a permit under Ontario Regulation 166/06, an additional administrative fee has been applied to this application.

Page 143: Meeting - Executive Committee - Toronto and Region ...trca.on.ca/dotAsset/159887.pdfEX8.2 HVAC RETROFITS, DUCT CLEANING AND AIR QUALITY TESTING Award of Sole Source Contract for HVAC

143

Timing:As the works have already been completed, the expiry date of this permit has been modified.

Control of Flooding:The subject property is not located within the Regional Storm Flood Plain. There will be no impacts on the storage or conveyance of flood waters.

Pollution:There are no pollution related issues associated with this application.

Dynamic Beaches:Not applicable.

Erosion:TRCA Geotechnical Staff are satisfied that the existing concrete pad and cabana will not impact the stability of the slope feature.

Conservation of Land:As a watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project.

PlantingsAll disturbed areas have been restored to the previous existing sodded condition and will not affect any significant natural features.

Policy Guidelines:The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program.

CFN: 49030 - Application #: 0239/13/KINGReport Prepared by: Anthony Sun, extension 5724For information contact: June Little, extension 5756Date: April 23, 2013


Recommended