Minnesota Department of Transportation MEMO Office of Materials Mailstop 645 1400 Gervais Avenue Maplewood, MN 55109 Date: July 31, 2008 To: Robert Evbayekha, Final Design Waters Edge From: Jeff Narr, Graduate Engineer 1 Geotechnical Engineering Section Concur: Gary Person, Foundations Engineer Geotechnical Engineering Section Concur: Rich Lamb, Foundations Project Engineer Geotechnical Engineering Section Subject: S.P. 6241-51 TH 280 Retaining Wall 2 Located between Larpenteur Avenue and Broadway Street Foundations Investigation & Recommendations Project Description This letter provides for a foundation analysis and recommendations for constructing Retaining Wall 2 as part of the Larpenteur Avenue bridge construction in St. Paul. The new wall will be constructed to retain soils on the east side of TH 280 NB. Field Investigation and Foundation Conditions Four foundation borings were taken at this site in May 2008 by Braun Intertec. The foundation soils at the proposed wall location consist of sand and gravel. Please see the attached boring logs for a more detailed description of the foundation soils. Foundation Analysis Existing ground lines, bottom of footing, and top of wall elevations were determined from preliminary plan and profile sheets (see attached wall profile). Spread Footing Bearing Capacity Bearing capacities were calculated for the foundation soils and compared with the required base pressures listed in the Bridge Design Manual for the equivalent retaining wall heights. For this analysis we assumed a 2 ft. live load surcharge loading case. Based on our analysis, the foundation soils from Wall Station 10+00 to 13+60 were determined to have adequate bearing capacities to support the wall. Settlement Wall settlements were calculated based on the bearing pressures listed in Mn/DOT’s Bridge Standard Plans Manual using the retaining wall heights. In addition, our analysis was based on a triangular strip loading stress distribution with the load varying from the maximum toe pressure to zero. The wall will settle a
Transcript

Minnesota Department of Transportation MEMO Office of Materials Mailstop 645 1400 Gervais Avenue Maplewood, MN 55109 Date: July 31, 2008

To: Robert Evbayekha, Final Design

Waters Edge From: Jeff Narr, Graduate Engineer 1

Geotechnical Engineering Section

Concur: Gary Person, Foundations Engineer Geotechnical Engineering Section

Concur: Rich Lamb, Foundations Project Engineer

Geotechnical Engineering Section Subject: S.P. 6241-51 TH 280 Retaining Wall 2

Located between Larpenteur Avenue and Broadway Street Foundations Investigation & Recommendations

Project Description This letter provides for a foundation analysis and recommendations for constructing Retaining Wall 2 as part of the Larpenteur Avenue bridge construction in St. Paul. The new wall will be constructed to retain soils on the east side of TH 280 NB. Field Investigation and Foundation Conditions Four foundation borings were taken at this site in May 2008 by Braun Intertec. The foundation soils at the proposed wall location consist of sand and gravel. Please see the attached boring logs for a more detailed description of the foundation soils. Foundation Analysis Existing ground lines, bottom of footing, and top of wall elevations were determined from preliminary plan and profile sheets (see attached wall profile). Spread Footing Bearing Capacity Bearing capacities were calculated for the foundation soils and compared with the required base pressures listed in the Bridge Design Manual for the equivalent retaining wall heights. For this analysis we assumed a 2 ft. live load surcharge loading case. Based on our analysis, the foundation soils from Wall Station 10+00 to 13+60 were determined to have adequate bearing capacities to support the wall. Settlement Wall settlements were calculated based on the bearing pressures listed in Mn/DOT’s Bridge Standard Plans Manual using the retaining wall heights. In addition, our analysis was based on a triangular strip loading stress distribution with the load varying from the maximum toe pressure to zero. The wall will settle a

S.P. 6241-51 TH 280 Ret. Wall 1 Foundations Investigation & Recommendations 7/31/2008

2

maximum of 1 in. at the toe during construction and backfilling operations. In addition, differential settlement from one wall panel to the next should be limited to ½ in. or less. Recommendations Based on the existing conditions along with an analysis of the project soils, we recommend that:

1. Topsoil and other organic material should be removed from areas where fill is to be placed.

2. The wall should be subcut and backfilled according to the attached

Diagram F-1 (Structural Backfill, Footing Subcut & Drainage System Treatment).

3. Footings should be buried a minimum of 4.5 ft. below the final ground

line for frost protection.

4. If the foundation soils found in the field during construction differ from those described in this report, please contact our office for revised foundation recommendations.

Attachments: Boring Logs STRW2-1, STRW2-2, STRW2-3, STRW2-4 (Unique Numbers: 70695 -70698) Boring Plan, Wall Profile, Diagram No. F-1, Boring Index Sheet cc: G. Engstrom D. VanDeusen E. Embacher File

10

10

1000’

RA

DIU

S

STRW2-2

STRW2-1

STRW2-3

STRW2-4

Retaining Wall 2

B1 B2

B3B4

B5B6

1

2

3

4

5

6 7

TOP OF RETAINING WALL

TOP OF FOOTING

BOTTOM OF FOOTING

RETAINING WALL RW2

Coh SPTpl SANDY LOAM, dk

brown, moist, fill

SAND & GRAVEL, w/

moist to dry, dense

moist, meddense

SAND & GRAVEL, brn,

moist, meddense to

dense

moist, meddense to

dense

Bottom of Hole - 31’

No water encountered

or measured during

drilling

Borehole backfilled

48

44

35

36

28

43

27

21

27

19

40

52

STRW2-1 - #70695 - 932.6

890

SAND, w/ a little G, brn,

SAND, w/ a little G, brn,

thin layers of Clay, brn,

Coh SPT 9" of BIT over 9" of

AGG

pl SANDY LOAM, w/G,

dk brn and brn, moist

SAND & GRAVEL, w/

some Bldr, brn, moist,

dense to meddense

SAND, w/G, brn, moist,

dense

Bottom of Hole - 26’

Borehole then

backfilled

37

79

30

16

20

34

34

37

34

33

STRW2-2 - #70696 - 933.1

950

940

930

920

910

900

10+0011+00

12+00

950

940

930

920

910

900

B7

B8

B9 B10

B11

8

9

1011

12

Coh SPT12" of BIT over 8" of

AGG

pl SANDY LOAM, w/G,

dk brn, moist

SAND, w/G and some

Bldr, lt brn, moist,

meddense

SAND & GRAVEL, w/

some Bldr, brn, moist,

meddense

SAND & GRAVEL, w/

some Bldr, brn, moist,

loose to meddense

Auger and sampler

refusal at 27’

Borehole then

backfilled

21

15

28

19

10

15

22

15

25

23

50/.05

STRW2-3 - #70697 - 936.1

INPLACE GROUND

Coh SPT 11" of BIT over 8" of

AGG

F SAND, w/G, w/3" of

Clay Loam, lt brn,

moist, loose, fill

nonpl SANDY LOAM,

w/G, dk brn, moist,

meddense, fill

F SAND, lt brn, moist,

meddense

SAND & GRAVEL w/

some Bldrs, brn, moist,

dense to meddense

Bottom of Hole - 16’

Borehole then

backfilled.

9

20

44

18

54

30

STRW2-4 - #70698 - 937.9

950

940

930

920

910

900

12+00 13+00 14+00

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

STRUCTURAL BACKFILL, FOOTING SUBCUT & DRAINAGE SYSTEM TREATMENT

(STANDARD CANTILEVER RETAINING WALL DESIGN)�PU�PU

PREPARED BY THE FOUNDATIONS UNIT

DIAGRAM NO.

VARIABLE BACKSLOPE

NOT TO SCALE

MINNESOTA

DE

PA

RT

ME

NT OF TRANS

PO

RT

ATIO

N

1A

1B

OR

OR

Weep Hole

2

1.5’

Version

2:1

2:1

All slope dimensions shown as V:H

2:1

F-1

For STANDARD CANTILEVER RETAINING WALLS with water tables at or below the

footing (or pile cap) elevation, the DRAINAGE SYSTEM should consist of one

of the following:

1. A 4" I.D. Non-steel Perforated Pipe (Mn/DOT Spec. 3245) wrapped

A) the top of the footing (or pile cap) and directly

behind the stem of the wall, or

B) the bottom elevation of the footing (or pile cap)

and directly behind the footing (or pile cap)...

completely surrounding the pipe. At all times, the slope of the pipe

should be checked to ensure positive drainage. Frequent ties (spaced

approximately 200 feet apart) should be made from the pipe to the

inplace or proposed drainage system ( subdrain or storm sewer) in the

area. OR

with any modifications as per the attached memorandum.

THE DRAINAGE SYSTEM

with a Type 1 geotextile fabric (Mn/DOT Spec. 3733 ) running the

with structural backfill material (as specified for behind the wall)

entire length of the wall and laid a minimum of 2 in. above...

2. Provide WEEP HOLES as specified in the Bridge Standard Plans Manual,

Standard Sheet No. 5-395.200 to 5-395.205 Wall Reinforcement dated March 14, 1996

2:1 2:

1

1.5’

November 2005

GEOTECHNICAL ENGINEERING SECTION - OFFICE OF MATERIALS

NOTE: THE RECOMMENDATIONS MAY

BE MODIFIED AS PER THE ATTACHED

MEMORANDUM.

IF SUBCUT IS REQUIRED, BACKFILL WITH

GRANULAR BORROW, Mn/DOT SPEC. 3149.2B1

COMPACT BACKFILL TO 100% OF

STANDARD PROCTOR (T-99)

Mn/DOT SPEC. 3149.2B2

MODIFIEDTO 10% PASSING

THE NO. 200 SIEVE COMPACT

BACKFILL TO SPECIFIED

DENSITY METHOD Mn/DOT

SPEC. 2105.3F1

MINIMUM LIMITS OF

WEDGE OF SPECIFIED

BACKFILL MATERIAL

PAY LIMITS FOR STRUCTURAL EXCAVATION

WHEN A SUBCUT IS REQUIRED. ACTUAL

EXCAVATION SLOPE IS DETERMINED BY

OSHA REGULATIONS AND IN-SITU SOILS.

4.5’

FINAL SLOPE TO BE

DETERMINED BY ROAD DESIGN

ANY SUITABLE

BACKFILL MATERIAL

ANY SUITABLE

BACKFILL MATERIAL

Vane Shear Test Washed Sample (Collected during plug drilling)

Minnesota Department of Transportation Geotechnical Section

Boring Log Descriptive Terminology (English Units)

USER NOTES, ABBREVIATIONS AND DEFINITIONS - Additional information available in Geotechnical Manual. This boring was made by ordinary and conventional methods and with care deemed adequate for the Department's design purposes. Since this boring was not taken to gather information relating to the construction of the project, the data noted in the field and recorded may not necessarily be the same as that which a contractor would desire. While the Department believes that the information as to the conditions and materials reported is accurate, it does not warrant that the information is necessarily complete. This information has been edited or abridged and may not reveal all the information which might be useful or of interest to the contractor. Consequently, the Department will make available at its offices, the field logs relating to this boring. Since subsurface conditions outside each borehole are unknown, and soil, rock and water conditions cannot be relied upon to be consistent or uniform, no warrant is made that conditions adjacent to this boring will necessarily be the same as or similar to those shown on this log. Furthermore, the Department will not be responsible for any interpretations, assumptions, projections or interpolations made by contractors, or other users of this log. Water levels recorded on this log should be used with discretion since the use of drilling fluids in borings may seriously distort the true field conditions. Also, water levels in cohesive soils often take extended periods of time to reach equilibrium and thus reflect their true field level. Water levels can be expected to vary both seasonally and yearly. The absence of notations on this log regarding water does not necessarily mean that this boring was dry or that the contractor will not encounter subsurface water during the course of construction. WATER MEASUREMENT

Augered Plug Drilled Split Tube Sample (SPT N60 2 in. spilt tube with liners) Thin Wall Sample (3 in. Shelby Tube) Core Drilled (NV Core Barrel unless otherwise noted) Continuous Soil Sample Augered & Jetted Jetted Augered & Plug Drilled

WS

PD

CS

A/J Jet A/P

AB ........................ After Bailing AC ........................ After Completion AF......................... After Flushing w/C ....................... with Casing

Index Sheet No. 3.0 March 2003 G:\geotech\Public\Forms\INDEX30.doc

w/M ...................... with Mud WSD ..................... While Sampling/Drilling w/AUG.................. with Hollow Stem Auger MISCELLANEOUS NA ........................ Not Applicable w/ ......................... with w/o ....................... with out sat ........................ saturated DRILLING OPERATIONS AUG ................. Augered CD .................... Core Drilled DBD.................. Disturbed by Drilling DBJ .................. Disturbed by Jetting PD .................... Plug Drilled ST..................... Split Tube (SPT test) TW.................... Thinwall (Shelby Tube) WS.................... Wash Sample NSR.................. No Sample Retrieved

WH ................... Weight of Hammer WR ................... Weight of Rod Mud.................. Drilling Fluids in Sample CS .................... Continuous Sample SOIL/CORE TESTS SPT N60 ............ ASTM D1586 Modified Blows per foot with 140 lb. hammer and a standard energy of 210 ft-lbs. This energy represents 60% of the potential energy of the system and is the average energy provided by a Rope & Cathead system. MC.................... Moisture Content COH ................. Cohesion γ ....................... Sample Density LL..................... Liquid Limit PI...................... Plasticity Index Φ ...................... Phi Angle REC.................. Percent Core Recovered RQD ................. Rock Quality Description (Percent of total core interval consisting of unbroken pieces 4 inches or longer) ACL .................. Average Core Length (Average length of core that is greater than 4 inches long) Core Breaks .... Number of natural core breaks per 2-foot interval. DISCONTINUITY SPACING Fractures Distance Bedding Very Close........ <2 inches ............Very Thin Close ................ 2-12 inches .........Thin Mod. Close ....... 12-36 inches .......Medium Wide................. >36 inches ..........Thick DRILLING SYMBOLS

RELATIVE DENSITY Compactness - Granular Soils BPF

very loose....................................0-4 loose ...........................................5-10 medium dense ............................11-24 dense ..........................................25-50 very dense...................................>50

Consistency - Cohesive Soils BPF

very soft.......................................0-1 soft ..............................................2-4 firm ..............................................5-8 stiff ..............................................9-15 very stiff.......................................16-30 hard.............................................31-60 very hard .....................................> 60

COLOR blk .................. Black wht ...........White grn ................. Green brn............Brown orng ............... Orange yel.............Yellow dk ................... Dark lt ...............Light IOS ................. Iron Oxide Stained GRAIN SIZE /PLASTICITY VF............. Very Fine pl ............Plastic F ............... Fine slpl .........Slightly Cr ............. Coarse Plastic SOIL/ROCK TERMS C............... Clay Lmst .......Limestone L ............... Loam Sst ..........Sandstone S............... Sand Dolo........Dolostone Si.............. Silt wx...........weathered G .............. Gravel (No. 10 Sieve to 3 inches) Bldr .......... Boulder (over 3 inches) T ............... till (unsorted, nonstratified glacial deposits) Mn/DOT Triangular Textural Soil Classification System

100%

100%

C

90807060 50 40 302010

90

80

70

60

50

40

30

20

10

(plastic)

(slightly plastic)

SC

SCL CL

L SL SiL

Si

SiCL

LSS Si

90

80

70

60

50

40

30

20

10

100 %

% Sand % Clay

% Silt

pl SANDY LOAM, dk brown, moist, fill

SAND & GRAVEL, w/ thin layers of Clay, brn, moist to dry,dense

SAND, w/ a little G, brn, moist, meddense

SAND & GRAVEL, brn, moist, meddense to dense

SAND, w/ a little G, brn, moist, meddense to dense

3

2

1

2

1

3

4

5

2.0930.6

12.0920.6

14.0918.6

19.0913.6

48

44

35

36

28

43

27

21

27

, , ft. LT(ft.)

LocationDrilling

SHEET 1 of 2

Ramsey Co. Coordinate: X=546099 Y=1737207511

Longitude (West)=93°12'18.55"CME Automatic Calibrated 5/8/08Completed

Latitude (North)=44°59'35.37"

Drill Machine

Hammer

Ground Elevation

(Surveyed)MN Trunk Highway 280Trunk Highway/Location Boring No.

6241-51State Project Bridge No. or Job Desc.

STRW2-1 932.6

(%)

U.S. Customary Units

5

10

15

20

25

(%) (ft)

(pcf)N60

FormationREC ACL

Soi

l

Dril

ling

Ope

ratio

n

Lith

olog

y

RQD Core

Index Sheet Code 3.0G:\GINT\PROJECTS-ACTIVE\6241-51_TH280_LARPENTEUR.GPJ

Roc

k

DE

PTH

(psf)MC(%)

Classification

Other Tests

This boring was taken by Braun Intertec under aconsultant contract for Mn/DOT

or Member

UNIQUE NUMBER 70695

(Continued Next Page)

DepthCOH

Soil Class:P. Martin Rock Class: Edit: Date: 7/24/08

Breaks

Or Remarks

Elev.

SPT

MINNESOTA DEPARTMENT OF TRANSPORTATION - GEOTECHNICAL SECTIONLABORATORY LOG & TEST RESULTS - SUBSURFACE EXPLORATION

Borehole offset 3 times dueto refusal on boulders

Auger refusal on boulders at4'Boring offset 6 feet north

Hard drilling 3 to 20 feet

SAND, w/ a little G, brn, moist, meddense to dense (continued)

Bottom of Hole - 31'No water encountered or measured during drillingBorehole backfilled

NSR

4

5

31.0901.6

19

40

52

Ground Elevation

(Surveyed)MN Trunk Highway 280Trunk Highway/Location Boring No.

6241-51State Project Bridge No. or Job Desc.

STRW2-1 932.6

Mn/DOT GEOTECHNICAL SECTION - LOG & TEST RESULTS SHEET 2 of 2

(%)

U.S. Customary Units

30

(%) (ft)

(pcf)N60

FormationREC ACL

Soi

l

Dril

ling

Ope

ratio

n

Lith

olog

y

RQD Core

G:\GINT\PROJECTS-ACTIVE\6241-51_TH280_LARPENTEUR.GPJ

Roc

k

DE

PTH

(psf)MC(%)

Classification

Other Tests

This boring was taken by Braun Intertec under aconsultant contract for Mn/DOT

or Member

UNIQUE NUMBER 70695

DepthCOH

Soil Class:P. Martin Rock Class: Edit: Date: 7/24/08

Breaks

Or Remarks

Elev.

SPT

MINNESOTA DEPARTMENT OF TRANSPORTATION - GEOTECHNICAL SECTIONLABORATORY LOG & TEST RESULTS - SUBSURFACE EXPLORATION

9" of BIT over 9" of AGG

pl SANDY LOAM, w/G, dk brn and brn, moist

SAND & GRAVEL, w/ some Bldr, brn, moist, dense tomeddense

SAND, w/G, brn, moist, dense

1.5931.62.0

931.1

14.0919.1

37

79

30

16

20

34

34

37

34

, , ft. LT(ft.)

LocationDrilling

SHEET 1 of 2

Ramsey Co. Coordinate: X=546040 Y=1738257511

Longitude (West)=93°12'19.38"CME Automatic Calibrated 5/19/08Completed

Latitude (North)=44°59'36.40"

Drill Machine

Hammer

Ground Elevation

(Surveyed)MN Trunk Highway 280Trunk Highway/Location Boring No.

6241-51State Project Bridge No. or Job Desc.

STRW2-2 933.1

(%)

U.S. Customary Units

5

10

15

20

25

(%) (ft)

(pcf)N60

FormationREC ACL

Soi

l

Dril

ling

Ope

ratio

n

Lith

olog

y

RQD Core

Index Sheet Code 3.0G:\GINT\PROJECTS-ACTIVE\6241-51_TH280_LARPENTEUR.GPJ

Roc

k

DE

PTH

(psf)MC(%)

Classification

Other Tests

This boring was taken by Braun Intertec under aconsultant contract for Mn/DOT

or Member

UNIQUE NUMBER 70696

(Continued Next Page)

DepthCOH

Soil Class:P. Martin Rock Class: Edit: Date: 7/24/08

Breaks

Or Remarks

Elev.

SPT

MINNESOTA DEPARTMENT OF TRANSPORTATION - GEOTECHNICAL SECTIONLABORATORY LOG & TEST RESULTS - SUBSURFACE EXPLORATION

Hard drilling surface to 10'depth

SAND, w/G, brn, moist, dense (continued)

Bottom of Hole - 26'Borehole then backfilled

26.0907.1

33

Ground Elevation

(Surveyed)MN Trunk Highway 280Trunk Highway/Location Boring No.

6241-51State Project Bridge No. or Job Desc.

STRW2-2 933.1

Mn/DOT GEOTECHNICAL SECTION - LOG & TEST RESULTS SHEET 2 of 2

(%)

U.S. Customary Units

(%) (ft)

(pcf)N60

FormationREC ACL

Soi

l

Dril

ling

Ope

ratio

n

Lith

olog

y

RQD Core

G:\GINT\PROJECTS-ACTIVE\6241-51_TH280_LARPENTEUR.GPJ

Roc

k

DE

PTH

(psf)MC(%)

Classification

Other Tests

This boring was taken by Braun Intertec under aconsultant contract for Mn/DOT

or Member

UNIQUE NUMBER 70696

DepthCOH

Soil Class:P. Martin Rock Class: Edit: Date: 7/24/08

Breaks

Or Remarks

Elev.

SPT

MINNESOTA DEPARTMENT OF TRANSPORTATION - GEOTECHNICAL SECTIONLABORATORY LOG & TEST RESULTS - SUBSURFACE EXPLORATION

12" of BIT over 8" of AGG

pl SANDY LOAM, w/G, dk brn, moistSAND, w/G and some Bldr, lt brn, moist, meddense

SAND & GRAVEL, w/ some Bldr, brn, moist, meddense

SAND & GRAVEL, w/ some Bldr, brn, moist, loose tomeddense

1.8934.32.0

934.13.0

933.1

11.0925.1

21

15

28

19

10

15

22

15

25

, , ft. LT(ft.)

LocationDrilling

SHEET 1 of 2

Ramsey Co. Coordinate: X=546006 Y=1739637511

Longitude (West)=93°12'19.85"CME Automatic Calibrated 5/19/08Completed

Latitude (North)=44°59'37.77"

Drill Machine

Hammer

Ground Elevation

(Surveyed)MN Trunk Highway 280Trunk Highway/Location Boring No.

6241-51State Project Bridge No. or Job Desc.

STRW2-3 936.1

(%)

U.S. Customary Units

5

10

15

20

25

(%) (ft)

(pcf)N60

FormationREC ACL

Soi

l

Dril

ling

Ope

ratio

n

Lith

olog

y

RQD Core

Index Sheet Code 3.0G:\GINT\PROJECTS-ACTIVE\6241-51_TH280_LARPENTEUR.GPJ

Roc

k

DE

PTH

(psf)MC(%)

Classification

Other Tests

This boring was taken by Braun Intertec under aconsultant contract for Mn/DOT

or Member

UNIQUE NUMBER 70697

(Continued Next Page)

DepthCOH

Soil Class:P. Martin Rock Class: Edit: Date: 7/24/08

Breaks

Or Remarks

Elev.

SPT

MINNESOTA DEPARTMENT OF TRANSPORTATION - GEOTECHNICAL SECTIONLABORATORY LOG & TEST RESULTS - SUBSURFACE EXPLORATION

Borehole offset 15' southHard drilling to bottom of hole

SAND & GRAVEL, w/ some Bldr, brn, moist, loose tomeddense (continued)

Auger and sampler refusal at 27'Borehole then backfilled

27.0909.1

23

50/.05

Ground Elevation

(Surveyed)MN Trunk Highway 280Trunk Highway/Location Boring No.

6241-51State Project Bridge No. or Job Desc.

STRW2-3 936.1

Mn/DOT GEOTECHNICAL SECTION - LOG & TEST RESULTS SHEET 2 of 2

(%)

U.S. Customary Units

(%) (ft)

(pcf)N60

FormationREC ACL

Soi

l

Dril

ling

Ope

ratio

n

Lith

olog

y

RQD Core

G:\GINT\PROJECTS-ACTIVE\6241-51_TH280_LARPENTEUR.GPJ

Roc

k

DE

PTH

(psf)MC(%)

Classification

Other Tests

This boring was taken by Braun Intertec under aconsultant contract for Mn/DOT

or Member

UNIQUE NUMBER 70697

DepthCOH

Soil Class:P. Martin Rock Class: Edit: Date: 7/24/08

Breaks

Or Remarks

Elev.

SPT

MINNESOTA DEPARTMENT OF TRANSPORTATION - GEOTECHNICAL SECTIONLABORATORY LOG & TEST RESULTS - SUBSURFACE EXPLORATION

Auger and sampler refusal at27' . Lead auger broke off,unable to continue.

11" of BIT over 8" of AGG

F SAND, w/G, w/3" of Clay Loam, lt brn, moist, loose, fill

nonpl SANDY LOAM, w/G, dk brn, moist, meddense, fill

F SAND, lt brn, moist, meddense

SAND & GRAVEL w/ some Bldrs, brn, moist, dense tomeddense

Bottom of Hole - 16'Borehole then backfilled.

1.6936.3

4.0933.9

5.5932.46.5

931.4

16.0921.9

9

20

44

18

54

30

, , ft. LT(ft.)

LocationDrilling

SHEET 1 of 1

Ramsey Co. Coordinate: X=545984 Y=1740687511

Longitude (West)=93°12'20.14"CME Automatic Calibrated 5/19/08Completed

Latitude (North)=44°59'38.81"

Drill Machine

Hammer

Ground Elevation

(Surveyed)MN Trunk Highway 280Trunk Highway/Location Boring No.

6241-51State Project Bridge No. or Job Desc.

STRW2-4 937.9

(%)

U.S. Customary Units

5

10

15

(%) (ft)

(pcf)N60

FormationREC ACL

Soi

l

Dril

ling

Ope

ratio

n

Lith

olog

y

RQD Core

Index Sheet Code 3.0G:\GINT\PROJECTS-ACTIVE\6241-51_TH280_LARPENTEUR.GPJ

Roc

k

DE

PTH

(psf)MC(%)

Classification

Other Tests

This boring was taken by Braun Intertec under aconsultant contract for Mn/DOT

or Member

UNIQUE NUMBER 70698

DepthCOH

Soil Class:P. Martin Rock Class: Edit: Date: 7/24/08

Breaks

Or Remarks

Elev.

SPT

MINNESOTA DEPARTMENT OF TRANSPORTATION - GEOTECHNICAL SECTIONLABORATORY LOG & TEST RESULTS - SUBSURFACE EXPLORATION

Hard drilling to bottom of hole

Auger broke off about 5'below surface. Sample rodcut off about 6" belowsurface.


Recommended