5
Transcript
Page 1: Minutes of 17th Connectivity and LTA Meeting of Eastern Region · Barh, Patna NTPC Barh Generation Switchyard 1980 2.2. Representative of NTPC informed that they have inadvertently
Page 2: Minutes of 17th Connectivity and LTA Meeting of Eastern Region · Barh, Patna NTPC Barh Generation Switchyard 1980 2.2. Representative of NTPC informed that they have inadvertently
Page 3: Minutes of 17th Connectivity and LTA Meeting of Eastern Region · Barh, Patna NTPC Barh Generation Switchyard 1980 2.2. Representative of NTPC informed that they have inadvertently

Minutes of 17th Connectivity and LTA Meeting of Eastern Region

Page 1

Minutes of 17th Connectivity and Long Term Access (LTA) meeting of Eastern

Region held on 24.10.2019 at POWERGRID, Gurugram office

The list of participants is enclosed in Annexure-I.

CGM (CTU-Plg.), POWERGRID welcomed all the participants to the meeting.

Thereafter, deliberations as per the agenda commenced and the details of the

deliberations are as given below

1.0 Confirmation of minutes of 16th Connectivity and LTA meeting of Eastern

Region

1.1. CTU informed that the minutes of 16th Connectivity and LTA meeting held on 29th

July, 2019 were circulated vide letter no. C/CTU/E/07/16 dated 02.08.2019. As no

comments were received accordingly, minutes of the16th Connectivity and LTA

Meeting of ER were considered as confirmed.

2.0 Grant of 1980MW connectivity to Barh STPP Stage-I (3x660MW) generation

project of NTPC

2.1. CTU informed that NTPC Ltd Barh1 has applied for 1980MW connectivity for its

Barh STPP Stage-I (3x660MW) generation project vide application no

1200002285. The details of the application is as under:

Sl. No.

Application No

Name of the

Applicant

Submission Date

Region Project

Location

Connectivity location

(requested)

Quantum (MW)

1. 1200002285 NTPC Ltd

Barh1 30-09-19 ER

Barh,

Patna

NTPC Barh

Generation

Switchyard

1980

2.2. Representative of NTPC informed that they have inadvertently mentioned the

name of the applicant as ‘NTPC Ltd Barh1’ instead of ‘NTPC Ltd’. Accordingly, as

per the request of NTPC, it was agreed to grant the Connectivity intimation in the

name of ‘NTPC Ltd’.

2.3. CTU further informed that in the application, the unit wise commissioning

schedule of the generating units has been mentioned as 1st Apr’20, 1st Oct’20 and

1st Apr’21 respectively and the date from which connectivity is requested is

mentioned as 15.10.2019. As the start date of Connectivity has already passed,

NTPC was requested to provide a fresh date from which Connectivity is required.

NTPC informed that Connectivity may be provided from 01.12.2019.

2.4. After detailed deliberations, following was decided:

(i) Connectivity will be provided to Barh STPP Stage-I of NTPC w.e.f.

01.12.2019. It was also informed that after grant of connectivity, the Applicant

shall furnish additional details to CTU for signing of “Connection Agreement”

Page 4: Minutes of 17th Connectivity and LTA Meeting of Eastern Region · Barh, Patna NTPC Barh Generation Switchyard 1980 2.2. Representative of NTPC informed that they have inadvertently

Minutes of 17th Connectivity and LTA Meeting of Eastern Region

Page 2

as per FORMAT-CON-4 at the earliest and physical Connection will be

allowed only after signing of requisite “Connection Agreement”.

(ii) Connectivity to NTPC will be provided through LILO of Kahalgaon – Patna

400kV D/c (Quad) line at Barh (NTPC) switchyard.

Note: Bays at Barh (NTPC) switchyard and LILO of Kahalgaon – Patna 400kV

D/c (Quad) line at Barh (NTPC) switchyard has already been implemented by

NTPC and POWERGRID respectively.

The meeting ended with vote of thanks.

-x-x-x-

Page 5: Minutes of 17th Connectivity and LTA Meeting of Eastern Region · Barh, Patna NTPC Barh Generation Switchyard 1980 2.2. Representative of NTPC informed that they have inadvertently

Minutes of 17th Connectivity and LTA Meeting of Eastern Region

Page 3

Annexure-I

List of participants in the 17th Connectivity and LTA meeting of Eastern Region held on 24.10.2019.

Sl. No. Name Designation Organization Email

1. Shri Subhash Thakur AGM NTPC [email protected]

2. Shri Rajesh Jain AGM NTPC [email protected]

3. Shri Mukesh Khanna CGM (CTU-Plg) POWERGRID [email protected]

4. Smt. Jyoti Prasad GM (CTU-Plg.,Law) POWERGRID [email protected]

5. Shri Laxmi Kant DGM (CTU-Plg) POWERGRID [email protected]

6. Shri Anil Kumar Meena DGM (CTU-Plg) POWERGRID [email protected]

7. Shri Manish Ranjan Keshari Dy. Manager (CTU-Plg) POWERGRID [email protected]

8. Shri Dwaipayan Sen Dy. Manager (CTU-Plg) POWERGRID [email protected]