111
Transcript
  • MINUTES OF 477TH MEETING OF OPERATION & COORDINATIONSUB-COMMITTEE OF WRPC

    HELD ON 9TH NOVEMBER 2015 AT NTPC SIPAT

    The 477th meeting of Operation & Co-ordination Sub-Committee of WRPC was

    held on 9th November 2015 at NTPC Sipat. The list of participants is enclosed at

    Annexure-A.Shri V B Fadnavis, Executive Director, NTPC Sipat welcomed Member Secretary

    WRPC, Officers of WRPC/WRLDC, Chief Engineers of SLDCs of Gujarat, MP,

    Chattisgarh and Maharashtra and all other delegates of the 477th OCC meeting. He

    thanked WRPC for providing the opportunity to host the 477th OCC meeting at NTPC

    Sipat.

    He told that the OCC meeting is a very important forum in terms of the gravity of the

    discussion and decisions taken from point of view of Power generation, transmission

    and distribution in the Western Region. He further told that requirement of power is

    essential for growth of Indian economy.

    He emphasized one important aspect of power i.e. power cant be stored and this is

    where comes the role of RPCs, RLDCs and SLDCs to successfully co-operate,

    monitor, regulate the entire power scenario of the WR in a synchronized and

    disciplined manner.

    He told that OCC forum deals mainly with technical part of power sector for sustained

    and smooth operation. Various outages and availability/non-availability of generating

    units, transmission elements etc are discussed at this forum so that generating units,

    transmission lines, frequency of operation is stable and Grid is disciplined.

    He further told that due to WRPC, WRLDC, SLDCs there is discipline in the region

    and there is tremendous improvement in the performance of the grid compared to

    previous decades.

    He informed that NTPC Sipat is first supercritical power plant of NTPC and also the

    first to have 765 KV switchyard. He told that total installed capacity at Sipat is 2980

    MW. He further told that there is tremendous reduction in cost of generation at NTPC

    Sipat as it is getting domestic coal rather than imported one.

    Shri S D Taksande, Member Secretary, WRPC extended warm welcome to all the

    participants of the 477th OCCM. He expressed his gratitude to Shri V B Fadnavis,

    Executive Director, NTPC Sipat, Shri Debashis Sen GM(O&M) NTPC Sipat, Shri P B

    Behere GM (NTPC), Shri D Paul GM (Operation) NTPC Sipat and all Chief Engineers

  • 2

    477th OCC MINUTES

    of SLDCs for making themselves available for meeting even in Diwali festival.

    Shri S D Taksande, Member Secretary, WRPC thanked the whole group of NTPC

    Sipat, particularly Shri P B Behere, GM (NTPC), Shri D Roy Choudhury AGM (NTPC),

    Shri M L Patra, AGM (NTPC) for arranging every aspect of the meeting meticulously.

    He highlighted the following events which took place since last OCC meeting:

    1. He informed that CERC has framed a draft regulation regarding Reliable grid

    management and large scale integration of variable renewable energy sources.

    As per this draft there give slight relaxation in DSM methodology for states with

    higher demand. This draft regulation dated 02.11.2015 was forwarded to

    Secretary, Power, Govt of India for approval.

    2. He highlighted three important things mentioned in this draft regulation to be

    achieved viz. creation of spinning reserve and use for ancillary services,

    automatic generation control and grid discipline. Spinning reserve to be

    achieved by 01.04.2016 and AGC to be finalized by 01.04.2017. he told that

    DSM limits are now on peak demand basis i.e. Maharashtra & Gujarat -250

    MW, MP-200 MW, Chhattishgarh-100 MW, GOA, DNH & DD-50 MW.

    3. He also informed that impact of present DSM is being felt in states having more

    renewable energy sources because of more un-certainty in RES sources. So

    slight relaxation in DSM will be given to those states in which high penetration

    of RES is there.

    4. A Workshop on detailed Procedure for Ancillary Services Operations & its

    implementation was conducted on 16.10.2015 at NLDC. WR constituents

    attended the same through VC. He informed that NLDC will be the nodal

    agency for Ancillary Services Operations and management. It will be declared

    for implementation very shortly, so we have to prepare for implementation of

    the same.

    5. He informed that two important decision were taken during the 71st CCM on

    03.11.2015 at WRPC

    Honble CERC order dated 05.10.2015 in petition No. 310/MP/2014(SASAN URS case) the ISGS/beneficiaries will be coordinatingagency instead of RLDC i.e. the surrendering/requisition of power

    to/from ISGS is coordinated by beneficiaries/ISGS. Other methodology

    will be remains same as is being done in respect of NTPC.

  • 3

    477th OCC MINUTES

    Ancillary Services Operations Regulations 2015 issued by Hon,bleCentral Electricity Regulatory Commission on 13.08.2015: Theobjective of these regulations is to restore the frequency at desired level

    and to relieve the congestion in the transmission network. These

    regulations shall be applicable to the Regional Entities involved in the

    transactions facilitated through STOA/MTOA/LTA in inter-State

    transmission of electricity. For Regulation-Up, the Nodal Agency(NLDC)

    shall prepare stack of un-requisitioned surplus capacities available in

    respect of Inter-State Generating Stations from lowest variable cost to

    highest variable cost in each time block, and taking into account ramp up

    or ramp down rate, response time, transmission congestion and such

    other parameters as stipulated in the Detailed Procedure. For

    Regulation-Down, a separate merit order stack from highest variable

    cost to lowest variable cost incorporating technical parameters as above

    shall be prepared.

    6. He informed that 30th WRPC meeting will be held on 23rd & 24th November,

    2015 at Bhubaneswar.

    7. He congratulated NTPC for synchronizing Vindhyachal unit # 13(stage-V, Unit-

    1). With this Vchal now becomes the largest capacity station at one place

    (4760 MW).

    8. He informed that WR demand during last month was 49938 MW on 19th

    October, 2015 which was highest so ever.

    Thereafter he requested SE (OPN), WRPC to take up regular agenda items in seriatim

    for discussion.

    ITEM No. 1: CONFIRMATION OF THE MINUTES

    SE(O), WRPC stated that minutes of 476th meeting of Operation & Coordination Sub-

    Committee of WRPC held on 14th October 2015 at APML Tiroda were forwarded vide

    letter No. WRPC/OPN/OCC-Minutes/2015-16/8818 dated 21.10.2015.

    No comments have been received. Therefore minutes were confirmed as it is.

    The Sub-Committee noted as above.

  • 4

    477th OCC MINUTES

    ITEM NO.2: REVIEW OF SYSTEM OPERATION DURING THE MONTH OFOCTOBER 2015.

    SE(OPN),WRPC requested WRLDC to brief the Committee on Grid Operation

    experiences during October 2015.

    DGM, WRLDC in the presentation (copy attached at Annexure 2 in soft copy)

    concentrated broadly on the performance of the grid for month of October 2015 as

    below:

    2.1 Frequency Particulars

    The average frequency during the month of October, 2015 was 49.98 Hz. The

    maximum instantaneous frequency was 50.33 Hz at 18:02 hrs on 1st October-15

    while minimum instantaneous frequency was 49.62 Hz at 18:22 hrs on 17th October -

    15. The frequency profile during October, 2015 was as under:

    01st October 2015 to 31st October 2015 % time

    IEGC band (49.9 < f < 50.05 Hz) 69.10

    < 49.9 Hz 13.93

    > 50.05 Hz 16.97

    The frequency particulars is enclosed at Annex-2.1

    The Sub-Committee noted.

    2.2 Inter-regional Exchanges

    There was a net inter-regional export of 5460.00 MUs by WR against net export

    schedule of 4999.00 MUs.

    The Sub-Committee noted.

    2.3 Voltage Profile

    Voltage profile at some of 765/400 kV sub-stations during the month of October 2015

    furnished by WRLDC is enclosed at Annex-2.3.

    The Sub-Committee noted as above.

    2.4 U/F Relay Operations

    As per WRLDC records during October 2015 the system frequency didnt touch 49.2 Hz

    and no UFR operation has been reported by WRLDC.

    The Sub-Committee noted as above.

  • 5

    477th OCC MINUTES

    2.5 Power Cuts / Load Restrictions

    Details of Power Cuts and Regulatory measures during October 2015 as furnished by

    the state utilities are given in Annex. 2.5.

    The Sub-Committee noted as above.

    2.6 Details of Generating Units under Forced outages

    Details of generating units under forced outages during October 2015 are given inAnnex-2.6.

    The Sub-Committee noted as above.

    2.7 Details of Generating Units under Planned outages

    The details of generating units under Planned Outages during October 2015 are given inAnnex-2.7

    The Sub-Committee noted as above.

    ITEM NO.3: OPERATIONAL PLANNING

    3.1 Proposed Planned maintenance programme of generating units.

    The maintenance programme of generating units for November 2015 & December

    2015 was discussed.

    The finalized outage schedule of generating units for the above period and the modified

    outages plan is placed at Annexure-3.1.

    The Sub-Committee agreed as above.

    3.2 OUTAGE PROGRAMME OF TRANSMISSION LINES/ELEMENTS

    Maintenance programme for transmission lines during the months for November 2015 &

    December 2015 were discussed.

    The outages planned agreed during the meeting is given in Annex 3.2.

    The Sub-Committee agreed/noted for the same.

    3.3 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS NOVEMBER 2015 &DECEMBER 2015

    Details of anticipated restricted & un-restricted demands for the months of November

    2015 & December 2015 are given in Annex 3.3.

    The Sub-Committee noted the same.

  • 6

    477th OCC MINUTES

    ITEM NO. 4: OPERATIONAL STATISTICS FOR THE MONTH OF SEPTEMBER 2015

    The details of actual generation, demand, drawl of power from grid; exchanges etc.

    are given in the following Annexures:

    Annex 4.1 - Actual Generation and Requirement for October 2015.

    Annex 4.2 - Peak Demand: Schedule Vs Actual for October 2015.

    Annex 4.3 - Integrated Operation of the System and Operation of Inter State Tie lines

    for October 2015.

    Annex 4.5- Details of Declared Capacity, Schedules and Injections from Central sector

    stations, Drawl Schedules and Entitlements of constituents during October 2015

    Annex 4.6 - Inter System Exchanges for October 2015.

    Annex 4.7 Details of level of Major Reservoirs in Western Region for October 2015.

    The Sub-Committee noted.

    ITEM NO. 5: SYSTEM DISTURBANCES IN WESTERN REGIONThere was no major grid disturbance in the Western Region during the month of

    October 2015. However the details of minor incidences during the month received

    from WRLDC are enclosed at Annexure-5. Black out incidence at 765kV Dhule S/S(BDTCL) on 28.10.2015 is included as agenda point under WRLDC items.

    The Sub-Committee noted as above.

    ITEM NO. 6: Healthiness status of SERs/DRs of equipment in the system.

    Constituents have furnished the status of healthiness of SER/DRs in their systems onthe dates below:

    Sl No. Name ofconstituents

    Date of Receipt

    1 PGCIL,WRTS-I 03.11.20152 PGCIL,WRTS-II 04.11.20153 MPPTCL 09.11.20154 NTPC 02.11.20155 CSPTCL 03.11.20156 GETCO 04.11.20157 MSETCL 06.11.2015

    Constituents of WR were requested to ensure healthiness and sent information to this

    office regularly as per the recommendation of enquiry committee of Grid disturbances on

    25.02.2007 and 28.02.2007.

    The Sub-Committee noted.

  • 7

    477th OCC MINUTES

    ITEM NO. 7: STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS, TRANSMISSION LINES ANDGENERATING UNITS IN WR.

    7.1 Status of completion of ongoing Schemes for Commissioning of reactors.

    The present status regarding schedule and commissioning of reactors is as below:

    S.No.

    400 kVSub/stn.

    Size(MVAR)

    Implementingagency

    Expected commissioningdate

    1 Nanded 125 MVAR MSETCL June 2016

    2 Sholapur 125 MVAR MSETCL June 2016

    3 Kolhapur 125 MVAR MSETCL June 2016

    4 Akola 125 MVAR MSETCL June 2016

    *5 Nagda 125 MVAR MPPTCL December 2015

    6 Bhopal 80 MVAR MPPTCL Commissioned on 27thAugust 2015

    7 ISP 125 MVAR NHDC December 2015

    8 Line reactorat Nagda-ISPline at Nagdaend

    50MVAR MPPTCL March 2016

    11 Satpura 50 MVAR MPPGCL April-2016

    12 Sasan Busreactor

    240 MVAR RELIANCE Commissioned on 23rd May-2015

    *50 MVAR existing bus reactor to be shifted to Nagda-ISP line as line reactor aftercommissioning of 125 MVAr reactor at Nagda.

    Utilities are requested to ensure that reactors are installed and commissionedaccording to the schedule agreed as above.

    Sub-Committee noted as above.

  • 8

    477th OCC MINUTES

    7.2 STATUS OF COMPLETION OF 765/400 KV AND ABOVE ONGOINGTRANSMISSION SCHEMES BEING EXECUTED/IMPLEMENTED BYTRANSMISSION AGENCIES.

    The updated status on various ongoing transmission schemes for the current year as

    per the current information available is as follows: -

    S.No.

    Name of the Line TargetCompletionDate

    Remarks

    POWERGRID1 400 kV Navsari Kudus D/C Line Dec -15 ROW/Forest problem2 765 kV Gwalior - Jaipur line -I

    765 kV Gwalior - Jaipur line -I ICommissioned on 13.08.15Commissioned on 11.08.15

    3 765 kV Dharamjaygarh - JabalpurPooling Station D/C line

    Ckt-1 Commissioned on15.10.15Ckt-2 Commissioned on14.10.15

    4 765 kV Wardha Nizamabad-Hyderabad D/C

    March-16

    5 765 kV Narendra-Kolhapur D/C Nov-15 November end.6 400 kV Aurangabad - Boisar line D/C

    lineDec -2015

    7 765 kV Aurangabad (PG) - Padghe(PG) D/C

    Dec -2015

    8 800kV Champa Kurukshetra Bipole Dec- 20159 765 kV Aurangabad- Solapur D/C

    lineCharged on 30.09.2015

    10 LILO of both circuits of Aurangabad Pune 400 kV D/c line at Pune765/400 kV GIS

    Dec -15

    11 400 kV Parli-Pune(Sikarapur) LILO atSikarapur

    Commissioned on24.02.2015

    12 765 kV Raipur Champa765 kV Raigarh - Champa

    Commissioned on 28.05.2015Commissioned on 29.05.2015

    13 765 kV Indore-Vadodara Commissioned on05.06.2015

    14 400 kV Vadodara-Asoj Commissioned on27.06.2015

    15 400 kV Vadodara-Pirana Commissioned on27.06.2015

    16 765kV Dharmjaigad-Rachi-II Commissioned on12.10.2015

    17 400 KV Solapur(NTPC)-Solapur(PG)ckt-I

    Commissioned on10.07.2015

    18 765 kV Aurangabad-Solapur D/C Commissioned on30.09.2015

    19 400 KV Vindhyachal Pooling-VSTPS(NTPC)

    Commissioned on30.09.201519.10.2015

  • 9

    477th OCC MINUTES

    CHHATTISHGARH1 400 kV Korba west- Marwa

    400 kV Marwa- KhedamaraCommissioned on28.05.2015

    2 400 kV DCDS Raipur(Raita)-Jagdalpur(DCDS)

    Mar- 2016

    3 220 kV DCDS lines Chhuri to Mopka(Bilaspur), (DCDS)

    Commissioned on08.11.2015

    4 LILO of 220 kV Raigarh-Budipadar at400 kV PGCIL S/s Raigarh

    Dec-15 Under discussion withOrissa and ERLDC

    5 LILO of 220 Korba (E)- Bishrampurline at 220 kV Churri S/s

    Commissioned on26.04.2015.

    GUJARAT1 400 kV D/C Mundra-Zerda line No. 1 March -162 400 kV D/C Mundra-Zerda line No. 2 Dec -20153 400 kV D/C Vadinar-Amreli line March -164 400kV APL-Hadala LILO to Halvad March -165 400 kV D/C Amreli-Kasor line(Part-1) March -166 400 kV Charanka- Veloda March -167 400kV Varsana-Hadala Dec-2015MADHYA PRADESH1 Satpura TPH-Ashta 400KV DCDS

    Line1st ckt commissioned on30th March 2015.2nd ckt expected by Nov2015.

    MAHARASHTRA(STU)1 400KV D/C line from Koradi-(II) to

    Wardha S/S(PG) D/CDec 2015 7.5 km stringing is balance

    2 LILO of 400 kV Chandrapur-Parli atNanded Dec-15

    3 2x1500 MVA 765/400 kV, ICTs atEktuni Dec -15

    4 400 kV Bableshwar-Kudus D/C(Quad) August -16

    5 765 kV Akola(II)-Ektuni -2 (charge at400kV at Tapthithanda)

    Charge at 400kV atTapthithanda on 20.05.2015

    6 400kV IEPL-Warora Dec- 2015 Line completed, legalissues being resolvedGUJARAT (IPTC route) by WRTransmission (Guj) Pvt. Ltd1 400 kV Rajgarh(PG)-Karamsad

    (GETCO) D/C Dec- 2015Letter written to concernedagency

    STERLITE (JTCL)1

    765 kV Dhramjaygarh - Jabalpur (JTCL)D/C line ckt 3 & 4.

    Ckt-I Commissioned on12.09.15Ckt-II Commissioned on13.09.15

    2 765 kV Jabalpur - Bina (JTCL) S/c Charged on 30th June 2015.3 400 kV Sujalpur-Kota(IR by RTCL) Dec 2015

  • 10

    477th OCC MINUTES

    STERLITE (BDTCL)1 765 kV Vadodara - Dhule (BDTCL) S/C Charged on 12th June 2015.2 765 kV Bhopal- Jabalpur Charged on 8th June 2015.3 765kV Bhopal - Jabalpur Charged on 8th June 2015.4 400 KV Dhule (BD)-Dhule (MS) Dec 2015 Bay completed. SCADAErection in progress

    The Sub-Committee noted as above.

    7.3 Commissioning of new Generating units in Western Region and thecapacity expected to be commissioned during the current year 2015-16.

    The status regarding Generating units, commissioned /expected to be commissionedduring the current year 2015-16 according the available information is as below:

    Name of the Power Projects Unit No. Capacity(MW)

    Date of Commissioning/Schedule Date

    GUJARATSIKKA TPS EXT 3 250 COD-17.09.2015

    SIKKA TPS EXT 4 250Dec-15, First time Synchdone

    CHHATTISGARHMarwa 1 500 Dec 2015

    2 500 Dec 2015MAHARASHTRACHANDRAPUR 8 500 Dec-15CHANDRAPUR 9 500 Feb- 2016KORADI 8 660 Nov-15KORADI 9 660 Jan- 2016KORADI 10 660 March -2016

    PARLI 8 250Jan - 2016 (Subject toavailability of Water)

    MADHYA PRADESHM/s Jhabua Power, Seoni 1 600 December 2015Moser Bear (Hindustan power) 2 600 December 2015Essar Power MP Ltd(Mahan) 2 600 December 2015CENTRAL SECTOR/IPPVINDYACHAL 13 500 COD on 30.10.2015KSK 3 600 March 2016KSK 4 600 June 2016SASAN 6 600 COD on 27.03.2015

    ACBIL(Maruti) 1 300Commissioned on17.04.2015

    RKM 1 360 Commissioned on

  • 11

    477th OCC MINUTES

    28.10.2015RKM 2 360 Dec 2015RKM 3 360 Feb 2016

    RKM 4 360 MARCH 2016BALCO 1 300 COD on 11.07.2015

    Sub-committee noted as above.

    ITEM NO. 8: MISCELLANEOUS OPERATIONAL ITEMS

    ITEM NO. 8.1: QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

    SE(O), WRPC requested all the constituents to submit the CMP report for the

    Second quarter (July 2015 to September 2015) for the year 2015-16.

    The Sub-Committee noted as above and agreed to furnish the same.

    ITEM NO. 8.2: STATUS OF PHYSICAL & CYBER SECURITY IN POWER SECTOR

    SE(O), WRPC requested all the constituents to submit the status of physical & cyber

    security in Power Sector for the second quarter (July 2015 to September 2015) for the

    year 2015-16.

    The Sub-Committee noted as above and agreed to furnish the same.

    ITEM NO. 8.3: READINESS OF SLDC AT GOA, OTHER SLDCs AND WRLDC FORUPGRADATION OF EXISTING SCADA/EMS SYSTEM

    During 29th WRPC meeting it was decided that the status of progress of SLDCs &

    Back-up SLDCs of WR constituents /WRLDC would be regularly monitored in monthly

    OCC meeting.

    Project status submitted by the implementing agency and discussed during 17th PRM

    on 9th October at Mumbai is furnished below. Further during the meeting WRLDC

    informed that WRLDC portion of contract amendment has been made for time

    extension up to 31.03.2016 and requested Alstom to complete the project by schedule

    completion date i.e. by 31st March 2016. In a clarification for SLDCs portion of

    contract, POWERGRID WR-II representative has also informed that time extension up

    to 31.03.2016 for state portion has also been approved and necessary amendment

    would be issued:

  • 12

    477th OCC MINUTES

    S.N. Utility ControlCentre

    SiteReadiness

    SAT ICCPCommunication

    SAVTHardware

    Software

    1. WRLDC Main CC Yes Done Done Done CompleteBackup CC Yes In

    ProgressIn

    ProgressDone Not Started

    2. MPPTCL SLDCJabalpur

    Yes Done Done Done Not Started

    Sub-SLDCBhopal

    Yes Done NotStarted

    Done Not Started

    Sub-SLDCIndore

    Yes Done Done Done Not Started

    3. GETCO SLDC Gotri Yes Done Underprogress

    Done Not Started

    Sub-SLDCJambua

    Yes Done Done Done Not Started

    Sub-SLDCJetpur

    Yes Done Underprogress

    Done Not Started

    BackupSLDCGandhinagar

    Yes Done NotStarted

    DoneNot Started

    Sub-SLDCGandhinagar

    Yes Done Done Done Not Started

    4. CSPTCL SLDC Raipur Yes Done Done Done CompleteBackupSLDC

    Yes NotStarted

    NotStarted

    Not Started Not Started

    5. GOA Main CC No NotStarted

    NotStarted

    Not Started Not Started

    Backup CC Yes Inprogress

    NotStarted

    Done Not Started

    6. DDED Magarwada Yes Done Done Done Not Started7. DNHED Silvassa Yes Not

    StartedNot

    StartedNot Started Not Started

    It was inferred during the discussions in the meeting that progress of SLDCs & Back-

    up SLDCs of WR constituents and WRLDC was not as per expectation. CE SLDC

    Gujrat informed that hardware and software installation is complete at their site but

    only SLD is displayed but data was not displayed. Constituents also complained

    regarding the shortage of manpower and a lot of anomalies with the implementing

    agency ALSTOM.

    CE, SLDC Gujarat informed the status through E Mail which is attached at annexure -

    8.3.

    CE, SLDC, Chhattishgarh informed that the status of up gradation of SCADA at Back

    up SLDC at Khedamara-The TELCOM equipment intended to be diverted to

    Chhattishgarh back up SLDC (as decided in the PRM on 09.10.2015) has been

  • 13

    477th OCC MINUTES

    diverted to some other PGCIL project(Kolhapur). This is causing delay in

    commissioning of SCADA.

    Representative from MP informed that the table which is showing theprogress of work, display a rosy picture but the fact at SLDC is quitedifferent.

    Member Secretary, WRPC suggested that the issue will be taken up with LD&C in

    board meeting.

    The Sub-Committee noted as above.

    ITEM NO. 8.4 LGBR PREPARATION FOR THE YEAR 2016-17 IN WESTERNREGION.As per the Regulation 5.7.4 of Central Electricity Regulatory Commission (IndianElectricity Grid Code)(First Amendment) Regulations, 2011(reproduced below forreference)Quote(c) RPCs Secretariat shall compile load Generation Balance Report for peak as wellas off peak scenario and also prepare annual outage plan for transmission elementsand major generating stations in the region. RPCs Secretariats shall then come outwith the draft outage programme for the next financial year by 30th November ofeach year for regional grid taking in to account the available resources in theoptimum manner and to maintain security standards. This will be done after carryingout necessary system studies and, if necessary, the outage programmes shall berescheduled. Adequate balance between generation and load requirement shall beensured while finalizing outage programme. The same shall be uploaded by theRPCs on their website.

    Unquote

    Accordingly WRPC shall prepare Load Generation Balance Report for the year 2016-

    17 in respect of Western Region. A meeting is proposed to be held on during last

    week of November-15 at WRPC wherein constituents are requested to attend the

    same with following data:

    1. Generating Units proposed annual Maintenance programme in respect of yoursystem(also under your control area) for the year April 2016- March 2017.

    2. Annual Maintenance programme in respect of transmission elements in yoursystem for the year April 2016- March 2017.

    3. Monthwise restricted and unrestricted requirement of power (MW) and energy(GWH) for the year April 2016- March 2017.

    4. Monthwise minimum requirement of power (MW) for the year April 2016-March 2017.

  • 14

    477th OCC MINUTES

    5. Projected monthwise, unitwise generation of power (MW) corresponding energy(GWH) as furnished in Generation Target for the above period.

    6. Commissioning dates of new generating units during the year April 2015-March 2015.

    7. Expected dates of commissioning of new generating units likely to becommissioned during the year April 2016- March 2017.

    8. Month wise detail of proposed / tied-up bilateral agreements / Short term openaccess sought for availing assistance from other agencies during the aboveperiod.

    9. Expected RES energy(MUs) & corresponding demand(MW) for the year April2016- March 2017.

    Member Secretary, WRPC told that there will be a meeting on 27.11.2015 at WRPC

    Mumbai. Concern Constituents/utilities are requested attend the meeting with above

    information/data pertaining to their system. He emphasized that all IPPs have to

    participate.

    The Sub-Committee noted as above.

    ITEM NO. 8.5 ADDITIONAL BUS REACTOR OF 3X80MVAR AT KOTRA PSAGM, PGCIL Raipur informed that at present one no 3x80MVAr Bus reactor isavailable at Kotra PS besides two nos switchable L/R (3x80MVAr) installed on 765kVKotra-Durg I & II as per approved scheme. During last one year of operation it wasnoticed that At 765kV Kotra PS , there have been continuously high voltage even afteropening of one ckt of 765kV Kotra Durg Line and using line reactor as Bus reactor.The voltage profile ( data received from WRLDC) for last one and half yr is as below

  • 15

    477th OCC MINUTES

    From above voltage profile it is very much visible that Bus voltage is more than 795

    Kv for quite a long time , which stress the equipments & already one no Reactor failed

    within 2 yr of its life . Keeping in view of above, an additional Bus reactor of 3x80MVAr

    is proposed.

    OCC discussed the matter and recommended for the reactor at Kotra(Raigarh),

    PGCIL.

    Member Secretary, WRPC suggested PGCIL to take up the issue to the Standing

    Committee of WR, CEA New Delhi with recommendation of OCC. He also told that the

    financial implication for the additional bus reactor will be discussed and approved in

    WRPC meeting after approval from SCM.

    The Sub-Committee noted as above.

    ITEM NO. 8.6 TERMINATION OF SOLAPUR-AURANGABAD LINE IN PADGHEBAYS AT AURANGABAD

    DGM, WRTS-I, PGCIL, Nagpur informed that the 765 kV Double Circuit Aurangabad-

    Solapur line has been commissioned and charged on 5.10.2015 successfully. The

    line at Aurangabad end is terminated into Padghe bays. It is to intimate that at the

    time of construction of line, the Reactors for Solapur bays at Aurangabad were not

    available. However, at the same time, Padghe line was not available except Reactors,

    which were used as Bus Reactors. As there was request from the constituents to

    charge the Aurangabad-Solapur line on urgent basis, the decision was taken to

    terminate the line into Padghe bays, and, accordingly the line is commissioned on

    5.10.2015.The Reactors at Aurangabad are expected to reach at site sometime by

    April, 2016. After the receipt of Reactor at Aurangabad end, the line will be re-

    terminated into Aurangabad bays one by one.

    CE, SLDC Maharashtra expressed its concern regarding outage of Aurangabad-

    Solapur line during restoration of Padghe bay. Moreover requested MS WRPC that

    the availability of 765kV Aurangabad-Solapur line during above outage period shall

    not be certified.

    Member Secretary, WRPC informed that above proposal will be put up to ensuing

    WRPC meeting.

    The Sub-Committee noted as above.

  • 16

    477th OCC MINUTES

    ITEM NO. 8.7: COMMISSIONING OF VARIOUS ASSETS IN ADVANCE CLAIMING ADDITIONAL ROE CERTIFICATE FROM WRPC

    Executive Director WRTS-I, PGCIL, Nagpur informed that, during 2014 and 2015

    POWERGRID had completed and commissioned 17 elements, as given in Annexure

    8.7, in different projects in Western Region within the time line provided by the

    Honorable CERC and entire National Grid especially Western Regional Grid got

    largely benefitted by the commissioning of these elements in advance. This

    achievement would have possible by our meticulous planning, deploying additional

    resources and continuous monitoring of execution of the works.

    He further intimated that as per the clause 24- 2(i) of 2014-19 Tariff order -

    QUOTE:In case of projects commissioned on or after 1st April, 2014, an additional return of

    0.50 % shall be allowed, if such projects are implemented within the timelinespecified.

    Further clause 24-2(iii) of 2014-19 Tariff order also states that additional RoE of 0.50%

    may be allowed if any element of the transmission project is completed within the

    specified timeline and it is certified by the Regional Power Committee/National Power

    Committee that commissioning of the particular element will benefit the system

    operation in the regional/national grid.

    He stated that as you know all these elements were being commissioned in

    advance for the benefit of the grid that too after due deliberation in different forums

    and approval/direction by the WRPC.

    He requested for issue necessary certificate for these elements, as per clause

    24-2(iii) of the Tariff order 2014-19, to enable us to put up our claim to honorable

    CERC.

    OCC discussed the matter & decided that the request letter from PGCIL shall becirculated to all beneficiaries of WR. Beneficiaries shall submit their comments withinone month to WRPC about full commissioning of transmission elements i.e. alongwith reactor, OLTC etc.Powergrid Nagpur shall also submit the overall benefit by the above elements for thesystem/grid operation of Western Region which will be justified by WRLDC.There after WRPC shall certify after considering comments of beneficiaries andjustification from WRLDC.

    The Sub-Committee noted as above.

  • 17

    477th OCC MINUTES

    ITEM NO. 8.8: REQUIREMENT OF PROLONGED OUTAGE OF 400 KV SSP -KASOR LINE AND 400 KV ASOJ - CHORANIA LINE NO. 1 FROM 18.11.15 TO17.12.15 (CONTINUOUS BASIS):CE, SLDC, Gujarat intimated that the outage of 400 KV SSP - Kasor line and 400 KV

    Asoj - Chorania line No. 1 is required from 18.11.15 to17.12.15 (continuous basis) for

    line height raising work for DFCC (Dedicated Mumbai - Delhi railway freight corridor).

    The work involves dismantling of 2 Nos. existing towers and commissioning of 2 Nos.

    DY+9 towers. During said outage, the despatch from RBPH units shall have to be

    restricted to around 600 MW. SLDC-Gujarat has concern over such a long outage of

    these lines.

    NCA vide mail dated 08.11.2015 informed that, zero MCM water is allocated for SSP

    RBPH m/cs from 1st Nov15 to 30th June 16. in Reservoir Operation Table (ROT)

    prepared by SSRRC of NCA , hence there will be no operation of RBPH m/cs during

    the aforementioned period as per ROT.

    The same matter was also discussed in 59th PSC meeting of NCA held on 04.11.2015

    at Vadodara wherein the committee agreed for prolonged outage of 400 kV SSP -

    Kasor Line for said period.

    Representative from WRLDC stated that the above line outage is approved in the

    Outage coordination meeting. Moreover, Gujarat would consult with WRTS-2 for

    feasibility and suitabilities of existing ERS tower so that the outage period could be

    minimized.

    Further, feasibility of preponing the Mock Black exercise of SSP before the above

    proposed outages will be explored, otherwise this contingency will be incorporated in

    the procedure of Mock Black exercise of SSP on 25-November-15.

    Member Secretary, WRPC suggested that first possibility of ERS may be explored & if

    not feasible then the outages can be granted.

    The Sub-Committee noted as above.

  • 18

    477th OCC MINUTES

    ITEM NO. 9(A): WRLDC ITEMS

    1. FREQUENCY RESPONSE CHARACTERISTICS OF REGIONALENTITIES IN WESTERN REGION

    WRLDC informed that the Frequency Response from Western Regions Utilities duringrise in frequency after the earthquake on 26.10.15 is tabulated below:

    J&K Earthquake and Load Loss of 1200MW at All India.Increase in Frequency from 50.02 to 50.29 Hz (Rise of 0.27 Hz)

    Generators Generation Before theeventGeneration After the

    event Difference

    SSP 106.78 102.78 -4KSTPS 2008.92 2002.98 -5.94VSTPS 3755.52 3702.58 -52.94SIPAT 2286.51 2195.96 -90.55Mouda 430.72 433.27 2.55CGPL 3009 3009.02 0.02SASAN 3746.3 3746.3 0NSPCL 471.96 466.06 -5.9KSK 1158.57 1155.37 -3.2DB Power 424.63 424.63 0JP NIGRIE 889.16 887.23 -1.93ESSARMAHAN 0 0 0MB Power 508.37 513.86 5.49MCPL 160.54 159.66 -0.88RKM 0 0 0Dhariwal 0 0 0GMR Raipur 0 0 0JPL Tamnar 572.48 578.07 5.59JPL 725.05 715.32 -9.73VANDANA 0 0 0BALCO 0 0 0LANCO 274.94 274.94 0EMCO 511.23 509.23 -2SKS 0 0 0KWPCL 0 0 0KAWAS 199.32 171.41 -27.91GAND-HAR 294.92 289.15 -5.77RGPPL -24.51 -24.51 0DGEN 660.63 661.82 1.19TAPS 1111.47 1115.59 4.12KAPS 191.27 186.48 -4.79

    State Control Area Frequency Response.

  • 19

    477th OCC MINUTES

    J&K Earthquake and Load Loss of 1200MW at All India.Increase in Frequency from 50.02 to 50.29Hz (Rise of 0.27 Hz)

    State Drawl Before the Event Drawl After the event DifferenceGUJ 2741.03 2902.68 161.65MAH 6737 6855.27 118.27MP 4904.74 5002.25 97.51

    Chhattisgarh 1157.37 1251.72 94.35GOA 336.13 339.52 0

    DD 286.78 286.19 0DNH 701.2 704.27 0

    WR -6724.01 -6037.25 686.76

    Indicate NO Frequency Response During the events

    All generating units to examine the response of their Stations and take measures toensure compliance to IEGC 5.2 (f), (g), (h), (i).

    All SLDCs to compute FRC in line with the CERC order dated 3.05.13 petition no 47,48, 49, 50, 51/MP/2012. The CERC approved procedure for FRC computation isavailable at URL: http://www.cercind.gov.in/2013/orders/SO47.pdf.

    SE(Opn), informed that there is a meeting of WR generator at WRPC on 27.11.2015(first half), therefore a separate meeting on second half of 27.11.2015 may be calledfor analyzing the same.

    Member Secretary, WRPC suggested all generating units to examine the FrequencyResponse of their Stations during such transients and take measures to ensurecompliance to IEGC 5.2 (f), (g), (h), (i) & attend the meeting with necessarydata/information to assess the performance of generators.

    The Sub-Committee agreed as above.

    2. SUDDEN FREQUENCY RISE DUE TO UNDER-DRAWL BY MPDURING LOAD CHANGE OVER PERIOD.

    WRLDC informed that there is a large frequency excursion during the hour boundariesparticularly at 0600 hrs, 1200 hrs and 1800 hrs caused by load changeover at thedistribution level and inadequate frequency response (RGMO/FGMO) from generatingstations. For instance the load in Madhya Pradesh drops 12:00 hrs and 18:00hrscausing under-drawal in the range of 500-700MW from the grid for one-two timeblocks. The sharp change in load results in rise in Grid frequency and suddenincrease in loading of Inter-Regional corridors. SPS on Solapur-Raichur D/C operatedat 18:01hrs of 06-10-2015 on this account.

  • 20

    477th OCC MINUTES

    Solution lies in better demand side management in the form of load staggering duringchangeover and primary response from generating units.

    Madhya Pradesh as well as other WR States may implement load staggering scheme

    during the load changeover for smooth ramping up/down at hour boundary.

    Representative from MP SLDC inform that they have taken up this issue with Discoms

    in their OCC and all possible measures will be taken to check the sharp drop of load at

    boundary hours.

    Member Secretary, WRPC suggested Madhya Pradesh to furnish in writing themeasures taken by MP Discoms to WRPC. He also suggested other states toimplement load staggering scheme during the load changeover for smooth operation.

    The Sub-Committee noted as above.

    3. BLACKOUT AT 765KV DHULE(BDTCL) STATION:

    WRLDC informed that the 765kV Vadodara-Dhule-S/C and 765kV Dhule-Aurangabad-

    S/C tripped at 14:39 hrs on 28-Oct-15, on B-phase to Earth fault leading to loss of

    supply at 765 kV Bus at Dhule BDTCL.

    The 2x1500 MVA 765/400 kV ICTs at Dhule and 400 kV Dhule-Dhule D/C which were

    idle charged from 765 kV side due to incomplete 400 kV bays at Dhule_MSETCL also

    got de-energized leading to total blackout at 765/400 kV Dhule_BDTCL.

    In the absence of feed from the 400 kV side, the restoration took 6-7 hrs when the 765

    kV Vadodara-Dhule S/C was charged from Vadodara end.

    The Blackout could have been prevented and restoration could have been expedited if

    the 400 kV Dhule (MSETCL) bays had been commissioned as envisaged.

    Representative from WRLDC stated that if 400 kV Dhule(BDTCL)- Dhule(MSETCL)

    was commissioned, the station black out may not happened.

    MSETCL informed that the line belongs to Sterlite limited. MSETCL further informed

    that only SCADA system integration with the 400 kV Dhule (MSETCL) bays is

    pending. 400 kV Dhule (MSETCL) bays will be commissioned latest by December

    2015.

  • 21

    477th OCC MINUTES

    Member Secretary, WRPC requested for expedite the commissioning of 400 kV Dhule

    (MSETCL) bays so that the 400 kV Dhule(BDTCL)- Dhule(MSETCL) can be charged.

    The Sub-Committee noted as above.

    4. Inadequate switchable Reactors at 765kV Aurangabad, 765kVWardha and 765kV Solapur

    WRLDC informed that the voltages has been on raise at 765kV Aurangabad, 765kV

    Wardha, 765kV Solapur and 765kV Pune after commissioning of 765kV Aurangabad-

    Solapur-D/C in particular during evening hours and night hours. The voltages remain

    on higher side even after, all available reactors are taken in service. The voltages at

    765kV Aurangabad and 765kV Solapur is in the range of 770kV - 800kV and 780kV -

    810kV respectively. Due to persistent high voltages one circuit of 765kV Wardha-

    Aurangabad Q/C has to be opened on daily basis in the evening hours and has to be

    restored in the morning hours. On certain occasions the lines tripped on over voltage

    as indicated below even after opening one line resulting in critical grid conditions.

    Date

    Time of

    tripping date

    time of

    revival Reason

    Name of the

    Line

    13-10-2015 03:58:00

    13-10-

    2015 07:26:00 Tripped on Over-voltage

    Wardha-

    Aurangabad-I

    24-10-2015 18:01:00

    25-10-

    2015 08:25:00 Tripped on O/V

    Wardha-

    Aurangabad-I

    03-10-2015 23:47:00

    04-10-

    2015 07:04:00

    TRIPPED ON

    OVERVOLTAGE

    Wardha-

    Aurangabad-II

    09-10-2015 03:02:00

    09-10-

    2015 04:45:00 Tripped on over voltage

    Wardha-

    Aurangabad-IV

    11-10-2015 17:59:00

    13-10-

    2015 10:03:00 Tripped on Over-voltage

    Wardha-

    Aurangabad-IV

    28-10-2015 12:11:00

    28-10-

    2015 16:41:00

    TRIPPED ON O/V . LINE

    WAS KEPT IN N/A MODE

    SINCE 07:28HR. Seoni-Wardha-I

    09-10-2015 03:02:00

    09-10-

    2015 07:33:00 Tripped on Over Voltage

    Seoni-Wardha-

    II

    24-10-2015 18:02:00

    25-10-

    2015 09:46:00 Tripped on O/V

    Seoni-Wardha-

    II

    06-10-2015 04:02:00

    06-10-

    2015 10:56:00

    TRIPPED AT OVER

    VOLTAGE, DT RECEIVED

    AT WARDHA

    Wardha-

    Aurangabad-III

  • 22

    477th OCC MINUTES

    Adequate switchable Reactors are required to keep the voltage profile within the

    prescribed operating limits.

    Moreover, the Over Voltage tripping is set at 805kV on 765kV Seoni-Wardha-D/c and

    765kV Wardha-Aurangabad-Q/C. This setting needs to be reviewed in the present

    scenario till the proper Reactors are provided, in order to avoid frequent tripping of

    critical 765kV Lines.

    Member Secretary, WRPC suggested Powergrid and Maharashtra to have a study to

    find the root cause of voltage rise. He also suggested for the additional switchable

    reactors can be proposed to SCM of WR at CEA, New Delhi.

    AGM PGCIL Raipur suggested that reactor at 765 kV Dharamjaigarh S/s can be

    shifted to Aurangabad on temporary basis.

    The Sub-Committee noted as above.

    5. REVIVAL OF TRANSMISSION ELEMENTS UNDER LONG OUTAGEWRLDC informed that the WR demand is on the rising trend, the element under longoutage need to be restored at the earliest.

    The following important transmission elements which are out of service for more than10 days

    S.No Element NameVoltageLevel Owner

    OutageDate Reason

    1 ASOJ-CHORANIA-II 400 kV GETCO 10-Oct-15 Charged on 29.10.2015

    2 INDORE(MP) ICT-1 400/220 kV MPPTCL 2-Aug-15 R-ph CT burst

    3 BINA(MP) ICT-3 400/220 kV MPPTCL 29-Sep-15 Buccholtz relay operated

    4 BINA(MP) ICT-1 400/220 kV MPPTCL 15-Oct-15 Buchholtz operated

    5 Morwa-Bina-S/C 132 kV MPPTCL 29-Jun-15 System requirement.

    6Dhule-SSP-1 50MVAR LR@DHULE 400 kV MSETCL 16-Apr-15

    Faulty CSR at Dhule(MSETCL)

    7Rajgarh-2 LR(50MVAR) atKasor 400 kV MSETCL 27-Jul-15 Repairing works

    8VINDHAYACHAL POLE-1HVDC

    500 kVHVDC NTPC 6-Aug-15 DC overcurrent Protection.

    9 SEONI 50 MVAR B/R-II BR 400 kV PGCIL 27-Aug-15 Amp works

    10 DURG-KOTRA-II 765 kV PGCIL 1-Sep-15Reactor oil level low / MCBProblem

  • 23

    477th OCC MINUTES

    It is requested to kindly expedite the restoration of above elements, especially the

    ICTs in Madhya Pradesh in view of high demand due to Rabi crop season.

    The Sub-Committee discussed the matter & constituents were agreed to expedite thecharging of their element.

    The Sub-Committee noted as above.

    6. Mock Black Start Exercise in Western RegionWRLDC informed that as mandated by IEGC, the Black start capable units need toconduct mock black start exercises once in every 6 months. Western Region has 29generating stations with black start capability. As per the information available withWRLDC only 6 Black Start stations have completed the Mock exercise in the year2015.

    Sl.No Generating station

    Date of mock drillexercisecompleted in 1st

    six months

    Date of mock drillexercise completedin 2nd six months

    1 Kadana, Gujarat 19th Feb 2015 -

    2 CLPIPL, Gujarat 6th March 2015 -

    3Hasdeo Bango,Chhatisgarh

    17th May 2015 -

    4Khopoli Hydro,Maharashtra

    23rd August 2015

    5 Tons 6th Oct 2015

    6 Bargi 12th Oct 2015

    NCA and SLDC Gujarat had intimated that the mock drill of RBPH units was beingplanned in November-15. A meeting of all stakeholders was scheduled on 4th

    November 2015 to finalize the procedure.As per last OCC minutes the schedule for mock drill in Madhya Pradesh stations is asfollows.

    PROPOSED DATE FOR BLACK START MOCK DRILL OF HYDEL POWERSl. No. Name of Power Station Date of Mock Drill

    1 Birsingpur Governor Problem2 Indira Sagar Project 17th Nov 20153 Pench 6th Nov 20154 Rajghat Governor Problem

  • 24

    477th OCC MINUTES

    5 Madhikheda Governor Problem6 Gandhi Sagar 27th Nov 20157 GTPS Uran 24th Nov 158 Ghatghar Hydro Station 4th December 29159 Koyna Hydro Station 23rd Nov 2015

    10 PTHN Dec 15

    10 Kawas-Gandhar1st week of December(Starting with DG set completed)

    SLDC Gujarat / NCA and SLDC MP updated the status.The current status of mock drill is as follows:

    Sl No Power Station StateBlack startconducted in2013-14

    Black startconducted in2015

    ProposedDates

    1 Ukai (H) Gujarat 17.12.2013 -

    2 Kadana Gujarat 02.04.2013 19.02.2015

    3 Dhuvaran Gujarat - -

    4 GIPCL-I Gujarat - -

    5 CLPIPL Gujarat - 06.03.2015

    6 Sugen Gujarat - -

    7 SSP Gujarat 22.06.20141st week of

    Oct15

    8 Kawas Gujarat 15.10.2013 -

    9 Gandhar Gujarat 07.12.2014 -

    10 Mini Hydro Gujarat - -

    11 Hasdeo Bango Chattisgarh 06.04.2014 17.05.2015

    12 GandhisagarMadhya

    Pradesh21.05.2014 27.11.2015

    13 BirsinghpurMadhya

    Pradesh-

    Governor

    Problem

    14 PenchMadhya

    Pradesh09.06.2014

    06.11.2015

    15 BargiMadhya

    Pradesh08.10.2014

    12.10.2015

  • 25

    477th OCC MINUTES

    16Bansagar Stage-

    I

    Madhya

    Pradesh-

    06.10.2015

    17 Indira SagarMadhya

    Pradesh10.06.2014

    17.11.2015

    18 OmkareshwarMadhya

    Pradesh-

    19 MedikhedaMadhya

    Pradesh-

    Governor

    Problem

    20 RajghatMadhya

    Pradesh-

    Governor

    Problem

    21 Koyna I & II Maharashtra 24.11.2014 23.11.2015

    22 Uran (Gas) Maharashtra 02.12.2014 24.11.2015

    23 Ghatghar Maharashtra 19.12.2014 04.12.2015

    24 Khopoli Maharashtra - 23.08.2015

    25 Bhivpuri Maharashtra -

    26 Bhira Maharashtra -

    27 Bhira PSS Maharashtra -

    28 Paithan Maharashtra -

    29 Trombay Maharashtra -Tata intimated -

    Not possible

    30Kawas &

    GandharNTPC

    First week of

    December

    2015

    MS, WRPC advised other constituents/regional entities to plan the Mock exercise oftheir black start units and submit their plan for compliance of IEGC regulation 5.8(b).

    The Sub-Committee noted as above.

    7. Generation and Demand Management during Dhanteras and Diwali

    WRLDC informed that this year Dhanteras and Diwali are falling on 09th November

    (Monday) and 11th November 2015 (Wednesday). It is generally observed that the

    demand rises on Dhanteras while there is a demand crash on one day after Diwali.

  • 26

    477th OCC MINUTES

    Member Secretary, WRPC advised all SLDCs and Regional Entities to review their

    demand supply position and take necessary measures to maintain grid parameters

    within secure limits.

    The Sub-Committee noted as above.9(B) ANY OTHER ITEMS:

    400kV Narendra- New Kolhapur(GIS) will be charged by the end of November2015.

    NTPC MOUDA would conduct the PG test on 16,17,18 Nov-15 and requestedall beneficiary to give full schedule during this period.

    The utilities agreed to schedule as per their entitlements.

    GM, NTPC informed that Vindhyachal units suffered wide range of scheduling(i.e. from zero MW to full capacity) which deteriorate the life of the Machine. He

    further requested to take VSTPS unit in RSD rather than Sipat units during the

    demand crash during Diwali period since VTPS power is costlier to Sipat.

    CE, SLDC Maharashtra informed they are not getting the data from 765 kVBDTCL Dhule S/s data. Representative from BDTCL ensured that they will be

    sent the data on regular basis.

    Member Secretary, WRPC advised that the data received in WRLDC shall alsobe arrange to SLDC Maharashtra.

    ITEM NO. 10: DATE AND VENUE OF NEXT OCC MEETING477th OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

    10. As per roster 478th OCC meeting will be hosted by TAPS 3&4 on 15.12.2015 at

    Tarapur in the month of December 2015. Further 479th OCC meeting would be hosted

    by CGPL in the month of January 2016.

    The Sub-Committee noted as above.

    ********************

  • Anaulagnak 2.1

    maah A@Taobar 2015

    1. INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

    1.1 MAXIMUM FREQUENCY 50.11 Hz. BETWEEN 1300 Hrs & 1400 Hrs Hrs. ON 28.10.2015

    AiQaktma AavaRi%t

    1.2 MINIMUM FREQUENCY 49.80 Hz. BETWEEN 1400 Hrs & 1500 Hrs Hrs. ON 13.10.2015

    nyaUnatma AavaRi%t

    1.3 AVERAGE FREQUENCY 49.98 Hz.

    AaOsat AavaRi%t

    2. INSTANTANEOUS ta%kailak

    2.1 MAXIMUM FREQUENCY 50.33 Hz. AT 18:02:00 Hrs. ON 01.10.2015

    AiQaktma AavaRi%t

    2.2 MINIMUM FREQUENCY 49.62 Hz. AT 18:22:00 hrs Hrs. ON 17.10.2015

    nyaUnatma AavaRi%t

    3. %AGE OF TIME WHEN FREQUENCY WAS OCTOBER 2015 SEPTEMBER 2015 AUGUST 2015

    AavaRi%t ka samaya p`itSat maoM

    3.1 BELOW 48.5 Hz. 0.00 0.00 0.00

    48.5 hT\ja ko naIcao3.2 BETWEEN 48.5 Hz. AND 48.8 Hz. 0.00 0.00 0.00

    48.5 hT\ja AaOr 48.8 hT\ja ko baIca3.3 BETWEEN 48.8 Hz. AND 49.2 Hz. 0.00 0.00 0.00

    48.8 hT\ja AaOr 49.2 hT\ja ko baIca3.4 BETWEEN 49.2 Hz. AND 49.5 Hz. 0.00 0.00 0.00

    49.2 hT\ja AaOr 49.5 hT\ja ko baIca3.5 BETWEEN 49.5 Hz. AND 49.7 Hz. 0.14 0.65 0.31

    49.5 hT\ja AaOr 49.7 hT\ja ko baIca3.6 BETWEEN 49.7 Hz. AND 49.9 Hz. 13.79 28.74 14.72

    49.7 hT\ja AaOr 50.2 hT\ja ko baIca3.7 BETWEEN 49.9 Hz. AND 50.05 Hz. 69.10 59.83 70.00

    49.9 hT\ja AaOr 50.05 hT\ja ko baIca3.8 BETWEEN 50.05 Hz. AND 51.5 Hz. 16.97 10.78 14.97

    50.05 hT\ja AaOr 51.5 hT\ja ko baIca3.9 ABOVE 51.5 Hz. 0.00 0.00 0.00

    51.5 hT\ja ko }pr

    4.1 NO. OF TIMES FREQUENCY 0 0 0

    TOUCHED 48.80 Hz. AavaRi%t 48.80 hT\ja kao CUhI

    4.2 NO. OF TIMES FREQUENCY 0 0 0

    TOUCHED 48.60 Hz. AavaRi%t 48.60 hT\ja kao CUhI

    4.3 NO. OF TIMES FREQUENCY 0 0 0

    TOUCHED 51.00 Hz. AavaRi%t 51.00 hT\ja kao CUhI

    maoM AavaRi%t ko AaMkD,aoM ka ivavarNa

    FREQUENCY PARTICULARS DURING OCTOBER 2015

    (AS PER FREQUENCY REPORT OF WRLDC)

    (piScama xao~ Baar p`oYaNa kond` kI AavaRi%t irpaoT- ko AaQaar pr)

  • Voltage Profile during the month of Oct. 2015Annex-I

    Date

    Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv

    1 418 397 418 399 433 411 431 398 416 400 418 400 414 405 406 388

    2 415 401 415 401 434 419 433 407 414 401 415 405 413 406 403 3853 415 397 414 399 436 415 430 402 415 400 419 406 415 408 402 3794 415 397 414 399 436 415 430 402 415 400 419 406 415 408 402 3795 414 400 413 401 435 414 430 400 415 403 418 407 414 408 401 3876 415 398 413 396 436 411 431 395 415 403 417 406 413 405 403 3877 416 397 413 396 435 414 431 397 416 399 417 407 412 405 404 3878 414 397 413 397 436 413 431 393 414 399 416 406 414 405 406 3789 417 397 414 396 433 410 431 395 414 399 418 407 412 403 403 387

    10 416 397 413 396 434 407 428 397 415 399 418 407 412 403 403 38311 417 400 414 399 433 413 429 393 416 402 418 409 413 406 404 38612 415 399 412 399 435 400 430 399 414 402 421 400 415 400 408 39513 414 400 413 399 433 412 428 393 413 403 417 409 415 408 408 391

    2015Annex-2.3

    Indore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

    ( ),

    Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

    Western Regional Load Despatch Centre,Mumbai

    , WRLDC, Mumbai MIS

    13 414 400 413 399 433 412 428 393 413 403 417 409 415 408 408 39114 414 394 413 394 431 403 427 393 413 399 419 407 414 404 408 39515 415 386 411 391 433 409 429 394 414 397 420 407 412 404 408 39816 415 386 411 391 433 409 429 394 414 397 420 407 412 404 408 39817 415 386 411 391 433 409 429 394 414 397 420 407 412 404 408 39818 415 386 411 391 433 409 429 394 414 397 420 407 412 404 408 39819 413 394 410 393 428 407 429 396 413 402 417 407 417 401 407 39420 415 386 412 394 430 404 428 387 413 398 420 407 416 401 409 39521 416 402 414 397 433 409 427 393 413 399 419 408 418 400 407 39322 419 386 414 397 438 412 427 393 418 397 420 407 420 404 418 39823 415 386 414 400 431 407 427 396 414 403 420 407 414 402 408 39224 416 396 411 396 432 407 428 392 413 396 418 407 417 409 408 39425 415 386 414 399 434 408 430 394 413 396 420 407 415 401 408 39426 415 386 411 391 433 409 429 394 414 397 420 407 412 404 408 39827 419 397 413 397 431 407 424 389 413 399 419 407 416 408 408 39228 420 400 417 397 431 406 426 387 414 398 419 407 418 407 411 39729 420 393 415 394 431 405 429 391 416 397 419 406 420 409 410 39630 419 393 414 390 435 405 432 395 416 400 417 407 420 410 412 39631 415 386 411 391 433 409 429 394 414 397 420 407 412 404 408 398

    420 386 418 390 438 400 433 387 418 396 421 400 420 400 418 378

    , WRLDC, Mumbai MIS , WRLDC, Mumbai MIS

  • Date

    Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv

    1 414 401 406 398 420 402 428 409 770 758 791 766 786 758 793 7662 413 404 408 395 417 402 427 410 769 759 787 773 789 767 790 7703 413 400 404 393 415 397 427 413 770 759 788 772 783 762 790 7654 411 401 405 396 415 397 427 413 770 759 786 768 784 766 785 769

    5 410 400 402 388 417 400 427 410 768 759 788 766 780 753 784 763

    6 411 400 400 391 417 397 427 406 766 751 787 762 777 756 784 763

    7 411 399 401 391 417 395 426 406 766 751 785 761 777 757 787 761

    8 410 399 403 389 416 396 426 407 768 758 788 766 779 754 788 760

    9 410 399 403 389 418 397 425 404 767 749 788 766 779 754 788 760

    10 413 401 411 400 419 395 427 406 764 749 784 759 785 762 788 76311 412 403 413 398 420 397 427 405 769 758 786 767 788 767 787 76912 411 402 408 398 419 398 426 409 768 757 786 767 789 766 786 76813 412 403 407 395 417 399 425 406 769 757 786 768 784 763 787 769

    Bina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

    ( ),

    Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

    Western Regional Load Despatch Centre,Mumbai

    , WRLDC, Mumbai MIS

    13 412 403 407 395 417 399 425 406 769 757 786 768 784 763 787 76914 413 399 408 398 416 394 425 411 771 749 787 762 786 763 790 76515 411 398 411 398 419 386 426 401 767 753 783 760 789 762 782 75716 410 401 408 395 419 386 426 401 763 753 778 761 783 762 779 76317 410 399 407 393 419 386 426 401 768 752 780 759 780 756 781 76918 411 403 404 394 419 386 426 401 769 759 782 765 783 766 782 76819 408 400 403 392 407 393 426 407 769 759 780 759 729 759 780 76520 411 400 404 394 415 393 425 401 759 759 783 760 779 765 783 76521 411 405 412 397 417 396 425 406 770 758 788 760 787 771 785 76322 411 405 409 400 419 386 426 406 770 758 785 770 791 775 788 77123 412 403 407 397 411 397 424 409 774 760 783 766 788 766 785 76724 414 405 409 401 420 396 424 403 765 756 784 762 790 770 788 77225 415 405 410 402 409 399 426 403 770 756 784 760 794 775 788 77226 413 402 409 395 419 386 426 401 766 751 782 762 793 764 789 766

    27 414 401 408 395 419 386 426 406 766 752 786 762 792 763 787 764

    28 419 404 415 396 419 386 427 406 777 753 790 763 802 765 796 76829 417 403 411 398 419 386 428 402 777 753 789 760 795 768 790 76630 416 399 410 393 419 386 426 397 769 753 791 763 793 762 790 76231 417 400 410 396 419 386 426 401 770 743 791 766 794 766 791 765

    419 398 415 388 420 386 428 397 777 743 791 759 802 753 796 757

    ( ),

    Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

    Western Regional Load Despatch Centre,Mumbai

    , WRLDC, Mumbai MIS , WRLDC, Mumbai MIS

  • No. ofOccasions

    Max Load Reliefat 49.2 Hz

    No. ofOccasions

    Max Load Reliefat 49.2 Hz

    No. ofOccasions

    Max Load Reliefat 49.2 Hz

    No. ofOccasions

    Max Load Reliefat 49.2 Hz

    1 01-Oct-15 0 0 0 0 0 0 0 02 02-Oct-15 0 0 0 0 0 0 0 03 03-Oct-15 0 0 0 0 0 0 0 04 04-Oct-15 0 0 0 0 0 0 0 05 05-Oct-15 0 0 0 0 0 0 0 06 06-Oct-15 0 0 0 0 0 0 0 07 07-Oct-15 0 0 0 0 0 0 0 08 08-Oct-15 0 0 0 0 0 0 0 09 09-Oct-15 0 0 0 0 0 0 0 0

    10 10-Oct-15 0 0 0 0 0 0 0 011 11-Oct-15 0 0 0 0 0 0 0 012 12-Oct-15 0 0 0 0 0 0 0 013 13-Oct-15 0 0 0 0 0 0 0 014 14-Oct-15 0 0 0 0 0 0 0 015 15-Oct-15 0 0 0 0 0 0 0 016 16-Oct-15 0 0 0 0 0 0 017 17-Oct-15 0 0 NIL NIL NIL 018 18-Oct-15 0 0 0 0 0 0 0 019 19-Oct-15 0 0 0 0 0 0 0 020 20-Oct-15 0 0 0 0 0 0 0 021 21-Oct-15 0 0 0 0 0 0 0 022 22-Oct-15 0 0 0 0 0 0 0 023 23-Oct-15 0 0 0 0 0 0 0 024 24-Oct-15 0 0 0 0 0 0 0 025 25-Oct-15 0 0 0 0 0 0 0 026 26-Oct-15 0 0 0 0 0 0 0 027 27-Oct-15 0 0 0 0 0 0 0 028 28-Oct-15 0 0 0 0 0 0 0 029 29-Oct-15 0 0 0 0 0 0 0 030 30-Oct-15 0 0 0 0 0 0 0 031 31-Oct-15 0 0 0 0 0 0 0 0

    1025 91 490 851Recommonded Load relief at49.2 Hz / 49.0/48.8/48.6 Hz

    Gujarat Maharashtra

    ANNEX -2.4

    DateSl. No Madhya Pradesh( Compiled from the data received from the constituents)

    Chhattisgarh

    Under Frequency Operation in various Constituent System of Western Region during the month OCTOBER - 2015

  • ANNEXURE-2.5

    A@Taobar 2015 ko daOrana piScama xao~ maoM ivaVut kTaOityaaM/ pabMaidyaaMPower Cut/Restrictions in Western Region for the month of October-2015

    k : gaujarat Gujarat

    1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut/ Restriction on Industriesa) All industries are allowed to run their units on all days of week & if they want to avail staggered holiday,

    then they will have to staggered on notified day only & cannot avail as per their choice.b) All industries are required to keep their recess timings staggered.

    2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2. Power supply to Agricultural & Rural Sectors

    a) Only 10 Hrs. Power supply in staggered form in rotation of day & night is given to Ag. Single Phasesupply during rest of 14 Hrs by providing LSTC.

    b) Jyotigram Yojana 24 hrs.

    3 Anya jaanakarI3. Any other information: NIL.K : maQya p`doSa Madhya Pradesh

    1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid1 Power Cut/ Restriction on Industries, Load Shedding in the state etc

    ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

    power cut (MW)

    pabandI ka samayaRestriction Timing

    p`it idna kula }jaa- kTaOtITotal Energy Cut

    (MUs /daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

    process HT/LT Industries M(b) Baar inayamana Load Shedding

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    (c) Anya jaanakarI Other information1.Weekly Off2.Staggering of power supply

    SaUnya NilSaUnya Nil

    SaUnya NilSaUnya Nil

    SaUnya NilSaUnya Nil

    SaUnya NilSaUnya Nil

    2 kRiYa xao~ kao ivaVut AapUit-2. Power supply to Agricultural Sector: -

    ivavarNa Details sao FromidnaaMk Date

    tk ToidnaaMk Date

    p`it idna AapUit- GaMTo Supply Hours per dayMax. (Hrs) Min. (Hrs) Average (Hrs)

    2.1 Three-PhaseSupply(DLF)

    01.10.2015 31.10.2015 23:37 22:52 23:19

    2.1 Three-PhaseSupply(Irrigation)

    01.10.2015 31.10.2015 09:53 09:36 09:47

    2.1 Three-PhaseSupply(Mixed)

    01.10.2015 31.10.2015 23:26 22:41 23:08

  • 3 Anya jaanakarI3. Any other information

    SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

    idnaaMk Datetk To idnaaMk

    DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

    Max.(Hrs)

    Min. (Hrs) Average (Hrs)

    3.1 Commissionary H. Qtrs. 01.10.2015 31.10.2015 23:55 23:33 23:473.2 District Head Qtrs. 01.10.2015 31.10.2015 23:56 23:27 23:483.3 Tehsil Head Qtrs. 01.10.2015 31.10.2015 23:45 23:18 23:36

    ga : maharaYT/ Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid1. Power Cut/ Restriction on Industries, Load Shedding in the state etc

    ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

    power cut (MW)

    pabandI ka samayaRestriction Timing

    pit idna kula }jaa- kTaOtITotal Energy Cut

    (MUs /dayFrom To

    (a) Power Cuts/Restriction on HT/LT Industries(b) Load SheddingFrom 01.10.15 to 31.10.15

    SaUnya Nil

    @ 15-757 MW

    SaUnya Nil

    00.00

    SaUnya Nil

    24.00

    SaUnya Nil

    @ 5.0 MUs/day

    (c) Any other information1.Weekly Off2. Staggering of power supplyIndustrial Staggering LSwithdrawn from 03/02/2012

    SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

    2 kRiYa xao~ kao ivaVut AapUit-2. Power supply to Agricultural Sector

    ivavarNa Details sao FromidnaaMk Date

    tk ToidnaaMk Date

    p`it idna AapUit- GaMTo Supply Hours per day

    Max. (Hrs) Min. (Hrs) Average (Hrs)2.1 Three-Phase Supply 01.10.2015 31.10.2015 10:00 08:00 09:00

    2.2 Single-Phase Supply 01.10.2015 31.10.2015 18:00 18:00 18:003 Anya jaanakarI Any other information:There is no load shedding on industrial feeders in Maharashtra

  • Ga : C%tIsagaZ, Chhattisgarh:1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid1 Power Cut/ Restriction on Industries, Load Shedding in the state etc

    ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

    pabandI ka samayaRestriction Time

    p`it idna kula}jaa- kTaOtI

    TotalEnergy Cut(MUs /day)

    sao From tkTo

    (A) Scheduled(a) (i) Power Cuts/Restriction on HT Industries(ii) Power Cuts/Restrictionon LT Industries(iii) Power Cuts/Restrictionon Rural(iv) Agriculture pump*

    (v)Urban/ Sub-Urban(iv)Town feeders(C-1to C-6)

    (B) Un-Scheduled(a) Load Shedding

    00.00(Av)

    00.00(Av)

    00.00 (Av)00.00 (Av)00.00(Av)00.00 (Av)

    1.Rural 92.18 MW(Av) For 98.24 Hrs.2.Town Feeders (C-1to C-6 & X) : 0.00(Av)

    -

    -

    -00.00

    --

    -

    -

    -

    -00.00

    --

    -

    -

    -

    -

    -0.00

    --

    0.287

    -

    3. HT Industries 80.64 (Av) For 101.38 Hrs.0.226

    Total Energy Cut/day 0.514( b) Any other information1.Weekly Off/staggering ofpower supply

    1day (In a week as perconsumers option) 50MW(Av.) - - 0.039

    2 kRiYa xao~ kao ivaVut AapUit-2. Power supply to Agricultural Sector

    ivavarNa Details sao FromidnaaMk Date

    tk ToidnaaMk Date

    p`it idna AapUit- GaMTo Supply Hours per dayMax. (Hrs) Min. (Hrs) Average (Hrs)

    2.1 Three-Phase Supply 01.10.2015 to 31.10.2015, 6.00Hrs (Power cut)

    18.00

    2.2 Single-Phase Supply - - - - -2.3 Remarks/Note/ - - - - -

    3 Anya jaanakarI / Any other information: SaUnya Nil

  • Annex-2.6

    ( )

    ,Power System Operation Corporation Ltd.(A wholly owned subsidiary company of POWERGRID)

    Western Regional Load Despatch Centre,Mumbai

    2015Details of forced unit outages during the month of Oct. 2015

    Sl.No

    Unit

    Constituent/IPP

    Cap.MW

    oFrom

    oFrom

    Reason

    Time Date Date

    1. ESSAR-2 GSECL 172 12:12 22-02-2013 Still out Still out SHORTAGE OF GAS

    2.GTPS-2

    GSECL 120 20:20 22-10-2014 Still out Still out RSD

    3.GTPS-3

    GSECL 210 19:10 27-10-2014 Still out Still out LOW DEMAND

    4. GTPS-1

    GSECL 120 5:36 22-10-2014 Still out Still out RSD

    5. UKAI-2 GSECL 120 15:02 10-11-2014 Still out Still out RSD6. SUGEN-2 GSECL 382 11:46 31-01-2015 Still out Still out RSD7. HAZIRA

    EXT-1GSECL 351 0:37 25-03-2015 Still out Still out

    RESTORATIONUNCERTAIN

    8.PIPAVAV 2

    GSECL 350 02:50 18-07-2015 Still out Still outGAS PURGE VALVEPROBLEM

    9. SLPP 3

    GSECL 125 21:43 17-08-2015 Still out Still out TURBINE TRIP

    10.GTPS 4

    GSECL 210 10:55 15-09-2015 02:35 24-10-2015 RSD

    11.WANAKBORI 6

    GSECL 210 20:15 18-09-2015 Still out Still out RSD

    12.STPS 1

    GSECL 120 11:00 19-09-2015 Still out Still out RSD

    13. UKAI 1 GSECL 120 08:00 20-09-2015 04:04 09-10-2015 RSD14. GPEC 2 GSECL 218 11:59 28-09-2015 04:04 09.10.2015

    COSTLYGENERATION(LOADMANAGEMENT)

    15. GPEC 1 GSECL 218 20:11 28-09-2015 Still out Still out RSD16. GPEC 3 GSECL 218 20:03 29-09-2015 Still out Still out RSD17.

    UTRAN STG II 1GSECL 375 14:17 01-10-2015 09:40 06-10-2015 RSD

    18. SUGEN 1 GSECL 382 21:23 02-10-2015 Still out Still out RSD

  • 19. SLPP 1

    GSECL 125 18:51 05-10-2015 18:10 18-10-2015 BTL

    20.WANAKBORI 5

    GSECL 210 13:39 06-10-2015 19:45 12-10-2015 RSD

    21. GIPCL STG 2

    GSECL 165 10:55 08-10-2015 06:02 12-10-2015STEAM LEAKAGESFROM HRSG

    22. DGBP 2 GSECL 112 23:58 17-10-2015 06:23 26-10-2015 STEAM LEAKAGES23.

    SLPP 2GSECL 125 19:59 19-10-2015 12:44 22-10-2015

    BOILER TUBELEAKAGE (BTL)

    24.STPS 2

    GSECL 120 18:00 21-10-2015 10:10 24-10-2015 RSD

    25. GPEC 2 GSECL 218 20:49 21-10-2015 04:00 26-10-2015 LOW SCHEDULE26.

    GIPCL STG 2GSECL 165 21:27 21-10-2015 06:19 26-10-2015 LOW SCHEDULE

    27.WANAKBORI 5

    GSECL 210 11:56 22-10-2015 17:21 27-10-2015 RSD

    28.STPS 3

    GSECL 250 11:22 23-10-2015 06:29 31-10-2015 LOSS OF FUEL

    29. UKAI 4

    GSECL 200 20:27 26-10-2015 09:19 29-10-2015 FLAME FAILURE

    30. SLPP 1

    GSECL 125 12:17 28-10-2015 13:59 01-11-2015 BTL

    31.WANAKBORI 4

    GSECL 210 21:59 28-10-2015 Still out Still out RSD

    32.WANAKBORI 5

    GSECL 210 10:15 29-10-2015 Still out Still out RSD

    33. UKAI 3

    GSECL 200 10:05 30-10-2015 Still out Still out RSD

    34.STPS 2

    GSECL 120 15:08 31-10-2015 Still out Still out RSD

    35.CHANDRAPUR-1

    MAHAGENCO 210 7:15 28-08-2014 Still out Still outBTL/ ECONOMICSHUTDOWN.

    36. PARLI 6 MAHAGENCO 250 15:07 25-06-2015 Still out Still out WATER SHORTAGE

    37. BHUSAWAL-2

    MAHAGENCO 210 12:43 07-09-2014 06:28 31-10-2015FLAMEFAILURE/ECONOMYSHUTDOWN

    38. KORADI-6 MAHAGENCO 210 01:02 20-03-2015 Still out Still out ECONOMIC SHUTDOWN39. URAN-7 MAHAGENCO 108 00:07 17.04.2015 Still out Still out CTO40. PARLI-3 MAHAGENCO 210 12:52 14.06.2015 Still out Still out WATER SHORTAGE

    41.WPCL 2

    MAHAGENCO 135 00:00 15-06-2015 Still out Still out LESS SCHEDULE

    42. PARLI 4 MAHAGENCO 210 19:47 05-07-2015 Still out Still out WATER SHORTAGE

    43. PARLI 5 MAHAGENCO 210 14:55:00 06-07-2015 Still out Still out WATER SHORTAGE.

    44. PARLI 7 MAHAGENCO 250 12:07:00 08-07-2015 Still out Still out WATER SHORTAGE

  • 45.WPCL 1

    MAHAGENCO 135 19:18 25-08-2015 01:14 10.10.2015 ESP Problem

    46. URAN B0 1 MAHAGENCO 120 23:06 28-09-2015 14:49 07.10.2015 GAS SHORTAGE47. URAN 8 MAHAGENCO 108 23:11 28-09-2015 06:30 07-10-2015 GAS SHORTAGE48. NASIK 2 MAHAGENCO 210 11:32 04-10-2015 15:12 10.10.2015

    BOILER TUBELEAKAGE

    49.WPCL 4

    MAHAGENCO 135 05:25 10-10-2015 13:51 23-10-2015 LESS SCHEDULE

    50.CHANDRAPUR 6

    MAHAGENCO 500 16:50 11-10-2015 14:38 14-10-2015 ACW Tube line leakage

    51.CHANDRAPUR 7

    MAHAGENCO 500 22:13 14-10-2015 07:05 18-10-2015 BTL

    52. KHAPARKHEDA 4

    MAHAGENCO 210 17:26 15-10-2015 00:27 18-10-2015BEARING VIBRATIONHIGH

    53.CHANDRAPUR 5

    MAHAGENCO 500 18:00 15-10-2015 23:55 19-10-2015 BTL

    54. BHUSAWAL 3

    MAHAGENCO 210 09:23 21-10-2015 01:36 25-10-2015 BTL

    55. KHAPARKHEDA 4

    MAHAGENCO 210 12:58 22-10-2015 17:05 28-10-2015TURBINE VIBRATIONHIGH

    56.WPCL 1

    MAHAGENCO 135 17:31 23-10-2015 Still out Still out LESS SCHEDULE

    57. URAN 5 MAHAGENCO 108 10:56 28-10-2015 20:42 31-10-2015 GAS SHORTAGE58. URAN B0 1 MAHAGENCO 120 09:35 30-10-2015 Still out Still out GAS TURBINEPROBLEM59. URAN 8 MAHAGENCO 108 09:35 30-10-2015 Still out Still out GAS TURBINEPROBLEM60. TROMBAY 6 TPC 500 17:08 15-07-2015 Still out Still out

    ECONOMYSHUTDOWN.

    61. AMRAVATITPP(INDIABULL)-5

    RATTANPOWER INDIA

    LTD270 14:22 03-04-2015 Still out Still out

    TURBINE SHAFTVIBRATIONS

    62. APML TIRODA 4

    ADANIPOWER,TIROD

    A660 20:49 11-09-2015 05:46 28-10-2015

    ABNORMAL SOUND INGENERATOR

    63. APML TIRODA 3

    ADANIPOWER,TIRO

    DA660 09:48 27-10-2015 Still out Still out

    EXCITATIONPROBLEM

    64. MCCPL 1

    ACBIL 300 01:01 11-10-2015 06:07 14-10-2015 BOILER MFT

    65. MCCPL 1

    ACBIL 300 21:19 20-10-2015 08:06 23-10-2015FURNACE FLAMEFAILED DUE TO PLCFAILURE

    66. MCCPL 1

    ACBIL 300 16:44 28-10-2015 Still out Still outPROBLEM IN BOTTOMASH SYSTEM

    67.ESSAR MAHAN-1

    ESSARPOWER

    660 17:16 17.10.14 Still out Still out LESS SCHEDULE

    68. ESSAR IPP1

    ESSARPOWER

    170 12:30 11-08-2015 Still out Still out SPARKING ON GT

    69. EPGL 1 ESSAR 600 12:46 30-10-2015 14:42 02-11-2015 RSD70. RGPPL 320 23:00 31-03-2014 Still out Still out DRY PRESERVATION

  • RGPPL-1B

    71. RGPPL-1A

    RGPPL 320 13:30 8-07-2014 Still out Still out LESS REQUISITION

    72. RGPPL-2A

    RGPPL 332 12:00 21-07-2014 Still out Still out CW PUMP PROBLEM

    73. RGPPL-2B

    RGPPL 332 13:30 1-09-2014 Still out Still out LESS REQUISITION

    74. RGPPL-3B

    RGPPL 332 18:09 30.05.2015 11:12 23-10-2015 NO SCHEDULE

    75. RGPPL-3A

    RGPPL 332 19:50 01-06-2015 Still out Still out NO SCHEDULE

    76. RGPPL 3B

    RGPPL 332 19:26 23-10-2015 09:51 27-10-2015 LESS SCHEDULE

    77. RGPPL 3B

    RGPPL 332 15:51 27-10-2015 Still out Still outTrail testing workcompleted.

    78. AMARKANTAK-4

    MPGCL 120 11:13 30-04-2014 Still out Still out TURBINE VIBRATION

    79. AMARKANTAK-3

    MPGCL 120 0:25 12-01-2015 Still out Still outFIRE CAUGHT INTURBINE FLOOR

    80. SATPURA-III-9

    MPPGCL 210 13:30 23.05.2015 Still out Still out FIRE IN GT

    81. SATPURA IV 11

    MPPGCL250 01:20 25-07-2015 Still out Still out FIRE IN GT

    82. SATPURA II 7

    MPPTCL 210 06:30 01-10-2015 01:45 06.10.2015GT DIFFERENTIALPROTECTIONOPERATED

    83.JP BINA 2

    MPPGCL 250 18:24 17-09-2015 02:30 07.10.2015 RSD

    84.S G TPS 4

    MPPTCL 210 21:50 02-10-2015 17:22 12.10.2015 HYDROGEN LEAKAGE

    85. MB Power 1

    MPPTCL 600 04:27 14-10-2015 16:40 18-10-2015 APH PROBLEM

    86.SINGAJI 1

    MPPTCL 600 12:29 27-10-2015 Still out Still outSTATOR WINDINGTEMP HIGH/WATERFLOW LOW

    87.JP BINA 1

    MPPTCL 250 00:05 29-10-2015 Still out Still out RSD

    88. SINGAJI 2 MPPTCL 600 10:04 29-10-2015 Still out Still out RSD

    89. SATPURA II 7

    MPPTCL 210 00:05 30-10-2015 Still out Still out RSD

    90.JP BINA 2

    JAYPEE 250 00:34 30-10-2015 Still out Still out RSD

    91.KORBA(W) EXTN

    CSPTCL 500 23:02 24-10-2015 20:55 28-10-2015TO ATTEND LEAKAGEAT KILNKER ANDBOTTOM ASH HOPPER

    92. DGEN-51

    TPGL 400 21:43 03-10-2015 06:00 19-10-2015 LOW SCHEDULE

    93. DGEN-53 3

    TPGL 400 21:47 17-10-2015 05:59 23-10-2015 LESS SCHEDULE

  • 94. DGEN-52 2

    TPGL 400 21:44 21-10-2015 06:40 24-10-2015 LESS SCHEDULE

    95. DGEN-51 1

    TPGL 400 21:42 23-10-2015 Still out Still out LESS SCHEDULE

    96. VANDANA -1

    VANDANA 135 15:00 9-01-2015 Still out Still out BTL

    97.DHARIWAL-2

    DHARIWAL 300 0:00 22-12-2014 19:34 31-10-2015 LESS SCHEDULE

    98. DHARIWAL-1

    DHARIWAL 300 02:27 28.05.2015 Still out Still outHIGH VIBRATIONPROBLEM

    99. LANCO-2 LANCO 300 12:20 21-08-2013 Still out Still out COAL SHORTAGE100. JPL Stg-I 1 JPL 250 00:07 02-10-2015 15:47 05-10-2015 LESS SCHEDULE

    101. JPL Stg-II 2

    JPL 600 17:16 05-10-2015 Still out Still outGENERATORPROTECTIONOPERATED

    102. JPL Stg-II 3

    JPL 600 00:42 11-10-2015 Still out Still out LOW SCHEDULE

    103. JPL STG-I 2

    JPL 250 00:09 22-10-2015 Still out Still out LOW SCHEDULE

    104.KWPCL 1

    KWPCL 600 06:14 10-10-2015 00:37 14-10-2015ABNORMAL SOUND INBOTH AIR PREHEATER

    105. DB POWER I

    DBP 600 14:35 31-10-2015 20:28 02-11-2015 ID FAN PROBLEM/BTL

    106. SASAN 5 SASAN 660 08:20 12-10-2015 18:22 16-10-2015 HOT PA BELOW107. SASAN 5 SASAN 660 17:38 17-10-2015 03:57 21-10-2015 HEAVY LEAKAGE ONSTARTUP SYSTEM.108. SASAN 5 SASAN 660 07:30 21-10-2015 07:02 25-10-2015 LEAKAGE IN STARTUPSYSTEM109. SASAN 1 SASAN 660 10:54 21-10-2015 03:58 26-10-2015 COAL FEEDINGTRIPPLER PROBLEM110. KAPS 2 NPCIL 220 14:09 01-07-2015 Still out Still out

    FEED WATER SIDEPROBLEM

    111. TAPS 2 NPCIL 160 12:55 10-09-2015 Still out Still out REFUELLING OUTAGE

    112. GANDHAR GT 2

    NTPC 219 19:58 28-08-2015 07:27 13.10.2015 RSD

    113. KAWAS 1A

    NTPC 164 02:39 15-09-2015 13:24 26-10-2015 RSD

    114. KAWAS GT 1C

    NTPC 106 12:06 01-10-2015 12:34 26-10-2015 LESS SCHEDULE

    115. KAWAS GT 1B

    NTPC 106 12:12 01-10-2015 07:40 26-10-2015 LESS SCHEDULE

    116.VSTPS 10

    NTPC 500 18:11 11-10-2015 06:17 14-10-2015 BTL

    117. GANDHAR GT 1

    NTPC 120 00:53 13-10-2015 05:47 26-10-2015 LESS SCHEDULE

    118. KAWAS 2 NTPC 164 17:23 21-10-2015 Still out Still out LESS SCHEDULE119.

    GANDHAR GT ST 2NTPC 219 17:30 21-10-2015 Still out Still out LESS SCHEDULE

  • 120. MOUDA 1

    NTPC 500 02:36 23-10-2015 Still out Still out LESS SCHEDULE(RSD)

    121.KSTPS 5

    NTPC 500 00:09 24-10-2015 Still out Still out AOH

    122. KAWAS 4 NTPC 13:34 26-10-2015 Still out Still out LOW SCHEDULE123.

    VSTPS 2NTPC 210 14:22 29-10-2015 Still out Still out LESS SCHEDULE/RSD

    124. GANDHAR GT ST 1

    NTPC 219 14:54 29-10-2015 Still out Still outUNIT AUXILIARYSUPLLY FAULT

    125. MOUDA 2

    NTPC 500 23:54 29-10-2015 Still out Still out LOW SCHEDULE

    126. KAWAS 1 NTPC 164 23:55 29-10-2015 05:59 02-11-2015 LOW SCHEDULENote: Units out for more than 72 hrs are only included.

    ***************

    Annex-2.7

    ( )

    ,Power System Operation Corporation Ltd.(A wholly owned subsidiary company of POWERGRID)

    Western Regional Load Despatch Centre,Mumbai

    2015Details of planned unit outages during the month of Oct. 2015

    Sl.No

    Unit

    Constituent/IPP

    Cap.MW

    oFrom

    oFrom

    Reason

    Time Date Time Date1. SIPAT I 3 NTPC 660 01:46 21-09-2015 06:56 01-11-2015 AOH2. MOUDA 2 NTPC 500 23:33 02-10-2015 16:10 20-10-2015 AOH3.

    CGPL 20CGPL 830 00:22 08-10-2015 Still out Still out AOH

    4.VSTPS 4

    NTPC 210 00:21 08-10-2015 Still out Still out AOH

  • (MW) From To1 GUVNL1.1 UGBPS Stage II GT + STG 375 7-Nov-15 1-Dec-15 Major inspection1.2 AECO F 121 11-Nov-15 20-Nov-15 Boiler Annual ispection1.3 AECO E 121 08.12.2015 22.12.2015 AOH1.4 ALTPS 2 125 16-Nov-15 26-Nov-15 AOH1.5 AECO D 120 22-Nov-15 6-Dec-15 Boiler Annual ispection1.6 UTPS-3 3 200 15-Dec-15 13-Mar-16 COH + ESP Refurbishment1.7 SUGEN 10 382.5 07.12.15 20.12.15 AOH1.8 UNO SUGEN 40 382.5 23.11.15 28.11.15 AOH

    2

    NIL

    3 CSPGCL

    3.1 KORBA EST 4 50 15.11.15 30.11.15 AOH3.2 DSPM 1 250 12.12.15 04.01.16 AOH3.3 KORBA EST 3 50 18.12.2015 27.01.16 COH

    44.1 EMCO 2 300 10.01.15 05.02.15 AOH

    NIL

    5 Central Sector5.1 VINDHYACHAL 12 500 20.11.15 10.12.15 BLR+TGB+INSP

    DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING NOEMBER 2015 AND DECEMBER 2015

    Capacity Outage as per AnnualMaintenance Plan

    Annexure- 3.1

    MSPGCL

    MPPGCL

    ReasonS. No. Unit No.

  • SN KV Line From To Basis Reason System Agency TypeDate Time Date Time

    1 765 Satna-Gwalior-1 16-Nov-15 8:00 17-Nov-15 18:00 Daily stringing work of 800kv HVDC Champa-Kurukshetra lineInter

    Regional NRPC Column1WR-NR TTC Revision required

    2

    400 SSP - Kasor

    18-Nov-15

    8:00

    17-Dec-15

    18:00

    ContDe stringing of 2 Nos. 400 KV double circuittower and dismentailing work. Erection ofDY+9 type tower because of DFCC crossing.

    GETCO GETCO Option of ERS may be explored.Mock Black start on 29-Nov maybe review

    3

    400 Asoj - Chorania No. 1

    18-Nov-15

    8:00

    17-Dec-15

    18:00

    ContDe stringing of 2 Nos. 400 KV double circuittower and dismentailing work. Erection ofDY+9 type tower because of DFCC crossing.

    GETCO GETCO Option of ERS may be explored.Mock Black start on 29-Nov maybe review

    4 HVDC Ramagundam-Chandrapur-1 18-Nov-15 9:00 18-Nov-15 19:00 DailyChecking and implementation of A/RScheme.

    InterRegional SRPC

    Date may be rescheduled since400 kV Gajuwaka south bus-1 isapproved in SRPC.

    5 HVDC Pole - 2 South Bus - 1 atHVDC Gajuwaka--2 18-Nov-15 9:00 18-Nov-15 18:00 Daily AMPInter

    Regional SRPCNo shutdown shall be allowed inWR-SR corridor.

    6 765/400 ICT-1 at Aurangabad 20-Nov-15 9:00 20-Nov-15 18:00 Daily for normalisation of B-ph unit after repairs andto take out Y-ph unit . WRTS-I WRTS-I R

    7 400 Boisar-1 line Reactor atAurangabad 20-Nov-15 9:00 20-Nov-15 18:00 Dailyfor Jumper connection and allignment of Lineisolator & Bay AMP works WRTS_I WRTS_I R

    8 765 Solapur -1 Main Bay 707at Aurangabad 20-Nov-15 9:00 20-Nov-15 18:00 Daily for checking the drive mechanism of CB WRTS_I WRTS_I R

    9 400 Bhadrawati-Parli # 1 20-Nov-15 7:00 19-Dec-15 18:00 Daily Auto reclose in Non auto mode for OPGWstringing works. WRTS-I WRTS-I R

    10 400 Bhadrawati-Chandrapur-3&4 20-Nov-15 7:00 30-Nov-15 18:00 DailyAuto reclose in Non auto mode for OPGWstringing works. WRTS-I WRTS-I R

    11 400 Tie Bay of Kolhapur-2 &ICT-2 at Mapusa 20-Nov-15 9:00 25-Nov-15 17:30 Cont.CB Overhauling works. WRTS-I WRTS-I

    Rmain bay line -1 out at Mapusa,ini 3-nov now 8-Nov(bec of y-phase)

    12 400 Pune(GIS)- Parli # 2 Linereactor at Pune(GIS) 20-Nov-15 9:00 20-Nov-15 18:00 Daily For Fire fighting works at Pune(GIS) WRTS-I WRTS-I RLR not switchable

    13 400 Pune (Talegoan)- PadhgeLine at Pune (Talegoan) 20-Nov-15 9:30 20-Nov-15 18:00 Daily Replacment of CVT 'B' phase WRTS-I WRTS-I Rafter LR parli-2

    14 400 Pune(GIS)-Pune # 1& 2 20-Nov-15 6:00 19-Dec-15 18:00 Daily Online OPGW work. A/R to be kept in Nonauto mode WRTML WRTS-I C

    15 400 Solapur-Parli # 1& 2 20-Nov-15 6:00 19-Dec-15 18:00 Daily Online OPGW work. A/R to be kept in Nonauto mode WRTML WRTS-I C

    16 765 Seoni-Wardha # 1 20-Nov-15 6:00 19-Dec-15 18:00 Daily Online OPGW work. A/R to be kept in Nonauto mode WRTS-I WRTS-I C

    17 400 Bhadrawati-Parli-1 & Bhadrawati - Dhariwal-Parli20-Nov-15 6:00 19-Dec-15 18:00 DailyOnline OPGW work. A/R to be kept in Nonauto mode WRTS-I WRTS-I C

    18 400 Solapur-Kolhapur-1&2 20-Nov-15 6:00 19-Dec-15 18:00 Daily Online OPGW work. A/R to be kept in Nonauto mode WRTML WRTS-I C

    19 765 Seoni-Bina 20-Nov-15 6:00 19-Dec-15 18:00 Daily Online OPGW work. A/R to be kept in Nonauto mode WRTS-I WRTS-I C

    20 220 Bus-II at Solapur 20-Nov-15 9:00 21-Nov-15 21:00 Daily Isolator alignment Works WRTS-I WRTS-I R21 400/220 ICT-3 at Solapur 20-Nov-15 9:00 21-Nov-15 21:00 Daily For CSD Commissioning WRTS-I WRTS-I R

    22 220 Solapur- Kumbhari-2 line 20-Nov-15 9:00 20-Nov-15 21:00 Daily BUS 2 Isolator alignment & bay AMP MSETCL WRTS-I R

    23 765/400 765 KV ICT # 2 atWardha 20-Nov-15 9:00 20-Nov-15 18:00 Daily AMP work at Wardha WRTS-I WRTS-I R

    ANNEXURE - 3.2Outage Planning of Transmission elements during the Duration 16.11.2015 to 21.12.2015

  • 24 400 Bus Reactor 125 MVARMain Bay at Raipur SS 20-Nov-15 9:00 20-Nov-15 17:00 Daily AMP WorkWRTS -

    1/CG Powegrid R

    25 220 Bhatapara-BhataparaLine at Bhatapara SS 20-Nov-15 9:00 20-Nov-15 17:00 Daily AMP WorkWRTS -

    1/CG Powegrid R

    26 765 ICT # 1 at Durg PS 20-Nov-15 9:00 21-Nov-15 17:00 Continous CSD Commsioning WRTS -1/CG Powegrid C

    27 765 765kv D/C Champa -Durg 1&2 line 20-Nov-15 8:00 19-Dec-15 18:00 Continous Non A/R mode for Addtional EarthingWRTS -

    1/CG Powegrid R

    28 765 765kv D/C Raigarh -Durg1&2 line 20-Nov-15 8:00 19-Dec-15 18:00 Continous Non A/R mode for Addtional EarthingWRTS -

    1/CG Powegrid R

    29 400 Raipur-Raigarh Ckt-I & IITL 20-Nov-15 8:00 19-Dec-15 18:00 Continous Non A/R mode for Addtional EarthingWRTS -

    1/CG Powegrid Rline-2 lilo at RKM , KWPCLSpecify the section

    30 765 AT Bank #1 at TamnarPS 20-Nov-15 10:00 20-Nov-15 14:00 Continuous AMP WorkWRTS -

    1/CG Powegrid R

    31 765 765kV Bus Reactor atKotra PS 20-Nov-15 10:00 20-Nov-15 14:00 Daily AMP WorkWRTS -

    1/CG Powegrid Rvotahe below 775 kV

    32 765 765 KV S/C Bilaspur-Korba TL 20-Nov-15 8:00 23-Nov-15 0:00 Daily Non A/R mode for Addtional EarthingWRTS -

    1/CG Powegrid R

    33 765 765kV Bus Reactor atBilaspur PS 20-Nov-15 8:00 20-Nov-15 16:00 DailyBushing Gasket Replacement Work in B-phase

    WRTS -1/CG Powegrid R

    34 765 765 KV S/C Vadodara-Dhule Line20-Nov-15 7:00 20-Dec-15 18:00 DailyAR to be kept in non Auto mode for OPGWworks BDTDCL BDTCL R

    35 765 765KV S/C ,Aurangabad-Dhule Line20-Nov-15 7:00 20-Dec-15 18:00 DailyAR to be kept in non Auto mode for OPGWworks BDTCL BDTCL R

    36 765 765KV S/C ,Indore-Bhopal Line20-Nov-15 7:00 20-Dec-15 18:00 DailyAR to be kept in non Auto mode for OPGWworks BDTCL BDTCL R

    37 765 765KV S/C ,Bhopal-Jabalpur Line20-Nov-15 7:00 20-Dec-15 18:00 DailyAR to be kept in non Auto mode for OPGWworks BDTCL BDTCL R

    38 765kV 701 -Main bay of ICT-1HV at Koradi-III SS 20-Nov-15 8:00 20-Nov-15 18:00 Daily701 CB, 701 CT Annual Maintenance of baysequipment MEGPTCL MEGPTCL R

    39 400 Korba Bhatapara line 20-Nov-15 8:30 20-Nov-15 17:30 Continuous Hot spot attending in Bus-4 gantry NTPC NTPC

    40 400 Bus-4 shutdown at Korba 20-Nov-15 8:30 20-Nov-15 17:30 Continuous Hot spot attending in Bus-4 gantry NTPC NTPC

    41 400 Wanakbori - Dehgam 20-Nov-15 8:00 21-Nov-15 18:00 Daily PMM work, Water washing GETCO GETCO

    42 400 CGPL Limdi Line-2 with Reactor20-Nov-15 6:00 20-Nov-15 18:00 Daily Modification in Limdi Line-2 (Mansar Line)413 89L IsolatorPGCIL CGPL

    43 400 Anuppur-Jabalpur (Ckt-I&II) 20-Nov-15 8:00 20-Nov-15 20:00 DailyFor crossing work of 800 KV HVDC Champa-Kurukshetra line at location no. (100/0-101/0). PGCIL WR-II C

    MB Power may beinformed.Clarification to besubmitted to WRPC/WRLDC onD-3 basis

    44 400 Itarsi-Indore # 2 Line 20-Nov-15 10:00 20-Nov-15 15:00 Daily For replacement of B-Ph CVT at Itarsi end PGCIL WR-II R45 400 500 MVA ICT 3 at Boisar 20-Nov-15 9:00 20-Nov-15 18:00 Daily For AMP work. PGCIL WR-II R

    46 400 315MVA ICT-II atShujalpur 20-Nov-15 10:00 20-Nov-15 18:00 Daily For AMP work. PGCIL WR-II R

    47 400 Bay -418 (Bus Reactor 2main bay)at Khandwa ss. 20-Nov-15 9:30 20-Nov-15 18:00 Daily Bay AMP work PGCIL WR-II R

    48 400 405-ICT#3 Tie Bay atVapi 20-Nov-15 9:00 20-Nov-15 17:00 Daily Bay AMP work PGCIL WR-II R

    49 765 B/R Main bay (703) atGwalior 20-Nov-15 10:00 21-Nov-15 18:00 Daily AMP WORKS and CT Samplling PGCIL WR-II R

    50 400 BUS-1 AT DEHGAM S/S 20-Nov-15 10:00 20-Nov-15 18:00 Daily For AMP work. PGCIL WR-II R

    51 400Bay 402(400KV Bhachau-Mundra ckt # 2 tie bay) atBhachau

    20-Nov-15 9:00 21-Nov-15 18:00 Cont. CB pull rod replacement work. Line will be inservice PGCIL WR-II RPlease clarify whether line shallbe in service or not

  • 52 765

    765kV JBP -DHARMJAYGARH # 4Line Reactor at JabalpurPooling Station

    20-Nov-15 9:00 20-Nov-15 18:00 Daily

    765kV Bus # 2 Spare Reactor PhaseCommissioning with Dharmjaygarh # 4 forSwapping with Dharmjaygarh # 4 R PhaseReactor.

    PGCIL WR-II C

    53 765 Sasan - Satna Ckt-I 20-Nov-15 6:00 19-Dec-15 18:00 Daily Online replacement of E/W with OPGW. A/Rshall be kept in non auto mode PGCIL WR-II C

    54 765 Gwalior - Agra Ckt-II 20-Nov-15 6:00 19-Dec-15 18:00 Daily Online replacement of E/W with OPGW. A/Rshall be kept in non auto mode PGCIL WR-II C

    55 765 Satna - Gwalior Ckt-I 20-Nov-15 6:00 19-Dec-15 18:00 Daily Online replacement of E/W with OPGW. A/Rshall be kept in non auto mode PGCIL WR-II C

    56 400 Vapi - Kala Ckt-I 20-Nov-15 6:00 19-Dec-15 18:00 Daily Online replacement of E/W with OPGW. A/Rshall be kept in non auto mode PGCIL WR-II C

    57 400 Navsari - Magarwada # I 20-Nov-15 6:00 19-Dec-15 18:00 Daily Online replacement of E/W with OPGW. A/Rshall be kept in non auto mode PGCIL WR-II C

    58 220 Kawas - Haldarwa # I,II 20-Nov-15 6:00 19-Dec-15 18:00 Daily Online replacement of E/W with OPGW. A/Rshall be kept in non auto mode PGCIL WR-II C

    59 220 Gandhar - Haldarwa #1,2 20-Nov-15 6:00 19-Dec-15 18:00 Daily Online replacement of E/W with OPGW. A/Rshall be kept in non auto mode PGCIL WR-II C

    60 220 Kawas - Dastan # 1,2 20-Nov-15 6:00 19-Dec-15 18:00 Daily Online replacement of E/W with OPGW. A/Rshall be kept in non auto mode PGCIL WR-II C

    61 220 Vav - Navsari(GETCO)#1,2 20-Nov-15 6:00 19-Dec-15 18:00 DailyOnline replacement of E/W with OPGW. A/Rshall be kept in non auto mode PGCIL WR-II C

    62 220 Kawas-Vav#1,2 20-Nov-15 6:00 19-Dec-15 18:00 Daily Online replacement of E/W with OPGW. A/Rshall be kept in non auto mode PGCIL WR-II C

    63 400 Vindhyachal Pooling -SASAN UMPP #1 20-Nov-15 6:00 19-Dec-15 18:00 DailyOnline replacement of E/W with OPGW. A/Rshall be kept in non auto mode PGCIL WR-II C

    64 220 Chhegeon Khandwa #1,2 20-Nov-15 6:00 19-Dec-15 18:00 DailyOnline replacement of E/W with OPGW. A/Rshall be kept in non auto mode PGCIL WR-II C

    65 220 Kawas-Dastan # 1,2 20-Nov-15 6:00 19-Dec-15 18:00 Daily Online replacement of E/W with OPGW. A/Rshall be kept in non auto mode PGCIL WR-II C

    66 220 Dastan-Navsari # 1,2 20-Nov-15 6:00 19-Dec-15 18:00 Daily Online replacement of E/W with OPGW. A/Rshall be kept in non auto mode PGCIL WR-II CShall be concurred if only oneDGEN machine will be on bar

    67 220 Haldarwa-Kakrapar(NPC) # 1,2 20-Nov-15 6:00 19-Dec-15 18:00 DailyOnline replacement of E/W with OPGW. A/Rshall be kept in non auto mode PGCIL WR-II C

    68 400 Navsari - Boiser# 1 20-Nov-15 6:00 19-Dec-15 18:00 Daily Online replacement of E/W with OPGW. A/Rwill be in N/A mode. PGCIL WR-II C

    69 220 Kakrapar - Vav Ckt I 20-Nov-15 9:00 20-Nov-15 18:00 Daily AMP of 220 KV Kakrapar I bay at Vav SS PGCIL WRII R70 400 Padhga-Nagothane ckt-II 20-Nov-15 10:00 20-Nov-15 18:00 Daily Faulty insulator string replacement work MSETCL MSETCL

    71400 Chandrapur Parali Circuit

    III20-Nov-15 8:00 20-Nov-15 18:00

    DailyFixing and replacement of broken Spacercum vibration dampers of Chandrapur-ParaliCKT II &III

    MSETCL MSETCL

    72 400 Kalwa-Padghe D/C 20-Nov-15 7:00 19-Dec-15 19:00 Daily 48F OPGW Stringing work . MSETCL MSETCL

    73 400 Mouda 400kv Bus reactor 20-Nov-15 9:00 21-Nov-15 18:00Continuou

    s ANNUAL PREVENTIVE MAINTENANCE NTPC NTPC

    74 400BAY 401( MAIN BAY OFPITAMPUR CKT#1) atIndore PS

    20-Nov-15 10:00 20-Nov-15 18:00 Daily AMP OF BAY EQUIPMENT at Indore PS PGCIL WR-II R

    75 765 765kV BUS REACTOR-2at Bina 20-Nov-15 9:00 21-Nov-15 18:00 Conti. B Phase Reactor Oil Leakage PGCIL WR-II R

    76 765 765 kV Vadodara Dhuleline 20-Nov-15 9:00 20-Nov-15 18:00 Daily Commissioning of Spare Reactor with DhuleLine PGCIL WR-II C

    77 765 BUS-II, Vchal Pooling SS 20-Nov-15 9:00 20-Nov-15 10:00 One hour Replacing CVT fuse PGCIL WR-II R

    78220kV

    Badod-Modak-S/c andBadod-Kota-S/c(Simultaneously) 20-Nov-15 9:00 20-Nov-15 17:00

    DailyShifting of Lines and Over head stringing

    ISTS MPPTCLNLDC concurrence required

    79 765 Satna-Gwalior-2 20-Nov-15 8:00 21-Nov-15 18:00 Daily stringing work of 800kv HVDC Champa-Kurukshetra lineInter

    Regional NRPC

  • 80 400 Khandwa-Dhule-2 lineReactor at Dhule 20-Nov-15 9:00 20-Nov-15 18:00 Daily DGA Sampling of Bushing oil. WRTS-I WRTS-I R

    81 400 Babhaleshwar- Dhule D/C 20-Nov-15 7:00 19-Dec-15 19:00 Daily 48F OPGW Stringing work . MSETCL MSETCL

    82 400 Aurangabad -Babhaleshwar20-Nov-15 7:00 19-Dec-15 19:00 Daily 48F OPGW Stringing work . MSETCL MSETCL

    83400 Talegaon -Lonikand 20-Nov-15 7:00 19-Dec-15 19:00 Daily 48F OPGW Stringing work .After completion

    of Padghe -Talegaon 48F OPGW Stringingwork .

    MSETCL MSETCL

    84 400 Main Bus-2 at Raita 20-Nov-15 8:00 21-Nov-15 18:00 Daily Y Phase Bus CVT need to be Checked CSPTCL CSPTCL R85 400 Chorania-Mundra-1 21-Nov-15 8:00 21-Nov-15 18:00 Daily PMM work PGCIL GETCO

    86 400 Bhadrawati-Dhariwal 21-Nov-15 8:00 21-Nov-15 18:00 Daily

    Replacement of Porcelain Insulators withGlass in N.H./HVDC Crossings.Auto recloseshall be kept in Non auto mode for Bhdrawati-Parli # 1 is required.

    WRTS-I WRTS-I R

    87 400 Boisar-2 Line Reactor atAurangabad 21-Nov-15 9:00 21-Nov-15 18:00 Dailyfor Jumper connection and allignment of Lineisolator & Bay AMP works WRTS_I WRTS_I R

    88 765 Solapur -2 Main Bay 710at Aurangabad 21-Nov-15 9:00 21-Nov-15 18:00 Daily for checking the drive mechanism of CB WRTS_I WRTS_I R

    89 400 Bhadrawati-Chanadrapur# 4 21-Nov-15 8:00 21-Nov-15 18:00 Daily

    Replacement of Porcelain Insulators with CLRPolymer in HVDC line crossings.Auto recloseshall be kept in Non auto mode forBhadrawati-Chanadrapur # 3 line is requied.

    WRTS-I WRTS-I R

    90 400 Pune(GIS)- Parli # 1 Linereactor at Pune(GIS) 21-Nov-15 7:00 21-Nov-15 18:00 Daily For Fire fighting works at Pune(GIS


Recommended