MULTIFLEX Girder slab formwork Assembly Instructions for Standard Application Edition 11/2007
Transcript
Page 1: Multiflex Assembly Instructions

MULTIFLEXGirder slab formwork

Assembly Instructions for Standard Application

Edition 11/2007

Page 2: Multiflex Assembly Instructions

Dokument 1 28.04.2005 12:48 Uhr Seite 1

Page 3: Multiflex Assembly Instructions

Overview 1Introduction 2Product features 2Intended use 2Safety instructions 3

A Assembly and Dismantling

A1 Storage and transport 4A2 MULTIFLEX components

Formlining and girder 5Props and propheads 6Tripod and erection bar 7

A3 Shuttering 8-9A4 Striking 10-11A5 Guardrails and setting of stopend 12

B Application

B1 General instructions 13B2 Calculation of slab formwork

(example) VT 20/VT20 14-15B3 Application example 16B4 Beams

with UZ Beam bracket 40 andUZ Perforated Rail 17with slab stopend angle 18

B5 Design tables 20-31

C Product Overview 32-43

Content

Page

Legend

Visual Check Hints Important Site Tipssafety instructions

Page 4: Multiflex Assembly Instructions

1

4

3

6

1a

1b

5

2

1a Main beam1b Cross beam2 Crosshead3 Clawhead4 Prop5 Tripod6 Formlining

Overview

Page 5: Multiflex Assembly Instructions

2

These assembly instructions describethe standard usage of the flexibleMULTIFLEX slab formwork systemtogether with PERI VT 20 girders.

At the beginning, there is informationon the product and its utilisation aswell as general and safety references.In Part A the intended use, as of astandard situation, is presented.

Introduction

Individual components:– formlining sheets– PERI VT 20 girder and GT 24

lattice girder– crosshead as non-tilting

supporting heads of formwork– clawhead for intermediate support– erection bar for girder assembly

from below– tripod / MRK frame as erection aid.

Support:– PERI slab props and shoring system.

These Assembly Guidelines containinstructions for the correct handlingand intended use of the PERIMULTIFLEX slab formwork system.Safety instructions and load specifi-cations must be observed at all times.

Special permission must be givenby PERI if the formwork is to be used

Product features

The MULTIFLEX slab formwork is agirder formwork system which issuitable for every ground plan anddifferent heights, depending on thetype of support used.

Depending on the slab thickness,assembly can be carried out usingthree girder combinations:Combination 1: VT 20 / VT 20Combination 2: VT 20 / GT 24Combination 3: GT 24 / GT 24

Main beam and connected crossbeams form a grid to accommodatethe formlining sheets. The main beamsare positioned in the supporting headsof props.

Part B contains details on systemapplication, and design tables for propspacing, formlining and accessories.Information on appropriate props canbe found in the PERI Design Tables –Formwork Technology.

Additional details for forming withPERI GT 24 girders are contained inPart A and B.

The individual system components arelisted in the product overview togetherwith their article numbers. Dimensionswithout any unit of measurement arein cm.

If you have any questions, pleasecontact your local PERI representative.

Additional guidelines

In particular, this includes at thepresent time– industrial safety regulations

(BetrSichV)– technical regulations for industrial

safety (TRBS)

PERI product information

PERI design tables –formwork technologyPERI MULTIPROP / PEPPERI slab edge trestle AWPERI UZ beamPERI construction site equipmentStripping Cart ASW 465Pallets and stacking devicesApproval for PERI girdersType tests for slab props

Intended use

for other applications other than ithas been designed for together withsupplementary assembly instructions.

Basically, only materials in perfectcondition may be used. The safety andenvironmental regulations of eachcountry where this product is usedmust be observed at all times.

The product is intended for commercialuse only.

These assembly guidelines, PERIoffer and implementation plansas well as other PERI productinformation do not replace specificconstruction site work and assemblyinstructions.

Page 6: Multiflex Assembly Instructions

Dokument 1 28.04.2005 12:48 Uhr Seite 1

Page 7: Multiflex Assembly Instructions

3

11. Striking takes place only whenthe concrete has sufficiently hardenedand site management has given thego-ahead!

12. When striking, use tools whichdo not damage the MULTIFLEXcomponents! Do not pull awaycomponents with the crane!

13. When striking, do not compromisethe stability of shoring and formworkcomponents!

14. Only transport components withhoisting gear if suitable attachingmeans are available!

15. The weight of the componentsmust not exceed the permissible loadcapacity of the lifting gear!

16. Remove lifting equipment from alowered formwork component or unitonly when it is in a stable position!

17. Store and transport componentsand pallets in a safe and secure manneravoiding any unintentional changeof position! Do not throw anycomponents!

Maintenance instruction forformlining

Immersion vibrator with rubber capminimises damage to the formlining.

Take care when placing heavy objectson formlining. Use timbers wherenecessary and be aware of load bearingcapacity.

Use reinforcement spacers with alarge bearing area to minimiseindentations.

Safety Instructions

These assembly instructions aredirected at those persons who workwith PERI MULTIFLEX.Non-observance of the safetyinstructions and assembly guidelinescan lead to accidents and damage tomaterials.

General information

– The basis of the MULTIFLEX systemis an all-sided horizontal andnon-moveable positioned slabformwork! This is given withperipheral walls and beams castin advance. Otherwise the transferof horizontal loads must be ensuredin accordance with DIN 4421through other measuresundertaken on site (e.g. bracing)!

– If bracing is required for cantilevers,this must be friction-lockedassembled!

– For supporting pre-fabricatedslab elements, manufacturer´sreferences and installationinstructions must be observed!

– The correct working loads forprops and girders is ensured withthe help of PERI design tables andthe respective building authorityapproval.

– The safe and secure installationof the bracing as well as assemblyof the shoring (including tripod,crosshead and clawhead) are to bedescribed in detail in thecontractor`s assembly instructions!

Responsibilities of the contractor:

1. The contractor must ensure thatthe PERI and all other requiredinstructions are at the user´s disposal.

2. All persons working with theproduct must be familiar with thecontent of these instructions andsafety information.

3. Persons who cannot or havedifficulty in reading and understandingthese instructions must inform andthen be fully briefed by the contractor.

4. The contractor has to ensure thatassembly, adjusting and dismantling,moving as well as correct use of theproduct is supervised by trained andauthorised personnel.

5. The contractor is obliged to provideall prerequisites to ensure compliancewith applicable safety regulations.

General Safety Information:

1. MULTIFLEX slab formworkcomponents are to be checked beforeevery use for signs of damage!Damaged parts are to be replacedby PERI original components!

2. When erecting the MULTIFLEX,ensure that all load effects are safelytransferred! The formwork must remainin a horizontal and non-moveableposition!

3. MULTIFLEX must be assembledon a flat, clean and sufficiently load-bearing surface!

4. Stability must be guaranteed at alltimes!

5. Never remove safety installations!

6. Do not exceed any givenpermissible loads!

7. Safe working areas are requiredat all times for assembly, adjusting,dismantling and moving of theformwork equipment

8. Safe access to all working areasmust be in place!

9. Working areas must be madesecure against falling!

10. Safe conditions for forming mustbe available at all times! Appropriatesafety precautions are to be in placeduring unfavourable weather conditionse.g. secure formwork against lifting!Site personnel must not enterjeopardized areas!

Page 8: Multiflex Assembly Instructions

4

A1 Storageand Transport

– PERI Instructions for Use: Pallets!BGR 500 operated by equipment -Pallets and stacking devices areattached by means of suitable andreliable lifting equipment to all fourdesignated lifting eyes!

– Secure components in the ringpallets against moving!(e.g. tension belt or steel band)

Storage

Stacked materials and pallets mustbe protected against effects of theweather, e.g. secure formliningagainst lifting.

Store and transport MULTIFLEXcomponents in craneable PERI ringpallets and PERI crate pallets,see also A3 / A4.Alternatively, stack girders andformlining using edge protection andstored on timbers.

Transport

Load-bearing capacity!

– PERI ring pallets and crate palletsare suitable for crane and fork-liftoperations. Lifting equipment mustbe attached to all four lifting eyes 10.They can also be moved using thePERI pallet lifting trolley.

– Both containers can be lifted usingboth the long and short sides. For safetransportation, the length of the liftingforks must be adjusted accordingly.

– Move stacks by means of suitablelifting gear.

Fig.1c

Fig.1b

10

10

10

Fig.1d

Fig.1a

10

10

Page 9: Multiflex Assembly Instructions

5

16,3

16,3

A2 Components

Formlining– PERI multi-layered sheeting 21 mm

(Beto), 62.5 x 2.50 m, Fig. 2– 3-Ply plywood 21mm or other plywood

sheeting, depending on requirements,see PERI plywoods.

In the PERI design tables and slidecharts, the 3-S plywood sheet has beentaken into consideration. If othersheeting is used, the deflection of theplywood used must be staticallychecked regarding the deflectiontolerances, see PERI design tables.

Formwork girders

Using theVT 20K high-grade web girderFig. 3a

Using theGT 24 lattice girderFig. 3bAs standard, the GT 24 lattice girderis supported in the girder nodes.

Due to the node configuration, theGT 24 has various permissible loads:

– support in the girder nodesFig. 4a

– support outside of the girder nodearea, Fig. 4b

The permissible loads must also bemaintained when supporting in theend areas. Fig. 4a + 4b

For calculating slab formwork withGT 24 lattice girders see PERI designtables or PERI slide charts

With clawhead 24 S or 24 L, GT 24girders can also be supported outsideof the node area with a maximumbearing load of 28 kN on the girder.Fig. 5

Fig.5

Fig.4a

Fig.3a

Fig.4b

20

8

- + - ++ -

+ - - + + -

perm. A = 14 kN

perm. A = 13 kN

perm. A = 28 kNperm. MST = 7.0 kNm

perm. A = 20 kNperm. MST = 4.0kNm

perm. A = 28 kNperm. QD = 14 kNperm. MST = 7.0 kNm

Fig.2

perm. Q = 11.0 kNperm. M = 5.0 kNm

lY = 4290 cm4

perm. QD / perm. QZ

perm. QD perm. QD

perm. QZ / perm. QD

perm. QZ perm. QZ

24

8

Fig.3bQD = perm. shear force for

compression strutQZ = perm. shear force for

diagonal tie

perm.QD= 14.0 kNperm.QZ = 13.0 kNperm.M = 7.0 kNm

lY =8000 cm4

Page 10: Multiflex Assembly Instructions

6

2a

2b

3a

4

3b

4a 4b

a + b

A2 Components

Slab props

Do not exceed the permissible loadspecifications!For other support systems,individual load specifications mustbe taken into consideration!

All loads resulting from the MULTIFLEXslab formwork must be safelytransferred into the ground or slab.

PERI support systems– steel tube props 4a: PEP– aluminium props 4b:

MULTIPROP (MP), Fig. 6– shoring towers: MP, PERI UP, PD 8,

ST 100For prop loads, see PERI design tables

Supporting heads of formworkProviding stable support for one or twogirders and as intermediate supportfor individual girders.

ExamplesWith self-locking coupling at end ofgirder or on girder joint:

– crosshead 20/24S 2a, alternative:– lowering head 20/24 2b with pins

and cotter pins

For intermediate support:– clawhead 24S 3a– clawhead 16/20S 3b

Fig. 7

Assembly:1. Position head on endplate of prop.

2. Engage self-locking coupling and checkfunctionality, Fig. 8 or without self-locking coupling, secure head with pinsand cotter pins.

3. Position props.The girders can now beaccommodated.

Dismantling:Release coupling or remove pins andtake off head.

Fig.6

Fig.8

40 m

mThe supporting heads offormwork fit all standardslab props with 40 mmhole diameters.

Pay attention to loweringrequirements whenaligning the props.(min. 4 cm).

Fig.7

Page 11: Multiflex Assembly Instructions

7

ø 48 - �

120 m

m

A2 Components

Formwork assembly

Three girder combinations1. Plywood sheet 21 mm

Cross beam VT 20Main beam VT 20h = 42 cm, Fig. 9a

2. Plywood sheet 21 mmCross beam VT 20Main beam GT 24h = 46 cm, Fig. 9b

3. Plywood sheet 21 mmCross beam GT 24Main beam GT 24h = 50 cm, Fig. 9c

Assembly aids

Universal tripodas erection aid for all round andsquare slab props.Through the swivel-mounted baseplates, the tripod can be erected incorners and against straight walls.Fig. 10a

Erection barfor installing and dismantling of girdersand formlining.

– erection bar GT/VT, for VT 20 andGT 24 girders, Fig.10b

– assembly bar 24 for GT 24 girders,Fig.10c

Brace clampfor round slab props. Fig.10dfor shuttering heights > 3.0 mfor assembly of diagonal bracing

Stripping carte.g. PERI Stripping Cart ASW 465Fig.10e

MULTIPROP Frame MRKfor forming heights > 3.0 m for bracingof MP props. Fig.10f

Fig.9b

Fig.9a

Fig.9c

42

46

50

Fig.10a

Fig.10b

Fig.10d

Fig.10e

Fig.10c

Fig.10f

Page 12: Multiflex Assembly Instructions

8

1

2b

40 mm

A3 Erection

Attach crosshead or clawhead to prop and engage (withself-locking coupling) Secure other types of support systemsby means of pins and cotter pins:Alternative to crosshead: Lowering Head 20/24 for simpleand easy lowering.

Position crosshead props on flat and load-bearing ground.Secure with tripods (erection aid).

Horizontal loads from the shuttering procedurecan only be transferred for shuttering heights upto approx. 3.0 m.

Shuttering height > 3.0 m with MULTIPROP props:Brace props by means of MRK frames (erection aid).See type test and MULTIPROP assembly instructionsfor more information.

Shuttering height > 3.0 m with steel tube support:e.g. PERI PEP:diagonal bracing must be mounted as an erection aid.

Turn the prop sothat the G-hookcan be operated.

2a

2

Page 13: Multiflex Assembly Instructions

9

min.15

VT 20VT 20VT 20 VT 20

A3 Erection

Position crosshead props. Mount main girders frombelow by means of erection bar.One or two main beams can be accommodated in eachcrosshead without any risk of tilting.

Position secondary girder from below by means of erection bar.Align cross beams in such a way so that the plywood sheetingjoints always rest on a cross beam or a pair of girders.Girder overlap: VT 20 min. 15 cm at both ends

GT 24 min.16.3 cm at both ends

Risk of falling!Mount guardrails before shutteringaccording to valid guidelines!

Secure cross beam against tilting.Install plywood sheeting and secure with nails.Level formwork and spray, e.g. with PERI Bio Clean.Caution: risk of slipping!

Mount intermediate props with claw heads on girdersusing prop spacing c.Extend props according to the length. GT 24 girders, see A2.

Risk of tilting!Ensure load effects are safely transferred!**see safety instructions "General Safety information"

The MULTIFLEX slab formwork can be now be usedin accordance with permissible load requirements.Pallets in position on the erection area ready to beused during striking operations

6

3 4

5

c

Main beam spacing bx . Prop spacing c

min.15 min.15min.15 min.15

Page 14: Multiflex Assembly Instructions

10

A4 Striking

Observe striking time!

Dismantle intermediate props and store in pallets.In cases of immediate re-use, the heads remain attachedto the props!

Lower all secondary girders by approx. 4 cm*.

Begin lowering and removal of props withlarger prop spans in the centre of the slab.

Dismantle plywood sheets and remaining cross beams– store in pallets.

Plywood must be accurately stacked in order toclean the sheet edges

Dismantle main girders and store in pallets.

* Observe permissible prop loads!If the formwork is not dismantled, it could lead tooverloading the props when concreting the slab forthe next floor.

1

4

2

54

Page 15: Multiflex Assembly Instructions

11

A4 Striking

Tip the secondary girders onto their sides and remove frombelow by means of the assembly bar and store in pallets.

Secondary girder located under plywood jointsremain in position.

Dismantle crosshead props and store in pallets.

In cases of immediate re-use, the heads remainattached to the props!

Before the first and any additional use, spray the plywoodsheet edges, e.g. with PERI BIO Clean. This facilitatesshuttering and striking procedures and helps to protectthe sheet.

2a

6 7

4

3

Alternative to No. 2Lower lowering head by means of hammer blow = 4 cm.

Push back wedge to starting position ready fornext use and fix tight with a hammer blow

Page 16: Multiflex Assembly Instructions

12

– scaffold components supplied bythe contractors must conform tovalid safety regulations!

– load effects must be safelytransferred!see safety instructions "General Information"

Guardrails *

on slab edges with slab tablesThe edge of the building is secured bymeans of PERI table modules. Fig. 11See also assembly instructions fortable modules.

during casting segmentwith slab edge trestle AWsee B5 for static value

AssemblyThe Stopend Angle 11 can be attachedin girder´s length direction as well asat 90° to the girder:

– 8 wire pins ø 3.1 x 65, (6 pins at front,2 pins at rear, Item. no. 018280)

– with clamp for attaching to the girderor timber

– insert handrail post AW 12 and nailrear end. Fig.12

with Stopend Angle AW, Fig.12a

with panel formwork and StopendAngle AW, Fig.12b

with slab stopend bar 105 andhandrail post HSGP, 13 + 14see B5 for static value. Fig. 13

See PERI construction site equipmentbrochure for additional setting ofstopends

*Guardrails– as a minimum, timber components

must correspond to Sort Class S10according to DIN 4074 and be markedwith a U symbol!

– secure guardrail boards with wire pinsor screws! Fig.12b

Fig.12

Fig.11

Fig.12b

11

11

12

Fig.12a

Fig.13

min

10

max. 14

max

50

13

14

A5 Guardrails andsetting of stopend

Page 17: Multiflex Assembly Instructions

13

Static-relevant instructions regarding the use ofslab formwork

Provided on-site assurance can be given that valuesof the slab thickness along with the spacing of thesecondary and main beams do not fall below thosespecified in the tables, and no additional loads areimposed as a result of the formwork being out ofplumb etc., the formwork girders satisfy all thecriteria for classification in Support Scaffold Group III.

Conditions for classifying the supportstructure in Support Scaffold Group I

Classification in Group I is possible for– erection heights of up to 5.00 m– spans of up to 6.00 m– vertical, uniformly distributed loads of up to 8 kN/m2

– uniformly distributed line loads from beams and downstands, and the like, of up to 15 kN/m

Drawings are not required. Proof of stability is onlyrequired if there is insufficient expertise available forassessment purposes.

The loads acting are to be multipliedby the group factor of 1.25

B1 GeneralInstructions

As a rule, the loads acting only have to be increasedby the group factor according to DIN 4421 for thesupport structure, which can mainly be classified inGroup I or II.

Conditions for classifying the supportstructure in Support Scaffold Group II

– proof of stability for all important structuralcomponents and their connections required toprevent collapse. Analyses may be carried outwith the simplifications described in Section 6.4.2.contained in DIN 4421

– drawings: general arrangement drawings whichclearly show the ground plans and sections of theconstruction. Presentation of the most importantdetails is necessary.

The loads acting are to be multipliedby the group factor of 1.15

Page 18: Multiflex Assembly Instructions

14

62,562,5 62,5

2,00 m

B2 Calculation ofSlab Formwork(example)

Example with slide chartVT 20/VT 20

Slab thickness: d = 20 cmClear room height: h = 2.80 mMain and cross beams: VT 20Plywood: 21 mm, 62.5 x 250 cm

Pre-selectionPre-selection makes it possible for theuser – subject to the available girderlengths – to more effectively plan theutilisation of the MULTIFLEX withregards to the available prop load-bearing capacity and building geometry.

From:– permissible prop spacing– possible main beam spacing (when

using the GT 24 girder as cross beam,pay attention to the 30 cm nodearrangement)

– available prop load

PlywoodThe 3-S plywood has been consideredin the slide chart.PERI Beto: see table, right.If another type of plywood is used, thecross beam spacing must be adaptedaccordingly, see B5 Plywood Chart.

1. Cross beam spacing aPlywood support, Fig.14(dependent on slab thickness and sizeof plywood sheet used, see B5Plywood Chart)

Cross beam spacing: 62.5 cmSee B5 for static values.

2. Main beam spacing bCross beam support, Fig.15

Max. permissible span for cross beamsaccording to the slide chart: 2.07 mMain beam spacing: 2.00 m(selected, dependent on roomgeometry)

Cross beam Max. slabspacing [cm] thickness [cm]

62.5 22

50 43

Size of plywood62.5 cm x 2.50 m

Fig.15

Fig.14

4 fields

5 fields

Max. slab thickness: PERI Beto

0,60

0,90

1,20

1,50

1,80

2,10

2,40

Loading: according to DIN 4421Deflection: limited to I/500

Basis for calculation is a three-ply sheet, 21 mm,with E = 7500 N/mm2 (saturated)and permissible B = 6.5 N/mm2 (saturated).

0,20

7,1

0,75 0,625 0,50

2,52

2,52

2,52

2,07

1,60

1,22

-

2,68

2,68

2,60

2,07

1,60

1,22

-

2,89

2,89

2,60

2,07

1,60

1,22

- - - -

22,0 22,0 22,0

22,0 22,0 22,0

22,0 22,0 22,0

21,5 22,0 22,0

16,1 17,1 18,5

10,7 11,4 12,3

a

b

c

Slab thickness d [m]Loading q [kN/m2]Permissible main beam spacing b [m]Existing prop load F [kN]Cross beam spacing a [m]

Prop spacing c [m]

Page 19: Multiflex Assembly Instructions

15

1,50 m1,50 m1,50 m

H

b

c

a

B2 Calculation ofSlab Formwork(example)

3. Prop spacing cMain beam support, Fig.16Prop spacing: 1.50 m

4. Prop loadSpecification for the slide chart:22.0 kNThrough the selection of the mainbeam spacing of b = 2.00 m, thisresults in a prop load of

to be transferred.

Now select a slab prop (PEP,MULTIPROP) corresponding to theextension length H with permissibleprop load = 21.3 kN.

The respective standards are used forthe support construction.

PERI slide chart for girdercombinations:VT 20 / VT 20GT 24 / VT 20GT 24 / GT 24

Fig.16

Fig.17

Example with PERI design tablesAccording to the selected girdercombination, calculations for theMULTIFLEX slab formwork arecarried out using the tables in B5.Depending on the slab thickness,the selected cross beam spacingand plywood sheet result in themain beam and prop spacings.Fig. 17

F = 22 kN x 2.00 m = 21.3 kN 2.07 m

Page 20: Multiflex Assembly Instructions

16

max

. 30

B3 ApplicationExample

Overviewwith edge tablesFig. 18

The basis of the MULTIFLEX is anall-sided horizontal and non-moveablepositioned slab formwork!

This is given with peripheral walls andbeams cast in advance. Otherwise thetransfer of horizontal loads must beensured in accordance with DIN 4421through other measures undertakenon site (e.g. bracing)!

Overview ofstarting bayFig.19

VT 20: min. d 15 cm, max. 30 cmGT 24: min. d 16.3 cm, max. 30 cm

Fig.18

Fig.19

Page 21: Multiflex Assembly Instructions

17

B4 Beams

UZ beam systemfor beams up to h = 80 cmconsisting of: UZ Beam Bracket 40 15a

UZ perforated rail 15b

– no formwork ties up to h = 80 cm– cross-sections are to be continuously

formed– girders or timbers can be used as

bottom formwork– side or bottom formwork can also be

formed with PERI TRIO elements– UZ perforated rails can be joined

together for extra-wide beams

Max. beam widthswith side form width b = 10 cm1 x UZ perforated rail 80 = 45 cm2 x UZ perforated rail 80 = 135 cm1 x UZ perforated rail 129 = 95 cmFig. 20See B5 for permissible widths ofinfluence.

Examples1. Side form with one or two 2 GT 24s

(vertical) Fig. 21a

2.Side form with two or three VT 20s(horizontal) Fig. 21b

3.Packing of formwork bottomFig. 21c

Fig.20

Fig.21b

Fig.21c

Fig.21a

15a

15b

b

Page 22: Multiflex Assembly Instructions

18

B4 Beams

Stopend Angle AWfor beams up to h = 60 cm

– the stopend angle 11 can be nailed tothe plywood (22 mm) as stopend upto h = 40 cm

– larger widths of influence and heightsare possible with the clamp, see B5

– side formwork can be formed usinghorizontal TRIO, DOMINO orHANDSET elements

– guardrails must be mountedaccording to valid regulations!

– load effects must be safelytransferred!see safety instructions "General Information"

Examples1. Edge beam: stopend nailed to table

module, Fig. 22a

2. Beam with Domino elements,Fig. 22b

3. Stopend angle with clamp 11a,Fig. 22c

AssemblySee A5, stopend angle AW

Used plywood sheets can be usedfor the working areas.

Fig.22b

Fig.22a

11

Fig.22c

11a

Page 23: Multiflex Assembly Instructions

19

Page 24: Multiflex Assembly Instructions

20

B5 Design tables

Plywood

Type ofplywood

Fin Ply

Fin Ply, Maxi

Fin Ply, USA

Fin Ply

PERI Birch

PERI Birch, USA

Combi Mirror

PERI Beto

PERI Beto, USA

PERI Beto

PERI Spruce

As-Ply

3-Ply Plywood

3-Ply Plywood

Lake Pine

Arauco Pine

FinNa-Ply

Thickness [mm]

21

20

19 / 3/4”

18

21

19 / 3/4”

21

21

19 / 3/4”

18

21

21

27

21

20,5

21

21

Veneers

Birch

Birch

Birch

Birch

Birch

Birch

Birch/Conifer Ply.

Birch/Conifer Ply.

Birch/Conifer Ply.

Birch/Conifer Ply.

Conifer Plywood

Plywood

Spruce

Spruce

Plywood

Pine

Conifer Plywood

E-modulus [N/mm2]

parallel/crosswise

8560/6610

7500/5760

6180/6880

8730/6440

8560/6610

9170/7060

8560/5060

6610/6560

6610/7140

6680/6500

5240/6370

1)

8000/1070

8000/1070

1)

1)

7910/3710

perm. [N/mm2]

parallel/crosswise

15.0/12.4

13.0/10.5

12.0/11.5

15.3/12.2

15.0/12.4

15.7/13.6

14.9/6.8

11.2/8.5

11.3/10.6

10.2/8.7

6.7/7.0

1)

4.9/1.5

5.9/1.3

1)

1)

8.0/5.0

1) No information possible because of large differences.

The static/mechanical values given in the tables refer, according toinformation from the manufacturers, to a moisture content of 15%.But GSV stipulate the values of moisture content as 20%.The values for the Modulus of Elasticity are therefore to bereduced by a factor of 0.9167 and the values for the permissibletension by a factor of 0.875.

The fibres of the face veneer span in the directionof the first length shown for the plywood size.

Solid timber

With a timber moisture content of 20% only the permissible tensionaccording to DIN 1052 is to be reduced by 0.833.

Softwood, Sorting Class S10

E-modulus [N/mm2]

parallel/crosswise

10000

perm. [N/mm2]

parallel/crosswise

10

Page 25: Multiflex Assembly Instructions

21

L L L L L L L

B5 Design tables

21 mm Plywood

The modulus of elasticity and the permissibletension is based on the grade and moisturecontent of the plywood (see page 20).

0.0068 · q · L4

Maximum deflection f = ––––––––––––––E · I

Maximum Moment M = 0.1071 · q · L2

(valid for at least 3 bays)

10 20 300 40 50 60 70 80 90 100 Concretepressure q[kN/m2]

25 cm

30 cm

35 cm

45 c

m

75 c

m

50 c

m

55 c

m

65 c

m

Def

lect

ion

f [m

m]

E =

300

0 N

/mm

2

E =

400

0 N

/mm

2

E =

500

0 N

/mm

2

E =

600

0 N

/mm

2

E =

700

0 N

/mm

2

E =

800

0 N

/mm

2

SPAN L

4.0

3.5

3.0

2.5

2.0

1.5

1.0

0.5

0.0

f f

4.6

4.0

3.4

2.9

2.3

1.7

1.1

0.6

0.0

5.3

4.7

4.0

3.3

2.7

2.0

1.3

0.7

0.0

6.4

5.6

4.8

4.0

3.2

2.4

1.6

0.8

0.0

8.0

7.0

6.0

5.0

4.0

3.0

2.0

1.0

0.0

10.7

9.3

8.0

6.7

5.3

4.0

2.7

1.3

0.0

Wall formwork

Slab formwork Slab Thickness d [cm]20 400 60 80 10010 30 50 70 90

60 c

m

70 c

m

40 cm

=

13N

/mm 2

=11

N/m

m 2

=

9N

/mm 2

=

7N

/mm 2

=5

N/m

m2

Page 26: Multiflex Assembly Instructions

22

B5 Design tables

MULTIFLEXGT 24 Girders as slab beams

0.22 0.24 0.26 0.28 0.30 0.35

7.6 8.1 8.7 9.2 9.8 11.3

0.75 0.625 0.50 0.625 0.50 0.40 0.625 0.50 0.40 0.625 0.50 0.40 0.625 0.50 0.40 0.50 0.40

2.99 3.18 3.42 3.09 3.33 3.59 3.02 3.25 3.50 2.95 3.17 3.42 2.88 3.11 3.35 2.96 3.1913.7 14.5 15.7 15.1 16.3 17.5 15.7 16.9 18.2 16.2 17.5 18.8 16.9 18.2 19.6 20.1 21.62.99 3.18 3.42 3.09 3.33 3.59 3.02 3.25 3.50 2.95 3.17 3.39 2.88 3.11 3.19 2.75 2.7520.5 21.8 23.5 22.7 24.4 26.3 23.5 25.3 27.3 24.3 26.2 28.0 25.3 27.3 28.0 28.0 28.02.99 3.06 3.06 2.87 2.87 2.87 2.69 2.69 2.69 2.54 2.54 2.54 2.39 2.39 2.39 2.06 2.0627.4 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.02.45 2.45 2.45 2.29 2.29 2.29 2.16 2.16 2.16 2.03 2.03 2.03 1.91 1.91 1.91 1.65 1.6528.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.01.88 1.88 1.88 1.76 1.76 1.76 1.65 1.65 1.65 1.56 1.56 1.56 1.47 1.47 1.47 1.26 1.2628.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.01.43 1.43 1.43 1.34 1.34 1.34 1.26 1.26 1.26 1.19 1.19 1.19 1.12 1.12 1.12 0.96 0.9628.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.01.22 1.22 1.22 1.15 1.15 1.15 1.08 1.08 1.08 1.02 1.02 1.02 0.96 0.96 0.96 0.82 0.8228.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0

0.60

0.90

1.20

1.50

1.80

2.10

2.40

0.10 0.12 0.14 0.16 0.18 0.20

4.5 5.0 5.5 6.1 6.6 7.1

0.75 0.625 0.50 0.75 0.625 0.50 0.75 0.625 0.50 0.75 0.625 0.50 0.75 0.625 0.50 0.75 0.625 0.50

3.79 4.03 4.34 3.60 3.82 4.12 3.44 3.65 3.93 3.30 3.51 3.78 3.18 3.38 3.64 3.08 3.27 3.5310.2 10.9 11.7 10.8 11.5 12.4 11.4 12.1 13.1 12.0 12.7 13.7 12.6 13.4 14.4 13.1 13.9 15.03.79 4.03 4.34 3.60 3.82 4.12 3.44 3.65 3.93 3.30 3.51 3.78 3.18 3.38 3.64 3.08 3.27 3.5315.4 16.3 17.6 16.3 17.3 18.6 17.1 18.2 19.6 18.0 19.1 20.6 18.9 20.0 21.6 19.7 20.9 22.53.79 4.03 4.34 3.60 3.82 4.12 3.44 3.65 3.93 3.30 3.51 3.78 3.18 3.38 3.55 3.08 3.27 3.2920.5 21.8 23.5 21.7 23.0 24.8 22.8 24.3 26.1 24.0 25.5 27.5 25.1 26.7 28.0 26.3 27.9 28.03.79 4.03 4.15 3.60 3.72 3.72 3.37 3.37 3.37 3.08 3.08 3.08 2.84 2.84 2.84 2.63 2.63 2.6325.6 27.2 28.0 27.1 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.03.18 3.18 3.18 2.85 2.85 2.85 2.58 2.58 2.58 2.36 2.36 2.36 2.18 2.18 2.18 2.02 2.02 2.0228.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.02.43 2.43 2.43 2.17 2.17 2.17 1.97 1.97 1.97 1.80 1.80 1.80 1.66 1.66 1.66 1.54 1.54 1.5428.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.02.07 2.07 2.07 1.86 1.86 1.86 1.68 1.68 1.68 1.54 1.54 1.54 1.42 1.42 1.42 1.31 1.31 1.3128.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0

Perm

. spa

n fo

r m

ain

gird

erPr

op s

paci

ng c

[m]

Slab thickness[m]

Loading q*[kN/m2]

Secondary beamspacing a [m]

0.60

0.90

1.20

1.50

1.80

2.10

2.40

Perm

. spa

n fo

r m

ain

gird

erPr

op s

paci

ng c

[m]

Slab thickness[m]

Loading q*[kN/m2]

Secondary beamspacing a [m]

Page 27: Multiflex Assembly Instructions

23

a aa

b

b

a

cc

c

B5 Design tables

MULTIFLEXGT 24 Girders as slab beams

0.40 0.45 0.50 0.60 0.70 0.80 0.90 1.00

12.9 14.4 16.0 19.1 22.2 25.4 28.5 31.4

0.50 0.40 0.50 0.40 0.50 0.40 0.50 0.40 0.50 0.40 0.50 0.40 0.50 0.40 0.50 0.40

2.83 3.05 2.73 2.94 2.64 2.84 2.42 2.44 2.10 2.10 1.84 1.84 1.64 1.64 1.49 1.4921.9 23.6 23.6 25.5 25.3 27.3 27.8 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.02.42 2.42 2.15 2.15 1.94 1.94 1.63 1.63 1.40 1.40 1.23 1.23 1.09 1.09 0.99 0.9928.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.01.81 1.81 1.62 1.62 1.46 1.46 1.22 1.22 1.05 1.05 0.92 0.92 0.82 0.82 0.74 0.7428.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.01.45 1.45 1.29 1.29 1.17 1.17 0.98 0.98 0.84 0.84 0.74 0.74 0.66 0.66 0.59 0.5928.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.01.11 1.11 0.99 0.99 0.89 0.89 0.75 0.75 0.64 0.64 0.56 0.56 0.50 0.50 0.46 0.4628.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.00.85 0.85 0.76 0.76 0.68 0.68 0.57 0.57 0.49 0.49 0.43 0.43 0.38 0.38 0.35 0.3528.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.00.72 0.72 0.65 0.65 0.58 0.58 0.49 0.49 0.42 0.42 0.37 0.37 0.33 0.33 0.30 0.3028.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0

0.60

0.90

1.20

1.50

1.80

2.10

2.40

Main beam

spac

ing

Prop spacing

Secondary beam spacing

Beam length Item no.

0.90m 0751001.20m 0751201.50m 0751501.80m 0751802.10m 0752102.40m 0752402.70m 0752703.00m 0753003.30m 0753303.60m 0753603.90m 0753904.20m 0754204.50m 0754504.80m 0754805.10m 0755105.40m 0755405.70m 0755706.00m 075600

* Loading to DIN 4421:

Formwork load g = 0.40 kN/m2

Concrete load b = 26 kN/m3 x d (m)Live load p = 0.20 x b

1.5 p 5.0 kN/m2

Total load q = g + b + p

The deflection has been limited to l/500.Main girder support at node intersections.Secondary girders assumed single span.

Table values mean the following:

2.87 Perm. main beam spacing b [m]

28.0 Existing prop load [kN]

Perm

. spa

n fo

r m

ain

gird

erPr

op s

paci

ng c

[m]

Slab thickness[m]

Loading q*[kN/m2]

Secondary beamspacing a [m]

Page 28: Multiflex Assembly Instructions

24

B5 Design tables

MULTIFLEXVT 20K Girders as slab beams

0.22 0.24 0.26 0.28 0.30 0.35

7.6 8.1 8.7 9.2 9.8 11.3

0.75 0.625 0.50 0.625 0.50 0.40 0.625 0.50 0.40 0.625 0.50 0.40 0.625 0.50 0.40 0.50 0.40

2.45 2.60 2.80 2.53 2.73 2.94 2.47 2.66 2.86 2.41 2.60 2.80 2.36 2.54 2.74 2.42 2.6111.2 11.9 12.8 12.4 13.3 14.3 12.8 13.8 14.9 13.3 14.3 15.4 13.8 14.9 16.0 16.4 17.72.45 2.60 2.80 2.53 2.73 2.94 2.47 2.66 2.82 2.41 2.60 2.66 2.36 2.50 2.50 2.16 2.1616.8 17.8 19.2 18.5 20.0 21.5 19.2 20.7 22.0 19.9 21.5 22.0 20.7 22.0 22.0 22.0 22.02.41 2.41 2.41 2.25 2.25 2.25 2.12 2.12 2.12 2.00 2.00 2.00 1.88 1.88 1.88 1.62 1.6222.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.01.92 1.92 1.92 1.80 1.80 1.80 1.69 1.69 1.69 1.60 1.60 1.60 1.50 1.50 1.59 1.30 1.3022.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.01.48 1.48 1.48 1.38 1.38 1.38 1.30 1.30 1.30 1.23 1.23 1.23 1.15 1.15 1.15 1.00 1.0022.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.01.13 1.13 1.13 1.05 1.05 1.05 0.99 0.99 0.99 0.93 0.93 0.93 0.88 0.88 0.88 0.76 0.7622.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.00.91 0.91 0.91 0.85 0.85 0.85 0.80 0.80 0.80 0.76 0.76 0.76 0.71 0.71 0.71 0.61 0.6122.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0

0.60

0.90

1.20

1.50

1.80

2.10

2.40

0.10 0.12 0.14 0.16 0.18 0.20

4.5 5.0 5.5 6.1 6.6 7.1

0.75 0.625 0.50 0.75 0.625 0.50 0.75 0.625 0.50 0.75 0.625 0.50 0.75 0.625 0.50 0.75 0.625 0.50

3.10 3.30 3.55 2.94 3.13 3.37 2.81 2.99 3.22 2.70 2.87 3.09 2.60 2.77 2.98 2.52 2.68 2.898.4 8.9 9.6 8.9 9.4 10.1 9.3 9.9 10.7 9.8 10.4 11.2 10.3 10.9 11.8 10.7 11.4 12.33.10 3.30 3.55 2.94 3.13 3.37 2.81 2.99 3.22 2.70 2.87 3.09 2.60 2.77 2.98 2.52 2.68 2.8912.6 13.4 14.4 13.3 14.1 15.2 14.0 14.9 16.0 14.7 15.6 16.9 15.4 16.4 17.7 16.1 17.1 18.43.10 3.30 3.55 2.94 3.13 3.37 2.81 2.99 3.22 2.70 2.87 3.03 2.60 2.77 2.79 2.52 2.58 2.5816.8 17.8 19.2 17.7 18.8 20.3 18.7 19.9 21.4 19.6 20.9 20.6 21.8 22.0 21.5 22.0 22.0 22.03.10 3.26 3.26 2.92 2.92 2.92 2.65 2.65 2.65 2.42 2.42 2.42 2.23 2.23 2.23 2.07 2.07 2.0721.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.02.50 2.50 2.50 2.24 2.24 2.24 2.03 2.03 2.03 1.86 1.86 1.86 1.71 1.71 1.71 1.59 1.59 1.5922.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.01.91 1.91 1.91 1.71 1.71 1.71 1.55 1.55 1.55 1.42 1.42 1.42 1.30 1.30 1.30 1.21 1.21 1.2122.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.01.54 1.54 1.54 1.38 1.38 1.38 1.25 1.25 1.25 1.15 1.15 1.15 1.06 1.06 1.06 0.98 0.98 0.9822.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0

0.60

0.90

1.20

1.50

1.80

2.10

2.40

Perm

. spa

n fo

r m

ain

gird

erPr

op s

paci

ng c

[m]

Slab thickness[m]

Loading q*[kN/m2]

Secondary beamspacing a [m]

Perm

. spa

n fo

r m

ain

gird

erPr

op s

paci

ng c

[m]

Slab thickness[m]

Loading q*[kN/m2]

Secondary beamspacing a [m]

Page 29: Multiflex Assembly Instructions

25

a

b

c

b

a aa

cc

B5 Design tables

MULTIFLEXVT 20K Girders as slab beams

0.40 0.45 0.50 0.60 0.70 0.80 0.90 1.00

12.9 14.4 16.0 19.1 22.2 25.4 28.5 31.4

0.50 0.40 0.50 0.40 0.50 0.40 0.50 0.40 0.50 0.40 0.50 0.40 0.50 0.40 0.50 0.40

2.32 2.50 2.23 2.40 2.16 2.29 1.92 1.92 1.65 1.65 1.45 1.45 1.29 1.29 1.17 1.1717.9 19.3 19.3 20.8 20.7 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.01.90 1.90 1.69 1.69 1.53 1.53 1.28 1.28 1.10 1.10 0.96 0.96 0.86 0.86 0.78 0.7822.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.01.42 1.42 1.27 1.27 1.15 1.15 0.96 0.96 0.82 0.82 0.72 0.72 0.64 0.64 0.58 0.5822.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.01.14 1.14 1.02 1.02 0.92 0.92 0.77 0.77 0.66 0.66 0.58 0.58 0.51 0.51 0.47 0.4722.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.00.87 0.87 0.78 0.78 0.70 0.70 0.59 0.59 0.51 0.51 0.44 0.44 0.40 0.40 0.36 0.3622.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.00.67 0.67 0.59 0.59 0.54 0.54 0.45 0.45 0.39 0.39 0.34 0.34 0.30 0.3022.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.00.54 0.54 0.48 0.48 0.43 0.43 0.36 0.36 0.31 0.3122.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0

0.60

0.90

1.20

1.50

1.80

2.10

2.40

* Loading to DIN 4421:

Formwork load g = 0.40 kN/m2

Concrete load b = 26 kN/m3 x d (m)Live load p = 0.20 x b

1.5 p 5.0 kN/m2

Total load q = g + b + p

The deflection has been limited to l/500.Secondary girders assumed single span.

Table values mean the following:

2.25 Perm. main beam spacing b [m]

22.0 Existing prop load [kN]

Secondary beam spacing

Main beam

spac

ing

Prop spacing

Beam length Item no.

1.45m 0749902.15m 0749052.45m 0749102.65m 0748902.90m 0749203.30m 0749303.60m 0749403.90m 0749504.50m 0749604.90m 0749705.90m 074980

Perm

. spa

n fo

r m

ain

gird

erPr

op s

paci

ng c

[m]

Slab thickness[m]

Loading q*[kN/m2]

Secondary beamspacing a [m]

Page 30: Multiflex Assembly Instructions

26

a

b

c

ba a

a

c

B5 Design tables

MULTIFLEXSecondary Girder: GT 24 / Main Girder: 2x GT 24

* Load to DIN 4421:

Dead load g = 0.40 kN/m2

Concrete load b = 26 kN/m3 x d (m)Live load p = 0.20 x b

1.5 p 5.0 kN/m2

Total load q = g + b + p

The deflection has been limited to 1/500.Main girder support at node intersections.Secondary girders assumed single span.

Table values mean the following:

3.17 perm. spacing of main girders [m]

56.0 actual prop load [kN]

One GT 24 is sufficient as main girderwhen prop loads < 28.0 kN

0.22 0.24 0.25 0.26 0.28

7.6 8.1 8.4 8.7 9.2

0.75 0.625 0.50 0.625 0.50 0.40 0.625 0.50 0.40 0.625 0.50 0.40 0.625 0.50 0.40

2.99 3.18 3.42 3.09 3.33 3.59 3.06 3.29 3.55 3.02 3.25 3.50 2.95 3.17 3.4213.6 14.5 15.6 15.0 16.2 17.4 15.4 16.6 17.9 15.8 17.0 18.3 16.3 17.5 18.92.99 3.18 3.42 3.09 3.33 3.59 3.06 3.29 3.55 3.02 3.25 3.50 2.95 3.17 3.4220.5 21.8 23.4 22.5 24.3 26.2 23.1 24.9 26.8 23.6 25.4 27.4 24.4 26.2 28.32.99 3.18 3.42 3.09 3.33 3.59 3.06 3.29 3.55 3.02 3.25 3.50 2.95 3.17 3.4227.3 29.0 31.2 30.0 32.4 34.9 30.8 33.2 35.8 31.5 33.9 36.5 32.6 35.0 37.82.99 3.18 3.42 3.09 3.33 3.59 3.06 3.29 3.55 3.02 3.25 3.50 2.95 3.17 3.4234.1 36.3 39.0 37.5 40.5 43.6 38.6 41.5 44.7 39.4 42.4 45.7 40.7 43.7 47.22.99 3.18 3.42 3.09 3.33 3.59 3.06 3.29 3.55 3.02 3.25 3.50 2.95 3.17 3.3840.9 43.5 46.8 45.1 48.6 52.3 46.3 49.7 53.7 47.3 50.9 54.8 48.9 52.5 56.0

0.60

0.90

1.20

1.50

1.80

0.30 0.35 0.40 0.50 0.60 0.70 0.80 0.90 1.00

9.8 11.3 12.9 16.0 19.1 22.2 25.4 28.5 31.4

0.625 0.50 0.40 0.50 0.40 0.50 0.40 0.50 0.40 0.50 0.40 0.40 0.40 0.40 0.40

2.88 3.11 3.35 2.97 3.21 2.83 3.05 2.64 2.84 2.42 2.68 2.51 2.35 2.22 2.0716.9 18.3 19.7 20.1 21.8 21.9 23.6 25.3 27.3 27.7 30.7 33.4 35.8 38.0 39.02.88 3.11 3.35 2.97 3.21 2.83 3.05 2.64 2.84 2.42 2.68 2.51 2.35 2.18 1.9825.4 27.4 29.5 30.2 32.6 32.9 35.4 38.0 40.9 41.6 46.1 50.1 53.7 56.0 56.02.88 3.11 3.35 2.97 3.21 2.83 3.05 2.64 2.84 2.42 2.44 2.10 1.84 1.64 1.4933.9 36.6 39.4 40.3 43.5 43.8 47.2 50.7 54.5 55.5 56.0 56.0 56.0 56.0 56.02.88 3.11 3.35 2.97 3.21 2.83 2.89 2.33 2.33 1.95 1.95 1.68 1.47 1.31 1.1942.3 45.7 49.2 50.3 54.4 54.8 56.0 56.0 56.0 56.0 56.0 56.0 56.0 56.0 56.02.88 3.11 3.17 2.75 2.75 2.41 2.41 1.94 1.94 1.63 1.63 1.40 1.22 1.09 0.9950.8 54.9 56.0 56.0 56.0 56.0 56.0 56.0 56.0 56.0 56.0 56.0 56.0 56.0 56.0

Secondary girder spacing

Main girder spacing

Propspacing

0.60

0.90

1.20

1.50

1.80

Perm

. spa

n fo

r m

ain

gird

erPr

op s

paci

ng c

[m]

Slab thickness[m]

Loading q*[kN/m2]

Secondary beamspacing a [m]

Perm

. spa

n fo

r m

ain

gird

erPr

op s

paci

ng c

[m]

Slab thickness[m]

Loading q*[kN/m2]

Secondary beamspacing a [m]

Page 31: Multiflex Assembly Instructions

27

a

b

c

ba a

c

B5 Design tables

MULTIFLEXSecondary Girder: VT 20K / Main Girder: 2x VT 20K

a = Secondary girder spacingMain girder spacing

Propspacing

0.22 0.24 0.25 0.26 0.28

7.6 8.1 8.4 8.7 9.2

0.75 0.625 0.50 0.625 0.50 0.40 0.625 0.50 0.40 0.625 0.50 0.40 0.625 0.50 0.40

2.45 2.60 2.80 2.53 2.73 2.94 2.50 2.69 2.90 2.47 2.66 2.86 2.41 2.60 2.809.30 9.90 10.7 10.3 11.1 12.0 10.5 11.3 12.2 10.7 11.5 12.4 11.1 11.9 12.92.45 2.60 2.80 2.53 2.73 2.94 2.50 2.69 2.90 2.47 2.66 2.86 2.41 2.60 2.8014.0 14.9 16.0 14.5 15.6 16.8 15.8 16.9 18.3 16.0 17.3 18.6 16.6 17.9 19.32.45 2.60 2.80 2.53 2.73 2.94 250 2.69 2.90 2.47 2.66 2.86 2.41 2.60 2.8018.7 19.8 21.3 20.6 22.2 23.9 21.0 22.6 24.4 21.4 23.0 24.8 22.1 23.9 25.72.45 2.60 2.80 2.53 2.73 2.94 2.50 2.69 2.90 2.47 2.66 2.86 2.41 2.60 2.8023.3 24.8 26.7 25.7 27.8 29.9 26.3 28.2 30.5 26.7 28.8 31.0 27.7 29.8 32.12.45 2.60 2.80 2.53 2.73 2.94 2.50 2.69 2.90 2.47 2.66 2.86 2.41 2.60 2.8028.0 29.7 32.0 30.9 33.3 35.9 31.5 33.9 36.5 32.1 34.6 37.2 33.2 35.8 38.62.45 2.60 2.80 2.53 2.73 2.94 2.50 2.69 2.90 2.47 2.66 2.86 2.41 2.60 2.7432.7 34.7 37.3 36.0 38.9 41.9 36.8 39.5 42.6 37.4 40.3 43.3 38.7 41.8 44.0

0.50

0.75

1.00

1.25

1.50

1.75

0.30 0.35 0.40 0.45 0.50

9.8 11.3 12.9 14.4 16.0

0.625 0.50 0.40 0.50 0.40 0.50 0.40 0.50 0.40 0.50 0.40

2.36 2.54 2.74 2.43 2.62 2.32 2.50 2.24 2.41 2.16 2.3211.5 12.4 13.4 13.8 14.8 14.9 16.1 16.2 17.4 17.3 18.62.36 2.54 2.74 2.43 2.62 2.32 2.50 2.24 2.41 2.16 2.3217.3 18.6 20.1 20.6 22.2 22.4 24.2 24.3 26.1 25.9 27.82.36 2.54 2.74 2.43 2.62 2.32 2.50 2.24 2.41 2.16 2.3223.0 24.8 26.7 27.5 29.7 29.9 32.2 32.3 34.8 34.6 37.12.36 2.54 2.74 2.43 2.62 2.32 2.50 2.24 2.41 2.16 2.3228.8 31.0 33.4 34.4 37.1 37.4 40.3 40.4 43.5 43.2 44.02.36 2.54 2.74 2.43 2.59 2.28 2.28 2.03 2.03 1.83 1.8334.6 37.2 40.1 41.3 40.0 44.0 44.0 44.0 44.0 44.0 44.02.36 2.54 2.58 2.22 2.22 1.95 1.95 1.74 1.74 1.57 1.5740.3 43.4 44.0 44.0 44.0 44.0 44.0 44.0 44.0 44.0 44.0

* Load to DIN 4421:

Dead load g = 0.40 kN/m2

Concrete load b = 26 kN/m3 x d (m)Live load p = 0.20 x b

1.5 p 5.0 kN/m2

Total load q = g + b + p

The deflection has been limited to 1/500.Secondary girders assumed single span.

Table values mean the following:

2.58 perm. spacing of main girders [m]

44.0 actual prop load [kN]

One VT 20K is sufficient as main girderwhen prop loads < 22.0 kN

0.50

0.75

1.00

1.25

1.50

1.75

Perm

. spa

n fo

r m

ain

gird

erPr

op s

paci

ng c

[m]

Slab thickness[m]

Loading q*[kN/m2]

Secondary beamspacing a [m]

Perm

. spa

n fo

r m

ain

gird

erPr

op s

paci

ng c

[m]

Slab thickness[m]

Loading q*[kN/m2]

Secondary beamspacing a [m]

Page 32: Multiflex Assembly Instructions

28

f

Z

B5 Design tables

Formwork Bracket-2

Permissible spacings [m] depending

on the slab depth and overhang.

Slab thickn. d Overhang f [m][m] 0.10 0.20 0.30 0.40 0.45

0.20 2.50 2.50 2.50 1.85 1.60

0.30 1.00 1.00 1.00 1.00 1.00

The above values relate to the load capacity of theformwork bracket. Depending on the formliningsmaller spacings may be required.The maximum anchor tension force is 6.5 kNand the shear force 5.3 kN.

Slab Stopend Bar 105

Permissible spacings [m] depending

on the slab depth.

Slab thickness d [m] 0.20 0.30 0.40 0.50

1.45 1.10 0.90 0.80

3.00 1.60 1.20 1.00

The maximum deflection at the top has been limitedto 3 mm. The maximum anchor tension force is 6.5 kN.

Stopend Sleeve 15

Concrete strength required depending

on the anchor tension force.

Anchor tens. Z [kN] 2.5 3.0 3.5 4.0 4.5 5.0 5.5 6.0 6.5*

4.5 5.5 6.3 7.2 8.2 9.1 10.0 10.9 11.8

* maximum permissible anchortension force for stopend sleeve 15

Concrete strengthsrequired [N/mm2]

Allowing for loadon the handrail post

Not allowing for loadon the handrail post

d

d

Edge formworkFormwork bracket-2, Slab Stopend Bar 105, Stopend Sleeve 15

Page 33: Multiflex Assembly Instructions

29

Page 34: Multiflex Assembly Instructions

30

1x GT 24 2x VT 20 1x GT 24 2x VT 20 2x GT 24 2x VT 20 2x GT 24 2x VT 20 2x GT 24 3x VT 20 2x GT 24 3x VT 20

B5 Design tables

BeamUZ beam formwork

Permissible width [m] of load that may be carried by UZ 40beam bracket depending on the depth of the beam and slab

Beam depth:h [m]

0.30 0.40 0.50 0.60 0.70 0.80

Slab thickness:d [m]

0

0.20

0.25

0.30

0.35

The above values relate to the load capacityof the UZ 40 beam bracket, the upright 8x8 cmtimbers and the secondary girders shownon the drawings.

Depending on the formlining used, additionalsecondary girders may be needed.

Separate structural calculations must beprovided to show the sub-structure can carrythe imposed loads.

The equivalent load (V/100) acting horizontallyand the pressures arising on one side (eg theedge beam) are to be taken by a restraintprovided by the client.

*) Timber on end in the UZ 40 beam bracket is 10 x 8 cm (rather than 8 x 8 cm)

The maximum deflection is 1/500

Version 1:

Side form with one or two GT 24s (vertical)

Version 2:

Side form with two or three VT 20s (horizontal)Version 3:

Packing for the beam soffit formwork

Version1 2

Version1 2

Version1 2

Version1 2

Version1 2

Version1 2

2.20 4.00 1.85 3.50 1.80 3.00 1.55 2.75 1.35 2.25 *1.05 *1.65

1.70 3.65 1.35 2.85 1.60 2.50 1.40 1.80 *1.05 *1.35 *0.75 *1.05

1.65 3.45 1.30 2.70 1.55 2.25 1.35 1.65 *1.00 *1.25 *0.70 *0.95

1.55 3.30 1.15 2.40 1.50 2.00 1.30 1.50 *0.95 *1.15 *0.65 *0.90

1.50 3.20 1.00 2.15 1.45 1.75 1.25 1.35 *0.90 *1.05 *0.60 *0.80

d = slab depthh = beam depth

dh

dh

dh

Page 35: Multiflex Assembly Instructions

31

B5 Design tables

1. Slab stopend 2. Slab with edge beam 3. Slab with T-beam

Separate structuralcalculations must beprovided to show thesub-structure isadequate to carry theloads arising. Theequivalent load (V/100)acting horizontally andthe pressure arising onone side (eg edgebeam) are to be takenby a restraint providedby the client.

Height ofside form- 0.20 0.25 0.30 0.35work h [m]

nailing on clamping nailing on clamping nailing on clamping nailing on clamping

SKY- plywood. timber timber SKY- plywood. timber timber SKY- plywood. timber timber SKY- plywood. timber timber

DECK* 21 mm girder girder DECK* 21 mm girder girder DECK* 21 mm girder girder DECK* 21 mm girder girder

0 2.50 2.50 2.50 2.50 1.60 2.50 2.50 2.50 0.90 1.50 2.50 2.50 0.60 0.90 1.60 2.50

0.20 0.90 1.45 2.50 2.50 0.70 1.10 1.80 2.50 0.50 0.80 1.40 1.90 0.40 0.65 1.10 1.50

0.25 0.80 1.25 2.10 2.50 0.60 0.90 1.60 2.10 0.45 0.70 1.20 1.70 – 0.58 1.00 1.35

0.30 0.70 1.10 1.80 2.50 0.50 0.80 1.40 1.90 0.40 0.65 1.10 1.50 – 0.50 0.90 1.20

0.35 0.60 0.95 1.65 2.20 0.45 0.70 1.25 1.70 – 0.58 1.00 1.30 – 0.45 0.80 1.10

0.40 0.55 0.85 1.50 2.00 0.40 0.65 1.10 1.50 – 0.50 0.90 1.20 – 0.40 0.70 1.00

Permissible width [m] of load that can be carried by AW stopendangle depending on the depth of slab and beam, and type of fixing.

* The AW safety handrail post must not be used on SKYDECK panels.

Nail with eight 3.1 mm dia nails(6 at the front and 2 at the back)

Height ofside form- 0.40 0.50 0.60work h [m]

nailing on clamping nailing on clamping nailing on clamping

SKY- plywood. timber timber SKY- plywood. timber timber SKY- plywood. timber timber

DECK* 21 mm girder girder DECK* 21 mm girder girder DECK* 21 mm girder girder

0 0.40 0.60 1.05 2.50 – – 0.50 1.60 – – – 1.10

0.20 – 0.50 0.90 1.25 – – 0.65 0.90 – – 0.50 0.67

0.25 – 0.45 0.80 1.10 – – 0.60 0.80 – – 0.45 0.60

0.30 – 0.40 0.70 1.00 – – 0.53 0.70 – – 0.40 0.55

0.35 – – 0.65 0.90 – – 0.50 0.65 – – – 0.50

0.40 – – 0.60 0.80 – – 0.45 0.60 – – – 0.48

Sla

b t

hic

kn

ess d

[m

]

h

h

d

h

BeamAW Stopend Angle

Sub-structure

Sub-structure

Sla

b t

hic

kn

ess d

[m

]

Page 36: Multiflex Assembly Instructions

9181214

15101806

21022398

26942990

32863582

38784174

44704766

50625358

56545950

55

80

1

30

296 296

311

296163

240

120

6060

80

28

32

Weight kg Item no.

GT 24 GirderGerman ApprovalCertificate No. Z-9.1-157Perm. Shear Force QD = 14,0kN* * QD = Permiss. shear force on compression strutsPerm. Shear Force QZ = 13,0kN** **QZ = Permiss. shear force on tension strutsPerm. Bending Moment M = 7,0kNmMoment of Inertia ly = 8000cm4

Nominal Lengths0,60m RF 4,45 075090

0,90m 5,30 0751001,20m 7,10 075120

To simplify handling the most 1,50m 8,90 075150 common GT 24 Girders are 1,80m 10,60 075180 colour coded for length. 2,10m 12,40 075210

2,40m 14,20 075240 brown 2,70m 15,90 075270 grey 3,00m 17,70 075300 blue 3,30m 19,50 075330 red 3,60m 21,20 075360 green 3,90m 23,00 075390

4,20m 24,80 0754204,50m 26,60 0754504,80m 28,30 0754805,10m 30,10 0755105,40m 31,90 0755405,70m 33,60 0755706,00m 35,40 075600

GT 24 Special Lengths 5,90/m 0750006,00-17,80mGirder Joint 070700

End Protection Cap GT 24, galv. 0,06 070750For protecting timber chord of girderagainst being sawn off accidentally.

Girder joint

Girder end296 = standard joint spacing

Page 37: Multiflex Assembly Instructions

200

24502650

29003300

36003900

45004900

5900

80

27

4040

120

21501450

24502900

33003600

39004900

5900

80

27

4040

80160

140 14050

22

33

Weight kg Item no.

VT 20K GirderWith steel end caps.German ApprovalCertificate No. Z-9.1-216

perm. Q = 11,0kNperm. M = 5,0kNm ly = 4290cm4

Nominal lengths1,45m 8,60 0749902,15m 12,70 0749052,45m 14,50 0749102,65m 15,60 0748902,90m 17,10 0749203,30m 19,50 0749303,60m 21,20 0749403,90m 23,00 0749504,50m 26,70 0749604,90m 28,90 0749705,90m 34,80 074980

Cutting Cost VT Girder 074900

VT 16K Girder*German ApprovalCertificate No. Z-9.1-216

Perm. Shear Force Q = 8,5kNPerm. Bending Moment M = 3,5kNmMoment of Inertia ly = 2420cm4

* is no longer produced

Nominal Lengths2,45m 11,30 0746102,90m 13,30 0746203,30m 15,20 0746303,60m 16,60 0746403,90m 17,90 0746504,90m 22,50 0746605,90m 27,10 074670

Cutting Cost VT Girder 074900

Page 38: Multiflex Assembly Instructions

64

280

ø 10

80

161

170210240

85125

155

201

ø 6

359

34

Crosshead 20/24 S, galv. 3,24 028680 Required diameter of hole in theWith self-locking coupling. endplate of the prop ø 40mm.Providing stable support for singleor twin GT 24 or VT 20K Girders.Girder overlap at both ends of at least 163mmin the case of the GT 24, 15cm with VT 20K.

Crosshead 20/24, galv 3,12 027890Without self-locking coupling.

Accessories:Pin ø 14x107, galv. 0,15 027990Cotter Pin FS 4/1, galv. 0,03 018060

Clawhead 24 S, galv. 1,67 028890 Required diameter of hole in theWith self-locking coupling. endplate of the prop ø 40mm.For supporting the GT 24 Girderat any location without nailing.

Clawhead 24 L, galv. 1,55 028880Without self-locking coupling.

With clawhead 24 S or 24 L, girdersGT 24 can even be supported outside thenode points with max. reaction at supports

Accessories: of 28kN being taken by the girder.Pin ø 14x107, galv. 0,15 027990Cotter Pin 4/1, galv. 0,03 018060

MULTIFLEX and Accessories

Weight kg Item no.

Page 39: Multiflex Assembly Instructions

14080

44

161

170

210

240

85125

155

161

ø 6

319

35

Crosshead 16 S, galv.* 3,00 028690 Required diameter of hole in theWith self-locking coupling. endplate of the prop ø 40mm.Providing stable support for singleor twin VT 16K Girders. Cantilever ofGirders at each end min. 150mm.* is no longer produced

Crosshead 16, galv.* 2,88 028700Without self-locking coupling.* is no longer produced

Accessories:Pin ø 14x107, galv. 0,15 027990Cotter Pin 4/1, galv. 0,03 018060

Clawhead 16/20 S, galv. 1,06 028660 Required diameter of hole in theWith self-locking coupling. endplate of the prop ø 40mm.For supporting the VT 20K or VT 16K Girderat any location without nailing.

Clawhead 16/20, galv. 0,94 028670Without self-locking coupling.

Accessories:Pin ø 14x107, galv. 0,15 027990Cotter Pin 4/1, galv. 0,03 018060

Weight kg Item no.

Page 40: Multiflex Assembly Instructions

85 170

385

195

240155

190

1711

85150

95

50

1550

20

ø 34

ø 7

ø 34

36

180

153

252

Lowering Head 20/24, galv. 5,10 028870Providing stable support for singleor twin GT 24 or VT 20K Girders.Girder overlap at both ends of at least 163mmin the case of the GT 24, 15cm with VT 20K.Lowers 40mm.

Accessories:Pin ø 14x107, galv. 0,15 027990Cotter Pin 4/1, galv. 0,03 018060

Crosshead PEP 10 / VT 20, galv. 1,42 106989With self-locking mechanism.Providing stable support for singleor twin VT 20K girders.

Erection Bar GT/VT, galv. 2,97 070740For easy erection of MULTIFLEXwith GT 24 or VT girders.

Assembly Bar 24, galv. 3,09 027930For easy erection of MULTIFLEXwith GT 24 girders.

Weight kg Item no.

Low

erin

g 40

1 VT 20

2 VT 20

Page 41: Multiflex Assembly Instructions

210

270

110

12

ø 14

129

1104

ø 26

ø 5

ø 4

70

185

995

460

120

190

6530

37

Tension Strap 16-25, galv. 0,57 028590For clamping 2 Girders GT 24,VT 20K or VT 16K onto Crosshead20/24 (S) or Crosshead 16 (S).

Pin ø 14x107, galv. 0,15 027990For fixing Crossheads as well asClawheads etc.

Cotter Pin 4/1, galv. 0,03 018060For Pins to ø 25mm.

Handrail Holder 9,79 035700For easy and quick clamping to concreteslabs for supporting handrails.Adjustable from 20 up to 420mm.

Weight kg Item no.

min

20

max

420

Page 42: Multiflex Assembly Instructions

ø 48 – 120

555

800

186

210

400

40

239

210

450

40

120

1

00

840

615

780

585

38

853

357

640

Universal Tripod, galv. 9,26 028000For props ø 48 to ø 120mm.Can also be used in combinationwith MULTIPROP Base MP 50.

Only to be used as an erection device!

Tripod, galv.* 8,98 027860For props ø 57 to ø 89mm.

*for hire only

Only to be used as an erection device!

Tripod PEP 10, galv. 5,40 107152For PEP 10 props ø 44 to ø 64mm.

Only to be used as an erection device!

Brace Clamp, galv. 1,85 027940Diameter of prop ø 48 up to 76mm.

Size of bracing board 30x150mm.

Brace Clamp HL, galv. 2,48 027790Diameter of prop ø 76 up to 89mmas well as 100 up to 120mm.

Size of bracing board 30x150mm.

Weight kg Item no.

Boa

rd m

ax 3

0

min ø 48max ø 76

min ø 76max 120

Boa

rd m

ax 3

0

Page 43: Multiflex Assembly Instructions

39

ø 48

1800 750

250

3035

1150

2360 1100

2

1

9

8

7

6

5

1110

34

Stripping Cart ASW 465 363,00 102031Complete with:1 Steel traverse 140/220 ASW (1x) 32,60 102033

consisting of 3 parts2 Folding base unit 160/190 ASW (1x) 18,60 1020253 Vertical frames 70/90 ASW (6x) 4,40 1020354 Vertical frames 70/120 ASW (6x) 4,90 1020345 Entry platforms 190 ASW (2x) 14,80 1020266 Toe-board set 70/190 ASW (1x) 8,00 1020307 Double handrails 190 ASW (4x) 5,30 1020278 Diagonal braces 210 ASW (3x) 2,40 1020289 Horizontal braces 190 ASW (2x) 2,30 10202910 Wind security clip 60 ASW (8x) 0,06 10203711 Ballast 10kg ASW (12x) 10,00 102807

Packed in:Ring pallet USP 104, galvanized 65,60 100678Complete with:Lashing strap 25x5750mm (1x) 0,50 100707Scaffold Tube steel ø 48,3x3,2, L = 1,0m 3,55 026411as Ring extensions (6x)Max. platform height = 4,65mMax. working height = 6,65mPlatform height alterations

= 300mm

Ring pallet USP 104, galv.Observe operating instructions!

Lifting device to BGR 500 Permissible load: 1200kg

Stripping Cart, Alu 77,00 035500Platform height: up to 2,00mPermissible load: 100kg/m2

Weight kg Item no.

hand

rail

heig

ht 9

80

plat

form

hei

ght

2000

Page 44: Multiflex Assembly Instructions

266

240

68

50 86

400

240

500

762

1439

140

67

122

132

2759040

–220

67

40

AW Slab Stopend Angle 1,68 065070Powder-coated.For forming stopends of slabs up to 400mm.Fixed to the plywood by nails.

AW Bracket 1,77 065075Slides into the AW Slab Stopend Angle.For height adjustment of side beam.

AW Clamp 8-10 3,37 065072With captive Triple Wingnut.For clamping the AW Slab Stopend Angleonto timbers or Girders 80-100mm wide.

AW Handrail Post 7,41 065071Slides into the AW Slab StopendAngle from top. With captive lockingdevice secured and fixed withadditional nails to the plywood.

Weight kg Item no.

AW Slab Stopend Angle, UZ Beam Formwork

ø 6.5 screw hole ø 3.5 nail hole

nail

hole

s

min

40

max

220

Page 45: Multiflex Assembly Instructions

500

440

500

155

84

69

35

26

ø 7

ø 17

ø 7

210

81

42

50

165420165

963

70081,5 70

50

ø 7ø 14

210

81

42

310

50

310310310

1453

17x70=1190

50

7081,5

ø 7ø 14

60

1000

120

180

40

80

ø 14

41

UZ Beam Bracket 40 12,10 065056Complete with:Captive Hook Tie and WingnutCounterplate DW15.

For allowable spacing see PERI tables.

UZ Beam Width Adjustment Bar 80 7,44 065057Beam width max. 400mm.Beam width more than 400mm 2 or more ofthe Adjustment Bars 80 to be connected.

UZ Beam Width Adjustment Bar 129 10,30 065065Beam width max. 900mm.Beam width more than 900mm.2 or more of the Adjustment Bars 129to be connected.

UZ Beam Yoke Waler 100 9,02 065058For bearing one or two Girders GT 24at each side.

For additional girder support.Can be mounted either on standardprops or shoring systems.

Weight kg Item no.

Page 46: Multiflex Assembly Instructions

87

15012080

64

150

120

80

10 7564

BA

75

10

64

ø 40

ø 14

100

150

ø12,5

ø42

80 200

500

ø 89

ø 17

ø 17

42

MULTIPROP and Accessories

MULTIPROP MP, AluCan be used individually, as well as incombination with MULTIPROP MRK Framestableforms or shoring towers.

MULTIPROP MP 120 10,40 027288(0,80-1,20m)MULTIPROP MP 250 15,00 027289(1,45-2,50m)MULTIPROP MP 350 18,80 027290(1,95-3,50m)MULTIPROP MP 480 23,80 027291(2,60-4,80m)MULTIPROP MP 625 33,60 027305(4,30–6,25m)

Base MP 50 8,81 027310With quick action clamp coupling.

For mounting propswith 6 to 10mm thickend plates.

Weight kg Item no.

L min. L max. A B

MP 120 800 1200 715 421

MP 250 1450 2500 1365 1071

MP 350 1950 3500 1865 1571

MP 480 2600 4800 2515 2221

MP 625 4300 6250 4211 1975

Section

End Plate

L m

in –

L m

ax

Page 47: Multiflex Assembly Instructions

B

100

8B

AD1

6

8410

0

D2

L

ø 14

ø 9

40

100

80

120

A

L

D2

D1

ø 14

ø 9

40

100

80

120

82

43

Weight kg Item no.

Props PEP 20, galv.

PEP 20-300 L = 1,71-3,00m 15,70 103058PEP 20-350 L = 1,96-3,50m 19,20 103059PEP 20-400 L = 2,21-4,00m 22,70 103060PEP 20-500 L = 2,71-5,00m 30,50 103061

For load capacity refer toPERI Formwork Design Tables.

Props PEP 30, galv.

PEP 30-150 L = 0,96-1,50m 10,40 103066PEP 30-250 L = 1,46-2,50m 15,00 103067PEP 30-300 L = 1,71-3,00m 18,70 103062PEP 30-350 L = 1,96-3,50m 22,70 103063PEP 30-400 L = 2,21-4,00m 27,20 103065

For load capacity refer toPERI Formwork Design Tables.

End Plate

20-300 20-350 20-400 20-500

A 1602 1852 2102 2602

B 143 93 143 143

D1 ø 66.0 ø 71.5 ø 75.5 ø 84.0

D2 ø 54.0 ø 59.5 ø 63.5 ø 72.0

End Plate

30-150 30-250 30-300 30-350 30-400

A 852 1352 1602 1852 2102

B 93 93 143 93 143

D1 ø 66.0 ø 66.0 ø 71.5 ø 75.5 ø 84.0

D2 ø 54.0 ø 54.0 ø 59.5 ø 63.5 ø 72.0

PEP 20, PEP 30 Props

Page 48: Multiflex Assembly Instructions

44

Page 49: Multiflex Assembly Instructions

45

Page 50: Multiflex Assembly Instructions

46

02 PERI S.A.S.

Zone Industrielle Nord

34-36 rue des Frères Lumière

77109 Meaux Cedex [email protected]

www.peri.fr

03 PERI AG

Aspstraße 17

8472 Ohringen [email protected]

www.peri.ch

04 PERI S.A. Sociedad

Unipersonal

Ctra. Paracuellos -

Fuente el Saz km. 18,9

Camino de Malatones, km. 0,5

28110 Algete/Madrid [email protected]

www.peri.es

05 N.V. PERI S.A.

Industriepark

Nijverheidsstraat 6 PB 54

1840 Londerzeel [email protected]

www.peri.be

06 PERI B.V.

v. Leeuwenhoekweg 23

Postbus 304

5480 AH-Schijndel [email protected]

www.peri.nl

07 PERI Formwork Systems, Inc.

7135 Dorsey Run Road

Elkridge, MD 21075 [email protected]

www.peri-usa.com

08 PT Beton Perkasa Wijaksana

P.O. Box 3737

Jakarta 10210 [email protected]

www.peri.de

09 PERI S.p.A.

Via G. Pascoli, 4

20060 Basiano (MI) [email protected]

www.peri.it

10 PERI Japan K.K.

7F Hakozaki 314 Building,

31-4 Hakozaki-cho,

Nihonbashi Chuo-ku

Tokyo 103-0015 [email protected]

www.perijapan.jp

11 PERI Ltd.

Market Harborough Road

Clifton upon Dunsmore

Rugby, CV23 0AN [email protected]

www.peri.ltd.uk

12 PERI Kalıp ve İskeleleri

San. ve Tic. Ltd. Sti.

Çakmaklı Mahallesi

Akçaburgaz Cad.

72. Sokak No: 23

Kıraç - Büyükçekmece/ Istanbul 34500 [email protected]

www.peri.com.tr

13 PERI Kft.

Zádor u. 4.

1181 Budapest [email protected]

www.peri.hu

14 PERI Formwork Malaysia

Sdn. Bhd.

Unit 19-07-4, Level 7

PNB Damansara

19 Lorong Dungun

Damansara Heights

50490 Kuala Lumpur [email protected]

www.perimalaysia.com

15 PERI ASIA Pte. Ltd

Formwork Pte. Ltd.

No. 1 Sims Lane # 06-10

Singapore 387355 [email protected]

www.periasia.com

16 PERI Ges.mbH

Traisenstraße 3

3134 Nußdorf ob der Traisen offi [email protected]

www.peri.at

17 PERI spol. s r.o.

Průmyslová 392

252 42 Jesenice [email protected]

www.peri.cz

18 PERI Danmark A/S

forskalling og stillads

Greve Main 26

2670 Greve [email protected]

www.peri.dk

19 PERI Suomi Ltd. Oy

Hakakalliontie 5

05460 Hyvinkää [email protected]

www.perisuomi.fi

20 PERI NORGE AS

Kobbervikdalen 156

3036 Drammen [email protected]

www.peri.no

21 PERI Polska Sp. z o.o.

ul. Stołeczna 62

05-860 Płochocin [email protected]

www.peri.pl.pl

22 PERIform SVERIGE AB

Montörgatan 4-6

Box 9073

30013 Halmstad [email protected]

www.periform.se

23 PERI (Korea) Ltd.

8-9th Fl., Yuseong Bldg.

830-67, Yeoksam-dong,

Kangnam-ku,

Seoul 135-080 [email protected]

www.perikorea.com

24 PERIcofragens Lda.

Cofragens e Andaimes

Rua Cesário Verde,

nº 5 - 3º Esq.

Linda-a-Pastora 2790-326 Queijas [email protected]

www.peri.pt

25 PERI S.A.

Ruta Nacional N°. 9, km 47,5

(Panamericana Ramal Escobar)

(1625) Escobar/Prov. Bs. As. [email protected]

www.peri.com.ar

26 PERI Formas e

Escoramentos Ltda.

Rodovia Raposo Tavares,

km 41

Colinas Bandeirante

CEP 06730-000 Vargem Grande Paulista São Paulo [email protected]

www.peribrasil.com.br

27 PERI Chile Ltda.

C/José de San Martin N° 104

Parque Industrial Los

Libertadores

Colina, Santiago de Chile [email protected]

www.peri.cl

28 PERI România SRL

Calea Bucureşti nr. 2B

077015 Baloteşti - ILFOV [email protected]

www.peri.ro

29 PERI SLOWENIEN

Goran Opalic

Obrežna 137

2000 Maribor [email protected]

www.peri.de

30 PERI spol. s r.o.

Šamorínska 18

903 01 Senec [email protected]

www.peri.sk

31 PERI Australia Pty. Ltd.

116 Glendenning Road

Glendenning NSW 2761 [email protected]

www.periaus.com.au

32 PERI AS

Valdmäe 8

Tänassilma Tehnopark

76401 Saku vald Harjumaa

[email protected]

www.peri.ee

2

1

3

4

5

6

9

11

12

1316

17

18

19

20

22

21

24

2829

30

32

33

34

38

41

42

46

48

52

53

01 PERI GmbH Rudolf-Diesel-Strasse

89264 Weissenhorn

[email protected]

www.peri.de

France

Switzerland

Spain

Belgium/Luxembourg

Netherlands

USA

Indonesia

Italy

Japan

United Kingdom/Ireland

Turkey

Hungary

Malaysia

Singapore

Austria

Czech Republic

Denmark

Finland

Norway

Poland

Sweden

Korea

Portugal

Argentina

Brazil

Chile

Romania

Slovania

Slovakia

Australia

Estonia

PERI International

Page 51: Multiflex Assembly Instructions

47

33 PERI Hellas Ltd.

Sokratous Str.

5th kil. Koropi-Varis Ave.

P. O. Box 407

194 00 Koropi [email protected]

www.perihellas.gr

34 PERI SIA

Granita 26

1057 Riga [email protected]

www.peri-latvija.lv

35 PERI (L.L.C.)

Brashy Building,

Offi ce No. 212

Shk. Zayed Road

P.O. Box 27933

Dubai [email protected]

www.perime.com

36 PERI Formwork Systems, Inc.

45 Nixon Road

Bolton, Ontario L7E 1K1 [email protected]

www.peri.ca

37 PERI GmbH

Lebanon Representative

Offi ce

AYA Commercial Center,

7th fl oor,

Dora Highway,

Beirut P.O. Box 90 416 Jdeidet

[email protected]

www.peri.de

38 PERI UAB

Titnago st. 19

02300 Vilnius [email protected]

www.peri.lt

39 PERI S.A.

Route de Rabat, km. 5

Piste de Beni Touzine

Tanger [email protected]

www.peri.de

40 PERI Formwork

Engineering Ltd

16 Moshe Dayan st.,

P.O. Box 10202

Petach Tikva,

49002 Israel [email protected]

www.peri.co.il

41 PERI BULGARIA EOOD

Kv. Vragdebna

m. Nova Machala Nr. 46

1839 – Sofi a [email protected]

www.peri.bg

42 MEST ltd.,

Fornubudum 5

220 Hafnarfjordur [email protected]

www.mest.is

43 TOO PERI Kazakhstan

Rubenstein Street 10

(Corner Dostyk Str. 7)

050010 Almaty [email protected]

www.peri.kz

44 OOO PERI

8 Etage, OOO PERI Buro

Krasnaya Presnya Str. 24

123022 Moskau [email protected]

www.peri.ru

45 PERI Wiehahn (Pty.) Ltd.

P.O. Box 2668

Bellville 7535 [email protected]

www.periwiehahn.co.za

46 TOW PERI Ukraina

23, M. Raskowa Str., B. 822

02002 Kiew [email protected]

www.peri.ua

47 PERI GmbH

Egypt Branch Offi ce

24 A, Obour Gardens,

4th Floor, apt. # 1

Salah Salem Street

11361 Heliopolis Cairo [email protected]

www.peri.com.eg

48 PERI Oplate d.o.o.

Jurija Gagarina 81

11070 Novi Beograd offi [email protected]

www.peri.co.yu

49 PERI Cimbras y Andamios,

S.A. de C.V.

Parque de las Américas

KM 3.5 de la Carretera

Jorobas - Tula

Huehuetoca

Estado de México, C.P. 54680 [email protected]

www.peri.com.mx

50 PERI Kalıp ve İskeleleri

Baku Branch Offi ce

28 May Küç. Ev 72 Menzil 27

Baku [email protected]

www.peri.com.tr

51 PERI Kalıp ve İskeleleri

Aşgabat Branch Offi ce

Göroglu Sokak No. 130, Kat 2

744035 Aşgabat [email protected]

www.peri.com.tr

52 PERI Belarus

Pr. Nesawisimosti 11

Kopus-2 Zimmer: 526,528

220030 Minsk [email protected]

www.peri.com.tr

53 PERI oplate i skele d.o.o.

Dolenica 20

10 250 Donji Stupnik/ Zagreb [email protected]

www.peri.com.hr

54 PERI GmbH

Iran Branch Offi ce

Flat 27, Blvd. KAVE,

Building No. 246

P.O. Box 9 3979 3669

Tehran [email protected]

www.peri.ir

55 PERI (India) Pvt Ltd

717 Palm Springs

Palm Court

Malad Link Road

Malad (West)

Mumbai – 400064 [email protected]

www.peri.in

56 PERI Jordan

Saad 5 Center, 4th Floor

Offi ce No. 404

Al Madineh

Al Munawara Street

P.O. Box 367

11947 Amman [email protected]

www.peri.de

57 PERI Kuwait

Arraya Center, 29th Floor

Al-Shuhada Street, Sharq

P.O. Box 1060 Safat

13011 Kuwait [email protected]

www.peri.de

58 PERI Saudi Arabia

33 AL-Batraa Street

AL -Shurbatiy Building

AL - Bughdadiah AL -

Gharbiah Distrect

6th Floor, Flat # 61

P.O. Box 11641

Jeddah [email protected]

www.peri.de

59 PERI Qatar LLC

P.O. Box 24133

Doha [email protected]

www.peri.de

60 Société PERI S.A.S.

Bureau de liaison d‘Alger

50 bis, Route de Gué

de Constantine

Hai El Badr (ex Apreval)

Immeuble FADLI

Kouba - Alger [email protected]

www.peri.fr

7

8

10

1415

23

25

26

27 31

35

36

3739 40

43

44

45

4749

50 51

54

595558

5760 56

Greece

Latvia

United Arab Emirates

Canada

Libanon

Lithuania

Marocco

Israel

Bulgaria

Iceland

Kazakhstan

Russian Federation

South Africa

Ukraine

Egypt

Serbia

Mexico

Azerbaijan

Turkmenistan

Belorussia

Croatia

Iran

India

Jordan

Kuwait

Saudi Arabia

Qatar

Algeria

Page 52: Multiflex Assembly Instructions

D e

11

/20

07

3m

a

Art

. N

r.:

79

19

32

©

Co

pyri

gh

t by P

ER

I G

mb

H

Wall FormworkPanel Formwork

Girder Formwork

Circular Formwork

Facade Formwork

Brace Frame

Column FormworkSquare

Rectangular

Circular

Slab FormworkPanel Formwork

Beam Grid Formwork

Girder Formwork

Slab Table

Beam Formwork

Shoring SystemsSteel Slab Props

Aluminium Slab Props

Tower Systems

Heavy-Duty Props

Climbing SystemsClimbing Scaffold

Self-Climbing System

Climbing Protection Panel

Platform Systems

Scaffold, Stairways, Working PlatformsFacade Scaffold

Working Platform

Weather Protection Roof

Stairway Access

Bridge and Tunnel FormworkCantilevered Parapet Carriage

Cantilevered Parapet Platform

Engineer´s Construction Kit

ServicesFormwork Assembly

Cleaning / Repairs

Formwork Planning

Software

Statics

Special Constructions

Additional Systems

Plywood

Formwork Girders

Stopend Systems

Pallets

Transportation Containers

PERI GmbHFormwork Scaffolding EngineeringP.O. Box 1264