Date post: | 23-Jan-2018 |
Category: |
Technology |
Upload: | monschal-huber |
View: | 1,483 times |
Download: | 0 times |
C O M M U N I C A T I O N I N A N E W D I M E N S I O N
Simple, safe and fast running of piping for fibre-optic cables in our streets: Communication in a new dimension.
We connect you – to the rest of the worldNano_Trench® construction technique creates communication in a new dimension – with a patented construction method.
Superbly and safely networkedWith the patented method for stepped milling, Nano_Trench® combines safety with fast and precise piping networks for fibre-optic cables. The pipes are shielded from vertical pressure through the milled step and are additionally secured with back-filling materials. Additional protective measures are available upon request.
Nano_Trench® ensures that you’re superbly networked.
THE ADVANTAGES OF THE NANO_TRENCH® CONSTRUCTION METHOD:
NANO_TRENCH®
Distribution throughPichler Bohrtechnik GmbH &HP Fiber GmbH
OFFICE ADDRESSBurgfriedstraße 123340 Waidhofen/Ybbs, Austria
Phone: +43 7442 / 52085Fax: +43 7442 / 52085-31E-mail: [email protected]
Patented construction method for your giga-network
www.nano-trench.com
OPEN-CUT CONSTRUCTION METHOD WITHIN ROAD INFRASTRUCTURE
CONSTRUCTION METHOD WITHIN ROAD INFRASTRUCTURE
Construction output • Location dependent: inner city, periphery, main roads
• Average daily output: 7 – 80 m a day
• Location independent: inner city, periphery, main roads
• Average daily output: 500 – 2000 m a day
Traffic disruption Heavy (heavy impact on traffic flow, especially in parking
areas and roads)
Minimal (minimal impact on traffic-flow between each
construction phase)
Weather (except snow-covered
streets)
High level of restriction in construction progress (rain and
temperatures below freezing point)
No restrictions in construction progress
The differences at a glance
Faster.
Cheaper.
Safer.
THE MILLING• Stepped milling: Width and depth are executed according to
customer-specific requirements • Output: up to 3 m per minute• High flexibility: tight radii possible• Cleanliness: Refuse is vacuumed off immediately
THE RUNNING …… and backfilling of piping for fibre-optic cables:
• Multiple pipes in a single working step• Running performance: up to 1 kilometre per hour• Empty pipes are cushioned with granulate or sand and fixated
at the deepest point of the kerf• Additional safety measures available upon request
CONNECTION VERSIONS
THE BACKFILLING• The kerf is backfilled with asphalt or two-component
encapsulant (motorcycle-proof) from step one of the cut• Instantly fit for traffic between each step of construction• The combination of the milled step and the backfilling material
protects the underlying piping-channel from vertical pressure
PATENTED METHOD FOR STEPPED MILLING: • For secure placement of piping• For protection against vertical pressure
ONE PROCESS, THREE STEPS TO SUCCESS:
Milling / Running / Backfilling
111
222
333
Fibre to the Curb
Connected via distribution box
Direct connection
Fibre to the Home
111
222
333
STREET SECTION:Street layout according to requirements of road sustainer
TELECOM/PROVIDER SECTION
With the construction method, planning is easy: Perfectly suited to your needs, our services are available as a modular system. This renders a cost-efficient construction output which is simple, fast and above all safe – while minimising traffic disruption.