108
List of Figures 1 CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LTD. National Rurban Mission (NRuM) INTEGRATED CLUSTER ACTION PLAN (ICAP) State : Maharashtra District : Pune Sub District : Haveli Cluster : Loni Kalbhor MINISTRY OF RURAL DEVELOPMENT, GOVERNMENT OF MANARASHTRA
Transcript
  • List of Figures

    1

    CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LTD.

    National Rurban Mission (NRuM)

    INTEGRATED CLUSTER ACTION PLAN (ICAP)

    State : Maharashtra

    District : Pune

    Sub District : Haveli

    Cluster : Loni Kalbhor

    MINISTRY OF RURAL DEVELOPMENT, GOVERNMENT OF MANARASHTRA

  • C O N T E N T S

    LONI KALBHOR: ICAP - Key Results............................................................................................................1

    The Context ............................................................................................................................................... 20

    Step by Step Process followed .................................................................................................................. 21

    Step 1 : Selection of Cluster .......................................................................................................................22

    Step 2 : Delineation & Notification of Planning Area .............................................................................. 27

    Step 3: Cluster Profiling .............................................................................................................................31

    Step 3a: General Profile .............................................................................................................................31

    Tourist Centre: RAMDARA ........................................................................................................................41

    Step 3 b: Component Profiling ................................................................................................................. 43

    Available and Identified Skills ...................................................................................................................46

    Step 4 - SWOT Analysis and Visioning of Cluster ..................................................................................... 72

    Step 4 a : SWOT Analysis ........................................................................................................................... 72

    Step 4 b : Vision for the Cluster ................................................................................................................ 73

    Step 5 - Deficiency Analysis and Identification of Needs ........................................................................ 74

    Step 6 - Prioritization of Needs ................................................................................................................ 78

    Step 7 - Detailing of the Mission Components ........................................................................................80

    Step 8 - Investment and Phasing ..............................................................................................................86

    Step 9 - Methods of Resource Mobilization ............................................................................................ 87

    Step 10 - Arriving at CGF Estimate ............................................................................................................ 87

    Step 11 - Implementation Strategy ...........................................................................................................90

    Step 12 - O &M Strategy ............................................................................................................................90

    Step 13 - Gram Sabha Resolutions .............................................................................................................91

    Step 14 - Revision of ICAP based on approved DPR costing ..................................................................102

    Step 15 - Five Yearly Iteration of ICAP .....................................................................................................102

  • L i s t o f T A B L E S

    Table 1: Basic Information of the Cluster.....................................................................................................1

    Table 2: CGF Summary ..................................................................................................................................1

    Table 3: Investment and CGF Phasing Summary ....................................................................................... 4

    Table 4: Convergence Abstract .................................................................................................................10

    Table 5: Strategic Activity Plan of Basic Amenities for Loni Kalbhor Cluster .......................................... 12

    Table 6: Strategic Activity Plan of Economic Activities for Loni Kalbhor Cluster ...................................14

    Table 7: Strategic Activity Plan of Social Amenities for Loni Kalbhor Cluster .........................................16

    Table 8: Strategic Activity Plan of Digital Amenities for Loni Kalbhor Cluster .......................................19

    Table 9: Selected List of Non Tribal Clusters ........................................................................................... 24

    Table 10: Selected List of Tribal Clusters .................................................................................................. 26

    Table 11: Demographic Profile of the Cluster ........................................................................................... 34

    Table 12: Social Profile of the Cluster ....................................................................................................... 37

    Table 13: Economic Profile of Cluster ....................................................................................................... 39

    Table 14: Cultural Profile of the Cluster ....................................................................................................40

    Table 15: Administrative Profile ................................................................................................................ 42

    Table 16: Skill Development training linked to Economic Activity in the Cluster .................................. 44

    Table 17: AGRI-SERVICES and PROCESSING ............................................................................................. 47

    Table 18: DIGITAL AMENITIES and LITERACY .......................................................................................... 50

    Table 19: 24 X 7 PIPED WATER SUPPLY .................................................................................................... 53

    Table 20: SANITATION .............................................................................................................................. 56

    Table 21: SOLID and LIQUID WASTE MANAGEMENT .............................................................................. 58

    Table 22: ACCESS TO VILLAGE STREETS WITH DRAINS ..........................................................................60

    Table 23: VILLAGE STREET LIGHTS ........................................................................................................... 62

    Table 24: HEALTH ......................................................................................................................................64

    Table 25: UP-GRADATION OF PRIMARY, SECONDARY and HIGHER SECONDARY SCHOOLS ..............66

    Table 26: INTER VILLAGE ROADS CONNECTIVITY ...................................................................................68

    Table 27: PUBLIC TRANSPORT .................................................................................................................. 70

    Table 28: LPG GAS CONNECTIONS ............................................................................................................ 71

    Table 29: Deficiency Analysis - Basic Amenities ....................................................................................... 75

    Table 30: Deficiency Analysis - Economic Activities ................................................................................ 76

  • Table 31: Deficiency Analysis - Social Amenities ...................................................................................... 77

    Table 32: Deficiency Analysis - Digital Amenities ..................................................................................... 77

    Table 33: Prioritisation of Needs - Basic Amenities ................................................................................. 78

    Table 34: Prioritisation of Needs - Economic Activities ........................................................................... 78

    Table 35: Prioritisation of Needs - Social Amenities ................................................................................ 79

    Table 36: Prioritisation of Needs -Digital Amenities ................................................................................ 79

    Table 37: Mission Components: Basic Amenities ....................................................................................80

    Table 38: Mission Components: Economic Activities ...............................................................................81

    Table 39: Mission Components: Social Amenities ................................................................................... 82

    Table 40: Mission Components: Digital Amenities ..................................................................................84

    Table 41: Detailing of mission components under CGF ...........................................................................84

    Table 42: Investment and Phasing ...........................................................................................................86

    Table 43: CGF Estimate for the Cluster ....................................................................................................88

  • L i s t o f F I G U R E S

    Figure 1: Step by Step Process for ICAP .................................................................................................... 21

    Figure 2: Steps to be taken by State- Identification of Non Tribal Rurban Clusters .............................. 23

    Figure 3: Steps to be taken by State for Identification of Non Tribal Cluster ........................................ 24

    Figure 4: Process of Identification of Tribal Clusters in a State .............................................................. 25

    Figure 5: Delineation of Cluster ................................................................................................................ 27

    Figure 6: Pune Metropolitan Region ........................................................................................................ 28

    Figure 7: Loni Kalbhor Development Plan ............................................................................................... 28

    Figure 8: ‘Pune 10km Fringe !rea Road Network Plan’ .......................................................................... 29

    Figure 1: PMRDA 60m wide road passing through Cluster ..................................................................... 30

    Figure 10: Proportion of Total Population Gram Panchayat Wise ...........................................................31

    Figure 11: Percentage of Households in Cluster, distributed GP wise .................................................... 32

    Figure 12: Distribution of Total Land Area ............................................................................................... 32

    Figure 13: Population Projections ............................................................................................................. 33

    Figure 14: Literacy Rate ............................................................................................................................. 35

    Figure 15: Education Level of Cluster ....................................................................................................... 35

    Figure 16: Population in Cluster SC / ST .................................................................................................... 36

    Figure 17: Workforce Participation in the Cluster .................................................................................... 38

    Figure 18: Available Skills ..........................................................................................................................46

    Figure 19: Issues related to Optimum Yield .............................................................................................49

    Figure 20: Percentage of Households with Digital Connectivity ............................................................ 52

    Figure 21: Percentage of Households with at least one E-literate Person ............................................. 52

    Figure 22 Coverage of Water Supply Connections (Piped) at Household Level .................................... 55

    Figure 23: Per Capita Drinking Water Supply (LPCD) (Required vs Current) ......................................... 55

    Figure 24: Coverage of households with Individual Toilets .................................................................... 57

    Figure 25: Household Connected with Septic Tanks ............................................................................... 57

    Figure 26: type of Village Streets in Cluster (Km) .....................................................................................61

    Figure 27: Coverage of Streets (Village Wise) ...........................................................................................61

    Figure 28: Total number of Street Lights ................................................................................................. 63

    Figure 29: Existing Vs Required no. of Sub-centres ................................................................................. 65

    Figure 30: Status of Anganwadis / Mini - Anganwadi Centres ................................................................ 67

  • Figure 31: Existing Vs Required LPG Gas Connections .............................................................................. 71

    Figure 32: Critical Gap Fund ...................................................................................................................... 87

    Figure 33: Revision of ICAP based on approved DPR costing ................................................................102

    A N N E X U R E S

    Gram Sabha Resolutions and Photographs ......................................................................................91 - 101

  • LONI KALBHOR

    ICAP - Key Results

    Table 1: Basic Information of the Cluster

    1 No of Clusters approved in Phase 1 7 Nos.

    2 No of GPs in this cluster 7 Nos.

    3 Total area of the cluster 11372.96 Hectare

    4 No of Households in the cluster 10582 Nos.

    5 Population of the cluster 50461 Souls

    Table 2: CGF Summary

    Sl. No.

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    PROJECT COMPONENT

    24 x 7 Piped Water Supply

    Sanitation

    Solid and Liquid Waste Management

    Access to Village Streets with Drains

    Village Street Lights

    Construction and Upgradation of GP building, Gym

    Works under MSEDCL

    Skill Development training Linked to Economic Activities

    Agri-Services and Processing

    Health

    Up gradation of Primary, Secondary and Higher Secondary Schools

    Social Welfare

    Non-Conventional Energy

    Digital Literacy

    Total

    CGF FUNDING (Rs. in Crores)

    3.800

    0.030

    6.800

    10.710

    0.250

    0.500

    0.030

    0.380

    4.200

    0.240

    2.135

    2.500

    0.520

    1.100

    33.195

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 1

  • CGF Required Rs. 33.195 Crores

    24 x 7 Piped Water Supply, 3.800, 11.45%

    Sanitation, 0.030, 0.09%

    Solid and Liquid Waste Management, 6.800,

    20.49%

    Access to Village Streets with Drains, 10.710, 32.26%

    Village Street Lights, 0.250, 0.75%

    Construction and Upgradation of GP

    building, Gym, 0.500, 1.51%

    Works under MSEDCL, 0.030, 0.09%

    Skill Development training Linked to

    Economic Activities, 0.380, 1.14%

    Agri-Services and Processing, 4.200,

    12.65%

    Health, 0.240, 0.72%

    Social Welfare,

    2.500, 7.53%

    Non-Conventional Energy,

    Digital Literacy, 1.100, 3.31%

    Up gradation of Primary, 0.520, 1.57% Secondary and Higher

    Secondary Schools, 2.135, 6.43%

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 2

  • Total Investment Required Rs. 222.081 Crores

    Skill Development Up gradation of primary,

    training Linked to secondary and higher

    Works under MSEDCL, 7.8085, 3.52%

    Non Conventional Energy, Construction and 4.27, 1.92%upgradation of GP Digital Literacy, 1.75,

    building, Gym, , 1.87, 0.79% 0.84%

    Public Transport, 0.55, Citizen Service Centres, 0.25% 0.1204, 0.05%

    Village Street Lights, 5.8725, 2.64%

    Sanitation, 1.4012, 0.63%

    8.54%

    24x7 Piped Water Supply , 33.294, 14.99%

    Solid and Liquid Waste Management, 18.975,

    Access to Village Streets with Drains, 90.38, 40.70%

    Economic Activities , 1.1656, 0.52%

    secondary schools, 11.179,

    Agri-services and

    Processing, 24.6348,

    11.09%

    Health , 14.73, 6.63%

    Social Welfare, 4.08, 1.84%

    5.03%

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 3

  • Investment and CGF Phasing Summary – Loni Kalbhor Cluster

    Table 3: Investment and CGF Phasing Summary

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 4

    Sr. No.

    Name of the Component

    Component wise Investment

    Required (Rs. In Lakh)

    Converged Schemes

    Investment Required

    (Rs. In Lakhs)

    Phasing

    2017-18 2018-19 2019-20

    1 24x7 Piped Water

    Supply 3329.4

    Central Govt. share 0.00 0.00 0.00 0.00

    State Govt. Share 2949.40 884.82 884.82 1179.76

    Beneficiary Share 0.00 0.00 0.00 0.00

    CGF 380.00 114.00 114.00 152.00

    Total 3329.40 998.82 998.82 1331.76

    2 Sanitation 140.12

    Central Govt. share 94.12 28.24 28.24 37.65

    State Govt. Share 43.00 12.90 12.90 17.20

    Beneficiary Share 0.00 0.00 0.00 0.00

    CGF 3.00 0.90 0.90 1.20

    Total 140.12 42.04 42.04 56.05

    3 Solid and Liquid

    Waste Management

    1897.5

    Central Govt. share 514.00 154.20 154.20 205.60

    State Govt. Share 703.50 211.05 211.05 281.40

    Beneficiary Share 0.00 0.00 0.00 0.00

    CGF 680.00 204.00 204.00 272.00

    Total 1897.50 569.25 569.25 759.00

  • 4 Access to Village

    Streets with Drains 9038

    Central Govt. share 2420.00 726.00 726.00 968.00

    State Govt. Share 5482.00 1644.60 1644.60 2192.80

    Beneficiary Share 65.00 19.50 19.50 26.00

    CGF 1071.00 321.30 321.30 428.40

    Total 9038.00 2711.40 2711.40 3615.20

    5 Village Street

    Lights 587.25

    Central Govt. share 5.00 1.50 1.50 2.00

    State Govt. Share 557.25 167.18 167.18 222.90

    Beneficiary Share 0.00 0.00 0.00 0.00

    CGF 25.00 7.50 7.50 10.00

    Total 587.25 176.18 176.18 234.90

    55

    Central Govt. share

    State Govt. Share

    0.00

    55.00

    0.00

    0.00

    55.00

    0.00

    16.50

    0.00

    0.00

    16.50

    0.00

    16.50

    0.00

    0.00

    16.50

    0.00

    22.00

    0.00

    0.00

    22.00

    6 Public Transport Benificiary Share

    CGF

    Total

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 5

  • 7 Construction and

    upgradation of GP building, Gym,

    187

    Central Govt. share 0.00 0.00 0.00 0.00

    State Govt. Share 137.00 41.10 41.10 54.80

    Beneficiary Share 0.00 0.00 0.00 0.00

    CGF 50.00 15.00 15.00 20.00

    Total 187.00 56.10 56.10 74.80

    8 Works under

    MSEDCL 780.85

    Central Govt. share 0.00 0.00 0.00 0.00

    State Govt. Share 777.85 233.36 233.36 311.14

    Beneficiary Share 0.00 0.00 0.00 0.00

    CGF 3.00 0.90 0.90 1.20

    Total 780.85 234.26 234.26 312.34

    9

    Skill Development training Linked to

    Economic Activities

    116.56

    Central Govt. share 34.06 10.22 10.22 13.62

    State Govt. Share 44.50 13.35 13.35 17.80

    Beneficiary Share 0.00 0.00 0.00 0.00

    CGF 38.00 11.40 11.40 15.20

    Total 116.56 34.97 34.97 46.62

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 6

  • 10 Agri-services and

    Processing 2463.48

    Central Govt. Share 554.06 166.22 166.22 221.62

    State Govt. Share 620.42 186.13 186.13 248.17

    Beneficiary Share 869.00 260.70 260.70 347.60

    CGF 420.00 126.00 126.00 168.00

    Total 2463.48 739.04 739.04 985.39

    11 Health 1473

    Central Govt. share 714.20 214.26 214.26 285.68

    State Govt. Share 722.66 216.80 216.80 289.06

    Beneficiary Share 12.14 3.64 3.64 4.86

    CGF 24.00 7.20 7.20 9.60

    Total 1473.00 441.90 441.90 589.20

    12

    Up gradation of primary,

    secondary and higher secondary

    schools

    1117.9

    Central Govt. share 144.50 43.35 43.35 57.80

    State Govt. Share 756.20 226.86 226.86 302.48

    Beneficiary Share 3.70 1.11 1.11 1.48

    CGF 213.50 64.05 64.05 85.40

    Total 1117.90 335.37 335.37 447.16

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 7

  • 13 Social Welfare 408

    Central Govt. share 0.00 0.00 0.00 0.00

    State Govt. Share 143.00 42.90 42.90 57.20

    Beneficiary Share 15.00 4.50 4.50 6.00

    CGF 250.00 75.00 75.00 100.00

    Total 408.00 122.40 122.40 163.20

    14 Non Conventional

    Energy 427

    Central Govt. share 0.00 0.00 0.00 0.00

    State Govt. Share 375.00 112.50 112.50 150.00

    Beneficiary Share 0.00 0.00 0.00 0.00

    CGF 52.00 15.60 15.60 20.80

    Total 427.00 128.10 128.10 170.80

    Central Govt. share

    State Govt. Share

    Beneficiary Share

    CGF

    15.00

    50.00

    0.00

    110.00

    4.50

    15.00

    0.00

    33.00

    4.50

    15.00

    0.00

    33.00

    6.00

    20.00

    0.00

    44.00

    70.00

    15 Digital Literacy 175

    52.50 52.50 Total 175.00

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 8

  • 16 Citizen Service

    Centres 12.04

    Central Govt. share 0.00 0.00 0.00 0.00

    State Govt. Share 12.04 3.61 3.61 4.82

    Beneficiary Share 0.00 0.00 0.00 0.00

    CGF 0.00 0.00 0.00 0.00

    Total 12.04 3.61 3.61 4.82

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 9

  • Convergence Abstract

    Table 4: Convergence Abstract

    SL NO.

    NAME OF SCHEME CONVERGED

    GP Wise TOTAL FUNDING IN Rs. LAKH TOTAL FUNDING

    IN Rs. LAKH

    LONI KALBHOR

    KUNJIRWADI SORTAPWADI SHINDAWANE ALANDI

    MHATOBA TAARDE VALATI

    1 Chief Minister Payjal Yojana

    100.00 170.00 228.00 241.00 218.40 90.00 135.00 1182.40

    2 Zilla Parishad 165.30 63.38 102.66 197.90 105.70 63.00 280.36 978.30

    3 Sarva Shiksha Abhiyan (SSA)

    65.50 0.00 44.50 57.90 59.00 65.00 47.50 339.40

    4 Swachya Bharat Mission Gramin

    85.50 33.64 15.00 32.48 56.00 33.00 27.50 283.12

    5 DPC (District Planning Committee)

    342.00 175.00 235.00 272.25 393.00 281.09 205.00 1903.34

    6 Dalit Wasti Sudhar Yajana

    110.00 25.00 30.00 60.00 45.00 0.00 0.00 270.00

    7 Gram-Nidhi 77.50 52.00 78.00 122.80 170.00 28.00 55.70 584.00

    8 NRHM 370.00 165.00 151.00 402.60 153.00 162.30 13.70 1417.60

    9 14 th Finance Commission

    110.00 53.50 94.00 108.00 117.00 50.00 89.00 621.50

    10 MEDA 286.00 0.50 60.00 25.00 0.00 0.00 65.00 436.50

    11 DDUGKY/ R- SETI 10.00 4.00 25.20 3.46 4.00 2.10 0.00 48.76

    12 Rashtriya Biogas Yojana

    0.00 1.80 0.75 1.00 1.80 1.80 4.50 11.65

    13 NHM 58.00 86.00 65.00 120.00 57.25 37.40 51.20 474.85

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 10

  • 14 Jalyukt Shivar Abhiyan

    185.60 58.00 0.00 100.00 272.20 85.50 30.00 731.30

    15 SCP 0.00 0.00 4.85 0.00 0.00 0.00 0.00 4.85

    16 CSR (Corporate-Social Responsibility)

    156.50 0.80 0.00 0.00 10.00 0.00 0.00 167.30

    17 SANGRAM -2 0.72 0.60 8.00 8.00 0.60 0.60 0.72 19.24

    18 PMPML 10.00 10.00 10.00 9.00 10.00 0.00 6.00 55.00

    19 PMGSY 1760.00 880.00 550.00 0.00 810.00 0.00 0.00 4000.00

    20 PWD 90.00 0.00 0.00 965.00 0.00 0.00 200.00 1255.00

    21 SR-PROGRAM(STATE)

    75.00 120.00 125.00 120.00 200.00 345.00 375.00 1360.00

    22 PMKSY 29.00 4.80 0.00 9.60 10.00 4.80 4.80 63.00

    23 AGRICULTURE MECHANISATION

    11.00 4.50 35.00 5.25 13.50 7.20 3.00 79.45

    24 RKVY 2.00 0.00 0.00 1.50 0.00 0.00 0.00 3.50

    25 EGS HOR. PLANTATION

    50.00 5.00 5.00 20.00 22.00 10.00 10.00 122.00

    26 WORLD BANK/GOI 377.00 0.00 0.00 0.00 0.00 0.00 0.00 377.00

    27 MSEDCL 675.00 0.00 21.50 46.00 40.00 16.35 0.00 798.85

    28 DDUGVY 165.00 70.00 0.00 0.00 0.00 0.00 90.75 325.75

    29 BENEFICIARY COMPONENT

    148.00 149.62 90.00 190.15 157.15 84.20 119.82 938.94

    30 CGF 1463.50 547.00 456.00 306.00 309.00 144.00 130.00 3355.50

    TOTAL 6978.12 2680.14 2434.46 3424.89 3234.60 1511.34 1944.55 22208.10

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 11

  • Table 5: Strategic Activity Plan of Basic Amenities for Loni Kalbhor Cluster

    Basic Amenities

    Sl

    no Component Sub-Component

    Service Delivery

    Indicators Activities

    Total Investme

    nt (In Lakhs)

    Available Fund With

    Existing Schemes CGF (In

    Lakhs ) Funding Schemes

    Funding Cost (In Lakhs )

    1 24x7 Piped

    Water Supply

    Instalation Of Digital WaterMeter

    Instalation Distribution Pipe

    Line

    Water Supply Scheme

    Purchase Of Land for WaterSource

    Water Filter Plant

    ESR

    Repair of well

    Installation Of R.O. Filter

    Minimum 70 LPCD

    quantity safe Drinking

    water assured

    Tap Connection assured

    to all Houses

    Daily minimum 2 hourssupply by panchyat and

    families will have 24x7

    water availability

    DW supply

    infrastructure

    created to provide

    safe DW at HH level

    to all families in the

    cluster.

    3329.40

    Chief

    Minister

    Peyajal

    Yojana, Z P

    Pune

    Scheme

    2949.40 380.00

    2 Sanitation

    Construction Of IndividualHouse Hold Toilets

    Construction Of

    Community toilets

    All Households

    Connected to a safe

    leach pit type of toilets.

    ODF Status to be

    achieved and sustained,

    covering all households.

    Enforcement of ODF

    - capacity building of

    GPs & Persons and

    ranking of GPs

    continuously

    140.12 SBM

    (Gramin) 137.12 3.00

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 12

  • 3 Solid and

    Liquid Waste Management

    Construction OfUnderground Drainage

    Solid Waste Transportation

    Procurement Of Land &Construction of Water

    Treatment Plant

    Household levelcollection and

    segregation of garbage

    Organic manurepreparation for organic

    farming

    Construction of

    Solid Waste

    Processing Centers

    Construction of

    individual vermi-

    compost pits to

    needy farmers

    1897.50

    DPC/ZP

    Fund/ SBM

    (Gramin)

    1217.50

    680.00

    4 Access to

    Village Streets with Drains

    Construction Of Roads

    All weather Roads

    provided to each street

    without pot holes and

    cesspools.

    Comfortable access tothe Village Streets.

    Construction and

    regular

    maintenance of

    internal village

    Roads

    9038.00

    SR

    Programm

    e/ DPC/ ZP

    Fund

    7967.00

    1071.00

    5 Village Street

    Lights

    LED Street Lights withpoles

    Providing electric

    transformer & maintenance

    LED Street Lighting @

    One per 30m distance

    90% Lights are assured

    illuminating at any point

    of night time.

    GPs to enter into an

    agreement to install

    and maintain LED587.25

    GP own

    Funds, ZP

    Funds

    55.00

    25.00

    New Tranformer 20 nos. Installation of electric Installation of

    6 Works under

    MSEDCL

    Underground Low

    frequency Wiring 15 km

    Underground Higher

    frequency Wiring 5 km

    transformer &

    maintenance

    Laying of underground

    cable

    electric transformer

    & maintenance

    Laying of

    underground cable

    780.85 DDUGVY,

    DPC 777.85

    3.00

    7 Public

    Transport Bus Stop Construction

    (Gaothan)

    Bus Stop Construction

    (Gaothan)

    Bus Stop

    Construction

    (Gaothan)

    55.00 DPC/PMP

    ML 55.00

    0

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 13

  • 8

    Construction and up-

    gradation of GP building, Gymnasium

    GP Building Upgradation ,

    Construction of GP Hall,

    Sabhha Mandap

    GP Building Up-

    gradation , Construction

    of GP Hall, Sabhha

    Mandap

    GP Building Up-

    gradation ,

    Construction of GP

    Hall, Sabhha

    Mandap

    187.00

    GP own

    Funds, ZP

    Funds

    137.00

    50.00

    Table 6: Strategic Activity Plan of Economic Activities for Loni Kalbhor Cluster

    Economic Activities

    Sl Component Sub-Component

    Service Delivery Activities

    Total

    Invest

    me

    AVAILABLE FUND

    WITH EXISTING

    SCHEMES

    CGF

    (In

    Lakhs

    )

    no Indicators nt

    ( In

    Crores )

    Funding Schemes

    Funding Cost (In Lakhs )

    Skill Development

    Construction of Mahila Asmita Bhavan

    Construction of Mahila Asmita Bhavan

    Skill Development

    DIC Scheme/

    9 training

    Linked to Economic Activities

    Skill Development training for village youth & women

    Skill Development training for village youth & women

    Centre catering to multiple skills will be established within the cluster

    116.56 R-SETI 78.56

    38

    NHM Polly House 26 unit, Shed Net

    Agri-Mechanization,

    Vermi-compost prepared in SWPCs and individual

    Vermi compost prepared in SWPCs and

    Naitional Horticult ure

    10 Agri-Services

    and Processing

    Power Spray, Tractor, Rotavator, etc

    Biogas Horticulture Plantation

    Scheme

    compost pits used for organic farming

    Sprinkler, Drip & Rain gun irrigations for all arable land

    Farmers trg- cum

    individual compost pits used for organic farming

    Farmers training

    2463.48 Mission/ Rashtiya Krushi Vikas Yajana/ Jalyukta

    2043.48

    420

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 14

  • Agri Area Treatmentand Development, CCT,NB, Soil pluge, etc

    milk processing center Organic Farming 1

    Nadef 20 nos

    . Vermi-culture 10Projects

    Individual BeneficiarySchemes

    PMKSY, Micro Irrigation Water Storage Tanks Repairs of percolation

    tanks

    Deepening of canals storage well irrigation scheme from

    Purandhar lift irrigationscheme

    learning needs to be addresed continuously upgrading new techniques

    supply of best qualityseed and fertilizer atdoorstep of all farmers

    Soil Testing will bedone regularly fforproper advice on soilreclamation forenhanced productivity

    Cluster is self sufficientin milk production andwill be surplus forexporting

    cum learning needs to be addressed continuously upgrading new techniques

    supply of bestquality seed andfertilizer atdoorstep of allfarmers

    Shivar Abhiyan

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 15

  • Table 7: Strategic Activity Plan of Social Amenities for Loni Kalbhor Cluster

    Social Amenities

    Sl

    N

    o

    Component Sub-Component Service Delivery

    Indicators Activities

    Total

    Invest

    me

    nt

    ( In

    Crores )

    AVAILABLE FUND

    WITH EXISTING

    SCHEMES

    CGF

    (In

    Lakhs

    )

    Funding Schemes

    Funding Cost

    PHC / Sub-centre Building X-Ray, Dental Chair & Other

    Equipment

    PHC Building Extension Installation Of Solar Water Heater

    500 Litre

    Easyaccessibility toPHC / AreaHospital forPrimary healthServices.

    Improvementof Facilitiessuch asBuildinginfrastructure, equipment,

    11 Health

    Ambulance Computer Individual Benefit Scheme

    Treatment forCommonailments andCommon

    otherdiagnosticservices

    Develop

    1473.0 NRHM/ DPC/ZP

    Fund 1449.00

    Maternity Home Kitchen Shed Building For PHC Land Purchasing For Animal

    Husbandry Dispensary

    Construction for Animal HusbandryDispensary Updating & repairing

    Medicine

    Services likeDelivery &Diagnosis.

    Contingencyfund to meetcost of manpower anddrugs atemergencies

    24.0

    12

    Up gradation of primary, secondary and higher secondary

    schools

    Toilet With Commode & Hand WashStation

    Teaching Rooms construction Ramps Ground / Play Ground Laboratory / library Compound Wall

    Englishlanguage to beintroducedfrom First Classitself alongwith Marathi

    Improvement

    SufficientFurniture toall studentsand teachers

    SeparateToilet blocksfor Boys and

    1117.9 SSC/DPC/ ZP Fund

    904.40

    213.5

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 16

  • Solar Light Unit Rain Harvesting Drinking Water filter units Computer Set & E-learning, Digital

    classroom, tabs for students

    Vermin-compost Unit Sport Equipment Benches building repairing scanning of record Construction Of Aanganwadi

    Buildings

    Land Purchase for AanganwadiBuilding

    Other Facility - Computer, Printer,decoration, weight Machine ,Educationsal Toys, Toilet Facility for21 Aanganwadi

    Kitchen Shed/ light connection Wall compound & Garden 21

    Aanganwadi

    Digital Aanganwadi 21 Nos

    in Quality of Education

    Girls

    Incentivesand awardsto bestteachers andStudents

    13 Social Welfare

    Improvement of Crematoriumpremises

    Construction of wall compound togarden

    Construction of walking plaza in

    ImprovementofCrematoriumpremises

    Construction

    ImprovementofCrematoriumpremises

    Construction GP own garden

    Construction of walking plazaaround percolation tank

    Play & Sport complex Development of Garden for citizens

    of wallcompound togarden

    Constructionof walking

    of wallcompound togarden

    Constructionof walking

    408.0 Funds, ZP Funds

    158.000

    Development Of Tourism Site plaza in garden plaza in 250.0

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 17

  • Construction garden of walking Constructionplaza around of walkingpercolation plaza aroundtank percolation

    Play & Sport tankcomplex Play & Sport Development complex

    of Garden for Developmentcitizens of Garden for

    Development citizensOf Tourism Site Development

    Of TourismSite

    14 Non Conventional Energy

    Water Supply Motors running OnWind power & Solar System

    Installation Of Solar & Wind HybridSystem

    Water SupplyMotorsrunning OnWind power &Solar System

    Water SupplyMotorsrunning OnWind power& Solar MEDA,

    Installation OfSolar & WindHybrid System

    SystemInstallationOf Solar &Wind Hybrid

    427.0 DPC

    375.000

    System 52.0

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 18

  • Table 8: Strategic Activity Plan of Digital Amenities for Loni Kalbhor Cluster

    Digital Amenities

    Sl

    N

    o

    Component Sub-

    Component

    Service Delivery

    Indicators Activities

    Total

    Invest

    me

    nt

    ( In

    Crores )

    AVAILABLE FUND

    WITH EXISTING

    SCHEMES

    CGF

    (In

    Lak

    hs ) Funding Schemes

    Funding Cost (In Lakhs )

    15 Digital Literacy

    Wi-FiFacility ForVillage

    MSCITcourse forvillagers

    Atleast one person ineach family will bedigital literate

    All 6+ standardschool children willbe exposed to digitalliteracy

    Continuous digital learningcentres

    established as a part of skilldevelopment

    Training and IEC activitiesunder digital literacy withvolunteers, net connectionsin GPs

    Computer lab in all 6+standard Schools

    175 Digital India, DDU-GKY

    65.000

    110

    16 Citizen Service Centres

    SANGRAM 2

    Citizen service centre( CSC ) one @ GP

    All Gram PanchayatOffices will be

    Establishment of mee- seva centres in all GPs

    12.04 Sangram 2 12.040

    digitally connectedand takeup e-transactions underdigital panchayat 0

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 19

  • INTEGRATED CLUSTER ACTION PLAN

    Cluster : LONI KALBHOR

    Sub District / Tahsil : HAVELI

    District : PUNE

    State : MAHARASHTRA

    The Context:

    The National Rurban Mission aims at development of a cluster of villages that preserve and nurture

    the essence of the rural community life with focus on equity and inclusiveness without

    compromising with the facilities perceived to be essentially urban in nature, thus creating a cluster of

    ‘Rurban Villages’.

    The mission intends to stimulate local economic development through well planned Rural Clusters to

    achieve overall development in the region.

    These projects will be implemented over a fixed timeframe of three years by integrating and

    converging the implementation of project components. This will be followed by an operations and

    maintenance period of ten years.

    The Integrated Cluster Action Plan (ICAP)

    The ICAP is a key document covering baseline studies outlining the requirements of the cluster and

    the key interventions needed to address these needs and to leverage its potential.

    An ICAP is required for a scientific and systematic assessment of the requirements of the

    components to be developed for the cluster. The ICAP will guide the development of the cluster it

    will include a long term vision for the cluster, interventions through various government schemes,

    plan the convergence of implementation of government schemes and lay out a strategy for

    operations and maintenance of the facilities created in the cluster. The Critical Gap Funding (CGF) for

    the cluster will be determined on the basis of the projections in the ICAP.

    The spatial planning component of the ICAP will ensure that the Rurban Cluster develops in the long

    term as well planned layouts with enforcement mechanisms similar to those in urban areas.

    The ICAP prepared enunciates the following:

    1. A strategy for cluster integrating the vision for each Gram Sabha, identified in the cluster.

    2. The desired outcomes for the cluster under the Rurban Mission.

    3. The resources to be converged under various Central Sector, Centrally sponsored and the StateSector schemes.

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 20

  • THE PROCESS

    4. The Critical Gap Funding (CGF) required for the cluster.

    5. The ICAP would delineate the cluster areas to form well planned layouts following the planningnorms (as laid down in the State Town and country planning Acts/similar Central or State statues as may be applicable), which would be duly notified by the State/UTs. These plans would be finally integrated with the District Plan/Master Plans as the case may be.

    The ICAPs for each cluster is to be prepared by the State Nodal Agencies. City and Industrial

    Development Corporation of Maharashtra, Ltd. is the Nodal Agency of Maharashtra State. The State

    Government has to prepare the ICAPs in close consultation with the District Collectors/ Zilla

    Parishads and concerned Panchayati Raj Institutions and ensure participation & ownership from all

    concerned stakeholders.

    Step by Step Process followed

    A step by step process is followed for the preparation of ICAP is summed up into 15 major steps as

    given in the figure below.

    Step 12- Obtaining Gram Sabha resolutions

    Step 13- Submission of ICAP to MoRD

    Step 7- Detailing of Mission Components

    Step 14- Revision of ICAP based on approved DPR

    Step 15- Five Yearly Iteration to ICAP

    Step 11- Implementation Strategy

    Step10- Arriving at CGF Estimate

    Step 8- Investment Phasing

    Step 6- Prioritisation of Needs

    Step 5- Deficiency Analysis & Identification of Needs No

    tifi

    cati

    on

    of

    Pla

    nn

    ing

    Are

    a at

    late

    r St

    age

    Step 9- Resource Mobilisation

    Step 4- SWOT and Visioning for the Cluster

    Step 3- Cluster Profiling

    STAKEHOLDER CONSULTATION

    Step 1- Selection of Cluster

    Step 2- Delineation & Notification of Planning Area

    Figure 1: Step by Step Process for ICAP

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 21

  • Step 1 : Selection of Cluster

    The cluster selection process followed the process delineated in section 12.0 in the Framework for

    Implementation. The relevant details about the clusters as defined in the framework of implementation

    is given below:

    • ! ‘Rurban

    cluster', is

    defined as

    a cluster

    of

    geographically contiguous villages with a population of about 25000 to 50000 in plain and coastal areas

    and a population of 5000 to 15000 in desert, hilly or tribal areas. As far as practicable, clusters of village

    would follow administrative convergence units of Gram Panchayats and shall be within a single block/

    tehsil for administrative convenience.

    • The cluster selection process was done by the Ministry and the State RD Departments, as per a pre-

    defined cluster selection methodology. The Ministry identified and shared with the State, a set of

    potential locations (sub districts) for Rurban clusters Ref Table and the State identified a set of

    contiguous villages around a growth centre within the sub district to form a Rurban cluster and further

    prioritized these clusters based on parameters suggested by the Ministry..

    • There are two categories of clusters under SPMRM: Non-Tribal and Tribal and the process of selection

    varied for each of these categories.

    A. Non- Tribal Clusters: For selection of Non-Tribal clusters, the Ministry provided a list of leading sub

    districts to the State, within which the clusters were identified. The selection of these sub districts by the

    Ministry was done based on parameters such as -

    (i) Decadal Growth in Rural Population

    (ii)Decadal Growth in Non-Farm work participation

    (iii) Presence of Economic Clusters

    (iv)Presence of places of Tourism and Religious significance and

    (v) Proximity to Transport Corridors. Appropriate weightages were given for each parameter.

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 22

  • Thereafter, within these sub districts, so identified by the Ministry, the State Governments selected the

    clusters and while doing so, included the following performance parameters:

    i. Decadal growth in Rural Population.

    ii. Rise in Land Values.

    iii. Decadal growth in Non- Farm Work force participation.

    iv. Percentage Enrollment of girls in secondary schools.

    v. Percentage Households with Bank accounts under PradhanMantri Jan DhanYojana.

    vi. Performance in Swacch Bharat Mission (Grameen).

    vii. Good Governance Initiatives by Gram Panchayats.

    (Any other factor, which the States may consider relevant, may also be included).

    A weightage of % was given for the first four parameters and % of the last.

    Figure 2: Steps to be taken by State- Identification of Non Tribal Rurban Clusters

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 23

  • Figure 3: Steps to be taken by State for Identification of Non - Tribal Cluster

    i.

    ii.

    Ranking of Non Tribal clusters

    Based on the methodology followed above the clusters have been ranked as below. Please

    refer to ranking methodology chart in Figure 2 and Figure 3.

    The Selected Non tribal clusters

    Following the above selection process the State has selected the following Non tribal

    clusters

    Table 9: Selected List of Non Tribal Clusters

    Sl no. District Sub-District Cluster

    1 Nagpur Kamptee Wadoda

    2 Aurangabad Gangapur Jogeshwari

    3 Pune Haveli Loni Kalbhor

    4 Jalna Partur Ashti

    5 Buldhana Lonar Sultanpur

    6 Beed Parali Shirsala

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 24

  • B. Tribal Clusters: For identification of the tribal clusters, the Ministry has selected the leading

    sub districts of the State falling within the top 100 tribal districts of the country, based on the

    Scheduled Tribes population. The selection of these sub districts has been based on

    parameters such as -

    (i) Decadal growth in Tribal Population

    (ii) Current Tribal Literacy Rate

    (iii) Decadal growth in Non- Farm Work force participation

    (iv) Decadal growth in Rural Population and

    (v) Presence of Economic Clusters. Appropriate weightages have been suggested respectively

    for each of these parameters while selecting the sub districts.

    Thereafter, within these sub districts so identified by the Ministry, the clusters have been

    selected and while doing so, the following performance parameters have been selected:

    i. Decadal growth in Tribal Population

    ii. Growth in Tribal Literacy rates

    iii. Decadal growth in Non- Farm Work force participation.

    Figure 4: Process of Identification of Tribal Clusters in a State

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 25

  • i.

    ii.

    Ranking of Tribal clusters

    Based on the methodology followed above the clusters have been ranked as below:

    The Selected Tribal clusters

    Following the selection process stated in Figure 4 the State has selected the following Tribal

    Clusters:

    Table 10: Selected List of Tribal Clusters

    Sl no. District Sub-District Cluster

    1 Jalgaon Muktainagar Muktainagar

    Accordingly, selection of Clusters is done by Ministry of Rural Development, Government of India and

    Government of Maharashtra following the guidelines of NRuM. Thus, 7 nos. of clusters have been

    finalised for first phase in Maharashtra out of which one is a Tribal Cluster. Loni Kalbhor is one among

    the 6 nos. of Non-Tribal clusters.

    The Loni Kalbhor Cluster includes 8 nos. of villages viz. Loni Kalbhor, Kunjirwadi, Alandi Mhatoba,

    Ramoshiwadi, Sortapwadi, Tarade, Valati, Shindavane. The two villages Alandi Mhatoba and

    Ramoshiwadi has one single Gram Panchayat and hence the village Ramoshiwadi is not listed

    separately.

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 26

  • Step 2 : Delineation & Notification of Planning Area The 7 nos. of villages forming LONI KALBHOR CLUSTER are contiguous and accordingly joining village

    boundaries the cluster is delineated.

    Figure 5: Delineation of Cluster

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 27

  • As contemplated in the NRuM Mission, The Clusters will have to be notified by the State Government

    at later stage. Thus, the Cluster of Loni Kalbhor will also have to be notified under Maharashtra

    Regional and Town Planning Act, 1966 so as to prepare the Development Plan.

    The cluster falls within the boundary of Pune Metropolitan Region Development Authority (PMRDA)

    and is located at around 24 km from Pune City on Pune – Solapur highway NH-9.

    Development Plan (DP) of village Loni Kalbhor sanctioned by Government of Maharashtra exists

    where Zilla Parishad is the Planning Authority. The DP was sanctioned in the year 1980 and is overdue

    for revision.

    Figure 6: Pune Metropolitan Region Source: Town Planning & Valuation Dept., GoM

    Figure 7: Loni Kalbhor Development Plan Source: Town Planning & Valuation Dept., GoM

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 28

  • PMRD! has revised the road network which is shown in red colour in the plan showing ‘Pune 10km

    Fringe !rea Road Network Plan’. These roads are sanctioned in the Regional Plan of Pune and some

    of these roads fall in Loni Kalbhor Cluster.

    Figure 6

    Figure 8Ƥ ƯPŘőň ͙͘ŎŐ FŕŌőŊň Aŕňń RŒńŇ NňŗŚŒŕŎ Pŏńőǯƥ

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 29

  • Hence, while preparing the Development Plan of Loni Kalbhor Cluster due cognisance of the

    proposals of PMRDA and the sanctioned Development Plan shall have to be taken to avoid conflict

    or duplicity of proposals.

    Figure 9: PMRDA 60m wide road passing through Cluster

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 30

  • Step 3: Cluster Profiling

    The existing profile of the cluster needs to be detailed out at 2 levels -

    (1) General Profile which includes Demography, Socio Economic, Administrative Profiling

    (2) Component Profiling.

    Step 3a: General Profile

    Under the General Profiling the Demographic details of the GPs within the cluster, the socio-

    economic profiling, cultural profiling and the administrative profiling, cultural profiling and the

    administrative profiling of the GPs need to be done. Each of these are elaborated below.

    I. Demography :

    The Loni Kalbhor Cluster includes 7 nos. of Gram Panchayats viz. Loni Kalbhor, Kunjirwadi, Alandi

    Mhatoba, Sortapwadi, Tarade, Valati, Shindavane. The total population of the cluster is 50,461 souls

    with Loni Kalbhor being the largest Gam Panchayat of the cluster, with population of 22,518 souls.

    Loni Kalbhor constitutes 44.63 % of total population of the cluster.

    There has been a 16.47 % growth in the cluster population from 2001 to 2011, with Loni Kalbhor

    showing largest growth of 32.6 % followed by village Tarade and Kunjirwadi respectively.

    44.63% 16.68%

    9.4%

    12.61%

    4.24%3.15%

    9.29%

    Existing Population Distribution

    Loni Kalbhor (44.63%)

    Kunjirwadi (16.68%)

    Alandi Mhatoba (9.40%)

    Sortapwadi (12.61%)

    Tarade (4.24%)

    Valati (3.15%)

    Shindavane (9.29%)

    Figure 10: Proprortion of Total Population Gam Panchayat Wise

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 31

  • The cluster has 12,023 households as per Census 2011, with an average household size of 4. As can be

    seen in the figure below, Singarayakonda and Mulaguntapadu GPs have the largest number of

    households in the cluster.

    Existing Percentage of Households Distribution

    44.60% 17.57%

    9.00%

    12.96% 8.85%

    Loni Kalbhor

    Kunjirwadi

    Alandi Mhatoba

    Sortapwadi

    Tarade

    Valati

    Shindavane

    3.12% 3.90%

    Figure 11: Percentage of Households in Cluster, distributed GP wise

    Total Land Area

    Agricultural 68%

    Other Landuse

    32%

    Figure 12: Distribution of Total Land Area

    The landuse pattern depicts

    that coverage of land under

    ‘Agriculture’ is around 68%,

    while the remaining 32% of land

    is under ‘Other Landuse’.

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 32

  • While considering various parameters, the population is projected for the year 2020. It is found that

    with a growth rate of around 53.5% the projected population for the year 2020 will be 77,441 Souls.

    80000

    60000

    40000

    20000

    0

    22518 8421 4741 6366 2138 1592 4685

    50461

    45000

    10500 5741 6500 2500 2000 5200

    77441

    Population (Census 2011) Projected Scenario (2020)

    Figure 13: Population Projections

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 33

  • Brief of the Demographic Profile is compiled in the table below.

    Table 11: Demographic Profile of the Cluster

    Details GP -1 GP-2 GP-3 GP-4 GP-5 GP-6 GP-7 Total

    S.N. Existing

    Lon

    ikal

    bh

    or

    Ku

    njir

    wad

    i

    Ala

    nd

    i

    Mh

    ato

    ba

    Sort

    apw

    adi

    Tara

    de

    Val

    ati

    Shin

    dav

    ane

    1 Total Population (as per census

    2011) 22518 8421 4741 6366 2138 1592 4685 50461

    2 Decadal Growth in Rural

    Population (%) (2001-2011) 32.60 21.79 19.09 20.11 26.21 13.63 -0.69

    16.47

    (avg)

    3 Household Size (No. of Members

    per HH) 5/HH 5/HH 5/HH 5/HH 5/HH 5/HH 5/HH

    5/HH

    (avg)

    4 No. of Households 4720 1859 952 1372 413 330 936 10582

    5 Sex Ratio (Male:Female) 1000:

    920

    1000:

    902

    1000:

    908

    1000:

    879

    1000:

    897

    1000:

    955

    1000:

    919

    1000: 911

    (avg)

    6

    Age Profile (Age bracket with the

    largest % of population as per

    Pune District Rural)

    20 - 35

    years

    (27% )

    20 - 35

    years

    (27% )

    20 - 35

    years

    (27% )

    20 - 35

    years

    (27% )

    20 - 35

    years

    (27% )

    20 - 35

    years

    (27% )

    20 - 35

    years

    (27% )

    20 - 35

    years

    (27% )

    7 Total Land Area (Hectors) 3370 624 2448.

    45 815

    1151.6

    6

    954.6

    4

    2009.2

    1 11372.96

    i Under agriculture (In Hectors &

    Percentage to Total Land)

    2097.4

    1

    (70.68

    %)

    554

    (76.44

    %)

    1450.6

    4

    (71.33

    %)

    732

    (51.28

    %)

    850

    (69%)

    567.4

    5(59.4

    4%)

    1535.43

    (76.41%

    )

    7786.93

    (67.76%)

    ii Irrigated Land in percentage to

    Total Land 49.68% 100%

    82.38

    % 97% 21% 22.62% 55.79%

    63.85%

    (avg)

    iii Under Forests (Hectors) 1202.82 No 407.5

    4 No 79.64 154.60 239.24 2083.84

    Projected Scenario- 2020 GP1 GP2 GP3 GP4 GP5 GP6 GP7

    1 Rural Population 45000 10500 5741 6500 2500 2000 5200 77441

    2 Household size (No. of Members

    per HH) 5/HH 5/HH 5/HH 5/HH 5/HH 5/HH 5/HH

    5/HH

    (avg)

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 34

  • The villages Loni Kalbhor, Kunjirwadi and Sortapwadi are abutting NH-9 i.e. Pune-Solapur

    Highway and hence, population is comparatively more in these cluster.

    Loni Kalbhor is having the largest area i.e. 29.63% followed by Alandi-Mhatoba and Shindavane

    17.66%.

    Decadal Population Growth as per Census 2001 – 2011 in Cluster is 21.09%.

    Literacy Rate in Cluster (as per census 2011)

    29.88 % 70.12 %

    Illerates

    Literates

    Figure 14: Literacy Rate

    Gram Panchayat of Tarade shows minimum Literacy Rate in the Cluster i.e. 61.36%. Literacy Rate

    in the rest of the Cluster ranges between 69.22% to 72.52 %.

    The cluster shows average literacy rate of 70.12% which is lower as compared to State average of

    82.34 % and National average of 74.04 % as per Census 2011.

    Percentage of Graduates and Post-Graduates is less than 24%.

    43%

    36%

    24%

    0% 10% 20% 30% 40% 50%

    % with Higher Secondary & above

    % with Senior Secondary & above

    % with Primary Education & above

    Figure 15: Education Level of Cluster

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 35

  • SC ST Others

    II. Social Profile of the Cluster :

    As per Census 2011, the population of SC in the cluster is 6,084 which constitutes around 12.05% of

    the total population. The population of ST in the cluster is 548 which is around 1.08% of the total

    population of the cluster.

    7000

    6000

    5000

    4000

    3000

    2000

    1000

    0

    SC / ST Population %

    12.05 %

    86.87 %

    1.08%SC

    ST

    Figure 16: Population in Cluster SC / ST

    In the Loni Kalbhor Cluster around 0.66 % of the population comprises Single Women which is

    negligible. Also, 1% of the total population is specially-abled, hence for Universal Accessibility the

    infrastructure to be laid should consider the accessibility features for specially-abled also.

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 36

  • The brief of the Social Profile of the cluster is compiled in the Table 4 below.

    Table 12: Social Profile of the Cluster

    Details GP -1 GP-2 GP-3 GP-4 GP-5 GP-6 GP-7 Total

    S.N. Existing

    Lon

    ikal

    bh

    or

    Ku

    njir

    wad

    i

    Ala

    nd

    i

    Mh

    ato

    ba

    So

    rtap

    wad

    i

    Tar

    ade

    Val

    ati

    Sh

    ind

    avan

    e

    1 Literacy Rate (as per census 2011)

    72.39 72.52 72.43 71.19 61.36 71.73 69.22 70.12 (Avg.)

    2 SC Population 3190 862 410 1088 128 96 310 6084

    3 ST Population 327 66 14 61 35 0 45 548

    4 OBC Population 5250 843 1135 730 1134 21 550 9663

    5 Open Category Population

    13751 6650 3182 4488 841 1475 3780 34167

    6 Education Levels

    (i) % with Higher Secondary and above

    15% 20% 15% 60% 5% 45% 8% 24% (Avg.)

    (ii) % with Senior

    Secondary and above

    10% 35% 40% 30% 55% 35% 45% 36% (Avg.)

    (iii) % with Primary

    Education and above

    70% 45% 30% 60% 40% 10% 47% 43% (Avg.)

    7 % of Population – disabled

    3% 0.35

    % 0.07

    % 0.30

    % 1.21%

    0.36 %

    0.20% 1% (Avg.)

    8 % of Single women 2.00

    % 0.05

    % 0.09

    % 0.20

    % 2.00

    % 0.06

    % 0.20%

    0.66% (Avg.)

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 37

  • III. Economic Profile of the Cluster

    In Loni Kalbhor Cluster 24,159 people are involved in both Farm and Non-Farm activities. From this

    working population 39.89% are female workers and remaining 60.11% are male workers.

    Cluster (Avg)

    Shindavane

    Valati

    Tarade

    Sortapwadi

    Alandi Mhatoba

    Kunjirwadi

    Loni Kalbhor

    60.11 39.89

    58.93 41.07

    53.92 46.08

    53.64 46.36

    65.32 34.68

    55.51 44.49

    66.74 33.26

    66.70 33.30

    Men

    Women

    0% 20% 40% 60% 80% 100%

    Figure 17: Workforce Participation in the Cluster

    Occupation in Primary Sector is predominant in Loni Kalbhor Cluster which constitutes 60.44% of the

    total work force. Nearly 40% of women work-force exists.

    MSME Clusters or industries are not existing in Loni Kalbhor Cluster. Sugarcane is one of the major

    crops and hence Jaggary Units are seen. Other agro-based industries include Nursery, Vegetable

    Processing, Poultry, Fruit Processing etc.

    Home based traditional industries like cobblers, carpentry, blacksmith, pottery also exist. A very

    small percentage of 1.92% is in service industry. The average distance travelled in the cluster, by the

    employees, to reach work place ranges from 2 to 3 Km.

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 38

  • The brief of the Economic Profile of the cluster is compiled in the Table 5 below.

    Table 13: Economic Profile of Cluster

    Details GP -1 GP-2 GP-3 GP-4 GP-5 GP-6 GP-7 Total

    S.N. Existing Lonikalbhor Kunjirwadi Alandi

    Mhatoba Sortapwadi Tarade Valati Shindavane

    1 Occupational Structure

    (i) Farm and Non-Farm work force (Total Working Population)

    9951 3815 2643 3053 1156 907 2634 24159

    (ii) Population in Primary Occupation

    4718 2313 1682 2155 745 827 2163 14603

    Population in Secondary Occupation

    1750 950 480 580 205 2 390 4357

    Population in Tertiary Occupation

    1550 550 147 250 25 67 70 2659

    Population in Service Industry 180 95 65 45 40 11 30 466

    (iii) Women as a % of Work Force 33.30 33.26 44.49 34.68 46.36 46.08 41.07 39.89 (Ave.)

    Male / Female Workers Ratio 100 : 49 100 : 49 100 : 83 100 : 53 100 : 86 100 : 85 100 : 69 100 : 69 (Ave.)

    Occupation by Industry (Industry in which majority of the work force is engaged in )

    NO NO NO NO NO NO NO Majority Work

    Force in Agriculture

    (iv) Average distance to work place for majority of the work force in the GP.

    4 Km 4 Km 3 Km 4 Km 2 Km 1 Km 1.5 Km 2.78Km

    (v) Any home based or traditional industry

    Carpentry Cobbler Black

    Smith

    Pottery

    Carpentry Cobbler Black

    Smith

    Pottery

    Carpentry Cobbler Black Smith Pottery

    NO Burud-kaam NO

    Carpentry Cobbler Black Smith Pottery

    Carpentry Cobbler Black Smith Pottery

    2 MSME Clusters Details -

    (i) No NO NO NO NO NO NO NO

    (ii) Type NO NO NO NO NO NO NO -

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 39

  • IV. Cultural Profile of Cluster :

    3.07% 0.36% Religion (%)

    96.57%

    High majority of people belonging to HinduHindu

    religion is seen.

    Muslim Marathi is the local language and the usage is

    very high. Others RAMDARA is a City Level picnic spot existing

    in the Cluster amidst forest land.

    Table 14: Cultural Profile of the Cluster

    Details GP -1 GP-2 GP-3 GP-4 GP-5 GP-6 GP-7 Total

    Lon

    ika

    lbh

    or

    Ku

    nji

    rwad

    i

    Ala

    nd

    i

    Mh

    ato

    ba

    So

    rta

    pw

    adi

    Tar

    ade

    Val

    ati

    Sh

    ind

    avan

    e

    S.N. Existing

    1

    2

    Languages Spoken

    Religion (% of population under each religion)

    Marathi, Hindi

    Hindu: 86% Muslim: 12% Chiristia n: 1% and Jain: 1%

    Marath i

    Hindu: 99% and Muslim : 1%

    Marath i

    Hindu: 98% Muslim : 1.5% and Jain: 0.5%

    Marath i

    Hindu: 97% and Muslim : 3%

    Marath i

    Hindu: 98% and Muslim :2%

    Marath i

    Hindu: 99% and Muslim :1%

    Marath i

    Hindu: 99% and Muslim :1%

    Marathi

    Hindu: 96.57% Muslim: 3.07% and Others: 0.36% (Avg.)

    3 Type of Tribes

    Non-Primitive

    Tribal Group

    Non PTG

    Non PTG

    Non PTG

    Non PTG

    Non PTG

    Non PTG

    Non PTG

    4 Pilgrimage Centres

    Tourist Centres

    Monuments / Places of Heritage

    YES

    RAMDAR A

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    NO

    5 RAMDARA

    NO 6

    7 Special Festivals

    No. of Theatres

    Weekly Market

    NO

    NO

    Weekly & Daily Market

    in village itself

    NO

    NO

    Weekly & Daily Market

    in village itself

    NO

    NO

    Weekly Market

    at Kunjir wadi, 5km from

    GP

    NO

    NO

    Weekly Market

    at Kunjir wadi, 4km from

    GP

    NO

    NO

    Weekly Market

    at Kunjir wadi, 6km from

    GP

    NO

    NO

    Weekly Market at Uruli Kancha n, 9km from

    GP

    NO

    NO

    Weekly Market at Uruli Kancha n, 8km from

    GP

    NO

    8 NO

    9

    2 nos. of Weekly &

    Daily Markets in the Cluster

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 40

  • Tourist Centre: RAMDARA

    Ramdara is one of the places of interest around Pune City that are listed on various websites. It is

    a temple complex owned by a private trust on the bank of a small lake amidst forest area.

    The temple complex is surrounded by forest

    land. Forest Dept. has carried-out

    development like Nature Trails, Arbours etc.

    surrounding the Temple Complex.

    The Temple Trust owns a land of around 70 acres where

    farming is done. ! ‘Goshala’ also exists with around 100

    cattle. Ramdara is a serene location and has a fair potential to

    be developed as a one day Picnic Spot. Camping site and one

    day treks can be carried-out to develop Adventure Tourism.

    Possibility of development of Village Tourism can be explored

    by promoting Floriculture, Vegetable Crops and Bullock Cart

    Rides etc.

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 41

  • V. Administrative Profile

    The Loni Kalbhor Cluster includes 8 nos. of villages viz. Loni Kalbhor, Kunjirwadi, Alandi Mhatoba,

    Ramoshiwadi, Sortapwadi, Tarade, Valati, Shindavane. The two villages Alandi Mhatoba and

    Ramoshiwadi has one single Gram Panchayat and hence the village Ramoshiwadi is not listed

    separately. Loni Kalbhor is the largest village in the Cluster and Tasil Haveli is the Block Head

    Quarter which is around 18km from Loni Kalbhor.

    The Gram Panchayat is the key nodal agency in the cluster for this mission. It is responsible for

    provision of key services of Water Supply, Sanitation, Village Streets and Drains. The Mandal

    Officer (BDO) is in-charge of the Key Development Programs.

    Table 15: Administrative Profile

    S. N. Details Total

    1 No of Gram Panchayats in the cluster 7 nos.

    2 Name of Block Head Quarters HAVELI

    3 Name of the BDO Mr. S. N. Kohinkar

    4 Distance of the Block Head Quarters from the largest settlement in the cluster ( in km)

    Shindavane to P.S. Haveli 36 km

    5

    Agencies providing key services

    i) Water Supply and SanitationRural Water Supply

    Depertment Z.P. Pune

    ii) Village Streets and DrainsPublic Works Depertment

    Z.P., Pune

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 42

  • Step 3 b : Component Profiling

    As per the NRuM framework 14 desirable components have been envisaged as ideal for the

    cluster which are:

    I. Skill development training linked to economic activities

    II. Agro Processing, Agri-Services, Storage and Warehousing

    III. Fully equipped mobile health unit

    IV. Upgrading school/higher education facilities

    V. Sanitation

    VI. Provision of piped water supply

    VII. Solid and liquid waste management

    VIII. Village streets and drains

    IX. Street lights

    X. Inter-village road connectivity

    XI. Public transport

    XII. LPG gas connections

    XIII. Digital Literacy

    XIV. Citizen Service Centres / e-gram - for electronic delivery of citizen connectivity

    Each of the above mentioned Desirable Components have been detailed out in the templates

    given below:

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 43

  • Table 16: Skill Development training linked to Economic Activity in the Cluster

    DETAILS GRAM PANCHAYATS TOTAL

    EXISTING GP - 1 GP - 2 GP - 3 GP - 4 GP - 5 GP - 6 GP - 7

    Loni Kalbhor Kunjirwadi Alandi

    Mhatoba Sortapwadi Tarade Valati Shindavane

    1 Average Income per capita (Rs. / Annum)

    67,000/- 50,000/- 52,000/- 48,000/- 50,000/- 48,000/- 54.000/-

    2 Primary source of income

    Agriculture & Allied Agriculture &

    Allied Agriculture &

    Allied Agriculture &

    Allied Agriculture &

    Allied Agriculture

    & Allied Agriculture &

    Allied

    3 Skills available-Handicraft/ handloom/ Industrial etc

    NO NO NO NO NO NO NO

    4 MSME clusters present (Y/N)

    NO NO NO NO NO NO NO

    5 If (Y), above then nos and type of MSME cluster

    - - - - - - -

    6 Employment generated through 1 above

    - - - - - - -

    7 Female to Male ratio of employment

    - - - - - - -

    8 Female to Male ratio of vocational skill engagement

    - - - - - - -

    9 Traditional/home based Industries present

    Poultry, Carpenter, Black-Smith,

    Cobbler, Men's Parlour, Burud kam

    Black-Smith, Cobbler,

    Potter, Barber

    Black-Smith, Cobbler,

    Potter, Barber

    Black-Smith, Cobbler, Potter, Barber

    Carpenter, Burud kam

    Carpenter, Barber

    Carpenter , Barber

    10 Identified needs for skill development

    Mobile Repairing, Tailoring & Fashion Designing, Beauty

    Parlour, Men's Saloon, Carpenter,

    Men's Saloon, Nursery

    Management, Polyhouse, Tailoring &

    Poultry, Dairy Management,

    Nursery Management,

    Polyhouse,

    Nursery Management, Men's Parlour

    Mens Parlour, Poultry , Dairy Management

    Mens Parlour, Poultry,

    Dairy Manageme

    Dairy Management

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 44

  • Fabrication, Poultry, Dairy Management

    Fashion Designing,

    Beauty Parlour

    Tailoring & Fashion

    Designing, Beauty Parlour

    nt

    11 Agencies involved in skill development / training

    YES; R-SETI Bank of Baroda, Kunjirwadi

    YES; R-SETI Bank of Baroda,

    Kunjirwadi

    YES; R-SETI Bank of Baroda,

    Kunjirwadi

    YES; R-SETI Bank of Baroda,

    Kunjirwadi

    YES; R-SETI Bank of Baroda,

    Kunjirwadi

    R-SETI Bank of Baroda, Kunjirwadi

    R-SETI Bank of Baroda, Kunjirwadi

    Projected GP - 1 GP - 2 GP - 3 GP - 4 GP - 5 GP - 6 GP - 7 TOTAL

    1 Projected no of households for 2022

    8000 2695 1450 2130 513 360 1029 16177 (Avg)

    2 Projected needs for skill development (no. of hoseholds)

    1565 265 55 265 50 30 101 2331 (Avg)

    No is Skills available nor the MSMEs regarding Handicraft/ handloom/ Industrial.

    Skills like Carpentry, Footwear making is existing.

    Many nurseries are seen and hence Floriculture has ample scope in the Cluster.

    The predominant activity is agriculture and allied. The existence of Carpenter, Blacksmith,

    Cobbler, Barber etc. form a part of home based industry.

    Existence of Brick Kilns shows the growing demand of building material. However, clay bricks

    need to be discouraged from environmental point of view. As loosing top soil will hamper

    Agriculture.

    The Rural Self Employment Training Institute attached to the Nationalized Bank i.e. Bank of

    Baroda, Kunjirwadi, is imparting skill development along with two more private agencies.

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 45

  • MAKING

    Available and Identified Skills:

    AVAILABLE SKILLS

    CARPENTRY

    FOOTWEAR

    POTTERY

    Figure 18: Available Skills

    GOAT FARMING

    IDENTIFIED SKILL-NEEDS

    FOR 1565 HHs BY 2020

    FLORICULTURE

    TAILORING

    BEAUTY PARLOUR

    DAIRY MANAGEMENT

    REPAIRS OF ELECTRONIC DIGITAL EQUIPMENT LIKE

    MOBILE, LAPTOP AND COMPUTER PERIPHERALS

    POULTRY FARM

    CARPENTRY

    FABRICATION

    Figure 16: Available Skills

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 46

  • Table 17: AGRI-SERVICES and PROCESSING

    DETAILS GRAM PANCHAYATS CLuster

    EXISTING GP - 1 GP - 2 GP - 3 GP - 4 GP - 5 GP - 6 GP - 7

    Loni Kalbhor Kunjirwadi Alandi Mhatoba Sortapwadi Tarade Valati Shindavane

    1 Any existing Agri Service Centre (Y/N)

    YES YES NO NO NO NO YES

    2 If Y then issues/need for up-gradation

    Timely supply of quality Seeds & Fertilisers etc. at reasonable rate is necessary

    Timely supply of quality Seeds & Fertilisers etc. at reasonable rate is necessary

    - - - -

    Timely supply of quality Seeds & Fertilisers etc. at reasonable rate is needed.

    3 Any agro-processing industries present (Y/N)

    Yes Yes Yes NO NO NO Yes

    4 If Y then details of the same – type, size, scale etc

    6 Jaggery Units; approx. 160 kg jaggery production / day

    One Jaggery Unit approx. 125 kg jaggery production /day, One vegetable processing unit 1000kg /day

    4 Jaggery Units; approx. 100-150 kg jaggery production /day

    - NO -One Jaggry Unit 1000kg /day

    5 Presence of adequate storage & warehousing facilities

    NO NO NO NO NO NO NO

    6 Presence of cold storage facilties

    NO NO NO NO NO NO NO

    7 Predominant agricultural produce

    Sugercane & Vegetables

    Sugercane, Onion & Vegetables

    Onion, Sugercane, Vegetable & Fruits

    Various Flower Crops

    Flowers, Onion, Vegetable & fruits

    Vegitable and Fruits

    Onion, Sugarcane, Vegetable & Fruits

    8 Issues related to optimum yield

    Insufficient organic manure use, expensive improved seeds & fertilizer,

    Insufficient of water supply for irrigation , low productivity of soil

    Insufficient of water supply for irrigation , expensive improved seeds

    Insufficient water supply for irrigation & proper

    Lack of parmanent water source

    Lack of parmanent water source

    Reducing land holding, insufficient labour, lack of parmanent

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 47

  • reducing land holdings, insufficient labour, pollution

    & fertilizer market water source

    Protected

    9

    Identified additional support infrastructure to improve agri-productivity.

    farming, organic farming, use of 100% microirrigation techniques, intigrated pest-disease & fertilizer management, warehouse for agril produce & cold storages

    Protected farming, organic farming, use of 100% microirrigation techniques & optimum use of organic manure

    Protected farming, organic farming, use of 100% micro-irrigation techniques & optimum use of organic manure

    Protected farming, optimum use of organic manure

    Protetive farming,drip errigatin, organic farm, water availability

    Protective farming, drip irrigation, organic farm, water availability

    Drip irrigation , organic farming , soil testing , intigrated pest-disease & fertilizer management

    10

    Presence of mandis/wholesale agri produce markets ( Nos and distance between these mandis)

    Yes; 1) Weekly anddaily market in village itself 2)APMC market at shevalwadi 7km from GP

    Yes; 1) Weekly anddaily market in village itself 2)APMC market at shevalwadi 11km from GP

    Yes; 1) Weekly anddaily market at kunjirwadi 5km 2)APMC market at shevalwadi 16km from GP

    Yes; 1) Weeklyand daily market at kunjirwadi 4.5km 2)APMC market at shevalwadi 15km from GP

    Yes; 1) Weeklyand daily market at kunjirwadi 3 km 2)APMC market at shevalwadi 23 km from GP

    APMC market at shevalwadi 20 km from GP

    Yes; 1) Weekly anddaily market at uruli-kanchan 8 km from GP 2)APMC market at shevalwadi 21 km from GP

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 48

  • Daily & Weekly Markets and Agriculture Produce Market Committee (APMC) are available but no Cold Storage.

    Sugarcane and vegetables are the prominent crops.

    Many Jaggery Units exist in the cluster with fair amount of production.

    Agriculture Service Centres exist in the cluster but lack facilities. The material like seeds, fertilizer and organic manure are un-affordable to

    many farmers.

    In-sufficient water supply for irrigation is another reason for continual reduction of agricultural land.

    OPTIMUM YIELD

    INSUFFICIENT ORGANIC MANURE USE

    REDUCING LAND HOLDINGS

    EXPENSIVE IMPROVED SEEDS & FERTILIZER

    INSUFFICIENT LABOUR

    Figure 19: Issues related to Optimum Yield

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 49

  • Table 18: DIGITAL AMENITIES and LITERACY

    DETAILS GRAM PANCHAYATS Cluster

    EXISTING GP - 1 GP - 2 GP - 3 GP - 4 GP - 5 GP - 6 GP - 7

    Loni Kalbhor Kunjirwadi Alandi

    Mhatoba Sortapwadi Tarade Valati Shindavane

    1

    Any existing ICT enabled front end Common Service Centre (Y/N)

    YES 1)Sangram Kaksha 2)Maha-E-Service Center 3)MSCIT Training Center 4)Job Center

    YES 1)Sangram Kaksha 2)Maha-E-Service Center

    YES Sangram Kaksha

    YES Sangram Kaksha

    YES Sangram Kaksha

    YES Sangram Kaksha

    YES Sangram Kaksha

    2 If Y any up-gradation required

    FullyEquippedCommonServiceCenter

    NEED ofNOFN / BroadBandconnectivity

    Need of NOFN / Broad Band connectivity

    Need of NOFN /

    Broad Band connectivity

    Need of NOFN /

    Broad Band connectivity

    Need of NOFN /

    Broad Band connectivity

    Need of NOFN /

    Broad Band connectivity

    Need of NOFN / Broad

    Band connectivity

    3 Connectivity under NOFN/Broad Band connectivity

    Broad Band connectivity

    YES NO Broad Band connectivity

    NO NO NO

    4 Gaps under 3 above ( coverage)

    Irregular Network

    Connectivity; Unavailability

    Of Modern Tools

    Irregular Network

    Connectivity; Unavailability

    Of Modern Tools

    Unavailability of Broad

    Band connectivity

    Unavailability of Broad

    Band connectivity

    NO NO

    Unavailability of Broad

    Band connectivity

    5 No. of mobile 4 4 2 4 NO NO 2

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 50

  • towers

    6 Coverage under E-Kranti

    - - - - - - -

    % of households 7 with digital 25% 12% 21% 11% 2% 2% 9% 11.71%

    connectivity

    % of households 8 with at-least one e- 55% 40% 20% 34% 7% 20% 65% 34.42%

    literate person

    PROJECTED GP - 1 GP - 2 GP - 3 GP - 4 GP - 5 GP - 6 GP - 7

    Projected no of 1 households for 8000 650 144 122 44 40 150 9150

    2022

    2 Projected needs for Digital Literacy (no of households)

    3700 HH; Full Coverage of

    Village with Wifi & NOFN/ Broad

    Band connectivity

    1209 HH; Full Coverage of Village with

    Wifi & NOFN/ Broad Band connectivity

    1306 HH; Full Coverage of Village with

    Wifi & NOFN/ Broad Band connectivity

    1240 HH; Full Coverage of Village with

    Wifi & NOFN/ Broad Band connectivity

    369 HH; Full Coverage of Village with

    Wifi & NOFN/

    Broad Band connectivity

    320 HH; Full Coverage of Village with

    Wifi & NOFN/

    Broad Band connectivity

    687 HH; Full Coverage of Village with

    Wifi & NOFN/ Broad Band connectivity

    Digital Literacy is poor.

    The service infrastructure like Maha E-Service Centre, MS-CIT, Sangram Kaksha is existing in the cluster.

    Mobile network connectivity is very poor especially in the villages away from highway.

    Provision of Broad Band connectivity is must to achieve digital literacy and use it to the maximum. National Optical Fiber Network (NOFN),free Wi-Fi etc. are necessary to bring about full Digital Literacy in the Cluster.

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 51

  • 52

    Figure 20: Percentage of Households with Digital Connectivity

    % of HH with Digital Connectivity

    25.00%

    12.00%

    21.00%

    11.00%

    2.00% 2.00%

    9.00% 11.71%

    0.00%

    5.00%

    10.00%

    15.00%

    20.00%

    25.00%

    30.00%

    Figure 21: Percentage of Households with at least one E-literate Person

    % of HH with at least one E-literate Person

    55.00%

    40.00%

    20.00%

    34.00%

    7.00%

    20.00%

    65.00%

    34.42%

    0.00%

    10.00%

    20.00%

    30.00%

    40.00%

    50.00%

    60.00%

    70.00%

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA

  • Table 19: 24 X 7 PIPED WATER SUPPLY

    DETAILS GRAM PANCHAYATS

    CLUST EREXISTING

    GP - 1 GP - 2 GP - 3 GP - 4 GP - 5 GP - 6 GP - 7

    Loni Kalbhor

    Kunjirwadi Alandi

    Mhatoba Sortapwadi Tarade Valati

    Shindavan e

    1 Source of water supply ( Ground/Surface)

    Open Well (3) and

    Borewell (19)

    Open Well (3) and

    Borewell (2)

    Open Well (4) and

    Borewell (7)

    Open Well (2) and

    Borewell (11)

    Open Well (1) and

    Borewell (1)

    Open Well (2) and

    Borewell (4)

    Open Well (2) and

    Borewell (23)

    Open Well (17) and

    Borew ell (67)

    2 Any Treatment Plant facility- type and capacity

    1 Unit 3 Lakh Litres

    NO NO NO NO NO 1 Unit 1.5 Lakh Litres

    3 Any problems with leakages/old piping systems

    NO NO YES NO NO NO YES

    4 Storage Reservoirs-nos and capacity (Over Head Tanks, Total Capacity)

    9 Tanks, 16.25 lakh

    lit

    2 Tanks, 3.35 lakh lit

    4 Tanks, 2.5 lakh lit

    2 Tanks, 1 lakh lit

    3 Tanks, 0.75 lakh

    lit

    4 Tanks, 0.7 lakh lit

    2 Tanks, 1.5 lakh lit

    26 Tanks, 26.05 lakh lit

    5 Coverage of WS connection (piped) at household level

    1266 785 350 36 86 30 305 2791

    6 No. of stand posts and coverage of each stand post ( no. of households)

    8 Stand Posts For 565 HH

    5 Stand Posts For 25HH

    15 Stand Posts

    14 Stand Posts For 90

    HH Nil

    12 Stand Posts For 125 HH

    105

    7 Per capita availability of drinking water supply

    50 Lit/day 40 Lit/day 40 Lit/day 42 Lit/day 35 Lit/day 40 Lit/day 40 Lit/day

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 53

  • 8 No. of hours of water supply

    30 Min /day 1Hr /day 1Hr / day 1Hr /day 30 Min

    /day 1 Hr /day 2 Hr /day

    9 Any metering systems available

    NO NO NO NO NO NO NO

    10 Quality of water supply Chlorinated

    Potable Chlorinated

    Potable Chlorinated

    Potable Chlorinated

    Potable Chlorinate d Potable

    Chlorinate d Potable

    Chlorinate d Potable

    11 Water supply systems of historical/religious significance

    NO NO NO NO NO NO NO

    PROJECTED GP - 1 GP - 2 GP - 3 GP - 4 GP - 5 GP - 6 GP - 7 CLUST

    ER

    1 Projected no of households for 2022

    8000 1490 1450 1750 513 360 1170

    2 Projected water demand for 2022

    19.2 Litres /day

    7 lakh lit / day

    11.6 lakh lit / day

    7 lakh lit / day

    1.50 lakh lit / day

    1.50 lakh lit / day

    4.5 lakh lit / day

    i Projected capacity of Treatment capacity

    2 MLD 8 lakh lit 2.75 lakh lit 7 lakh lit 1.5 lakh lit 1 lakh lit 4.5 lakh lit

    Ii Projected capacity of SR 20 lakh lit 8 lakh lit 2.75 lakh lit 7 lakh lit 1.5 lakh lit 1 lakh lit 4 lakh lit

    Iii No of household connections

    8000 1480 1450 1750 513 330 1170

    Iv Projected water supply network -distribution

    ALL HH Must be Covered

    ALL HH Must be Covered

    ALL HH Must be Covered

    ALL HH Must be Covered

    ALL HH Must be Covered

    ALL HH Must be Covered

    ALL HH Must be Covered

    The main sources are open well and bore well. Due to growing population, these sources are going to fall short and hence exclusive Pumping Station

    needs to be installed in River Mula at least for agriculture.

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 54

  • 0

    1000

    2000

    3000

    1266 785

    350 36 86 30

    305

    2791

    Coverage of WS Connections (piped) at HH Level

    Figure 22: Coverage of Water Supply Connections (Piped) at Household Level

    Per Capita Drinking Water Status

    0%

    20%

    40%

    60%

    80%

    100%

    36% 46% 47% 59% 49% 45% 51% 42%

    64% 54% 53% 41% 51% 55% 49% 58%

    Required WS Current WS

    Figure 23: Per Capita Drinking Water Supply (LPCD) (Required vs Current)

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 55

  • Table 20: SANITATION

    DETAILS GRAM PANCHAYATS

    CLUSTER EXISTING

    GP - 1 GP - 2 GP - 3 GP - 4 GP - 5 GP - 6 GP - 7

    Loni Kalbhor

    Kunjirwadi Alandi

    Mhatoba Sortapwadi Tarade Valati Shindavane

    1 Coverage of households with Individual Toilets

    3003 934 287 980 211 282 629 6326

    2 Any Open defecation (HH) 217 20 211 287 102 30 104 971 HH

    3 Existing condition of the IHH Toilets Good Fair Fair Fair Good Good Good

    4 Connection with septic tanks 3003 910 41 920 211 282 619 5986

    5 No. of Public Toilets 11 Units,

    113 Toilets 5 Units,

    24 Toilets 3 Units,

    15 Toilets 2 Units,

    12 Toilets 1 Unit,

    3 Toilets Nil

    1 Unit, 3 Toilets

    23 Units, 170 Toilets

    6 Coverage with sewerage systems-type and condition

    NO NO NO NO NO NO NO

    7 Any sewage treatment plant available-type and condition

    NO NO NO NO NO NO NO

    8 Any alternate systems of treatment being used

    NO NO NO NO NO NO NO

    9 Any recycling facilities available NO NO NO NO NO NO NO

    Projections GP - 1 GP - 2 GP - 3 GP - 4 GP - 5 GP - 6 GP - 7 CLUSTER

    1 Projected no of households for 2022 8000 1761 1450 2022 513 360 1170 15276

    2 Requirement of HH Toilets -2022 5000 827 1239 1042 302 78 541 9029

    3 Projected need for sewage network 10KM 3.5 Km UG Drainage

    3 Km UG Drainage

    1.830Km UG

    Drainage

    1.5Km UG

    Drainage

    150 soak Pit 2000 m UG

    Drainage

    5.2Km UG Drainage

    4 Projected need of Sewage Treatment Plant

    1 1 1 1 1 1 1 7

    All house-holds still do not have Individual Toilet facility. Treatment of Sewage at household level can be done as per the practice being followed in

    Nanded District. Sulabh Shouchalaya / Public Toilets are also necessary. STP is must in the cluster.

    RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT


Recommended