List of Figures
1
CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LTD.
National Rurban Mission (NRuM)
INTEGRATED CLUSTER ACTION PLAN (ICAP)
State : Maharashtra
District : Pune
Sub District : Haveli
Cluster : Loni Kalbhor
MINISTRY OF RURAL DEVELOPMENT, GOVERNMENT OF MANARASHTRA
C O N T E N T S
LONI KALBHOR: ICAP - Key Results............................................................................................................ 1
The Context ............................................................................................................................................... 20
Step by Step Process followed .................................................................................................................. 21
Step 1 : Selection of Cluster .......................................................................................................................22
Step 2 : Delineation & Notification of Planning Area .............................................................................. 27
Step 3: Cluster Profiling ............................................................................................................................. 31
Step 3a: General Profile ............................................................................................................................. 31
Tourist Centre: RAMDARA ........................................................................................................................ 41
Step 3 b: Component Profiling ................................................................................................................. 43
Available and Identified Skills ................................................................................................................... 46
Step 4 - SWOT Analysis and Visioning of Cluster ..................................................................................... 72
Step 4 a : SWOT Analysis ........................................................................................................................... 72
Step 4 b : Vision for the Cluster ................................................................................................................ 73
Step 5 - Deficiency Analysis and Identification of Needs ........................................................................ 74
Step 6 - Prioritization of Needs ................................................................................................................ 78
Step 7 - Detailing of the Mission Components ........................................................................................ 80
Step 8 - Investment and Phasing .............................................................................................................. 86
Step 9 - Methods of Resource Mobilization ............................................................................................ 87
Step 10 - Arriving at CGF Estimate ............................................................................................................ 87
Step 11 - Implementation Strategy ........................................................................................................... 90
Step 12 - O &M Strategy ............................................................................................................................ 90
Step 13 - Gram Sabha Resolutions ............................................................................................................. 91
Step 14 - Revision of ICAP based on approved DPR costing .................................................................. 102
Step 15 - Five Yearly Iteration of ICAP ..................................................................................................... 102
L i s t o f T A B L E S
Table 1: Basic Information of the Cluster ..................................................................................................... 1
Table 2: CGF Summary .................................................................................................................................. 1
Table 3: Investment and CGF Phasing Summary ....................................................................................... 4
Table 4: Convergence Abstract ................................................................................................................. 10
Table 5: Strategic Activity Plan of Basic Amenities for Loni Kalbhor Cluster .......................................... 12
Table 6: Strategic Activity Plan of Economic Activities for Loni Kalbhor Cluster ................................... 14
Table 7: Strategic Activity Plan of Social Amenities for Loni Kalbhor Cluster ......................................... 16
Table 8: Strategic Activity Plan of Digital Amenities for Loni Kalbhor Cluster ....................................... 19
Table 9: Selected List of Non Tribal Clusters ........................................................................................... 24
Table 10: Selected List of Tribal Clusters .................................................................................................. 26
Table 11: Demographic Profile of the Cluster ........................................................................................... 34
Table 12: Social Profile of the Cluster ....................................................................................................... 37
Table 13: Economic Profile of Cluster ....................................................................................................... 39
Table 14: Cultural Profile of the Cluster .................................................................................................... 40
Table 15: Administrative Profile ................................................................................................................ 42
Table 16: Skill Development training linked to Economic Activity in the Cluster .................................. 44
Table 17: AGRI-SERVICES and PROCESSING ............................................................................................. 47
Table 18: DIGITAL AMENITIES and LITERACY .......................................................................................... 50
Table 19: 24 X 7 PIPED WATER SUPPLY .................................................................................................... 53
Table 20: SANITATION .............................................................................................................................. 56
Table 21: SOLID and LIQUID WASTE MANAGEMENT .............................................................................. 58
Table 22: ACCESS TO VILLAGE STREETS WITH DRAINS .......................................................................... 60
Table 23: VILLAGE STREET LIGHTS ........................................................................................................... 62
Table 24: HEALTH ...................................................................................................................................... 64
Table 25: UP-GRADATION OF PRIMARY, SECONDARY and HIGHER SECONDARY SCHOOLS .............. 66
Table 26: INTER VILLAGE ROADS CONNECTIVITY ................................................................................... 68
Table 27: PUBLIC TRANSPORT .................................................................................................................. 70
Table 28: LPG GAS CONNECTIONS ............................................................................................................ 71
Table 29: Deficiency Analysis - Basic Amenities ....................................................................................... 75
Table 30: Deficiency Analysis - Economic Activities ................................................................................ 76
Table 31: Deficiency Analysis - Social Amenities ...................................................................................... 77
Table 32: Deficiency Analysis - Digital Amenities ..................................................................................... 77
Table 33: Prioritisation of Needs - Basic Amenities ................................................................................. 78
Table 34: Prioritisation of Needs - Economic Activities ........................................................................... 78
Table 35: Prioritisation of Needs - Social Amenities ................................................................................ 79
Table 36: Prioritisation of Needs -Digital Amenities ................................................................................ 79
Table 37: Mission Components: Basic Amenities .................................................................................... 80
Table 38: Mission Components: Economic Activities ............................................................................... 81
Table 39: Mission Components: Social Amenities ................................................................................... 82
Table 40: Mission Components: Digital Amenities .................................................................................. 84
Table 41: Detailing of mission components under CGF ........................................................................... 84
Table 42: Investment and Phasing ........................................................................................................... 86
Table 43: CGF Estimate for the Cluster .................................................................................................... 88
L i s t o f F I G U R E S
Figure 1: Step by Step Process for ICAP .................................................................................................... 21
Figure 2: Steps to be taken by State- Identification of Non Tribal Rurban Clusters .............................. 23
Figure 3: Steps to be taken by State for Identification of Non Tribal Cluster ........................................ 24
Figure 4: Process of Identification of Tribal Clusters in a State .............................................................. 25
Figure 5: Delineation of Cluster ................................................................................................................ 27
Figure 6: Pune Metropolitan Region ........................................................................................................ 28
Figure 7: Loni Kalbhor Development Plan ............................................................................................... 28
Figure 8: ‘Pune 10km Fringe Area Road Network Plan’ .......................................................................... 29
Figure 1: PMRDA 60m wide road passing through Cluster ..................................................................... 30
Figure 10: Proportion of Total Population Gram Panchayat Wise ........................................................... 31
Figure 11: Percentage of Households in Cluster, distributed GP wise .................................................... 32
Figure 12: Distribution of Total Land Area ............................................................................................... 32
Figure 13: Population Projections ............................................................................................................. 33
Figure 14: Literacy Rate ............................................................................................................................. 35
Figure 15: Education Level of Cluster ....................................................................................................... 35
Figure 16: Population in Cluster SC / ST .................................................................................................... 36
Figure 17: Workforce Participation in the Cluster .................................................................................... 38
Figure 18: Available Skills .......................................................................................................................... 46
Figure 19: Issues related to Optimum Yield ............................................................................................. 49
Figure 20: Percentage of Households with Digital Connectivity ............................................................ 52
Figure 21: Percentage of Households with at least one E-literate Person ............................................. 52
Figure 22 Coverage of Water Supply Connections (Piped) at Household Level .................................... 55
Figure 23: Per Capita Drinking Water Supply (LPCD) (Required vs Current) ......................................... 55
Figure 24: Coverage of households with Individual Toilets .................................................................... 57
Figure 25: Household Connected with Septic Tanks ............................................................................... 57
Figure 26: type of Village Streets in Cluster (Km) ..................................................................................... 61
Figure 27: Coverage of Streets (Village Wise) ........................................................................................... 61
Figure 28: Total number of Street Lights ................................................................................................. 63
Figure 29: Existing Vs Required no. of Sub-centres ................................................................................. 65
Figure 30: Status of Anganwadis / Mini - Anganwadi Centres ................................................................ 67
Figure 31: Existing Vs Required LPG Gas Connections .............................................................................. 71
Figure 32: Critical Gap Fund ...................................................................................................................... 87
Figure 33: Revision of ICAP based on approved DPR costing ................................................................ 102
A N N E X U R E S
Gram Sabha Resolutions and Photographs ...................................................................................... 91 - 101
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 1
LONI KALBHOR
ICAP - Key Results
Table 1: Basic Information of the Cluster
1 No of Clusters approved in Phase 1 7 Nos.
2 No of GPs in this cluster 7 Nos.
3 Total area of the cluster 11372.96 Hectare
4 No of Households in the cluster 10582 Nos.
5 Population of the cluster 50461 Souls
Table 2: CGF Summary
Sl. No. PROJECT COMPONENT
CGF FUNDING (Rs. in Crores)
1 24 x 7 Piped Water Supply 3.800
2 Sanitation 0.030
3 Solid and Liquid Waste Management 6.800
4 Access to Village Streets with Drains 10.710
5 Village Street Lights 0.250
6 Construction and Upgradation of GP building, Gym 0.500
7 Works under MSEDCL 0.030
8 Skill Development training Linked to Economic Activities 0.380
9 Agri-Services and Processing 4.200
10 Health 0.240
11 Up gradation of Primary, Secondary and Higher Secondary Schools 2.135
12 Social Welfare 2.500
13 Non-Conventional Energy 0.520
14 Digital Literacy 1.100
Total 33.195
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 2
CGF Required Rs. 33.195 Crores
24 x 7 Piped Water Supply, 3.800, 11.45%
Sanitation, 0.030, 0.09%
Solid and Liquid Waste Management, 6.800,
20.49%
Access to Village Streets with Drains, 10.710, 32.26%
Village Street Lights, 0.250, 0.75%
Construction and Upgradation of GP
building, Gym, 0.500, 1.51%
Works under MSEDCL, 0.030, 0.09%
Skill Development training Linked to
Economic Activities, 0.380, 1.14%
Agri-Services and Processing, 4.200,
12.65%
Health, 0.240, 0.72%
Up gradation of Primary, Secondary and Higher
Secondary Schools, 2.135, 6.43%
Social Welfare,
2.500, 7.53%
Non-Conventional Energy, 0.520, 1.57%
Digital Literacy, 1.100, 3.31%
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 3
Total Investment Required Rs. 222.081 Crores
24x7 Piped Water Supply , 33.294, 14.99%
Sanitation, 1.4012, 0.63%
Solid and Liquid Waste Management, 18.975,
8.54%
Access to Village Streets with Drains, 90.38, 40.70%
Village Street Lights, 5.8725, 2.64%
Public Transport, 0.55, 0.25%
Construction and upgradation of GP
building, Gym, , 1.87, 0.84%
Works under MSEDCL, 7.8085, 3.52%
Skill Development training Linked to
Economic Activities , 1.1656, 0.52%
Agri-services and
Processing, 24.6348,
11.09%
Health , 14.73, 6.63%
Up gradation of primary, secondary and higher
secondary schools, 11.179, 5.03%
Social Welfare, 4.08, 1.84%
Non Conventional Energy, 4.27, 1.92%
Digital Literacy, 1.75, 0.79%
Citizen Service Centres, 0.1204, 0.05%
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 4
Investment and CGF Phasing Summary – Loni Kalbhor Cluster
Table 3: Investment and CGF Phasing Summary
Sr. No.
Name of the Component
Component wise Investment
Required (Rs. In Lakh)
Converged Schemes
Investment Required
(Rs. In Lakhs)
Phasing
2017-18 2018-19 2019-20
1 24x7 Piped Water
Supply 3329.4
Central Govt. share 0.00 0.00 0.00 0.00
State Govt. Share 2949.40 884.82 884.82 1179.76
Beneficiary Share 0.00 0.00 0.00 0.00
CGF 380.00 114.00 114.00 152.00
Total 3329.40 998.82 998.82 1331.76
2 Sanitation 140.12
Central Govt. share 94.12 28.24 28.24 37.65
State Govt. Share 43.00 12.90 12.90 17.20
Beneficiary Share 0.00 0.00 0.00 0.00
CGF 3.00 0.90 0.90 1.20
Total 140.12 42.04 42.04 56.05
3 Solid and Liquid
Waste Management
1897.5
Central Govt. share 514.00 154.20 154.20 205.60
State Govt. Share 703.50 211.05 211.05 281.40
Beneficiary Share 0.00 0.00 0.00 0.00
CGF 680.00 204.00 204.00 272.00
Total 1897.50 569.25 569.25 759.00
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 5
4 Access to Village
Streets with Drains 9038
Central Govt. share 2420.00 726.00 726.00 968.00
State Govt. Share 5482.00 1644.60 1644.60 2192.80
Beneficiary Share 65.00 19.50 19.50 26.00
CGF 1071.00 321.30 321.30 428.40
Total 9038.00 2711.40 2711.40 3615.20
5 Village Street
Lights 587.25
Central Govt. share 5.00 1.50 1.50 2.00
State Govt. Share 557.25 167.18 167.18 222.90
Beneficiary Share 0.00 0.00 0.00 0.00
CGF 25.00 7.50 7.50 10.00
Total 587.25 176.18 176.18 234.90
6 Public Transport 55
Central Govt. share 0.00 0.00 0.00 0.00
State Govt. Share 55.00 16.50 16.50 22.00
Benificiary Share 0.00 0.00 0.00 0.00
CGF 0.00 0.00 0.00 0.00
Total 55.00 16.50 16.50 22.00
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 6
7 Construction and
upgradation of GP building, Gym,
187
Central Govt. share 0.00 0.00 0.00 0.00
State Govt. Share 137.00 41.10 41.10 54.80
Beneficiary Share 0.00 0.00 0.00 0.00
CGF 50.00 15.00 15.00 20.00
Total 187.00 56.10 56.10 74.80
8 Works under
MSEDCL 780.85
Central Govt. share 0.00 0.00 0.00 0.00
State Govt. Share 777.85 233.36 233.36 311.14
Beneficiary Share 0.00 0.00 0.00 0.00
CGF 3.00 0.90 0.90 1.20
Total 780.85 234.26 234.26 312.34
9
Skill Development training Linked to
Economic Activities
116.56
Central Govt. share 34.06 10.22 10.22 13.62
State Govt. Share 44.50 13.35 13.35 17.80
Beneficiary Share 0.00 0.00 0.00 0.00
CGF 38.00 11.40 11.40 15.20
Total 116.56 34.97 34.97 46.62
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 7
10 Agri-services and
Processing 2463.48
Central Govt. Share 554.06 166.22 166.22 221.62
State Govt. Share 620.42 186.13 186.13 248.17
Beneficiary Share 869.00 260.70 260.70 347.60
CGF 420.00 126.00 126.00 168.00
Total 2463.48 739.04 739.04 985.39
11 Health 1473
Central Govt. share 714.20 214.26 214.26 285.68
State Govt. Share 722.66 216.80 216.80 289.06
Beneficiary Share 12.14 3.64 3.64 4.86
CGF 24.00 7.20 7.20 9.60
Total 1473.00 441.90 441.90 589.20
12
Up gradation of primary,
secondary and higher secondary
schools
1117.9
Central Govt. share 144.50 43.35 43.35 57.80
State Govt. Share 756.20 226.86 226.86 302.48
Beneficiary Share 3.70 1.11 1.11 1.48
CGF 213.50 64.05 64.05 85.40
Total 1117.90 335.37 335.37 447.16
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 8
13 Social Welfare 408
Central Govt. share 0.00 0.00 0.00 0.00
State Govt. Share 143.00 42.90 42.90 57.20
Beneficiary Share 15.00 4.50 4.50 6.00
CGF 250.00 75.00 75.00 100.00
Total 408.00 122.40 122.40 163.20
14 Non Conventional
Energy 427
Central Govt. share 0.00 0.00 0.00 0.00
State Govt. Share 375.00 112.50 112.50 150.00
Beneficiary Share 0.00 0.00 0.00 0.00
CGF 52.00 15.60 15.60 20.80
Total 427.00 128.10 128.10 170.80
15 Digital Literacy 175
Central Govt. share 15.00 4.50 4.50 6.00
State Govt. Share 50.00 15.00 15.00 20.00
Beneficiary Share 0.00 0.00 0.00 0.00
CGF 110.00 33.00 33.00 44.00
Total 175.00 52.50 52.50 70.00
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 9
16 Citizen Service
Centres 12.04
Central Govt. share 0.00 0.00 0.00 0.00
State Govt. Share 12.04 3.61 3.61 4.82
Beneficiary Share 0.00 0.00 0.00 0.00
CGF 0.00 0.00 0.00 0.00
Total 12.04 3.61 3.61 4.82
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 10
Convergence Abstract
Table 4: Convergence Abstract
SL NO.
NAME OF SCHEME CONVERGED
GP Wise TOTAL FUNDING IN Rs. LAKH TOTAL FUNDING
IN Rs. LAKH
LONI KALBHOR
KUNJIRWADI SORTAPWADI SHINDAWANE ALANDI
MHATOBA TAARDE VALATI
1 Chief Minister Payjal Yojana
100.00 170.00 228.00 241.00 218.40 90.00 135.00 1182.40
2 Zilla Parishad 165.30 63.38 102.66 197.90 105.70 63.00 280.36 978.30
3 Sarva Shiksha Abhiyan (SSA)
65.50 0.00 44.50 57.90 59.00 65.00 47.50 339.40
4 Swachya Bharat Mission Gramin
85.50 33.64 15.00 32.48 56.00 33.00 27.50 283.12
5 DPC (District Planning Committee)
342.00 175.00 235.00 272.25 393.00 281.09 205.00 1903.34
6 Dalit Wasti Sudhar Yajana
110.00 25.00 30.00 60.00 45.00 0.00 0.00 270.00
7 Gram-Nidhi 77.50 52.00 78.00 122.80 170.00 28.00 55.70 584.00
8 NRHM 370.00 165.00 151.00 402.60 153.00 162.30 13.70 1417.60
9 14 th Finance Commission
110.00 53.50 94.00 108.00 117.00 50.00 89.00 621.50
10 MEDA 286.00 0.50 60.00 25.00 0.00 0.00 65.00 436.50
11 DDUGKY/ R- SETI 10.00 4.00 25.20 3.46 4.00 2.10 0.00 48.76
12 Rashtriya Biogas Yojana
0.00 1.80 0.75 1.00 1.80 1.80 4.50 11.65
13 NHM 58.00 86.00 65.00 120.00 57.25 37.40 51.20 474.85
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 11
14 Jalyukt Shivar Abhiyan
185.60 58.00 0.00 100.00 272.20 85.50 30.00 731.30
15 SCP 0.00 0.00 4.85 0.00 0.00 0.00 0.00 4.85
16 CSR (Corporate-Social Responsibility)
156.50 0.80 0.00 0.00 10.00 0.00 0.00 167.30
17 SANGRAM -2 0.72 0.60 8.00 8.00 0.60 0.60 0.72 19.24
18 PMPML 10.00 10.00 10.00 9.00 10.00 0.00 6.00 55.00
19 PMGSY 1760.00 880.00 550.00 0.00 810.00 0.00 0.00 4000.00
20 PWD 90.00 0.00 0.00 965.00 0.00 0.00 200.00 1255.00
21 SR- PROGRAM(STATE)
75.00 120.00 125.00 120.00 200.00 345.00 375.00 1360.00
22 PMKSY 29.00 4.80 0.00 9.60 10.00 4.80 4.80 63.00
23 AGRICULTURE MECHANISATION
11.00 4.50 35.00 5.25 13.50 7.20 3.00 79.45
24 RKVY 2.00 0.00 0.00 1.50 0.00 0.00 0.00 3.50
25 EGS HOR. PLANTATION
50.00 5.00 5.00 20.00 22.00 10.00 10.00 122.00
26 WORLD BANK/GOI 377.00 0.00 0.00 0.00 0.00 0.00 0.00 377.00
27 MSEDCL 675.00 0.00 21.50 46.00 40.00 16.35 0.00 798.85
28 DDUGVY 165.00 70.00 0.00 0.00 0.00 0.00 90.75 325.75
29 BENEFICIARY COMPONENT
148.00 149.62 90.00 190.15 157.15 84.20 119.82 938.94
30 CGF 1463.50 547.00 456.00 306.00 309.00 144.00 130.00 3355.50
TOTAL 6978.12 2680.14 2434.46 3424.89 3234.60 1511.34 1944.55 22208.10
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 12
Table 5: Strategic Activity Plan of Basic Amenities for Loni Kalbhor Cluster
Basic Amenities
Sl
no Component Sub-Component
Service Delivery
Indicators Activities
Total Investme
nt (In Lakhs)
Available Fund With
Existing Schemes CGF (In
Lakhs ) Funding Schemes
Funding Cost (In Lakhs )
1 24x7 Piped
Water Supply
Instalation Of Digital Water
Meter
Instalation Distribution Pipe
Line
Water Supply Scheme
Purchase Of Land for Water
Source
Water Filter Plant
ESR
Repair of well
Installation Of R.O. Filter
Minimum 70 LPCD
quantity safe Drinking
water assured
Tap Connection assured
to all Houses
Daily minimum 2 hours
supply by panchyat and
families will have 24x7
water availability
DW supply
infrastructure
created to provide
safe DW at HH level
to all families in the
cluster.
3329.40
Chief
Minister
Peyajal
Yojana, Z P
Pune
Scheme
2949.40 380.00
2 Sanitation
Construction Of Individual
House Hold Toilets
Construction Of
Community toilets
All Households
Connected to a safe
leach pit type of toilets.
ODF Status to be
achieved and sustained,
covering all households.
Enforcement of ODF
- capacity building of
GPs & Persons and
ranking of GPs
continuously
140.12 SBM
(Gramin) 137.12 3.00
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 13
3 Solid and
Liquid Waste Management
Construction Of
Underground Drainage
Solid Waste Transportation
Procurement Of Land &
Construction of Water
Treatment Plant
Household level
collection and
segregation of garbage
Organic manure
preparation for organic
farming
Construction of
Solid Waste
Processing Centers
Construction of
individual vermi-
compost pits to
needy farmers
1897.50
DPC/ZP
Fund/ SBM
(Gramin)
1217.50
680.00
4 Access to
Village Streets with Drains
Construction Of Roads
All weather Roads
provided to each street
without pot holes and
cesspools.
Comfortable access to
the Village Streets.
Construction and
regular
maintenance of
internal village
Roads
9038.00
SR
Programm
e/ DPC/ ZP
Fund
7967.00
1071.00
5 Village Street
Lights
LED Street Lights with
poles
Providing electric
transformer & maintenance
LED Street Lighting @
One per 30m distance
90% Lights are assured
illuminating at any point
of night time.
GPs to enter into an
agreement to install
and maintain LED 587.25
GP own
Funds, ZP
Funds
55.00
25.00
6 Works under
MSEDCL
New Tranformer 20 nos.
Underground Low
frequency Wiring 15 km
Underground Higher
frequency Wiring 5 km
Installation of electric
transformer &
maintenance
Laying of underground
cable
Installation of
electric transformer
& maintenance
Laying of
underground cable
780.85 DDUGVY,
DPC 777.85
3.00
7 Public
Transport Bus Stop Construction
(Gaothan)
Bus Stop Construction
(Gaothan)
Bus Stop
Construction
(Gaothan)
55.00 DPC/PMP
ML 55.00
0
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 14
Table 6: Strategic Activity Plan of Economic Activities for Loni Kalbhor Cluster
Economic Activities
Sl
no Component Sub-Component
Service Delivery
Indicators Activities
Total
Invest
me
nt
( In
Crores )
AVAILABLE FUND
WITH EXISTING
SCHEMES
CGF
(In
Lakhs
) Funding Schemes
Funding Cost (In Lakhs )
9
Skill Development
training Linked to Economic Activities
Construction of Mahila Asmita Bhavan
Skill Development training for village youth & women
Construction of Mahila Asmita Bhavan
Skill Development training for village youth & women
Skill
Development Centre catering to multiple skills will be established within the cluster
116.56
DIC Scheme/ R-SETI
78.56
38
10 Agri-Services
and Processing
NHM Polly House 26 unit, Shed Net
Agri-Mechanization, Power Spray, Tractor, Rotavator, etc
Biogas
Horticulture Plantation Scheme
Vermi-compost prepared in SWPCs and individual compost pits used for organic farming
Sprinkler, Drip & Rain gun irrigations for all arable land
Farmers trg- cum
Vermi compost prepared in SWPCs and individual compost pits used for organic farming
Farmers training
2463.48
Naitional Horticulture Mission/ Rashtiya Krushi Vikas Yajana/ Jalyukta
2043.48
420
8
Construction and up-
gradation of GP building, Gymnasium
GP Building Upgradation ,
Construction of GP Hall,
Sabhha Mandap
GP Building Up-
gradation , Construction
of GP Hall, Sabhha
Mandap
GP Building Up-
gradation ,
Construction of GP
Hall, Sabhha
Mandap
187.00
GP own
Funds, ZP
Funds
137.00
50.00
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 15
Agri Area Treatment and Development, CCT, NB, Soil pluge, etc
milk processing center
Organic Farming 1 Nadef 20 nos
. Vermi-culture 10 Projects
Individual Beneficiary Schemes
PMKSY, Micro Irrigation
Water Storage Tanks
Repairs of percolation tanks
Deepening of canals
storage well
irrigation scheme from Purandhar lift irrigation scheme
learning needs to be addresed continuously upgrading new techniques
supply of best quality seed and fertilizer at doorstep of all farmers
Soil Testing will be done regularly ffor proper advice on soil reclamation for enhanced productivity
Cluster is self sufficient in milk production and will be surplus for exporting
cum learning needs to be addressed continuously upgrading new techniques
supply of best quality seed and fertilizer at doorstep of all farmers
Shivar Abhiyan
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 16
Table 7: Strategic Activity Plan of Social Amenities for Loni Kalbhor Cluster
Social Amenities
Sl
N
o
Component Sub-Component Service Delivery
Indicators Activities
Total
Invest
me
nt
( In
Crores )
AVAILABLE FUND
WITH EXISTING
SCHEMES
CGF
(In
Lakhs
)
Funding Schemes
Funding Cost
11 Health
PHC / Sub-centre Building
X-Ray, Dental Chair & Other Equipment
PHC Building Extension
Installation Of Solar Water Heater 500 Litre
Ambulance
Computer
Individual Benefit Scheme
Maternity Home
Kitchen Shed Building For PHC
Land Purchasing For Animal Husbandry Dispensary
Construction for Animal Husbandry Dispensary Updating & repairing
Medicine
Easy accessibility to PHC / Area Hospital for Primary health Services.
Treatment for Common ailments and Common Services like Delivery & Diagnosis.
Improvement of Facilities such as Building infrastructure, equipment, other diagnostic services
Develop Contingency fund to meet cost of man power and drugs at emergencies
1473.0 NRHM/ DPC/ZP
Fund 1449.00
24.0
12
Up gradation of primary, secondary and higher secondary
schools
Toilet With Commode & Hand Wash Station
Teaching Rooms construction
Ramps
Ground / Play Ground
Laboratory / library
Compound Wall
English language to be introduced from First Class itself along with Marathi
Improvement
Sufficient Furniture to all students and teachers
Separate Toilet blocks for Boys and
1117.9 SSC/DPC/ ZP Fund
904.40
213.5
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 17
Solar Light Unit
Rain Harvesting
Drinking Water filter units
Computer Set & E-learning, Digital classroom, tabs for students
Vermin-compost Unit
Sport Equipment
Benches
building repairing
scanning of record
Construction Of Aanganwadi Buildings
Land Purchase for Aanganwadi Building
Other Facility - Computer, Printer, decoration, weight Machine , Educationsal Toys, Toilet Facility for 21 Aanganwadi
Kitchen Shed/ light connection
Wall compound & Garden 21 Aanganwadi
Digital Aanganwadi 21 Nos
in Quality of Education
Girls
Incentives and awards to best teachers and Students
13 Social Welfare
Improvement of Crematorium premises
Construction of wall compound to garden
Construction of walking plaza in garden
Construction of walking plaza around percolation tank
Play & Sport complex
Development of Garden for citizens
Development Of Tourism Site
Improvement of Crematorium premises
Construction of wall compound to garden
Construction of walking plaza in garden
Improvement of Crematorium premises
Construction of wall compound to garden
Construction of walking plaza in
408.0 GP own
Funds, ZP Funds
158.000
250.0
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 18
Construction of walking plaza around percolation tank
Play & Sport complex
Development of Garden for citizens
Development Of Tourism Site
garden
Construction of walking plaza around percolation tank
Play & Sport complex
Development of Garden for citizens
Development Of Tourism Site
14 Non Conventional Energy
Water Supply Motors running On Wind power & Solar System
Installation Of Solar & Wind Hybrid System
Water Supply Motors running On Wind power & Solar System Installation Of Solar & Wind Hybrid System
Water Supply Motors running On Wind power & Solar System Installation Of Solar & Wind Hybrid System
427.0 MEDA,
DPC 375.000
52.0
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 19
Table 8: Strategic Activity Plan of Digital Amenities for Loni Kalbhor Cluster
Digital Amenities
Sl
N
o
Component Sub-
Component
Service Delivery
Indicators Activities
Total
Invest
me
nt
( In
Crores )
AVAILABLE FUND
WITH EXISTING
SCHEMES
CGF
(In
Lak
hs ) Funding Schemes
Funding Cost (In Lakhs )
15 Digital Literacy
Wi-Fi Facility For Village
MSCIT course for villagers
Atleast one person in each family will be digital literate
All 6+ standard school children will be exposed to digital literacy
Continuous digital learning centres
established as a part of skill development
Training and IEC activities under digital literacy with volunteers, net connections in GPs
Computer lab in all 6+ standard Schools
175 Digital India, DDU-GKY
65.000
110
16 Citizen Service Centres
SANGRAM 2
Citizen service centre ( CSC ) one @ GP
All Gram Panchayat Offices will be digitally connected and takeup e-transactions under digital panchayat
Establishment of mee- seva centres in all GPs
12.04
Sangram 2 12.040
0
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 20
Cluster : LONI KALBHOR
Sub District / Tahsil : HAVELI
District : PUNE
State : MAHARASHTRA
INTEGRATED CLUSTER ACTION PLAN
The Context:
The National Rurban Mission aims at development of a cluster of villages that preserve and nurture
the essence of the rural community life with focus on equity and inclusiveness without
compromising with the facilities perceived to be essentially urban in nature, thus creating a cluster of
‘Rurban Villages’.
The mission intends to stimulate local economic development through well planned Rural Clusters to
achieve overall development in the region.
These projects will be implemented over a fixed timeframe of three years by integrating and
converging the implementation of project components. This will be followed by an operations and
maintenance period of ten years.
The Integrated Cluster Action Plan (ICAP)
The ICAP is a key document covering baseline studies outlining the requirements of the cluster and
the key interventions needed to address these needs and to leverage its potential.
An ICAP is required for a scientific and systematic assessment of the requirements of the
components to be developed for the cluster. The ICAP will guide the development of the cluster it
will include a long term vision for the cluster, interventions through various government schemes,
plan the convergence of implementation of government schemes and lay out a strategy for
operations and maintenance of the facilities created in the cluster. The Critical Gap Funding (CGF) for
the cluster will be determined on the basis of the projections in the ICAP.
The spatial planning component of the ICAP will ensure that the Rurban Cluster develops in the long
term as well planned layouts with enforcement mechanisms similar to those in urban areas.
The ICAP prepared enunciates the following:
1. A strategy for cluster integrating the vision for each Gram Sabha, identified in the cluster.
2. The desired outcomes for the cluster under the Rurban Mission.
3. The resources to be converged under various Central Sector, Centrally sponsored and the State Sector schemes.
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 21
4. The Critical Gap Funding (CGF) required for the cluster.
5. The ICAP would delineate the cluster areas to form well planned layouts following the planning norms (as laid down in the State Town and country planning Acts/similar Central or State statues as may be applicable), which would be duly notified by the State/UTs. These plans would be finally integrated with the District Plan/Master Plans as the case may be.
The ICAPs for each cluster is to be prepared by the State Nodal Agencies. City and Industrial
Development Corporation of Maharashtra, Ltd. is the Nodal Agency of Maharashtra State. The State
Government has to prepare the ICAPs in close consultation with the District Collectors/ Zilla
Parishads and concerned Panchayati Raj Institutions and ensure participation & ownership from all
concerned stakeholders.
Step by Step Process followed
A step by step process is followed for the preparation of ICAP is summed up into 15 major steps as
given in the figure below.
THE PROCESS Step 1- Selection of Cluster
Step 3- Cluster Profiling
Step 12- Obtaining Gram Sabha resolutions
Step 13- Submission of ICAP to MoRD
Step 7- Detailing of Mission Components
Step 14- Revision of ICAP based on approved DPR
Step 15- Five Yearly Iteration to ICAP
Step 11- Implementation Strategy
Step10- Arriving at CGF Estimate
Step 8- Investment Phasing
Step 6- Prioritisation of Needs
Step 5- Deficiency Analysis & Identification of Needs No
tifi
cati
on
of
Pla
nn
ing
Are
a at
late
r St
age
Step 9- Resource Mobilisation
STAKEHOLDER CONSULTATION
Step 4- SWOT and Visioning for the Cluster
Step 2- Delineation & Notification of Planning Area
Figure 1: Step by Step Process for ICAP
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 22
Step 1 : Selection of Cluster
The cluster selection process followed the process delineated in section 12.0 in the Framework for
Implementation. The relevant details about the clusters as defined in the framework of implementation
is given below:
• A ‘Rurban
cluster', is
defined as
a cluster
of
geographically contiguous villages with a population of about 25000 to 50000 in plain and coastal areas
and a population of 5000 to 15000 in desert, hilly or tribal areas. As far as practicable, clusters of village
would follow administrative convergence units of Gram Panchayats and shall be within a single block/
tehsil for administrative convenience.
• The cluster selection process was done by the Ministry and the State RD Departments, as per a pre-
defined cluster selection methodology. The Ministry identified and shared with the State, a set of
potential locations (sub districts) for Rurban clusters Ref Table and the State identified a set of
contiguous villages around a growth centre within the sub district to form a Rurban cluster and further
prioritized these clusters based on parameters suggested by the Ministry..
• There are two categories of clusters under SPMRM: Non-Tribal and Tribal and the process of selection
varied for each of these categories.
A. Non- Tribal Clusters: For selection of Non-Tribal clusters, the Ministry provided a list of leading sub
districts to the State, within which the clusters were identified. The selection of these sub districts by the
Ministry was done based on parameters such as -
(i) Decadal Growth in Rural Population
(ii)Decadal Growth in Non-Farm work participation
(iii) Presence of Economic Clusters
(iv)Presence of places of Tourism and Religious significance and
(v) Proximity to Transport Corridors. Appropriate weightages were given for each parameter.
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 23
Thereafter, within these sub districts, so identified by the Ministry, the State Governments selected the
clusters and while doing so, included the following performance parameters:
i. Decadal growth in Rural Population.
ii. Rise in Land Values.
iii. Decadal growth in Non- Farm Work force participation.
iv. Percentage Enrollment of girls in secondary schools.
v. Percentage Households with Bank accounts under PradhanMantri Jan DhanYojana.
vi. Performance in Swacch Bharat Mission (Grameen).
vii. Good Governance Initiatives by Gram Panchayats.
(Any other factor, which the States may consider relevant, may also be included).
A weightage of % was given for the first four parameters and % of the last.
Figure 2: Steps to be taken by State- Identification of Non Tribal Rurban Clusters
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 24
Figure 3: Steps to be taken by State for Identification of Non - Tribal Cluster
i. Ranking of Non Tribal clusters
Based on the methodology followed above the clusters have been ranked as below. Please
refer to ranking methodology chart in Figure 2 and Figure 3.
ii. The Selected Non tribal clusters
Following the above selection process the State has selected the following Non tribal
clusters
Table 9: Selected List of Non Tribal Clusters
Sl no. District Sub-District Cluster
1 Nagpur Kamptee Wadoda
2 Aurangabad Gangapur Jogeshwari
3 Pune Haveli Loni Kalbhor
4 Jalna Partur Ashti
5 Buldhana Lonar Sultanpur
6 Beed Parali Shirsala
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 25
B. Tribal Clusters: For identification of the tribal clusters, the Ministry has selected the leading
sub districts of the State falling within the top 100 tribal districts of the country, based on the
Scheduled Tribes population. The selection of these sub districts has been based on
parameters such as -
(i) Decadal growth in Tribal Population
(ii) Current Tribal Literacy Rate
(iii) Decadal growth in Non- Farm Work force participation
(iv) Decadal growth in Rural Population and
(v) Presence of Economic Clusters. Appropriate weightages have been suggested respectively
for each of these parameters while selecting the sub districts.
Thereafter, within these sub districts so identified by the Ministry, the clusters have been
selected and while doing so, the following performance parameters have been selected:
i. Decadal growth in Tribal Population
ii. Growth in Tribal Literacy rates
iii. Decadal growth in Non- Farm Work force participation.
Figure 4: Process of Identification of Tribal Clusters in a State
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 26
i. Ranking of Tribal clusters
Based on the methodology followed above the clusters have been ranked as below:
ii. The Selected Tribal clusters
Following the selection process stated in Figure 4 the State has selected the following Tribal
Clusters:
Table 10: Selected List of Tribal Clusters
Sl no. District Sub-District Cluster
1 Jalgaon Muktainagar Muktainagar
Accordingly, selection of Clusters is done by Ministry of Rural Development, Government of India and
Government of Maharashtra following the guidelines of NRuM. Thus, 7 nos. of clusters have been
finalised for first phase in Maharashtra out of which one is a Tribal Cluster. Loni Kalbhor is one among
the 6 nos. of Non-Tribal clusters.
The Loni Kalbhor Cluster includes 8 nos. of villages viz. Loni Kalbhor, Kunjirwadi, Alandi Mhatoba,
Ramoshiwadi, Sortapwadi, Tarade, Valati, Shindavane. The two villages Alandi Mhatoba and
Ramoshiwadi has one single Gram Panchayat and hence the village Ramoshiwadi is not listed
separately.
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 27
Step 2 : Delineation & Notification of Planning Area The 7 nos. of villages forming LONI KALBHOR CLUSTER are contiguous and accordingly joining village
boundaries the cluster is delineated.
Figure 5: Delineation of Cluster
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 28
As contemplated in the NRuM Mission, The Clusters will have to be notified by the State Government
at later stage. Thus, the Cluster of Loni Kalbhor will also have to be notified under Maharashtra
Regional and Town Planning Act, 1966 so as to prepare the Development Plan.
The cluster falls within the boundary of Pune Metropolitan Region Development Authority (PMRDA)
and is located at around 24 km from Pune City on Pune – Solapur highway NH-9.
Development Plan (DP) of village Loni Kalbhor sanctioned by Government of Maharashtra exists
where Zilla Parishad is the Planning Authority. The DP was sanctioned in the year 1980 and is overdue
for revision.
Figure 6: Pune Metropolitan Region Source: Town Planning & Valuation Dept., GoM
Figure 7: Loni Kalbhor Development Plan Source: Town Planning & Valuation Dept., GoM
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 29
Figure 6
PMRDA has revised the road network which is shown in red colour in the plan showing ‘Pune 10km
Fringe Area Road Network Plan’. These roads are sanctioned in the Regional Plan of Pune and some
of these roads fall in Loni Kalbhor Cluster.
Figure 8: ‘Pune 10km Fringe Area Road Network Plan’.
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 30
Hence, while preparing the Development Plan of Loni Kalbhor Cluster due cognisance of the
proposals of PMRDA and the sanctioned Development Plan shall have to be taken to avoid conflict
or duplicity of proposals.
Figure 9: PMRDA 60m wide road passing through Cluster
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 31
Step 3: Cluster Profiling
The existing profile of the cluster needs to be detailed out at 2 levels -
(1) General Profile which includes Demography, Socio Economic, Administrative Profiling
(2) Component Profiling.
Step 3a: General Profile
Under the General Profiling the Demographic details of the GPs within the cluster, the socio-
economic profiling, cultural profiling and the administrative profiling, cultural profiling and the
administrative profiling of the GPs need to be done. Each of these are elaborated below.
I. Demography :
The Loni Kalbhor Cluster includes 7 nos. of Gram Panchayats viz. Loni Kalbhor, Kunjirwadi, Alandi
Mhatoba, Sortapwadi, Tarade, Valati, Shindavane. The total population of the cluster is 50,461 souls
with Loni Kalbhor being the largest Gam Panchayat of the cluster, with population of 22,518 souls.
Loni Kalbhor constitutes 44.63 % of total population of the cluster.
There has been a 16.47 % growth in the cluster population from 2001 to 2011, with Loni Kalbhor
showing largest growth of 32.6 % followed by village Tarade and Kunjirwadi respectively.
44.63% 16.68%
9.4%
12.61%
4.24% 3.15%
9.29%
Existing Population Distribution
Loni Kalbhor (44.63%)
Kunjirwadi (16.68%)
Alandi Mhatoba (9.40%)
Sortapwadi (12.61%)
Tarade (4.24%)
Valati (3.15%)
Shindavane (9.29%)
Figure 10: Proprortion of Total Population Gam Panchayat Wise
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 32
Agricultural 68%
Other Landuse
32%
Total Land Area
The cluster has 12,023 households as per Census 2011, with an average household size of 4. As can be
seen in the figure below, Singarayakonda and Mulaguntapadu GPs have the largest number of
households in the cluster.
The landuse pattern depicts
that coverage of land under
‘Agriculture’ is around 68%,
while the remaining 32% of land
is under ‘Other Landuse’.
44.60% 17.57%
9.00%
12.96%
3.90% 3.12%
8.85%
Existing Percentage of Households Distribution
Loni Kalbhor
Kunjirwadi
Alandi Mhatoba
Sortapwadi
Tarade
Valati
Shindavane
Figure 11: Percentage of Households in Cluster, distributed GP wise
Figure 12: Distribution of Total Land Area
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 33
While considering various parameters, the population is projected for the year 2020. It is found that
with a growth rate of around 53.5% the projected population for the year 2020 will be 77,441 Souls.
0
20000
40000
60000
80000
22518 8421 4741 6366 2138 1592 4685
50461
45000
10500 5741 6500 2500 2000 5200
77441
Population (Census 2011) Projected Scenario (2020)
Figure 13: Population Projections
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 34
Brief of the Demographic Profile is compiled in the table below.
Table 11: Demographic Profile of the Cluster
Details GP -1 GP-2 GP-3 GP-4 GP-5 GP-6 GP-7 Total
S.N. Existing
Lon
ikal
bh
or
Ku
njir
wad
i
Ala
nd
i
Mh
ato
ba
Sort
apw
adi
Tara
de
Val
ati
Shin
dav
ane
1 Total Population (as per census
2011) 22518 8421 4741 6366 2138 1592 4685 50461
2 Decadal Growth in Rural
Population (%) (2001-2011) 32.60 21.79 19.09 20.11 26.21 13.63 -0.69
16.47
(avg)
3 Household Size (No. of Members
per HH) 5/HH 5/HH 5/HH 5/HH 5/HH 5/HH 5/HH
5/HH
(avg)
4 No. of Households 4720 1859 952 1372 413 330 936 10582
5 Sex Ratio (Male:Female) 1000:
920
1000:
902
1000:
908
1000:
879
1000:
897
1000:
955
1000:
919
1000: 911
(avg)
6
Age Profile (Age bracket with the
largest % of population as per
Pune District Rural)
20 - 35
years
(27% )
20 - 35
years
(27% )
20 - 35
years
(27% )
20 - 35
years
(27% )
20 - 35
years
(27% )
20 - 35
years
(27% )
20 - 35
years
(27% )
20 - 35
years
(27% )
7 Total Land Area (Hectors) 3370 624 2448.
45 815
1151.6
6
954.6
4
2009.2
1 11372.96
i Under agriculture (In Hectors &
Percentage to Total Land)
2097.4
1
(70.68
%)
554
(76.44
%)
1450.6
4
(71.33
%)
732
(51.28
%)
850
(69%)
567.4
5(59.4
4%)
1535.43
(76.41%
)
7786.93
(67.76%)
ii Irrigated Land in percentage to
Total Land 49.68% 100%
82.38
% 97% 21% 22.62% 55.79%
63.85%
(avg)
iii Under Forests (Hectors) 1202.82 No 407.5
4 No 79.64 154.60 239.24 2083.84
Projected Scenario- 2020 GP1 GP2 GP3 GP4 GP5 GP6 GP7
1 Rural Population 45000 10500 5741 6500 2500 2000 5200 77441
2 Household size (No. of Members
per HH) 5/HH 5/HH 5/HH 5/HH 5/HH 5/HH 5/HH
5/HH
(avg)
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 35
The villages Loni Kalbhor, Kunjirwadi and Sortapwadi are abutting NH-9 i.e. Pune-Solapur
Highway and hence, population is comparatively more in these cluster.
Loni Kalbhor is having the largest area i.e. 29.63% followed by Alandi-Mhatoba and Shindavane
17.66%.
Decadal Population Growth as per Census 2001 – 2011 in Cluster is 21.09%.
Gram Panchayat of Tarade shows minimum Literacy Rate in the Cluster i.e. 61.36%. Literacy Rate
in the rest of the Cluster ranges between 69.22% to 72.52 %.
The cluster shows average literacy rate of 70.12% which is lower as compared to State average of
82.34 % and National average of 74.04 % as per Census 2011.
Percentage of Graduates and Post-Graduates is less than 24%.
Figure 15: Education Level of Cluster
29.88 % 70.12 %
Literacy Rate in Cluster (as per census 2011)
Illerates
Literates
Figure 14: Literacy Rate
43%
36%
24%
0% 10% 20% 30% 40% 50%
% with Higher Secondary & above
% with Senior Secondary & above
% with Primary Education & above
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 36
II. Social Profile of the Cluster :
As per Census 2011, the population of SC in the cluster is 6,084 which constitutes around 12.05% of
the total population. The population of ST in the cluster is 548 which is around 1.08% of the total
population of the cluster.
In the Loni Kalbhor Cluster around 0.66 % of the population comprises Single Women which is
negligible. Also, 1% of the total population is specially-abled, hence for Universal Accessibility the
infrastructure to be laid should consider the accessibility features for specially-abled also.
12.05% 1.08%
86.87%
SC / ST Population %
SC ST Others
0
1000
2000
3000
4000
5000
6000
7000
SC
ST
Figure 16: Population in Cluster SC / ST
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 37
The brief of the Social Profile of the cluster is compiled in the Table 4 below.
Table 12: Social Profile of the Cluster
Details GP -1 GP-2 GP-3 GP-4 GP-5 GP-6 GP-7 Total
S.N. Existing
Lon
ikal
bh
or
Ku
njir
wad
i
Ala
nd
i
Mh
ato
ba
So
rtap
wad
i
Tar
ade
Val
ati
Sh
ind
avan
e
1 Literacy Rate (as per census 2011)
72.39 72.52 72.43 71.19 61.36 71.73 69.22 70.12 (Avg.)
2 SC Population 3190 862 410 1088 128 96 310 6084
3 ST Population 327 66 14 61 35 0 45 548
4 OBC Population 5250 843 1135 730 1134 21 550 9663
5 Open Category Population
13751 6650 3182 4488 841 1475 3780 34167
6 Education Levels
(i) % with Higher Secondary and above
15% 20% 15% 60% 5% 45% 8% 24% (Avg.)
(ii) % with Senior Secondary and above
10% 35% 40% 30% 55% 35% 45% 36% (Avg.)
(iii) % with Primary Education and above
70% 45% 30% 60% 40% 10% 47% 43% (Avg.)
7 % of Population – disabled
3% 0.35
% 0.07
% 0.30
% 1.21%
0.36%
0.20% 1% (Avg.)
8 % of Single women 2.00
% 0.05
% 0.09
% 0.20
% 2.00
% 0.06
% 0.20%
0.66% (Avg.)
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 38
III. Economic Profile of the Cluster
In Loni Kalbhor Cluster 24,159 people are involved in both Farm and Non-Farm activities. From this
working population 39.89% are female workers and remaining 60.11% are male workers.
Occupation in Primary Sector is predominant in Loni Kalbhor Cluster which constitutes 60.44% of the
total work force. Nearly 40% of women work-force exists.
MSME Clusters or industries are not existing in Loni Kalbhor Cluster. Sugarcane is one of the major
crops and hence Jaggary Units are seen. Other agro-based industries include Nursery, Vegetable
Processing, Poultry, Fruit Processing etc.
Home based traditional industries like cobblers, carpentry, blacksmith, pottery also exist. A very
small percentage of 1.92% is in service industry. The average distance travelled in the cluster, by the
employees, to reach work place ranges from 2 to 3 Km.
66.70
66.74
55.51
65.32
53.64
53.92
58.93
60.11
33.30
33.26
44.49
34.68
46.36
46.08
41.07
39.89
0% 20% 40% 60% 80% 100%
Loni Kalbhor
Kunjirwadi
Alandi Mhatoba
Sortapwadi
Tarade
Valati
Shindavane
Cluster (Avg)
Men
Women
Figure 17: Workforce Participation in the Cluster
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 39
The brief of the Economic Profile of the cluster is compiled in the Table 5 below.
Table 13: Economic Profile of Cluster
Details GP -1 GP-2 GP-3 GP-4 GP-5 GP-6 GP-7 Total
S.N. Existing Lonikalbhor Kunjirwadi Alandi
Mhatoba Sortapwadi Tarade Valati Shindavane
1 Occupational Structure
(i) Farm and Non-Farm work force (Total Working Population)
9951 3815 2643 3053 1156 907 2634 24159
(ii) Population in Primary Occupation
4718 2313 1682 2155 745 827 2163 14603
Population in Secondary Occupation
1750 950 480 580 205 2 390 4357
Population in Tertiary Occupation
1550 550 147 250 25 67 70 2659
Population in Service Industry 180 95 65 45 40 11 30 466
(iii) Women as a % of Work Force 33.30 33.26 44.49 34.68 46.36 46.08 41.07 39.89 (Ave.)
Male / Female Workers Ratio 100 : 49 100 : 49 100 : 83 100 : 53 100 : 86 100 : 85 100 : 69 100 : 69 (Ave.)
Occupation by Industry (Industry in which majority of the work force is engaged in )
NO NO NO NO NO NO NO Majority Work
Force in Agriculture
(iv) Average distance to work place for majority of the work force in the GP.
4 Km 4 Km 3 Km 4 Km 2 Km 1 Km 1.5 Km 2.78Km
(v) Any home based or traditional industry
Carpentry
Cobbler
Black Smith
Pottery
Carpentry
Cobbler
Black Smith
Pottery
Carpentry
Cobbler
Black Smith
Pottery
NO Burud-kaam
NO
Carpentry
Cobbler
Black Smith
Pottery
Carpentry
Cobbler
Black Smith
Pottery
2 MSME Clusters Details -
(i) No NO NO NO NO NO NO NO
(ii) Type NO NO NO NO NO NO NO -
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 40
IV. Cultural Profile of Cluster :
High majority of people belonging to Hindu
religion is seen.
Marathi is the local language and the usage is
very high.
RAMDARA is a City Level picnic spot existing
in the Cluster amidst forest land.
Table 14: Cultural Profile of the Cluster
S.N.
Details GP -1 GP-2 GP-3 GP-4 GP-5 GP-6 GP-7 Total
Existing
Lon
ika
lbh
or
Ku
nji
rwad
i
Ala
nd
i
Mh
ato
ba
So
rta
pw
adi
Tar
ade
Val
ati
Sh
ind
avan
e
1 Languages Spoken
Marathi, Hindi
Marathi
Marathi
Marathi
Marathi
Marathi
Marathi
Marathi
2 Religion (% of population under each religion)
Hindu: 86% Muslim: 12% Chiristian: 1% and Jain: 1%
Hindu: 99% and Muslim: 1%
Hindu: 98% Muslim: 1.5% and Jain: 0.5%
Hindu: 97% and Muslim: 3%
Hindu: 98% and Muslim:2%
Hindu:99% and Muslim:1%
Hindu: 99% and Muslim:1%
Hindu: 96.57% Muslim: 3.07% and Others: 0.36% (Avg.)
3 Type of Tribes
Non-Primitive
Tribal Group
Non PTG
Non PTG
Non PTG
Non PTG
Non PTG
Non PTG
Non PTG
4 Pilgrimage Centres
YES NO NO NO NO NO NO NO
5 Tourist Centres
RAMDARA
NO NO NO NO NO NO RAMDARA
6 Monuments/ Places of Heritage
NO NO NO NO NO NO NO NO
7 Special Festivals
NO NO NO NO NO NO NO NO
8 No. of Theatres
NO NO NO NO NO NO NO NO
9
Weekly Market
Weekly & Daily Market
in village itself
Weekly & Daily Market
in village itself
Weekly Market
at Kunjirwadi, 5km from
GP
Weekly Market
at Kunjirwadi, 4km from
GP
Weekly Market
at Kunjirwadi, 6km from
GP
Weekly Market at Uruli Kanchan, 9km from
GP
Weekly Market at Uruli Kanchan, 8km from
GP
2 nos. of Weekly &
Daily Markets in the Cluster
96.57%
3.07% 0.36% Religion (%)
Hindu
Muslim
Others
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 41
Tourist Centre: RAMDARA
Ramdara is one of the places of interest around Pune City that are listed on various websites. It is
a temple complex owned by a private trust on the bank of a small lake amidst forest area.
The temple complex is surrounded by forest
land. Forest Dept. has carried-out
development like Nature Trails, Arbours etc.
surrounding the Temple Complex.
The Temple Trust owns a land of around 70 acres where
farming is done. A ‘Goshala’ also exists with around 100
cattle. Ramdara is a serene location and has a fair potential to
be developed as a one day Picnic Spot. Camping site and one
day treks can be carried-out to develop Adventure Tourism.
Possibility of development of Village Tourism can be explored
by promoting Floriculture, Vegetable Crops and Bullock Cart
Rides etc.
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 42
V. Administrative Profile
The Loni Kalbhor Cluster includes 8 nos. of villages viz. Loni Kalbhor, Kunjirwadi, Alandi Mhatoba,
Ramoshiwadi, Sortapwadi, Tarade, Valati, Shindavane. The two villages Alandi Mhatoba and
Ramoshiwadi has one single Gram Panchayat and hence the village Ramoshiwadi is not listed
separately. Loni Kalbhor is the largest village in the Cluster and Tasil Haveli is the Block Head
Quarter which is around 18km from Loni Kalbhor.
The Gram Panchayat is the key nodal agency in the cluster for this mission. It is responsible for
provision of key services of Water Supply, Sanitation, Village Streets and Drains. The Mandal
Officer (BDO) is in-charge of the Key Development Programs.
Table 15: Administrative Profile
S. N. Details Total
1 No of Gram Panchayats in the cluster 7 nos.
2 Name of Block Head Quarters HAVELI
3 Name of the BDO Mr. S. N. Kohinkar
4 Distance of the Block Head Quarters from the largest settlement in the cluster ( in km)
Shindavane to P.S. Haveli 36 km
5
Agencies providing key services
i) Water Supply and Sanitation Rural Water Supply
Depertment Z.P. Pune
ii) Village Streets and Drains Public Works Depertment
Z.P., Pune
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 43
Step 3 b : Component Profiling
As per the NRuM framework 14 desirable components have been envisaged as ideal for the
cluster which are:
I. Skill development training linked to economic activities
II. Agro Processing, Agri-Services, Storage and Warehousing
III. Fully equipped mobile health unit
IV. Upgrading school/higher education facilities
V. Sanitation
VI. Provision of piped water supply
VII. Solid and liquid waste management
VIII. Village streets and drains
IX. Street lights
X. Inter-village road connectivity
XI. Public transport
XII. LPG gas connections
XIII. Digital Literacy
XIV. Citizen Service Centres / e-gram - for electronic delivery of citizen connectivity
Each of the above mentioned Desirable Components have been detailed out in the templates
given below:
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 44
Table 16: Skill Development training linked to Economic Activity in the Cluster
DETAILS GRAM PANCHAYATS TOTAL
EXISTING GP - 1 GP - 2 GP - 3 GP - 4 GP - 5 GP - 6 GP - 7
Loni Kalbhor Kunjirwadi Alandi
Mhatoba Sortapwadi Tarade Valati Shindavane
1 Average Income per capita (Rs. / Annum)
67,000/- 50,000/- 52,000/- 48,000/- 50,000/- 48,000/- 54.000/-
2 Primary source of income
Agriculture & Allied Agriculture &
Allied Agriculture &
Allied Agriculture &
Allied Agriculture &
Allied Agriculture
& Allied Agriculture &
Allied
3 Skills available- Handicraft/ handloom/ Industrial etc
NO NO NO NO NO NO NO
4 MSME clusters present (Y/N)
NO NO NO NO NO NO NO
5 If (Y), above then nos and type of MSME cluster
- - - - - - -
6 Employment generated through 1 above
- - - - - - -
7 Female to Male ratio of employment
- - - - - - -
8 Female to Male ratio of vocational skill engagement
- - - - - - -
9 Traditional/home based Industries present
Poultry, Carpenter, Black-Smith,
Cobbler, Men's Parlour, Burud kam
Black-Smith, Cobbler,
Potter, Barber
Black-Smith, Cobbler,
Potter, Barber
Black-Smith, Cobbler, Potter, Barber
Carpenter, Burud kam
Carpenter, Barber
Carpenter , Barber
10 Identified needs for skill development
Mobile Repairing, Tailoring & Fashion Designing, Beauty
Parlour, Men's Saloon, Carpenter,
Men's Saloon, Nursery
Management, Polyhouse, Tailoring &
Poultry, Dairy Management,
Nursery Management,
Polyhouse,
Nursery Management, Men's Parlour
Mens Parlour, Poultry , Dairy Management
Mens Parlour, Poultry,
Dairy Manageme
Dairy Management
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 45
Fabrication, Poultry, Dairy Management
Fashion Designing,
Beauty Parlour
Tailoring & Fashion
Designing, Beauty Parlour
nt
11 Agencies involved in skill development / training
YES; R-SETI Bank of Baroda, Kunjirwadi
YES; R-SETI Bank of Baroda,
Kunjirwadi
YES; R-SETI Bank of Baroda,
Kunjirwadi
YES; R-SETI Bank of Baroda,
Kunjirwadi
YES; R-SETI Bank of Baroda,
Kunjirwadi
R-SETI Bank of Baroda, Kunjirwadi
R-SETI Bank of Baroda, Kunjirwadi
Projected GP - 1 GP - 2 GP - 3 GP - 4 GP - 5 GP - 6 GP - 7 TOTAL
1 Projected no of households for 2022
8000 2695 1450 2130 513 360 1029 16177 (Avg)
2 Projected needs for skill development (no. of hoseholds)
1565 265 55 265 50 30 101 2331 (Avg)
No is Skills available nor the MSMEs regarding Handicraft/ handloom/ Industrial.
Skills like Carpentry, Footwear making is existing.
Many nurseries are seen and hence Floriculture has ample scope in the Cluster.
The predominant activity is agriculture and allied. The existence of Carpenter, Blacksmith,
Cobbler, Barber etc. form a part of home based industry.
Existence of Brick Kilns shows the growing demand of building material. However, clay bricks
need to be discouraged from environmental point of view. As loosing top soil will hamper
Agriculture.
The Rural Self Employment Training Institute attached to the Nationalized Bank i.e. Bank of
Baroda, Kunjirwadi, is imparting skill development along with two more private agencies.
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 46
Available and Identified Skills:
GOAT FARMING
IDENTIFIED SKILL-NEEDS
FOR 1565 HHs BY 2020
FLORICULTURE
TAILORING
BEAUTY PARLOUR
CARPENTRY
FABRICATION
DAIRY MANAGEMENT
REPAIRS OF ELECTRONIC DIGITAL EQUIPMENT LIKE
MOBILE, LAPTOP AND COMPUTER PERIPHERALS
POULTRY FARM
AVAILABLE SKILLS
CARPENTRY
FOOTWEAR
MAKING
POTTERY
Figure 18: Available Skills
Figure 16: Available Skills
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 47
Table 17: AGRI-SERVICES and PROCESSING
DETAILS GRAM PANCHAYATS CLuster
EXISTING GP - 1 GP - 2 GP - 3 GP - 4 GP - 5 GP - 6 GP - 7
Loni Kalbhor Kunjirwadi Alandi Mhatoba Sortapwadi Tarade Valati Shindavane
1 Any existing Agri Service Centre (Y/N)
YES YES NO NO NO NO YES
2 If Y then issues/need for up-gradation
Timely supply of quality Seeds & Fertilisers etc. at reasonable rate is necessary
Timely supply of quality Seeds & Fertilisers etc. at reasonable rate is necessary
- - - -
Timely supply of quality Seeds & Fertilisers etc. at reasonable rate is needed.
3 Any agro-processing industries present (Y/N)
Yes Yes Yes NO NO NO Yes
4 If Y then details of the same – type, size, scale etc
6 Jaggery Units; approx. 160 kg jaggery production / day
One Jaggery Unit approx. 125 kg jaggery production /day, One vegetable processing unit 1000kg /day
4 Jaggery Units; approx. 100-150 kg jaggery production /day
- NO - One Jaggry Unit 1000kg /day
5 Presence of adequate storage & warehousing facilities
NO NO NO NO NO NO NO
6 Presence of cold storage facilties
NO NO NO NO NO NO NO
7 Predominant agricultural produce
Sugercane & Vegetables
Sugercane, Onion & Vegetables
Onion, Sugercane, Vegetable & Fruits
Various Flower Crops
Flowers, Onion, Vegetable & fruits
Vegitable and Fruits
Onion, Sugarcane, Vegetable & Fruits
8 Issues related to optimum yield
Insufficient organic manure use, expensive improved seeds & fertilizer,
Insufficient of water supply for irrigation , low productivity of soil
Insufficient of water supply for irrigation , expensive improved seeds
Insufficient water supply for irrigation & proper
Lack of parmanent water source
Lack of parmanent water source
Reducing land holding, insufficient labour, lack of parmanent
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 48
reducing land holdings, insufficient labour, pollution
& fertilizer market water source
9
Identified additional support infrastructure to improve agri-productivity.
Protected farming, organic farming, use of 100% microirrigation techniques, intigrated pest-disease & fertilizer management, warehouse for agril produce & cold storages
Protected farming, organic farming, use of 100% microirrigation techniques & optimum use of organic manure
Protected farming, organic farming, use of 100% micro-irrigation techniques & optimum use of organic manure
Protected farming, optimum use of organic manure
Protetive farming,drip errigatin, organic farm, water availability
Protective farming, drip irrigation, organic farm, water availability
Drip irrigation , organic farming , soil testing , intigrated pest-disease & fertilizer management
10
Presence of mandis/wholesale agri produce markets ( Nos and distance between these mandis)
Yes; 1) Weekly and daily market in village itself 2)APMC market at shevalwadi 7km from GP
Yes; 1) Weekly and daily market in village itself 2)APMC market at shevalwadi 11km from GP
Yes; 1) Weekly and daily market at kunjirwadi 5km 2)APMC market at shevalwadi 16km from GP
Yes; 1) Weekly and daily market at kunjirwadi 4.5km 2)APMC market at shevalwadi 15km from GP
Yes; 1) Weekly and daily market at kunjirwadi 3 km 2)APMC market at shevalwadi 23 km from GP
APMC market at shevalwadi 20 km from GP
Yes; 1) Weekly and daily market at uruli-kanchan 8 km from GP 2)APMC market at shevalwadi 21 km from GP
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 49
Daily & Weekly Markets and Agriculture Produce Market Committee (APMC) are available but no Cold Storage.
Sugarcane and vegetables are the prominent crops.
Many Jaggery Units exist in the cluster with fair amount of production.
Agriculture Service Centres exist in the cluster but lack facilities. The material like seeds, fertilizer and organic manure are un-affordable to
many farmers.
In-sufficient water supply for irrigation is another reason for continual reduction of agricultural land.
OPTIMUM YIELD
INSUFFICIENT ORGANIC MANURE USE
REDUCING LAND HOLDINGS
EXPENSIVE IMPROVED SEEDS & FERTILIZER
INSUFFICIENT LABOUR
Figure 19: Issues related to Optimum Yield
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 50
Table 18: DIGITAL AMENITIES and LITERACY
DETAILS GRAM PANCHAYATS Cluster
EXISTING GP - 1 GP - 2 GP - 3 GP - 4 GP - 5 GP - 6 GP - 7
Loni Kalbhor Kunjirwadi Alandi
Mhatoba Sortapwadi Tarade Valati Shindavane
1
Any existing ICT enabled front end Common Service Centre (Y/N)
YES 1)Sangram Kaksha 2)Maha-E-Service Center 3)MSCIT Training Center 4)Job Center
YES 1)Sangram Kaksha 2)Maha-E-Service Center
YES Sangram Kaksha
YES Sangram Kaksha
YES Sangram Kaksha
YES Sangram Kaksha
YES Sangram Kaksha
2 If Y any up-gradation required
Fully Equipped Common Service Center
NEED of NOFN / Broad Band connectivity
Need of NOFN / Broad Band connectivity
Need of NOFN /
Broad Band connectivity
Need of NOFN /
Broad Band connectivity
Need of NOFN /
Broad Band connectivity
Need of NOFN /
Broad Band connectivity
Need of NOFN / Broad
Band connectivity
3 Connectivity under NOFN/Broad Band connectivity
Broad Band connectivity
YES NO Broad Band connectivity
NO NO NO
4 Gaps under 3 above ( coverage)
Irregular Network
Connectivity; Unavailability
Of Modern Tools
Irregular Network
Connectivity; Unavailability
Of Modern Tools
Unavailability of Broad
Band connectivity
Unavailability of Broad
Band connectivity
NO NO
Unavailability of Broad
Band connectivity
5 No. of mobile 4 4 2 4 NO NO 2
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 51
towers
6 Coverage under E- Kranti
- - - - - - -
7 % of households with digital connectivity
25% 12% 21% 11% 2% 2% 9% 11.71%
8 % of households with at-least one e-literate person
55% 40% 20% 34% 7% 20% 65% 34.42%
PROJECTED GP - 1 GP - 2 GP - 3 GP - 4 GP - 5 GP - 6 GP - 7
1 Projected no of households for 2022
8000 650 144 122 44 40 150 9150
2 Projected needs for Digital Literacy (no of households)
3700 HH; Full Coverage of
Village with Wifi & NOFN/ Broad
Band connectivity
1209 HH; Full Coverage of Village with
Wifi & NOFN/ Broad Band connectivity
1306 HH; Full Coverage of Village with
Wifi & NOFN/ Broad Band connectivity
1240 HH; Full Coverage of Village with
Wifi & NOFN/ Broad Band connectivity
369 HH; Full Coverage of Village with
Wifi & NOFN/
Broad Band connectivity
320 HH; Full Coverage of Village with
Wifi & NOFN/
Broad Band connectivity
687 HH; Full Coverage of Village with
Wifi & NOFN/ Broad Band connectivity
Digital Literacy is poor.
The service infrastructure like Maha E-Service Centre, MS-CIT, Sangram Kaksha is existing in the cluster.
Mobile network connectivity is very poor especially in the villages away from highway.
Provision of Broad Band connectivity is must to achieve digital literacy and use it to the maximum. National Optical Fiber Network (NOFN),
free Wi-Fi etc. are necessary to bring about full Digital Literacy in the Cluster.
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 52
Figure 20: Percentage of Households with Digital Connectivity
25.00%
12.00%
21.00%
11.00%
2.00% 2.00%
9.00% 11.71%
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
% of HH with Digital Connectivity
55.00%
40.00%
20.00%
34.00%
7.00%
20.00%
65.00%
34.42%
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
% of HH with at least one E-literate Person
Figure 21: Percentage of Households with at least one E-literate Person
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 53
Table 19: 24 X 7 PIPED WATER SUPPLY
DETAILS GRAM PANCHAYATS
CLUSTER EXISTING
GP - 1 GP - 2 GP - 3 GP - 4 GP - 5 GP - 6 GP - 7
Loni Kalbhor
Kunjirwadi Alandi
Mhatoba Sortapwadi Tarade Valati
Shindavane
1 Source of water supply ( Ground/Surface)
Open Well (3) and
Borewell (19)
Open Well (3) and
Borewell (2)
Open Well (4) and
Borewell (7)
Open Well (2) and
Borewell (11)
Open Well (1) and
Borewell (1)
Open Well (2) and
Borewell (4)
Open Well (2) and
Borewell (23)
Open Well (17) and
Borewell (67)
2 Any Treatment Plant facility- type and capacity
1 Unit 3 Lakh Litres
NO NO NO NO NO 1 Unit 1.5 Lakh Litres
3 Any problems with leakages/old piping systems
NO NO YES NO NO NO YES
4 Storage Reservoirs-nos and capacity (Over Head Tanks, Total Capacity)
9 Tanks, 16.25 lakh
lit
2 Tanks, 3.35 lakh lit
4 Tanks, 2.5 lakh lit
2 Tanks, 1 lakh lit
3 Tanks, 0.75 lakh
lit
4 Tanks, 0.7 lakh lit
2 Tanks, 1.5 lakh lit
26 Tanks, 26.05 lakh lit
5 Coverage of WS connection (piped) at household level
1266 785 350 36 86 30 305 2791
6 No. of stand posts and coverage of each stand post ( no. of households)
8 Stand Posts For 565 HH
5 Stand Posts For 25HH
15 Stand Posts
14 Stand Posts For 90
HH Nil
12 Stand Posts For 125 HH
105
7 Per capita availability of drinking water supply
50 Lit/day 40 Lit/day 40 Lit/day 42 Lit/day 35 Lit/day 40 Lit/day 40 Lit/day
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 54
8 No. of hours of water supply
30 Min /day 1Hr /day 1Hr / day 1Hr /day 30 Min
/day 1 Hr /day 2 Hr /day
9 Any metering systems available
NO NO NO NO NO NO NO
10 Quality of water supply Chlorinated
Potable Chlorinated
Potable Chlorinated
Potable Chlorinated
Potable Chlorinated Potable
Chlorinated Potable
Chlorinated Potable
11 Water supply systems of historical/religious significance
NO NO NO NO NO NO NO
PROJECTED GP - 1 GP - 2 GP - 3 GP - 4 GP - 5 GP - 6 GP - 7 CLUST
ER
1 Projected no of households for 2022
8000 1490 1450 1750 513 360 1170
2 Projected water demand for 2022
19.2 Litres /day
7 lakh lit / day
11.6 lakh lit / day
7 lakh lit / day
1.50 lakh lit / day
1.50 lakh lit / day
4.5 lakh lit / day
i Projected capacity of Treatment capacity
2 MLD 8 lakh lit 2.75 lakh lit 7 lakh lit 1.5 lakh lit 1 lakh lit 4.5 lakh lit
Ii Projected capacity of SR 20 lakh lit 8 lakh lit 2.75 lakh lit 7 lakh lit 1.5 lakh lit 1 lakh lit 4 lakh lit
Iii No of household connections
8000 1480 1450 1750 513 330 1170
Iv Projected water supply network -distribution
ALL HH Must be Covered
ALL HH Must be Covered
ALL HH Must be Covered
ALL HH Must be Covered
ALL HH Must be Covered
ALL HH Must be Covered
ALL HH Must be Covered
The main sources are open well and bore well. Due to growing population, these sources are going to fall short and hence exclusive Pumping Station
needs to be installed in River Mula at least for agriculture.
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 55
Figure 22: Coverage of Water Supply Connections (Piped) at Household Level
Per Capita Drinking Water Status
Figure 23: Per Capita Drinking Water Supply (LPCD) (Required vs Current)
0
1000
2000
3000
1266 785
350 36 86 30
305
2791
Coverage of WS Connections (piped) at HH Level
0%
20%
40%
60%
80%
100%
36% 46% 47% 59% 49% 45% 51% 42%
64% 54% 53% 41% 51% 55% 49% 58%
Required WS Current WS
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 56
Table 20: SANITATION
DETAILS GRAM PANCHAYATS
CLUSTER EXISTING
GP - 1 GP - 2 GP - 3 GP - 4 GP - 5 GP - 6 GP - 7
Loni Kalbhor
Kunjirwadi Alandi
Mhatoba Sortapwadi Tarade Valati Shindavane
1 Coverage of households with Individual Toilets
3003 934 287 980 211 282 629 6326
2 Any Open defecation (HH) 217 20 211 287 102 30 104 971 HH
3 Existing condition of the IHH Toilets Good Fair Fair Fair Good Good Good
4 Connection with septic tanks 3003 910 41 920 211 282 619 5986
5 No. of Public Toilets 11 Units,
113 Toilets 5 Units,
24 Toilets 3 Units,
15 Toilets 2 Units,
12 Toilets 1 Unit,
3 Toilets Nil
1 Unit, 3 Toilets
23 Units, 170 Toilets
6 Coverage with sewerage systems- type and condition
NO NO NO NO NO NO NO
7 Any sewage treatment plant available-type and condition
NO NO NO NO NO NO NO
8 Any alternate systems of treatment being used
NO NO NO NO NO NO NO
9 Any recycling facilities available NO NO NO NO NO NO NO
Projections GP - 1 GP - 2 GP - 3 GP - 4 GP - 5 GP - 6 GP - 7 CLUSTER
1 Projected no of households for 2022 8000 1761 1450 2022 513 360 1170 15276
2 Requirement of HH Toilets -2022 5000 827 1239 1042 302 78 541 9029
3 Projected need for sewage network 10KM 3.5 Km UG Drainage
3 Km UG Drainage
1.830Km UG
Drainage
1.5Km UG
Drainage
150 soak Pit 2000 m UG
Drainage
5.2Km UG Drainage
4 Projected need of Sewage Treatment Plant
1 1 1 1 1 1 1 7
All house-holds still do not have Individual Toilet facility. Treatment of Sewage at household level can be done as per the practice being followed in
Nanded District. Sulabh Shouchalaya / Public Toilets are also necessary. STP is must in the cluster.
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 57
Figure 24: Coverage of households with Individual Toilets:
Figure 25: Household Connected with Septic Tanks
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
80.00%
90.00%
63.62%
50.24%
30.14%
71.42%
51.08%
85.45%
67.20% 59.78%
Coverage of HH with Individual Toilets
0
1000
2000
3000
4000
5000
6000
3003 (100%)
910 (97.43%)
41 (14.28%)
920 (93.87%)
211 (100%)
282 (100%)
619 (98.41%)
5986 (94.62%)
HH with Septic Tanks
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 58
Table 21: SOLID and LIQUID WASTE MANAGEMENT
DETAILS GRAM PANCHAYATS
CLUSTER EXISTING
GP - 1 GP - 2 GP - 3 GP - 4 GP - 5 GP - 6 GP - 7
Loni Kalbhor Kunjirwadi Alandi
Mhatoba Sortapwadi Tarade Valati Shindavane
1 Solid Waste Generated Yearly (MT)
1825 375 162 290 70 1250 2190 6162 MT
1 Existing facilities for collection at the household level
2 nos. of Tractors
1 no. of Garbage
Collection Vehicle (Ganta-
gaadi)
No Facility 1 Vehicle No Facility No Facility No Facility
Total 4 nos. of Vehicles
2 Any segregation done at the household level
NO NO NO NO NO NO YES
3 Frequency and mode of collection
ONE TIME DALY BY TRACTOR
Daily by Garbage
Collection Vehicle (Ganta-
gaadi)
NO NO NO NO NO ,
4 Existing facilities for disposal and treatment
No Dumping Ground
Dumping Ground 0.20 Ha
NO NO NO NO NO
5 Type of treatment facility ( need in 2022)
Solid & Liquid Waste
Management Plant, Vermi-Composting, Biogas Plant
Solid & Liquid Waste
Management Plant, Vermi-Composting, Biogas Plant
Solid & Liquid Waste Managemen
t Plant, Vermi-
Composting, Biogas Plant
Solid & Liquid Waste
Management Plant, Vermi-Composting, Biogas Plant
Solid & Liquid Waste Managemen
t Plant, Vermi-
Composting, Biogas Plant
Varmi-Compost
Plant, Biogas Plant
Collection and Vermi-Compost
Plant
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 59
6
Any non-conventional/ traditional methods/ oganic (e.g. vermi composting) of solid waste treatment
NO NO NO NO NO NO NO
7 Any recycling options/ facilities
NO NO NO NO NO NO NO
8
Waste disposal facilities for hazardous/ industrial waste
NO NO NO NO NO NO NO
A proper system of segregation of garbage into wet & dry one at source, collection & treatment of garbage needs to be devised.
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 60
Table 22: ACCESS TO VILLAGE STREETS WITH DRAINS
DETAILS GRAM PANCHAYATS
CLUSTER EXISTING
GP - 1 GP - 2 GP - 3 GP - 4 GP - 5 GP - 6 GP - 7
Loni Kalbhor Kunjirwadi Alandi
Mhatoba Sortapwadi Tarade Valati
Shindavane
1 Coverage of Village Streets 75 Km 12.5 Km 26 Km 15 Km 15 Km 11 Km 5 Km 159.5 Km
2
Type of village street Kutcha/Semi Pucca/Kutcha (BT/Concrete/interlocking tiles/other)
Kucha 50 Km, BT Road 20
Km, and Concrete Road
5 Km
Kucha 9Km, BT 2.5Km,
Concrete 1Km
Kucha 15Km, BT 10Km,
Concrete 1Km
Kucha 12Km, BT
2.5Km, Concrete 0.23Km
Kucha 1Km, BT
7Km, Concrete 0.10Km
Kucha 5Km, BT
5Km, Concrete 0.50Km
Kucha 2.3Km, BT
0.0Km, Concrete
1.9Km
Kucha 44.3Km, BT
47Km, Concrete 8.73 Km
3 Width of village streets-whether motorable or non motorable
Motorable Motorable Motorable Motorable Motorable Motorable Motorable
4 Pedestrian pathways available
NO NO NO NO NO NO NO
5 % of streets covered with drains
NO NO NO NO NO NO NO
6 Type of drains( covered /uncovered)
Covered Covered Uncovered Covered Covered NO NO
7 Storm water disposal facilities
NO NO No NO NO NO NO
All villages have motorable access. The villages away from highway have access through Kachha roads only. Very few of the village streets in the
cluster are with open / covered drains.
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 61
Figure 26: type of Village Streets in Cluster (Km)
In Loni Kalbhor Cluster 8.73 Km of Village Streets are White Top roads, 47 Km are Black Top / Tar
roads and 44.30 Km of Kuhcha Roads. Out of the total roads constructed in the cluster, Loni Kalbhor
has the maximum share of 50% of Village roads.
Figure 27: Coverage of Streets (Village Wise)
44.30 Km
47.00 Km
8.73 Km Type of Village Streets (Km)
Kuchha Black top Concrete
50.00%
8.33%
17.32%
9.81%
1.73%
6.99%
2.79%
Coverage of Streets (Village Wise)
Loni Kalbhor (50%)
Kunjirwadi (8.33%)
Alandi Mhatoba (17.32%)
Sortapwadi (9.81%)
Tarade (1.73%)
Valati (6.99%)
Shindavane (2.79%)
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 62
Table 23: VILLAGE STREET LIGHTS
DETAILS GRAM PANCHAYATS
CLUSTER EXISTING
GP - 1 GP - 2 GP - 3 GP - 4 GP - 5 GP - 6 GP - 7
Loni Kalbhor Kunjirwadi Alandi Mhatoba Sortapw
adi Tarade Valati
Shindavane
1 No of street lights per km of street length
5 Poles/Km (375 nos.)
15 Poles/Km (188 nos.)
16 Poles/Km (416 nos.)
13 Poles/Km (192 nos)
18Poles/Km (128 nos.)
18Poles /Km (189
nos.)
15 Poles/Km (63 nos)
1551 nos.
2 Type of street light ( whether sodium vapour/LED)
Sodium Vapour , LED
& CFL LED, CFL CFL LED LED CFL
LED AND CFL
3 Any non conventional methods of street lighting
NO NO NO NO NO NO NO
4 No of non functional street lights to be replaced
YES YES YES YES YES YES NO
5 Electric Poles availability 300 275 85 148 55 40 105 1008
6 Coverage of households with electricity
3870 HH 1859 HH 895 HH 1192 HH 413 HH 300 HH 843 HH 9372 HH
7 Use of non -conventional sources of electricity
NO NO NO NO NO NO NO
8 Potential for renewable energy usage (wind/ solar/ mini-hydel )
Solar Solar Solar and Wind Solar Solar and
Wind
Solar and
Wind
Solar AND Wind
Fair nos. of street lights exists in the villages. The street lighting needs up-gradation and improvement. Existing hills can be used to install wind mills.
Also, people may be educated regarding solar energy for consistent electricity supply in future.
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 63
Figure 28: Total number of Street Lights
0
200
400
600
800
1000
1200
300 275
85 148
55 40 105
1008
Number of Street Lights
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 64
Table 24: HEALTH
DETAILS GRAM PANCHAYATS Total
EXISTING GP - 1 GP - 2 GP - 3 GP - 4 GP - 5 GP - 6 GP - 7
Loni Kalbhor Kunjirwadi Alandi
Mhatoba Sortapwadi Tarade Valati
Shindavane
1 Existing nos. of sub centres /dispensaries.
1 Sub Centres / 5
Private Clinics
12 3 2 NO NO 1 Sub
Centre 23
2 Infrastructure facilities of the sub centres
1 NO YES NO NO NO YES 1
4 Existing nos. of maternity homes 2 2 NO NO NO NO NO 4
5 No. of Primary Health Centres 1 1 NO NO NO NO NO 2
6 No. of Hospitals / Trauma Centres (Govt./Private)
3 Private 8 Private 0 0 0 0 0 11
7 No. of Multi-Speciality Hospitals 0 0 0 0 0 0 0 0
8 No. of veterinary centres 1 1 1 NO NO NO NO 3
Projections GP - 1 GP - 2 GP - 3 GP - 4 GP - 5 GP - 6 GP - 7 Total
1 Projected Population 2022 45000 10500 5741 9430 2500 2000 5200 80371
2 Requirement of sub centres-2022 2 1 1 1 1 1 No 7
3 Requirement of maternity homes-2022 1 5 2 1 1 1 1 12
4 Requirement of PHCs 1 No 1 No No No 1 3
5 Requirement of veterinary centres-2022 1 2 1 1 1 1 1 8
Sub-Centres / Dispensaries do not exist in the all the villages. Along with these, Maternity Homes and Primary Health Centres need to be provided. At
least one Multi-Speciality Hospital would be desirable in the cluster.
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 65
Figure 29: Existing Vs Required no. of Sub-centres
2
0 0 0 0 0 0
2
2
0 0 0 1 0 0
3
0 0.5
1 1.5
2 2.5
3 3.5
Existing Subcentres Required Subcentres
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 66
Table 25: UP-GRADATION OF PRIMARY, SECONDARY and HIGHER SECONDARY SCHOOLS
DETAILS GRAM PANCHAYATS
Total EXISTING
GP - 1 GP - 2 GP - 3 GP - 4 GP - 5 GP - 6 GP - 7
Loni Kalbhor Kunjirwadi Alandi
Mhatoba Sortapwadi Tarade Valati Shindavane
1 No of Anganwadis /Mini Anganwadi Centres
21 9 6 5 5 2 3 51
2 No of Primary Schools (Govt. + Private)
14 (11+3) 2 (2+0) 4 (4+0) 3 (3+0) 2 (2+0) 1 (1+0) 1 (1+0) 27
(24+3)
3 No of Senior Secondary Schools (Govt. + Private)
2 (2+0) 1 (0+1) 1 (1+0) 1 (0 + 1) 0 0 1 (1+0) 5 (4+1)
4 No of Higher Secondary Schools (Govt. + Private)
1 (1+0) 0 0 0 0 0 0 1
5 Any schools for physically challenged persons
0 0 0 0 0 0 0 0
6 Degree College / Medical college / Engineering COllege
0 0 0 0 0 0 0 0
7 Existing condition of 1-4 Good Good Good Good Good Good Good
8 Up-gradation needs for 1-4
New School Buildings ,
Play-Grounds, E-Learning & Improvement
In Toilets
E-Learning; Improvement In Toilets &
Drinking Water Facility
New School Buildings ,
Play-Grounds, E-Learning & Improvement
In Toilets
E-Learing; Drinking
Water Facility &
Play-Ground
E-Learning
Building, Water, Play Ground , E-
Learning
YES Water, Play
Ground , Building E-Learning,
English Medium School, College
Projections GP - 1 GP - 2 GP - 3 GP - 4 GP - 5 GP - 6 GP - 7 Total
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 67
1 Projected no of households for 2022
8000 1761 1450 2130 100 360 1170
2 Projections for 1-4 above
Digital Anganwadi, New School Buildings ,
Play-Grounds, E-Learning
Digital Anganwadi, New School Buildings ,
Play-Grounds, E-
Learning
Digital Anganwadi, New School Buildings ,
Play-Grounds, E-Learning
Digital Anganwadi, New School Buildings ,
Play-Grounds, E-
Learning
Digital Anganwadi, New School
Buildings , Play-
Grounds, E-
Learning
Digital Anganwadi, New School Buildings ,
Play-Grounds, E-
Learning
Digital Anganwadi, New School
Buildings , Play-Grounds, E-
Learning
Residential schools with CBSE and ICSE patterns do not exist in the cluster. These are required with all facilities for an enhanced basic education.
Figure 30: Status of Anganwadis / Mini - Anganwadi Centres
0
20
40
60
80
21
9 6 5 5 2 3
51 45
9 6 7 5 2 3
77
Existing no. of Anganwadi Required no. of Anganwadis
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 68
Table 26: INTER VILLAGE ROADS CONNECTIVITY
DETAILS GRAM PANCHAYATS Total
EXISTING GP - 1 GP - 2 GP - 3 GP - 4 GP - 5 GP - 6 GP - 7
Loni Kalbhor
Kunjirwadi Alandi
Mhatoba Sortapwadi Tarade Valati Shindavane
1 Distance between GPs
Loni Kalbhor to
Kunjirwadi: 3km
Loni Kalbhor 3 Km ; Alandi
Mhatoba 5Km ; Sortapwadi-5 ; Shindavane 12
Km
Alandi Mhatoba
to Kunjirwadi
5 km
Shindavane 7 Km, Tarde 2.5
Km, Kunjirwadi-4 Km, Alandi Mhatoba 3
Km, Lonikalbhor
7km
Valati 3 Km,
Sortapwadi-3
Valati To Shindavane 2 Km, Valati To Tarde 3
Km
Valati 2 Km, Tarde 5 Km, Loni Kalbhor - 15 Km, Kunjirwadi-
12 Km, Alandi Mhatoba - 8 Km
Sortapwadi-7
2 % covered by BT roads- whether NH/SH/MDR/PMGSY
100 %, NH-9 100% NH-9 100% MDR
NH-9 80% PMGSY
50%, MDR 50%
60%, MDR
100 %, SH-61, MDR 28%
3 Length of non connectivity between GPs
Lonikalbhor to Alandi Mhatoba 10 Km
Connected Kunjirwadi 5km
Connected Alandi Mahtob 3 Km
Valti To Tarde 3 Km
Shindvane To Tarde
4 Capacity of existing roads – no of vehicles
- - - - - - -
No. of Bus Stops / Depots
2 Bus Stops 1 Bus Stop 1 Bus Stop 1 Bus Stop No No 1 Bus Stop 5 Bus Stops
No. of Railway Station No No 1 No No No 1 2 Nos.
No. of HMV 769 20 0 11 0 0 2
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 69
No. of LMV 1070 80 5 20 0 70 3
No. of Trucks 1026 35 2 25 5 15 6
No. of Three Wheelers 269 20 2 15 26 5 1
No. of Two Wheelers 5410 950 317 810 296 400 456
5 Need for strengthening/widening of existing roads
YES YES YES YES YES YES
Yes , inter village road connectivity,highway to shindavane railway station connecting road,shindavane to pune local railways nedded,
Inter Village Road Connectivity needs improvement i.e. the width and quality of roads. This is more important for the villages which are away from NH-
9. The newly proposed 60 m wide road by PMRDA can cater to improvement and establishment of excellent connectivity with NH-9. The junctions of
Feeder roads with 60 m wide road can be put to apt landuse alongwith parking lots. Parking lots shall be necessary along with Public Toilets near the
future crowded places.
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 70
Table 27: PUBLIC TRANSPORT
DETAILS GRAM PANCHAYATS
Total EXISTING
GP - 1 GP - 2 GP - 3 GP - 4 GP - 5 GP - 6 GP - 7
Loni Kalbhor Kunjirwadi Alandi
Mhatoba Sortapwadi Tarade Valati Shindavane
1 Public Transport facilities at household level viz. tempos/ rikshaws etc
YES; City Bus, 3 & 6 Sitter Rickshaw
and ST Bus
YES; City Bus, 3 & 6
Sitter Rickshaw and
ST Bus
City Bus, Railway,
Tempo and jeep
YES; City Bus 3 & 6 Sitter Rickshaw
Jeep and
Tempo
Jeep and
Tempo
Rickshaw and Tempo
2
Public Transport facilities at GP level- Bus stops/tempo stops/number of buses plying and frequency.
2 Bus & 4 Times In a Day
1 Bus & 4 times in a day
Bus & 3 times in a day
One bus & 2 times in a
day NO NO
Rickshaw and Tempo
stop
3 Public Transport at the cluster level- Bus Terminals/Local trains
NO NO No NO NO NO NO
4 Improvement/ Augmentation proposals by Government
Increase bus frequency & extend bus route upto "Ramdara"
Increase bus frequency & extend bus
route upto GP
NO
Increase bus
frequency & extend bus route upto GP
NO NO NO
The villages abutting NH-9 have good connectivity to main city by Municipal and State Transport. For the villages away from highway, private vehicles
like six seater Rickshaws, Tempos etc. are in use.
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 71
Table 28: LPG GAS CONNECTIONS
S.N.
DETAILS GRAM PANCHAYATS
Total EXISTING
GP - 1 GP - 2 GP - 3 GP - 4 GP - 5 GP - 6 GP - 7
Loni Kalbhor
Kunjirwadi Alandi
Mhatoba Sortapwad
i Tarade Valati
Shindavane
1 No. of households with LPG connections
11384 1820 555 1130 370 240 890 16389
2 No. of LPG godowns 1 NO NO NO NO NO NO 1
3 Projected no. of LPG connections additionally required for 2022
10848 875 1450 950 146 120 250 14084
4 Projected no. of LPG Godowns for 2022 0 0 1 0 0 0 1 2
Provision of Mahanagar Gas Pipeline for supply of PNG needs to be done along the road side. The demand of LPG connections till year 2022 is still
substantial.
11384
1820
555 1130 370 240 890
16389
10848
875 895 950 146 120 250
14084
0 2000 4000 6000 8000
10000 12000 14000 16000 18000
No. of LPG Connections Existing (2016)
No. of LPG Connections Additionally Required (2022)
Figure 31: Existing Vs Required LPG Gas Connections
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 72
Step 4 - SWOT Analysis and Visioning of Cluster
Step 4 a - SWOT Analysis
The SWOT analysis is done with respect to the available data and the on-ground situation in the
cluster. SWOT analysis is basically aimed at removing ‘Threats’. The Opportunities are to be duly
utilised to convert Weaknesses into Strengths so as to avoid future threats.
S T R E N G T H Existence of river at a close proximity
ensures the source of water supply.
Existing hills for wind mills and Master
balance Reservoir (MBR).
The cluster is a part of Pune
Metropolitan Region Development
Authority (PMRDA), hence good
Connectivity to Metro City Pune.
W E A K N E S S Poor connectivity to villages located
away from highway.
Insufficient Water Supply.
No Under Ground Sewerage Network
and STP
Poor Solid Waste Management System
Only few agro-based MSME clusters are
existing.
O P P O R T U N I T Y Sanctioned 60m wide 10km Fringe Area
road of PMRDA passes through cluster.
River Mula is abutting north boundary
of village Loni-Kalbhor and exclusive
Pumping Station.
Existing Govt. lands can be used for
STPs, Dumping ground or Compost Pits.
Agency offering free services of
Collection of Plastic waste exists in
Pune.
Non-polluting ancillary industries can be
planned in an exclusive zone in Cluster.
T H R E A T Due to Brick Kilns, the top soil is
diminishing and so does the agricultural
land.
Underground water level is going down
as no. of bore wells are increasing due
to in-sufficient network of piped water
supply.
Water of canals is getting polluted due
to chemicals.
LONI KALBHOR
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 73
Step 4 b : Vision for the Cluster Considering the aspiration of the residents and after consulting the major stakeholders of the
cluster, a vision statement of the cluster is as below:
“The LONI KALBHOR Cluster will be developed as a Self Dependent, Self Sustainable and
Environment Friendly Digital Cluster.”
Vision of the LONI KALBHOR Cluster
The VISION is to retain the agrarian character of the cluster with all urban infrastructure and
carrying out development maintaining environmental balance.
There is high development pressure on the cluster. This can be experienced while passing
through the villages abutting Loni Kalbhor, Kunjirwadi and Sortapwadi which are abutting NH-9.
The cluster is just 24 Km from the main city of Pune and currently is a victim of urban sprawl.
Hence, Due precautions are required to be taken while preparing the Development Plan for Loni
Kalbhor Cluster.
To transform the VISION into REALITY through implementation of ICAP, targeted vision is
attempted by the year 2022. Achievement of targets shall get the momentum of development
going till the Vision actually becomes a reality. Thus, the VISION is -
To have 7500 trained persons
To have fully functional Agri-Service Centre with all available materials and technical
experts in agriculture to build confidence in farmers to convert agriculture into a profit
making business
Installation of Free Wi-Fi and sufficient no. of Mobile towers (with due precautions so as
to prevent health adversity)
Development of source at Mula River, at least for agriculture purpose. 100% piped potable
water supply with due provision of augmentation and expansion
To have 2000 nos. of individual toilets with septic tanks. To have public toilets at all public
places and parking areas.
To have SWM system of international standards
To have quality roads with BT or WT with covered drains and ground water recharging
pits to maintain underground water level
To have 1008 more nos. of street lights with LED bulbs and a system of maintenance so
that no part in the cluster remain in complete darkness
To have sub-centre duly located to have easy access for all in the cluster
Provision for development of residential schools with CBSE and ICSE pattern
Improvement in connectivity with due provision of parking for public transport
LPG Connections for 11000 HH
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 74
•Upgradation of Schools
•Health Facilities
•Full Digital Literacy
•Sangram 2
•Skill Development
•Agri-Processing & Service
•24x7 Pipedwater supply
•Individual HH Toilets
•solidwaste Management
•Village Roads & Connectivity
•LPG Connections Basic
Amenities Economic Activities
Social Amenities
Digital Amenities
Step 5 - Deficiency Analysis and Identification of Needs
The deficiency analysis, based on the present & 5 years projected demands needs to be done for
the basic sectors enlisted or considered under NRuM for the selected cluster. For the ease of
doing the analysis, the various components have been categorized into 4 basic components
which are:
i. Basic Amenities
ii. Economic Activities
iii. Social Amenities
iv. Digital Amenities
Gap Analysis
The deficiencies in each cluster has been identified after ascertaining the existing levels with
respect to each component and the same has been compared with the benchmarks set for each
component as per the framework as well as based on the needs of the cluster as determined
through the focus group discussions with the GP members and other relevant stakeholders. The
details of the deficiency analysis exercise is as given in the Tables below.
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 75
Table 29: Deficiency Analysis - Basic Amenities
BASIC AMENITIES
A B C D
Sl no.
Component Desired Levels Existing Situation
Gaps Deficit
Assuming A=100
(A-B)
1 24x7 Piped Water Supply
Considering70 LPCD (54,20,870
lpcd (5.5 MLD) 2.2 MLD 60.00% 3.30
2 Sanitation 8950 HH with
individual toilets 6326 29.32% 2624
3 Solid and Liquid Waste Management
13748.4 7407.4 0.46% 6341
4 Access to Village Streets with Drains
111.65 15.95 85.71% 95.70
5 Village Street Lights
5316.00 1008 81.04% 4308.00
6 Inter village roads connectivity
75.00 60 20.00% 15.00
7 Public transport
1.00 100% 0.00% 0
8 LPG Gas Connections
15276.00 14206.00 7.00% 1070.00
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 76
Table 30: Deficiency Analysis - Economic Activities
ECONOMIC ACTIVITIES
A B C D
Sl no.
Component Desired Levels Existing Situation Gaps Deficit
Assuming A=100
(A-B)
1
Skill Development training Linked to Economic Activities
10693.00 6416 40.00% 4277
2
Agri-Services and Processing
10 Fully functional Agri-Service
Centres in the Cluster t
Total 8 nos. of Agri Service Centres
exist in the Cluster but services are
insufficient to cater to the Cluster
20.00% 2
Agri-Services and Farm Productivity
300 Ha Land needs to be cover with Micro irrigation
50 Ha under Existing
Microirrigation schemes uner
PMKSY
83.33% 250
Agri-Services
Need 1 Fully functional Agri-
Service Centres in the Cluster to
support Organic Farming under Paramparagat
Krishi Vikas Yojna (PKVY)
0 1 1
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 77
Table 31: Deficiency Analysis - Social Amenities
SOCIAL AMENITIES
A B C D
Sl no.
Component Desired Levels Existing
Situation
Gaps Assuming
A=100
Deficit (A-B)
1 Health
Sub Centers / Dispensaries
3 2 33.33% 1
Maternity Homes 5 4 0.00% 0
Primary Health Centers
3 2 33.33% 1
Veternary Centers 3 3 0.00% 0
2
Up
gradation
of primary,
secondary
and higher
secondary
schools
Anganwadi/ Mini Anganwadi/ Pre
Primary School (1 for population of 1000)
77 51 0.00% 26
Primary Schools (1 for population of
5000) 16 16 0.00% 0
Senior Secondary Schools (1 for
population of 7500) 11 13 0.00% 0
Table 32: Deficiency Analysis - Digital Amenities
DIGITAL AMENITIES
A B C D
Sl no.
Component Desired Levels Existing
Situation
Gaps Assuming
A=100
Deficit (A-B)
1 Digital Literacy At least one e-
literate person in every household.
15276 2407 84.24% 12869
2 Citizen Service
Centres 7 Sangram
Centres 0 7 0.00% 0
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 78
Step 6 - Prioritization of Needs
Based on the deficiencies identified above the same have been prioritized for funding as below:
Table 33: Prioritisation of Needs - Basic Amenities
BASIC AMENITIES Score-D
Weightage
Overall
Weightage
X
Weighted
Score =
X*D Desirable Component Gaps Assuming
A=100
1 24x7 Piped Water Supply 60.00% 20%
80.00%
10%
2 Sanitation 29.32% 10% 2%
3 Solid and Liquid Waste
Management 46.12% 20% 7%
4 Access to Village Streets
with Drains 85.71% 18% 12%
5 Village Street Lights 81.04% 15% 10%
6 Inter village roads
connectivity 20.00% 10% 2%
7 Public transport 0.00% 5% 0%
8 LPG Gas Connections 7.00% 2% 0%
Table 34: Prioritisation of Needs - Economic Activities
ECONOMIC ACTIVITIES Score-D Weightage
Overall Weightage
X
Weighted Score = X*D
Desirable Component
Gaps Assuming A=100
1
Skill Development
training Linked to
Economic Activities
40.00% 50%
10.00%
2.0%
2 Agri Services and
Processing 20.00% 5.00% 0.1%
3 Agri Services and Farm
Productivity 83.33% 20.00% 1.7%
4 Agri-services and
Processing 100.00% 25% 2.5%
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 79
Table 35: Prioritisation of Needs - Social Amenities
SOCIAL AMENITIES Score-D
Weightage
Overall Weightage
X
Weighted Score = X*D
Desirable Component
Gaps Assuming A=100
1 Health 33.33% 50%
6.00%
1.00%
2
Up gradation of primary, secondary and higher secondary schools
0.00% 50% 0.00%
Table 36: Prioritisation of Needs -Digital Amenities
DIGITAL AMENITIES Score-D Weightage
Overall Weightage
X
Weighted Score= X*D
Desirable Component Gaps Assuming
A=100
1 Digital Literacy 84.24% 70%
4.00%
2%
2 Citizen Service Centres 0.00% 30% 0%
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 80
Step 7 - Detailing of the Mission Components The mission components which have been identified through the gap analysis, have been detailed
out based on thumb rule costing as given in the tables below
Table 37: Mission Components: Basic Amenities
BASIC AMENITIES
Component Sub-Component Costing- (Rs
in Lakhs)
Total Costing (Rs
in Lakhs)
1 24x7 Piped
Water Supply
1) Instalation Of Digital Water Meter ₹ 177.00
₹ 3,329.40
2) Instalation Distribution Pipe Line ₹ 110.00
3) Water Supply Scheme ₹ 1,042.40
4) Purchase Of Land for Water Source ₹ 61.00
5) Water Filter Plant ₹ 100.00
6) ESR ₹ 1,610.00
7) Repairs of wells ₹ 15.00
8) Installation Of R.O. Filter ₹ 214.00
2 Sanitation 1) Construction Of Indivisual House Hold ₹ 106.12
₹ 140.12 2) Construction Of Community toilets ₹ 34.00
3 Solid and Liquid
Waste Management
1) Construction Of Underground Drainage ₹ 555.00
₹ 1,897.50 2) Solid Waste Transportation ₹ 155.50
3) Sewage treatment plant ₹ 847.00
4)Procurement Of Land & Const. WTP ₹ 340.00
4 Access to
Village Streets with Drains
Construction Of Roads ₹ 9,038.00 ₹ 9,038.00
5 Village Street
Lights
1)LED Street Lights with poles ₹ 541.25
₹ 587.25 2)Providing electric transformer & maintenance
₹ 46.00
6 Works under
MSEDCL
New Transformer 20 nos. ₹ 155.85
₹ 780.85 UG Low frequency Wiring 15km ₹ 375.00
UG Higher frequency Wiring 5 km ₹ 250.00
7 Public
Transport Bus Stop Construction (Gaonthan) ₹ 55.00 ₹ 55.00
8
Construction and
upgradation of GP building,
Gym,
GP Building Upgradation ,Construction of GP Hall, Sabhha Mandap
₹ 187.00 ₹ 187.00
TOTAL COSTING ₹ 16,015.12
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 81
Table 38: Mission Components: Economic Activities
ECONOMIC ACTIVITIES
Component Sub-Component Costing- (Rs
in Lakhs)
Total Costing (Rs
in Lakhs)
9
Skill
Development
training Linked to
Economic
Activities
Construction of Mahila Asmita Bhavan
₹ 60.00
₹ 116.56 Skill Development training for
village youth & women ₹ 56.56
10 Agri-services and
Processing
NHM Polly House 26 unit, Shade
Net ₹ 958.08
₹ 2,463.48
Agri Mechanization, Power Spray,
Tractor, Rotavator, etc ₹ 177.20
Biogas ₹ 23.25
Horticulture Plantation Scheme ₹ 92.00
Agri Area Treatment and
Development, CCT, NB, Soil pluge,
etc.
₹ 82.80
Milk Processing Center ₹ 10.00
Organic Farming 1 Nadef 20 nos ₹ 12.00
2. Vermiculture 10 Projects ₹ 7.50
Individual Beneficiary Schemes ₹ 2.65
PMKSY, Micro Irrigation ₹ 175.00
Water Storage Tanks ₹ 240.00
Repairs Of Percolation Tanks ₹ 228.00
Deepening of canals ₹ 260.00
Storage Wells ₹ 50.00
Irrigation Scheme from Purandhar
lift Irrigation Scheme ₹ 145.00
TOTAL COSTING ₹ 2,580.04
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 82
Table 39: Mission Components: Social Amenities
SOCIAL AMENITIES
Component Sub-Component Costing (Rs
in Lakhs) Total Costing (Rs in Lakhs)
11 Health
PHC /Sub centre Building ₹ 820.00
₹ 1,473.00
X-Ray, Dental Chair & Other
Equipment ₹ 66.40
PHC Building Extention ₹ 40.00
Installation Of Solar Water Heater
500 Litre ₹ 2.00
Ambulance ₹ 22.00
Computer ₹ 2.40
Individual Benefit Scheme ₹ 11.80
Maternity Home ₹ 150.00
Kitchen Shed Building For PHC ₹ 10.00
Land Purchasing For Animal
Husbandry Dispensary ₹ 50.00
Construction for Animal Husbandry
Dispensary Updation & repairing ₹ 155.20
Individual Benefit Scheme ₹ 113.20
Medicine ₹ 30.00
12
Up gradation of primary,
secondary and higher secondary
schools
Toilet With Commode & Hand Wash
Station ₹ 58.40
₹ 1,117.90
Teaching Rooms construction ₹ 112.00
Ramps ₹ 0.20
Ground / Play Ground ₹ 11.00
Laboratory / library ₹ 11.50
Compound Wall ₹ 151.50
Solar Light Unit ₹ 69.00
Rain Harvesting ₹ 2.00
Drinking Water 7filter unit ₹ 10.00
Computer Set & E-learing, Digital
classroom, tabs for students ₹ 371.50
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 83
VERMI COMPOST UNIT ₹ 2.50
Sport Equipments ₹ 14.00
Benches ₹ 4.00
Building Repairing ₹ 87.00
Scaning Of Records ₹ 1.00
Construction Of Aanganwadi
Buildings ₹ 1.60
Land Purchase for Aanganwadi
Building ₹ 76.00
Other Facility - Computer, Printer,
decoration, weight Machine ,
Educationsal Toys, Toilet Facility for
21 Aanganwadi
₹ 33.70
Kitchen Shed/ light connection ₹ 4.00
Wall compound & Garden 21
Aanganwadi ₹ 46.00
Digital Aanganwadi 21 Nos ₹ 51.00
13 Social Welfare
Improvement of Crematorium ₹ 25.00
₹ 408.00
Construction Of Wall Compound To
Garden ₹ 70.00
Construction Of Walking Plaza In
Garden ₹ 63.00
Construction Of Walking Plaza
Around Percolation Tank ₹ 50.00
Play & Sport Complex ₹ 125.00
Development of Garden for citizens ₹ 25.00
Development Of Tourism Site ₹ 50.00
14 Non Conventional
Energy
1) Water Supply Motors runing On
Wind power & Solar System ₹ 255.00
₹ 427.00 2) Installation Of Solar & Wind Hibrid
System ₹ 172.00
TOTAL COSTING ₹ 3,425.90
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 84
Table 40: Mission Components: Digital Amenities
DIGITAL AMENITIES
Component Sub-Component Costing- (Rs
in Lakhs)
Total Costing
(Rs in Lakhs)
15 Digital Literacy 1) Wi-Fi Facility For Village ₹ 120.00
₹ 175.00 2) MSCIT COURCE FOR VILLAGERS ₹ 55.00
16 Citizen Service
Centres SANGRAM 2 ₹ 12.04 ₹ 12.04
TOTAL COSTING ₹ 187.04
The Grand Total of investment required for the cluster works out to be
Rs. 22,208.10 Lakhs or Rs. 222.081 Crores.
Table 41: Detailing of mission components under CGF
Sl.
No Project Component Sub Component Funded
CGF (Rs. In
Lakhs)
1 24x7 Piped Water Supply Augmentation of Source, Additional Taps
for distribution 380
2 Sanitation Public toilets, Mini-Tractor, Tractor, Tri-
cycles, Fogging Machine, Sanitary Kits 3
3 Solid and Liquid Waste
Management Mini-Tractor, Tractor, Tri-cycles 680
4 Access to Village Streets
with Drains
Cement Concrete Roads, covered drains,
road dividers 1071
5 Village Street Lights Upgrading of Lines, Laying of new lines for
Street Lights 25
6 Public Transport Nil 0
7
Construction and
upgradation of GP
building, Gym,
Construction and upgradation of GP
building, Gym, 50
8 Works under MSEDCL New Transformers 20 nos. 3
9
Skill Development training
Linked to Economic
Activities
Construction of Mahila Asmita Bhavan
38
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 85
10 Agri-services and
Processing
Milk Processing Centre,
Organic Farming 1 Nadef 20 nos ,
2. Vermiculture 10 Projects,
Water Storage Tanks
420
11 Health
Ambulance,
maternity home
PHC Building Extention
24
12
Up gradation of primary,
secondary and higher
secondary schools
Toilet With Camode & Hand Wash Station,
Solar Light Unit,
Drinking Water 7filter unit
213.5
13 Social Welfare
Improvement of Crematorium
play & sport complex
250
14 Non Conventional Energy Installation Of Solar & Wind Hibrid System 52
15 Digital Literacy
Wi-Fi Facility For Village
MSCIT COURCE FOR VILLAGERS
110
16 Citizen Service Centres Nil 0
TOTAL 3319.5
The total CGF required for the cluster works out to be Rs.3319.50 Lakhs or
33.195 Crores
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 86
Step 8 - Investment and Phasing The components and the investment required have been phased out over the mission period of 5
years based on the prioritization and year wise costing requirements estimated allowing for
escalation.
Table 42: Investment and Phasing
Project Component
Investment
Required (Rs. In
Lakhs)
2017-18 2018-19 2019-20
24x7 Piped Water Supply 3329.4 998.82 998.82 1331.76
Sanitation 140.12 42.036 42.036 56.048
Solid and Liquid Waste
Management 1897.5 569.25 569.25 759
Access to Village Streets with
Drains 9038 2711.4 2711.4 3615.2
Village Street Lights 587.25 176.175 176.175 234.9
Public Transport 55 16.5 16.5 22
Construction and upgradation
of GP building, Gymnasium 187 56.1 56.1 74.8
Works under MSEDCL 780.85 234.255 234.255 312.34
Skill Development training
Linked to Economic Activities 116.56 34.968 34.968 46.624
Agri-services and Processing 2463.48 739.044 739.044 985.392
Health 1473 441.9 441.9 589.2
Up gradation of primary,
secondary and higher secondary
schools
1117.9 335.37 335.37 447.16
Social Welfare 408 122.4 122.4 163.2
Non Conventional Energy 427 128.1 128.1 170.8
Digital Literacy 175 52.5 52.5 70
Citizen Service Centres 12.04 3.612 3.612 4.816
TOTAL ₹ 22,208.10 ₹ 6,662.43 ₹ 6,662.43 ₹ 8,883.24
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 87
Step 9 - Methods of Resource Mobilization
The resources for meeting the total investments estimated above is proposed to be mobilized
from various central government, central sector and state government and others such as 14th
finance commission grants and MPLAD funds.
Step 10 - Arriving at CGF Estimate
As per the Mission framework the CGF will be restricted to 30% of the Project capital expenditure
or Rs. 30 crores,whichever is less in plain areas. In desert, hilly and tribal areas the CGF will be
capped at 30% of the Project capital expenditure or Rs. 15 crores- whichever isless. The total
investment required as estimated in Step 7 above, the resources that can be obtained through
convergence and the balance CGF amount, capped as per the norms, have been detailed out as
given below:
Figure 32: Critical Gap Fund
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 88
Table 43: CGF Estimate for the Cluster
Project Component
Name of the
Scheme
Converged
Investment
Required
(Rs. In
Lakh)
[A]
Funding Available through the scheme (Rs. Lakhs)
Funding
Gap
[C=A-B] GoI Share State Govt.
Share
Benificiary
Share, if any
Total
Funding
Available
[B]
24x7 Piped Water Supply
Chief Minester
Payjal Yojana, Z
P Pune Scheme
3329.400 0.000 2949.400 0.000 2949.400 380.000
Sanitation SBM (Gramin) 140.120 94.120 43.000 0.000 137.120 3.000
Solid and Liquid Waste
Management
DPC/ZP Fund/
SBM (Gramin) 1897.500 514.000 703.500 0.000 1217.500 680.000
Access to Village Streets
with Drains
SR
Programme/
DPC/ ZP Fund
9038.000 2420.000 5482.000 65.000 7967.000 1071.000
Village Street Lights GP own Funds,
ZP Funds 587.250 5.000 557.250 0.000 562.250 25.000
Public Transport DPC/PMPML 55.000 0.000 55.000 0.000 55.000 0.000
Construction and
upgradation of GP building,
Gymnasium
GP own Funds,
ZP Funds 187.000 0.000 137.000 0.000 137.000 50.000
Works under MSEDCL DDUGVY, DPC 780.850 0.000 777.850 0.000 777.850 3.000
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 89
Skill Development training
Linked to Economic
Activities
DIC Scheme/ R-
seti 116.560 34.060 44.500 0.000 78.560 38.000
Agri-services and
Processing
Naitional
Horticulture
Mission/
Rashtiya Krushi
Vikas Yajana/
Jalyukta Shivar
Abhiyan
2463.480 554.060 620.420 869.000 2043.480 420.000
Health NRHM/ DPC/ZP
Fund 1473.000 714.200 722.660 12.140 1449.000 24.000
Up gradation of primary,
secondary and higher
secondary schools
SSC/DPC/ ZP
Fund 1117.900 144.500 756.200 3.700 904.400 213.500
Social Welfare GP own Funds,
ZP Funds 408.000 0.000 143.000 15.000 158.000 250.000
Non Conventional Energy MEDA, DPC 427.000 0.000 375.000 0.000 375.000 52.000
Digital Literacy Digital India,
DDU-GKY 175.000 15.000 50.000 0.000 65.000 110.000
Citizen Service Centres Sangram 2 12.040 0.000 12.040 0.000 12.040 0.000
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 90
Step 11 - Implementation Strategy
Respective State Government Agencies/Departments will implement the various components
identified based on the priority of the Department concerned.
Step 12 - O &M Strategy
The Operations and Maintenance Expenses of the project will be recovered through user charges
as per the user charges policy in the State with shortfall supported by the State budget. A
detailed strategy regarding the same will be submitted subsequently.
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 91
Step 13 - Gram Sabha Resolutions
Copies of Gram Sabha Resolutions have been obtained for villages and the same are annexed.
Loni Kalbhor Gram Sabha Resolution
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 92
Loni Kalbhor Gram Sabha Photographs
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 93
Kunjirwadi Gram Sabha Resolution
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 94
Sortapwadi Gram Sabha Resolution
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 95
Sortapwadi Gram Sabha Photograph
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 96
Tarade Gram Sabha Resolution
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 97
Tarade Gram Sabha Photographs
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 98
Valati Gram Sabha Resolution
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 99
Valati Gram Sabha Photograph
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 100
Shindavane Gram Sabha Resolution
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 101
Shindavane Gram Sabha Photograph
RURAL DEVELOPMENT DEPARTMENT, GOVERNMENT OF MAHARASHTRA 102
Step 14 - Revision of ICAP based on approved DPR costing
The cost which is calculated in the ICAP is a tentative cost, depending on various considerations.
The costs will be revised while preparing the DPR which will be based on actual estimates. Based
on the DPRs the ICAP will be revised taking into account any changes in the project cost.
Step 15 - Five Yearly Iteration of ICAP
This ICAP for Loni Kalbhor cluster will be a basic document which will act like a foundation stone in
assessing the gaps in the service delivery for the next five years for the cluster. There will be a need
to do relevant Iteration in the ICAP, after every five years based on the progress in the cluster and
the revised needs of the cluster. Hence, the Vision envisaged for the cluster will help to pave a path
for the type of development, which the cluster wants to adopt, even after the five years.
A spatial plan will also be prepared for the cluster in collaboration with the Town Planning and
Valuation Department and will be completed within the envisaged mission period.
Figure 33: Revision of ICAP based on approved DPR costing