NEB Lifecycle regulation · Planning Construction Operation and Maintenance Abandonment Application...

Date post: 10-Jul-2018
Category:
Upload: doanmien
View: 216 times
Download: 0 times
Share this document with a friend
1
Planning Construction Operation and Maintenance Abandonment Application to Construct & Operate Application for Leave to Open Application to Abandon NEB Public Hearing Decision/Recommendation NEB Public Hearing Decision NEB oversight throughout the lifecycle: Regulations – Conditions – Inspections – Audits – Enforcement. NEB requires companies to consult throughout the entire lifecycle, with those potentially affected. NEB Decision on Safe Operation NEB Lifecycle regulation
Transcript

Planning

Construction

Operation and Maintenance

Abandonment

Ap

plic

ati

on

to

Con

stru

ct

& O

pera

te

Ap

plic

atio

n fo

rLeave

to O

pen

Ap

plic

ati

on

to A

ban

don

NEB Public HearingDecision/Recommendation

NEB PublicHearing Decision

NEB oversight throughout the lifecycle: Regulations – Conditions – Inspections – Audits – Enforcement.NEB requires companies to consult throughout the entire lifecycle, with those potentially affected.

NEB Decision onSafe Operation

NEB Lifecycle regulation

Recommended