+ All Categories
Home > Documents > NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in...

NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in...

Date post: 08-Jul-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
44
Transcript
Page 1: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 2: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 3: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 4: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 5: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 6: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 7: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 8: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 9: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 10: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 11: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 12: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 13: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 14: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 15: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 16: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 17: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 18: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 19: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 20: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 21: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 22: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 23: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 24: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 25: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 26: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 27: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 28: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 29: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 30: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 31: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 32: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 33: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 34: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 35: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 36: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 37: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 38: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 39: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 40: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 41: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 42: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 43: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on
Page 44: NFTR SCAN2019-06-18 (19) · 2019-06-21 · deposited in shape prescribed above, and balance in shape of Bank Guarantee of any scheduled bank. 7. Those contractors not registered on

Recommended