nicmar pms itaipu.pptx

Date post: 02-Jun-2018
Category:
Upload: hrithikpandey
View: 234 times
Download: 0 times
Share this document with a friend

of 23

Transcript
  • 8/10/2019 nicmar pms itaipu.pptx

    1/23

    Presented byChandan G AG14114

    Vinoth AG14126

    Richard AG14127

    Vignesh.p AG14116

    ITAIPU DAM

  • 8/10/2019 nicmar pms itaipu.pptx

    2/23

    INTRODUCTION

    Itaipu dam is a hydroelectric damand largest hydroelectric powergenerator in the world.

    The construction started in theyear jan-1975 and completed andbegan generating electricity in

    may-1984.Total cost of the project is 13.5

    billion pounds (19.6billion dollars).

  • 8/10/2019 nicmar pms itaipu.pptx

    3/23

  • 8/10/2019 nicmar pms itaipu.pptx

    4/23

  • 8/10/2019 nicmar pms itaipu.pptx

    5/23

    location

    The dam is build across Paranariver located on the borderbetween Brazil and Paraguay.

  • 8/10/2019 nicmar pms itaipu.pptx

    6/23

    Need of the project

    Main reason behind was forgeneration of hydroelectricity.

    To solve a diplomatic impasseinvolving Brazil and Paraguay.

    For the economic growth of thecountries.

    To reduce emission of co2.

    Use of renewable source of energy.

  • 8/10/2019 nicmar pms itaipu.pptx

    7/23

    Contract details

    Client: itaipu Binacional.

    Contractors: ELC Electro consult

    (Italy), IECO (us).

    The key consultant engineer for theproject was an Italian engineer

    named Piero Sembenalli.

  • 8/10/2019 nicmar pms itaipu.pptx

    8/23

    Technical details

    Dam and spillway

    Height: 196 m (643 ft.).

    Length: 7,919 m (25,981 ft.).

    Volume: 12.3 million m (430 millioncu ft).

    Spillway capacity: 62,200 m/s(2,196,572 cu Ft./s).

  • 8/10/2019 nicmar pms itaipu.pptx

    9/23

    Reservoir

    Capacity: 29,000 million m

    Catchment area: 1.35 million km.Surface area: 1,350 km .

    Reservoir length: 170 km

  • 8/10/2019 nicmar pms itaipu.pptx

    10/23

    Construction details

    Before construction the Paranriver was diverted and coffer damwas constructed to divert water.

    the dam is constituted by 4 sub dams

    a) earth dam B) rock dam

    C) Main dam D) wing dam

    Portland pozzolonic cement wereused and fe500 grade steel was usedfor construction.

    Refrigerants were used for reduction

  • 8/10/2019 nicmar pms itaipu.pptx

    11/23

    of heat of hydration.

    Foundation:

  • 8/10/2019 nicmar pms itaipu.pptx

    12/23

    1

    2

    3

    4

    5

  • 8/10/2019 nicmar pms itaipu.pptx

    13/23

  • 8/10/2019 nicmar pms itaipu.pptx

    14/23

  • 8/10/2019 nicmar pms itaipu.pptx

    15/23

    Power generation

    18 generating units were installedusing slip form technique.

    Francis turbine measuring 16m and

    weighing 800tons capacity ofgenerating 715mw of power.

    2 more were installed in 2006-07 for

    generating larger power.It was able to serve 75% of total

    power consumed by Paraguay and25% of brazil.

  • 8/10/2019 nicmar pms itaipu.pptx

    16/23

  • 8/10/2019 nicmar pms itaipu.pptx

    17/23

  • 8/10/2019 nicmar pms itaipu.pptx

    18/23

  • 8/10/2019 nicmar pms itaipu.pptx

    19/23

    http://localhost/var/www/apps/conversion/tmp/scratch_9/Capturing%20the%20Networked%20Society%20-%20Case%2039%20Itaipu%20Dam.mp4
  • 8/10/2019 nicmar pms itaipu.pptx

    20/23

    Risks and challenges during

    the project

    Negotiation of land acquisition.

    Diversion of river Paran.

    Recruitment of skilled workers.Project was delayed for few

    months to investigate the crumblingrock.

    140tons of concrete was needed forevery 20 minutes.

    Social and environmental impacts.

  • 8/10/2019 nicmar pms itaipu.pptx

    21/23

  • 8/10/2019 nicmar pms itaipu.pptx

    22/23

  • 8/10/2019 nicmar pms itaipu.pptx

    23/23