Non-road Electric Transportation Update Andra Rogers Sr. Project Manager Infrastructure Working Council December 13, 2011
Transcript
Page 1: Non-road Electric Transportation Update - EPRImydocs.epri.com/docs/publicmeetingmaterials/1112...• Ports: Dredge – Study completed on electric dredging at the Port of Long Beach.

Non-road Electric Transportation Update

Andra RogersSr. Project ManagerInfrastructure Working CouncilDecember 13, 2011

Page 2: Non-road Electric Transportation Update - EPRImydocs.epri.com/docs/publicmeetingmaterials/1112...• Ports: Dredge – Study completed on electric dredging at the Port of Long Beach.

2© 2011 Electric Power Research Institute, Inc. All rights reserved.

EPRI Non-road Electric Transportation Program

•Program at EPRI began in 1994– Industry Advisory Council– Airport Roundtable

•Goal: Market enhancement and expansion1. R&D/technology development2. Technology demonstrations3. Case studies, information tools and

technology transfer–Standards development through the IWC

Page 3: Non-road Electric Transportation Update - EPRImydocs.epri.com/docs/publicmeetingmaterials/1112...• Ports: Dredge – Study completed on electric dredging at the Port of Long Beach.

3© 2011 Electric Power Research Institute, Inc. All rights reserved.

EPRI Non-road Program Research Areas

• Ports– Cranes, dredges, shore power

• Airports– Ground support equipment

• Material Handling– Forklifts, utility vehicles

• Truck Stop Electrification• Other

– Mining vehicles, conveyers, rail locomotives, all-terrain vehicles used in agriculture and military, tractors, etc.

– More on www.epri.com/et

Page 4: Non-road Electric Transportation Update - EPRImydocs.epri.com/docs/publicmeetingmaterials/1112...• Ports: Dredge – Study completed on electric dredging at the Port of Long Beach.

4© 2011 Electric Power Research Institute, Inc. All rights reserved.

2011 Status

• Ports: Dredge – Study completed on electric dredging at the Port of Long Beach.

• Rail – Two in depth studies conducted on the costs and benefits of electrified short haul rail, and electrified switch locomotives. Summary document from the switch locomotive report (January 2012).

• Mining – Completed study of electric equipment in three underground mines. Determined hurdles and opportunities to increase electrification.

• Fleets – Completed study on alternative fueled fleet vehicle options, and how EPAct influences current PEVs

Page 5: Non-road Electric Transportation Update - EPRImydocs.epri.com/docs/publicmeetingmaterials/1112...• Ports: Dredge – Study completed on electric dredging at the Port of Long Beach.

5© 2011 Electric Power Research Institute, Inc. All rights reserved.

2011 Status (cont.)

• Ag/Military – Two Utility Terrain Vehicle demonstrations, with data collection for energy use

• Launched Non-road Market and Environmental Assessment Model and Demonstration Project

• Held annual meeting in Portland, OR.

Page 6: Non-road Electric Transportation Update - EPRImydocs.epri.com/docs/publicmeetingmaterials/1112...• Ports: Dredge – Study completed on electric dredging at the Port of Long Beach.

6© 2011 Electric Power Research Institute, Inc. All rights reserved.

What’s planned for 2012

• Ports – Analysis of RTGs in Savannah, GA. They are installing 2-4 bus bar type electric rubber tired gantry cranes.

• Ports – EPRI PHEV Yard Tractor dyno comparison in process and to be completed. Possible optimization of that tractor in 2012.

• Airport – Development of additional prototype cargo tractor, and demonstration. Project is being developed now, scope is open to multiple airports.

• Airport – Electrification plan from FAA ACRP 02-16: Airport Ground Support Equipment (GSE) Inventory and Emission Reduction Strategies results

Page 7: Non-road Electric Transportation Update - EPRImydocs.epri.com/docs/publicmeetingmaterials/1112...• Ports: Dredge – Study completed on electric dredging at the Port of Long Beach.

7© 2011 Electric Power Research Institute, Inc. All rights reserved.

What’s planned for 2012 (con’t)

• Mining – Development of two types of chargers.– Fast charger with a single port charger intended for a 128-volt

battery.– High frequency dual port charger for the equipment that uses

two 64-volt batteries.• Rail Electrification (Passenger rail, switch locomotives,

high speed rail, analytical tools)• Non-road Video – 5-6 minute summary showcasing

Non-road ET. Will develop multiple industry videos for EPRI web from clips not used in summary.

• Mobile forklift calculator (on iTunes)

Page 8: Non-road Electric Transportation Update - EPRImydocs.epri.com/docs/publicmeetingmaterials/1112...• Ports: Dredge – Study completed on electric dredging at the Port of Long Beach.

8© 2011 Electric Power Research Institute, Inc. All rights reserved.

2012 supplemental project

• Non-road Electric Transportation Market and Environmental Assessment Model and Demonstration

– Develop model (collaborative)

– Prepare energy efficiency and demand response white paper

– Demonstrate model in a region

SPN Product #1023305

Page 9: Non-road Electric Transportation Update - EPRImydocs.epri.com/docs/publicmeetingmaterials/1112...• Ports: Dredge – Study completed on electric dredging at the Port of Long Beach.

9© 2011 Electric Power Research Institute, Inc. All rights reserved.

Building off the EPRI Non-road Program

• 2010 technology assessment (operational analysis)– Material handling– Marine/port equipment– Airport ground support– Locomotives– Mining– Agricultural equipment– Other, including:

• Sweepers/scrubbers• APUs• Turf trucks• TSE• Personnel Carriers

Photo Credit: Toyota Industrial Equipment

Page 10: Non-road Electric Transportation Update - EPRImydocs.epri.com/docs/publicmeetingmaterials/1112...• Ports: Dredge – Study completed on electric dredging at the Port of Long Beach.

10© 2011 Electric Power Research Institute, Inc. All rights reserved.

Non-road Electric Transportation Market and Environmental Assessment Model & Demo

1. Develop model (collaborative)Framework enables a utility to estimate the potential

environmental and economic impacts of a non-road electric transportation program

Inputs:

• Number of pieces of each technology to be analyzed

• Weighting percentages to criteria

• Financial information

• kW/kWh rates

• Program administration costs

Page 11: Non-road Electric Transportation Update - EPRImydocs.epri.com/docs/publicmeetingmaterials/1112...• Ports: Dredge – Study completed on electric dredging at the Port of Long Beach.

11© 2011 Electric Power Research Institute, Inc. All rights reserved.

Non-road ET Mkt. & Enviro Model & Demo (con’t)

1. Model output will assess estimated: – Load impact per technology (kW)– Total program impacts (kW)– Cost-effectiveness of program implementation– Technology potential ranking– Expected program revenue– Environmental impact

Page 12: Non-road Electric Transportation Update - EPRImydocs.epri.com/docs/publicmeetingmaterials/1112...• Ports: Dredge – Study completed on electric dredging at the Port of Long Beach.

12© 2011 Electric Power Research Institute, Inc. All rights reserved.

2. Energy efficiency and demand response analysis– Despite increased electricity use, decreased emissions,

oil use and other societal benefits should be counted– This study will quantify these potential benefits and

demonstrate how they translate into environmental and economic gains for the utility and region (and meet energy efficiency and demand response goals)

– White paper can be shared with utility management and regulators

Non-road ET Mkt. & Enviro Model & Demo (con’t)

Page 13: Non-road Electric Transportation Update - EPRImydocs.epri.com/docs/publicmeetingmaterials/1112...• Ports: Dredge – Study completed on electric dredging at the Port of Long Beach.

13© 2011 Electric Power Research Institute, Inc. All rights reserved.

3. Demonstrate the model with regional informationSub-task 3A: Market Analysis

– Utility, with support from EPRI, chooses six non-road electric technologies to assess in its region

– EPRI conducts a market potential and impact report for each selected technology

Sub-task 3B: Cost Benefit Analysis– Analyze the structure, financial performance, risks, and

other characteristics of various business models designed to support the growth of non-road electric technologies.

Non-road ET Mkt. & Enviro Model & Demo (con’t)

Page 14: Non-road Electric Transportation Update - EPRImydocs.epri.com/docs/publicmeetingmaterials/1112...• Ports: Dredge – Study completed on electric dredging at the Port of Long Beach.

14© 2011 Electric Power Research Institute, Inc. All rights reserved.

3. Demonstrate the model with regional informationSub-task 3C: Implementation Plan

– EPRI develops four scenarios of most efficient path for the utility to meet its goal

– Additional scenario development can be added– Utility or a third-party implements the plan

Non-road ET Mkt. & Enviro Model & Demo (con’t)

Page 15: Non-road Electric Transportation Update - EPRImydocs.epri.com/docs/publicmeetingmaterials/1112...• Ports: Dredge – Study completed on electric dredging at the Port of Long Beach.

15© 2011 Electric Power Research Institute, Inc. All rights reserved.

What’s next: Join the supplemental

• Join the program as a Demonstrator– Receive the model developed as part of Task 1– Choose 6 technologies to research for your region– EPRI conducts custom market assessment and cost

benefit analysis – EPRI develops plan– Receive the white paper

• Join the program as a Collaborator– Receive model developed as part of Task 1– DIY: run the model with your custom data– Receive the white paper

Page 16: Non-road Electric Transportation Update - EPRImydocs.epri.com/docs/publicmeetingmaterials/1112...• Ports: Dredge – Study completed on electric dredging at the Port of Long Beach.

16© 2011 Electric Power Research Institute, Inc. All rights reserved.

Contact Information

Andra RogersSr. Project Manager, Non-road Electric Transportation

Electric Power Research Institute, Inc. (EPRI)3420 Hillview Avenue | Palo Alto, CA 94304Tel: 650.855.2101 | Fax: 650.855.2258Cell: 650.387.6642 | Email: [email protected]

Together...Shaping the Future of ElectricityPublic information: http://www.epri.com/et

Page 17: Non-road Electric Transportation Update - EPRImydocs.epri.com/docs/publicmeetingmaterials/1112...• Ports: Dredge – Study completed on electric dredging at the Port of Long Beach.

17© 2011 Electric Power Research Institute, Inc. All rights reserved.

Together…Shaping the Future of Electricity

Page 18: Non-road Electric Transportation Update - EPRImydocs.epri.com/docs/publicmeetingmaterials/1112...• Ports: Dredge – Study completed on electric dredging at the Port of Long Beach.

18© 2011 Electric Power Research Institute, Inc. All rights reserved.

Extra Slides

Page 19: Non-road Electric Transportation Update - EPRImydocs.epri.com/docs/publicmeetingmaterials/1112...• Ports: Dredge – Study completed on electric dredging at the Port of Long Beach.

19© 2011 Electric Power Research Institute, Inc. All rights reserved.

Port Electrification Benefits

Photos courtesy of Mike Watts, Cochran Electric, and EPRI

New project: Electric Rubber Tired Gantry Cranes

• APM Terminals to convert 400 RTGs to electric operation over the next two to three years

• Estimate of 3-5 years ROI

• Bus bar envisioned

• Savannah converting 2-4 RTGs

– Confirmed Bus Bar

– EPRI project for 2011


Recommended