+ All Categories
Home > Documents > Biomass Torrefaction Workshop -...

Biomass Torrefaction Workshop -...

Date post: 19-Mar-2018
Category:
Upload: dotruc
View: 222 times
Download: 3 times
Share this document with a friend
27
Biomass Torrefaction Workshop Biomass Upgrading Basics Luis M. Cerezo Technical Executive Renewable Energies Pensacola, Fl April 13, 2011
Transcript

Biomass Torrefaction Workshop

Biomass Upgrading Basics

Luis M. CerezoTechnical Executive Renewable Energies

Pensacola, FlApril 13, 2011

2© 2011 Electric Power Research Institute, Inc. All rights reserved.

Biomass……… a diverse energy source

3© 2011 Electric Power Research Institute, Inc. All rights reserved.

US BIOMASS FEED STOCKS ARE ABUNDANT

BIOMASS CONSUPTIUM FOR ELECTRICITY PRODUCTION MAY DOUBLE EVERY 10 YEARS UP TO 2030

4© 2011 Electric Power Research Institute, Inc. All rights reserved.

US AVAILABILITY OF SUSTAINABLE BIOMASSNREL/TP-560-39181 Dec 2005

SUSTAINABLE BIOMASS MAY SUBSTITUTE > 10% COAL GENERATION IN THE US BY 2030

PROVIDING > 500 BILLION kWh/YEAR

5© 2011 Electric Power Research Institute, Inc. All rights reserved.

BIOMASS FOREST AND CROP DISTRIBUTION

ABOUT 350 MILLION DRY TONS/YEAR >450 MILLION DRY TONS/YEAR

6© 2011 Electric Power Research Institute, Inc. All rights reserved.

BIOMASS…… IS A DIFFICULT ENERGY SOURCE

• PRODUCTION

• HARVESTING/COLLECTION

• HANDLING

• TRANSPORT

• STORAGE

• PRE-TREATMENT (MILLING..)

• FEEDING

• CONVERSION

7© 2011 Electric Power Research Institute, Inc. All rights reserved.

BIOMASS CO-FIRING CONCEPTS

8© 2011 Electric Power Research Institute, Inc. All rights reserved.

DRIVERS FOR BIOMASS CO-FIRING

• Reduce CO2/SOx Emissions• Federal/States Targets for RPS• Co-firing Biomass is the Lowest

Capital and O&M cost option• Shortest term , Lowest risk option• Advantage of high efficiency of large

coal plants (coal 38%, dedicated biomass 25%)

• Reduction of NOx and SOx emissions• Co-firing diversifies Plant fuel Portfolio• Jobs creation

9© 2011 Electric Power Research Institute, Inc. All rights reserved.

CO-FIRING BOILER MODIFICATIONS FACTORS TO CONSIDER

• BIOMASS FUEL CHARACTERISTICS(PARTICLE SIZE, ASH MELTING AND SOFTENING TENDENCY, CHLORINE CONTENT, CALORIFIC VALUE, REQUIRED RESIDENCE TIME IN THE FURNACE..)

• EFFECT OF SLAGGING, FOULING, LIFE-TIME

• EFFECT ON H/T SURFACES OF DEPOSIT FORMATION

• IMPACT ON EMISSIONS AND EFFICIENCY

• BOILER OUT-PUT POTENTIAL REDUCTION

• LIMITATIONS ON BIOMASS % FROM MILLING AND AIR/FUEL FEED CAPACITY

• OVER-ALL TECH PERFORMANCE• SITE SPECIFIC ENG AND DESIGN

10© 2011 Electric Power Research Institute, Inc. All rights reserved.

EFFECTIVENESS EVALUATION OF MEASURES IN MITIGATING BIOMASS CO-FIRING PROBLEMS (EUR 22461 EN)

11© 2011 Electric Power Research Institute, Inc. All rights reserved.

Biomass Pre-Treatment to reduce co-firing constraints“BIO-COAL”

• Coal is conventional

• Turn Biomass into Bio-coal– High Energy density

• >3x biomass/1,5-2x wood pellets

– Water resistant• No swelling or des-integration

– No/less bio-degradation– Excellent Grindability

• Similar to coal

– Good Combustion and Gasification properties

– >>15% Biomass Heat InputCo-firing FEASIBLE

CHALLENGE…GET A HIGH ENERGY EFFICIENCY AND AFFORDABLE COST FOR BIO-COAL

12© 2011 Electric Power Research Institute, Inc. All rights reserved.

Pyrolysis/Gasification/Combustion Processes

13© 2011 Electric Power Research Institute, Inc. All rights reserved.

TORREFACTION ..General process Description (ECN.nl)

14© 2011 Electric Power Research Institute, Inc. All rights reserved.

Biomass Quality Improvement through Torrefaction+ Pelletization(ToP) =BIO-COAL (ECN)

Bio-Coal

15© 2011 Electric Power Research Institute, Inc. All rights reserved.

Good grindability and reactivity of ToP biomass(ECN tests)

16© 2011 Electric Power Research Institute, Inc. All rights reserved.

ToP PRE-TRATMENT RANGE OF APPLICATIONS

• CO-FIRING IN “PULVERIZED COAL”EXISTING BOILERS >> 25% HEAT INPUT

• BIOMASS STORAGE AND LONG DISTANCE TRANSPORT (IMPORTS)

• (CO-)FIRING IN EGF GASIFIERS FOR POWER (IGSCC) O FUELS

• SMALL SCALE PELLET BOILERS AND STOVES

FT

REACTOR

EFG-SIEMENS

17© 2011 Electric Power Research Institute, Inc. All rights reserved.

MARKET HIGH POTENTIAL STATES FOR ToP CO-FIRING

SCREENING CRITERIA• AVG. DELIVERED COAL PRICES

• HIGH COAL USE FOR GENERATION IN PC BOILERS.

• LOW-COST BIOMASS FEED STOCK

• HIGH RPS REQUIREMENTS

• CO2 CAP AND TRADE

• LAND FILL TIPPING FEES

Ontario (CANADA) has a very high potential too

18© 2011 Electric Power Research Institute, Inc. All rights reserved.

Some ToP COMPETING TECHNOLOGIES

• ECN (NL)…………………….MOVING BED REACTOR

• TOPELL (NL)………………..TORBED REACTOR

• AIRLESS SYS (UK)…………SUPERHEATED STEAM REACTOR

• STRAMPROY/BGP (NL)……CDS-AIRLESS Dryer REACTOR

• WYSSMONT (USA)…………DISK TURBO-DRYER REACTOR

19© 2011 Electric Power Research Institute, Inc. All rights reserved.

Keys to reduce ToP Total production costs

• OPTIMIZATION OF TORREFACTION CONDITIONS

(T, RESIDENCE TIME, NET PROCESS EFFICIENCY)

• OPTIMUM OUTPUT CAPACITY• USE BIOMASS FEEDSTOCK AS UTILITY

FUEL IF BELOW AUTOTHERMAL OPERATION

• FEEDSTOCK FLEXIBILITY• SPECIFIC GAS FROM DRYING

CLEANING TECHNOLOGIES• INTEGRATION OF TORREFACTION AND

PELLETIZING PROCESSES TO IMPROVE ENERGY BALANCE.

20© 2011 Electric Power Research Institute, Inc. All rights reserved.

EPRI’s ToP Development Activities 2009-2011

1- Issued TOP Technology Assessment Report #1018661 03/2009

2-Issued TI Aspen Plus Torrefaction Model #1020506 12/2009

3-Issued TI Small Scale Production Testing of TOP from woody and herbaceous feedstock #1020508 4/2010

4-Issued Test Burns of Torrefied wood # 1017602 6/2010

5- Front End Engineering and Design of Small Modular Movable ToP plants Report # 1022209 11/2010

6-On-going Biomass washing- leaching technology Bench Batch Testing Summary Report scheduled 5/2011

21© 2011 Electric Power Research Institute, Inc. All rights reserved.

Together…Shaping the Future of Electricity

22© 2011 Electric Power Research Institute, Inc. All rights reserved.

DIRECT CONTACT MOVING BED DRYER & TORREFACTION REACTOR (ECN- GEA..)

• Compact reactor

• Small Foot print

• High heat transfer rates

• Accurate T control

• Uniform product quality Feed Stock flexibility

• Low Capital Investment

23© 2011 Electric Power Research Institute, Inc. All rights reserved.

Wyssmont Turbo-Tray Convection Dryer for torrefaction

• UNIFORM /RAPID DRYING

• PRECISELY CONTROLLED TEMPERATURE

• LOW ENERGY/LABOR COSTS

• CONTINOUS FEED EASY TO ADJUST

• SELF CLEANING WIPING ACTION

• EASY STAR-UP ON DIFFERENT MATERIALS

• LOW MAINTENANCE COST

• HIGH RELIABILITY

• CAN USE ANY SUPLEMENTAL HEATING MEDIUM (STEAM , WASTE GAS, ELECTRICITY

• VERTICAL CONSTRUCTION (LOW FOOT PRINT)

• ACCURATE SCALE-UP

24© 2011 Electric Power Research Institute, Inc. All rights reserved.

THE SPIRAL FLASH CONVECTION REACTOR

(TORFTECH UK)-…GMF–GOUDA (NL)..GEA-NIRO…

• HIGH SCALABILITY OF THE PROCESS PLANT

• SMALL REACTOR SIZE PER GIVEN CAPACITY DUE TO BETTER HEAT TRANSFER WITHIN THE REACTOR

• GOOD CONTROLLABILITY OF THE REACTOR

• LOW MAINTENANCE DUE TO LACK OF MOVING PARTS

• HIGH THOROUGH AND HOMOGENOUS PROCESS THANKS TO FASTER KINETICS

• LOW PRESSURE RESULTING IN HIGHER ENERGY EFFICIENCY

• TOLERANCE OF WIDE RANGE OF FEED PARTICLE SIZE AND MOISTURE CONTENT

• RAPID START-UP/SHUTDOWN

• LOW SOLIDS HOLD-UP PROVIDES PROTECTION FROM FEED BLOCKAGES/ INTERRUPTIUMS.

25© 2011 Electric Power Research Institute, Inc. All rights reserved.

BGP ENG+STRAMPROY(NL) MILD PYROLYSIS TORREF-PROCESS FOR BIOMASS (Airless-SHS dryer)

26© 2011 Electric Power Research Institute, Inc. All rights reserved.

Airless Systems..SHSteam Dryer-Torrefaction

• Continuous feed Dryer and Torrefaction system. High throughput

• Smaller plant, capital and operating cost savings

• Superheated steam at atmospheric pressure

• Reduced drying times• Recapture and reuse heat and

fuel from in process biomass• Not need of a hot air exhaust

stack• Demin. Water, no noxious

emissions, reduced anti pollution costs

• Quick start-up time• High efficiency ratio (>85%)

27© 2011 Electric Power Research Institute, Inc. All rights reserved.

ToP

WP

EC FGW AW

Typical BIOMASS Mwth SUPPORTED vs. P-PLANT DISTANCE (miles)

FGW.Forest Green Wood AW. Agricultural Wastes EC. Energy Crops WP. Wood Pellets ToP. Torrefaction+Pelletizing