+ All Categories
Home > Documents > October 9 , 2014

October 9 , 2014

Date post: 03-Jan-2016
Category:
Upload: chantale-perry
View: 22 times
Download: 0 times
Share this document with a friend
Description:
Cowlitz Falls North Shore Collector Request for Qualifications pre-proposal meeting design review october 9, 2014. By Kirk Kessler, P.E. October 9 , 2014. Agenda. October 9, 2014. Tacoma Power’s Cowlitz Project Overview Cowlitz Falls North Shore Collector (CFNSC) Design Review - PowerPoint PPT Presentation
Popular Tags:
15
COWLITZ FALLS NORTH SHORE COLLECTOR REQUEST FOR QUALIFICATIONS PRE-PROPOSAL MEETING DESIGN REVIEW OCTOBER 9, 2014 Slide 1 October 9, 2014 BY KIRK KESSLER, P.E.
Transcript
Page 1: October 9 ,  2014

COWLITZ FALLS NORTH SHORE COLLECTORREQUEST FOR QUALIFICATIONS

PRE-PROPOSAL MEETING DESIGN REVIEW

OCTOBER 9, 2014

Slide 1 October 9, 2014

BY KIRK KESSLER, P.E.

Page 2: October 9 ,  2014

AGENDA

Tacoma Power’s Cowlitz Project Overview

Cowlitz Falls North Shore Collector (CFNSC) Design Review

Construction Schedule

In-Water Work & Reservoir Operation Constraints

Slide 2 October 9, 2014

Page 3: October 9 ,  2014

COWLITZ PROJECT OVERVIEW

Cowlitz River

Slide 3 October 9, 2014

Cowlitz River Basin

Page 4: October 9 ,  2014

LAKE SCANEWA

Slide 4 October 9, 2014

Cispus River

Cowlitz Falls Dam

Cowlitz River

Page 5: October 9 ,  2014

COWLITZ FALLS NORTH SHORE COLLECTOR

October 9, 2014 Slide 5

Upstream Face of Dam

Pumpback Discharge Structure

Primary & Secondary Screens

Existing CFFFFlume

Bypass Channel

Entrance thru DamTailrace Diffuser

500cfs Pumps (Expandable to 750cfs)

Pumpback Pipe

Page 6: October 9 ,  2014

COWLITZ FALLS NORTH SHORE COLLECTOR

October 9, 2014 Slide 6

Pumpback Discharge Structure

Collector Location

Page 7: October 9 ,  2014

COWLITZ FALLS NORTH SHORE COLLECTOR

October 9, 2014 Slide 7

Page 8: October 9 ,  2014

COWLITZ FALLS NORTH SHORE COLLECTOR

October 9, 2014 Slide 8

Page 9: October 9 ,  2014

COWLITZ FALLS NORTH SHORE COLLECTOR

October 9, 2014 Slide 9

Page 10: October 9 ,  2014

COWLITZ FALLS NORTH SHORE COLLECTOR

October 9, 2014 Slide 10

Page 11: October 9 ,  2014

COWLITZ FALLS NORTH SHORE COLLECTOR

Collector Entrance

October 9, 2014 Slide 11

Page 12: October 9 ,  2014

CONSTRUCTION SCHEDULE

Advertise for Bid …………….........................….….....December 2014

Open Bids……………………….…………………….…..February 2015

Commence Construction……………….…………..…..March 2015

Complete Construction ……………………....….….December 2016

October 9, 2014 Slide 12

Page 13: October 9 ,  2014

IN-WATER WORK & RESERVOIR OPERATION CONSTRAINTS

Typical Reservoir Ops:• Held between elev. 860 – 862 (unless under flood

condition)

Construction Constraints:• Work conducted below OHWM (elev. 862) must be

conducted during two approved work windows• September 1st thru December 31st 2015

• September 1st thru December 31st 2016

• Reservoir drawdowns (below elev. 860) must be conducted during work windows

• Rules regarding the scheduling, duration, and penalties for reservoir adjustments will be detailed in the general bid specification

October 9, 2014 Slide 13

Page 14: October 9 ,  2014

QUESTIONS?

October 9, 2014 Slide 14

Page 15: October 9 ,  2014

COWLITZ FALLS NORTH SHORE COLLECTOR

October 9, 2014 Slide 15


Recommended