OSR Project List November 2011

Date post: 18-Mar-2016
Category:
Upload: junewarren-nickles-energy-group
View: 220 times
Download: 2 times
Share this document with a friend
Description:
Sourced from company releases, the Energy Resources Conservation Board and the Daily Oil Bulletin, with files from Strategy West. For changes and updates, please contact Deborah Jaremko at [email protected]. Disclaimer: Oilsands Review accepts no liability for errors or inaccuracies in the information provided in this report.
Popular Tags:
5
836482 Industrial Training Consultants Inc 1/4h · tqc project status section or right before on right hand page www.itctrng.com · 205-663-4960 © 2011 CH2M HILL EC080811112054GVO_V2 Who says oil and water don’t mix? Global talent with local presence ch2mhill.com\oilsands Most people know CH2M HILL as a global leader in water, waste water, and environmental solutions. What you might not know is that we’ve been serving energy clients for over 40 years, delivering complex oil & gas processing facilities in some of the world’s harshest environments. No other company can bring this powerful combination of experience to your oil sands project. Project Management and Consulting Engineering and Procurement Construction and Construction Management Operations and Maintenance Services Process Facilities and Systems Environmental Services Water and Wastewater Transportation and Infrastructure Development CURRENT PROJECT CAPACITY START-UP REGULATORY STATUS NORTH ATHABASCA REGION — MINING Canadian Natural Resources Limited Horizon Updated: Sep 2011 Canadian Natural is reporting that synthetic crude oil shipments from Horizon resumed at the end of August post-fire repairs. Saipem has been awarded the EPC contract for a secondary upgrader with production capacity of 42,599 bpd of hydrotreated gas oil as part of the Hydrotreater Phase 2. Phase 1 135,000 2008 Operating Phase 2A 10,000 2014 Approved Phase 2B 45,000 TBD Approved Phase 3 80,000 TBD Approved Tranche 1 (engineering/design) -- 2007 Complete Tranche 2 5,000 2012 Construction Imperial Oil Limited Kearl Updated: Sep 2011 Imperial Oil has contracted Babcock & Wilcox to supply four modularized boilers for Kearl, which will produce utility steam that will be used to support various processes in the plant. Phase 1 110,000 2012 Construction Phase 2 235,000 TBD Approved Shell Albian Sands Jackpine Updated: Sep 2011 The Canadian Environmental Assessment Agency and ERCB have agreed to the final terms of refer- ence for the Jackpine mine expansion. The environmental impact assessment for both the Jackpine expansion and Pierre River mines is deemed complete and has been referred to a joint review panel. Expansion 100,000 2017 Application Phase 1A 100,000 2010 Operating Phase 1B 100,000 TBD Approved Muskeg River Updated: Nov 2010 Commercial 155,000 2002 Operating Expansion & Debottlenecking 115,000 TBD Approved CURRENT PROJECT CAPACITY START-UP REGULATORY STATUS Pierre River Updated: Sep 2011 Phase 1 100,000 2018 Application Phase 2 100,000 TBD Application SilverBirch Energy Corporation Frontier Updated: Aug 2011 Silverbirch has completed its design basis memorandum and cost estimate for the Frontier/Equinox project. All four phases cost cost up to $22.9 billion. The company remains open to partnering and other options to progress its projects to commercialization. Regulatory application to be filed before the end of 2011. Phase 1 80,000 2020 Announced Phase 2 80,000 TBD Announced Phase 3 80,000 TBD Announced Phase 4 Equinox 40,000 TBD Announced Suncor Energy Inc. Base Operations Updated: Aug 2011 Suncor says that with major maintenance now behind it at its oilsands facilities, it is looking forward to a strong second half of the year. Millennium Debottlenecking 23,000 2008 Operating Millennium Mine 294,000 1967 Operating North Steepbank Extension 180,000 2012 Construction Steepbank Debottleneck Phase 3 4,000 2007 Operating Fort Hills Updated: May 2011 Suncor expects to progress with engineering and site preparation work at the Fort Hills mine, target- ing a 2016 start-up. Project still must be sanctioned, and does not include upgrader portion. Debottleneck 25,000 TBD Approved Phase 1 165,000 2016 Approved Voyageur South Updated: Nov 2010 Phase 1 120,000 TBD Application For even more details on all of these projects, visit www.oilsandsreview.com. NORTH ATHABASCA REGION SOUTH ATHABASCA REGION COLD LAKE REGION SASKATCHEWAN REGION INDUSTRIAL HEARTLAND REGION NEW EXPORT PIPELINES PEACE RIVER REGION NEW INFORMATION THIS MONTH NOVEMBER 2011 | OILSANDSREVIEW.COM 37 PROJECT STATUS PROJECT STATUS 11. 11 Peace River Region Athabasca Region Northwestern Saskatchewan Industrial Heartland Region Cold Lake Region Sourced from company releases, the Energy Resources Conservation Board, and the Daily Oil Bulletin, with files from Strategy West. For changes and updates, please contact Deborah Jaremko at [email protected]. Disclaimer: Oilsands Review accepts no liability for errors or inaccuracies in the information provided in this report.
Transcript
Page 1: OSR Project List November 2011

436168CH2M Hill Canada Ltd

full page · fp

836482Industrial Training Consultants Inc

1/4h · tqcproject status section or right before on right

hand pagewww.itctrng.com · 205-663-4960

© 2011 CH2M HILL EC080811112054GVO_V2

Who says oil and water don’t mix?

Global talent with local presence

ch2mhill.com\oilsands

Most people know CH2M HILL as a global leader in water,

waste water, and environmental solutions. What you

might not know is that we’ve been serving energy clients

for over 40 years, delivering complex oil & gas processing

facilities in some of the world’s harshest environments.

No other company can bring this powerful combination

of experience to your oil sands project.

• Project Management and Consulting

• Engineering and Procurement

• Construction and Construction Management

• Operations and Maintenance Services

• Process Facilities and Systems

• Environmental Services

• Water and Wastewater

• Transportation and Infrastructure Development

CURRENT PROJECT CAPACITY START-UP REGULATORY STATUS

NORTH ATHABASCA REGION — MINING

Canadian Natural Resources Limited

• Horizon Updated: Sep 2011

Canadian Natural is reporting that synthetic crude oil shipments from Horizon resumed at the end of August post-fire repairs. Saipem has been awarded the EPC contract for a secondary upgrader with production capacity of 42,599 bpd of hydrotreated gas oil as part of the Hydrotreater Phase 2.

Phase 1 135,000 2008 Operating

Phase 2A 10,000 2014 Approved

Phase 2B 45,000 TBD Approved

Phase 3 80,000 TBD Approved

Tranche 1 (engineering/design) -- 2007 Complete

Tranche 2 5,000 2012 Construction

Imperial Oil Limited

• Kearl Updated: Sep 2011

Imperial Oil has contracted Babcock & Wilcox to supply four modularized boilers for Kearl, which will produce utility steam that will be used to support various processes in the plant.

Phase 1 110,000 2012 Construction

Phase 2 235,000 TBD Approved

Shell Albian Sands

• Jackpine Updated: Sep 2011

The Canadian Environmental Assessment Agency and ERCB have agreed to the final terms of refer-ence for the Jackpine mine expansion. The environmental impact assessment for both the Jackpine expansion and Pierre River mines is deemed complete and has been referred to a joint review panel.

Expansion 100,000 2017 Application

Phase 1A 100,000 2010 Operating

Phase 1B 100,000 TBD Approved

Muskeg River Updated: Nov 2010

Commercial 155,000 2002 Operating

Expansion & Debottlenecking 115,000 TBD Approved

CURRENT PROJECT CAPACITY START-UP REGULATORY STATUS

• Pierre River Updated: Sep 2011

Phase 1 100,000 2018 Application

Phase 2 100,000 TBD Application

SilverBirch Energy Corporation

Frontier Updated: Aug 2011

Silverbirch has completed its design basis memorandum and cost estimate for the Frontier/Equinox project. All four phases cost cost up to $22.9 billion. The company remains open to partnering and other options to progress its projects to commercialization. Regulatory application to be filed before the end of 2011.

Phase 1 80,000 2020 Announced

Phase 2 80,000 TBD Announced

Phase 3 80,000 TBD Announced

Phase 4 Equinox 40,000 TBD Announced

Suncor Energy Inc.

Base Operations Updated: Aug 2011

Suncor says that with major maintenance now behind it at its oilsands facilities, it is looking forward to a strong second half of the year.

Millennium Debottlenecking 23,000 2008 Operating

Millennium Mine 294,000 1967 Operating

North Steepbank Extension 180,000 2012 Construction

Steepbank Debottleneck Phase 3 4,000 2007 Operating

Fort Hills Updated: May 2011

Suncor expects to progress with engineering and site preparation work at the Fort Hills mine, target-ing a 2016 start-up. Project still must be sanctioned, and does not include upgrader portion.

Debottleneck 25,000 TBD Approved

Phase 1 165,000 2016 Approved

Voyageur South Updated: Nov 2010

Phase 1 120,000 TBD Application

For even more details on all of these projects, visit www.oilsandsreview.com.

NORTH ATHABASCA REGION

SOUTH ATHABASCA REGION

COLD LAKE REGION

SASKATCHEWAN REGION

INDUSTRIAL HEARTLAND REGION

NEW ExPORT PIPELINES

PEACE RIVER REGION NEW INFORMATION THIS MONTH•

NOVEMBER 2011 | OILSANDSREVIEW.COM 37

P R O J E C T S TAT U S

PROJECT STATUS11.11Peace River Region

Athabasca Region

Northwestern Saskatchewan

Industrial Heartland Region

Cold Lake Region

Sourced from company releases, the Energy Resources Conservation Board, and the Daily Oil Bulletin, with files from Strategy West. For changes and updates, please contact Deborah Jaremko at [email protected]. Disclaimer: Oilsands Review accepts no liability for errors or inaccuracies in the information provided in this report.

Page 2: OSR Project List November 2011

522876PROJEX1/4h · tqc

THIRD page of Project Status

Project: Oil Sands Review AdIssue date: ______________

Image size: 7.0625” x 2.25”Bleed: none

Proof 3

Canada’s best for SAGD well pads and pipelines

Learn more at projex.ca

OSR ad QtrPg ex words v3.indd 2 24-05-11 8:19 AM

CURRENT PROJECT CAPACITY START-UP REGULATORY STATUS

SOUTH ATHABASCA REGION — IN SITU

Alberta Oilsands Inc.

Clearwater West Updated: Aug 2011

Alberta Oilsands reports that Alberta Sustainable Resource Development has cancelled a company lease application that would have been used as a construction staging site for Clearwater Phase 1. AOS has identified another potential site. Alberta SRD cancelled a number of lease applications in the Fort McMurray area in order to facilitate commercial development.

Phase 2 25,000 2016 Announced

Pilot 4,500 2012 Application

Athabasca Oil Sands Corp.

Hangingstone Updated: Aug 2011

With the first phase application filed in March 2011, AOSC will now continue engineering and begin the procurement process for long-lead equipment. Regulatory approval anticipated in 2012, at which point construction will begin. As of late July, AOSC says this is progressing as planned.

Phase 1 12,000 2013 Application

Phase 2 25,000 2016 Announced

Phase 3 25,000 2019 Announced

Hangingstone Pilot Updated: Aug 2011

Experimental Combustion Pilot 1,000 TBD Application

BlackPearl Resources Inc.

Blackrod Updated: Aug 2011

BlackPearl says that steam injection began in May, and is now in the two- to four-month warm-up phase. After that, the well pair will be converted to SAGD. The company also continues to work on the regulatory application for its commercial project, which will be filed in the first half of 2012.

Commercial 40,000 TBD Announced

Pilot 500 2011 Operating

Canadian Natural Resources Limited

• Gregoire Lake Updated: Sep 2011

Phase 1 60,000 2024 Announced

• Grouse Updated: Sep 2011

Regulatory application is targeted for Q1/2012.

Commercial 40,000 2017 Announced

• Kirby (North) Updated: Sep 2011

Canadian Natural is targeting a regulatory application for Phase 1 in Q4.

Phase 1 40,000 2016 Application

Phase 2 40,000 2019 Announced

• Kirby (South) Updated: Sep 2011

Plant construction is 11 per cent complete, detailed engineering is 53 per cent complete, and the overall project is 19 per cent complete. Canadian Natural reports it is tracking well to plan and within its capital expenditure forecast.

Phase 1 45,000 2013 Construction

Phase 2 15,000 2020 Announced

Leismer Updated: Dec 2010

Commercial 30,000 2020 Announced

CURRENT PROJECT CAPACITY START-UP REGULATORY STATUS

Sunshine Oilsands Ltd.

Harper Updated: May 2011

Sunshine Oilsands has raised $230 million and secured significant investments including from China Life Overseas and Bank of China Group. At Harper, it reports it has successfully conducted a single-well CSS test. Results from the test were presented to the ERCB, which subsequently encour-aged the company to continue investigation of the formation through extension of its pilot permit.

Carbonate Pilot 1,000 2011 Operating

Legend Lake Updated: May 2011

The 2010/2011 winter program included additional caprock tests at Thickwood and Legend Lake, showing the suitability of the overlying shale for SAGD. 76 exploration and delineation wells drilled at the two areas.

Phase 1 10,000 2013 Announced

Phase 2 10,000 TBD Announced

Phase 2 Expansion 10,000 TBD Announced

Phase 3 20,000 TBD Announced

Phase 3 Expansion 10,000 TBD Announced

Thickwood Updated: Dec 2010

Phase 1 10,000 2014 Announced

Phase 2 20,000 2017 Announced

Phase 2 Expansion 20,000 2020 Announced

West Ells Updated: May 2011

Sunshine says that ongoing formal dialogue with regulators indicates that its regulatory application is technically sound and that environmental and stakeholder concerns have been addressed. Ap-proval timing for final permit depends on resolution of gas over bitumen hearing. FEED has begun.

Phase 1 5,000 2012 Application

Phase 2 5,000 2013 Application

Phase 3 40,000 2018 Announced

Phase 4 40,000 2024 Announced

Total E&P Canada Ltd.

Joslyn Updated: Dec 2010

Phase 2 10,000 2006 Suspended

Value Creation Inc.

Terre de Grace Updated: Dec 2010

Phase 1 40,000 TBD Announced

Phase 2 40,000 TBD Announced

Pilot 10,000 TBD Approved

CURRENT PROJECT CAPACITY START-UP REGULATORY STATUS

Syncrude Canada Ltd.

Mildred Lake/Aurora North & South Updated: Aug 2011

Production volumes were impacted during the second quarter due to unplanned maintenance at the vacuum distallation unit and the LC finer.

Aurora South Train 1 100,000 2016 Approved

Aurora South Train 2 100,000 2018 Approved

Base Mine Stage 1 & 2 Expansion 290,700 1978 Operating

Stage 3 Expansion 116,300 2006 Operating

Total E&P Canada Ltd.

Joslyn North Mine Updated: Aug 2011

Phase 1 100,000 2018 Approved

Joslyn South Mine Updated: Dec 2010

Phase 1 100,000 TBD Announced

Northern Lights Mine Updated: Nov 2010

Phase 1 57,250 TBD On Hold

Phase 2 57,250 TBD On Hold

NORTH ATHABASCA REGION — IN SITU

Athabasca Oil Sands Corp.

Dover West Clastics Updated: Aug 2011

AOSC reports that it is on track to submit regulatory applications for its Dover West projects before year-end 2011.

Phase 1 12,000 2015 Announced

Phase 2 35,000 2018 Announced

Phase 3 35,000 2021 Announced

Dover West Leduc Carbonates Updated: Aug 2011

AOSC says that its first test (steam injection) last winter has added 140 million barrels of contin-gent resource to its profile. Construction of a thermal assisted gravity drainage (TAGD) heating test pilot is complete. Heating—using electrical cables—is underway and observation wells indicate that the heat is spreading, confirming predictions. Production results are expected once the area can be accessed on winter roads.

Phase 1 Demonstration 12,000 2014 Announced

Canadian Natural Resources Limited

• Birch Mountain Updated: Sep 2011

Phase 1 60,000 2022 Announced

Phase 2 60,000 2026 Announced

Cenovus Energy Inc.

Telephone Lake Borealis Updated: Jun 2011

Cenovus will be revising its initial 35,000 bpd application and plans to file an updated application for an 80,000 bpd project in the fourth quarter of 2011. It has reported that it may seek transactions related to this asset area.

Phase A 35,000 TBD Application

Phase B 15,000 TBD Announced

Dover Operating Corp.

Dover Updated: May 2011

AOSC filed its regulatory application for a 250,000-barrel-per-day project at Dover in December 2010. Approval anticipated in 2012.

Phase 1 50,000 2015 Application

Subsequent Phases 200,000 TBD Application

Mackay River Updated: Jun 2011

AOSC anticipates commercial approval for full gross 150,000-barrel-per-day project in 2011. Detailed engineering underway.

Phase 1 35,000 2014 Application

Phase 2 40,000 2017 Application

Phase 3 40,000 2019 Application

Phase 4 35,000 TBD Application

E-T Energy Ltd.

Poplar Creek Updated: May 2011

E-T has announced a deal (undisclosed value) with Total E&P Canada for ongoing testing, as well as $6.86 million in funding from the Climate Change and Emissions Management Corporation. E-T anticipates regulatory approval for commerical project in 2011.

Phase 1 10,000 2014 Application

Pilot 1,000 2007 Operating

CURRENT PROJECT CAPACITY START-UP REGULATORY STATUS

Husky Energy Inc.

Sunrise Updated: Aug 2011

Husky says that the Sunrise project continues to achieve its milestones, with the first 12 of 49 SAGD well pairs recently completed on schedule. The full drilling program is forecast to be complete in the third quarter of 2012. A full field development plan including Sunrise expansions is expected by the end of the year.

Phase 1 60,000 2014 Construction

Phase 2 50,000 2016 Approved

Phase 3 50,000 TBD Approved

Phase 4 50,000 TBD Approved

Ivanhoe Energy Inc.

Tamarack Updated: Aug 2011

Ivanhoe has been issued a new Canadian patent for its HTL (heavy-to-light) oil technology, broad-ening and expanding its IP in Canada.

Phase 1 20,000 2014 Application

Phase 2 20,000 TBD Application

Marathon Oil Corporation

• Birchwood Updated: Sep 2011

Marathon plans to file an application for Birchwood in 2012. The company says it has potential for 40,000 bpd capacity.

Pilot 12,000 2016 Announced

Oak Point Energy Ltd.

Lewis Updated: Jul 2011

Pilot 1,720 2013 Application

Royal Dutch Shell plc

Grosmont Updated: May 2011

The project, which would incorporate electrical heaters, has been delayed. Laricina Energy’s May purchase of additional leases in the Grosmont carbonate zone included “non-core” portions of Shell Canada’s Grosmont acreage.

Pilot TBD TBD On Hold

Southern Pacific Resource Corp.

STP McKay Updated: Aug 2011

Southern Pacific says construction is advancing on budget, with a number of milestones achieved including completion of central plant site and well pad civil work, procurement of all major equip-ment. Drilling of the first well pad is complete and the second is about 50 per cent complete.

Phase 1 12,000 2012 Construction

Phase 2A 12,000 2015 Announced

Phase 2B 12,000 TBD Announced

Suncor Energy Inc.

Firebag Updated: Aug 2011

First oil from Firebag Stage 3 achieved as planned in July. Production volumes expected to ramp up to capacity of 62,500 barrels per day over the next 24 months. In July it also started production from infill wells. Construction of infastructure, well pads, and central plant and cogeneration facili-ties continues on Firebag Stage 4.

Cogeneration and Expansion 25,000 2007 Operating

Stage 1 35,000 2004 Operating

Stage 2 35,000 2006 Operating

Stage 3 62,500 2011 Operating

Stage 3-6 Debottleneck 23,000 TBD Application

Stage 4 62,500 2013 Construction

Stage 5 62,500 2018 Approved

Stage 6 62,500 2019 Approved

Lewis Updated: Dec 2010

Phase 1 40,000 TBD Application

Phase 2 40,000 TBD Application

MacKay River Updated: Mar 2011

Suncor says that higher bitumen supply from its in situ and mining projects and greater upgrader reliability resulted in record production rates in the fourth quarter of 2010. The company has confirmed that the MacKay River expansion is a key part of its near-term plans, and will spend $70 million on the project in 2011.

MR2 40,000 2016 Application

Phase 1 33,000 2002 Operating

38 OILSANDS REVIEW | NOVEMBER 2011

P R O J E C T S TAT U S

NOVEMBER 2011 | OILSANDSREVIEW.COM 39

P R O J E C T S TAT U S

Page 3: OSR Project List November 2011

538708SNC-Lavalin Inc

1/4h · tqc1/2

538708SNC-Lavalin Inc

1/4h · tqc2/2

CURRENT PROJECT CAPACITY START-UP REGULATORY STATUS

Phase 2 72,000 TBD Approved

Phase 3 72,000 TBD Application

Phase 4 72,000 TBD Announced

Paramount Resources Ltd.

Hoole Updated: Aug 2011

Paramount has received an updated resource evaluation, pegging economic contingent bitumen resources increased to 763 million barrels. During the remainder of 2011 it plans to complete engineering design and environmental analysis. Conceptual and pre-FEED engineering being conducted by IMV Projects, reportedly including new technologies that have never been tried anywhere else in the world.

Commercial 35,000 TBD Announced

Petrobank Energy And Resources Ltd.

• Conklin (Whitesands) Updated: Sep 2011

Air injection has been suspended. All of Petrobank’s near-term testing operations scheduled for Conklin are complete and the facility will be suspended until plans are finalized to either integrate the site into May River or abandon.

Expansion 1,900 TBD On Hold

Pilot 1,900 2006 Suspended

• May River Updated: Sep 2011

Regulatory hearing is scheduled for March 6, 2012. The suspension of Conklin does not impact the May River development plans.

Phase 1 10,000 2013 Application

Subsequent Phases 90,000 TBD Disclosed

Statoil

Kai Kos Dehseh Updated: Aug 2011

Corner 40,000 2015 Application

Corner Expansion 40,000 TBD Application

Hangingstone 20,000 TBD Application

Leismer 20,000 TBD Application

Leismer Demonstration 10,000 2010 Operating

Leismer Expansion 20,000 TBD Application

Leismer Northwest 20,000 TBD Application

Leismer South 20,000 TBD Application

Thornbury 40,000 TBD Application

Thornbury Expansion 20,000 TBD Application

Suncor Energy Inc.

Chard Updated: Dec 2010

Phase 1 40,000 TBD Announced

Meadow Creek Updated: Dec 2010

Phase 1 40,000 TBD Approved

Phase 2 40,000 TBD Approved

Value Creation Inc.

TriStar Updated: Jan 2011

Value Creation is providing the ERCB with additional information supporting its application.

Pilot 1,000 2012 Application

CURRENT PROJECT CAPACITY START-UP REGULATORY STATUS

Hangingstone Pilot Updated: Aug 2011

JACOS owner JAPEX says regulatory approval for expansion is anticipated this fall, and an invest-ment decision will follow.

Pilot 11,000 1999 Operating

Laricina Energy Ltd.

Germain Updated: Aug 2011

Laricina says the Germain project remains on track for first steam at the end of 2012. All major equipment has been procured, and four fabricators are now under contract. The next stage of construction will be drilling of piles for the modules. Construction of contracted slant drilling rig complete and in position to begin drilling.

Phase 1 Commercial Demonstration 5,000 2014 Construction

Phase 2 30,000 2014 Announced

Saleski Updated: Aug 2011

Laricina says initial results from the Saleski pilot say SAGD continues to work well in the Grosmont carbonate. Production is expected to steadily increase through 2011. Supplementary information requests regarding the 10,700 capacity commercial Phase 1 have been completed and provided to the regulator. Design basis memorandum for Phase 1 is now complete.

Phase 1 10,700 2013 Application

Pilot 1,800 2011 Operating

MEG Energy Corporation

Christina Lake Updated: Aug 2011

MEG reports that detailed engineering for Phase 2B is 71 per cent complete, and capital commitments for major equipment and materials were 75 per cent complete. Overall construction 15 per cent complete.

Phase 1 Pilot 3,000 2008 Operating

Phase 2A 22,000 2009 Operating

Phase 2B 35,000 2013 Construction

Phase 3A 50,000 2016 Application

Phase 3B 50,000 2018 Application

Phase 3C 50,000 2020 Application

Surmont Updated: Dec 2010

Phase 1 50,000 2018 Announced

Phase 2 50,000 TBD Announced

N-SOLV Corporation

Pilot Updated: Aug 2011

N-Solv and partner Suncor Energy have been granted funding from the Government of Canada under Sustainable Development Technology Canada to develop the N-Solv pilot.

Demonstration Plant 500 2012 Announced

Nexen Inc.

Long Lake Updated: Aug 2011

Nexen says it has achieved a 9 per cent production increase between Q1 and Q2, and during June successfully ran the upgrader at 65 per cent of capacity with an on-stream factor of 95 per cent. The company continues to drill and develop new well pairs, and is accelerating the development of a portion nof the Kinosis lease to access resource to fill the upgrader. Partner Opti Canada has declared bankruptcy and will be acquired by CNOOC for $2.1 billion.

Long Lake South (Kinosis) Phase 1 40,000 TBD Approved

Long Lake South (Kinosis) Phase 2 40,000 TBD Approved

Phase 1 72,000 2008 Operating

CURRENT PROJECT CAPACITY START-UP REGULATORY STATUS

Cenovus Energy Inc.

• Christina Lake Updated: Sep 2011

During the remainder of 2011 Cenovus expects to continue construction on Phases D and E, and commence earthworks on Phase F.

Phase 1A 10,000 2002 Operating

Phase 1B 8,800 2008 Operating

Phase C 40,000 2011 Operating

Phase D 40,000 2013 Construction

Phase E 40,000 2014 Approved

Phase F 40,000 2016 Approved

Phase G 40,000 2017 Approved

Phase H 40,000 2019 Announced

• Foster Creek Updated: Sep 2011

Cenovus has increased the expected production capacity of Phases F, G and H by 5,000 bpd to 40,000 bpd each. Phase F is now in early stages of construction.

Phase A 24,000 2001 Operating

Phase B Debottleneck 6,000 2003 Operating

Phase C Stage 1 10,000 2005 Operating

Phase C Stage 2 20,000 2007 Operating

Phase D 30,000 2009 Operating

Phase E 30,000 2009 Operating

Phase F 35,000 2014 Construction

Phase G 35,000 2015 Approved

Phase H 35,000 2016 Approved

Phase I 45,000 2017 Announced

Grand Rapids Updated: Aug 2011

Single well pair SAGD pilot underway. Steaming began in December and Cenovus says it continues to monitor the pilot to gain a better understanding of the reservoir. It plans to file a commercial application by the end of the year.

Phase A 60,000 2017 Application

Phase B 60,000 TBD Announced

Phase C 60,000 TBD Announced

Pilot 600 2011 Operating

Narrows Lake Updated: May 2011

A total of 41 gross strat wells were drilled during Q1/2011 to further assess the resource at Narrows Lake in preparation for commercial production.

Phase 1 43,333 2016 Application

Phase 2 43,333 TBD Application

Phase 3 43,334 TBD Application

Connacher Oil And Gas Limited

• Great Divide Updated: Sep 2011

Connacher says its SAGD+ (solvent) pilot project has been proceeding favourably with recorded evidence of attendant SOR reductions and a positive response in well productivity, while recovery a high percentage of the solvent. The company is evaluating expanding the pilot to four of the seven wells on one of its Algar pads. A joint venture transaction for the Great Divide expansion is expected later this year.

Algar Pod 2 10,000 2010 Operating

Expansion 24,000 2014 Application

CURRENT PROJECT CAPACITY START-UP REGULATORY STATUS

Pod 1 10,000 2007 Operating

ConocoPhillips Canada Limited

Surmont Updated: Aug 2011

ConocoPhillips says it has received regulatory approval to increase production capacity of Phase 2 to 109,000 bpd, up from the previously approved 83,000 bpd.

Phase 1 27,000 2007 Operating

Phase 2 109,000 2015 Construction

Pilot 1,200 1997 Operating

Devon Canada Corporation

• Jackfish Updated: Sep 2011

Devon reports that it has achieved first oil production from Jackfish 2 and predicts the ramp-up to capacity of 35,000 bpd will occur over the next 18 months. Effective Jan. 1, 2012, Devon’s Jackfish and Pike leases will be part of Lac La Biche County instead of the Regional Municipality of Wood Buffalo.

Phase 1 35,000 2007 Operating

Phase 2 35,000 2011 Operating

Phase 3 35,000 2015 Application

Pike Updated: May 2011

Devon reports successful completion of 135 appraisal wells on its Pike lease, with results consistent with company expectations. Regulatory application anticipated for the first phase of the project in the first half of 2012.

1A 35,000 2016 Announced

1B 35,000 2017 Announced

1C 35,000 2017 Announced

Grizzly Oil Sands Ulc

• Algar Lake Updated: Sep 2011

Grizzly has awarded a $4-million+ contract to Rockwell Automation for a process automation system for the Axe Lake project. It has also selected GE’s produced water evaporation technology, which will recycle up to 97 per cent of produced water.

Phase 1 5,000 2013 Application

Phase 2 5,000 2014 Application

Harvest Operations Corp.

BlackGold Updated: Aug 2011

Harvest says the BlackGold project has experienced cost and schedule pressure and it is evaluating possibilities to minimize impact. Construction, drilling and detailed engineering remain underway.

Phase 1 10,000 2013 Construction

Phase 2 20,000 2015 Application

Husky Energy Inc.

McMullen Updated: Aug 2011

Drilling of the pilot observation wells commenced. Facility construction will proceed in Q2, with air injection scheduled for Q3.

Air Injection Pilot-Experimental 755 2012 Construction

Japan Canada Oil Sands Limited

Hangingstone Updated: Dec 2010

JACOS anticipates regulatory approval for Phase 1 expansion in the third quarter of 2011.

Expansion 35,000 2014 Application

40 OILSANDS REVIEW | NOVEMBER 2011

P R O J E C T S TAT U S

NOVEMBER 2011 | OILSANDSREVIEW.COM 41

P R O J E C T S TAT U S

Page 4: OSR Project List November 2011

834563Express Integrated

Technologies Canada1/2v · hpv

far forward, outside righ

790257Thunder Bay Port

Authority1/4v · qpv

Far Forward

477713Hollimex Products

1/4v · qpv

SUPERIOR CORE RECOVERY with COREMIX ® (Oilsands Coring Fluid)

COREMIX® is designed as a one-sack system for oilsands drilling and coring.

Coremix® is field proven & cost e�ective.

COREMIX® PERFORMANCE DELIVERS:

Developed by: Dicorp for the activeoilsands drilling customer

Marketed by: The Drilling Depot, Canamara United Supply

and Hollimex Products

Edmonton: 780.468.1654 • www.di-corp.com • Calgary: 403.265.4401

• Tubular cleaning (inhibits tar accretion to pipe and equipment)

• Excellent core recovery (core stays intact)

• Exceptional core penetration (less sticking permits longer core runs)

• Better hole cleaning (slick pipe provides less obstructions)

• Microtox threshold of 35kg/m3

Hollimex Products is celebrating 50 years of providing quality products and services to the Canadian oil industry.

Best choice for project cargoDirect route to the oilsands via upgraded rail corridorMinimize shipment handling, time, and costStaging area and storage available

Thunder Bay Port AuthorityThunder Bay, Ontariot: 807.345.6400 | f: [email protected] | www.portofthunderbay.ca

Canada’s Gateway to the West

The Port of Thunder Bay

➙➙➙➙

Once-Through Steam GeneratorsCustom Innovative DesignsSAGD and CSS Applications50 mm BTU/hr and LargerU.S. Manufacturing FacilitiesCanadian Pre-Assembly and Installation

www.ExpressGroupHoldings.com

• Heat Recovery Steam Generators• Waste Heat Recovery Units• Process Fired Heaters• Simple Cycle Catalyst Systems• Aftermarket Services

EIT also Engineers and Fabricates

Please contact us to learn more about our in-house engineering and fabrication capabilities.

Express Integrated Technologies (EIT) engineers and fabricates custom-designed equipment for the process and power industries, including mid-stream processes, cogeneration equipment, and Once-Through Steam Generators for in-situ oil production.

We are pleased to announce the opening of our Calgary office, EIT Canada Ltd., created specifically to serve the needs of the Canadian oil sands market.

CURRENT PROJECT CAPACITY START-UP REGULATORY STATUS

PEACE RIVER REGION — IN SITU

Andora Energy Corporation

Sawn Lake Updated: Aug 2011

Andora Energy owner PanOrient Energy Corp. says Andora’s strategic review process to enhance shareholder value that could result in a sale or merger was expected to be closed in June, but this did not occur. The process is ongoing with a number of parties that have expressed interest.

SAGD Demonstration 1,400 TBD Approved

Northern Alberta Oil Ltd.

Sawn Lake Updated: Feb 2011

CSS Pilot 700 TBD Approved

Petrobank Energy And Resources Ltd.

Dawson Updated: Aug 2011

Surface facilities from the first two wells at the Kerrobert project are being decommissioned and will be moved to Dawson during Q3. Civil work underway, drilling expected to commence mid-September. Pre-ignition heating cycle to commence in the fourth quarter, with air injection targeted before year-end.

Phase 2 10,000 TBD Announced

THAI Demonstration-Experimental TBD 2011 Approved

Royal Dutch Shell plc

Peace River

Cadotte Lake 12,500 1986 Operating

Carmon Creek - Phase 1 40,000 2014 Announced

Carmon Creek - Phase 2 40,000 TBD Announced

Southern Pacific Resource Corp.

Red Earth Updated: Aug 2011

In June Southern Pacific commenced steaming wellbores at Red Earth. The project will be tested throughout the remaining summer and fall, after which the test information will be interpreted and go-forward plans will be prepared.

Commercial 10,000 TBD Announced

Pilot 1,000 2009 Operating

Pilot Expansion 3,000 TBD Announced

SASKATCHEWAN REGION — IN SITU

Oilsands Quest Inc.

Axe Lake Updated: Aug 2011

Oilsands Quest has been granted the change from its Saskatchewan oilsands permits to leases, making them the first oilsands leases granted in Saskatchewan.

Commercial 30,000 TBD On Hold

Reservoir Test 600 2008 On Hold

SAGD Pilot TBD TBD On Hold

NORTH ATHABASCA REGION — UPGRADER

Canadian Natural Resources Limited

• Horizon Updated: Sep 2011

Canadian Natural is reporting that synthetic crude oil shipments from Horizon resumed at the end of August post-fire repairs. Saipem has been awarded the EPC contract for a secondary upgrader with production capacity of 42,599 bpd of hydrotreated gas oil as part of the Hydrotreater Phase 2.

Phase 1 114,000 2009 Operating

Phase 2A 10,000 2014 Approved

Phase 2B 45,000 TBD Approved

Phase 3 80,000 TBD Approved

Tranche 1 (engineering/design) -- 2007 Complete

Tranche 2 5,000 2012 Construction

Ivanhoe Energy Inc.

Tamarack Updated: Aug 2011

Ivanhoe has been issued a new Canadian patent for its HTL (heavy-to-light) oil technology, broadening and expanding its IP in Canada.

Phase 1 34,784 TBD Application

CURRENT PROJECT CAPACITY START-UP REGULATORY STATUS

COLD LAKE REGION — IN SITU

Canadian Natural Resources Limited

• Primrose/Wolf Lake Updated: Sep 2011

Canadian Natural says that a new McMurray SAGD pad started steaming at Wolf Lake during Q2, and a Grand Rapids SAGD pad was drilled and started steaming in Q3. At Primrose it plans to pursue infill drilling, steam flooding and adding solvents.

Primrose East 32,000 2008 Operating

Primrose North 30,000 2006 Operating

Primrose South 45,000 1985 Operating

Wolf Lake 13,000 1985 Operating

Husky Energy Inc.

Caribou Updated: Nov 2010

Demonstration 10,000 TBD Approved

Tucker Updated: Aug 2011

Husky reports continued progress enhancing its understanding of how to develop the Tucker res-ervoir. It continues to remediate older wells with new stimulation techniques and develop new well pairs, and is seeing an increase in production rates.

Phase 1 30,000 2006 Operating

Imperial Oil Limited

Cold Lake Updated: Aug 2011

Cold Lake achieved production record of 158,000 bpd in Q2/2011, attributed to contributions of new wells steamed in 2011, but offset by cyclic nature of project. Site clearing and road construction underway for Nabiye expansion.

Phase 1-10 110,000 1985 Operating

Phase 11-13 30,000 2002 Operating

Phase 14-16 30,000 2015 Approved

Koch Exploration Canada Corporation

Gemini Updated: Mar 2011

Commercial 10,000 TBD Application

Pilot 1,200 TBD Application

OSUM Oil Sands Corp.

• Taiga Updated: Sep 2011

Regulatory approval expected to be received mid-2011. Detailed engineering underway. OSUM says it will be ready to execute in late 2011 or early 2012 subsequent to regulatory approval. OSUM has selected Veolia Water Solutions and Technologies for its produced water treatment.

Phase 1 17,500 2014 Application

Phase 2 17,500 2016 Application

Pengrowth Energy Corporation

Lindbergh Updated: Aug 2011

The Lindbergh pilot has received all regulatory approvals to begin construction. First steam is targeted for the first half of 2012. Drilling of SAGD well pairs and facility construction will begin in Q3 2011.

Commercial 12,000 2014 Announced

Pilot 1,200 2012 Approved

Royal Dutch Shell plc

Orion Updated: Dec 2010

Phase 1 10,000 2007 Operating

Phase 2 10,000 TBD Approved

42 OILSANDS REVIEW | NOVEMBER 2011

P R O J E C T S TAT U S

NOVEMBER 2011 | OILSANDSREVIEW.COM 43

P R O J E C T S TAT U S

Page 5: OSR Project List November 2011

487551JuneWarren-Nickle’s Energy Group

1/2h · hpPlace in last half of magazine. Ad split w/IMV.

#50501/2

487551JuneWarren-Nickle’s Energy Group

1/2h · hpPlace in last half of magazine. Ad split w/IMV.

#50502/2

Canada’s Go-to Project Execution Provider for the Energy Industry www.imvprojects.com

We can make it a breeze.

Working your way through the regulatory process for in situ

heavy oil projects can be daunting. Our EERA Group can

help position your project for success, the first time.

Kristine Morgan - Manager Environmental

Engineering & Regulatory Affairs

Dean Milner

Canada’s Go-to Project Execution Provider for the Energy Industry www.imvprojects.com

Retaining Value.

IMV Projects attracts employees who are aligned with our

Core Values. We believe that’s why we offer our Clients one

of the best staff retention records in the market.

Dean Milner - VP Business Development

Canada’s Go-to Project Execution Provider for the Energy Industry www.imvprojects.com

Upwardly mobile.

There are more exciting alternatives to the corporate ladder.

IMV Projects has helped me develop my career in the energy

industry while providing the flexibility to pursue my favorite

recreational activities.

Paul Sudlow - Project Manager

Canada’s Go-to Project Execution Provider for the Energy Industry www.imvprojects.com

Canada’s Go-to Project Execution Provider for the Energy Industry www.imvprojects.com

Social skills.

Turning colleagues into friends has always

been a key part of our corporate culture.

Our Social Club volunteers pave the way.

IMV Projects Social Club

Brent

Dan

Lara Kirk

Aleks

Jen

Alana

Karin

Mubashir

Nina

Saami

Jane

Great teams keep score.

Asking our Clients what they think is the best way to

improve our project performance. Feedback surveys

ensure that our project teams are aligned with your

business objectives.

Tom Fransham - Vice President Quality Assurance

Canada’s Go-to Project Execution Provider for the Energy Industry www.imvprojects.com

Upwardly mobile.

There are more exciting alternatives to the corporate ladder.

IMV Projects has helped me develop my career in the energy

industry while providing the flexibility to pursue my favorite

recreational activities.

Paul Sudlow - Project Manager

Canada’s Go-to Project Execution Provider for the Energy Industry www.imvprojects.com

Thank you to the readers of Oilsands Review for your overwhelming response to our ad campaign over the past year!

Look for future ads in this, and other, JuneWarren-Nickle’s publications

CURRENT PROJECT CAPACITY START-UP REGULATORY STATUS

Shell Albian Sands

Scotford Upgrader 1 Updated: May 2011

First commercial production from Scotford upgrader expansion announced in May 2011. Engineers will now focus on improving operating efficiencies and adding capacity through debottlenecking.

Commercial 158,000 2003 Operating

Expansion 91,000 2011 Operating

Scotford Upgrader 2 Updated: Nov 2010

Shell withdrew its application for all phases of Scotford Upgrader 2 in fall 2010.

Phase 1 97,750 TBD Cancelled

Phase 2 97,750 TBD Cancelled

Phase 3 97,750 TBD Cancelled

Phase 4 97,750 TBD Cancelled

Statoil

Strathcona Updated: Mar 2010

Application withdrawn in Dec. 2008.

Phase 1 65,000 TBD Cancelled

Phase 2 152,000 TBD Cancelled

Total E&P Canada Ltd.

Northern Lights Updated: Nov 2010

Previous project owner Synenco Energy withdrew the Northern Lights upgrader application in Jun. 2008. Total purchased Synenco in Aug. 2008.

Phase 1 50,600 TBD Cancelled

Phase 2 50,600 TBD Cancelled

Strathcona Updated: Dec 2010

Total says it will not proceed with the its Strathcona upgrader.

Debottlenecking 46,000 TBD Cancelled

Phase 1 138,000 TBD Cancelled

Phase 2 87,000 TBD Cancelled

CURRENT PROJECT CAPACITY START-UP REGULATORY STATUS

Suncor Energy Inc.

Base Operations Updated: Aug 2011

Suncor says that with major maintenance now behind it at its oilsands facilities, it is looking forward to a strong second half of the year.

Millennium Coker Unit 97,000 2008 Operating

Millennium Vacuum Unit 35,000 2005 Operating

U1 and U2 225,000 1967 Operating

Fort Hills Updated: May 2011

Suncor expects to progress with engineering and site preparation work at the Fort Hills mine, target-ing a 2016 start-up. Project still must be sanctioned, and does not include upgrader portion.

Phase 1 145,000 TBD Approved

Phase 2 & 3 145,000 TBD Approved

Voyageur Upgrader 3 Updated: Sep 2011

Suncor expects to progress with partner Total E&P Canada on-site preparation and engineering for the re-start of Voyageur construction. Project still needs to be officially sanctioned.

Phase 1 127,000 2016 Approved

Phase 2 63,000 TBD Approved

Syncrude Canada Ltd.

Mildred Lake/Aurora North & South Updated: Aug 2011

Production volumes were impacted during the second quarter due to unplanned maintenance at the vacuum distallation unit and the LC finer.

Base Plant Stage 1 & 2 Debottleneck 250,000 1978 Operating

Stage 3 Debottleneck 75,000 TBD Announced

Stage 3 Expansion (UE-1) 100,000 2006 Operating

Value Creation Inc.

Terre de Grace Updated: Dec 2010

Phase 1 33,600 TBD Application

Phase 2 33,600 TBD Application

Pilot 8,400 TBD Approved

CURRENT PROJECT CAPACITY START-UP REGULATORY STATUS

SOUTH ATHABASCA REGION — UPGRADER

Nexen Inc.

Long Lake Updated: Aug 2011

Nexen says it has achieved a 9 per cent production increase between Q1 and Q2, and during June successfully ran the upgrader at 65 per cent of capacity with an on-stream factor of 95 per cent. The company continues to drill and develop new well pairs, and is accelerating the development of a portion nof the Kinosis lease to access resource to fill the upgrader. Partner Opti Canada has declared bankruptcy and will be acquired by CNOOC for $2.1 billion.

Phase 1 58,500 2008 Operating

Phase 2 58,500 TBD Approved

Phase 3 58,500 TBD Announced

Phase 4 58,500 TBD Announced

Value Creation Inc.

TriStar Updated: Jan 2011

Value Creation is providing the ERCB with additional information supporting its application.

Pilot 840 TBD Application

INDUSTRIAL HEARTLAND REGION — UPGRADER

North West Upgrading Inc.

• Upgrader Updated: Sep 2011

Final sanction anticipated late this year or early 2012. Alberta’s Industrial Heartland Association expects to this fall see activity ramping up including moving project management trailers onto the site, improvements to the approaches to the site, and some site grading.

Phase 1 77,000 2013 Approved

Phase 2 77,000 2018 Approved

Phase 3 77,000 TBD Approved

N E W E x p o r t p i p E l i N E s

Enbridge

• Northern Gateway Updated: Sep 2011

NEB hearings to begin in January 2012. Enbridge has secured commercial agreements for the project, fully subscribing to long-term capacity. It still faces opposition from First Nations and environmental groups. Enbridge has appointed Janet Holder as executive vice-president, Western Access, assuming overall responsibility for Northern Gateway.

Alberta to Kitimat, B.C.525,000 plus 70,000 diluent line

2016 Application

Kinder Morgan Canada

Trans Mountain Expansion (TMx) Updated: Mar 2011

Open season for expansion project planned for Fall 2011.

Edmonton to Burnaby, B.C., Washington State and offshore

Expansion up to 700,000 n/q Announced

TransCanada Pipelines

Keystone Expansion Updated: Aug 2011

The U.S. Department of State has completed its final environmental impact statement on the project, indicating it will have no significant impact on the environment. Decision to follow in November 2011.

Cushing, Okla., to U.S. Gulf Coast 500,000 2012 Announced

CURRENT PROJECT CAPACITY START-UP REGULATORY STATUS

Value Creation Inc.

Heartland Updated: Nov 2010

Construction suspended in Sep. 2008.

Phase 1 46,300 TBD On Hold

Phase 2 46,300 TBD Approved

Phase 3 46,300 TBD Approved

44 OILSANDS REVIEW | NOVEMBER 2011

P R O J E C T S TAT U S

NOVEMBER 2011 | OILSANDSREVIEW.COM 45

P R O J E C T S TAT U S

kbessie
Sticky Note
It's gone to AdDesk. Client (IMV Projects) has signed off, so we don't need to show them at proof. Would appreciate Proofing giving it a once-over.

Recommended